09.11.2012 Views

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

PROF. DIPL.-ING. H. QUICK INGENIEURE UND GEOLOGEN GMBH ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong><br />

<strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

DARMSTADT • MUNICH<br />

D-64295 DARMSTADT<br />

GROSS-GERAUER-WEG 1<br />

PHONE: +49 (0) 61 51 / 13 03 6-0<br />

FAX: +49 (0) 61 51 / 13 03 6-10<br />

E-MAIL: Q@<strong>QUICK</strong>-IG.DE<br />

INTERNET: WWW.<strong>QUICK</strong>-IG.COM<br />

COMMERCIAL REGISTER<br />

DARMSTADT HRB 8076<br />

UST-IDNR.: DE213671986<br />

FEASIBILITY STUDIES<br />

EXPERTISE · SOIL REPORT<br />

FO<strong>UND</strong>ATION DESIGN<br />

ANALYTICAL - NUMERICAL CALCULATION<br />

APPROVAL ENGINEER<strong>ING</strong><br />

COURT EXPERTISE<br />

SUPERVISION<br />

CONTRACT AND CLAIM MANAGEMENT<br />

RISK MANAGEMENT<br />

GEOTECHNICS<br />

SOIL AND ROCK MECHANICS<br />

ENGINEER<strong>ING</strong> GEOLOGY<br />

HYDROGEOLOGY<br />

ENVIRONMENTAL GEOLOGY<br />

GEOTHERMICS<br />

HIGH-RISE BUILD<strong>ING</strong>S<br />

HIGH SPEED RAILWAY LINES<br />

TUNNELS<br />

BRIDGES<br />

PITS<br />

CUTS · DAMS<br />

SPORT ARENAS<br />

LANDFILLS<br />

DECONTAMINATION OF SITES<br />

REHABILITATION OF BUILD<strong>ING</strong>S<br />

CHIEF EXECUTIVE OFFICER:<br />

<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. HUBERT <strong>QUICK</strong><br />

PUBLICLY APPOINTED<br />

AND SWORN EXPERT<br />

MANAG<strong>ING</strong> DIRECTOR:<br />

DR. RER. NAT. JOACHIM MICHAEL<br />

GEOTECHNICAL QUALITY MANAGEMENT<br />

CONSULTANT / CHECK<strong>ING</strong> ENGINEER:<br />

<strong>DIPL</strong>.-<strong>ING</strong>. WOLFHARD ROMBERG<br />

SCIENTIFIC CONSULTANTS:<br />

UNIV. <strong>PROF</strong>. DR.-<strong>ING</strong>. ULVI ARSLAN<br />

<strong>PROF</strong>. DR. HELMUT PRINZ


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� DELEGATION JOURNEYS<br />

Journey of the German Chancellor Dr. Gerhard Schröder<br />

Kingd. of Saudi Arabia, Kuwait, Qatar, Yemen, Oman, United Arab Emirates (U.A.E.)<br />

27 th February until 5 th Chancellor (Germany)<br />

Prof. Hubert Quick<br />

Dr. Gerhard Schröder<br />

March 2005<br />

Prof. Hubert Quick<br />

Journey of the Federal Minister for economics and technology Dr. Karl-Theodor<br />

Freiherr zu Guttenberg, United Arab Emirates (U.A.E.), Kingdom of Saudi Arabia<br />

9 th until 11 th May 2009<br />

Prime Minister (Qatar)<br />

H.H. Sheikh Abdulla<br />

Prof. Hubert Quick Bin Khalifa Al Thani<br />

Journey of the Bavarian Minister Dr. Otto Wiesheu<br />

Qatar, 20 th until 23 rd November 2004<br />

Federal Minister of Eco-<br />

nomics and Technology<br />

(Germany) Michael Glos<br />

Federal Minister of<br />

Economics and Technology<br />

Dr. Karl-Theodor Freiherr zu Guttenberg Prof. Hubert Quick<br />

Bavarian Minister<br />

Dr. Otto Wiesheu<br />

Minister of Economy<br />

and Planning (U.A.E.)<br />

H.H. Sheikha Lubna<br />

Journey of the Federal Minister for economics and technology Michael Glos<br />

United Arab Emirates (U.A.E.), 5 th until 7 th May 2006<br />

Minister President<br />

Roland Koch<br />

Journey of the Hessian Minister president Roland Koch<br />

United Arab Emirates (U.A.E.), 11 th until 14 th November 2005<br />

Kingdom of Saudi Arabia, 30 th April until 4 th May 2009<br />

Prof. Hubert Quick<br />

Prof. H. Quick<br />

Vice-Chancellor and Federal<br />

Minister for economics and<br />

technology (Germany)<br />

Dr. Philipp Rösler<br />

Journey of the Federal Minister for economics and technology Dr. Philipp Rösler<br />

Qatar, Egypt, 7 th until 9 th December 2011


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� PRESENTATION / QUALIFICATION<br />

The office Prof. Dipl.-Ing. H. Quick Ingenieure und Geologen GmbH provides expertise and consultancy<br />

as follows:<br />

• Geotechnical and tunnelling feasibility studies<br />

• Concept, tender and allocation of ground investigations<br />

• Supervision of ground investigations<br />

• Ground and foundation reports, tunnelling reports<br />

• Geological and hydrogeological reports<br />

• Geotechnical, geological, geophysical, hydrogeological and tunnelling consultancy<br />

• Design and numerical simulations of foundations, building pits and tunnels<br />

• Numerical deformation simulations<br />

• Supervision and documentation of geotechnical works<br />

• Concept of monitoring programmes incl. evaluation<br />

• Comprehensive evaluation of displacements<br />

• Geoenvironmental reports<br />

• Structural fabric reports<br />

• Groundwater management<br />

• Concept of the dewatering<br />

• Consultancy, calculations and design for the use of geothermal energy<br />

• Geotechnical and tunnelling risk and contract / claim management<br />

• Geotechnical and tunnelling approval of the execution planning and for authorities<br />

• Expertise for court and court of arbitration<br />

• Research<br />

Prof. Dipl.-Ing. Hubert Quick is an Honorary Professor at Technical University of Darmstadt and<br />

teaches the class: foundation of high-rise buildings.<br />

Dr. rer. nat. Michael carried out his doctoral thesis at the Philipps-University Marburg with the main<br />

topics rockmechanics and tunnelling and is the office’s confidential clerk.<br />

Dipl.-Ing. Wolhard Romberg supports our office as a geotechnical consultant and checking engineer<br />

and is responsible for the geotechnical quality management. Mr. Romberg looks back on 40 years of<br />

experience in Germany and abroad.<br />

Further scientific advice is given by Prof. Dr.-Ing. Arslan, Ordinary Professor for Geotechnics at the<br />

