04.01.2015 Views

Annexure - Department of Planning, Govt. of Arunachal Pradesh

Annexure - Department of Planning, Govt. of Arunachal Pradesh

Annexure - Department of Planning, Govt. of Arunachal Pradesh

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Page 1<br />

BORDER AREA DEVLOPMENT PROGRAMME (BADP)<br />

ANNUAL ACTION PLAN FOR THE YEAR 2012-13<br />

<strong>Annexure</strong> - I<br />

NAME OF THE STATE<br />

:: ARUNACHAL PRADESH<br />

METING OF SLSC HELD ON :: 13 TH SEPTEMBER, 2012 (Amount in Rs.)<br />

Sl.<br />

No.<br />

Name <strong>of</strong> the Sector / Scheme project Orginal Approved<br />

outlay<br />

Physical<br />

target with<br />

Whether<br />

scheme is<br />

District Block Village<br />

date <strong>of</strong> new<br />

Year <strong>of</strong><br />

completion <strong>of</strong><br />

commencem<br />

the work<br />

ent<br />

Whether scheme is oning<br />

from the previous year<br />

Fund already<br />

utilised<br />

(Year wise)<br />

Fund<br />

requirment in<br />

the current<br />

year<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

Remarks<br />

1 C/o 5 Class room at <strong>Govt</strong> Town sec school (250 sqm) Tawang Tawang Shyo 4300000.00 31/3/2013 New 2012-13 Nil 4300000.00<br />

2 C/o Teachers quarter at Seru school (50 sqm) Tawang Tawang Seru 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

3 Procurement <strong>of</strong> Ultrasound machine for PHC Tawang Tawang Tawang Tawang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

4 C/o Public Toilet at Gyangong Tawang Tawang Gyangong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

5 C/o Public drainage at Damgin (120 mtr) Tawang Tawang Damgin 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

6 C/o public drainage at Khinmey (120 mtr) Tawang Tawang Khinmey 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

7 C/o public drainage at Nyongo (120 mtr) Tawang Tawang Changbu 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

8 C/o public drainage at craft center (100 mtr) Tawang Tawang Damgin 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

9 C/o Public drainage at Shyo vill (320 mtr.) Tawang Tawang Shyo 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

10 C/o Public drainage at Bumteng (120 mtr) Tawang Tawang Bumteng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

11 C/o protection wall near industrial area.(36 cum) Tawang Tawang Changprong 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

12 C/o protection wall at Tsomro (20 cum) Tawang Tawang Changprong 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

13 C/o Protection wall & drain at Khinmey Lhakhang (48 Tawang Tawang Khinmey 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

cum)<br />

14 C/o Protection wall at Shimchangteng (36 cum) Tawang Tawang Tawang 473439.00 31/3/2013 New 2012-13 Nil 473439.00<br />

15 C/o Protection wall at shyo (56 cum) Tawang Tawang Shyo 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

16 C/o Protection wall at medical line (16 cum) Tawang Tawang Changprong 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

17 C/o Protection wall at girdhar lakhang (24 cum) Tawang Tawang Tsaighar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

18 Drinking Water supply at Old age home at Teli (490 mtr) Tawang Tawang Teli 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

19 Providing Watersupply at Shazing vill (200 mtr) Tawang Tawang Sajing 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

20 Formation cutting <strong>of</strong> Link road from Helipad to Novadaya Tawang Tawang Teli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

school (100 mtr)<br />

21 C/o RCC culvert at Rhomang (1.50 mtr) Tawang Tawang Surbi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

22 C/o Pathway at Keteng (50 mtr) Tawang Tawang Urgeling 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

23 C/o Pathway from PMGSY road to Gormang (150 mtr) Tawang Tawang Gormang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

24 C/o pathway within Ketchenga (200 mtr) Tawang Tawang New lebrang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

25 C/o Pathway from road point to lamrong (150 mtr) Tawang Tawang Lamrong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 2<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

26 C/o Pathway within gomkang (150 mtr) Tawang Tawang Gomkang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

27 C/o Pathway at Ngingmey culture center (100 mtr) Tawang Tawang Bramdungchung 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

28 C/o pathway from kakaling school to HDS colony (150 Tawang Tawang Changbu 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

mtr)<br />

29 C/o Pathway at Yussum (150 mtr) Tawang Tawang Yussum 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

30 C/o Pathway within lemberdung (150 mtr) Tawang Tawang lemberdung 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

31 C/o log bridge at Dushumgang (11 mtr) Tawang Tawang Khinmey 220000.00 31/3/2013 New 2012-13 Nil 220000.00<br />

32 C/o Tourist Guest house at Bramdungchung (24 sqm) Tawang Tawang Bramdung<br />

chung<br />

400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

33 Improvement <strong>of</strong> Mandreling Community Center (60 sqm) Tawang Tawang Gonpa basti 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

34 C/o Community hall at Famla (48 sqm) Tawang Tawang Famla 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

35 C/o Community Hall at Surbi (54 sqm) Tawang Tawang Surbi 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

36 C/o Community Hall at Changprong ph-I (54 sqm) Tawang Tawang Changprong 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

37 C/o Cultural center at Urgelling Ph-I (60 sqm) Tawang Tawang Urgeling 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

38 Capacity building / Skill development on local dress<br />

making, painting, agarbati making, etc.<br />

Tawang Tawang Tawang Block 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

39 Capacity building / Skill development on Tourism Tawang Tawang Tawang Block 608436.00 31/3/2013 New 2012-13 Nil 608436.00<br />

40 Construction <strong>of</strong> foot track from BP No. 356 to 358 along<br />

IBB (14 kms)<br />

Tawang Zemithang-<br />

Dudunghar/A<br />

ll blocks<br />

41 Installation <strong>of</strong> 50 nos Solar Home Lighting for SSB BOPs Tawang Zemithang-<br />

Dudunghar/A<br />

ll blocks<br />

Sub total = 24168750.00<br />

1516875.00 31/3/2013 New 2012-13 Nil 1516875.00<br />

900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

1 C/o Teachers quarter at Sazo (46.0 Sqm) Tawang Lumla Sazo 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

2 C/o Teachers quarter at Hoongla (46.0 Sqm) Tawang Lumla Hoongla 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

3 C/o Teachers quarter at Kharsot (46.0 Sqm) Tawang Lumla Kharsot 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

4 C/o Teachers quarter at Mangnam (46.0 Sqm) Tawang Lumla Mangnam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

5 C/o Teachers quarter at Melonghar (46.0 Sqm) Tawang Lumla Melonghar 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

6 C/o Teachers quarter at Thongleng (46.0 Sqm) Tawang Lumla Thongleng 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

7 C/o Teachers quarter at Pamaghar. (46.0 Sqm) Tawang Lumla Pamaghar 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

8 C/o Teachers quarter at Kharteng (46.0 Sqm) Tawang Lumla Kharteng 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

9 Procurement <strong>of</strong> 1 No. Shadowless OT Lamp with stand Tawang Lumla Lumla 25000.00 31/3/2013 New 2012-13 Nil 25000.00<br />

10 Procurement <strong>of</strong> 1 No. Baby Warmer Tawang Lumla Lumla 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

11 Procurement <strong>of</strong> 1 No. Sterilizer(Electrical) Tawang Lumla Lumla 5000.00 31/3/2013 New 2012-13 Nil 5000.00<br />

12 Procurement <strong>of</strong> 2 Nos. ENT Diagonistic Set Tawang Lumla Lumla 10000.00 31/3/2013 New 2012-13 Nil 10000.00<br />

13 Public drainage facilities at Zero (Magnam) (200 mtr.) Tawang Lumla Mangnam 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

14 Land Protection at Flabu (28 mtr) Tawang Lumla Kharteng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 3<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

15 Land Protection at Khedung. (28 mtr) Tawang Lumla Lumla 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

16 Land Protection at New Lumla. (28 mtr) Tawang Lumla New Lumla 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

17 Land Protection at Kudung. (28 mtr) Tawang Lumla Kudung 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

18 Land Protection at Sakpret. (28 mtr) Tawang Lumla Sakpret 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

19 Land Protection at Pamaghar. (28 mtr) Tawang Lumla Pamaghar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

20 Land Protection at Thongleng. (28 mtr) Tawang Lumla Thongleng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

21 Land protection at Baghar. (28 mtr) Tawang Lumla Baghar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

22 Porter Track from Thrillam to Tsangtse (2 km) Tawang Lumla Thrillam 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

23 2 nos Log Bridges at Gokorong and Kyamteng (2x7 mtr) Tawang Lumla Sakpret 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

24 CC Pathway School to Playground at Sakyur (120 mtr) Tawang Lumla Sakyur 253439.00 31/3/2013 New 2012-13 Nil 253439.00<br />

25 CC Pathway at New Lumla (200 mtr) Tawang Lumla New Lumla 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

26 Construction <strong>of</strong> one unit quarter for <strong>of</strong>ficials engaged in Tawang Lumla Lumla 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

education sector at Mangnam (46 sqm)<br />

27 Construction <strong>of</strong> one unit quarter for <strong>of</strong>ficials engaged in<br />

education sector at Lumla (46 sqm)<br />

28 Construction <strong>of</strong> one unit quarter for <strong>of</strong>ficials engaged in<br />

Health sector at Lumla (46 sqm)<br />

Tawang Lumla Lumla 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Tawang Lumla Lumla 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

29 Public Sanitary Toilets 2 units at Thongleng<br />

Tawang Lumla Thongleng 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

(Ngangmey)<br />

30 C/o Cultural Centre at Gispu-II (60 sqm) Tawang Lumla Gispu-II 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

31 C/o Cultural Centre at Mangnam (60 sqm) Tawang Lumla Mangnam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

32 C/o Cultural Centre at Kungba (60 sqm) Tawang Lumla Kungba 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

33 C/o Cultural Centre at Brumedung (60 sqm) Tawang Lumla Sherbang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

34 C/o Cultural Centre at Lumla Toth (60 sqm) Tawang Lumla Lumla 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

35 Capacity building / Skill development on local dress<br />

making, painting, agarbati making, Jam and Pickle<br />

making, etc.<br />

Tawang Lumla Lumla 657248.00 31/3/2013 New 2012-13 Nil 657248.00<br />

36 Capacity building / Skill development on Tourism Tawang Lumla Lumla 551188.00 31/3/2013 New 2012-13 Nil 551188.00<br />

37 C/o Mule track from Log Bridge to Khukri (Chainage 0.00<br />

km to 1.15 kms)<br />

38 Construction <strong>of</strong> 3 nos wooden bridges connecting<br />

Surwasamba and Khukri<br />

39 Installation <strong>of</strong> 20 nos Solar street light for ITBP BOPs<br />

and in Mule Track<br />

Tawang<br />

Tawang<br />

Tawang<br />

Zemithang<br />

Dudunghar<br />

& Lumla<br />

Zemithang<br />

Dudunghar<br />

& Lumla<br />

Zemithang<br />

Dudunghar<br />

& Lumla<br />

Zemithang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

856875.00 31/3/2013 New 2012-13 Nil 856875.00<br />

Lumla 560000.00 31/3/2013 New 2012-13 Nil 560000.00<br />

Sub total = 24168750.00<br />

BADP AAP 2012-13 for website


Page 4<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

1 C/o Mule track from Log Bridge to Khukri (Chainage 1.15<br />

km to 2.30 kms)<br />

2 C/o Mule track from Log Bridge to Khukri (Chainage 2.30<br />

km to 3.20 kms)<br />

Tawang<br />

Tawang<br />

Zemithang<br />

Dudunghar<br />

Zemithang<br />

Dudunghar<br />

3 Upgradation <strong>of</strong> MHS T. Gonpa Tawang Zemithang<br />

Dudunghar<br />

4 C/o Cultural Center at Buri (60 sqm) Tawang Zemithang<br />

Dudunghar<br />

5 C/o Cultural Center at Kraiteng (60 sqm) Tawang Zemithang<br />

Dudunghar<br />

6 C/o Cultural Center at Maramey (60 sqm) Tawang Zemithang<br />

Dudunghar<br />

7 C/o Cultural Center at Ramyang (60 sqm) Tawang Zemithang<br />

Dudunghar<br />

8 C/o Cultural Center at Shakti (60 sqm) Tawang Zemithang<br />

Dudunghar<br />

9 C/o Cultural Center at Banghar (60 sqm) Tawang Zemithang<br />

Dudunghar<br />

10 C/o Cultural Center at Taksang (60 sqm) Tawang Zemithang<br />

Dudunghar<br />

11 C/o Cultural Center at Thiksi (60 sqm) Tawang Zemithang<br />

Dudunghar<br />

12 Construction <strong>of</strong> one unit Type-II house for <strong>of</strong>ficials<br />

engaged in education sector (46 sqm)<br />

13 Construction <strong>of</strong> one unit Type-II house for <strong>of</strong>ficials<br />

engaged in Health sector (46 sqm)<br />

Tawang<br />

Tawang<br />

Zemithang<br />

Dudunghar<br />

Zemithang<br />

Dudunghar<br />

14 Land Protection Dungser Leng (28 mtr) Tawang Zemithang<br />

Dudunghar<br />

15 Land Protection Ngarmaleng (28 mtr) Tawang Zemithang<br />

Dudunghar<br />

16 Land Protection Namtsering Leng (28 mtr) Tawang Zemithang<br />

Dudunghar<br />

17 C/o Teachers quarter at Khobleteng (46.0 Sqm) Tawang Zemithang<br />

Dudunghar<br />

18 C/o Teachers quarter at Taksang (46.0 Sqm) Tawang Zemithang<br />

Dudunghar<br />

19 C/o Teachers quarter at Shakti (46.0 Sqm) Tawang Zemithang<br />

Dudunghar<br />

20 C/o Teachers quarter at Guntse (46.0 Sqm) Tawang Zemithang<br />

Dudunghar<br />

Zemithang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Zemithang 787875.00 31/3/2013 New 2012-13 Nil 787875.00<br />

Taksang 629000.00 31/3/2013 New 2012-13 Nil 629000.00<br />

Buri 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Khobleteng 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Maramey 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Ramyang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Shakti 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Namtsering 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Taksang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Thiksi 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Dudunghar 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Dudunghar 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Guntse 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Guntse 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Namtsering 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Khobleteng 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Taksang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Shakti 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Guntse 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 5<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

21 C/o Teachers quarter at Dudunghar (46.0 Sqm) Tawang Zemithang<br />

Dudunghar<br />

22 C/o Girls Hostle Building at Namtsering ME School<br />

(56.00 Sqm)<br />

23 C/o Public Library/ reading room at Zemithang (52.00<br />

Sqm)<br />

Tawang<br />

Tawang<br />

Zemithang<br />

Dudunghar<br />

Zemithang<br />

Dudunghar<br />

24 Procurement <strong>of</strong> 1 No. Autoanalizer Tawang Zemithang<br />

Dudunghar<br />

25 Link Road CO Office to Dudunghar Vill (100 mtr) Tawang Zemithang<br />

Dudunghar<br />

26 Approach Road BRTF Road to Bletting Village (100 mtr) Tawang Zemithang<br />

Dudunghar<br />

27 Porter Track Lhatse to Mirgala (3 km) Tawang Zemithang<br />

Dudunghar<br />

28 Porter Track Samtent Tseling to Serteng (3 km) Tawang Zemithang<br />

Dudunghar<br />

29 Porter Track Besateng to Sarongpo (3 km) Tawang Zemithang<br />

Dudunghar<br />

30 Log Bridges at Kerodung (7 mtr) Tawang Zemithang<br />

Dudunghar<br />

31 Capacity building / Skill development on Seiculture Tawang Zemithang<br />

Dudunghar<br />

32 Capacity building / Skill development on Tourism Tawang Zemithang<br />

Dudunghar<br />

1 C/o Pathway from PMGSY road to Gyamdong SSB BOP<br />

(320 m)<br />

2 C/O foot track from BOP Zalim BP No.330 to BP No.<br />

334. (12 kms)<br />

3 Providing <strong>of</strong> water supply line with water Tank at BOP<br />

Gyamdong.<br />

4 C/o Guarding Shed for SSB personnel at bridge point<br />

Bongkhar (28 sqm)<br />

Tawang<br />

Tawang<br />

Tawang<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

5 Water Supply line with Water tank at SSB Camp Mukto Tawang Mukto<br />

Bongkhar<br />

6 Capacity building / Skill development on Hand made<br />

Paper making<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

7 Training <strong>of</strong> Youth on forest tracking and tourist guide Tawang Mukto<br />

Bongkhar<br />

Dudunghar 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Namtsering 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Zemithang 895000.00 31/3/2013 New 2012-13 Nil 895000.00<br />

Zemithang 648439.00 31/3/2013 New 2012-13 Nil 648439.00<br />

Dudunghar 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Bletting 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Socksten 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Socksten 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Socksten 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Socksten 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Zemithang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Zemithang 708436.00 31/3/2013 New 2012-13 Nil 708436.00<br />

Sub total = 24168750.00<br />

Mukto 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

750000.00 31/3/2013 New 2012-13 Nil 750000.00<br />

275000.00 31/3/2013 New 2012-13 Nil 275000.00<br />

516875.00 31/3/2013 New 2012-13 Nil 516875.00<br />

275000.00 31/3/2013 New 2012-13 Nil 275000.00<br />

Mukto Block 808437.00 31/3/2013 New 2012-13 Nil 808437.00<br />

Mukto Block 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

BADP AAP 2012-13 for website


Page 6<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

8 C/o CC pathway within Bomja village (300 m) Tawang Mukto<br />

Bongkhar<br />

9 C/o Resting shed on porter track from Bongleng to<br />

Kharung (12 sqm)<br />

10 C/o Resting shed on porter track from Kharung to Bomja<br />

(12 sqm)<br />

11 C/o Resting shed on porter track from Bomja to Khet (12<br />

sqm)<br />

12 C/o Resting shed on porter track from Khet to<br />

Gyamdong (12 sqm)<br />

13 C/o Resting shed on porter track from Gyamdong to<br />

Gongkhar (12 sqm)<br />

Tawang<br />

Tawang<br />

Tawang<br />

Tawang<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

14 C/o Resting shed at Changteng (12 sqm) Tawang Mukto<br />

Bongkhar<br />

15 Electrification <strong>of</strong> Thumbey hamlet under Khet village<br />

(100 m)<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

16 C/o CC culvert at Khet (10 m) Tawang Mukto<br />

Bongkhar<br />

17 C/o CC pathway from Old Mirba to New Mirba (420 m) Tawang Mukto<br />

Bongkhar<br />

18 C/o CC pathway within Gyamdong village (420 m) Tawang Mukto<br />

Bongkhar<br />

19 C/o CC pathway within Khet Toth village (400 m) Tawang Mukto<br />

Bongkhar<br />

20 C/o CC pathway within Khet Meith village (400 m) Tawang Mukto<br />

Bongkhar<br />

21 Procurement <strong>of</strong> Telescopic Labor Table for PHC Mukto Tawang Mukto<br />

Bongkhar<br />

22 Procurement <strong>of</strong> OT Lamp (Shadow less) for PHC Mukto Tawang Mukto<br />

Bongkhar<br />

23 C/o 2 unit Bachelor Barrack for teachers at Bongkhar<br />

(50 sqm)<br />

24 Development <strong>of</strong> play field at Gyamdong Middle School<br />

(400 Sqm)<br />

Tawang<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

25 C/o reading room at <strong>Govt</strong>. ME School Khet ((40 Sqm) Tawang Mukto<br />

Bongkhar<br />

26 Plantation <strong>of</strong> Dephnae Papercea locally named<br />

Shugsheng at Langaiteng<br />

27 C/o Public drainage at Kangdorong in Gomkyaleng<br />

village (400 mtr.)<br />

Tawang<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

Bomja 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Bongleng 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kharung 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Bomja 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Khet 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gyamdong 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gongkhar 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Khet 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Khet 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Mirba 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Gyamdong 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Khet 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Khet 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Mukto 80000.00 31/3/2013 New 2012-13 Nil 80000.00<br />

Mukto 25000.00 31/3/2013 New 2012-13 Nil 25000.00<br />

Bongleng 971719.00 31/3/2013 New 2012-13 Nil 971719.00<br />

Gyamdong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Khet 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Mukto 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gomkyaleng 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

BADP AAP 2012-13 for website


Page 7<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

28 C/o Public drainage within Changteng village (155 mtr.) Tawang Mukto<br />

Bongkhar<br />

29 C/o Public drainage within Gongkhar village (360 mtr.) Tawang Mukto<br />

Bongkhar<br />

30 C/o Public drainage system at Kharung village (400 mtr.) Tawang Mukto<br />

Bongkhar<br />

31 C/o Public drainage system at Bongleng (500 mtr.) Tawang Mukto<br />

Bongkhar<br />

32 C/o Public drainage below Serjong village (450 mtr.) Tawang Mukto<br />

Bongkhar<br />

33 Flood Protection wall near Bomja village Tawang Mukto<br />

Bongkhar<br />

34 C/o Multipurpose Community Shed near Secondary<br />

School Mukto (56 sqm)<br />

35 C/o 2 unit Bachelor Barrack for Medical staff at<br />

Bongkhar (50 sqm)<br />

36 C/o SPT Type-II building for Medical staff at Bongkhar<br />

(45 sqm)<br />

Tawang<br />

Tawang<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

37 C/o Rural sanitation block at Kitdung (15 sqm) Tawang Mukto<br />

Bongkhar<br />

38 C/o Common toilet for Girls at Sec. School Mukto (15 Tawang Mukto<br />

sqm)<br />

Bongkhar<br />

39 C/o Common toilet for Boys at Sec. School Mukto (15<br />

sqm)<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

40 C/o Rural sanitation block at Serjong Gompa (15 sqm) Tawang Mukto<br />

Bongkhar<br />

41 C/o Rural sanitation block at Gyamdong (15 sqm) Tawang Mukto<br />

Bongkhar<br />

42 C/o Culture center at Yatpapho near Bemdung (60 sqm) Tawang Mukto<br />

Bongkhar<br />

43 C/o Community Hall at Mukto (60 sqm) Tawang Mukto<br />

Bongkhar<br />

44 C/o Community Hall at Serjong (60 sqm) Tawang Mukto<br />

Bongkhar<br />

45 C/o Common shelter for old and handicapped near<br />

Gomkyaleng Gompa (50 sqm)<br />

46 C/o Common shelter for old and handicapped near<br />

Serjong Gompa (45 sqm)<br />

Tawang<br />

Tawang<br />

Mukto<br />

Bongkhar<br />

Mukto<br />

Bongkhar<br />

Gongkhar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Gongkhar 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Kharung 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Bongleng 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Serjong 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Bomja 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Serjong 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Bongleng 971719.00 31/3/2013 New 2012-13 Nil 971719.00<br />

