09.11.2012 Views

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong><br />

<strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

DARMSTADT • MUNICH<br />

D-64295 DARMSTADT<br />

GROSS-GERAUER-WEG 1<br />

PHONE: +49 (0) 61 51 / 13 03 6-0<br />

FAX: +49 (0) 61 51 / 13 03 6-10<br />

E-MAIL: Q@<strong>QUICK</strong>-IG.DE<br />

INTERNET: WWW.<strong>QUICK</strong>-IG.COM<br />

COMMERCIAL REGISTER<br />

DARMSTADT HRB 8076<br />

UST-IDNR.: DE213671986<br />

FEASIBILITY STUDIES<br />

EXPERTISE · SOIL REPORT<br />

FO<strong>UND</strong>ATION DESIGN<br />

ANALYTICAL - NUMERICAL CALCULATION<br />

APPROVAL ENGINEER<strong>ING</strong><br />

COURT EXPERTISE<br />

SUPERVISION<br />

CONTRACT AND CLAIM MANAGEMENT<br />

RISK MANAGEMENT<br />

GEOTECHNICS<br />

SOIL AND ROCK MECHANICS<br />

ENGINEER<strong>ING</strong> GEOLOGY<br />

HYDROGEOLOGY<br />

ENVIRONMENTAL GEOLOGY<br />

GEOTHERMICS<br />

HIGH-RISE BUILD<strong>ING</strong>S<br />

HIGH SPEED RAILWAY LINES<br />

TUNNELS<br />

BRIDGES<br />

PITS<br />

CUTS · DAMS<br />

SPORT ARENAS<br />

LANDFILLS<br />

DECONTAMINATION OF SITES<br />

REHABILITATION OF BUILD<strong>ING</strong>S<br />

CHIEF EXECUTIVE OFFICER:<br />

<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. HUBERT <strong>QUICK</strong><br />

PUBLICLY APPOINTED<br />

AND SWORN EXPERT<br />

MANAG<strong>ING</strong> DIRECTOR:<br />

DR. RER. NAT. JOACHIM MICHAEL<br />

GEOTECHNICAL QUALITY MANAGEMENT<br />

CONSULTANT / CHECK<strong>ING</strong> ENGINEER:<br />

<strong>DIPL</strong>.-<strong>ING</strong>. WOLFHARD ROMBERG<br />

SCIENTIFIC CONSULTANTS:<br />

UNIV. <strong>PROF</strong>. DR.-<strong>ING</strong>. ULVI ARSLAN<br />

<strong>PROF</strong>. DR. HELMUT PRINZ


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� DELEGATION JOURNEYS<br />

Journey of the German Chancellor Dr. Gerhard Schröder<br />

Kingd. of Saudi Arabia, Kuwait, Qatar, Yemen, Oman, United Arab Emirates (U.A.E.)<br />

27 th February until 5 th Chancellor (Germany)<br />

Prof. Hubert Quick<br />

Dr. Gerhard Schröder<br />

March 2005<br />

Prof. Hubert Quick<br />

Journey of the Federal Minister for economics and technology Dr. Karl-Theodor<br />

Freiherr zu Guttenberg, United Arab Emirates (U.A.E.), Kingdom of Saudi Arabia<br />

9 th until 11 th May 2009<br />

Prime Minister (Qatar)<br />

H.H. Sheikh Abdulla<br />

Prof. Hubert Quick Bin Khalifa Al Thani<br />

Journey of the Bavarian Minister Dr. Otto Wiesheu<br />

Qatar, 20 th until 23 rd November 2004<br />

Federal Minister of Eco-<br />

nomics and Technology<br />

(Germany) Michael Glos<br />

Federal Minister of<br />

Economics and Technology<br />

Dr. Karl-Theodor Freiherr zu Guttenberg Prof. Hubert Quick<br />

Bavarian Minister<br />

Dr. Otto Wiesheu<br />

Minister of Economy<br />

and Planning (U.A.E.)<br />

H.H. Sheikha Lubna<br />

Journey of the Federal Minister for economics and technology Michael Glos<br />

United Arab Emirates (U.A.E.), 5 th until 7 th May 2006<br />

Minister President<br />

Roland Koch<br />

Journey of the Hessian Minister president Roland Koch<br />

United Arab Emirates (U.A.E.), 11 th until 14 th November 2005<br />

Kingdom of Saudi Arabia, 30 th April until 4 th May 2009<br />

Prof. Hubert Quick<br />

Prof. H. Quick<br />

Vice-Chancellor and Federal<br />

Minister for economics and<br />

technology (Germany)<br />

Dr. Philipp Rösler<br />

Journey of the Federal Minister for economics and technology Dr. Philipp Rösler<br />

Qatar, Egypt, 7 th until 9 th December 2011


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� PRESENTATION / QUALIFICATION<br />

The office Prof. Dipl.-Ing. H. Quick Ingenieure und Geologen GmbH provides expertise and consultancy<br />

as follows:<br />

• Geotechnical and tunnelling feasibility studies<br />

• Concept, tender and allocation of ground investigations<br />

• Supervision of ground investigations<br />

• Ground and foundation reports, tunnelling reports<br />

• Geological and hydrogeological reports<br />

• Geotechnical, geological, geophysical, hydrogeological and tunnelling consultancy<br />

• Design and numerical simulations of foundations, building pits and tunnels<br />

• Numerical deformation simulations<br />

• Supervision and documentation of geotechnical works<br />

• Concept of monitoring programmes incl. evaluation<br />

• Comprehensive evaluation of displacements<br />

• Geoenvironmental reports<br />

• Structural fabric reports<br />

• Groundwater management<br />

• Concept of the dewatering<br />

• Consultancy, calculations and design for the use of geothermal energy<br />

• Geotechnical and tunnelling risk and contract / claim management<br />

• Geotechnical and tunnelling approval of the execution planning and for authorities<br />

• Expertise for court and court of arbitration<br />

• Research<br />

Prof. Dipl.-Ing. Hubert Quick is an Honorary Professor at Technical University of Darmstadt and<br />

teaches the class: foundation of high-rise buildings.<br />

Dr. rer. nat. Michael carried out his doctoral thesis at the Philipps-University Marburg with the main<br />

topics rockmechanics and tunnelling and is the office’s confidential clerk.<br />

Dipl.-Ing. Wolhard Romberg supports our office as a geotechnical consultant and checking engineer<br />

and is responsible for the geotechnical quality management. Mr. Romberg looks back on 40 years of<br />

experience in Germany and abroad.<br />

Further scientific advice is given by Prof. Dr.-Ing. Arslan, Ordinary Professor for Geotechnics at the<br />