Technical University of Darmstadt and by Prof. Dr. Prinz, lecturer for Rockmechanics and Tunnelling<br />

at the University of Zittau / Görlitz (FH).<br />

Prof. Quick conducts approval works for German Authorities and for the Federal Railway Office in<br />

the fields of Earthworks and Ground Engineering, Rock Mechanics and Tunnelling as well as Environmental<br />

Engineering. He is publicly appointed and sworn expert of the Chamber of Commerce for<br />

Earthworks, Foundation Engineering, Soil- and Rock Mechanics.<br />

In the ISSMGE Prof. Quick is active member in the<br />

• Technical Committee 28: “Underground Construction in Soft Ground”<br />

• Technical Committee 19: “Preservation of Historic Sites”<br />

World-wide consultancy activities of Prof. Quick are provided e. g. in China, South Korea, Thailand,<br />

United Arab Emirates, Qatar, Kingdom of Saudi Arabia, Oman, Jordan, Iran, Pakistan, Uzbekistan,<br />

Vietnam, India, Ukraine, Russia, Italy, Austria, Switzerland and Poland.


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TRANSRAPID (MAGLEV)<br />

Munich<br />

central station<br />

airport<br />

Location Munich central station – Munich airport<br />

Route length 37.4 km<br />

Time of construction -<br />

Tasks Geotechnical feasibility study<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Geoenvironmental report<br />

Design and numerical simulations of the foundations<br />

Geotechnical and tunnelling risk management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� DISTRICT OF PARLIAMENT AND GOVERNMENT IN BERLIN<br />

“Reichstag“-building (House of parliament)<br />

Design Foster + Partners, United Kingdom<br />

1926<br />

fine-mediumsand<br />

loose-medium dense<br />

sand, gravelly<br />

medium dense<br />

sand, gravelly/<br />

gravel, sandy<br />

dense<br />

1999<br />

Location Berlin, Germany<br />

Height of building 53 m<br />

Foundation area of the dome Combined Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 15 - 25 m / 0.9 – 1.5 m<br />

Foundation of the edge towers existing foundation on timber piles<br />

Time of construction 1995 - 1999<br />

Tasks Geotechnical feasibility study of the new foundation<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Supervision and documentation of the geotechnical work<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the<br />

building pit<br />

Groundwater management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� DISTRICT OF PARLIAMENT AND GOVERNMENT IN BERLIN<br />

Marie-Elisabeth-Lüders-House<br />

Federal government’s<br />

press and information<br />

office<br />

Children day care centre<br />

Paul-Löbe-House<br />

Jakob-Kaiser-House<br />

Chancellor’s office<br />

Paul-Löbe-House and Marie-Elisabeth-Lüders-House<br />

Design Stephan Braunfels, Germany<br />

Chancellor’s office Federal government’s press and information office<br />

Design Schultes Frank Architekten, Germany Design Nalbach und Nalbach, Germany<br />

Jakob-Kaiser-House Children day care centre<br />

Design Gerkan, Marg & Partner (gmp), Germany Design Gustav Peichl, Austria<br />

Location Berlin, Germany<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the building pit<br />

Supervision and documentation of the geotechnical work<br />

Groundwater management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� LEHRTER STADTQUARTIER<br />

Office and business buildings • Berlin, Germany<br />

MK 9 Office Building<br />

„Cube“<br />

Main<br />

station<br />

MK 8 MK 9 MK 3-7<br />

MK 4 InterCityHotel MK 3 Hotel Meininger<br />

MK 8 Tower<br />

Location Berlin, Germany<br />

Development 9 buildings (MK 1 to MK 9)<br />

Height of building MK 8 150 m<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and<br />

the building pit


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� EUROPAVIERTEL<br />

Residential, office and business buildings • Frankfurt/Main, Germany<br />

Europa-Allee<br />

South 2<br />

South 1<br />

Europa-Allee<br />

North 4 · Hotel Meininger<br />

North 1<br />

Location Frankfurt/Main, Germany<br />

Development 11 project sites incl. the Europa-Boulevard<br />

Tasks Geotechnical consultancy<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the building pit<br />

Concept of the dewatering


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Skyline Plaza<br />

Location Frankfurt/Main, Germany<br />

Height of building 25 m<br />

Foundation Raft Foundation / Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 20-30 m / 1.2 m<br />

Time of construction 2009 -<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

Design oft the building pit<br />

Concept of monitoring programmes incl. Evaluation<br />

Supervision and documentation of geotechnical works<br />

Geoenvironmental reports


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • kap europa - Kongresshaus<br />

Design ECE Projektmanagement GmbH & Co. KG, Germany<br />

kap europa<br />

Location Frankfurt/Main, Germany<br />

Height of building 33 m<br />

Foundation Strip foundation<br />

Fläche 3.300 m²<br />

Time of construction since 2012<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulation of foundation and building pit<br />

Concept of the dewatering<br />

Supervision


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Doha, Qatar • QIPCO Office Tower<br />

Design JSK - SIAT, Germany / Qatar<br />

QIPCO Office Tower<br />

Location Doha, Qatar<br />

Height of building 200 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 40 x 28 m / 1.2 m and 39 x 24 m / 1.2 m<br />

Thickness of the raft 4.0 m<br />

Time of construction 2006 - 2009<br />

Tasks Geotechnical feasibility study<br />

Concept, tender and allocation of the ground investigation<br />

Design and numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> � <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

��INTELLIGENT AND VALUE ENGINEER<strong>ING</strong> ► INNOVATIVE SOLUTIONS<br />

��Combined pile-raft foundation<br />

transfers loads by raft and by piles into the ground<br />

► saves construction costs in comparison to a pile foundation<br />

► reduction of piles - up to 70 %<br />

► reduction of construction time - up to 70 %<br />

Combined pile-raft foundation pile foundation<br />

action<br />

reaction<br />

raft<br />

amount of piles: 79<br />

reduction of 65 %<br />

piles<br />

plan view<br />

with pile location<br />

action<br />

reaction<br />

amount of piles: 225<br />

piles


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Millenniumtower<br />

Design Albert Speer & Partner, Germany<br />

Messeturm<br />

Millenniumtower<br />

Millenniumtower<br />

Location Frankfurt/Main, Germany<br />

Height of building approx. 350 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF) (planned)<br />

Tasks Geotechnical feasibility study<br />

Geotechnical consultancy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Tower 185<br />

Design Christoph Mäckler, Germany<br />

Tower 185<br />

Tower 185<br />

Location Frankfurt/Main, Germany<br />

Height of building 200 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 50 m / 1.50 m<br />

Thickness of the raft 3.5 m<br />

Foundation of low-rise building Raft Foundation<br />

Time of construction 2008 - 2011<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the<br />

building pit<br />

Concept of monitoring programmes<br />

Supervision and documentation of geotechnical works<br />

Groundwater management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Main Tower<br />