Kharung 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Mukto 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Serjong 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Serjong 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Serjong 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Gyamdong 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Mukto 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Mukto 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Serjong 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Gomkyaleng 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Serjong 945000.00 31/3/2013 New 2012-13 Nil 945000.00<br />

Sub total = 24168750.00<br />

BADP AAP 2012-13 for website


Page 8<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

1 Widening <strong>of</strong> approch road for namet community hall<br />

(157 mtr)<br />

Tawang Kitpi Namet 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

2 C/o Class room at kitpi school (50 sqm) Tawang Kitpi Khardung 850000.00 31/3/2013 New 2012-13 Nil 850000.00<br />

3 Improvement <strong>of</strong> hostel building at VKV Kitpi (120 sqm) Tawang Kitpi Kralling 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

4 C/o Public drainage at Jungmang within Kitpi village Tawang Kitpi Kitpi 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

(290 mtr.)<br />

5 C/o Public drainage at dharmkang (110 mtr.) Tawang Kitpi Dharmakang 275000.00 31/3/2013 New 2012-13 Nil 275000.00<br />

6 C/o Public drainage within Khrimu meith (120 mtr) Tawang Kitpi Khrimu Meith 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

7 C/o Public drainage for soma vill (120 mtr) Tawang Kitpi Soma 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

8 C/o Public drainage at Chaksam vill (180 mtr.) Tawang Kitpi Chaksam 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

9 C/o Public drainage at Maidung I & II (160 mtr.) Tawang Kitpi Maidung 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

10 C/o Public drainage at Bragyap (200 mtr.) Tawang Kitpi Khrimu Toth 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

11 C/o Public drainage at Jarmakang <strong>of</strong> weikhar vill (120 Tawang Kitpi Weikhar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

mtr)<br />

12 C/o Public drainage at berghar (120 mtr) Tawang Kitpi Berghar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

13 C/o MIC at Tengthin (160 mtr) Tawang Kitpi Tengthin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

14 C/o MIC at Khardung (200 mtr) Tawang Kitpi Khardung 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

15 C/o MIC at Tsomleng , Bathung (160 mtr) Tawang Kitpi Bathung 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

16 C/o MIC at Rhomdung, Shernup (160 mtr) Tawang Kitpi Shernup 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

17 C/o MIC at Jamkhar Gyap (160 mtr) Tawang Kitpi Jamkhar 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

18 C/o Protection wall & drain at lower maidung (16 cum) Tawang Kitpi Maidung 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

19 C/o Protection wall at Kyableng (24 cum) Tawang Kitpi Kyableng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

20 C/o Protection wall at Gyanghar (40 cum) Tawang Kitpi Gyanghar 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

21 C/o Protection wall at Kitpi village (13 cum) Tawang Kitpi Kitpi 168439.00 31/3/2013 New 2012-13 Nil 168439.00<br />

22 C/o Protection wall at Khrimu (20 cum) Tawang Kitpi Khrimu 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

23 C/o Protection wall at kitpi Sec school (48 cum) Tawang Kitpi Kitpi 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

24 C/o protection wall at khardung residential School (40 Tawang Kitpi Khardung 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

cum)<br />

25 C/o Protection wall at Langputse school (16 cum) Tawang Kitpi Langputse 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

26 C/o Pathway at maidung (150 mtr) Tawang Kitpi Maidung 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

27 C/o Pathway at Lhargang (250 mtr) Tawang Kitpi Lhargang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

28 C/o Pathway wihtin Khartoot (150 mtr) Tawang Kitpi Khartoot 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

29 C/o Pathway from VKV school to Peshenga (100 mtr) Tawang Kitpi Peshenga 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

30 C/o Pathway from Ngueleng to Ruikhar (150 mtr) Tawang Kitpi Ruikhar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

31 C/o Pathway from Audung to Co-operative (200 mtr) Tawang Kitpi Audung 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

32 C/o Pathway within Boksar vill (150 mtr) Tawang Kitpi Boksar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

33 C/o Pathway at Themkhar (150 mtr) Tawang Kitpi Themkhar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

34 C/o Pathway from Langputse pry school to Kralling zero Tawang Kitpi Langputse 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

point road (250 mtr)<br />

35 C/o Pathway from Paidhar vill to Dharmbumdey (250<br />

mtr)<br />

Tawang Kitpi Paidhar 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

BADP AAP 2012-13 for website


Page 9<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

36 C/o Pathway within Kralling (250 mtr) Tawang Kitpi Kralling 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

37 C/o Pathway within Yubu vill (100 mtr) Tawang Kitpi Yubu 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

38 C/o Pathway within Sheleng & Changteng vill (150 mtr) Tawang Kitpi Changteng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

39 C/o Pathway within Bomba vill (250 mtr) Tawang Kitpi Bomba 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

40 C/o Pathway from Kitkhar to Maidung vill (150 mtr) Tawang Kitpi Kitkhar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

41 C/o Porter Track from BRTF road to Khoromteng (3.50 Tawang Kitpi Khromteng 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

km)<br />

42 C/o Pathway within Sharmang (150 mtr) Tawang Kitpi Sharmang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

43 C/o Pathway within Grenghar (150 mtr) Tawang Kitpi Grenghar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

44 C/o Pathway within VKV school complex (250 mtr) Tawang Kitpi Kitpi 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

45 C/o Pathway within Chaksam (150 mtr) Tawang Kitpi Chaksam 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

46 C/o Pathway within Khrimumeith (250 mtr) Tawang Kitpi Khrimu Meith 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

47 C/o Public Sanitation at Kangyur Lhakang Culture<br />

center (2 unit)<br />

Tawang Kitpi Kitpi 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

48 C/o Cultural center at Namgick Lhakang at Gyanghar<br />

(30 sqm)<br />

Tawang Kitpi Gyanghar 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

49 Extension <strong>of</strong> Cultural Center at Paikhar (30 sqm) Tawang Kitpi Paikhar 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

50 C/o Community hall at Bomdir supply point vill (42 sqm) Tawang Kitpi Bomdir 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

51 Capacity building / Skill development on local dress<br />

making, painting, agarbati making, etc.<br />

Tawang Kitpi Kitpi 596000.00 31/3/2013 New 2012-13 Nil 596000.00<br />

52 Capacity building / Skill development on Tourism Tawang Kitpi Kitpi 612436.00 31/3/2013 New 2012-13 Nil 612436.00<br />

53 Construction <strong>of</strong> Porter track from Coy. Hqr Namtsering to<br />

BP No-350 13.5 Km beyond Guru Padma Sambhava<br />

Cave via river confluence <strong>of</strong> Tawang & Nyamjang Chu.<br />

Tawang<br />

Zemithang<br />

Dudunghar &<br />

all blocks<br />

1436875.00 31/3/2013 New 2012-13 Nil 1436875.00<br />

54 Installation <strong>of</strong> 35 nos Solar street light for SSB BOPs Tawang Zemithang<br />

Dudunghar &<br />

all blocks<br />

1 C/o Public toilet at Luguthang (30 sqm) Tawang Jang<br />

Thingbu<br />

2 C/o Public toilet 2 nos. at Lhoudung Lhagang (20 sqm) Tawang Jang<br />

Thingbu<br />

3 C/o Community toilet near Vetty. Aid Center Jang (10 Tawang Jang<br />

sqm)<br />

Thingbu<br />

4 C/o Common shed atToth Kochung (40 sqm) Tawang Jang<br />

Thingbu<br />

980000.00 31/3/2013 New 2012-13 Nil 980000.00<br />

Sub total = 24168750.00<br />

Luguthang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Lhou 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Jang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Lhou 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

BADP AAP 2012-13 for website


Page 10<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

5 C/o Reading room at <strong>Govt</strong>. ME School Jang (40 Sqm) Tawang Jang<br />

Thingbu<br />

6 Procurement <strong>of</strong> Ambulance against CHC Jang Tawang Jang<br />

Thingbu<br />

7 C/o Public drainage at Sarong Gompa (300 mtr.) Tawang Jang<br />

Thingbu<br />

8 C/o R/Wall around Morgue at Jang (50 Cum) Tawang Jang<br />

Thingbu<br />

9 C/o Protection wall near New Circuit house Jang (125<br />

cum)<br />

Tawang Jang<br />

Thingbu<br />

10 C/o Protection wall at Sec. School Jang (250 cum) Tawang Jang<br />

Thingbu<br />

11 C/o Protection wall near GA colony Jang (175 cum) Tawang Jang<br />

Thingbu<br />

12 C/o Protection wall near BDO Colony, Jang (85 cum) Tawang Jang<br />

Thingbu<br />

13 C/o Protection wall at Pop Ngiysa (Shyaro Meith) (125 Tawang Jang<br />

cum)<br />

Thingbu<br />

14 C/o Water storage tank at Pop Ngiysa (Shyaro Meith) Tawang Jang<br />

(120 cum)<br />

Thingbu<br />

15 C/o <strong>of</strong> water storage tanks at Kaisangmeng and Mlegti<br />

Parmang Kharsa (35 cum)<br />

Tawang<br />

Jang<br />

Thingbu<br />

16 C/o CC culvert at Lhoukhar Rong (4 m) Tawang Jang<br />

Thingbu<br />

17 C/o Pathway within Sec. School colony Jang (250 m) Tawang Jang<br />

Thingbu<br />

18 C/o Pathway at Kharsa village (350m) Tawang Jang<br />

19 C/o Pathway at Namazing village (350 m) Tawang Thingbu Jang<br />

Thingbu<br />

20 C/o Pathway at Brakhar Gompa Ney (500 m) Tawang Jang<br />

Thingbu<br />

21 C/o Pathway from School to Duri village <strong>of</strong> Mago (200 Tawang Jang<br />

m)<br />

Thingbu<br />

22 C/o Pathway from main nallah to Luguthang (250 m) Tawang Jang<br />

Thingbu<br />

23 C/o Foot bridge from Sela to Luguthang (5 m) Tawang Jang<br />

Thingbu<br />

24 C/o Foot bridge from Mago to Luguthang (5 m) Tawang Jang<br />

Thingbu<br />

25 C/o CC foot bridge at Marmang (15 sqm) Tawang Jang<br />

Thingbu<br />

26 Electrification <strong>of</strong> Lhou Sport Club Tawang Jang<br />

Thingbu<br />

Jang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Jang 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Jangda 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Yuthembu-II 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Jang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Jang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Jang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Jang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Shyaro 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Shyaro 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Kharsa 243438.00 31/3/2013 New 2012-13 Nil 243438.00<br />

Lhou 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Jang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Kharsa 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Namazing 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Lhou 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Mago 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Luguthang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Luguthang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Luguthang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Marmang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Lhou 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

BADP AAP 2012-13 for website


Page 11<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

27 Electrification <strong>of</strong> Jang Sport Club Tawang Jang<br />

Thingbu<br />

28 C/o Tourist center and development <strong>of</strong> hot spring at Tawang Jang<br />

Tsechu (140 sqm)<br />

Thingbu<br />

29 C/o Community center at Bratse (45 sqm) Tawang Jang<br />

Thingbu<br />

30 Development <strong>of</strong> ground at cultural centre Aryadung Lhou Tawang Jang<br />

(150 sqm)<br />

Thingbu<br />

31 C/o Cultural center at Aryadhong (55 sqm) Tawang Jang<br />

Thingbu<br />

32 C/o Cultural center at Lhoudung Lhagang (55 sqm) Tawang Jang<br />

Thingbu<br />

33 C/o Cultural center at Toth Kochung (55 sqm) Tawang Jang<br />

Thingbu<br />

34 C/o Cultural centre at Grelling Kochung (50 sqm) Tawang Jang<br />

Thingbu<br />

35 C/o Cultural centre at Khamba (40 sqm) Tawang Jang<br />

Thingbu<br />

36 C/o Cultural Centre at Tsewkhar Lhoutso (56 sqm) Tawang Jang<br />

Thingbu<br />

37 Training <strong>of</strong> Youth on weaving, carpet making and bag Tawang Jang<br />

making (as earmarked)<br />

Thingbu<br />

38 Training <strong>of</strong> Youth on forest tracking and tourist guide Tawang Jang<br />

Thingbu<br />

39 C/o Pathway within SSB camp, Jang (200 m) Tawang Jang<br />

Thingbu<br />

40 Construction <strong>of</strong> foot track from Border pillar No 323 Tawang Jang<br />

(Negorteng) to B.P. No 325 via B.P. No 324.(9 kms)<br />

Thingbu<br />

41 Construction <strong>of</strong> foot track from BOP Negorteng to BP<br />

No.326. (6.5 kms)<br />

42 Providing <strong>of</strong> water supply line with water Tank at BOP<br />

Bangajang.<br />

43 Providing <strong>of</strong> water supply line with water Tank at BOP<br />

Negorteng<br />

Tawang<br />

Tawang<br />

Tawang<br />

Jang<br />

Thingbu<br />

Jang<br />

Thingbu<br />

Jang<br />

Thingbu<br />

Jang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tsechu 3000000.00 31/3/2013 New 2012-13 Nil 3000000.00<br />

Jang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Lhou 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Lhou 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Lhou 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Lhou 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Lhou 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Lhou 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Lhou 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Jang Block 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Jang Block 608437.00 31/3/2013 New 2012-13 Nil 608437.00<br />

Jang 416875.00 31/3/2013 New 2012-13 Nil 416875.00<br />

600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

44 Providing <strong>of</strong> Electricity connection at BOP Bangajang. Tawang Jang<br />

300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Thingbu<br />

Sub total = 24168750.00<br />

Total Tawang District = 145012500.00<br />

1 C/o Primary School building at Dibrick West<br />

Kameng<br />

2 C/o Teacher Qtr – 2units (1 no.) for <strong>Govt</strong>. ME School,<br />

Medical Colony, Nafra<br />

West<br />

Kameng<br />

Nafra Dibrick 650000.00 31/3/2013 New 2012-13 Nil 650000.00<br />

Nafra Nafra 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

BADP AAP 2012-13 for website


Page 12<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

3 C/o Teacher Qtr – 2units (1 no.) for <strong>Govt</strong>. ME School,<br />

Nakhu<br />

West<br />

Kameng<br />

Nafra Nakhu 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

4 C/o Teacher Qtr for <strong>Govt</strong>. pry. School, Mathow West<br />

Kameng<br />

5 C/o Brick Boundary Wall around GHSS, Bomdila as well<br />

as Boys hostel (Ph-I)<br />

West<br />

Kameng<br />

6 C/o Entrance Gate for GHSS, Bomdila West<br />

Kameng<br />

7 Procurement <strong>of</strong> Vaccine / medicines for prevention <strong>of</strong><br />

treatment <strong>of</strong> existing endangered species, Mithun under<br />

Nafra Block<br />

West<br />

Kameng<br />

8 C/o Storm Water Drain near PWD IB, Nafra West<br />

Kameng<br />

9 C/o Storm water drain at Bomdila(Sh: 0-127.89 mtr) West<br />

Kameng<br />

10 C/o Storm water drain at Bomdila(Sh: 127.89- 255.78 West<br />

mtr)<br />

Kameng<br />

11 C/o Storm water drain at Bomdila(Sh: 255.78- 318.78 West<br />

mtr)<br />

Kameng<br />

12 C/o Boulder Wall at Ch. No. 38.50 Kms on Salari – Nafra West<br />

Road<br />

Kameng<br />

13 Protection wall near RCC culvert at Ch. No. 36.50 Kms West<br />

on Salari- Nafra Road<br />

Kameng<br />

14 Restoration <strong>of</strong> Flood damaged at Nafra bridge (Sh: C/o<br />

Damaged Retaining Wall <strong>of</strong> Right side abutment<br />

approach)<br />

15 C/o Soil conservation/ protection work near Upper<br />

Gonpa, Bomdila<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

16 Anti- Soil erosion work near CRC Church, Bomdila West<br />

Kameng<br />

17 C/o Anti- Soil erosion work in between Kameng house to<br />

Old upper Gonpa at Bomdila<br />

West<br />

Kameng<br />

18 Soil conservation work at Alubari, Rurang (Ph-II) West<br />

Kameng<br />

19 C/o Approach Road from PWD main road to old<br />

Jerigaon<br />

West<br />

Kameng<br />

20 C/o Approach Road to newly constructed IB at Nafra West<br />

Kameng<br />

21 C/o Suspension Bridge over river Bichom connecting<br />

village Dillung and Najang (Ph-II)<br />

22 C/o CC Step / Pathways at Medical colony (Downside),<br />

Bomdila<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

Nafra Mathow 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Nafra Bomdila 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Nafra Bomdila 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nafra Nafra 153437.00 31/3/2013 New 2012-13 Nil 153437.00<br />

Nafra Nafra 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nafra Bomdila 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Nafra Bomdila 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Nafra Bomdila 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nafra Nafra 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Nafra Nafra 360000.00 31/3/2013 New 2012-13 Nil 360000.00<br />

Nafra Nafra 1130000.00 31/3/2013 New 2012-13 Nil 1130000.00<br />

Nafra Bomdila 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Nafra Bomdila 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Nafra Bomdila 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Nafra Rurang 950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

Nafra Jerigaon 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nafra Nafra 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nafra Dillung / Najang 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Nafra Bomdila 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

BADP AAP 2012-13 for website


Page 13<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

23 Collection and disposal <strong>of</strong> Garbage activities for Bomdila<br />

Township<br />

West<br />

Kameng<br />

24 C/o CC Steps at Kakaling (Bomdila) West<br />

Kameng<br />

25 C/o Block Resource Centre for 08- Nafra Anchal Samity, West<br />

Nafra<br />

Kameng<br />

26 C/o Block Resource Centre for 09- Jerigaon Anchal West<br />

Samity, Nafra<br />

Kameng<br />

27 C/o Residential Qtr T-IV for MO, CHC Nafra West<br />

Kameng<br />

28 C/o Community Gathering Ground at Ditchik West<br />

Kameng<br />

29 C/o Community Gathering Ground at Dibbin West<br />

Kameng<br />

30 C/o Cultural Hall near Upper Gonpa, Bomdila (Ph-II) West<br />

Kameng<br />

31 C/o security Fencing around Staging hut, Khazallang West<br />

Kameng<br />

32 C/o Staging Hut at Dillung (Ph-II) West<br />

Kameng<br />

33 C/o Compound wall around PWD IB, Nafra West<br />

Kameng<br />

34 C/o Anganwadi Bldg at Janaching West<br />

Kameng<br />

35 Training on Capacity Building and Skilled development – West<br />

Cultivation <strong>of</strong> Horticulture crops like Apple, Kiwi, Walnut, Kameng<br />

Orange, Guava, Ginger and Medicinal plants like<br />

Chirayata, etc under Nafra CD Block (3 dyas)<br />

36 Training on Vermicompost / Vermiculture, Emonstration<br />

and Exposure visit to Agricultural institutions <strong>of</strong> Assam<br />

and Meghalaya under Capacity building <strong>of</strong> Trainees<br />

under Nafra CD block. (1 month)<br />

37 60 Days Skill Upgradation training programme in<br />

Weaving for 20 Weavers at Nafra CD Block<br />

38 Skill Upgradation training programme for Adventurous<br />

sports activities(Sh: Rock climbing, Rapelling, Rafting<br />

and camping areas) under Nafra CD Block (1 month)<br />

39 C/o Concrete cemented security boundary wall (SH: with<br />

RCC post, Iron Angle and Barbed Wire on the top<br />

including maing entrance iron gate at SSB, Bank colony,<br />

Bomdila)<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

Nafra Bomdila 1200000.00 31/3/2013 New 2012-13 Nil 1200000.00<br />

Nafra Bomdila 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Nafra Nafra 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Nafra Nafra 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Nafra Nafra 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Nafra Ditchik 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nafra Dibbin 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Nafra Bomdila 1000000.00 31/3/2013 New 2010-11 1500000 1000000.00<br />

Nafra Khazallang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Nafra Dillung 500000.00 31/3/2013 New 2011-12 500000 500000.00<br />

Nafra Nafra 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Nafra Janaching 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Nafra Nafra 333335.00 31/3/2013 New 2012-13 Nil 333335.00<br />

Nafra Nafra 321035.00 31/3/2013 New 2012-13 Nil 321035.00<br />

Nafra Nafra 375000.00 31/3/2013 New 2012-13 Nil 375000.00<br />

Nafra Nafra 179063.00 31/3/2013 New 2012-13 Nil 179063.00<br />

Nafra Bomdila 2416880.00 31/3/2013 New 2012-13 Nil 2416875.00<br />

Sub total = 24168750.00<br />

BADP AAP 2012-13 for website


Page 14<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

1 C/o Retaining wall around Sluice gate SSB BOP new<br />

location, Balemu (120 mtrs)<br />

2 Training on Capacity Building and Skilled development -<br />

Cultivation <strong>of</strong> Horticulture crops like Apple, Kiwi, Walnut,<br />

Orange, Guava, Ginger and Medicinal plants like<br />

Chirayata etc. under Kalaktang CD Block<br />

3 Training on Vermicompost / Vermiculture, Emonstration<br />

and Exposure visit to Agricultural institutions <strong>of</strong> Assam<br />

and Meghalaya under capacity building <strong>of</strong> Trainees<br />

under Kalaktang CD Block<br />

4 60 Days Skill Upgradation training programme in<br />

Weaving for 20 Weavers at Kalaktang CD Block<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