Technical University of Darmstadt and by Prof. Dr. Prinz, lecturer for Rockmechanics and Tunnelling<br />

at the University of Zittau / Görlitz (FH).<br />

Prof. Quick conducts approval works for German Authorities and for the Federal Railway Office in<br />

the fields of Earthworks and Ground Engineering, Rock Mechanics and Tunnelling as well as Environmental<br />

Engineering. He is publicly appointed and sworn expert of the Chamber of Commerce for<br />

Earthworks, Foundation Engineering, Soil- and Rock Mechanics.<br />

In the ISSMGE Prof. Quick is active member in the<br />

• Technical Committee 28: “Underground Construction in Soft Ground”<br />

• Technical Committee 19: “Preservation of Historic Sites”<br />

World-wide consultancy activities of Prof. Quick are provided e. g. in China, South Korea, Thailand,<br />

United Arab Emirates, Qatar, Kingdom of Saudi Arabia, Oman, Jordan, Iran, Pakistan, Uzbekistan,<br />

Vietnam, India, Ukraine, Russia, Italy, Austria, Switzerland and Poland.


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TRANSRAPID (MAGLEV)<br />

Munich<br />

central station<br />

airport<br />

Location Munich central station – Munich airport<br />

Route length 37.4 km<br />

Time of construction -<br />

Tasks Geotechnical feasibility study<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Geoenvironmental report<br />

Design and numerical simulations of the foundations<br />

Geotechnical and tunnelling risk management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� DISTRICT OF PARLIAMENT AND GOVERNMENT IN BERLIN<br />

“Reichstag“-building (House of parliament)<br />

Design Foster + Partners, United Kingdom<br />

1926<br />

fine-mediumsand<br />

loose-medium dense<br />

sand, gravelly<br />

medium dense<br />

sand, gravelly/<br />

gravel, sandy<br />

dense<br />

1999<br />

Location Berlin, Germany<br />

Height of building 53 m<br />

Foundation area of the dome Combined Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 15 - 25 m / 0.9 – 1.5 m<br />

Foundation of the edge towers existing foundation on timber piles<br />

Time of construction 1995 - 1999<br />

Tasks Geotechnical feasibility study of the new foundation<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Supervision and documentation of the geotechnical work<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the<br />

building pit<br />

Groundwater management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� DISTRICT OF PARLIAMENT AND GOVERNMENT IN BERLIN<br />

Marie-Elisabeth-Lüders-House<br />

Federal government’s<br />

press and information<br />

office<br />

Children day care centre<br />

Paul-Löbe-House<br />

Jakob-Kaiser-House<br />

Chancellor’s office<br />

Paul-Löbe-House and Marie-Elisabeth-Lüders-House<br />

Design Stephan Braunfels, Germany<br />

Chancellor’s office Federal government’s press and information office<br />

Design Schultes Frank Architekten, Germany Design Nalbach und Nalbach, Germany<br />

Jakob-Kaiser-House Children day care centre<br />

Design Gerkan, Marg & Partner (gmp), Germany Design Gustav Peichl, Austria<br />

Location Berlin, Germany<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the building pit<br />

Supervision and documentation of the geotechnical work<br />

Groundwater management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� LEHRTER STADTQUARTIER<br />

Office and business buildings • Berlin, Germany<br />

MK 9 Office Building<br />

„Cube“<br />

Main<br />

station<br />

MK 8 MK 9 MK 3-7<br />

MK 4 InterCityHotel MK 3 Hotel Meininger<br />

MK 8 Tower<br />

Location Berlin, Germany<br />

Development 9 buildings (MK 1 to MK 9)<br />

Height of building MK 8 150 m<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and<br />

the building pit


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� EUROPAVIERTEL<br />

Residential, office and business buildings • Frankfurt/Main, Germany<br />

Europa-Allee<br />

South 2<br />

South 1<br />

Europa-Allee<br />

North 4 · Hotel Meininger<br />

North 1<br />

Location Frankfurt/Main, Germany<br />

Development 11 project sites incl. the Europa-Boulevard<br />

Tasks Geotechnical consultancy<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the building pit<br />

Concept of the dewatering


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Skyline Plaza<br />

Location Frankfurt/Main, Germany<br />

Height of building 25 m<br />

Foundation Raft Foundation / Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 20-30 m / 1.2 m<br />

Time of construction 2009 -<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

Design oft the building pit<br />

Concept of monitoring programmes incl. Evaluation<br />

Supervision and documentation of geotechnical works<br />

Geoenvironmental reports


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • kap europa - Kongresshaus<br />

Design ECE Projektmanagement GmbH & Co. KG, Germany<br />

kap europa<br />

Location Frankfurt/Main, Germany<br />

Height of building 33 m<br />

Foundation Strip foundation<br />

Fläche 3.300 m²<br />

Time of construction since 2012<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulation of foundation and building pit<br />

Concept of the dewatering<br />

Supervision


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Doha, Qatar • QIPCO Office Tower<br />

Design JSK - SIAT, Germany / Qatar<br />

QIPCO Office Tower<br />

Location Doha, Qatar<br />

Height of building 200 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 40 x 28 m / 1.2 m and 39 x 24 m / 1.2 m<br />

Thickness of the raft 4.0 m<br />

Time of construction 2006 - 2009<br />

Tasks Geotechnical feasibility study<br />

Concept, tender and allocation of the ground investigation<br />

Design and numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> � <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

��INTELLIGENT AND VALUE ENGINEER<strong>ING</strong> ► INNOVATIVE SOLUTIONS<br />

��Combined pile-raft foundation<br />

transfers loads by raft and by piles into the ground<br />

► saves construction costs in comparison to a pile foundation<br />

► reduction of piles - up to 70 %<br />

► reduction of construction time - up to 70 %<br />

Combined pile-raft foundation pile foundation<br />

action<br />

reaction<br />

raft<br />

amount of piles: 79<br />

reduction of 65 %<br />

piles<br />

plan view<br />

with pile location<br />

action<br />

reaction<br />

amount of piles: 225<br />

piles


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Millenniumtower<br />

Design Albert Speer & Partner, Germany<br />

Messeturm<br />

Millenniumtower<br />

Millenniumtower<br />

Location Frankfurt/Main, Germany<br />

Height of building approx. 350 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF) (planned)<br />

Tasks Geotechnical feasibility study<br />

Geotechnical consultancy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Tower 185<br />

Design Christoph Mäckler, Germany<br />

Tower 185<br />

Tower 185<br />

Location Frankfurt/Main, Germany<br />

Height of building 200 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 50 m / 1.50 m<br />