Design Schweger + Partner, Germany<br />

Equipment of the energy pile<br />

return flow<br />

bored pile<br />

flow<br />

reinforcement<br />

heat exchanger<br />

fit on the<br />

reinforcement<br />

Location Frankfurt/Main, Germany<br />

Height of building 198 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 15 - 30 m / 1.5 m<br />

Thickness of the raft 3.0 – 3.8 m<br />

Foundation of low-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Time of construction 1997 - 1999<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the<br />

building pit<br />

Concept of the dewatering<br />

Supervision and documentation of the geotechnical work<br />

Concept of the monitoring programme incl. evaluation<br />

Consultancy, calculations and design for the use of geothermal<br />

energy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Commerzbank<br />

Design Foster + Partners, United Kingdom<br />

Location Frankfurt/Main, Germany<br />

Height of building 299 m<br />

Foundation of high-rise building Pile Foundation<br />

Length / Diameter of the bored piles 38 - 46 m / 1.8 m (1.5 m)<br />

Thickness of the raft 2.5 m<br />

Time of construction 1995 - 1997<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and<br />

the building pit<br />

Concept of the dewatering<br />

Supervision and documentation of the geotechnical work<br />

Concept of the monitoring programme incl. evaluation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Campanile<br />

Design JSK Architekten, Germany<br />

Campanile<br />

Campanile<br />

Location Frankfurt/Main, Germany<br />

Height of building 300 m<br />

Foundation of high-rise building Raft Foundation (planned)<br />

Thickness of the raft 4,5 m (planned)<br />

Tasks Geotechnical consultancy<br />

Geotechnical report<br />

Foundation report<br />

Design and numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Frankfurt/Main • Ordnungsamt<br />

Design Meixner · Schlüter · Wendt, Germany<br />

Location Frankfurt/Main, Germany<br />

Height of building 6 floors<br />

Building area 9.328m²<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 12 - 20 m / 0.9 m<br />

Thickness of the raft 0.5 m<br />

Geothermal method Field of borehole heat exchangers (BHE)<br />

Number / Length of the BHE 110 BHE / 85 m<br />

Time of construction 2006 - 2009<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and<br />

the building pit<br />

Concept of the dewatering<br />

Supervision and documentation of the geotechnical work<br />

Concept of the monitoring programme incl. evaluation<br />

Consultancy, calculations and design for the use of geothermal<br />

energy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Berlin • Sony Center<br />

Design Murphy / Jahn, USA<br />

Location Berlin, Germany<br />

Height of building 103 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 15 - 25 m / 1.5 m<br />

Thickness of the raft 1.5 – 2.5 m<br />

Time of construction 1996 - 1998<br />

Tasks Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

and the building pit<br />

Concept of the dewatering<br />

Concept of the monitoring programme incl. evaluation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Berlin • Total-Tower<br />

Design Barkow Leibinger, Germany<br />

Total-Tower<br />

Location Berlin, Germany<br />

Height of building 69 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles 17 m / 1.10 - 1.20 m<br />

Thickness of the raft 1.2 – 2.0 m<br />

Time of construction 2010 - 2012<br />

Tasks Geotechnical consultancy<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation and the<br />

building pit


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Munich • Süddeutscher Verlag<br />

Design Gewers, Kühn + Kühn, Germany<br />

use of geothermal energy by energy piles<br />

Location Munich, Germany<br />

Height of building 100 m<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF)<br />

Length / Diameter of the bored piles approx. 20 - 25 m / 1.5 m<br />

Thickness of the raft approx. 2.5 m<br />

Foundation of low-rise building Raft foundation<br />

Time of construction 2006 - 2008<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Geoenvironmental report<br />

Design and numerical simulations of the foundation and<br />

the building pit<br />

Concept of the dewatering<br />

Concept of the monitoring programme incl. evaluation<br />

Consultancy, calculations and design for the use of geothermal<br />

energy<br />

100 m


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Doha, Qatar • Al Quds Tower<br />

Design Arab Engineering Bureau (AEB), Qatar<br />

Location Doha, Qatar<br />

Height of building 500 m<br />

Foundation of high-rise building Pile Foundation<br />

Length / Diameter of the bored piles 28 m / 1.5 m<br />

Thickness of the raft 3.5 m<br />

Time of construction 2009 -<br />

Tasks Geotechnical feasibility study of the foundation<br />

Geotechnical consultancy<br />

Numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Abu Dhabi, United Arab Emirates • Landmark Tower<br />

Design Cesar Pelli & Associates Architects, USA<br />

Landmark Tower<br />

Location Abu Dhabi, United Arab Emirates<br />

Height of building 324 m<br />

Foundation of high-rise building Piled-Raft Foundation<br />

Length / Diameter of the bored piles 14 m / 1.5 m<br />

Thickness of the raft 4 m<br />

Time of construction 2008 -<br />

Tasks Design and numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Dubai, United Arab Emirates • Jumeirah Gardens, EP 09 Tower<br />

Design Smith + Gill, USA<br />

Dubai<br />

EP 09 Tower<br />

Jumeirah Gardens<br />

EP 09 Tower<br />

EP 09 Tower<br />

Location Dubai, United Arab Emirates<br />

Height of high-rise buildings 130 – 150 m (6 Tower)<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF) (planned)<br />

Thickness of the raft approx. 3.0 m (planned)<br />

Time of construction (planned)<br />

Tasks Geotechnical report building pit<br />

Geotechnical, geological and hydrogeological consultancy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Dubai, United Arab Emirates • Momema, Museum of Middle Eastern Modern Art<br />

Design UNStudio, The Netherlands<br />

Dubai Creek<br />

Location Dubai, United Arab Emirates<br />

Height of building approx. 50 m<br />

Foundation of the building Raft Foundation<br />

Time of construction 2009 -<br />

Tasks Feasibility study of foundation and building pit


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Amman, Jordan • Limitless Towers<br />

Design Werner Sobek, Germany<br />

Limitless Towers<br />

Amman<br />

Location Amman, Jordan<br />

Height of building approx. 210 m<br />

Foundation of high-rise building Raft Foundation (planned)<br />

Thickness of the raft 4.0 m (planned)<br />

Time of construction -<br />

Tasks Geotechnical feasibility study of the foundation<br />

Geotechnical consultancy<br />

Numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-RISE BUILD<strong>ING</strong>S AND PITS<br />

Kiev, Ukraine • Pobedy Prospekt Komplex<br />

Design Werner Sobek, Germany<br />

Kiev<br />

Pobedy Prospekt Komplex<br />

Location Kiev, Ukraine<br />

Height of high-rise buildings 230 m (2 Towers)<br />

Foundation of high-rise building Combined-Pile-Raft Foundation (CPRF) (planned)<br />

