4. Design <strong>of</strong> innovation for more effective operation<br />

Required parameters <strong>of</strong> steam = dem<strong>and</strong>s on flowmeter<br />

Steam pipe for TG1,2<br />

Steam pipe for TG3<br />

Temperature ( C) 535 485<br />

Pressure (MPa) 13,3 6,6<br />

Flow (tones/hour) Max. 350 Max. 49<br />

Diameter <strong>of</strong> pipe TG1: DN 200<br />

TG2: DN 250<br />

DN 200<br />