Thickness of the raft 3.5 m<br />

Foundation of low-rise building Raft Foundation<br />

Time of construction 2008 - 2011<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the<br />

building pit<br />

Concept of monitoring programmes<br />

Supervision and documentation of geotechnical works<br />

Groundwater management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Main Tower<br />

Design Schweger + Partner, Germany<br />

Equipment of the energy pile<br />

return flow<br />

bored pile<br />

flow<br />

reinforcement<br />

heat exchanger<br />

fit on the<br />

reinforcement<br />

Location Frankfurt/Main, Germany<br />

Height of building 198 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 15 - 30 m / 1.5 m<br />

Thickness of the raft 3.0 – 3.8 m<br />

Foundation of low-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Time of construction 1997 - 1999<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the<br />

building pit<br />

Concept of the dewatering<br />

Supervision and documentation of the geotechnical work<br />

Concept of the monitoring programme incl. evaluation<br />

Consultancy, calculations and design for the use of geothermal<br />

energy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Commerzbank<br />

Design Foster + Partners, United Kingdom<br />

Location Frankfurt/Main, Germany<br />

Height of building 299 m<br />

Foundation of high-rise building Pile Foundation<br />

Length / Diameter of the bored piles 38 - 46 m / 1.8 m (1.5 m)<br />

Thickness of the raft 2.5 m<br />

Time of construction 1995 - 1997<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and<br />

the building pit<br />

Concept of the dewatering<br />

Supervision and documentation of the geotechnical work<br />

Concept of the monitoring programme incl. evaluation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Campanile<br />

Design JSK Architekten, Germany<br />

Campanile<br />

Campanile<br />

Location Frankfurt/Main, Germany<br />

Height of building 300 m<br />

Foundation of high-rise building Raft Foundation (planned)<br />

Thickness of the raft 4,5 m (planned)<br />

Tasks Geotechnical consultancy<br />

Geotechnical report<br />

Foundation report<br />

Design and numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Ordnungsamt<br />

Design Meixner · Schlüter · Wendt, Germany<br />

Location Frankfurt/Main, Germany<br />

Height of building 6 floors<br />

Building area 9.328m²<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 12 - 20 m / 0.9 m<br />

Thickness of the raft 0.5 m<br />

Geothermal method Field of borehole heat exchangers (BHE)<br />

Number / Length of the BHE 110 BHE / 85 m<br />

Time of construction 2006 - 2009<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and<br />

the building pit<br />

Concept of the dewatering<br />

Supervision and documentation of the geotechnical work<br />

Concept of the monitoring programme incl. evaluation<br />

Consultancy, calculations and design for the use of geothermal<br />

energy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Berlin • Sony Center<br />

Design Murphy / Jahn, USA<br />

Location Berlin, Germany<br />

Height of building 103 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 15 - 25 m / 1.5 m<br />

Thickness of the raft 1.5 – 2.5 m<br />

Time of construction 1996 - 1998<br />

Tasks Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

and the building pit<br />

Concept of the dewatering<br />

Concept of the monitoring programme incl. evaluation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Berlin • Total-Tower<br />

Design Barkow Leibinger, Germany<br />

Total-Tower<br />

Location Berlin, Germany<br />

Height of building 69 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 17 m / 1.10 - 1.20 m<br />

Thickness of the raft 1.2 – 2.0 m<br />

Time of construction 2010 - 2012<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the<br />

building pit


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Munich • Süddeutscher Verlag<br />

Design Gewers, Kühn + Kühn, Germany<br />

use of geothermal energy by energy piles<br />

Location Munich, Germany<br />

Height of building 100 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles approx. 20 - 25 m / 1.5 m<br />

Thickness of the raft approx. 2.5 m<br />

Foundation of low-rise building Raft foundation<br />

Time of construction 2006 - 2008<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Geoenvironmental report<br />

Design and numerical simulations of the foundation and<br />

the building pit<br />

Concept of the dewatering<br />

Concept of the monitoring programme incl. evaluation<br />

Consultancy, calculations and design for the use of geothermal<br />

energy<br />

100 m


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Doha, Qatar • Al Quds Tower<br />

Design Arab Engineering Bureau (AEB), Qatar<br />

Location Doha, Qatar<br />

Height of building 500 m<br />

Foundation of high-rise building Pile Foundation<br />

Length / Diameter of the bored piles 28 m / 1.5 m<br />

Thickness of the raft 3.5 m<br />

Time of construction 2009 -<br />

Tasks Geotechnical feasibility study of the foundation<br />

Geotechnical consultancy<br />

Numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Abu Dhabi, United Arab Emirates • Landmark Tower<br />

Design Cesar Pelli & Associates Architects, USA<br />

Landmark Tower<br />

Location Abu Dhabi, United Arab Emirates<br />

Height of building 324 m<br />

Foundation of high-rise building Piled-Raft Foundation<br />

Length / Diameter of the bored piles 14 m / 1.5 m<br />

Thickness of the raft 4 m<br />

Time of construction 2008 -<br />

Tasks Design and numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Dubai, United Arab Emirates • Jumeirah Gardens, EP 09 Tower<br />

Design Smith + Gill, USA<br />

Dubai<br />

EP 09 Tower<br />

Jumeirah Gardens<br />

EP 09 Tower<br />

EP 09 Tower<br />

Location Dubai, United Arab Emirates<br />

Height of high-rise buildings 130 – 150 m (6 Tower)<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF) (planned)<br />

Thickness of the raft approx. 3.0 m (planned)<br />

Time of construction (planned)<br />

Tasks Geotechnical report building pit<br />

Geotechnical, geological and hydrogeological consultancy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Dubai, United Arab Emirates • Momema, Museum of Middle Eastern Modern Art<br />

Design UNStudio, The Netherlands<br />

Dubai Creek<br />

Location Dubai, United Arab Emirates<br />

Height of building approx. 50 m<br />

Foundation of the building Raft Foundation<br />

Time of construction 2009 -<br />

Tasks Feasibility study of foundation and building pit


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Amman, Jordan • Limitless Towers<br />

Design Werner Sobek, Germany<br />

Limitless Towers<br />

Amman<br />

Location Amman, Jordan<br />

Height of building approx. 210 m<br />

Foundation of high-rise building Raft Foundation (planned)<br />

Thickness of the raft 4.0 m (planned)<br />

Time of construction -<br />

Tasks Geotechnical feasibility study of the foundation<br />

Geotechnical consultancy<br />

Numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Kiev, Ukraine • Pobedy Prospekt Komplex<br />

Design Werner Sobek, Germany<br />

Kiev<br />

Pobedy Prospekt Komplex<br />

Location Kiev, Ukraine<br />

Height of high-rise buildings 230 m (2 Towers)<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF) (planned)<br />