Length / Diameter of the bored piles 35 m – 45 m / 1.3 m - 1.5 m (planned)<br />

Thickness of the raft 2.5 m – 4.0 m (planned)<br />

Time of construction 2008 - 2012<br />

Tasks Geotechnical, geological and hydrogeological consultancy<br />

Design and numerical simulations of the foundation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPECIAL PROJECTS<br />

Al Ain, U.A.E. • Jebel Hafeet – Glacier: Ski Dome, Mountain Villas and Golf Course<br />

Design PNYG-VA, United Arab Emirates<br />

Peak Hotel<br />

Location Al Ain, United Arab Emirates<br />

Description Longest ski hall of the world, approx. 5 km ski piste, FIS-ski jump, slalom,<br />

halfpipe etc., 350 new villas and 4 hotels<br />

Time of construction Under planning<br />

Tasks Geotechnical feasibility study<br />

Geotechnical, geological, geophysical and hydrogeological consultancy<br />

Geotechnical risk management<br />

Consultancy, calculations and design for the use of geothermal energy<br />

Supervision of the soil investigation<br />

Geological and hydrogeological report


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPECIAL PROJECTS<br />

Abu Dhabi, United Arab Emirates • Abu Dhabi Ridge – Falcon Lagoon<br />

Creation of a 2000 m artificial mountain ridge<br />

Design 3V-Design / Schrödel Engineering, Germany / Australia<br />

Location Abu Dhabi, United Arab Emirates<br />

Description 2000 meter high artificial mountain ridge<br />

Abu Dhabi<br />

Cities with official buildings, universities and schools, residential buildings,<br />

winter and summer sport arenas, lakes and lagoons, airport, railway lines<br />

Energy supply Solar / wind / geothermal energy<br />

Time of construction Under planning<br />

Tasks Geotechnical feasibility study<br />

Geotechnical, geological and hydrogeological consultancy<br />

Consultancy, calculations and design for the use of geothermal energy<br />

,


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPECIAL PROJECTS<br />

Abu Dhabi, United Arab Emirates • Water Falcon<br />

Design Werner Sobek, Germany<br />

Abu Dhabi<br />

3 possible locations<br />

Location Abu Dhabi, United Arab Emirates<br />

Description Creation of a new City with official buildings, residential buildings, hotels,<br />

luxury and high quality housing, business center, shopping malls, parks,<br />

beaches and water canals<br />

Time of construction Under planning<br />

Tasks Geotechnical, geological and hydrogeological consultancy<br />

,


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPORT ARENAS<br />

Munich • Allianz-Arena<br />

Design Herzog & de Meuron, Switzerland<br />

Location Munich, Germany<br />

Height of the arena 50 m<br />

Dimensioning 258 x 227 m<br />

Capacity 66,000<br />

Time of construction 2002 - 2005<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

Supervision and documentation of the geotechnical work


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPORT ARENAS<br />

Frankfurt/Main • Commerzbank Arena<br />

Design Gerkan, Marg und Partner (gmp), Germany<br />

Location Frankfurt/Main, Germany<br />

Height of the arena 33 m<br />

Dimensioning 290 x 250 m<br />

Capacity 52,000<br />

Time of construction 2003 - 2005<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

Supervision and documentation of the geotechnical work<br />

Geoenvironmental and structural fabric report


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPORT ARENAS<br />

Cologne • RheinEnergieStadion<br />

Design Gerkan, Marg und Partner (gmp), Germany<br />

Location Cologne, Germany<br />

Height of the arena 33 m<br />

Dimensioning 220 x 180 m<br />

Capacity 51,000<br />

Time of construction 2001 - 2004<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report<br />

Design and numerical simulations of the foundation<br />

Supervision and documentation of the geotechnical work<br />

Geoenvironmental and structural fabric report


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� SPORT ARENAS<br />

Tashkent, Uzbekistan • Sport Park „Bunjodkor“<br />

Design Gerkan, Marg und Partner (gmp) & Werner Sobek, Germany<br />

Location Tashkent, Uzbekistan<br />

Height of the stadium 34 m<br />

Dimensioning of the stadium 218 x 181 m<br />

Capacity 35,000<br />

Time of construction 2009 - 2010<br />

Tasks Ground and foundation report<br />

Geotechnical and geological consultancy<br />

Design and numerical simulations of the foundation<br />

Supervision and documentation of the geotechnical work<br />

�<br />

Stadium<br />

Sport school


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� INFRASTRUCTURE<br />

Arabian peninsula<br />

Cairo<br />

Nicosia<br />

Beirut<br />

Jerusalem<br />

Asmara<br />

Amman<br />

Damaskus<br />

Jeddah<br />

1<br />

Riyadh<br />

Jubail<br />

Dammam Manama<br />

4 Port Saqre<br />

Doha Dubai<br />

Hufuf<br />

3<br />

Abu Dhabi Khor Fakkan<br />

Sanaa<br />

Baghdad<br />

Kuwait<br />

Haradh<br />

Teheran<br />

Ruwais<br />

Landbridge Project, Kingdom of Saudi Arabia<br />

Riyadh Jeddah<br />

2<br />

Muscat<br />

Asgabat<br />

1<br />

2<br />

3<br />

4<br />

Landbridge Project<br />

Riyadh - Jeddah, Dammam - Jubail<br />

U.A.E. Rail Project<br />

Ruwais - Abu Dhabi - Dubai -<br />

Port Saqr - Fujairah/Khor Fakkan<br />

Dubai Light Rail Project<br />

Qatar Integrated Railway Network<br />

Location Riyadh – Jeddah, Dammam – Jubail<br />

Length more than 1,000 km<br />

950 km of new line between Riyadh - Jeddah<br />

115 km of new line between Dammam - Jubail<br />

450 km existing Dammam – Riyadh line will be upgraded<br />

Bridges 293<br />

Tunnel 1 (planned)<br />

Tasks Geotechnical, hydrogeological and tunnelling consultancy<br />

Geotechnical and tunnelling risk management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

U.A.E. Rail Project, United Arab Emirates<br />

Sabkha Igneous rocks (north-east-coast)<br />

Location Ruwais – Abu Dhabi – Dubai – Port Saqr – Fujairah/Khor Fakkan<br />

Length 650 km<br />

Bridges planned<br />

Tunnel 1 (planned 4.5 km)<br />

Time of construction (planned)<br />

Tasks Geotechnical and tunnelling feasibility study<br />

Geological and hydrogeological report<br />

Dubai Light Rail Project, United Arab Emirates<br />

Location Dubai<br />

Length 68.6 km<br />

Bridges -<br />

Tunnel 2 (total length 11.5 km)<br />

Time of construction 2005 - 2009<br />

Tasks Geotechnical and tunnelling risk management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