Kalaktang Balemu 2416875.00 31/3/2013 New 2012-13 Nil 2416875.00<br />

Kalaktang Kalaktang 333335.00 31/3/2013 New 2012-13 Nil 333335.00<br />

Kalaktang Kalaktang 321035.00 31/3/2013 New 2012-13 Nil 321035.00<br />

Kalaktang Kalaktang 375000.00 31/3/2013 New 2012-13 Nil 375000.00<br />

5 Skill Upgradation training programme for Adventure<br />

sports activities (Sh: Rock climbing, Rapelling, Rafting<br />

and camping area) under Kalaktang CD Block<br />

West<br />

Kameng<br />

6 C/o Community Hall at Ankaling West<br />

Kameng<br />

7 C/o Cultural Hall fencing at Betchilling West<br />

Kameng<br />

8 C/o Commnity shed at lower Gonpa Baha West<br />

Kameng<br />

9 C/o Cultural Hall fencing at Chingi West<br />

Kameng<br />

10 C/o Community Hall at Samdrung West<br />

Kameng<br />

11 C/o Cultural Hall at Domkho West<br />

Kameng<br />

12 C/o Cultural Hall fencing at Kalaktang village West<br />

Kameng<br />

13 C/o Cultural Hall fencing at Liphakpu West<br />

Kameng<br />

14 C/o Cultural Hall fencing at Lungdur West<br />

Kameng<br />

15 C/o Commnity Shed at Morshing West<br />

Kameng<br />

16 C/o Cultural Hall at Morshing (floor <strong>of</strong> existing building) West<br />

Kameng<br />

17 C/o Comnity Hall at Rangthanjorpam West<br />

Kameng<br />

18 C/o Cultural Hall at Sanglem West<br />

Kameng<br />

19 C/o Community Shed at Sanglem West<br />

Kameng<br />

Kalaktang Kalaktang 178800.00 31/3/2013 New 2012-13 Nil 178800.00<br />

Kalaktang Ankaling 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Betchilling 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Kalaktang Boha 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Kalaktang Chingi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Samdrung 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Kalaktang Domkho 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Kalaktang Kalaktang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Liphakpu 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Lungdur 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Morshing 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Kalaktang Morshing 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kalaktang Rangthanjor 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

pam<br />

Kalaktang Sanglem 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Kalaktang Sanglem 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 15<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

20 C/o Community Shed at Dikshi West<br />

Kameng<br />

21 C/o Community Shed at Gorbow West<br />

Kameng<br />

22 C/o Cultural Hall at Lower Jigaon West<br />

Kameng<br />

23 C/o Community Shed at Lumbaktang West<br />

Kameng<br />

24 C/o Cultural Hall at Membachur West<br />

Kameng<br />

25 C/o Cultural Hall fencing at Mukuthing West<br />

Kameng<br />

26 C/o Community Shed at Upper Thongre West<br />

Kameng<br />

27 C/o Security fnecing at Upper Dungzoor community Hall West<br />

Kameng<br />

28 Providing CGI sheet ro<strong>of</strong>ing and fencing <strong>of</strong> Community West<br />

Hall at Kamalangchen<br />

Kameng<br />

29 C/o Cultural Hall fencing at Brokpalangchin West<br />

Kameng<br />

30 C/o Cultural Hall at Marmee Langang (extension <strong>of</strong> West<br />

cultural Hall jigoan<br />

Kameng<br />

31 C/o Anganwadi Centre at Balemu West<br />

Kameng<br />

32 C/o Security Fencing at cultural Hall at Jigaon West<br />

Kameng<br />

33 C/o Security fencing <strong>of</strong> doctor's residential Qtr at Balemu West<br />

Kameng<br />

34 C/o Porter Track from Aaktung to new and old Dinnik<br />

Khruk, Kroo<br />

West<br />

Kameng<br />

35 C/o Porter Track to Log bridge near Dengzi camp West<br />

Kameng<br />

36 C/o Porter Track & Log Bridge to Jangkhar West<br />

Kameng<br />

37 C/o Suspension bridge at Demachang West<br />

Kameng<br />

38 C/o pathway with railing to Tuklung Zong at Sanglem West<br />

Kameng<br />

39 C/o pathway at Warrangpam West<br />

Kameng<br />

40 C/o pathway and ro<strong>of</strong>ing <strong>of</strong> Chankang West<br />

Kameng<br />

Kalaktang Dikshi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Gorbow 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kalaktang Jigaon 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Kalaktang Lumbaktang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Membachur 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Kalaktang Mukuthing 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Thongre 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Kalaktang Rupa 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Kalaktang Kamalangchen 425000.00 31/3/2013 New 2012-13 Nil 425000.00<br />

Kalaktang Brokpalangchin 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Jigaon 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Balemu 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Kalaktang Jigaon 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Kalaktang Balemu 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Thongree 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Kalaktang Dengzi 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kalaktang Rangthangior 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

pam<br />

Kalaktang Demachang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Kalaktang Taklung Zong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Kalaktang Warrangpam 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Kalaktang Waizer 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 16<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

41 C/o Porter Track at Nekro West<br />

Kameng<br />

42 C/o funeral shed at Jigoan West<br />

Kameng<br />

43 C/o Security Fencing on Helipad at Shergaon West<br />

Kameng<br />

44 C/o outlet drainage from Rupa village to Prouding village West<br />

Kameng<br />

45 C/o Cross drainage at forest colony, Kalaktang West<br />

Kameng<br />

46 C/o Cross drainage at Musaksing village internal road West<br />

Kameng<br />

47 C/o drainage at Jumshing bow at Rupa village West<br />

Kameng<br />

48 C/o Security fencing <strong>of</strong> girls Hostel at Dengzi West<br />

Kameng<br />

49 C/o School building at Betcheling West<br />

Kameng<br />

50 C/o School building at Brokpalangchin West<br />

Kameng<br />

51 C/o one class room for Pry. School at Yollongripam West<br />

Kameng<br />

52 C/o Teacher Qtr (T-II) at Birpur West<br />

Kameng<br />

53 C/o Teacher Qtr security fencing at Kalaktang village West<br />

Kameng<br />

54 Extension <strong>of</strong> Teacher Quarter at Yollongripam West<br />

Kameng<br />

55 Supply <strong>of</strong> furnituer for Dispensary at Balemu West<br />

Kameng<br />

56 Providing Dental equipment at CHC, Rupa West<br />

Kameng<br />

57 Soil Protection <strong>of</strong> Namghar Cultural Hall at Kalaktang<br />

town<br />

West<br />

Kameng<br />

58 Soil Protection <strong>of</strong> Shiv Mandir Cultural Hall West<br />

Kameng<br />

59 Soil Protection and fencing <strong>of</strong> Stupa and Manee at<br />

Chillipam village<br />

West<br />

Kameng<br />

60 Soil Protection <strong>of</strong> residential buildings at Chillipam West<br />

Kameng<br />

61 C/o flood protection work to protect Horti garden near<br />

lower Dengzi river<br />

West<br />

Kameng<br />

Kalaktang Yollongripa 26880.00 31/3/2013 New 2012-13 Nil 26880.00<br />

Kalaktang Jigoan 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Kalaktang Shergaon 650000.00 31/3/2013 New 2012-13 Nil 650000.00<br />

Kalaktang Prouding 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Kalaktang Kalaktang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Kalaktang Musaksing 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kalaktang Jamshing bow 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Kalaktang Dengzi 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Kalaktang Betcheling 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Kalaktang Brokpalangchin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Kalaktang Yollongripam 125000.00 31/3/2013 New 2012-13 Nil 125000.00<br />

Kalaktang Birpur 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Kalaktang Kalaktang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Kalaktang Yollongripam 125000.00 31/3/2013 New 2012-13 Nil 125000.00<br />

Kalaktang Balemu 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Rupa 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Kalaktang Kalaktang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Kalaktang Kalaktang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Kalaktang Chillipam 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Kalaktang Chillipam 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kalaktang Dengzi 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

BADP AAP 2012-13 for website


Page 17<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

62 C/o Protection wall and cross drainage at Hydel nalah<br />

residential area at brokpablang<br />

63 Soil Protection / C/o Retaining Wall at village internal<br />

road at Rupa<br />

64 Providing <strong>of</strong> water supply to 10 km school building,<br />

Ankaling<br />

West<br />

Kameng<br />

West<br />

Kament<br />

West<br />

Kameng<br />

65 Water Supply to Jomoje and Rupa bazar West<br />

Kameng<br />

66 Providing Gym equipment to Rupa club West<br />

Kameng<br />

67 C/o Solar Fencing at Painaktang West<br />

Kameng<br />

68 C/o Community Toilet and C/o Choisam at Melongkhar West<br />

Kameng<br />

69 C/o Zimthung (Retiring room) at Rupa Gonpa West<br />

Kameng<br />

1 C/o community shed at Sandan West<br />

Kameng<br />

2 Developemnt <strong>of</strong> play field including C/O wall at<br />

Nangroijap Pry. School<br />

West<br />

Kameng<br />

3 C/o Irrigation channel at Salari(200 mtr) West<br />

Kameng<br />

4 Soil conservation/protection <strong>of</strong> erosion / flood protection West<br />

work at Dirang village (120 Mtr)<br />

Kameng<br />

5 Soil conservation/protection <strong>of</strong> erosion work at Phadam<br />

village (16 mtr)<br />

6 Soil conservation/protection <strong>of</strong> erosion work at Namsalo<br />

village (24 mtr)<br />

7 Soil conservation/protection <strong>of</strong> erosion work near<br />

community place at Mohan camp (40 mtr)<br />

8 Soil conservation/protection <strong>of</strong> erosion work at<br />

Khamkhar village (16 mtr)<br />

9 Soil conservation/flood protection work on the bank<br />

Dungphuri river at Barchipam (50 mtr)<br />

10 Soil conservation/protection <strong>of</strong> erosion work at zingkha<br />

(28 mtr)<br />

11 Soil conservation/flood protection work near suspension<br />

bridge at Sangti (28mtr)<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

Kalaktang Brokpablang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Kalaktang Rupa 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kalaktang Ankaling 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Kalaktang Rupa 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Kalaktang Rupa 191825.00 31/3/2013 New 2012-13 Nil 191825.00<br />

Kalaktang Painaktang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kalaktang Melongkhar 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Kalaktang Rupa 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Sub total = 24168750.00<br />

Dirang Sandan 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang Nangroijap 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Dirang Salari 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Dirang Dirang village 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Dirang Phadam 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang Namsalo 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Dirang Mohan camp 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Dirang Khamkhar 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang Barchipam 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Dirang Zingkha 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Dirang Sangti 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

BADP AAP 2012-13 for website


Page 18<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

12 Soil conservation/protection <strong>of</strong> erosion work at Lish<br />

Gompachee (Ph-II) (24 mtr)<br />

13 Soil conservation/flood protection work at Dangsing<br />

village (10 mtr)<br />

14 Soil conservation/protection <strong>of</strong> erosion work at<br />

Thembang village (20 mtr)<br />

15 Soil conservation/protection <strong>of</strong> erosion work at Khalibok<br />

village (40 mtr)<br />

16 Soil conservation/protection <strong>of</strong> erosion work near<br />

community place at Pangma (14 mtr)<br />

17 Soil conservation/protection <strong>of</strong> erosion work near<br />

primary school at Panchavati (13 mtr)<br />

18 Soil conservation/protection <strong>of</strong> erosion work at Gunthung<br />

(13 mtr)<br />

19 Soil conservation/flood protection work at Khasso (50<br />

mtr)<br />

20 Soil conservation/flood protection work at Bishum-<br />

Phudung (45 mtr)<br />

21 Soil conservation/protection <strong>of</strong> erosion work at<br />

Mandalaphudung village (35 mtr)<br />

22 Soil conservation/protection <strong>of</strong> erosion work behind boys<br />

hostel at Dirang HQ (47 mtr)<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

Dirang Lish Gompache 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Dirang Dangsing 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Dirang Thembang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Dirang Khalibok 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Dirang Pangma 130000.00 31/3/2013 New 2012-13 Nil 130000.00<br />

Dirang Panchavati 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Dirang Gunthung 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Dirang Khasso 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Dirang<br />

Dirang<br />

Bishum-<br />

Phudung<br />

Mandala<br />

phudung<br />

500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Dirang Dirang HQ 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

23 Soil conservation/flood protection work at Chodak colony<br />

near ITI Dirang village (125 mtr)<br />

24 Soil conservation/protection <strong>of</strong> erosion work near<br />

community place at Munna camp (48 mtr)<br />

25 Soil conservation/protection <strong>of</strong> erosion work at Namshu<br />

(24 mtr)<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

26 C/o storage cum intake tank at Khoitam West<br />

Kameng<br />

27 C/o 3(three) nos <strong>of</strong> culverts on link road at Zimthung<br />

(Jalapemthung)<br />

West<br />

Kameng<br />

Dirang Dirang 3000000.00 31/3/2013 New 2012-13 Nil 3000000.00<br />

Dirang Munna camp 750000.00 31/3/2013 New 2012-13 Nil 750000.00<br />

Dirang Namshu 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Dirang khoitam 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Dirang Zimthung 750000.00 31/3/2013 New 2012-13 Nil 750000.00<br />

28 C/o link road from NRC on Yak to Namsol (PH-II) SH:<br />

Improvement soiling metalling and C/o culverts (300 mtr)<br />

West<br />

Kameng<br />

Dirang Yewang 3413437.00 31/3/2013 New 2012-13 Nil 3413437.00<br />

29 Improvement <strong>of</strong> link road from BRTF road to<br />

Khorung(200 mtr)<br />

West<br />

Kameng<br />

30 C/o CC pathway at Khamkhar (135 mtr) West<br />

Kameng<br />

Dirang khorung 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Dirang Khamkhar 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 19<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

31 C/o CC pathway at Yewang (135 mtrs) West<br />

Kameng<br />

32 C/o CC pathway including protection wall at Darbu (135<br />

mtrs)<br />

33 Widening and improvement <strong>of</strong> pathway (porter track)<br />

from Lubrang to Naga GG (135 mtrs)<br />

34 Widening and improvement <strong>of</strong> pathway (porter track)<br />

from Pangma to Chandar (135 mtrs)<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

West<br />

Kameng<br />

35 C/o Tourist lodge at Mandalaphudung (PH-III) West<br />

Kameng<br />

36 C/o Tourist lodge at salari (PH-III) West<br />

Kameng<br />

37 C/o Tourist lodge at Khellong (PH-III) West<br />

Kameng<br />

38 C/o Tourist lodge at Namshu (PH-III) West<br />

Kameng<br />

39 Skill up-Gradation Training Programme in weaving for 60<br />

Days for 20 Weavers at Dirang CD Block<br />

40 Training <strong>of</strong> Farmers in skill development and Capacity<br />

building - Cultivation <strong>of</strong> Horticulture crops like Apple,<br />

Kiwi, Walnut, Orange, Guava, Ginger and Medicinal<br />

plants like Chirayata, etc under Dirang CD Block<br />

41 Training on Vermicompost / Vermiculture, Emonstration<br />

and Exposure visit to Agricultural institutions <strong>of</strong> Assam<br />

and Meghalaya under Capacity building <strong>of</strong> Trainees<br />

under Dirang CD block.<br />

42 Skill Upgradation training programme for Adventurous<br />

sports activities(Sh: Rock climbing, Rapelling, Rafting<br />

and camping areas) under Dirang CD Block<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

West<br />

kameng<br />

Dirang Yewang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Dirang Darbu 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang Lubrang 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Dirang Pangma 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang M/Phudung 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang Salari 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang Khellong 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang Namshu 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dirang Dirang 375000.00 31/3/2013 New 2012-13 Nil 375000.00<br />

Dirang Dirang 333335.00 31/3/2013 New 2012-13 Nil 333335.00<br />

Dirang Dirang 321040.00 31/3/2013 New 2012-13 Nil 321040.00<br />

Dirang Dirang 179063.00 31/3/2013 New 2012-13 Nil 179063.00<br />

43 C/o Retaining concrete wall on the nallah from near<br />

Nangrojap (Main RP gate) towards Dirang river (SH : 2<br />

mtrs, Ht = 54 mtr. 3 mtr Ht = 85.15 mtr, total =139.16<br />

mtr.)<br />

West<br />

Kameng<br />

Dirang Dirang 2416875.00 31/3/2013 New 2012-13 Nil 2416875.00<br />

Sub total = 24168750.00<br />

Total West Kameng District = 72506250.00<br />

1 C/o SPT class room at Mara Tasar Primary School,<br />

Kesse<br />

East<br />

Kameng<br />

2 C/o SPT building at <strong>Govt</strong>. Primary School Raro Solung East<br />

Kameng<br />

3 C/o additional School building at Veo East<br />

Kameng<br />

Chayangtajo Kesse 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Chayangtajo Raro Solung 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Chayangtajo Veo 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

BADP AAP 2012-13 for website


Page 20<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

4 C/o additional School building at Sawa East<br />

Kameng<br />

5 C/o Type-II Building for teacher quarter at Sangrung East<br />

Yangfo GPS<br />

Kameng<br />

6 C/o Girls Hostel at IV School, Sewa East<br />

Kameng<br />

7 C/o SPT Boys Hostel at <strong>Govt</strong>. ME School, Bodo East<br />

Kameng<br />

8 C/o Dormitory for Girls Students <strong>of</strong> KGBV School<br />

Chayangtajo (Stage-II)<br />

East<br />

Kameng<br />

9 C/o play ground at Veo East<br />

Kameng<br />

10 C/o Security chain link fencing at Karema Pao Primary<br />

School<br />

East<br />

Kameng<br />

11 C/o Community Fish pond at Krema Pao East<br />

Kameng<br />

12 Bamboo Plantation at Namchar Bagang East<br />

Kameng<br />

13 Bamboo Plantation at Myotang land at Chayangtajo East<br />

Kameng<br />

14 Bamboo Plantation Dayo Land at Killo village East<br />

Kameng<br />

15 C/o Bamboo Plantation at Chayangtajo East<br />

Kameng<br />

16 Rangbang Plantation at Yakil Solung East<br />

Kameng<br />

17 Bamboo Plantation at Nari camp East<br />

Kameng<br />

18 Bamboo Plantation at Krema Pao East<br />

Kameng<br />

19 Bamboo Plantation at Bengde East<br />

Kameng<br />

20 Rangbang & Bamboo plantation at Chayangtajo<br />

Township<br />

East<br />

Kameng<br />

21 C/o Flood Control at Loto Yangfo East<br />

Kameng<br />

22 C/o Flood Control at Daknering Nallah at Krema Pao East<br />

Kameng<br />

23 C/o Land protection work Type-I colony at PI residence<br />

area Chayangtajo<br />

East<br />

Kameng<br />

Chayangtajo Sawa 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Chayangtajo<br />

Sangrung<br />

Yangfo<br />

1100000.00 31/3/2013 New 2012-13 Nil 1100000.00<br />

Chayangtajo Sewa 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Chayangtajo Bodo 1127500.00 31/3/2013 New 2012-13 Nil 1127500.00<br />

Chayangtajo Chayangtajo 2000000.00 31/3/2013 Ongoing 2011-12 1500000 2000000.00<br />

Chayangtajo Veo 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Chayangtajo Karema Pao 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Chayangtajo Krema pao 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Chayangtajo<br />

Namchar<br />

Bagang<br />

850000.00 31/3/2013 New 2012-13 Nil 850000.00<br />

Chayangtajo Chayangtajo 850000.00 31/3/2013 New 2012-13 Nil 850000.00<br />

Chayangtajo Killo 850000.00 31/3/2013 New 2012-13 Nil 850000.00<br />

Chayangtajo Chayangtajo 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Chayangtajo Yakil Solung 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Chayangtajo Nari camp 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Chayangtajo Krema pao 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Chayangtajo Bengde 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Chayangtajo Chayangtajo 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Chayangtajo Loto Yangfo 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Chayangtajo Krema Pao 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Chayangtajo Chayangtajo 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

BADP AAP 2012-13 for website


Page 21<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

24 C/o Water Supply Work at Tamsang Yangfo East<br />

Kameng<br />

25 Social Forestry at Namchar Bagang East<br />

Kameng<br />

26 C/o Foot Suspension Bridge over river Pao in between<br />

Namchar, Pao Camp to Flago at Chamte point<br />

East<br />

Kameng<br />

Chayangtajo<br />

Chayangtajo<br />

Chayangtajo<br />

Tamsang<br />

Yangfo<br />

Namchar<br />

Bagang<br />

Namchar<br />

Bagang<br />

1400000.00 31/3/2013 New 2012-13 Nil 1400000.00<br />

950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

27 C/o porter track from Nari camp to Bodi East<br />

Kameng<br />

28 C/o Foot Bridge over river Pavit at Killo East<br />

Kameng<br />

29 C/o Suspension Bridge over Laching river at Doriphu East<br />

Bagang with locally available materials<br />

Kameng<br />

30 C/o CC Steps at Nari camp East<br />

Kameng<br />

31 C/o Foot Hanging Bridge over Wapli river at Veo village East<br />

Kameng<br />

32 Creation <strong>of</strong> Tourism, Sports and Adventure Tourism in East<br />

border block<br />

Kameng<br />

33 C/o Anganwadi Centre at Nampu East<br />

Kameng<br />

34 C/o Anganwadi Centre at Dara East<br />

Kameng<br />

Chayangtajo Nari Camp 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Chayangtajo Killo 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Chayangtajo Doriphu Bagang 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Chayangtajo Nari Camp 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Chayangtajo Veo 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Chayangtajo Chayangtajo 1122500.00 31/3/2013 New 2012-13 Nil 1122500.00<br />

Chayangtajo Nampu 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Chayangtajo Dara 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Sub total = 22450000.00<br />

C/o Anganwadi building at Pangia<br />

Creation <strong>of</strong> Tourism, Sports and Adventure Tourism in<br />

border block<br />

C/o Suspension Bridge over Sibi river at Jomoh village<br />

C/o CC Steps at Waii village<br />

C/o Suspension Bridge over Sabi river between Pangia<br />

to Jomoh<br />

C/o Protection wall at Pakke Camp<br />

C/o Protection wall at Tasam Myorang at Rubber<br />

Plantation area<br />

Procurement <strong>of</strong> bench / desk at entire school <strong>of</strong><br />

Khenewa block<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

Khenewa Pangia 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Khenewa Khenewa 1122500.00 31/3/2013 New 2012-13 Nil 1122500.00<br />

Khenewa Jomoh 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Khenewa Waii 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Khenewa Pangia 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Khenewa Pakke Camp 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Khenewa Tasam Myorang 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Khenewa Khenewa 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 22<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

C/o SPT School Building at Primary school Nampe -<br />

Lamnio<br />

C/o SPT School Building at Paffa IV School<br />

C/o SPT School Building at <strong>Govt</strong>. School 18th Mile<br />

C/o 2 units SPT building for Teacher quarter at <strong>Govt</strong>. ME<br />

School Khenewa<br />

C/o SPT Teacher quarter at Riga Camp IV School<br />

C/o MIP at Pacha Sobo at Pakke<br />

C/o MIP at Sangbia village<br />

C/o MIP at Beyong village<br />

Providing <strong>of</strong> drinking water supply at Parte Sollung<br />

village<br />

Providing <strong>of</strong> drinking water supply at <strong>Govt</strong>. ME School<br />