Length / Diameter of the bored piles 35 m – 45 m / 1.3 m - 1.5 m (planned)<br />

Thickness of the raft 2.5 m – 4.0 m (planned)<br />

Time of construction 2008 - 2012<br />

Tasks Geotechnical, geological and hydrogeological consultancy<br />

Design and numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPECIAL PROJECTS<br />

Al Ain, U.A.E. • Jebel Hafeet – Glacier: Ski Dome, Mountain Villas and Golf Course<br />

Design PNYG-VA, United Arab Emirates<br />

Peak Hotel<br />

Location Al Ain, United Arab Emirates<br />

Description Longest ski hall of the world, approx. 5 km ski piste, FIS-ski jump, slalom,<br />

halfpipe etc., 350 new villas and 4 hotels<br />

Time of construction Under planning<br />

Tasks Geotechnical feasibility study<br />

Geotechnical, geological, geophysical and hydrogeological consultancy<br />

Geotechnical risk management<br />

Consultancy, calculations and design for the use of geothermal energy<br />

Supervision of the soil investigation<br />

Geological and hydrogeological report


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPECIAL PROJECTS<br />

Abu Dhabi, United Arab Emirates • Abu Dhabi Ridge – Falcon Lagoon<br />

Creation of a 2000 m artificial mountain ridge<br />

Design 3V-Design / Schrödel Engineering, Germany / Australia<br />

Location Abu Dhabi, United Arab Emirates<br />

Description 2000 meter high artificial mountain ridge<br />

Abu Dhabi<br />

Cities with official buildings, universities and schools, residential buildings,<br />

winter and summer sport arenas, lakes and lagoons, airport, railway lines<br />

Energy supply Solar / wind / geothermal energy<br />

Time of construction Under planning<br />

Tasks Geotechnical feasibility study<br />

Geotechnical, geological and hydrogeological consultancy<br />

Consultancy, calculations and design for the use of geothermal energy<br />

,


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPECIAL PROJECTS<br />

Abu Dhabi, United Arab Emirates • Water Falcon<br />

Design Werner Sobek, Germany<br />

Abu Dhabi<br />

3 possible locations<br />

Location Abu Dhabi, United Arab Emirates<br />

Description Creation of a new City with official buildings, residential buildings, hotels,<br />

luxury and high quality housing, business center, shopping malls, parks,<br />

beaches and water canals<br />

Time of construction Under planning<br />

Tasks Geotechnical, geological and hydrogeological consultancy<br />

,


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPORT ARENAS<br />

Munich • Allianz-Arena<br />

Design Herzog & de Meuron, Switzerland<br />

Location Munich, Germany<br />

Height of the arena 50 m<br />

Dimensioning 258 x 227 m<br />

Capacity 66,000<br />

Time of construction 2002 - 2005<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

Supervision and documentation of the geotechnical work


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPORT ARENAS<br />

Frankfurt/Main • Commerzbank Arena<br />

Design Gerkan, Marg und Partner (gmp), Germany<br />

Location Frankfurt/Main, Germany<br />

Height of the arena 33 m<br />

Dimensioning 290 x 250 m<br />

Capacity 52,000<br />

Time of construction 2003 - 2005<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

Supervision and documentation of the geotechnical work<br />

Geoenvironmental and structural fabric report


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPORT ARENAS<br />

Cologne • RheinEnergieStadion<br />

Design Gerkan, Marg und Partner (gmp), Germany<br />

Location Cologne, Germany<br />

Height of the arena 33 m<br />

Dimensioning 220 x 180 m<br />

Capacity 51,000<br />

Time of construction 2001 - 2004<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

Supervision and documentation of the geotechnical work<br />

Geoenvironmental and structural fabric report


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPORT ARENAS<br />

Tashkent, Uzbekistan • Sport Park „Bunjodkor“<br />

Design Gerkan, Marg und Partner (gmp) & Werner Sobek, Germany<br />

Location Tashkent, Uzbekistan<br />

Height of the stadium 34 m<br />

Dimensioning of the stadium 218 x 181 m<br />

Capacity 35,000<br />

Time of construction 2009 - 2010<br />

Tasks Ground and foundation report<br />

Geotechnical and geological consultancy<br />

Design and numerical simulations of the foundation<br />

Supervision and documentation of the geotechnical work<br />

�<br />

Stadium<br />

Sport school


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� INFRASTRUCTURE<br />

Arabian peninsula<br />

Cairo<br />

Nicosia<br />

Beirut<br />

Jerusalem<br />

Asmara<br />

Amman<br />

Damaskus<br />

Jeddah<br />

1<br />

Riyadh<br />

Jubail<br />

Dammam Manama<br />

4 Port Saqre<br />

Doha Dubai<br />

Hufuf<br />

3<br />

Abu Dhabi Khor Fakkan<br />

Sanaa<br />

Baghdad<br />

Kuwait<br />

Haradh<br />

Teheran<br />

Ruwais<br />

Landbridge Project, Kingdom of Saudi Arabia<br />

Riyadh Jeddah<br />

2<br />

Muscat<br />

Asgabat<br />

1<br />

2<br />

3<br />

4<br />

Landbridge Project<br />

Riyadh - Jeddah, Dammam - Jubail<br />

U.A.E. Rail Project<br />

Ruwais - Abu Dhabi - Dubai -<br />

Port Saqr - Fujairah/Khor Fakkan<br />

Dubai Light Rail Project<br />

Qatar Integrated Railway Network<br />

Location Riyadh – Jeddah, Dammam – Jubail<br />

Length more than 1,000 km<br />

950 km of new line between Riyadh - Jeddah<br />

115 km of new line between Dammam - Jubail<br />

450 km existing Dammam – Riyadh line will be upgraded<br />

Bridges 293<br />

Tunnel 1 (planned)<br />

Tasks Geotechnical, hydrogeological and tunnelling consultancy<br />

Geotechnical and tunnelling risk management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

U.A.E. Rail Project, United Arab Emirates<br />

Sabkha Igneous rocks (north-east-coast)<br />

Location Ruwais – Abu Dhabi – Dubai – Port Saqr – Fujairah/Khor Fakkan<br />

Length 650 km<br />

Bridges planned<br />

Tunnel 1 (planned 4.5 km)<br />

Time of construction (planned)<br />

Tasks Geotechnical and tunnelling feasibility study<br />

Geological and hydrogeological report<br />

Dubai Light Rail Project, United Arab Emirates<br />

Location Dubai<br />

Length 68.6 km<br />

Bridges -<br />

Tunnel 2 (total length 11.5 km)<br />

Time of construction 2005 - 2009<br />

Tasks Geotechnical and tunnelling risk management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