Qatar Integrated Railway Network, Qatar<br />

West Bay<br />

Long-distance rail Metro<br />

Location Qatar<br />

Length Long-distance rail 325 km / Metro 352 km<br />

Tunnel Total length approx. 65 km<br />

Time of construction (planned)<br />

Tasks Geotechnical and tunnelling consultancy<br />

Implementation Plan FIFA-World Cup 2022, Doha<br />

West Bay<br />

Doha West Bay


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> � <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

�� HIGH-SPEED RAILWAY LINES, GERMANY<br />

Cologne<br />

1<br />

Mannheim<br />

3<br />

Basle<br />

Frankfurt<br />

2<br />

8<br />

Karlsruhe<br />

Hannover<br />

Stuttgart<br />

Ulm<br />

4<br />

6<br />

Würzburg<br />

Erfurt<br />

Augsburg<br />

Ebensfeld<br />

Nuremberg<br />

5<br />

7<br />

Ingolstadt<br />

Munich<br />

Leipzig<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

Cologne - Rhine / Main<br />

Rhine / Main - Rhine / Neckar<br />

Karlsruhe - Basle<br />

Stuttgart - Ulm - Augsburg<br />

Nuremberg - Ingolstadt - Munich<br />

Ebensfeld - Erfurt<br />

Erfurt - Leipzig/Halle<br />

Hannover - Würzburg


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-SPEED RAILWAY LINES, GERMANY<br />

Services<br />

�<br />

Cologne-<br />

Rhine / Main<br />

�<br />

Rhine / Main-<br />

Rhine / Neckar<br />

�<br />

Karlsruhe-Basle<br />

�<br />

Stuttgart-Ulm-<br />

Augsburg<br />

�<br />

Nuremberg-<br />

Ingolstadt-<br />

Munich<br />

�<br />

Ebensfeld-Erfurt<br />

�<br />

Erfurt-Leipzig/Halle<br />

�<br />

Hannover-<br />

Würzburg<br />

• geotechnical, tunnelling, hydrogeological and environmental expertise on the basis of archives<br />

• preparation of bidding documents for construction works, participation in solicitations and awarding of<br />

contracts<br />

• preparation of investigation announcements for the authorities<br />

• consultancy of the client regarding geophysical investigation methods, Preparation of bidding / tender<br />

documents, participation in solicitations and awarding of contracts<br />

• ground and foundation expertises, feasibility studies, preliminary and approval planning incl. structural<br />

design<br />

• geotechnical, tunnelling, hydrogeological and environmental consultancy of the client<br />

• proof of approval and execution plannings incl. numerical analysis<br />

• controlling of Construction Supervision<br />

• participation in the geotechnical and tunnelling contract / claim management of the client<br />

• geotechnical, tunnelling, hydrogeological and environmental expertise on the basis of archives<br />

• preparation of bidding documents for construction works, participation in solicitations and awarding of<br />

contracts<br />

• preparation of investigation announcements for the authorities<br />

• carrying out of standard procedures and tender documents for geotechnical consultants related to<br />

several lots<br />

• coordination of geotechnical consultants related to several lots<br />

• preparation of the geotechnical expertise for the entire line<br />

• collection of historical data, concept for environmental investigation<br />

• hydrogeological consultancy for the client<br />

• consultancy of the client regarding geophysical investigation methods, Preparation of bidding / tender<br />

documents, participation in solicitations and awarding of contracts<br />

• cooperation with the client for the preparation of bidding documents for construction works, participation<br />

in solicitations and awarding of contracts<br />

• investigation programme and supervision of investigation<br />

• expert monitoring of the ground investigation<br />

• preparation of the geotechnical, tunnelling, hydrogeological and environmental expertise for the entire<br />

line<br />

• preparation of construction related ground and foundation expertise<br />

• geotechnical, tunnelling, hydrogeological and environmental consultancy of the client,<br />

• working out of a geotechnical, tunnelling, hydrogeological, vibrancy related and architectural conservation<br />

of evidence programme<br />

• coordination of all measures for conservation of evidence<br />

• geotechnical numerical considerations regarding the stability of the landslides Bad Bellingen, Schliengener<br />

Weinberg and for the portal zone North of the Katzenbergtunnel<br />

• supervision of ground investigation<br />

• time and cost control management<br />

• contract / claim management<br />

• safety and health coordination according to German Standard<br />

• geotechnical and tunnelling consultancy of the client, i.e.:<br />

• cooperation in working group „Karst“<br />

• geotechnical supervision of geophysical investigations<br />

• numerical considerations regarding the stability of slopes / cuts in kartsic terrain<br />

• geotechnical documentation, recommendations for a economical optimized construction of cuts in soil<br />

• feasibility study for the tunnel E2<br />

• consultancy for the tunnel construction “Tunnel Euerwang“<br />

• stability considerations (Finite-Element-Method), analysis of the scenario „failure deep de-watering<br />

Auer Berg”<br />

• concept for monitoring according EC 7<br />

• cooperation in contract / claim management with the client<br />

• ground and foundation expertise, feasibility study, preliminary and approval planning (incl. compressed-air<br />

driving concept, freezing of the ground, proof of alternative studies from technical and economical<br />

point of view, concept and evaluation of pile-load-testings, preparation of documents regarding<br />

the exposure with water for the authorities, conservation of evidence “Tunnel Offenbau<br />

• numerical considerations regarding the stability of cuts<br />

• preliminary planning<br />

• geotechnical consultant<br />

• claim management<br />

• approval of the executive planning<br />

• concept, tender and allocation of the soil investigation<br />

• supervision of the soil investigation<br />

• preparation geotechnical, tunneling, hydrogeological and rock mechanical expertise<br />

• preparation of bidding documents for construction works, participation in solicitations and awarding of<br />

contracts<br />

• planning, supervision and evaluation of insitu test<br />

• preparation of the preliminary, approval and executive planning<br />

• continuous evaluation of the monitoring (tunnels)<br />

• determination of the measure of the temporary supports during tunnel driving<br />

• geotechnical and tunneling consultancy and supervision during construction


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-SPEED RAILWAY LINES<br />

Cologne - Rhine/Main<br />

Lahntalbrücke<br />

Cologne<br />

Wallbachtalbrücke<br />

Frankfurt<br />

Cologne Frankfurt<br />

Location DB New High-Speed Railway Line Cologne - Rhine/Main, Germany<br />

Length 177 km<br />

Bridges 18<br />

Tunnel 30<br />

Time of construction 1996 - 2002<br />

Tasks Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and tunnelling report<br />