Marjingla<br />

C/o Approach Road from main road to <strong>Govt</strong>. ME school<br />

Marjingla<br />

C/o SPT Guest House building at Khenewa town<br />

Extension <strong>of</strong> Tourist Lodge at Tasam Myorang<br />

Extension <strong>of</strong> Tourist Lodge for VIP room at Waii village<br />

Procurement <strong>of</strong> Solar Lamp for cultural centre at<br />

Khenewa<br />

C/o Common Shelters building for Old age at Produng<br />

village<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

Khenewa Nampe Lamnio 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Khenewa Paffa 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Khenewa 18th Mile 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Khenewa Khenewa 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Khenewa Riga Camp 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Khenewa Pakke 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Khenewa Sangbia 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Khenewa Beyong 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Khenewa Parte Sollung 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Khenewa Marjingla 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Khenewa Marjingla 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Khenewa Khenewa 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Khenewa Tasam Myorang 1627500.00 31/3/2013 New 2012-13 Nil 1627500.00<br />

Khenewa Rawa 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Khenewa Khenewa 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Khenewa Produng 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Sub total = 22450000.00<br />

C/o SPT Teacher Qtr at Emborinang<br />

C/o Community Hall at Lower Liyak<br />

C/o VIP room and protection wall at Tourist Lodge Lada<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

Bameng Emboriang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Bameng Lower Liyak 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Bameng Lada 3577500.00 31/3/2013 New 2012-13 Nil 3577500.00<br />

BADP AAP 2012-13 for website


Page 23<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

Creation <strong>of</strong> Tourism, Sports and Adventure Tourism in<br />

border block<br />

Providing <strong>of</strong> drinking water supply at teacher colony,<br />

Bameng<br />

C/o drinking water supply at Poube Sollung<br />

C/o water tank staff colony at Bameng<br />

Providing drinking water supply at Yardawa at Bameng<br />

C/o MIP at Lower Liyak<br />

C/o SPT Teacher quarter at Sekong ME School<br />

C/o SPT Teacher quarter at residential school Pio<br />

C/o SPT Teacher quarter at Lapung ME School<br />

C/o SPT Communty School building at Lengdi Liyang<br />

C/o Community Fish pond at Upper Liyak village<br />

C/o Mule Track between Langri Riang and Bameng<br />

C/o CC Steps from Changmari to Bameng Secondary<br />

School<br />

C/o CC Steps and CO <strong>of</strong>fice gate at Lada<br />

C/o Mule Track from Bameng to Tara via Changmari<br />

C/o WRSB over Paksa river at Paksa camp<br />

C/o Medical staff qtr at Paksa Camp<br />

Procurement <strong>of</strong> Bench and desk for schools <strong>of</strong> Bameng<br />

block<br />

Procurement <strong>of</strong> Solar Lamp for cultural centre at<br />

Bameng<br />

Extension <strong>of</strong> Community hall and toilet at Bameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

East<br />

Kameng<br />

Bameng Bameng 1122500.00 31/3/2013 New 2012-13 Nil 1122500.00<br />

Bameng Bameng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Bameng Pube Sollung 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bameng Bameng 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Bameng Yardawa 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Bameng Lower Liyak 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bameng Sekong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bameng Pio 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bameng Lapung 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bameng Lengdi Liyang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Bameng Bameng 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Bameng Bameng 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Bameng Bameng 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Bameng Lada 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bameng Changmari 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bameng Paksa camp 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Bameng Paksa Camp 1000000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Bameng Bameng 1200000.00 31/3/2013 New 2012-13 Nil 1200000.00<br />

Bameng Bameng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

East Bameng Bameng 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Kameng<br />

Sub total = 22450000.00<br />

Total East Kameng District = 67350000.00<br />

BADP AAP 2012-13 for website


Page 24<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

1 C/o Wire rope Suspension bridge over Kojuk Nallah at<br />

Liyu from Ringling to Diri.<br />

2 C/o hanging bridge over Kobo river from Bosirai to<br />

Charu.<br />

3 Maintenance/renovation <strong>of</strong> Pigasi bridge over Subansiri<br />

river at Neing village.<br />

4 Maintenance/renovation <strong>of</strong> Hanging bridge over<br />

Subansiri river at Ayingmuri to Dingser<br />

5 C/o Suspension bridge over Mini river at Mademba Rai<br />

& Mayaba Rai<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

6 C/o School building at Keojoring Middle School. Upper<br />

Subansiri<br />

7 C/o Teachers’ qtr at Jibaying Pry School. Upper<br />

Subansiri<br />

8 C/o Teachers’ quarter at Ragmi Pry School. Upper<br />

Subansiri<br />

9 C/o Teacher’s Qtr at Nacho Middle School. Upper<br />

Subansiri<br />

10 Procurement <strong>of</strong> Life Saving drugs for Nacho Block. Upper<br />

Subansiri<br />

11 Medicinal plantation at Riri under Charu Village. Upper<br />

Subansiri<br />

12 Medicinal plantation at Chekke village. Upper<br />

Subansiri<br />

13 Medicinal plantation at Daying village. Upper<br />

Subansiri<br />

14 Bammboo Plantation at Diri village. Upper<br />

Subansiri<br />

15 C/o toilets for 3 units at Loke Model village. Upper<br />

Subansiri<br />

16 C/o Barrack for Jawans / porters at GR-070908 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

17 C/o Huts at GR-070908 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

18 C/o Barrack for Jawans / porters at GR-057936 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

19 C/o Huts at GR-057936 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Nacho Ringling 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nacho Bosirai 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Nacho Neing 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nacho Ayingmuri 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Nacho Mademba-Rai 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nacho Keojoring 5000000.00 31/3/2013 New 2012-13 Nil 5000000.00<br />

Nacho Jibaying 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Nacho Rangmi 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Nacho Nacho 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Nacho Nacho 732500.00 31/3/2013 New 2012-13 Nil 732500.00<br />

Nacho Charu 3000000.00 31/3/2013 New 2012-13 Nil 3000000.00<br />

Nacho Chekke 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nacho Daying 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nacho Diri 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nacho Loke 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Nacho Nacho 495000.00 31/3/2013 New 2012-13 Nil 495000.00<br />

Nacho Nacho 160000.00 31/3/2013 New 2012-13 Nil 160000.00<br />

Nacho Nacho 535000.00 31/3/2013 New 2012-13 Nil 535000.00<br />

Nacho Nacho 175000.00 31/3/2013 New 2012-13 Nil 175000.00<br />

BADP AAP 2012-13 for website


Page 25<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

20 C/o Barrack for Jawans / porters at GR-018009 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

21 C/o Huts at GR-018009 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

22 C/o Barrack for Jawans / porters at GR-988059 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

23 C/o Huts at GR-988059 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

24 C/o Barrack for Jawans / porters at GR-175885 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

25 C/o Huts at GR-175885 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

26 C/o Barrack for Jawans / porters at GR-142948 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

27 C/o Huts at GR-142948 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

28 C/o Barrack for Jawans / porters at GR-140967 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

29 C/o Huts at GR-140967 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

30 C/o Barrack for Jawans / porters at GR-123013 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

31 C/o Huts at GR-123013 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

32 C/o Barrack for Jawans / porters at GR-122051 (wooden<br />

flooring, CGI sheet ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and<br />

CGI sheet)<br />

33 C/o Huts at GR-122051 (wooden flooring, CGI sheet<br />

ro<strong>of</strong>ing, walls <strong>of</strong> wooden planks and CGI sheet)<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Nacho Nacho 575000.00 31/3/2013 New 2012-13 Nil 575000.00<br />

Nacho Nacho 185000.00 31/3/2013 New 2012-13 Nil 185000.00<br />

Nacho Nacho 615000.00 31/3/2013 New 2012-13 Nil 615000.00<br />

Nacho Nacho 205000.00 31/3/2013 New 2012-13 Nil 205000.00<br />

Nacho Nacho 495000.00 31/3/2013 New 2012-13 Nil 495000.00<br />

Nacho Nacho 160000.00 31/3/2013 New 2012-13 Nil 160000.00<br />

Nacho Nacho 535000.00 31/3/2013 New 2012-13 Nil 535000.00<br />

Nacho Nacho 180000.00 31/3/2013 New 2012-13 Nil 180000.00<br />

Nacho Nacho 575000.00 31/3/2013 New 2012-13 Nil 575000.00<br />

Nacho Nacho 190000.00 31/3/2013 New 2012-13 Nil 190000.00<br />

Nacho Nacho 615000.00 31/3/2013 New 2012-13 Nil 615000.00<br />

Nacho Nacho 205000.00 31/3/2013 New 2012-13 Nil 205000.00<br />

Nacho Nacho 620000.00 31/3/2013 New 2012-13 Nil 620000.00<br />

Nacho Nacho 215000.00 31/3/2013 New 2012-13 Nil 215000.00<br />

Sub total = 25817500.00<br />

1 C/o Poultry farm at Rai village. Upper<br />

Subansiri<br />

2 C/o Teacher’s qtr at Eyum Pry School. Upper<br />

Subansiri<br />

Siyum Rai 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Siyum Eyum 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 26<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

3 C/o Bachelor Barrack at middle School Mosu. Upper<br />

Subansiri<br />

4 D/o Play Ground at Pry.School & I.V. School at Rai Upper<br />

Village.<br />

Subansiri<br />

5 Procurement <strong>of</strong> School Furniture for middle School Page-<br />

Nalo.<br />

Upper<br />

Subansiri<br />

6 C/o MIP at Ate village. Upper<br />

Subansiri<br />

7 C/o flood control at Rigia village under Papi village. Upper<br />

Subansiri<br />

8 Maintenance/Renovation <strong>of</strong> water Supply at Kajering<br />

village.<br />

Upper<br />

Subansiri<br />

9 Maintenance <strong>of</strong> drinking water supply at Janering village. Upper<br />

Subansiri<br />

10 Water supply from kiyor stream to Rava village. Upper<br />

Subansiri<br />

11 C/o Suspension bridge over Gong river at Rai to<br />

Mechuka<br />

Upper<br />

Subansiri<br />

12 C/o Mule Track at Chep Rai Village. Upper<br />

Subansiri<br />

13 C/o Mule track from Kampong to Nyogin Taring Village. Upper<br />

Subansiri<br />

14 C/o Mule track at Eru village. Upper<br />

Subansiri<br />

15 C/o Suspension bridge over Sato river at Bogia Siyum. Upper<br />

Subansiri<br />

16 C/o CC step at Dingdopa village. Upper<br />

Subansiri<br />

17 C/o CC Lining at Ekke Village. Upper<br />

Subansiri<br />

18 C/o Suspension bridge over river Sepe at Dagu to Upper<br />

Tamu.<br />

Subansiri<br />

19 C/o Suspension bridge over river Sirin at Sarta village. Upper<br />

Subansiri<br />

20 C/o Suspension bridge over Gunung river at Ebya to Upper<br />

Gyate.<br />

Subansiri<br />

21 C/o CC step at Lingbia Tarak at Dui village. Upper<br />

Subansiri<br />

22 C/o suspension bridge over Nu Nallah at Jingmuring. Upper<br />

Subansiri<br />

23 C/o CC footpath at Baki Upper<br />

Subansiri<br />

Siyum Mosu 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Siyum Rai 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Siyum Page-Nalo 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Siyum Ate 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Siyum Papi 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Siyum Kajering 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Siyum Janering 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Siyum Rava 182500.00 31/3/2013 New 2012-13 Nil 182500.00<br />

Siyum Rai 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Siyum Rai 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Siyum Kampong 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Siyum Eru 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Siyum Bogia Siyum 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Siyum Dingdopa 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Siyum Ekke 2000000.00 31/3/2013 New 2012-13 Nil 2000000.00<br />

Siyum Dagu 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Siyum Sarta 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Siyum Ebya 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Siyum Dui 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Siyum Jingmuring 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Siyum Baki 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 27<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

24 C/o Community hall at Byaching. Upper<br />

Subansiri<br />

25 C/o Cultural Hall at Doku village. Upper<br />

Subansiri<br />

1 C/o Cultural centre at Taksing. Upper<br />

Subansiri<br />

2 C/o Wire Rope Suspension bridge over Subansiri river at Upper<br />

Kiyariging at Lemiking.<br />

Subansiri<br />

3 Renovation <strong>of</strong> suspension bridge at Yekte. Upper<br />

Subansiri<br />

4 Renovation <strong>of</strong> Suspension bridge at Doloring. Upper<br />

Subansiri<br />

5 Renovation <strong>of</strong> Suspension bridge at Ging Upper<br />

Subansiri<br />

6 C/o CC footpath from Taksing Helipad to CO Office. Upper<br />

Subansiri<br />

7 Water supply at Gelomo village under Maja. Upper<br />

Subansiri<br />

8 Renovation <strong>of</strong> Rural water at Badok village under<br />

Lemiking.<br />

Upper<br />

Subansiri<br />

9 Land development work at Lingne Bochok. Upper<br />

Subansiri<br />

10 Land development work at Paksi. Upper<br />

Subansiri<br />

11 Land development work at Gelejing. Upper<br />

Subansiri<br />

12 Land development work at Gamo. Upper<br />

Subansiri<br />

13 Renovation <strong>of</strong> classroom at <strong>Govt</strong>.Pry School at Bogum. Upper<br />

Subansiri<br />

14 Extension <strong>of</strong> three class room at <strong>Govt</strong>. Pry School at<br />

TCC.<br />

15 Renovation/repairing <strong>of</strong> 10(ten) nos <strong>of</strong> class room at<br />

<strong>Govt</strong>. Middle School Taksing.<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

16 Renovations <strong>of</strong> teacher qtr at <strong>Govt</strong> pry School at TCC. Upper<br />

Subansiri<br />

17 Purchase <strong>of</strong> life saving medicines for Lemiking Block. Upper<br />

Subansiri<br />

18 Tabiu plantation at Gelomo Upper<br />

Subansiri<br />

Siyum Byaching 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Siyum Doku 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Sub total = 19082500.00<br />

Lemiking Taksing 5000000.00 31/3/2013 New 2012-13 Nil 5000000.00<br />

Limeking Lemiking 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Limeking Yekte 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Limeking Doloring 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Limeking Lemiking 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Limeking Taksing 2000000.00 31/3/2013 New 2012-13 Nil 2000000.00<br />

Lemiking Gelomo 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Lemiking Badok 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Lemiking Bochok 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Lemiking Paksi 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Lemiking Gelejing 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Lemiking Gamo 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Lemiking Bogum 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Lemiking TCC 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Lemiking Taksing 2000000.00 31/3/2013 New 2012-13 Nil 2000000.00<br />

Lemiking TCC 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Lemiking Lemiking 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Lemiking Gelomo 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

BADP AAP 2012-13 for website


Page 28<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

19 Kiwi plantation at TCC. Upper<br />

Subansiri<br />

20 Seri-culture training programme on pre-cocoon & postcocoon<br />

Upper<br />

technology for un-employed youth<br />

Subansiri<br />

21 Training & Demonastration programme <strong>of</strong> Fish-cum-pigcum-duck<br />

farming (integratted fish farming) for unemployed<br />

youth<br />

22 Training Programme on repairing mobile / computer for<br />

unemployed youth<br />

23 Awarness programme on sanitation, hygienic and plastic<br />

(polythen) free zone<br />

24 Training programme on Wild life protection and<br />

conservation <strong>of</strong> forest<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Upper<br />

Subansiri<br />

Lemiking TCC 482500.00 31/3/2013 New 2012-13 Nil 482500.00<br />

Limiking,<br />

Nacho &<br />

Siyum<br />

Limiking,<br />

Nacho &<br />

Siyum<br />

Limiking,<br />

Nacho &<br />

Siyum<br />

Limiking,<br />

Nacho &<br />

Siyum<br />

Limiking,<br />

Nacho &<br />

Siyum<br />

Limiking, Nacho<br />

& Siyum<br />

Limiking, Nacho<br />

& Siyum<br />

Limiking, Nacho<br />

& Siyum<br />

Limiking, Nacho<br />

& Siyum<br />

Limiking, Nacho<br />

& Siyum<br />

Sub total = 22450000.00<br />

Total Upper Subansiri District = 67350000.00<br />

800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

867500.00 31/3/2013 New 2012-13 Nil 867500.00<br />

500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

1 C/o SPT/ILCT Type-III teacher quarter at <strong>Govt</strong>. Middle<br />

school Damin<br />

Kurung<br />

kumey<br />

2 Renovation <strong>of</strong> teacher quarter at <strong>Govt</strong>. Middle School Kurung<br />

Taba<br />

kumey<br />

3 Renovation <strong>of</strong> teacher quarter at <strong>Govt</strong>. I.V School Kopila Kurung<br />

kumey<br />

4 Play field at Damin Kurung<br />

kumey<br />

5 Renovation <strong>of</strong> M.O quarter at Damin Kurung<br />

kumey<br />

6 C/o Domistic fish pond at Dokwa under Namepe village Kurung<br />

kumey<br />

7 C/o Fish Pond at Damin Kurung<br />

kumey<br />

8 C/o Horticulture garden at Gapo Kurung<br />

kumey<br />

9 C/o Tasse Plantation at Senamriang village Kurung<br />

kumey<br />

10 C/o Tasse Plantation at Kopila village Kurung<br />

kumey<br />

11 C/o banana garden at Damin Kurung<br />

kumey<br />

12 C/o Tasse Plantation at Chulla village Kurung<br />

kumey<br />

Damin Damin 2600000.00 31/3/2013 New 2012-13 Nil 2600000.00<br />

Damin Taba 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Damin Kopila 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Damin Damin 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Damin Damin 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Damin Dokwa 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Damin Damin Town 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Damin Gapo 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Damin Senamriang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Damin Kopila 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Damin Damin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Damin Chulla 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 29<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

13 C/o Tabu bamboo plantation at Rala Kurung<br />

kumey<br />

14 C/o Boulder wall fencing at Damin village agrifeild Kurung<br />

kumey<br />

15 C/o boulder wall fencing at Panie agrifield under Chiya Kurung<br />

village<br />

kumey<br />

16 C/o Security fencing around Horticulture garden at<br />

Damin town<br />

Kurung<br />

kumey<br />

17 C/o MIC at Todoriang Kurung<br />

kumey<br />

18 C/o MIC at Hulin-riangjo under Jali village Kurung<br />

kumey<br />

19 C/o Land protection work at Chiya village Kurung<br />

kumey<br />

20 C/o Soil conservation work at Taderiang under<br />

Kurung<br />

Mariangha viallge<br />

kumey<br />

21 C/o LD work at Dalwariang under Moruk village Kurung<br />

kumey<br />

22 C/o Water Tank at Sarang village Kurung<br />

kumey<br />

23 Procurement <strong>of</strong> GI Pipe for Sarang village Kurung<br />

kumey<br />

24 Renovation <strong>of</strong> Veteniary dispensry at Damin Kurung<br />

kumey<br />

25 Improvement <strong>of</strong> WRSB over Kode river Kurung<br />

Kumey<br />

26 Improvement <strong>of</strong> foot track from Taba village to Huri Kurung<br />

Kumey<br />

27 C/o C.C foot path from Block colony to Damin Bazar line Kurung<br />

Kumey<br />

28 C/o MIBT Transit Camp at Pipa Kurung<br />

Kumey<br />

29 C/o Porter Track from Mariangha village to Chiya village Kurung<br />

via Pilpuk<br />

Kumey<br />

30 Improvement <strong>of</strong> WRSB over Kamla river in between<br />

Machang to Huri<br />

31 Improvement <strong>of</strong> WRSB over Kamla river at Hurak in<br />

between Huri to Ruba village<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

32 Renovation <strong>of</strong> WRSB over Khode between Peni to Taba Kurung<br />

Kumey<br />

33 C/o Waiting Shed at Pabin bridge point Kurung<br />

Kumey<br />

Damin Rala 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Damin Damin village 750000.00 31/3/2013 New 2012-13 Nil 750000.00<br />

Damin Chiya village 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Damin Damin 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Damin Nampe 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Damin Jali 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Damin Chiya village 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Damin Taderiang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Damin Moruk 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Damin Sarang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Damin Sarang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Damin Damin 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Damin Kode 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Damin Taba/Huri 750000.00 31/3/2013 New 2012-13 Nil 750000.00<br />

Damin Damin Town 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Damin Pipa 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Damin Mariangha /<br />

Chiya<br />

400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Damin Machang 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Damin Hurak 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Damin Kode 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Damin Pabin 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 30<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

34 C/o Porter track from Ruba to Machang village Kurung<br />

Kumey<br />

35 C/o Cane Suspension bridge over Hunik river in<br />

between Ruba to Machang village<br />

Kurung<br />

Kumey<br />

36 C/o Porter Track from Huter to Trenine Kurung<br />

Kumey<br />

37 C/o Waiting Shed at Doha under Chiya village Kurung<br />

Kumey<br />

38 Improvement <strong>of</strong> WRSB over Tolo river at Suwa in<br />

between Huba to Tarla village<br />

39 Improvement <strong>of</strong> foot track from Pabin bridge point to Jali<br />

via Taba village<br />

40 C/o WRSB at chater over Tolo river in between Terik to<br />

Huba village<br />

41 C/o Helipad (Emmergency landing ground) at Nampe<br />

village<br />

42 C/o Log bridge over Hure river in between Machang to<br />

Damin town<br />

43 C/o Log bridge over Hutluk Nallah between Chulla to<br />

Damin<br />

44 Improvement <strong>of</strong> WRSB over Pania river in between<br />

Chulla village to Nampe village<br />

45 C/o Log bridge over Yaso river in between Degok to<br />

Kukcho village<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

46 C/o Renovation <strong>of</strong> Guest house at Sejik Kurung<br />

kumey<br />

47 C/o Public toilet at general ground at Damin town Kurung<br />

kumey<br />

48 Capacity Building and training on handloom and rural Kurung<br />

artisans for CD Block Damin<br />

kumey<br />

1 C/o Internal Electrification at PHC building at Parsiparlo Kurung<br />

kumey<br />

2 Renovation <strong>of</strong> PHC building at Parsiparlo Kurung<br />

kumey<br />

3 C/o MIBT school building at ME school Pado Kurung<br />

kmey<br />

4 Renovation <strong>of</strong> school building at middle school<br />

Renchiporiang.<br />

Kurung<br />

kmey<br />

Damin Ruba /<br />

Machang<br />

800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Damin Machang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Damin Huter / Trenine 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Damin Doha 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Damin Suwa 650000.00 31/3/2013 New 2012-13 Nil 650000.00<br />