Qatar Integrated Railway Network, Qatar<br />

West Bay<br />

Long-distance rail Metro<br />

Location Qatar<br />

Length Long-distance rail 325 km / Metro 352 km<br />

Tunnel Total length approx. 65 km<br />

Time of construction (planned)<br />

Tasks Geotechnical and tunnelling consultancy<br />

Implementation Plan FIFA-World Cup 2022, Doha<br />

West Bay<br />

Doha West Bay


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> � <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

�� HIGH-SPEED RAILWAY LINES, GERMANY<br />

Cologne<br />

1<br />

Mannheim<br />

3<br />

Basle<br />

Frankfurt<br />

2<br />

8<br />

Karlsruhe<br />

Hannover<br />

Stuttgart<br />

Ulm<br />

4<br />

6<br />

Würzburg<br />

Erfurt<br />

Augsburg<br />

Ebensfeld<br />

Nuremberg<br />

5<br />

7<br />

Ingolstadt<br />

Munich<br />

Leipzig<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Cologne - Rhine / Main<br />

Rhine / Main - Rhine / Neckar<br />

Karlsruhe - Basle<br />

Stuttgart - Ulm - Augsburg<br />

Nuremberg - Ingolstadt - Munich<br />

Ebensfeld - Erfurt<br />

Erfurt - Leipzig/Halle<br />

Hannover - Würzburg


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-SPEED RAILWAY LINES, GERMANY<br />

Services<br />

�<br />

Cologne-<br />

Rhine / Main<br />

�<br />

Rhine / Main-<br />

Rhine / Neckar<br />

�<br />

Karlsruhe-Basle<br />

�<br />

Stuttgart-Ulm-<br />

Augsburg<br />

�<br />

Nuremberg-<br />

Ingolstadt-<br />

Munich<br />

�<br />

Ebensfeld-Erfurt<br />

�<br />

Erfurt-Leipzig/Halle<br />

�<br />

Hannover-<br />

Würzburg<br />

• geotechnical, tunnelling, hydrogeological and environmental expertise on the basis of archives<br />

• preparation of bidding documents for construction works, participation in solicitations and awarding of<br />

contracts<br />

• preparation of investigation announcements for the authorities<br />

• consultancy of the client regarding geophysical investigation methods, Preparation of bidding / tender<br />

documents, participation in solicitations and awarding of contracts<br />

• ground and foundation expertises, feasibility studies, preliminary and approval planning incl. structural<br />

design<br />

• geotechnical, tunnelling, hydrogeological and environmental consultancy of the client<br />

• proof of approval and execution plannings incl. numerical analysis<br />

• controlling of Construction Supervision<br />

• participation in the geotechnical and tunnelling contract / claim management of the client<br />

• geotechnical, tunnelling, hydrogeological and environmental expertise on the basis of archives<br />

• preparation of bidding documents for construction works, participation in solicitations and awarding of<br />

contracts<br />

• preparation of investigation announcements for the authorities<br />

• carrying out of standard procedures and tender documents for geotechnical consultants related to<br />

several lots<br />

• coordination of geotechnical consultants related to several lots<br />

• preparation of the geotechnical expertise for the entire line<br />

• collection of historical data, concept for environmental investigation<br />

• hydrogeological consultancy for the client<br />

• consultancy of the client regarding geophysical investigation methods, Preparation of bidding / tender<br />

documents, participation in solicitations and awarding of contracts<br />

• cooperation with the client for the preparation of bidding documents for construction works, participation<br />

in solicitations and awarding of contracts<br />

• investigation programme and supervision of investigation<br />

• expert monitoring of the ground investigation<br />

• preparation of the geotechnical, tunnelling, hydrogeological and environmental expertise for the entire<br />

line<br />

• preparation of construction related ground and foundation expertise<br />

• geotechnical, tunnelling, hydrogeological and environmental consultancy of the client,<br />

• working out of a geotechnical, tunnelling, hydrogeological, vibrancy related and architectural conservation<br />

of evidence programme<br />

• coordination of all measures for conservation of evidence<br />

• geotechnical numerical considerations regarding the stability of the landslides Bad Bellingen, Schliengener<br />

Weinberg and for the portal zone North of the Katzenbergtunnel<br />

• supervision of ground investigation<br />

• time and cost control management<br />

• contract / claim management<br />

• safety and health coordination according to German Standard<br />

• geotechnical and tunnelling consultancy of the client, i.e.:<br />

• cooperation in working group „Karst“<br />

• geotechnical supervision of geophysical investigations<br />

• numerical considerations regarding the stability of slopes / cuts in kartsic terrain<br />

• geotechnical documentation, recommendations for a economical optimized construction of cuts in soil<br />

• feasibility study for the tunnel E2<br />

• consultancy for the tunnel construction “Tunnel Euerwang“<br />

• stability considerations (Finite-Element-Method), analysis of the scenario „failure deep de-watering<br />

Auer Berg”<br />

• concept for monitoring according EC 7<br />

• cooperation in contract / claim management with the client<br />

• ground and foundation expertise, feasibility study, preliminary and approval planning (incl. compressed-air<br />

driving concept, freezing of the ground, proof of alternative studies from technical and economical<br />

point of view, concept and evaluation of pile-load-testings, preparation of documents regarding<br />

the exposure with water for the authorities, conservation of evidence “Tunnel Offenbau<br />

• numerical considerations regarding the stability of cuts<br />

• preliminary planning<br />

• geotechnical consultant<br />

• claim management<br />

• approval of the executive planning<br />

• concept, tender and allocation of the soil investigation<br />

• supervision of the soil investigation<br />

• preparation geotechnical, tunneling, hydrogeological and rock mechanical expertise<br />

• preparation of bidding documents for construction works, participation in solicitations and awarding of<br />

contracts<br />

• planning, supervision and evaluation of insitu test<br />

• preparation of the preliminary, approval and executive planning<br />

• continuous evaluation of the monitoring (tunnels)<br />

• determination of the measure of the temporary supports during tunnel driving<br />

• geotechnical and tunneling consultancy and supervision during construction


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-SPEED RAILWAY LINES<br />

Cologne - Rhine/Main<br />

Lahntalbrücke<br />

Cologne<br />

Wallbachtalbrücke<br />

Frankfurt<br />

Cologne Frankfurt<br />

Location DB New High-Speed Railway Line Cologne - Rhine/Main, Germany<br />

Length 177 km<br />

Bridges 18<br />

Tunnel 30<br />

Time of construction 1996 - 2002<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and tunnelling report<br />