Geotechnical and tunnelling consultancy<br />

Supervision and documentation of the geotechnical work<br />

Concept of monitoring programmes incl. evaluation<br />

Geotechnical and tunnelling approval of the execution planning<br />

Geotechnical and tunnelling risk and contract management<br />

Comprehensive evaluation of displacements


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� HIGH-SPEED RAILWAY LINES<br />

Nuremberg – Ingolstadt – Munich<br />

Location DB New High-Speed Railway Line Nuremberg – Ingolstadt - Munich,<br />

Germany<br />

Length 171 km<br />

Bridges 7<br />

Tunnel 9<br />

Time of construction 1999 - 2006<br />

Tasks Concept, tender and allocation of the ground investigation in consideration<br />

of “Karst”<br />

Supervision of the ground investigation<br />

Numerical simulations for the proof of the ultimate and serviceability limit<br />

state<br />

Supervision and documentation of the geotechnical work<br />

Geotechnical and tunnelling consultancy<br />

Geotechnical and tunnelling risk and contract management<br />

Concept of monitoring programmes incl. evaluation


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Brenner Basetunnel, Investigation Tunnel Aicha · Italy<br />

Investigation Tunnel<br />

Innsbruck<br />

Brenner Basetunnel<br />

Bolzano<br />

Location Franzensfeste, Italy · Extension Line Munich – Verona<br />

Length of tunnel Investigation Tunnel approx. 10 km, Brenner Basetunnel approx. 52 km<br />

Tunnelling method Conventional and mechaniced<br />

Time of construction 2008 – 2012 (Investigation Tunnel)<br />

Tasks Geotechnical consultancy<br />

Supervision and documentation of the geotechnical work


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Brenner Basetunnel, Investigation Tunnel Periadriatic Seam · Italy<br />

Conjunction Area<br />

Investigation<br />

Tunnel<br />

Tunnel<br />

West<br />

Innsbruck<br />

Brenner Basetunnel<br />

Crosscut 48/2(2) Typ 2,<br />

L = 87 m<br />

Connection to<br />

Investigation Tunnel<br />

L = 420 m<br />

Connection to<br />

Investigation Tunnel<br />

Investigation Tunnel<br />

Periadriatic Seam<br />

Investigation Tunnel<br />

Periadriatic Seam<br />

assembly TBM<br />

Entrance Tunnel<br />

Mauls<br />

Conjunction Area<br />

Access Shaft<br />

Crosscut to Investigation Tunnel<br />

Crosscut 48/3(2) Typ 2,<br />

L = 59 m<br />

Mauls Section B<br />

L = 75 m<br />

Mauls Section A<br />

L = 172 m<br />

Entrance Tunnel Mauls<br />

L = 1607 m<br />

Investigation-<br />

Tunnel Aicha<br />

Logistic Section<br />

L = 148 m<br />

TBM assembly Cavern for<br />

Investigation Tunnel L = 35 m<br />

Connection Tunnel<br />

L = 41 m<br />

TBM assembly Caverns<br />

for Main Tunnel<br />

Gleis 1 und 2 L = 180 m<br />

Logistic Carvern<br />

L = 40 m<br />

Bolzano<br />

Investigation Tunnel<br />

Aicha<br />

Location Franzensfeste, Italy · Extension Line Munich – Verona<br />

Length of tunnel Investigation Tunnel 529 m + approx. 1325 m, Brenner Basetunnel 52 km<br />

Tunnelling method Universell<br />

Time of construction 2012 - (Investigation Tunnel)<br />

Tasks Geotechnical and tunnelling consultancy<br />

Determination of excavation classes<br />

Concept of monitoring programmes incl. evaluation<br />

Geotechnical and tunnelling riskmanagement<br />

Daily risk assessment and report<br />

Weekly reports on geotechnical and tunnelling data<br />

Tunnel<br />

East


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Khojak-Tunnel, rehabilitation / dualization (road and railway) of an existing tunnel Pakistan<br />

Chaman<br />

Khojak-Tunnel<br />

No. 18 3.920 m<br />

Shela Bagh<br />

Location Province Belutschistan, Quetta, Chaman, Pakistan<br />

Length of tunnel 3920 m<br />

Diameter min. 8.0 m (planning)<br />

Tasks Assessment of possible rehabilitation measures on the basis of geotechnical<br />

and tunnelling archive documents and a site inspection<br />

Tunnelling consultancy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Dubai Light Rail Project · United Arab Emirates<br />

DMD<br />

Station Al Ras<br />

10.00 Creek<br />

0.00<br />

-10.00<br />

-20.00<br />

-30.00<br />

-40.00<br />

-50.00<br />

-60.00<br />

Tunnel 6800 m<br />

weak rocks<br />

Green Line<br />

upper silty sand<br />

lower silty sand<br />

Tunnel 4700 m<br />

Dubai Creek<br />

calcisiltite<br />

TBM, Dubai<br />

Station Al Ghubaiba<br />

Location Dubai, UAE<br />

Length of tunnel 2 tunnel, total length 11.5 km<br />

Section 78 m²<br />

Diameter 9.90 m<br />

Tunnelling method Shield tunnelling with liquid and/or earth supported face<br />

Time of construction since 2005<br />

Tasks Geotechnical and tunnelling risk management<br />

conglomerate


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Extension of the Metro Tehran, Line 3 · Iran<br />

Line 3<br />

Location Tehran, Iran<br />

Total length 36 km<br />

Total length of tunnels 24 km<br />

Tunnelling method Shield and universal tunnelling and cut-and-cover method for the underground<br />

stations<br />

Time of construction since 2006<br />

Tasks Geotechnical and tunnelling consultancy


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Frankfurt 21<br />

m.a.s.l.<br />

140.00<br />

120.00<br />

100.00<br />

80.00<br />

60.00<br />

40.00<br />

m.a.s.l.<br />

140.00<br />

120.00<br />

100.00<br />

80.00<br />

60.00<br />

40.00<br />

20.00<br />

0.00<br />

Frankfurt<br />

Main Station<br />

Frankfurt Clay<br />

Limestone Bed<br />

Subway<br />

Frankfurt limestone<br />

Frankfurt Clay<br />

Tunnel City North<br />

Main<br />

North Main Station<br />

Subway<br />

Subway<br />

Frankfurt Limestone<br />

Tertiary marl<br />

Location Frankfurt/Main, Germany<br />

Length of tunnel Tunnel City North 2 x 3,130 m<br />

Tunnelling method<br />

Tunnel City South 2 x 1,770 m<br />

Shield driving / Earth supported face (planning)<br />

Section 4 Single-tracked<br />

Time of construction Planning<br />

Tasks Geotechnical and tunnelling feasibility study<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report, tunnelling report<br />

gw<br />

South


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Tunnel Frankfurter Kreuz<br />