Damin Pabin 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Damin Charter 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Damin Nampe 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Damin Machang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Damin Hutluk 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Damin Pania 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Damin Yaso 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Damin Sejik 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Damin Damin 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Damin Damin 1150000.00 31/3/2013 New 2012-13 Nil 1150000.00<br />

Sub total = 22450000.00<br />

Parsiparlo Parsiparlo 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Parsiparlo Parsiparlo 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Parsi parlo Pado 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Parsi parlo R/Poriang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 31<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

5 Renovation <strong>of</strong> school building at Segriang Pry.school Kurung<br />

kumey<br />

6 Renovation <strong>of</strong> educational building at Parsi parlo. Kurung<br />

kumey<br />

7 C/o MIBT School building at <strong>Govt</strong>. Sec.School,<br />

Kurung<br />

Parsiparlo.<br />

kumey<br />

8 C/o MIBT building teachers quarter at <strong>Govt</strong>. Primary<br />

School, Yaluha.<br />

Kurung<br />

kumey<br />

9 C/o fish pond at Parsiriangjo at taram village. Kurung<br />

kumey<br />

10 C/o fish pond at Dargang Kurung<br />

kumey<br />

11 C/o fish pond at Pachang. Kurung<br />

kumey<br />

12 C/o fish pond at Parsi parlo Kurung<br />

kumey<br />

13 C/o Tabu bamboo plantation at Edin under Gyayang<br />

village<br />

Kurung<br />

kumey<br />

14 C/o Tasse Plantation at Komlang under Gyayang village Kurung<br />

kumey<br />

15 C/o banana garden at Bame under Gonang village Kurung<br />

kumey<br />

16 C/o orange garden at Rebia Nyoriang under Parsi parlo Kurung<br />

kumey<br />

17 C/o Tasse Plantation at Tajo under Tongbia village. Kurung<br />

kumey<br />

18 C/o Orange garden at vigo village Kurung<br />

kumey<br />

19 C/o Horticulture garden at Tarik village (Orange/Banana) Kurung<br />

kumey<br />

20 C/o Sugarcane garden at Patuk village. Kurung<br />

kumey<br />

21 C/o Toko-Pata plantation at Pape village Kurung<br />

kumey<br />

22 C/o Orange garden at Pado village Kurung<br />

kumey<br />

23 C/o Orange garden at Renchiporiang. Kurung<br />

kumey<br />

24 C/o <strong>of</strong> Tabu bamboo plantation at Pagam Kurung<br />

kumey<br />

25 C/o Boulder fencing work at Talok Agriculture field under<br />

Chote Village<br />

Kurung<br />

kumey<br />

Parsi Parlo Segriang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Parsi Parlo Parsi parlo 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Parsiparlo 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Parsi parlo Yaluha 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Parsiparlo Malo 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Dargang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Parsi Parlo Pachang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Parsi Parlo Parsi 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Gyayang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Gyayang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Gonang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Rebia-Nyoriang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Tongbia 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Vigo 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Tarik 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Patuk 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Pape 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Pado 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Renchiporiang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Pagam 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Chote 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

BADP AAP 2012-13 for website


Page 32<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

26 C/o Tabu bamboo plantation at Nyokuriang village Kurung<br />

kumey<br />

27 C/o Tabu Bomboo plantation at Gonang village Kurung<br />

kumey<br />

28 C/o boulder fencing wall at Hashi agrifield Lebia Kurung<br />

kumey<br />

29 C/o earth cutting fencing at Sera agri-field at sera village. Kurung<br />

kumey<br />

30 C/o C.C drain from Saba stream to Pakangriang at patuk Kurung<br />

kumey<br />

31 C/o Land development work at Rimumring Kurung<br />

kumey<br />

32 C/o Land development work at Torukring Kurung<br />

kumey<br />

33 C/o land development work at Renchiporiang village. Kurung<br />

kumey<br />

34 C/o Boulder Protection work at Parsi river Kurung<br />

kumey<br />

35 C/o Land protection work at middle school Pado Kurung<br />

kumey<br />

36 C/o Land protection work at <strong>Govt</strong>.Primary school<br />

Segriang.<br />

Kurung<br />

kumey<br />

37 C/o soil protection work at Langa Kurung<br />

kumey<br />

38 C/o soil conservation work at Rashik village Kurung<br />

kumey<br />

39 C/o land protection work at Renchiporiang village. Kurung<br />

kumey<br />

40 C/o boulder protection work near girl hostel at<br />

Kurung<br />

<strong>Govt</strong>.Sec.school Parsi Parlo.<br />

kumey<br />

41 C/o boulder wall near community hall at Parsi parlo Kurung<br />

kumey<br />

42 C/o boulder protection work at Tarik. Kurung<br />

kumey<br />

43 C/o land development at Mana Kurung<br />

kumey<br />

44 C/o boulder protection work at Nakchang Agri field,<br />

Rashik.<br />

Kurung<br />

kumey<br />

45 C/o water tank at Hissang village Kurung<br />

kumey<br />

Parsi parlo Parsi parlo 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Gonang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Lebia 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Parsi parlo Sera 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Patuk 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Parsi parlo Rimumring 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Patuk 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Parsi parlo Boa 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Parsi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi parlo Pado 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Langa 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Pado 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Rashik 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi parlo Renchiporiang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi Parlo Parsi parlo 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi Parlo Parsi Parlo Hq. 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Rashik 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi Parlo Mana 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi Parlo Rashik 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi Parlo Hissang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 33<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

46 C/o Mini spring water Conservation tank at Tarik Kurung<br />

kumey<br />

47 C/o Porter track from Pagam to Topuriang Kurung<br />

Kumey<br />

48 C/o Porter track from Patuk to Sangkong Kurung<br />

Kumey<br />

49 Renovation <strong>of</strong> WRSB over Parsi river at Parsi Parlo town Kurung<br />

Kumey<br />

50 Renovation <strong>of</strong> WRSB over Parsi river at Malo village. Kurung<br />

Kumey<br />

51 C/o Porter track from Mollo to bigo. Kurung<br />

Kumey<br />

52 C/o Porter track from Renchiporiang to Pado village. Kurung<br />

Kumey<br />

53 C/o porter track from Renchiporiang to Chollo village. Kurung<br />

Kumey<br />

54 C/o porter track from Yerba to Sera village. Kurung<br />

Kumey<br />

55 C/o wire rope suspension bridge over Maya river Kurung<br />

Kumey<br />

56 C/o Porter track from Tongbia to Rakpuporiang Kurung<br />

Kumey<br />

57 Renovation <strong>of</strong> WRSB over Kamla river/Rashik river Kurung<br />

Kumey<br />

58 C/o porter track from Rashik to Yaluha village. Kurung<br />

Kumey<br />

59 C/o porter track from Tongbia to Parsi parlo. Kurung<br />

Kumey<br />

60 C/o Porter track from pado village to pado river. Kurung<br />

Kumey<br />

61 C/o porter track from Mangio village to Kaduk Pass. Kurung<br />

Kumey<br />

62 C/o waiting shed at Tame Hogu, Solongriang and Raba. Kurung<br />

Kumey<br />

63 C/o porter track from Parsi parlo to Langpong via Bigo<br />

Village.<br />

64 C/o porter track from Parsi parlo to Bompong-Hema<br />

village.<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

65 C/o waiting shed at Rashik-Haklin Kurung<br />

Kumey<br />

Parsi Parlo Tarik 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Pachik 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi parlo Patuk 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Parsi parlo Parsi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi parlo mallo 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Taram 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Renchiporiang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Renchiporiang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Yerba 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Parsi parlo Yarba 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Parsi parlo Rashik 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi parlo Rashik 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Nyokuriang 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Parsi parlo Rashik 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Parsi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi parlo Mangio 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Parsi parlo Seriang / Molo /<br />

Pado<br />

300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Parsi parlo Hema 1350000.00 31/3/2013 New 2012-13 Nil 1350000.00<br />

Parsi parlo Leya 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Sera 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

BADP AAP 2012-13 for website


Page 34<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

66 C/o porter track from Leneriang to Tongbia village Kurung<br />

Kumey<br />

67 C/o Log bridge at Tongbia village. Kurung<br />

Kumey<br />

68 C/o boulder foot-Path from Parsi river to parking ground. Kurung<br />

Kumey<br />

69 C/o Log bridge over Pado river Kurung<br />

Kumey<br />

70 C/o Porter Track at Lamnia,Subu, Tawriang, Leneriang<br />

and Lebia to R/Poriang Village.<br />

Kurung<br />

Kumey<br />

71 C/o Rostum/VIP gallery at general ground Patuk Kurung<br />

kumey<br />

72 C/o Public toilet at Pai Camp Kurung<br />

kumey<br />

73 C/o Public Toilet at ParsiParlo Circle HQ Kurung<br />

kumey<br />

74 Capacity building and training on handloom and rural<br />

artisans for CD Block Parsiparlo<br />

Kurung<br />

kumey<br />

Parsi parlo Leneriang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi Parlo Tongbia 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi Parlo Parsi Parlo 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi Parlo Parsi 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Lamnia / Subu /<br />

Tawriang /<br />

Leneriang /<br />

Lebia<br />

500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Parsi parlo Patuk 1400000.00 31/3/2013 New 2012-13 Nil 1400000.00<br />

Parsi Parlo Pai 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Parsi parlo Parsi 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Parsi parlo Parsiparlo 1150000.00 31/3/2013 New 2012-13 Nil 1150000.00<br />

Sub total = 22450000.00<br />

1 C/o Common toilet and bathroom at <strong>Govt</strong>. Middle<br />

School, Nikja (2 units)<br />

2 C/o Common toilet and bathroom at <strong>Govt</strong>. Primary<br />

School, Tayeng (01 unit)<br />

Kurung<br />

kumey<br />

Kurung<br />

kumey<br />

3 C/o Community toilet at Yapak village Kurung<br />

kumey<br />

4 C/o Public Toilet at Kurung Bridge Point Kurung<br />

kumey<br />

5 C/o Path way at CHC, Koloriang Kurung<br />

Kumey<br />

6 C/o Pathway from BRO Road to Naya fumu Power Kurung<br />

House at Fua village<br />

Kumey<br />

7 C/o Improvement <strong>of</strong> WRSB and foot track at Digging<br />

village<br />

Kurung<br />

Kumey<br />

8 Improvement <strong>of</strong> Porter Track from Nyollo to Toba Village Kurung<br />

Kumey<br />

9 C/o CC wall at Goving Pada Koloriang Kurung<br />

Kumey<br />

Koloriang Nikja 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Tayeng 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Koloriang Yapak village 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Kurung bridge 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Point<br />

Koloriang Koloriang Hq. 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Fua 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Koloriang Digging 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Toba 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Koloriang Hq. 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 35<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

10 C/o pathway from Staff line to Siyang colony, Koloriang Kurung<br />

Kumey<br />

11 C/o Improvement <strong>of</strong> porter track from Kopunyor to Naji<br />

Bibuk village<br />

12 C/o Compound Wall at Tani Colony near Staff line<br />

Koloriang<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

13 C/o Log bridge over Papi river Kurung<br />

Kumey<br />

14 C/o compound wall between <strong>Govt</strong>. Higher Secondary Kurung<br />

School and Pakrang Koke, Koloriang.<br />

Kumey<br />

15 C/o Pathway at Tayang village Kurung<br />

Kumey<br />

16 C/o Log bridge at Paha river in between Kiley to Yumlam Kurung<br />

Kumey<br />

17 C/o boulder retaining wall at Kachu Nallah near Nikja<br />

road, Koloriang<br />

Kurung<br />

Kumey<br />

18 C/o pathway at Namgram village Kurung<br />

Kumey<br />

19 C/o pathway at <strong>Govt</strong>. Primary School Sangkung Kurung<br />

Kumey<br />

20 C/o pathway at Kush Kurung<br />

Kumey<br />

21 C/o pathway from Rakte to Pagba village Kurung<br />

Kumey<br />

22 C/o Porter track from Kiley to Yumlam village Kurung<br />

Kumey<br />

23 C/o Path way from <strong>Govt</strong>. M.E School Nikja to Taipa Kurung<br />

village<br />

Kumey<br />

24 C/o Path way from Rostrum to BRTF road at General<br />

Ground, Koloriang<br />

Kurung<br />

Kumey<br />

25 Transformer shed at Rilong village Kurung<br />

Kumey<br />

26 Waiting shed at Jiri Kurung<br />

Kumey<br />

27 C/o Pathway from Teachers qtr. to Boys/Girls Hostel at Kurung<br />

<strong>Govt</strong>. Higher Secondary School, Koloriang<br />

Kumey<br />

28 Water Supply at CHC, Koloriang Kurung<br />

kumey<br />

29 C/o Water storage Tank at Naji Bibuk village Kurung<br />

kumey<br />

30 C/o Water storage tank at Yumlam village. Kurung<br />

kumey<br />

Koloriang Siang colony. 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Koloriang Kopunyor 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Tani Clony. 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Koloriang Pipe 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Koloriang Pakrang Koke 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Koloriang Manghe 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Koloriang Yumlam 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Nikja 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Nangram 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Koloriang Sangkung 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Kush 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Rakte / Pagba 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Kiley 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Nikja/Taipa 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Koloriang Koloriang Hq. 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Koloriang Rilong 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Koloriang Jiri 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Koloriang Hq. 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Koloriang Hq. 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Naji Bibuk 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

village<br />

Koloriang Yumlam 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

BADP AAP 2012-13 for website


Page 36<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

31 C/o Water storage Tank at old Bazar line Koloriang Kurung<br />

kumey<br />

32 C/o Land Protection work at Yarkum Kurung<br />

kumey<br />

33 C/o Land Protection wall for Paddy cum fish culture at<br />

HUR<br />

Kurung<br />

kumey<br />

34 C/o LD at Kiley village Kurung<br />

kumey<br />

35 LD work at Tayek under Yumlam village Kurung<br />

kumey<br />

36 C/o flood protection work at Kachap Colony Kurung<br />

kumey<br />

37 C/o retaining wall to protect Nikja-Taipa road, Koloriang Kurung<br />

kumey<br />

38 C/o land protection wall near Horik nallah Kurung<br />

kumey<br />

39 C/o Reatining wall near PWD IB Koloriang Kurung<br />

kumey<br />

40 C/o Retaining wall near civil power colony, Koloriang Kurung<br />

kumey<br />

41 C/o Retaining wall at Old Bazar line Kurung<br />

kumey<br />

42 C/o Retaining wall near electrical colony,Koloriang Kurung<br />

kumey<br />

43 C/o Flood control at Tapin Agri. Field Kurung<br />

kumey<br />

44 Land protection work at Sangba under Nangram Kurung<br />

kumey<br />

45 Land protection work at Yarpuk under Nangram Kurung<br />

kumey<br />

46 C/o CC protection wall at Papi bridge Kurung<br />

Kumey<br />

47 C/o Cross Drainage at Helipad ground, Koloriang Kurung<br />

kumey<br />

48 C/o Security fencing for community Agro-Horti Garden at<br />

Sebi village<br />

Kurung<br />

kumey<br />

49 C/o Boulder fencing <strong>of</strong> Agri-field at Manghe Kurung<br />

kumey<br />

50 Bamboo Garden at Pakpu village Koloriang Kurung<br />

kumey<br />

51 Diary cum Agriculture farm at Goariang. Kurung<br />

kumey<br />

Koloriang Koloriang Hq. 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Yarkum 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang HUR 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Kiley village 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Yumlam 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Koloriang Kachap colony 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Nikja 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Horik 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Koloriang Koloriang Hq. 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Koloriang Hq. 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Koloriang Hq. 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Koloriang Hq. 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Tapin 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Sangba 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Koloriang Yarpuk 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Papi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Koloriang Hq. 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Sebi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Manghe 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Pakpu village 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Koloriang Goariang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

BADP AAP 2012-13 for website


Page 37<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

52 Boulder security fencing at Kaho agri field at Sangkung<br />

village<br />

53 C/o Boulder wall around Bamboo plantation garden at<br />

Taponey<br />

Kurung<br />

kumey<br />

Kurung<br />

kumey<br />

54 C/o additional class room at <strong>Govt</strong>. Primary School, Pari Kurung<br />

kumey<br />

55 Maintenance <strong>of</strong> <strong>Govt</strong>. I.V School at Riangchi Kurung<br />

kumey<br />

56 C/o Boulder fencing wall at <strong>Govt</strong>.Middle School Chello Kurung<br />

kumey<br />

57 C/o Primary Sub-Health Centre building at Chello Kurung<br />

kumey<br />

58 C/o Seri cultural garden at Solungyar Kurung<br />

kumey<br />

59 C/o 2 nos fish pond Sangkung village Kurung<br />

kumey<br />

60 C/o 2 unit <strong>of</strong> fish pond at Papu village Kurung<br />

kumey<br />

61 C/o Drift irrigation at Rakte horticulture garden Kurung<br />

kmey<br />

62 C/o MIC cum LD works at Chomi village Kurung<br />

kumey<br />

63 C/o MIC from Langnering at Nyollo village Kurung<br />

kumey<br />

64 C/o MIC for Woman SHG at Tayeng Kurung<br />

kumey<br />

65 C/o MIC from Tabu Nallah to Lere paddy field Kurung<br />

kumey<br />

66 C/o MIC at Palang stream to Yamakrioriang Kurung<br />

kumey<br />

67 C/o MIC from Hotte source to Fureg Kurung<br />

kumey<br />

68 C/o MIC at Paleng to Papingriang paddy field Kurung<br />

kumey<br />

69 C/o MIC at Taburiang Kurung<br />

kumey<br />

70 C/o Maintenance <strong>of</strong> link road from main road to <strong>Govt</strong>. Kurung<br />

Primary School, Koloriang<br />

kumey<br />

71 C/o Weaving centre at Rambo village Kurung<br />

kumey<br />

72 Special Renovation <strong>of</strong> Badmainton court at multipurpose<br />

Community Hall at Koloriang<br />

Kurung<br />

kumey<br />

Koloriang<br />

Sangkung<br />

village<br />

100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Koloriang Taponey 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Pari 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Koloriang Riangchi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Chello 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Chello 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Koloriang Solungyar 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Sangkung villag 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Papu village 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Rakte 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Koloriang Chomi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Nyollo 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Tayeng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Tabu 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Koloriang Palang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Fureg 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Koloriang Paleng 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Koloriang Taburiang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Koloriang Koloriang Hq. 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Koloriang Rambo 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Koloriang Koloriang Hq. 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 38<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

73 Community Hall at Nikja (Taipa) village Kurung<br />

kumey<br />

74 Security fencing around ITBP campus Koloriang (Phase- Kurung<br />

II)<br />

kumey<br />

75 Capacit building and training on handloom and rural<br />

artisans for CD Block Koloriang<br />

1 C/o Maintenance <strong>of</strong> petrolling track/suspension<br />

bridge/log bridge from Sarli to Jammu pass and Darmu<br />

Pass<br />

Kurung<br />

kumey<br />

Kurung<br />

kumey<br />

2 C/o MIC at radaporiang from Fudang Nallah Kurung<br />

kumey<br />

3 C/o MIC from walla nallah to Yuyuangriang Kurung<br />

kumey<br />

4 C/o Irrigatigon water reserviour tank at teyan Kurung<br />

kumey<br />

5 C/o MIC at Piluoriang under raktepu village Kurung<br />

kumey<br />

6 C/o <strong>of</strong> Fish Pond at sate village Kurung<br />

kumey<br />

7 C/o Fish Pond at Swariang village Kurung<br />

kumey<br />

8 C/o compound wall at <strong>Govt</strong> PHC new sarli Kurung<br />

kumey<br />

9 C/o Medical sub centre at Polosang Kurung<br />

kumey<br />

10 C/o Fencing at <strong>Govt</strong>. I.V School at Furung Kurung<br />

kumey<br />

11 C/o Additional Classroom at Sape IV School. Kurung<br />

kumey<br />

12 C/o Playfield at sate II village Kurung<br />

kumey<br />

13 C/o playfield at Primary School machane Kurung<br />

kumey<br />

14 C/o boulder wall at community paddy field maigong Kurung<br />

kumey<br />

15 C/o Fencing for community agro- Horti garden at Sate Kurung<br />

with retention works.<br />

kumey<br />

16 C/o bamboo plantation at Ania field under Sarli Kurung<br />

kumey<br />

17 C/o Bamboo Plantation at Sangrilakang Kurung<br />

kumey<br />

Koloriang Nikja / Taipa 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Koloriang Koloriang Hq. 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Koloriang Koloriang Hq. 1150000.00 31/3/2013 New 2012-13 Nil 1150000.00<br />

Sub total = 22450000.00<br />

Sarli Sarli 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Sarli Radaporiang 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Sarli yuyuangriang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli wabia 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sarli Raktepu 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Sarli Sate 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Swariang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Sarli Nade, New Sarli 800000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Polosang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Furung 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Sarli Sape 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Sate II 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Machane 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli maigong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Sarli new Sarli 2200000.00 31/3/2013 New 2012-13 Nil 2200000.00<br />

Sarli Sarli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Sarli Sangrilkang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

BADP AAP 2012-13 for website


Page 39<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

18 C/o Orange Garden with security fencing at Rasangriang<br />

in Raktepu village<br />

Kurung<br />

kumey<br />

19 C/o Bamboo Plantation at Rasangriang under Raktepu Kurung<br />

kumey<br />

20 C/o Orange Garden at wabia village with fencing Kurung<br />

kumey<br />

21 C/o Orange Garden at Namla village with fencing Kurung<br />

kumey<br />

22 C/o Tase plantation at Paneyang Kurung<br />

kumey<br />

23 C/o Bamboo Plantation at Ronggak Kurung<br />

kumey<br />

24 C/o Orange Plantation at Nade village Kurung<br />

kumey<br />

25 C/o One and half Hectre bamboo plantation along with Kurung<br />

toko path and tase in Jorong<br />

kumey<br />

26 C/o Orange Plantation at Pirak riang Kurung<br />

kumey<br />

27 C/o Bamboo Plantation at Fuyeriang Kurung<br />

kumey<br />

28 C/o orange garden at Maigong with fencing Kurung<br />

kumey<br />

29 C/o Flood control Protection Project for community Kurung<br />

Paddy field Sate<br />

kumey<br />

30 C/o Flood protection at siangriang Kurung<br />

kumey<br />

31 C/o Flood control at Niakuriang Kurung<br />

kumey<br />

32 Protection Wall near CPO Godown Kurung<br />

kumey<br />

33 C/o Flood control at rakap colony Kurung<br />

kumey<br />

34 C/o Bolder wall at Rakap dompom Kurung<br />

kumey<br />

35 C/o Flood control at kakyang Kurung<br />

kumey<br />

36 C/o Land protection at Sarli town Kurung<br />

kumey<br />

37 C/o Boulder wall at Sarli town Kurung<br />

kumey<br />

38 C/o Soil erosion protection scheme at maigong Kurung<br />

kumey<br />

39 C/o Pathway from <strong>Govt</strong>. Secondary School to Sate Kurung<br />

Kumey<br />

Sarli Raktepu 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Sarli Raktepu 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli wabia 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sarli Namla 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sarli peneyang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Ronggak 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Nade 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Tai Jorong 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Nade 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Sarli Nade 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Sarli maigong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Sate 2200000.00 31/3/2013 New 2012-13 Nil 2200000.00<br />

