the projected 30 year transformer life and transformer loading. Evaluated Cost is the sum of the<br />

Base Price and Losses.<br />

Summary of Evaluation<br />

Manufacturer<br />

Base<br />

Evaluated<br />

Price ($) Losses ($) Cost ($)<br />

<strong>Transformer</strong>s and Rectifiers (India) Ltd. 623,650 257,620 881,270<br />

CG Power Systems 671,400 357,116 1,<strong>02</strong>8,516<br />

Virginia <strong>Transformer</strong> 695,275 354,891 1,050,116<br />

Weg 734,383 373,944 1,108,327<br />

Delta Star 849,578 336,819 1,186,397<br />

ABB 850,975 351,115 1,2<strong>02</strong>,090<br />

Howard Industries<br />

Incomplete bid packet<br />

The bid specification requires the <strong>Bid</strong>der to manufacture the transformer in the continental United<br />

States. <strong>Transformer</strong>s and Rectifiers (India) Ltd. manufactures transformers at their facility in<br />

Ahmedabad, India so their bid does not meet the requirements in the bid specifications. CG Power<br />

Systems would manufacture the transformer at their facility in Washington, MO. However, this plant<br />

has only manufactured smaller, distribution-type transformers and has not manufactured a<br />

transformer with the capacity required in the bid specifications. Consequently, CG Power Systems<br />

does not meet the minimum qualifications for <strong>Bid</strong>der’s experience as required in the bid<br />

specifications. Based the evaluation of the bids submitted, Virginia <strong>Transformer</strong> was determined to<br />

be the lowest responsible bidder.<br />

Budget Impact: Funding for the project will come from the electric rate stabilization fund and a<br />

budget of $1.1 million has been established for this project. The remaining budgeted funds after the<br />

purchase of the new transformer will be used for the installation of the new transformer, upgrading<br />

control and protection systems, and the additional equipment required in the substation to handle the<br />

added capacity.<br />

Recommendation: It is <strong>rec</strong>ommended that the Trustees award the bid for the <strong>Kinzie</strong> substation<br />

transformer to Virginia <strong>Transformer</strong> in the amount of $695,275 and authorize expenditures for the<br />

purchase of the transformer in the same amount.<br />

Prepared by:<br />

Kyle Muret, Electrical Engineer Intern<br />

Reviewed by Operations Di<strong>rec</strong>tor: Lee Jackson, Engineering Manager<br />

Reviewed by Administrative Di<strong>rec</strong>tor: Dan Blankenship, <strong>SUA</strong> Di<strong>rec</strong>tor<br />

Date of Preparation: January 3, 20<strong>13</strong><br />

Submitted by:<br />

___________________________<br />

Dan Galloway<br />

City Manager