Geotechnical and tunnelling consultancy<br />

Supervision and documentation of the geotechnical work<br />

Concept of monitoring programmes incl. evaluation<br />

Geotechnical and tunnelling approval of the execution planning<br />

Geotechnical and tunnelling risk and contract management<br />

Comprehensive evaluation of displacements


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-SPEED RAILWAY LINES<br />

Nuremberg – Ingolstadt – Munich<br />

Location DB New High-Speed Railway Line Nuremberg – Ingolstadt - Munich,<br />

Germany<br />

Length 171 km<br />

Bridges 7<br />

Tunnel 9<br />

Time of construction 1999 - 2006<br />

Tasks Concept, tender and allocation of the ground investigation in consideration<br />

of “Karst”<br />

Supervision of the ground investigation<br />

Numerical simulations for the proof of the ultimate and serviceability limit<br />

state<br />

Supervision and documentation of the geotechnical work<br />

Geotechnical and tunnelling consultancy<br />

Geotechnical and tunnelling risk and contract management<br />

Concept of monitoring programmes incl. evaluation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Brenner Basetunnel, Investigation Tunnel Aicha · Italy<br />

Investigation Tunnel<br />

Innsbruck<br />

Brenner Basetunnel<br />

Bolzano<br />

Location Franzensfeste, Italy · Extension Line Munich – Verona<br />

Length of tunnel Investigation Tunnel approx. 10 km, Brenner Basetunnel approx. 52 km<br />

Tunnelling method Conventional and mechaniced<br />

Time of construction 2008 – 2012 (Investigation Tunnel)<br />

Tasks Geotechnical consultancy<br />

Supervision and documentation of the geotechnical work


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Brenner Basetunnel, Investigation Tunnel Periadriatic Seam · Italy<br />

Conjunction Area<br />

Investigation<br />

Tunnel<br />

Tunnel<br />

West<br />

Innsbruck<br />

Brenner Basetunnel<br />

Crosscut 48/2(2) Typ 2,<br />

L = 87 m<br />

Connection to<br />

Investigation Tunnel<br />

L = 420 m<br />

Connection to<br />

Investigation Tunnel<br />

Investigation Tunnel<br />

Periadriatic Seam<br />

Investigation Tunnel<br />

Periadriatic Seam<br />

assembly TBM<br />

Entrance Tunnel<br />

Mauls<br />

Conjunction Area<br />

Access Shaft<br />

Crosscut to Investigation Tunnel<br />

Crosscut 48/3(2) Typ 2,<br />

L = 59 m<br />

Mauls Section B<br />

L = 75 m<br />

Mauls Section A<br />

L = 172 m<br />

Entrance Tunnel Mauls<br />

L = 1607 m<br />

Investigation-<br />

Tunnel Aicha<br />

Logistic Section<br />

L = 148 m<br />

TBM assembly Cavern for<br />

Investigation Tunnel L = 35 m<br />

Connection Tunnel<br />

L = 41 m<br />

TBM assembly Caverns<br />

for Main Tunnel<br />

Gleis 1 und 2 L = 180 m<br />

Logistic Carvern<br />

L = 40 m<br />

Bolzano<br />

Investigation Tunnel<br />

Aicha<br />

Location Franzensfeste, Italy · Extension Line Munich – Verona<br />

Length of tunnel Investigation Tunnel 529 m + approx. 1325 m, Brenner Basetunnel 52 km<br />

Tunnelling method Universell<br />

Time of construction 2012 - (Investigation Tunnel)<br />

Tasks Geotechnical and tunnelling consultancy<br />

Determination of excavation classes<br />

Concept of monitoring programmes incl. evaluation<br />

Geotechnical and tunnelling riskmanagement<br />

Daily risk assessment and report<br />

Weekly reports on geotechnical and tunnelling data<br />

Tunnel<br />

East


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Khojak-Tunnel, rehabilitation / dualization (road and railway) of an existing tunnel Pakistan<br />

Chaman<br />

Khojak-Tunnel<br />

No. 18 3.920 m<br />

Shela Bagh<br />

Location Province Belutschistan, Quetta, Chaman, Pakistan<br />

Length of tunnel 3920 m<br />

Diameter min. 8.0 m (planning)<br />

Tasks Assessment of possible rehabilitation measures on the basis of geotechnical<br />

and tunnelling archive documents and a site inspection<br />

Tunnelling consultancy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Dubai Light Rail Project · United Arab Emirates<br />

DMD<br />

Station Al Ras<br />

10.00 Creek<br />

0.00<br />

-10.00<br />

-20.00<br />

-30.00<br />

-40.00<br />

-50.00<br />

-60.00<br />

Tunnel 6800 m<br />

weak rocks<br />

Green Line<br />

upper silty sand<br />

lower silty sand<br />

Tunnel 4700 m<br />

Dubai Creek<br />

calcisiltite<br />

TBM, Dubai<br />

Station Al Ghubaiba<br />

Location Dubai, UAE<br />

Length of tunnel 2 tunnel, total length 11.5 km<br />

Section 78 m²<br />

Diameter 9.90 m<br />

Tunnelling method Shield tunnelling with liquid and/or earth supported face<br />

Time of construction since 2005<br />

Tasks Geotechnical and tunnelling risk management<br />

conglomerate


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Extension of the Metro Tehran, Line 3 · Iran<br />

Line 3<br />

Location Tehran, Iran<br />

Total length 36 km<br />

Total length of tunnels 24 km<br />

Tunnelling method Shield and universal tunnelling and cut-and-cover method for the underground<br />

stations<br />

Time of construction since 2006<br />

Tasks Geotechnical and tunnelling consultancy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Frankfurt 21<br />

m.a.s.l.<br />

140.00<br />

120.00<br />

100.00<br />

80.00<br />

60.00<br />

40.00<br />

m.a.s.l.<br />

140.00<br />

120.00<br />

100.00<br />

80.00<br />

60.00<br />

40.00<br />

20.00<br />

0.00<br />

Frankfurt<br />

Main Station<br />

Frankfurt Clay<br />

Limestone Bed<br />

Subway<br />

Frankfurt limestone<br />

Frankfurt Clay<br />

Tunnel City North<br />

Main<br />

North Main Station<br />

Subway<br />

Subway<br />

Frankfurt Limestone<br />

Tertiary marl<br />

Location Frankfurt/Main, Germany<br />

Length of tunnel Tunnel City North 2 x 3,130 m<br />

Tunnelling method<br />

Tunnel City South 2 x 1,770 m<br />

Shield driving / Earth supported face (planning)<br />

Section 4 Single-tracked<br />

Time of construction Planning<br />

Tasks Geotechnical and tunnelling feasibility study<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report, tunnelling report<br />