Sarli Siangriang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sarli Niakuriang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Sarli town 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Sarli town 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Sarli town 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Sarli kakyang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli sarli town 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli sarli town 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli maigong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Sarli Sate 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 40<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

40 C/o porter track in between milli- Gane Kurung<br />

Kumey<br />

41 C/o Porter track with ladder log bridge, sate to<br />

Kurung<br />

peneyang<br />

Kumey<br />

42 C/o Porter track from sape to mallo Kurung<br />

Kumey<br />

43 C/o Porter track from sape to haraiho Kurung<br />

Kumey<br />

44 C/o internal electrification <strong>of</strong> commuinity hall New Sarli Kurung<br />

Kumey<br />

45 C/o Pathway from BRTF road to community hall Kurung<br />

Kumey<br />

46 C/o Log Bridge over waba nallah between milli-macane Kurung<br />

Kumey<br />

47 C/o Footpath, Logladder bridge in WabaNallah between<br />

milli-sarli<br />

Kurung<br />

Kumey<br />

48 C/o Log Bridge over Polobong between Kapu to Waru Kurung<br />

Kumey<br />

49 C/o Porter Track from Ripang to Riyang Kurung<br />

Kumey<br />

50 C/o Pathway at Wabia Kurung<br />

Kumey<br />

51 C/o porter track from wabia to chana Kurung<br />

Kumey<br />

52 C/o Porter track with Log Bridge over Fulk Nallah Kurung<br />

between Rerung and Lengtaso<br />

Kumey<br />

53 C/o Waiting shed at Tai Village Kurung<br />

Kumey<br />

54 C/o Log Bridge over Fatra nallah under Keney village Kurung<br />

Kumey<br />

55 C/o Porter Track and log bridges from Ragtepu to Kurung<br />

Yusang<br />

Kumey<br />

56 C/o Internal Electrification at PHC Quarters New Sarli Kurung<br />

kumey<br />

57 C/o Toilet and Bathroom at <strong>Govt</strong> I.V School at Furung Kurung<br />

kumey<br />

58 C/o Toilet and bathroom for Girls Hostel at <strong>Govt</strong><br />

Kurung<br />

Secondary school sarli<br />

kumey<br />

59 C/o 3 No's <strong>of</strong> Public toilet at sarli town Kurung<br />

kumey<br />

60 C/o Toilet bathroom at community hall sarli town Kurung<br />

kumey<br />

Sarli milli-gane 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Sarli sate / peneyang 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Sarli sape/mallo 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli sape haraiho 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli New Sarli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli New sarli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli milli / macane 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli mili/sarli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Kapu/waru 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Ripang / Riyang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Sarli sarli town 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli wabia/chana 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Sarli fulk nalla 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Tai 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli keney 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Sarli Ragtepu /<br />

yusang<br />

300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli New Sarli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Furung 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sarli Sarli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sarli sarli town 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Sarli sarli town 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 41<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

61 C/o toilet & bathroom at sate II village Kurung<br />

kumey<br />

62 C/o Toilet and Bathroom at <strong>Govt</strong> school Machane Kurung<br />

kumey<br />

63 C/o Single No's <strong>of</strong> Toilet and Bathroom at <strong>Govt</strong> IV school Kurung<br />

Kari-Bade<br />

kumey<br />

64 Capacity building and training on handloom and rural<br />

artisans for CD Block Sarli<br />

1 C/o ILCT School building for <strong>Govt</strong>. Middle School, Dana<br />

Raha.<br />

Kurung<br />

kumey<br />

Kurung<br />

kmey<br />

2 C/o Teacher Quarter at <strong>Govt</strong>. M.E School, Pipsorang Kurung<br />

kumey<br />

3 C/o Play field at M.E. School, Lukbia Kurung<br />

kumey<br />

4 Providing Water Supply for Gyapin Village Kurung<br />

kumey<br />

5 C/o Driking water Tank at Korapu Kurung<br />

kumey<br />

6 C/o Driking water Tank at Lekam Soku Kurung<br />

kumey<br />

7 C/o WRSB over river Palam at Sokambok between<br />

Hania to Rikung<br />

8 C/o Porter Track from to Gyapin to Hapuk village with<br />

Log bridge at Upper Pare<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

9 C/o Porter Track from Gyapin to Songio Kurung<br />

Kumey<br />

10 C/o Porter track from songio to Bikya Village Kurung<br />

Kumey<br />

11 C/o Porter Track from Bikya to Raha via Nikbia Kurung<br />

Kumey<br />

12 C/o WRSB at Kerin between Raha to Pania Kurung<br />

Kumey<br />

13 C/o WRSB over Dutte river to connect Tedung and Kurung<br />

Sepaha village<br />

Kumey<br />

14 C/o Porter track from Pipsorang to Haimachi Kurung<br />

Kumey<br />

15 C/o WRSB over river Mike at Korapu village Kurung<br />

Kumey<br />

16 C/o WRSB over Hama river at Hagu Sile between Riba Kurung<br />

Karsang to Pipsorang<br />

Kumey<br />

Sarli sate II 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Sarli Machane 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sarli Kari-Bade 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Sarli Sarli 1150000.00 31/3/2013 New 2012-13 Nil 1150000.00<br />

Sub total = 22450000.00<br />

Pipsorang Dana Raha 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Pipsorang Pipsorang 1600000.00 31/3/2013 New 2012-13 Nil 1600000.00<br />

Pipsorang Lukbia 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Pipsorang Gyapin 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Pipsorang Korapu 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Pipsorang Lekam Soku 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Pipsorang Hania 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Pipsorang Gyapin / Hapuk 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Pipsorang Gyapin / Songio 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Pipsorang Bikya 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Pipsorang Bikya / Raha 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Pipsorang Raha / Pania 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Pipsorang Tedung /<br />

Sepaha<br />

600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Pipsorang Pipsorang / 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Haimachi<br />

Pipsorang Korapu 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Pipsorang Reba Karsang /<br />

Pipsorang<br />

700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

BADP AAP 2012-13 for website


Page 42<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

17 C/o Porter track from Lukbia to Ha village Kurung<br />

Kumey<br />

18 C/o Porter track from Ha to Tali Kurung<br />

Kumey<br />

19 C/o WRSB over river Keik in between Ha to Tali Kurung<br />

Kumey<br />

20 C/o WRSB over river Solu in between Ha to Bagjam (Ph- Kurung<br />

I)<br />

Kumey<br />

21 C/o Porter tack between Bagjam to Lukbia Kurung<br />

Kumey<br />

22 C/o Porter track in between Keba to Niobia village Kurung<br />

Kumey<br />

23 C/o WRSB over river Solu at Tinee in between Keba to Kurung<br />

Zara village<br />

Kumey<br />

24 Maintenance <strong>of</strong> Porter tracks/Log bridges and log<br />

ladders under Pipsorang Block constructed last 3<br />

years back<br />

25 Maintenance <strong>of</strong> existing WRSB under Pipsorang BADP<br />

Block constructed last 3 (three) years back<br />

26 C/o WRSB at Panyong over Solu river between Pillua to<br />

Niobia (Ph-III)<br />

27 C/o WRSB over Huma river Lotum between Kolleng to<br />

Niame<br />

28 C/o WRSB over river Lukte-Rate between Niobia to<br />

Lukbia (Ph-II)<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

Kurung<br />

Kumey<br />

29 C/o Community Hall at Songio village Kurung<br />

kumey<br />

30 Capacity building programme by way <strong>of</strong> vocational Kurung<br />

studies and training for youths <strong>of</strong> self-help employment kumey<br />

and skill-gradation <strong>of</strong> Mason, carpentry, crafts making<br />

and weaving/knitting.<br />

31 Capacity building and training on handloom and rural<br />

artisans for CD Block<br />

Kurung<br />

kumey<br />

Pipsorang Lukbia / Ha 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Pipsorang Ha / Tali 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Pipsorang Ha / Tali 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Pipsorang Ha / Bagjam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Pipsorang Bagja / Lukbia 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Pipsorang Keba / Niobia 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Pipsorang Keba / Zara 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Pipsorang Pipsorang 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Pipsorang Pipsorang 650000.00 31/3/2013 New 2012-13 Nil 650000.00<br />

Pipsorang Pillua / Nioba 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Pipsorang Kolleng / Niame 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Pipsorang Niobia / Lukbia 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Pipsorang Songio 1400000.00 31/3/2013 New 2012-13 Nil 1400000.00<br />

Pipsorang Pipsorang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Pipsorang Pipsorang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Sub total = 22450000.00<br />

Total Kurung Kumey District = 112250000.00<br />

1 C/o Security fencing around Barangang school<br />

premises.<br />

West Siang<br />

Mechukha<br />

Tato<br />

Barangang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

2 Procurement <strong>of</strong> Medical equipment & upgradation <strong>of</strong><br />

CHC,Mechukha.<br />

West Siang<br />

Mechukha<br />

Tato<br />

Mechukha 2000000.00 31/3/2013 New 2012-13 Nil 2000000.00<br />

BADP AAP 2012-13 for website


Page 43<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

3 C/o Fish pond at Decengthang. West Siang Mechukha<br />

Tato<br />

4 C/o Fish pond at Yornyi village at Mechukha. West Siang Mechukha<br />

Tato<br />

5 Bamboo plantation at Yorje-Sine land at Rego village. West Siang Mechukha<br />

Tato<br />

6 Apple garden at Sokarpu. West Siang Mechukha<br />

Tato<br />

7 C/o CC Drain at Dronsar West Siang Mechukha<br />

Tato<br />

8 C/o CC Drain at Super Colony at Mechukha. West Siang Mechukha<br />

Tato<br />

9 C/o CC Drain at General ground at Tato. West Siang Mechukha<br />

Tato<br />

10 C/o CC Drain from Radha Krishna Mandir to landing West Siang Mechukha<br />

ground via back old market.<br />

Tato<br />

11 C/o Flood control at Nishingbum at Segong village. West Siang Mechukha<br />

Tato<br />

12 C/o Flood control at Patum land at Tato. West Siang Mechukha<br />

Tato<br />

13 Upgradation <strong>of</strong> water supply at Gause. West Siang Mechukha<br />

Tato<br />

14 Improvement <strong>of</strong> water supply at Tato village. West Siang Mechukha<br />

Tato<br />

15 Providing <strong>of</strong> water supply at Police colony at Mechukha. West Siang Mechukha<br />

Tato<br />

16 C/o RCC Mini bridge at Lhallung village. West Siang Mechukha<br />

Tato<br />

17 C/o Approach road from PMGSY road to Barangang West Siang Mechukha<br />

school.<br />

Tato<br />

18 C/o Approach road with log bridge between Chorling to<br />

Barangang village.<br />

19 C/o soiling and metalling from BRTF road to <strong>Govt</strong>.Higher<br />

Secondary school, Mechukha.<br />

West Siang<br />

West Siang<br />

Mechukha<br />

Tato<br />

Mechukha<br />

Tato<br />

20 C/o Road from BRTF road to Football ground at Tato. West Siang Mechukha<br />

Tato<br />

21 Extension <strong>of</strong> approach road from BRTF road to Lipusi West Siang Mechukha<br />

Tato<br />

22 Upgradation <strong>of</strong> Suspension bridge over Yomgo river in West Siang Mechukha<br />

between Lipo to Yapik.<br />

Tato<br />

23 Upgradation <strong>of</strong> bridge over Kigar-rong at Dorjeeling. West Siang Mechukha<br />

Tato<br />

Decengthang 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Mechukha 605000.00 31/3/2013 New 2012-13 Nil 605000.00<br />

Rego 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sokarpu 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Dronsal 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Mechukha 570000.00 31/3/2013 New 2012-13 Nil 570000.00<br />

Tato 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Mechukha 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Segong 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Tato 950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

Gause 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tato 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Mechukha 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Lhallung 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Barangang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Chorling 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Mechukha 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Tato 2000000.00 31/3/2013 New 2012-13 Nil 2000000.00<br />

Lipusi 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Lipo. 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Dorjeeling 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

BADP AAP 2012-13 for website


Page 44<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

24 C/o CC steps from BRTF road to Primary school at<br />

Tadogitu.<br />

West Siang<br />

Mechukha<br />

Tato<br />

25 C/o CC Steps from bridge point to Lower Heyo. West Siang Mechukha<br />

Tato<br />

26 C/o CC steps at Yornyi land at Hiri village. West Siang Mechukha<br />

Tato<br />

27 C/o CC steps at Tato village. West Siang Mechukha<br />

Tato<br />

28 C/o CC steps at Decenthang near Philley land. West Siang Mechukha<br />

Tato<br />

29 C/o Porter track from Tato village to Akir. West Siang Mechukha<br />

Tato<br />

30 Maintenance / Repair <strong>of</strong> suspension bridge in between West Siang Mechukha<br />

Tato to Upper Heyo.<br />

Tato<br />

31 C/o CC Steps from BRTF road to Seko area under Tato<br />

circle.<br />

West Siang<br />

Mechukha<br />

Tato<br />

32 C/o Bus waiting shed at Sorangdam village. West Siang Mechukha<br />

Tato<br />

33 C/o Rustom and Gallery at General groud at Tato. West Siang Mechukha<br />

Tato<br />

34 Upgradation <strong>of</strong> Kebang Ghar at Tato. West Siang Mechukha<br />

Tato.<br />

35 C/o Tagin Culture Centre at Mechukha. West Siang Mechukha<br />

Tato.<br />

36 C/o Community Hall at Gyanang village. West Siang Mechukha<br />

Tato.<br />

37 Organisation <strong>of</strong> Capacity Building Training Programme. West Siang Mechukha<br />

Tato.<br />

38 C/o Staging Hut (15x15feet) at Singedraphu SQ 3128<br />

between Lamang to Lakhanya Pass.<br />

39 C/o staging Hut (15x15 feet) at Sastri Camp SQ2816<br />

between Yorlung to Chinuing La and Seruptangla.<br />

40 C/o Log bridge at GR 255217 between Tri junctions to<br />

Seruptangla route.<br />

41 C/o FSB/Log at GR 301271 between Lamang to<br />

Singedraphu.<br />

42 C/o FSB/Log at GR 299273 between Lamang to Lola<br />

Pass.<br />

43 C/o FSB/Log bridge at GR303285 between Lamang to<br />

Puning.<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

Mechukha<br />

Tato<br />

Mechukha<br />

Tato<br />

Mechukha<br />

Tato<br />

Mechukha<br />

Tato<br />

Mechukha<br />

Tato<br />

Mechukha<br />

Tato<br />

Tadogitu. 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Lower Heyo 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Hiri 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tato 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Decengthang 75000.00 31/3/2013 New 2012-13 Nil 75000.00<br />

Akir 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Upper Heyo 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Seko 882500.00 31/3/2013 New 2012-13 Nil 882500.00<br />

Sorangdam 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Tato 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Tato 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Mechukha 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Gyanang 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Mechukha Tato 1122500.00 31/3/2013 New 2012-13 Nil 1122500.00<br />

Singedraphu 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Yorlung 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Seruptangla<br />

route<br />

300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Lamang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Lamang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Lamang 345000.00 31/3/2013 New 2012-13 Nil 345000.00<br />

BADP AAP 2012-13 for website


Page 45<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

Sub total = 22450000.00<br />

1 Renovation <strong>of</strong> existing staging hut at Tabeyongkong SQ<br />

5144 between Henkar to Buje Takok Pass.<br />

West Siang<br />

Monigong<br />

Pidi<br />

Tabeyongkong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

2 C/o Staging Hut (15x15 feet) at kising Simu SQ 6552<br />

between Monigong to Tunkarogo.<br />

West Siang<br />

Monigong<br />

Pidi<br />

kising Simu 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

3 C/o Log bridge at GR 659509 near Kishing Simu area<br />

between Monigong to Tunkarogo Pass.<br />

West Siang<br />

Monigong<br />

Pidi<br />

Monigong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

4 C/o FSB/Log bridge at GR 512447 over Tabe Nala<br />

between Tabeyongkong to Bujetakok Pass.<br />

West Siang<br />

Monigong<br />

Pidi<br />

Tabeyongkong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

5 C/o FSB at GR 522444 over Tabe Nala between Henkar<br />

to Tabeyongkong.<br />

6 C/o FSB at GR 539438 between Henkar to<br />

Tabeyongkong.<br />

7 C/o Cenented water tank havig 02 diameter and 1.5<br />

Mtr.dept at Kongpong between Monigong to Tunkarogo<br />

Pass.<br />

West Siang<br />

West Siang<br />

West Siang<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

8 Organisation <strong>of</strong> Capacity Building training Programmee. West Siang Monigong<br />

Pidi<br />

9 C/o Cultural Centre near medical line at Monigong. West Siang Monigong<br />

Pidi<br />

10 C/o Newly foot suspension bridge over Sutum river in West Siang Monigong<br />

between Simugong to Rotung.<br />

Pidi<br />

11 C/o CC Steps from Didu to Yingrang at Didu village. West Siang Monigong<br />

Pidi<br />

12 C/o CC Steps from Yamen Lingpak to Simuying at Upper West Siang Monigong<br />

Karle.<br />

Pidi<br />

13 C/o CC Steps from BRTF road to Gamgo Yingkong. West Siang Monigong<br />

Pidi<br />

14 C/o Mule track from Hemi village to Tao Obange. West Siang Monigong<br />

Pidi<br />

15 C/o CC Step from Hemi village to Primary School, Hemi West Siang Monigong<br />

Pidi<br />

16 C/o Jeepable road from BRTF road to Yadang Village. West Siang Monigong<br />

Pidi<br />

17 C/o Village link road within Sajigong hamlets. West Siang Monigong<br />

Pidi<br />

18 C/o Jeepable road from BRTF road to Takinglingtak West Siang Monigong<br />

village.<br />

Pidi<br />

19 C/o Jeepable road from BRTF road to Notin village at<br />

Karo.<br />

West Siang<br />

Monigong<br />

Pidi<br />

Tabeyongkong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tabeyongkong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kongpong 45000.00 31/3/2013 New 2012-13 Nil 45000.00<br />

Monigong Pidi 1122500.00 31/3/2013 New 2012-13 Nil 1122500.00<br />

Monigong 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Simugong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Didu 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Upper Karle 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Gamgo 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Yingkong<br />

Hemi 234628.00 31/3/2013 New 2012-13 Nil 234628.00<br />

Hemi 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Yadang 1750000.00 31/3/2013 New 2012-13 Nil 1750000.00<br />

Sajigong 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Takinglingtak 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Karo. 1750000.00 31/3/2013 New 2012-13 Nil 1750000.00<br />

BADP AAP 2012-13 for website


Page 46<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

20 C/o Village road from BRTF road to IV school, Lungte<br />

village.<br />

21 C/o Jeepable road from BRTF road to playground<br />

through Bazar line,Monigong.<br />

West Siang<br />

West Siang<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

22 C/o CC Drain at Pasang Sokong at Pasang village. West Siang Monigong<br />

Pidi<br />

23 C/o CC Drain between Kebang Ghar and Gandhi Statue. West Siang Monigong<br />

Pidi<br />

24 C/o Security fencing for Horticulture plantation at Komte West Siang Monigong<br />

village.<br />

Pidi<br />

25 Providing furniture for schools <strong>of</strong> Monigong-Pidi Block. West Siang Monigong<br />

Pidi<br />

26 C/o Security fencing around <strong>Govt</strong>.Secondary school,<br />

Monigong.<br />

27 Extension <strong>of</strong> 2(two) class rooms <strong>of</strong> <strong>Govt</strong>. Primary school,<br />

Hemi.<br />

28 C/o RCC Bachelor Barrack for Teachers at <strong>Govt</strong>.<br />

Primary School, Namashibo village.<br />

29 C/o RCC Bachelor Barrack for Teachers at <strong>Govt</strong>.<br />

Primary School,Simugong village.<br />

30 C/o Community fencing and preservation <strong>of</strong> Milch cow at<br />

Simugong village.<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

31 C/o Community fencing and preservation <strong>of</strong> Milch cow at West Siang<br />

Sukudom village.<br />

32 C/o Community fencing and preservation <strong>of</strong> Milch cow at West Siang<br />

Sajegong village.<br />

33 C/o Community fencing and preservation <strong>of</strong> Milch cow at<br />

Geaker village.<br />

34 C/o Community fencing and preservation <strong>of</strong> Milch cow at<br />

Karle village.<br />

35 C/o Community fencing and preservation <strong>of</strong> Milch cow at<br />

Notin village.<br />

36 C/o Community fencing and preservation <strong>of</strong> Milch cow at<br />

Tangchak Yingkong village.<br />

37 C/o Community fencing and preservation <strong>of</strong> Milch cow at<br />

Soyorgang village.<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Monigong<br />

Pidi<br />

Lungte 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Monigong 510334.00 31/3/2013 New 2012-13 Nil 510334.00<br />

Pasang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Monigong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Komte 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Monigong Pidi 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Monigong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Hemi 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Namashibo 1200000.00 31/3/2013 New 2012-13 Nil 1200000.00<br />

Simugong 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Simugong 437538.00 31/3/2013 New 2012-13 Nil 437538.00<br />

Sukudom 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sajegong 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Geaker 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Karle 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Notin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Tangchak<br />

Yingkong<br />

400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Soyorgang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Sub total = 22450000.00<br />