fill<br />

sand<br />

sand/gravel<br />

sand<br />

final concrete<br />

lining<br />

sand<br />

silt/clay<br />

sand<br />

silt/clay<br />

final lining<br />

track level<br />

II<br />

II<br />

overall<br />

cross<br />

section<br />

shotcrete<br />

initial lining<br />

excavation/bench/invert<br />

invert<br />

ground surface<br />

(BAB A3)<br />

backfill concrete<br />

"Sägezahn"<br />

bench<br />

jet grouted floor cover<br />

top heading cross section<br />

top heading<br />

support core<br />

transverse bulkhead<br />

I<br />

embankment BAB A3<br />

jet grouted roof cover<br />

I<br />

jet grouted<br />

face columns<br />

7 m<br />

gw<br />

top heading support<br />

core<br />

gw<br />

quaternary<br />

(pleistocene)<br />

tertiary<br />

(pliocene)<br />

15 m<br />

6 m<br />

embankment BAB A3<br />

quarternary<br />

(pleistocene)<br />

tertiary<br />

(pliocene)<br />

shotcrete<br />

initial lining<br />

final concrete<br />

lining<br />

track level<br />

bench<br />

jet grouted<br />

floor cover<br />

II I<br />

invert<br />

II I<br />

ground surface<br />

(BAB A3)<br />

jet grouted roof cover<br />

jet grouted<br />

face columns<br />

Location DB New High-Speed Railway Line Cologne-Rhine/Main, Germany<br />

Length of tunnel 1,886 m<br />

Tunnelling method Shotcrete tunnelling with partial drivings (282m)<br />

Section Double-tracked<br />

150 m² (full section)<br />

Time of construction 1996 - 1999<br />

Tasks Geotechnical and tunnelling feasibility study<br />

Concept, tender and allocation of the ground investigation<br />

Supervision of the ground investigation<br />

Ground and foundation report, tunnelling report<br />

Supervision and documentation of the geotechnical work<br />

Concept of monitoring programmes incl. evaluation<br />

Geotechnical and tunnelling contract and claim management


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Subway Tunnel U5<br />

start shaft<br />

m.a.s.l.<br />

jet grouted block<br />

35<br />

30<br />

25<br />

20<br />

15<br />

10<br />

5<br />

North<br />

track 1<br />

stones and<br />

blocks<br />

shield driving [m]<br />

100<br />

150<br />

start shaft<br />

U5<br />

200<br />

filling<br />

upper sand<br />

valley sand<br />

track level<br />

melting water sand<br />

Brandenburger<br />

Tor<br />

planned subway tunnel<br />

jet grouted block<br />

250 300<br />

350 400<br />

450 500 550<br />

Location Berlin, Germany<br />

Length of tunnel Tunnel 1 480 m<br />

Tunnel 2 498 m<br />

Tunnelling method Shield driving (liquid-supported face by means of a mix-shield<br />

machine)<br />

Section 2 Single-tracked<br />

69 m² (full section)<br />

Time of construction 1998 - 2000<br />

Tasks Geotechnical and tunnelling consultancy<br />

Supervision and documentation of the geotechnical work<br />

Geotechnical and tunnelling contract and claim management<br />

East<br />

target


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

U55 Shuttle, subway station Brandenburger Tor<br />

filling<br />

subway station, "Unter den Linden"<br />

valley sand<br />

boulder clay/<br />

stones and blocks<br />

valley sand / melting water sand<br />

26<br />

27<br />

25<br />

28<br />

24<br />

29<br />

4<br />

5<br />

23<br />

3<br />

30<br />

6<br />

gw -2.00 m<br />

steel column<br />

2<br />

7<br />

Shotcrete initial lining<br />

1<br />

8<br />

22.0 m<br />

gallery south gallery north<br />

centre gallery<br />

14<br />

9<br />

22<br />

15<br />

13<br />

10<br />

12<br />

11<br />

21<br />

16<br />

20<br />

17<br />

frozen body<br />

19<br />

18<br />

10.4 m<br />

Microtunnel Ø 1.636 m<br />

Location Berlin, Germany<br />

Length of tunnel 90 m (subway station “Brandenburger Tor”)<br />

Tunnelling method Universal driving protected by frozen ground technology<br />

(30 Microtunnel, ø1.62 m)<br />

Time of construction 2005 - 2009<br />

Tasks Geotechnical and tunnelling consultancy<br />

Geotechnical and tunnelling contract management<br />

Numerical deformation simulations<br />

No. 76


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

New S-Bahn S21 Berlin • Westhafen – Central Station<br />

S21<br />

Total-Tower<br />

Location Berlin, Germany<br />

Length of tunnel and trough 610 m / 190 m<br />

Tunnelling method Open cut construction<br />

Time of construction since 2009<br />

Tasks Geotechnical and tunnelling approval of the execution planning<br />

for the Federal Railway Authority<br />

S21


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Stuttgart 21 • PFA 1.1 Undercrossing with Central Station<br />

Origin: Aldinger & Wolf<br />

Location Stuttgart, Germany<br />

Length PFA 1.1 approx. 900 m<br />

Foundation Open cut construction (Raft Foundation/Pile Foundation)<br />

Time of construction since 2011<br />

Tasks<br />

Geotechnical approval of the execution planning<br />

Supervision - documentation of geotechnical works<br />

Geotechnical and tunnelling consultancy<br />

Checking of plans<br />

Undercrossing<br />

Building of Infrastructure<br />

Origine: dpa


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Lohbergtunnel<br />

Location Mühltal, Germany<br />

Length of tunnel 1080 m<br />

Section 86.6 m²<br />

Diameter 10.5 m<br />

Tunnelling method Shotcrete tunnelling with partial drivings<br />

Time of construction 2003 – 2007<br />

Tasks Supervision and documentation of the geotechnical work and of the face<br />

Geotechnical and tunnelling consultancy<br />

Geotechnical and tunnelling contract management<br />

Geoenvironmental report (Asbestos)