gw<br />

South


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Tunnel Frankfurter Kreuz<br />

fill<br />

sand<br />

sand/gravel<br />

sand<br />

final concrete<br />

lining<br />

sand<br />

silt/clay<br />

sand<br />

silt/clay<br />

final lining<br />

track level<br />

II<br />

II<br />

overall<br />

cross<br />

section<br />

shotcrete<br />

initial lining<br />

excavation/bench/invert<br />

invert<br />

ground surface<br />

(BAB A3)<br />

backfill concrete<br />

"Sägezahn"<br />

bench<br />

jet grouted floor cover<br />

top heading cross section<br />

top heading<br />

support core<br />

transverse bulkhead<br />

I<br />

embankment BAB A3<br />

jet grouted roof cover<br />

I<br />

jet grouted<br />

face columns<br />

7 m<br />

gw<br />

top heading support<br />

core<br />

gw<br />

quaternary<br />

(pleistocene)<br />

tertiary<br />

(pliocene)<br />

15 m<br />

6 m<br />

embankment BAB A3<br />

quarternary<br />

(pleistocene)<br />

tertiary<br />

(pliocene)<br />

shotcrete<br />

initial lining<br />

final concrete<br />

lining<br />

track level<br />

bench<br />

jet grouted<br />

floor cover<br />

II I<br />

invert<br />

II I<br />

ground surface<br />

(BAB A3)<br />

jet grouted roof cover<br />

jet grouted<br />

face columns<br />

Location DB New High-Speed Railway Line Cologne-Rhine/Main, Germany<br />

Length of tunnel 1,886 m<br />

Tunnelling method Shotcrete tunnelling with partial drivings (282m)<br />

Section Double-tracked<br />

150 m² (full section)<br />

Time of construction 1996 - 1999<br />

Tasks Geotechnical and tunnelling feasibility study<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report, tunnelling report<br />

Supervision and documentation of the geotechnical work<br />

Concept of monitoring programmes incl. evaluation<br />

Geotechnical and tunnelling contract and claim management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Subway Tunnel U5<br />

start shaft<br />

m.a.s.l.<br />

jet grouted block<br />

35<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

North<br />

track 1<br />

stones and<br />

blocks<br />

shield driving [m]<br />

100<br />

150<br />

start shaft<br />

U5<br />

200<br />

filling<br />

upper sand<br />

valley sand<br />

track level<br />

melting water sand<br />

Brandenburger<br />

Tor<br />

planned subway tunnel<br />

jet grouted block<br />

250 300<br />

350 400<br />

450 500 550<br />

Location Berlin, Germany<br />

Length of tunnel Tunnel 1 480 m<br />

Tunnel 2 498 m<br />

Tunnelling method Shield driving (liquid-supported face by means of a mix-shield<br />

machine)<br />

Section 2 Single-tracked<br />

69 m² (full section)<br />

Time of construction 1998 - 2000<br />

Tasks Geotechnical and tunnelling consultancy<br />

Supervision and documentation of the geotechnical work<br />

Geotechnical and tunnelling contract and claim management<br />

East<br />

target


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

U55 Shuttle, subway station Brandenburger Tor<br />

filling<br />

subway station, "Unter den Linden"<br />

valley sand<br />

boulder clay/<br />

stones and blocks<br />

valley sand / melting water sand<br />

26<br />

27<br />

25<br />

28<br />

24<br />

29<br />

4<br />

5<br />

23<br />

3<br />

30<br />

6<br />

gw -2.00 m<br />

steel column<br />

2<br />

7<br />

Shotcrete initial lining<br />

1<br />

8<br />

22.0 m<br />

gallery south gallery north<br />

centre gallery<br />

14<br />

9<br />

22<br />

15<br />

13<br />

10<br />

12<br />

11<br />

21<br />

16<br />

20<br />

17<br />

frozen body<br />

19<br />

18<br />

10.4 m<br />

Microtunnel Ø 1.636 m<br />

Location Berlin, Germany<br />

Length of tunnel 90 m (subway station “Brandenburger Tor”)<br />

Tunnelling method Universal driving protected by frozen ground technology<br />

(30 Microtunnel, ø1.62 m)<br />

Time of construction 2005 - 2009<br />

Tasks Geotechnical and tunnelling consultancy<br />

Geotechnical and tunnelling contract management<br />

Numerical deformation simulations<br />

No. 76


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

New S-Bahn S21 Berlin • Westhafen – Central Station<br />

S21<br />

Total-Tower<br />

Location Berlin, Germany<br />

Length of tunnel and trough 610 m / 190 m<br />

Tunnelling method Open cut construction<br />

Time of construction since 2009<br />

Tasks Geotechnical and tunnelling approval of the execution planning<br />

for the Federal Railway Authority<br />

S21


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Stuttgart 21 • PFA 1.1 Undercrossing with Central Station<br />

Origin: Aldinger & Wolf<br />

Location Stuttgart, Germany<br />

Length PFA 1.1 approx. 900 m<br />

Foundation Open cut construction (Raft Foundation/Pile Foundation)<br />

Time of construction since 2011<br />

Tasks<br />

Geotechnical approval of the execution planning<br />

Supervision - documentation of geotechnical works<br />

Geotechnical and tunnelling consultancy<br />

Checking of plans<br />

Undercrossing<br />

Building of Infrastructure<br />

Origine: dpa


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Lohbergtunnel<br />

Location Mühltal, Germany<br />

Length of tunnel 1080 m<br />

Section 86.6 m²<br />

Diameter 10.5 m<br />

Tunnelling method Shotcrete tunnelling with partial drivings<br />

Time of construction 2003 – 2007<br />

Tasks Supervision and documentation of the geotechnical work and of the face<br />

Geotechnical and tunnelling consultancy<br />

Geotechnical and tunnelling contract management<br />

Geoenvironmental report (Asbestos)