1 C/o RCC Type-II Teacher Qtrs. at Bogne. West Siang Kaying<br />

Payum<br />

Bogne 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

BADP AAP 2012-13 for website


Page 47<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

2 C/o RCC Teacher quarter at <strong>Govt</strong>. Middle School,<br />

Kerang<br />

West Siang<br />

Kaying<br />

Payum<br />

3 Extension <strong>of</strong> class room at <strong>Govt</strong>. Middle School, Bogne West Siang Kaying<br />

Payum<br />

4 Procurement <strong>of</strong> medicine for PHC Kaying and Payum West Siang Kaying<br />

Payum<br />

5 C/o one room medical sub-centre building at Reying West Siang Kaying<br />

Payum<br />

6 C/o Fish pond at Sirum. West Siang Kaying<br />

Payum<br />

7 C/o Fish pond at Bogne. West Siang Kaying<br />

Payum<br />

8 Estt. <strong>of</strong> Modern Piggery Farm at Kaying West Siang Kaying<br />

Payum<br />

9 Preservation <strong>of</strong> Mithun at Kile area <strong>of</strong> Kaying West Siang Kaying<br />

Payum<br />

10 Esstt. <strong>of</strong> Orange garden at Borang area at Reying. West Siang Kaying<br />

Payum<br />

11 Plantation <strong>of</strong> Hollok garden at Yule area <strong>of</strong> Gasheng West Siang Kaying<br />

village<br />

Payum<br />

12 C/o Orange garden at Molo (Bille) West Siang Kaying<br />

Payum<br />

13 Esstt. <strong>of</strong> Horticulture garden at Sanggu at Gaming. West Siang Kaying<br />

Payum<br />

14 Esstt. <strong>of</strong> Horticulture garden at Sikek area <strong>of</strong> Sirum West Siang Kaying<br />

village.<br />

Payum<br />

15 Esstt. <strong>of</strong> Horticulture garden at Bayang area <strong>of</strong> Bogne<br />

village.<br />

16 Esstt. <strong>of</strong> Horticulture garden at Sritying area <strong>of</strong> Gaming<br />

village.<br />

17 Esstt. <strong>of</strong> Horticulture garden at Tarisoying area <strong>of</strong><br />

Gasheng village.<br />

18 Esstt. <strong>of</strong> Horticulture garden at Mebung Poying area <strong>of</strong><br />

Bogu village.<br />

19 Esstt. <strong>of</strong> Horticulture garden at Ritying area <strong>of</strong> Gate<br />

village.<br />

20 Esstt. <strong>of</strong> Horticulture garden at Mulung area <strong>of</strong> Kaying<br />

village.<br />

21 Esstt. <strong>of</strong> Bamboo plantation at Monging area <strong>of</strong> Payum<br />

village.<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

West Siang<br />

Kaying<br />

Payum<br />

Kaying<br />

Payum<br />

Kaying<br />

Payum<br />

Kaying<br />

Payum<br />

Kaying<br />

Payum<br />

Kaying<br />

Payum<br />

Kaying<br />

Payum<br />

Kerang 700000.00 31/3/2013 New 2012-13 Nil 650000.00<br />

Bogne 500000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Kaying & Payum 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Reying 500000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Sirum 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Bogne 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Kaying 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Kaying 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Reying 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gasheng 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Molo 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Gaming 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Sirum 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Bogne 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gaming 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gasheng 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Bogu 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gate 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kaying 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Payum 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

BADP AAP 2012-13 for website


Page 48<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

22 C/o CC Drainage at back side <strong>of</strong> Town Primary School<br />

Kaying<br />

West Siang<br />

Kaying<br />

Payum<br />

23 C/o Sedimentation-cum-Storage Tank at Kaying. West Siang Kaying<br />

Payum<br />

24 Estt. <strong>of</strong> Social Forestry at Rabung area <strong>of</strong> Kaying West Siang Kaying<br />

Payum<br />

25 Esstt. <strong>of</strong> Social forestry at Pitsam area <strong>of</strong> Kaying village. West Siang Kaying<br />

Payum<br />

26 Estt. <strong>of</strong> Social forestry at Kolek area <strong>of</strong> Bogne village. West Siang Kaying<br />

Payum<br />

27 Estt. <strong>of</strong> Social forestry at Gopu area <strong>of</strong> Gasheng village. West Siang Kaying<br />

Payum<br />

28 Esstt. <strong>of</strong> Social forestry at Silli area <strong>of</strong> Gate village. West Siang Kaying<br />

Payum<br />

29 Esstt. <strong>of</strong> Social forestry at Emit Dorung area <strong>of</strong> Bogu West Siang Kaying<br />

village.<br />

Payum<br />

30 Esstt. <strong>of</strong> Social forestry at Kungkong area <strong>of</strong> Yio village. West Siang Kaying<br />

Payum<br />

31 Esstt. <strong>of</strong> Social forestry at Luying area <strong>of</strong> Gasheng<br />

village.<br />

West Siang<br />

Kaying<br />

Payum<br />

32 Esstt. <strong>of</strong> Social forestry at Orbung area <strong>of</strong> Mega village. West Siang Kaying<br />

Payum<br />

33 Esstt. <strong>of</strong> Social forestry at Oying area <strong>of</strong> Rigong village. West Siang Kaying<br />

Payum<br />

34 Esstt. <strong>of</strong> Social forestry at Siking area <strong>of</strong> Bogne village. West Siang Kaying<br />

Payum<br />

35 Esstt. <strong>of</strong> Social forestry at Mulung area <strong>of</strong> kaying. West Siang Kaying<br />

Payum<br />

36 Esstt. <strong>of</strong> Social forestry at Pere area <strong>of</strong> Molo village. West Siang Kaying<br />

Payum<br />

37 Esstt. <strong>of</strong> Social forestry at Monir Erik <strong>of</strong> Molo village. West Siang Kaying<br />

Payum<br />

38 Esstt. <strong>of</strong> Social forestry at Sikek area at Sirum. West Siang Kaying<br />

Payum<br />

39 C/o Social forestry at Peram area <strong>of</strong> Payum. West Siang Kaying<br />

Payum<br />

40 C/o. small RCC bridge at Kardong area at Bogne West Siang Kaying<br />

Payum<br />

41 C/o Security fencing around Knitting Centre at Kaying<br />

town<br />

42 Completion <strong>of</strong> Foot Suspension Bridge at Dange over<br />

Sike river at Gasheng.(Ph-II)<br />

West Siang<br />

West Siang<br />

Kaying<br />

Payum<br />

Kaying<br />

Payum<br />

Kaying 377500.00 31/3/2013 New 2012-13 Nil 377500.00<br />

Kaying 650000.00 31/3/2013 New 2012-13 Nil 650000.00<br />

Reying 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Kaying 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Bogne 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gasheng 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gate 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Bogu 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Yio 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Gasheng 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Mega 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Rigong 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Bogne 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

kaying. 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Molo 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Molo 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Sirum 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Payum 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Bogne 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Kaying town 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Gasheng 800000.00 31/3/2013 Ongoing 2011-12 400000 800000.00<br />

BADP AAP 2012-13 for website


Page 49<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

43 C/o CC Steps from Sinyot Bridge to Gate. West Siang Kaying<br />

Payum<br />

44 C/o CC Steps from Reying to Mega bridge point. West Siang Kaying<br />

Payum<br />

45 C/o CC Steps at near Korpo Soboh West Siang Kaying<br />

Payum<br />

46 C/o CC Steps at Reying village. West Siang Kaying<br />

Payum<br />

47 C/o CC Steps from kardong to Rebo. West Siang Kaying<br />

Payum<br />

48 Upgradation <strong>of</strong> Foot Suspension bridge <strong>of</strong> Sinyot river at West Siang Kaying<br />

Gate.<br />

Payum<br />

49 C/o Porter track from Gate to Payum. West Siang Kaying<br />

Payum<br />

50 C/o Porter track from Gaming to Lising. West Siang Kaying<br />

Payum<br />

51 C/o CC Steps from Sirging bridge point to Gasheng. West Siang Kaying<br />

Payum<br />

52 C/o CC Steps at Molo village. West Siang Kaying<br />

Payum<br />

53 C/o CC Steps at Ene Line <strong>of</strong> Payum village. West Siang Kaying<br />

Payum<br />

54 C/o CC Steps from Pisang bridge to Gaming. West Siang Kaying<br />

Payum<br />

55 C/o CC Steps from Molo to Menchung. West Siang Kaying<br />

Payum<br />

56 C/o. Stagging hut at Gamming village West Siang Kaying<br />

Payum<br />

57 C/o Stagging hut at Gasheng village West Siang Kaying<br />

Payum<br />

58 C/o. Stagging hut at Gate village West Siang Kaying<br />

Payum<br />

59 C/o. Bus waiting –cum- Car parking shed at Mikbung West Siang Kaying<br />

Payum<br />

60 C/o. Foot suspension bridge at Bille over Sike river West Siang Kaying<br />

Payum<br />

61 C/o Community Centre (Dere) at Bogne village. West Siang Kaying<br />

Payum<br />

62 C/o Community Dere near EAC <strong>of</strong>fice, Kaying West Siang Kaying<br />

Payum<br />

63 C/o Community Toilet at EAC Office,Kaying. West Siang Kaying<br />

Payum<br />

64 Upgradation <strong>of</strong> Dere at Gasheng. West Siang Kaying<br />

Payum<br />

Gate 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Reying 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Korpo Soboh 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Reying 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

kardong 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Gate 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Gate 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Gaming 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Gasheng 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Molo 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Payum 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Gaming 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Menchung 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Gamming 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Gasheng 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Gate 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Mikbung 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Bille 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Bogne 800000.00 31/3/2013 Ongoing 2010-11 800000 800000.00<br />

Kaying 750000.00 31/3/2013 New 2012-13 Nil 750000.00<br />

Kaying 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Gasheng 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

BADP AAP 2012-13 for website


Page 50<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

65 Upgradation <strong>of</strong> Dere at Sirum. West Siang Kaying<br />

Payum<br />

66 Upgradation <strong>of</strong> Dere at Reying. West Siang Kaying<br />

Payum<br />

67 Upgradation <strong>of</strong> Dere at Rigong. West Siang Kaying<br />

Payum<br />

68 Organisation <strong>of</strong> Capacity Building Training Programmee. West Siang Kaying<br />

Payum<br />

Sirum 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Reying 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Rigong 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Kaying Payum 1122500.00 31/3/2013 New 2012-13 Nil 1122500.00<br />

Sub total = 22450000.00<br />

Total West Siang District = 67350000.00<br />

1 C/o Community Hall (Dere) at Zido-I(Rangku ) Upper<br />

Siang<br />

2 C/o Cultural hall at Ngereng Village Upper<br />

Siang<br />

3 Renovation & Modification <strong>of</strong> Community Hall (Dere) <strong>of</strong><br />

Rishing Village.<br />

Upper<br />

Siang<br />

4 C/o Pedestrian foot path within Rishing village Upper<br />

Siang<br />

5 C/o Village Path from Sinning Bridge to Ngereng village Upper<br />

Siang<br />

6 C/o Village Path from Ngereng to Cultural centre . Upper<br />

Siang<br />

7 C/o Village Path from Arpong Nallah to Kuging village. Upper<br />

Siang<br />

8 C/o Village path from Siyat Nallah to Kuging Village Upper<br />

Siang<br />

9 C/o Village path at Kotle area BRTF Road <strong>of</strong> Ningging<br />

village<br />

Upper<br />

Siang<br />

10 C/o Waiting shed at Zido-II (Pokbir) Upper<br />

Siang<br />

11 C/o Pedestrian foot path from Purung to Old Tuting Upper<br />

Siang<br />

12 Street Light Connection from PWD Road supply line to<br />

Lali Village<br />

13 C/o Bench Terracing for TRC at Chokong area <strong>of</strong> Kuging<br />

village<br />

14 Extension <strong>of</strong> 2(Two) Classroom at <strong>Govt</strong>.Primary School<br />

Ngaming<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Tuting Zido 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Tuting Ngereng 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Rishing 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Tuting Rishing 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Ngereng 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Ngereng 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Kuging 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Kuging 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Tuting Ningging 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Zido 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Old Tuting 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Lali 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Kuging 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Ngaming 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 51<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

15 C/o Chain link Fencing around <strong>Govt</strong>.Middle School<br />

Ngaming<br />

16 Extension <strong>of</strong> 5 Class room for <strong>Govt</strong>.Middle School<br />

Ngaming<br />

17 C/o Kendra Vidyalaya school (for New Establishment) at<br />

Tuting<br />

18 C/o Chain link Fencing around <strong>Govt</strong>.Primary School<br />

Ningging<br />

19 Procurement <strong>of</strong> life saving Medicine for Various<br />

Community Health Centre <strong>of</strong> Tuting<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

20 C/o CC Drain/lining at Kodak WRC Field at Tuting Upper<br />

Siang<br />

21 C/o CC Drain from Ngekgong Nallah to Onyong WRC<br />

field at Tuting<br />

Upper<br />

Siang<br />

22 C/o RCC Drain in and around Zido-II (Pokbir) Upper<br />

Siang<br />

23 C/o RCC Drainage system from Community hall to BRTF<br />

road at Ningging village<br />

Upper<br />

Siang<br />

24 C/o CC Drain at Elung Area at Tuting. Upper<br />

Siang<br />

25 C/o CC Drain at Bihari line Area at Tuting. Upper<br />

Siang<br />

26 C/o CC Drain including Culvert in and around Ngaming<br />

Phase-II<br />

27 C/o CC Drain from Lirung Nallah to Tiyun area <strong>of</strong><br />

Ningging village<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

28 C/o RCC Drain at Pekong Tinali at Tuting Upper<br />

Siang<br />

29 C/o CC Drain from Gompa Cultural Centre to<br />

<strong>Govt</strong>.Primary school at Pekong at Tuting<br />

30 C/o Stone Fencing at Koying Cultivation area at old<br />

Tuting<br />

31 C/o Protection wall for WRC Field at Emang area at<br />

Tuting<br />

32 C/o Retaining Wall for Land Protection near Siang Valley<br />

school <strong>of</strong> Pekong Village<br />

33 Soiling and Metaling <strong>of</strong> approach road from PWD road to<br />

Tourist Lodge Complex at Tuting.<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Tuting Ngaming 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Ngaming 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Tuting Tuting 2200000.00 31/3/2013 New 2012-13 Nil 2200000.00<br />

Tuting Ningging 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Tuting 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Tuting 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Tuting 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting zido 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Ningging 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Tuting Tuting 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Tuting 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Ngaming 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Tuting Ningging 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Pekong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Pekong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Old Tuting 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Tuting Tuting 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Tuting Pekong 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Tuting Tuting 871750.00 31/3/2013 New 2012-13 Nil 871750.00<br />

BADP AAP 2012-13 for website


Page 52<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

34 Capacity building for rural artisans for weaving and<br />

handloom production at Tuting<br />

35 C/o Mongkong FSB in-between Yareng Cultivation area<br />

and Ningging village<br />

36 Black Topping <strong>of</strong> road from PWD main Road to Lali<br />

village approach Road constructed under BADP 2009-<br />

10<br />

37 Repair & Maint.<strong>of</strong> FSB Over Arpong river (Constructed<br />

under BADP-2008-09)<br />

38 Repair& Maint.<strong>of</strong> FSB OverSinyung river (Constructed<br />

under BADP-2008-09)<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

39 C/o Daily Market shed at Tuting Upper<br />

Siang<br />

40 C/o 2 Unit Toilet for <strong>Govt</strong>. Hr.Secondary school at<br />

Tuting<br />

Upper<br />

Siang<br />

41 C/o 2 Unit Public Toilet at Lower Market at Tuting Upper<br />

Siang<br />

42 C/o Community Toilet at Upper Segment <strong>of</strong> Kuging<br />

Village<br />

43 C/o Community Toilet at Lower Segment <strong>of</strong> Kuging<br />

Village<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

44 C/o Staging Hut at Mithun Gate. Upper<br />

Siang<br />

45 C/o FSB at Hesi-II at Tuting Upper<br />

Siang<br />

46 C/o Staging hut at ITBP Camp at Migging Upper<br />

Siang<br />

47 C/o Stating hut for Security Personnels at Panggo Upper<br />

Siang<br />

48 Capacity building for rural artisans for weaving and<br />

handloom production at Ngaming<br />

Upper<br />

Siang<br />

Tuting Tuting 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Tuting Ningging 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Lali 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Tuting Kuging 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Kuging 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Tuting 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Tuting 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Tuting 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Kuging 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Kuging 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Tuting Ningging 550000.00 31/3/2013 New 2012-13 Nil 550000.00<br />

Tuting Hesi-II 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Tuting Migging 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Tuting Panggo 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Tuting Ngaming 528250.00 31/3/2013 New 2012-13 Nil 528250.00<br />

Sub total = 22450000.00<br />

1 C/o Staging hut with attached Toilet and bathroom for<br />

Officer’s at Mayung for security personnel’s<br />

2 C/o Barrack for Jawan to cater upto 60(Sixty )Jawan with<br />

kitchen and separate Toilet and bathroom at Mayung for<br />

security personnels.<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

3 C/o 2 Nos Blick Toilet for Security Personels at Bishing Upper<br />

Siang<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Mayung 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Mayung 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bishing 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

BADP AAP 2012-13 for website


Page 53<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

4 C/o 4 Unit public Toilet at Nyukkong village Upper<br />

Siang<br />

5 C/o 3 Unit Community Toilet at Mayung Village Upper<br />

Siang<br />

6 C/o Approach Road from BRTF Road to Kopu village Upper<br />

Siang<br />

7 C/o RCC Slab over Silingiri river between BRTF road<br />

and Norbuling village<br />

8 Repairs & Renovation <strong>of</strong> FSB over Siang river between<br />

Situm BRTF road and Mayung village<br />

9 C/o Chain link Fencing for Laibari TRC field <strong>of</strong> nyukkong<br />

village<br />

10 C/o Land Protection <strong>of</strong> WRC field at Simuk area <strong>of</strong><br />

Gelling<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

11 C/o CC Drain in and around Kopu village Upper<br />

Siang<br />

12 C/o RCC Drain from BRTF Road Point to IB Colony at<br />

Gelling.<br />

13 Procurement <strong>of</strong> life saving Medicines for Varoius health<br />

centre Singa-Gelling border block.<br />

14 Extension <strong>of</strong> 2 Class room for <strong>Govt</strong>.Primary<br />

school,Mayung<br />

15 C/o Village path from BRTF road Point <strong>of</strong> Gelling<br />

Choiten towards Norbuling village<br />

16 C/o Village Path from Jinggong rest Camp to Helipad<br />

ground <strong>of</strong> Bishing Village<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

17 C/o Village path in and around Norbuling village Upper<br />

Siang<br />

18 C/o Village Path at Tsagong Damba area <strong>of</strong> Yortung Upper<br />

Siang<br />

19 C/o Waiting Shed at Yortung Laso at Yortung. Upper<br />

Siang<br />

20 C/o Waiting Shed at Jinggong area <strong>of</strong> Bishing Village Upper<br />

Siang<br />

21 C/o Waiting Shed on BRTF Road Point at Silingiri Camp<br />

<strong>of</strong> Norbuling<br />

Upper<br />

Siang<br />

22 C/o Waiting Shed at Pema Lamcho Lake <strong>of</strong> Norbuling Upper<br />

Siang<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Nyukkong 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Mayung 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kopu 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Norbuling 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Mayung 171750.00 31/3/2013 New 2012-13 Nil 171750.00<br />

Nyukkong 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Gelling 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Kopu 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Gelling 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Singa Gelling 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Mayung 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Gelling 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bishing 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Norbuling 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Yortung 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Yortung 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Bishing 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Norbuling 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Norbuling 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 54<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

23 C/o Waiting sheds at Beying <strong>of</strong> Mayung village Upper<br />

Siang<br />

24 C/o SPT Type-I Medical Qtr for Medical staffs at Gelling Upper<br />

Siang<br />

25 Development <strong>of</strong> Site for Beautification <strong>of</strong> Pema Lamcho<br />

Lake at Norbuling.<br />

26 Capacity building for rural artisans on wood carving<br />

awareness at Gelling<br />

Upper<br />

Siang<br />

Upper<br />

Siang<br />

27 C/o Musup (Banggo )at Mayung village Upper<br />

Siang<br />

28 C/o Community Hall at Yortung Upper<br />

Siang<br />

29 C/o Community Hall at Payindem Upper<br />

Siang<br />

30 C/o Community hall at Nyukkong Upper<br />

Siang<br />

31 C/o Community Hall at Kopu village Upper<br />

Siang<br />

32 C/o Community Hall at Bona village. Upper<br />

Siang<br />

33 C/o Topchang for cultural centre at Nyukkong Upper<br />

Siang<br />

34 C/o Topchang for cultural centre at Kopu Upper<br />

Siang<br />

35 C/o Topchang at Cultural Centre at Bishing Upper<br />

Siang<br />

36 Capacity building for rural artisans on wood carving<br />

awareness at Nyukkong<br />

Upper<br />

Siang<br />

1 C/o Community cum Reko building at Aguli vill with<br />

fencing<br />

Dibang<br />

Valley<br />

2 C/o New Anganwadi Centre at Akobe village Dibang<br />

Valley<br />

3 C/o Tourist Lodge at Anini (Phase - II) Dibang<br />

Valley<br />

4 C/o CC pathway & tourist view point at Aaro Falls, Eron Dibang<br />

village<br />

Valley<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Singa<br />

Gelling<br />

Mayung 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Gelling 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Norbuling 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Gelling 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Mayung 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Yortung 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Payindem 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Nyukkong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Kopu 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Bona 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Nyukkong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Kopu 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Bishing 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Nyukkong 628250.00 31/3/2013 New 2012-13 Nil 628250.00<br />

Sub total = 22450000.00<br />

Total Upper Siang District = 44900000.00<br />

Anini Mipi Aguli 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Anini Mipi Akobe 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anini Mipi Anini 700000.00 31/3/2013 Ongoing 2010-11 2300000 800000.00<br />

Anini Mipi Eron 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 55<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