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

Siegauentunnel<br />

m.a.s.l.<br />

55<br />

50<br />

45<br />

40<br />

35<br />

highway A560<br />

door frame slab method<br />

compressed-air<br />

driving (170 m)<br />

curch<br />

churchyard<br />

community centre<br />

driving section<br />

170 m compressed-air driving<br />

pilot tunnel<br />

shotcrete tunnelling with<br />

side wall drifts (200 m) open cut<br />

North South<br />

station 390 Tertiary basement clay<br />

Tertiary<br />

channel filling Quaternary<br />

station 220<br />

clay<br />

sand and silt<br />

surface<br />

Quaternary<br />

gw<br />

Tertiary<br />

13 m<br />

jet grouted<br />

column Ø1.30 m<br />

core<br />

12.45 m<br />

pilot tunnel<br />

side wall side wall<br />

shotcrete<br />

bench/invert<br />

profile<br />

Location DB New High-Speed Railway Line Cologne-Rhine/Main, Germany<br />

Length of tunnel 2,202 m<br />

Tunnelling method Open cut, shotcrete tunnelling with sidewall drifts (200m), compressed-air<br />

driving (170 m), door frame slab method<br />

Section Double-tracked, 156 m² (full section)<br />

Time of construction 1998 - 2002<br />

Tasks Geotechnical and tunnelling consultancy<br />

Supervision and documentation of the geotechnical work<br />

Concept of monitoring programmes incl. evaluation<br />

Geotechnical and tunnelling contract and claim management<br />

7 m<br />

3.4 m<br />

3.5 m<br />

20 m


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� TUNNEL<br />

New Tunnel Mainz<br />

North<br />

Mainz main station<br />

concrete<br />

inner<br />

lining<br />

fill<br />

clay, silt, marl<br />

shotcrete lining<br />

excavation<br />

bench/invert<br />

max. 120 m<br />

fill<br />

limestone bed<br />

clay, silt, marl<br />

limestone bed<br />

Mainz centre<br />

~30 m<br />

top heading<br />

~50 m<br />

1-1.5 m<br />

1.292m<br />

fill<br />

sidewall drift<br />

1-1.5 m<br />

fill<br />

clay, silt, marl<br />

sidewall<br />

drift<br />

top<br />

heading<br />

bench/<br />

invert<br />

South<br />

Mannheim<br />

North South East<br />

West<br />

sidewall<br />

drift<br />

bolting<br />

gw fill fill gw<br />

Location DB Extension Line Mainz-Mannheim, Germany<br />

Length of tunnel 1,300 m<br />

Tunnelling method Shotcrete tunnelling with sidewall drifts<br />

Section Double-tracked<br />

130 m² (full section)<br />

Time of construction 1998 – 2001<br />

Tasks Geotechnical and tunnelling approval for the German Railway Authority


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� ENVIRONMENTAL GEOTECHNICS<br />

Construction of disposals<br />

Disposal Flotzgrün / Speyer, Germany Waste disposal Aßlar, Germany<br />

Base sealing, disposal Flotzgrün / Speyer, Germany Remediation of a contaminated site, Germany<br />

Base sealing, disposal Nieder-Ofleiden, Germany Waste disposal Heßheim, Germany<br />

Tasks Determination of required investigation<br />

Coordination of environmental investigation, sampling and supervision of field<br />

works<br />

Planning and supervision of disposal remediations<br />

Planning and supervision of new disposals and sealing systems<br />

Supervision and documentation of the geotechnical work<br />

Geotechnical and environmental consultancy<br />

Geotechnical approval<br />

Stability considerations<br />

Geotechnical and geoenvironmental reports


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� ENVIRONMENTAL GEOTECHNICS<br />

Abandoned sites, Contamination • Ground / Soilgas / Groundwater<br />

Tasks Study and evaluation of existing archive documents<br />

Historical research<br />

Geoenvironmental impact assessment<br />

Determination of required investigation / chemical-analytical parameters<br />

Coordination of concepts for remedation, sampling<br />

Preperation of concepts for remediation and disposal<br />

Planning and supervision of remediation (ground, soilgas, groundwater)<br />

Classification of waste and assessment according to national regulations<br />

Geoenvironmental reports


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� ENVIRONMENTAL GEOTECHNICS<br />

Building demolition / reconstruction / remediation and modification<br />

Tasks Evaluation / compilation of existing structural fabric and harmful substances<br />

Estimation of volume and mass<br />

Organisation of site works<br />

Evaluation of the risk potential concerning the waste<br />

Classification of waste<br />

Setting up programmes for the waste disposal<br />

Working out solicitations for the demolition and disposal<br />

Tender and allocation of the demolition works<br />

Supervision of the demolition, consulting during demolition<br />

Documentation and final conclusion


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� USE OF GEOTHERMAL ENERGY<br />

Deep geothermal energy<br />

Geothermal power plant unit Drilling rig for deep boreholes<br />

Electricity production with geothermal power plants<br />

Engineering services Concepts and feasibility studies for the construction of geothermal power<br />

plants<br />

Assessment of location<br />

Planning, supervision and evaluation of geothermal investigation works<br />

Accompanation during conceptual design phase of geothermal plant<br />

Geothermal expertise<br />

Geothermal and geotechnical risk assessment study<br />

Research


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� USE OF GEOTHERMAL ENERGY<br />

Shallow geothermal systems<br />

Horizontal heat exchangers<br />

• Fluid circulates within a closed tube systems<br />

• Located 0.2 m below local frost penetration depth<br />

• Undeveloped area required<br />

Heat exchanger tubes<br />

• Fluid circulates within a closed tube systems<br />

• Single heat exchanger tubes or assembly<br />

• Cooling and heating<br />

Earth affected structures<br />

• Fluid circulates within closed tube systems in earth<br />

affected concrete structures such as retaining walls,<br />

piles, rafts and tunnels<br />

• Cooling and heating<br />

energy<br />

anchor<br />

energy absorber<br />

system<br />

shotcrete<br />

inner lining<br />

horizontal<br />

energy absorber system


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> • <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

� USE OF GEOTHERMAL ENERGY<br />

Shallow geothermal systems<br />

raft<br />

energy<br />

pile<br />

foundation pile = energy pile<br />

Engineering services Geological, geotechnical and hydrogeological expertise<br />

Planning, tendering and expert monitoring of investigation works (drillings,<br />

geothermal tests)<br />

Geothermal consultancy<br />

Design of shallow geothermal systems<br />

Expert monitoring during approval procedure of authorities<br />

Expert documentation<br />

Effects by using geothermal energy<br />

► Saves lifetime costs<br />

► Reduction of energy consumption<br />

► Environmental-friendly energy<br />

► Forward-looking thinking<br />

heat exchanger<br />

fit on the<br />

reinforcement<br />

Prof. Quick and Dr. Michael are active members of working groups concerning shallow and deep geothermal<br />

energy.


<strong>PROF</strong>. <strong>DIPL</strong>.-<strong>ING</strong>. H. <strong>QUICK</strong> � <strong>ING</strong>ENIEURE <strong>UND</strong> <strong>GEOLOGEN</strong> <strong>GMBH</strong><br />

�� GEOTECHNICAL RISK AND CONTRACT / CLAIM MANAGEMENT<br />

Geotechnical risk management<br />

�� Evaluation ground and system risks<br />

�� Realization of risk-simulations<br />

�� Evaluation of effects of risk concerning the ultimate and serviceability limit state<br />

�� Continuous comparison of the risk-analysis during execution of projects<br />

Contract / claim management<br />

�� Contract preparation and allocation (participation)<br />

�� Evaluation of solicitations<br />

�� Evaluation of ground and system risks during construction

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!