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Siegauentunnel<br />

m.a.s.l.<br />

55<br />

50<br />

45<br />

40<br />

35<br />

highway A560<br />

door frame slab method<br />

compressed-air<br />

driving (170 m)<br />

curch<br />

churchyard<br />

community centre<br />

driving section<br />

170 m compressed-air driving<br />

pilot tunnel<br />

shotcrete tunnelling with<br />

side wall drifts (200 m) open cut<br />

North South<br />

station 390 Tertiary basement clay<br />

Tertiary<br />

channel filling Quaternary<br />

station 220<br />

clay<br />

sand and silt<br />

surface<br />

Quaternary<br />

gw<br />

Tertiary<br />

13 m<br />

jet grouted<br />

column Ø1.30 m<br />

core<br />

12.45 m<br />

pilot tunnel<br />

side wall side wall<br />

shotcrete<br />

bench/invert<br />

profile<br />

Location DB New High-Speed Railway Line Cologne-Rhine/Main, Germany<br />

Length of tunnel 2,202 m<br />

Tunnelling method Open cut, shotcrete tunnelling with sidewall drifts (200m), compressed-air<br />

driving (170 m), door frame slab method<br />

Section Double-tracked, 156 m² (full section)<br />

Time of construction 1998 - 2002<br />

Tasks Geotechnical and tunnelling consultancy<br />

Supervision and documentation of the geotechnical work<br />

Concept of monitoring programmes incl. evaluation<br />

Geotechnical and tunnelling contract and claim management<br />

7 m<br />

3.4 m<br />

3.5 m<br />

20 m


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

New Tunnel Mainz<br />

North<br />

Mainz main station<br />

concrete<br />

inner<br />

lining<br />

fill<br />

clay, silt, marl<br />

shotcrete lining<br />

excavation<br />

bench/invert<br />

max. 120 m<br />

fill<br />

limestone bed<br />

clay, silt, marl<br />

limestone bed<br />

Mainz centre<br />

~30 m<br />

top heading<br />

~50 m<br />

1-1.5 m<br />

1.292m<br />

fill<br />

sidewall drift<br />

1-1.5 m<br />

fill<br />

clay, silt, marl<br />

sidewall<br />

drift<br />

top<br />

heading<br />

bench/<br />

invert<br />

South<br />

Mannheim<br />

North South East<br />

West<br />

sidewall<br />

drift<br />

bolting<br />

gw fill fill gw<br />

Location DB Extension Line Mainz-Mannheim, Germany<br />

Length of tunnel 1,300 m<br />

Tunnelling method Shotcrete tunnelling with sidewall drifts<br />

Section Double-tracked<br />

130 m² (full section)<br />

Time of construction 1998 – 2001<br />

Tasks Geotechnical and tunnelling approval for the German Railway Authority


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� ENVIRONMENTAL GEOTECHNICS<br />

Construction of disposals<br />

Disposal Flotzgrün / Speyer, Germany Waste disposal Aßlar, Germany<br />

Base sealing, disposal Flotzgrün / Speyer, Germany Remediation of a contaminated site, Germany<br />

Base sealing, disposal Nieder-Ofleiden, Germany Waste disposal Heßheim, Germany<br />

Tasks Determination of required investigation<br />

Coordination of environmental investigation, sampling and supervision of field<br />

works<br />

Planning and supervision of disposal remediations<br />

Planning and supervision of new disposals and sealing systems<br />

Supervision and documentation of the geotechnical work<br />

Geotechnical and environmental consultancy<br />

Geotechnical approval<br />

Stability considerations<br />

Geotechnical and geoenvironmental reports


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� ENVIRONMENTAL GEOTECHNICS<br />

Abandoned sites, Contamination • Ground / Soilgas / Groundwater<br />

Tasks Study and evaluation of existing archive documents<br />

Historical research<br />

Geoenvironmental impact assessment<br />

Determination of required investigation / chemical-analytical parameters<br />

Coordination of concepts for remedation, sampling<br />

Preperation of concepts for remediation and disposal<br />

Planning and supervision of remediation (ground, soilgas, groundwater)<br />

Classification of waste and assessment according to national regulations<br />

Geoenvironmental reports


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� ENVIRONMENTAL GEOTECHNICS<br />

Building demolition / reconstruction / remediation and modification<br />

Tasks Evaluation / compilation of existing structural fabric and harmful substances<br />

Estimation of volume and mass<br />

Organisation of site works<br />

Evaluation of the risk potential concerning the waste<br />

Classification of waste<br />

Setting up programmes for the waste disposal<br />

Working out solicitations for the demolition and disposal<br />

Tender and allocation of the demolition works<br />

Supervision of the demolition, consulting during demolition<br />

Documentation and final conclusion


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� USE OF GEOTHERMAL ENERGY<br />

Deep geothermal energy<br />

Geothermal power plant unit Drilling rig for deep boreholes<br />

Electricity production with geothermal power plants<br />

Engineering services Concepts and feasibility studies for the construction of geothermal power<br />

plants<br />

Assessment of location<br />

Planning, supervision and evaluation of geothermal investigation works<br />

Accompanation during conceptual design phase of geothermal plant<br />

Geothermal expertise<br />

Geothermal and geotechnical risk assessment study<br />

Research


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� USE OF GEOTHERMAL ENERGY<br />

Shallow geothermal systems<br />

Horizontal heat exchangers<br />

• Fluid circulates within a closed tube systems<br />

• Located 0.2 m below local frost penetration depth<br />

• Undeveloped area required<br />

Heat exchanger tubes<br />

• Fluid circulates within a closed tube systems<br />

• Single heat exchanger tubes or assembly<br />

• Cooling and heating<br />

Earth affected structures<br />

• Fluid circulates within closed tube systems in earth<br />

affected concrete structures such as retaining walls,<br />

piles, rafts and tunnels<br />

• Cooling and heating<br />

energy<br />

anchor<br />

energy absorber<br />

system<br />

shotcrete<br />

inner lining<br />

horizontal<br />

energy absorber system


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� USE OF GEOTHERMAL ENERGY<br />

Shallow geothermal systems<br />

raft<br />

energy<br />

pile<br />

foundation pile = energy pile<br />

Engineering services Geological, geotechnical and hydrogeological expertise<br />

Planning, tendering and expert monitoring of investigation works (drillings,<br />

geothermal tests)<br />

Geothermal consultancy<br />

Design of shallow geothermal systems<br />

Expert monitoring during approval procedure of authorities<br />

Expert documentation<br />

Effects by using geothermal energy<br />

► Saves lifetime costs<br />

► Reduction of energy consumption<br />

► Environmental-friendly energy<br />

► Forward-looking thinking<br />

heat exchanger<br />

fit on the<br />

reinforcement<br />

Prof. Quick and Dr. Michael are active members of working groups concerning shallow and deep geothermal<br />

energy.


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> � <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

�� GEOTECHNICAL RISK AND CONTRACT / CLAIM MANAGEMENT<br />

Geotechnical risk management<br />

�� Evaluation ground and system risks<br />

�� Realization of risk-simulations<br />

�� Evaluation of effects of risk concerning the ultimate and serviceability limit state<br />

�� Continuous comparison of the risk-analysis during execution of projects<br />

Contract / claim management<br />

�� Contract preparation and allocation (participation)<br />

�� Evaluation of solicitations<br />

�� Evaluation of ground and system risks during construction

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!