02.01.2015 Views

Overview of NRCs Uranium Recovery Inspection Program

Overview of NRCs Uranium Recovery Inspection Program

Overview of NRCs Uranium Recovery Inspection Program

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Post <strong>Inspection</strong> Activities<br />

• Post inspection debrief <strong>of</strong> NRC management and staff<br />

– Generally week <strong>of</strong> return to <strong>of</strong>fice<br />

• Ship any samples to NRC contractor lab for analysis<br />

• Coordinate any enforcement<br />

– See NRC enforcement policy<br />

http://pbadupws.nrc.gov/docs/ML0934/ML093480037.pdf<br />

• Issue <strong>Inspection</strong> Report<br />

– 30 day goal for normal inspection reports (post exit)<br />

– 45 day goal for team inspections (post exit)<br />

• Determine need for any follow-up

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!