Annex 5: Categorization of Audit Findings by Risk Severity<br />

In addition to explaining and giving details about the “Effect, potential impact or risk” in the text of<br />

an audit observation, UNDP requires that the auditor also identifies the risk level in the audit report<br />

by using one of the following 3 pre-established risk levels:<br />

High<br />

Medium<br />

Low<br />

Action that is considered imperative to ensure that UNDP is not exposed to high<br />

risks (i.e. failure to take action could result in major consequences and issues).<br />

Action that is considered necessary to avoid exposure to significant risks (i.e. failure<br />

to take action could result in significant consequences).<br />

Action that is considered desirable and should result in enhanced control or better<br />

value for money.