5 C/o 1 Nos Type I staff qtr for health Deptt. Dibang<br />

Valley<br />

6 C/o 2 unit Bachelor Barrack for health department at<br />

Anini<br />

Dibang<br />

Valley<br />

7 C/o 1 unit Type-II Qtr for health department at Anini Dibang<br />

Valley<br />

8 C/o Log Bridge at Kamo Nallah at Engolin Dibang<br />

Valley<br />

9 C/o CC path at Ambolin village Dibang<br />

Valley<br />

10 C/o WRSB Bridge over Majii River at Kamuyi village Dibang<br />

Valley<br />

11 C/o Suspension Bridge over Mathu River connecting Dibang<br />

Maruli village & Agili village<br />

Valley<br />

12 C/o WRSB at Kadeli village Dibang<br />

Valley<br />

13 C/o Suspension Bridge over Dri river at Akobe village Dibang<br />

Valley<br />

14 C/o WRSB at Ambolin Dibang<br />

Valley<br />

15 C/o 1 No. Additional class room at Kaji Pry. School Dibang<br />

Valley<br />

16 C/o Hostel Building at punli Residential School, Punli Dibang<br />

Valley<br />

17 C/o Security fnece at <strong>Govt</strong>. Middle School Mipi Dibang<br />

Valley<br />

18 C/o water supply / tank at <strong>Govt</strong>. H S School, Anini Dibang<br />

Valley<br />

19 C/o Community Fencing at Dambuen Dibang<br />

Valley<br />

20 C/o CC drainage at Marunli village Dibang<br />

Valley<br />

21 C/o Storm water drain at Noge colony (Kongo I vill) Dibang<br />

Valley<br />

22 C/o Earthen Irrigation channel at Gipuin village Dibang<br />

Valley<br />

23 Soil Erosion & Flood protection work at Rehko & Dibang<br />

Anganwadi centre at Kadili village<br />

Valley<br />

24 Anti Erosion work near New DC's <strong>of</strong>fice Dibang<br />

Valley<br />

25 C/o Protection wall at Power house at Alinye (P-I) Dibang<br />

Valley<br />

Anini Mipi Anini 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Anini Mipi Anini 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anini Mipi Anini 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Anini Mipi Engolin 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Anini Mipi Ambolin 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Anini Mipi Kamuyi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Anini Mipi Maruli / Agili 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Anini Mipi Kadeli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anini Mipi Akobe 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anini Mipi Ambolin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anini Mipi Kaji 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Anini Mipi Punli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anini Mipi Mipi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Anini Mipi Anini 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anini Mipi Dambuen 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anini Mipi Marunli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anini Mipi Kongo I 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anini Mipi Gipuin 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anini Mipi Kadili 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anini Mipi Anini 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anini Mipi Alinye 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 56<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

26 C/o Retaining wall against Boo river (JM) Dibang<br />

Valley<br />

27 C/o Retaining wall at Akobe village Dibang<br />

Valley<br />

28 C/o Flood control at Dambuen (Acheso) village power<br />

house<br />

Dibang<br />

Valley<br />

29 C/o Retaining wall at Kaji village Dibang<br />

Valley<br />

30 C/o Retaining wall at District Hospital Dibang<br />

Valley<br />

31 Anti Erosion work at <strong>of</strong>ficers colony near T-IV GA Bldg. Dibang<br />

Valley<br />

32 C/o Security fencing for Indoor Sports complex at Anini Dibang<br />

Valley<br />

33 C/o Approach road at New Ayengo village to BRTF road Dibang<br />

Valley<br />

34 C/o culvert aon the road to CO's <strong>of</strong>fice at Mipi Dibang<br />

Valley<br />

35 C/o Approach road from BRTF road to upper village <strong>of</strong><br />

Angrim valley<br />

Dibang<br />

Valley<br />

36 C/o 1 culvert at Etabe vill Dibang<br />

Valley<br />

37 C/o 1 No culvert at Gipulin vill Dibang<br />

Valley<br />

38 C/o 1 no culvert at Anguli to JNV school Dibang<br />

Valley<br />

39 C/o culvert at Boo Nalah / Kongo - I Dibang<br />

Valley<br />

40 C/o 1 culvert at Mihundo village Dibang<br />

Valley<br />

41 Provision <strong>of</strong> BT <strong>of</strong> approach road to new police colony<br />

(BADP 09-10)<br />

Dibang<br />

Valley<br />

42 C/o 6 unit toilets from boys / girls hostel in GHSS, Anini Dibang<br />

Valley<br />

43 C/o toilet at Reko hall at Mipi Dibang<br />

Valley<br />

44 C/o 2 (two) roomed public convenience for Trainees / Dibang<br />

public at DIC, Anini<br />

Valley<br />

45 C/o Suspension Bridge over Indu River at Induli village<br />

on the Andrala ITBP patrolling route<br />

Dibang<br />

Valley<br />

Anini Mipi 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anini Mipi Akobe 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anini Mipi Dambuen 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anini Mipi Kaji 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Anini Mipi Anini 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anini Mipi Anini 222000.00 31/3/2013 New 2012-13 Nil 222000.00<br />

Anini Mipi Anini 4300000.00 31/3/2013 New 2012-13 Nil 4300000.00<br />

Anini Mipi Ayengo 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Anini Mipi Mipi 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anini Mipi Angrim Valley 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Anini Mipi Etabe 83000.00 31/3/2013 New 2012-13 Nil 83000.00<br />

Anini Mipi Gipulin 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anini Mipi Anguli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anini Mipi Kongo - I 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Anini Mipi Mihundo 45000.00 31/3/2013 New 2012-13 Nil 45000.00<br />

Anini Mipi Anini 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anini Mipi Anini 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Anini Mipi Mipi 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anini Mipi Anini 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anini Mipi Induli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

BADP AAP 2012-13 for website


Page 57<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

46 C/o 1 Nos Staging hut at Chigu camp on Aguila ITBP<br />

patrol Routes<br />

47 C/o 1 Nos Staging hut at Basam on the Andrala ITBP<br />

patrol Routes<br />

Dibang<br />

Valley<br />

Dibang<br />

Valley<br />

48 C/o Culvert nearby PWD approach road to Kaji village Dibang<br />

Valley<br />

Anini Mipi Chigu 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

Anini Mipi Basam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anini Mipi Kaji 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Sub total = 22250000.00<br />

1 C/o 1 staging Hut at Balua on Maliney to Kayala Patrol<br />

Routes<br />

Dibang<br />

Valley<br />

2 C/o Community Toilet at Etalin HQ 2 nos. Dibang<br />

Valley<br />

3 Toilet for ME School at Etalin Dibang<br />

Valley<br />

4 Communicty toilet at Angoling vill Dibang<br />

Valley<br />

5 C/o Community toilet at New Aropo - 2 nos. Dibang<br />

Valley<br />

6 Water Supply Tank at Itili village Dibang<br />

Valley<br />

7 C/o water tank at Etalin Model village Dibang<br />

Valley<br />

8 C/o and repairing <strong>of</strong> drinking water supply at suli vill Dibang<br />

Valley<br />

9 C/o water tank at Malinye vill Dibang<br />

Valley<br />

10 C/o protection wall at Natho colony <strong>of</strong> Athunli village Dibang<br />

Valley<br />

11 C/o protection work near APEDA power houses at Aronli<br />

village<br />

Dibang<br />

Valley<br />

12 C/o protection work at Aroli village Dibang<br />

Valley<br />

13 C/o Land protection work at Ita Nallah Dibang<br />

Valley<br />

14 Flood Protection & Augmentation <strong>of</strong> Nee MHS at<br />

Malinye<br />

Dibang<br />

Valley<br />

15 Flood Protection work at Kuh-Nallah near PHC Dibang<br />

Valley<br />

16 Flood Protection work at punli village Dibang<br />

Valley<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Maliney 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Etalin 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Etalin 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Angoling 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Aropo 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Itili 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Etalin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Suli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Malinye 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Athunli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Aronli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Aroli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Malinye 1800000.00 31/3/2013 New 2012-13 Nil 1800000.00<br />

400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Punli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

BADP AAP 2012-13 for website


Page 58<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

17 Establishment <strong>of</strong> 2 units Medicinal plants garden at<br />

Maliney<br />

Dibang<br />

Valley<br />

18 C/o Security Fencing at Angolin School Dibang<br />

Valley<br />

19 C/o Iron Gate at Etalin ME School Dibang<br />

Valley<br />

20 C/o Boys Hostel at Etalin ME School Dibang<br />

Valley<br />

21 C/o Class room building for residential School at Etalin<br />

B/P<br />

Dibang<br />

Valley<br />

22 C/o Class room for Maliney II school Dibang<br />

Valley<br />

23 C/o Class room for ME School Etalin Dibang<br />

Valley<br />

24 C/o PHC building (Phase-II) at Etalin Dibang<br />

Valley<br />

25 Storm water drain & culvert at Etalin Dibang<br />

Valley<br />

26 C/o CC drain at Aronli village Dibang<br />

Valley<br />

27 Black Topping <strong>of</strong> road & CC drainage to Etalin IB Dibang<br />

Valley<br />

28 Approach Road P-II at Arunli vill Dibang<br />

Valley<br />

29 C/o Culvert at Athunli vill 2 nos. Dibang<br />

Valley<br />

30 C/o and widening <strong>of</strong> road from BRO road to Etili vill at<br />

Etalin<br />

31 C/o approach road from BRO road to Athunli Primary<br />

School<br />

Dibang<br />

Valley<br />

Dibang<br />

Valley<br />

32 Widening <strong>of</strong> jeepable road from BRTF road to Bralai vill Dibang<br />

Valley<br />

33 C/o Approach road P-II at Arunli Dibang<br />

Valley<br />

34 C/o culvert at Etalin HQ 2 nos. Dibang<br />

Valley<br />

35 C/o culvert at Awunli vill Dibang<br />

Valley<br />

36 C/o culvert at Model village at Etalin 2 nos Dibang<br />

Valley<br />

37 C/o porter track at Amuchi / Arego vill Dibang<br />

Valley<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Maliney<br />

Etalin<br />

Malinye<br />

Maliney 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Angolin 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Etalin 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Etalin 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Etalin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Maliney 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Etalin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Etalin 1800000.00 31/3/2013 New 2012-13 Nil 1800000.00<br />

Etalin 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Aronli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Etalin 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Arunli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Athunli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Etili 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Athunli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Bralai 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Arunli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Etalin 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Awunli 200000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Etalin 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Amuchi / Arego 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

BADP AAP 2012-13 for website


Page 59<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

38 C/o porter track from Etalin bridge point to Apuli vill Dibang<br />

Valley<br />

39 C/o porter track from Anguli to Wali vill Dibang<br />

Valley<br />

40 C/o porter track from Aliru vill to Emuli vill Dibang<br />

Valley<br />

41 C/o waiting shed for Aliru vill Dibang<br />

Valley<br />

42 C/o porter track from BRTF road to bridge point at Dibang<br />

Angolin<br />

Valley<br />

43 C/o porter track from Asuli to Aranli Dibang<br />

Valley<br />

44 C/o porter track from Punli to Chanli Dibang<br />

Valley<br />

45 C/o Fencing at Etalin Tourist Lodge Dibang<br />

Valley<br />

46 C/o 2 unit Bachelor Barrack for Medical staff at Etalin Dibang<br />

Valley<br />

47 C/o Medical staff qtr at Malinye Dibang<br />

Valley<br />

48 C/o security fencing & approach road at Angulin tourist<br />

lodge<br />

Dibang<br />

Valley<br />

49 C/o RCC Gallery for public sitting at Etalin General<br />

Ground<br />

Dibang<br />

Valley<br />

50 C/o Reko building at Aweli village Dibang<br />

Valley<br />

51 C/o Community cum Reko building at New Aropo vill Dibang<br />

Valley<br />

52 C/o Anganwadi building at Awunli vill Dibang<br />

Valley<br />

53 C/o Community building <strong>of</strong> Itili vill Dibang<br />

Valley<br />

54 C/o Anganwadi Centre at New Aropo village Dibang<br />

Valley<br />

55 C/o Rekho at Aweli village Dibang<br />

Valley<br />

56 Training <strong>of</strong> Youths in cultivation & preservation Medicinal Dibang<br />

Plants in Dibang Valley<br />

Valley<br />

57 Training on making <strong>of</strong> furniture & other utilities with Dibang<br />

canes & bamboos<br />

Valley<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Malinye<br />

Etalin<br />

Maliney<br />

Apuli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anguli 82000.00 31/3/2013 New 2012-13 Nil 82000.00<br />

Aliru / Emuli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Aliru 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Angolin 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Asuli / Aranli 418000.00 31/3/2013 New 2012-13 Nil 418000.00<br />

Punli / Chanli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Etalin 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Etalin 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Malinye 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Angulin 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Etalin<br />

Maliney<br />

Etalin 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Etalin Aweli 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Maliney<br />

Etalin New Aropo 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Maliney<br />

Etalin Awunli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Maliney<br />

Etalin Itili 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Maliney<br />

Etalin New Aropo 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Maliney<br />

Etalin Aweli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Maliney<br />

Etalin Anini 1100000.00 31/3/2013 New 2012-13 Nil 1100000.00<br />

Maliney<br />

Anini Mipi Anini 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Sub total = 22650000.00<br />

1 C/o Reko and Community Hall at Athopro / Acomra and<br />

Alini vill<br />

Dibang<br />

Valley<br />

Anelih Arzoo Athopro /<br />

Acomra / Alini<br />

500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

BADP AAP 2012-13 for website


Page 60<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

2 C/o Community cum Reko Building at Rali vill Dibang<br />

Valley<br />

3 Extention <strong>of</strong> Reko / Community Hall at Aruzoo Dibang<br />

Valley<br />

4 C/o Reko cum Community Hall at Akuli village Dibang<br />

Valley<br />

5 C/o Tourist Lodge (Phase-II) at Ranli Dibang<br />

Valley<br />

6 C/o 2 nos Bachelor Barrack for Anelih Medical Staff Dibang<br />

Valley<br />

7 C/o WRSB at Endolin Nallah Dibang<br />

Valley<br />

8 C/o FSB at Apuh Sha (Engalin), Ane (Esuli), Bree Pani Dibang<br />

(Kronli) and Aliani / Apranli<br />

Valley<br />

9 C/o Mule tracks at Awoka, Esunli, New Endolin Dibang<br />

Valley<br />

10 C/o WRSB over EH-SHA river Awoli village Dibang<br />

Valley<br />

11 C/o porter track, log bridge & suspension bridge at Dibang<br />

Anelih to Chepe vill<br />

Valley<br />

12 C/o WRSB over Pee river between Arzoo to Gunli village Dibang<br />

Valley<br />

13 C/o Hanging bridge with RCC pilar over Ahi river at<br />

Awali vill<br />

Dibang<br />

Valley<br />

14 C/o Foot path at thiyee Model village Dibang<br />

Valley<br />

15 C/o Foot path at 173 Km Dibang<br />

Valley<br />

16 C/o Hanging bridge over Aropani at Karo vill Dibang<br />

Valley<br />

17 C/o Hanging bridge over Awe river at Echigu Dibang<br />

Valley<br />

18 C/o porter track from Rali to Kronli Dibang<br />

Valley<br />

19 C/o porter track from Aprali to Athoro Ashomra village Dibang<br />

Valley<br />

20 C/o One Waiting Shed and Two room CommunityToilet Dibang<br />

at Echindo village<br />

Valley<br />

21 C/o Security fencing at SHC at Anelih P-II Dibang<br />

Valley<br />

22 C/o 2 class room at ME School at Anelih Dibang<br />

Valley<br />

Anelih Arzoo Rali 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Anelih Arzoo Aruzoo 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anelih Arzoo Akuli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anelih Arzoo Ranli 1000000.00 31/3/2013 Ongoing 2010-11 1400000 1000000.00<br />

Anelih Arzoo Anelih 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Anelih Arjoo Endolin 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Anelih Arjoo Engalin / Esuli /<br />

Kronli / Aliani /<br />

Apranli<br />

500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Anelih Arjoo Awoka, Esunli, 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

New Endolin<br />

Anelih Arjoo Awoli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anelih Arjoo Anelih 2200000.00 31/3/2013 New 2012-13 Nil 2200000.00<br />

Anelih Arjoo Arzoo 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Anelih Arjoo Awali 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Anelih Arjoo Thiyee 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anelih Arjoo 173 Km 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anelih Arjoo Karo 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Anelih Arjoo Echigu 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Anelih Arjoo Rali / Kronli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anelih Arjoo Aprali 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Anelih Arjoo Echindo 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Anelih Arzoo Anelih 500000.00 31/3/2013 Ongoing 2011-12 600000 500000.00<br />

Anelih Arzoo Anelih 1200000.00 31/3/2013 New 2012-13 Nil 1200000.00<br />

BADP AAP 2012-13 for website


Page 61<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

23 C/o SPT 2 room additional class rooms for IV School<br />

Ranli<br />

Dibang<br />

Valley<br />

24 C/o Security Fencing at ME School Anelih P-II Dibang<br />

Valley<br />

25 Establishment <strong>of</strong> 2 units Medicinal plants garden at Dibang<br />

Anelih<br />

Valley<br />

26 C/o Anti-Soil Erosion with retaining wall at Tourist lodge<br />

at Ranli<br />

Dibang<br />

Valley<br />

27 C/o Land Protection work at JAA Nalah at Anelih village Dibang<br />

Valley<br />

28 C/o Boulder Caging for Protection <strong>of</strong> Paddy Fields at Alili<br />

village, Eprali village & Ashombra village<br />

Dibang<br />

Valley<br />

29 C/o Drinking water tank at Awali village 132 KM Dibang<br />

Valley<br />

30 C/o water tank at Brito village Dibang<br />

Valley<br />

31 C/o Drinking Water Supply with tank at thiyee village Dibang<br />

Valley<br />

32 C/o Water Supply & Flood protection at Echi-Afa, New<br />

Anaya<br />

33 C/o Augmentation <strong>of</strong> Eya nallah MHS (APEDA) at<br />

Aruzoo<br />

Dibang<br />

Valley<br />

Dibang<br />

Valley<br />

34 C/o Jeepable road from BRTF road to Kano village Dibang<br />

Valley<br />

35 C/o Anelih township road Dibang<br />

Valley<br />

36 Training <strong>of</strong> Local Youths in White water Rafting Dibang<br />

Valley<br />

Anelih Arzoo Ranli 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Anelih Arzoo Anelih 500000.00 31/3/2013 Ongoing 2011-12 600000 500000.00<br />

Anelih Arzoo Anelih 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Anelih Arzoo Ranli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anelih Arzoo Anelih 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Anelih Arzoo Alili / Eprali /<br />

Ashombra<br />

400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anelih Arzoo Awali 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Anelih Arzoo Brito 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Anelih Arzoo Thiyee 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Anelih Arzoo New Anaya 2000000.00 31/3/2013 New 2012-13 Nil 2000000.00<br />

Anelih Arzoo Aruzoo 1800000.00 31/3/2013 New 2012-13 Nil 1800000.00<br />

Anelih Arzoo Kano 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Anelih Arzoo Anelih 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Anelih Arzoo Anini 1600000.00 31/3/2013 New 2012-13 Nil 1600000.00<br />

Sub total = 22450000.00<br />

Total Dibang Valley Districe = 67350000.00<br />

1 C/o approach road from Eyanli Village to Hanging Bridge<br />

over Ithun between Eyanli and Hunli.<br />

L / Dibang<br />

Valley.<br />

2 C/o RCC culvert from SDO's Office to <strong>Govt</strong>. Middle<br />

School Road at Hunli<br />

L / Dibang<br />

Valley.<br />

3 C/o Water Reservoir for Yumra Village (Hunli). L / Dibang<br />

Valley.<br />

4 C/o water tank at Dusuli village L / Dibang<br />

Valley.<br />

5 C/o water tank at Akady village, Chanli L / Dibang<br />

Valley.<br />

Hunli Desali Eyanli / Hunli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Hunli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Brinli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Dusuli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Hunli Desali Chanli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 62<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

6 Extension and renovation <strong>of</strong> water supply at Donli<br />

village<br />

7 Extension and renovation <strong>of</strong> water supply at Amengo<br />

village in between Donli and Taloni villlage<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

8 Providing <strong>of</strong> water supply at Apanli village L / Dibang<br />

Valley.<br />

9 Maintenance <strong>of</strong> water tank at Yumra village(17 km<br />

point), Brinli<br />

L / Dibang<br />

Valley.<br />

10 C/o water tank at New Aranli village L / Dibang<br />

Valley.<br />

11 C/o boulder wall to protect Dusuli agricultural field, L / Dibang<br />

Desali<br />

Valley.<br />

12 C/o boulder wall to protect Chuyuni Model Village from L / Dibang<br />

erosion.<br />

Valley.<br />

13 C/o Head work on Chili Nallah MIC <strong>of</strong> Donli Village. L / Dibang<br />

Valley.<br />

14 C/o boulder wall on Dusuli Nallah at Chimaro Village, L / Dibang<br />

Desali.<br />

Valley.<br />

15 C/o boulder wall on Abo Machi MIC <strong>of</strong> Abo agricultural L / Dibang<br />

field <strong>of</strong> Dopowa Village.<br />

Valley.<br />

16 C/o boulder wall at Akonpra Machi MIC <strong>of</strong> Talonli<br />

Vaillge.<br />

17 C/o boulder wall and soil conservation works to protect<br />

soil erosion on New Elope Village – Hunli Road.<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

18 C/o boulder wall on Desa Machi to Protect Desali L / Dibang<br />

Valley.<br />

19 C/o Boulder wall for Soil conservation works at Yumra L / Dibang<br />

Village (Hunli).<br />

Valley.<br />

20 C/o CC storm Water Drain at Sulunggo Village, Desali. L / Dibang<br />

Valley.<br />

21 C/o flood protection / Boulder wall on Chichi Nallah at<br />

Ruyinggo Village (Desali).<br />

L / Dibang<br />

Valley.<br />

22 C/o Boulder wall to protect Chulunggo Village (Hunli). L / Dibang<br />

Valley.<br />

23 C/o Boulder wall on Denge MIC (Desali). L / Dibang<br />

Valley.<br />

24 Restoration and construction <strong>of</strong> Boulder wall on Chowta L / Dibang<br />

Nallah MIC, Desali.<br />

Valley.<br />

25 C/o Boulder wall on Chewe Machi to protect Apanli<br />

Village.<br />

L / Dibang<br />

Valley.<br />

Hunli Desali Donli 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Hunli Desali Donli/Taloni 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Hunli Desali Apanli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Brinli 35775.00 31/3/2013 New 2012-13 Nil 35775.00<br />

Hunli Desali Arali 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Desali 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Chuyuni 124750.00 31/3/2013 New 2012-13 Nil 124750.00<br />

Hunli Desali Donli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Desali 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Dopowa 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Hunli Desali Taloni 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali New Elope 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Desali 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Brinli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Desali 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Desali 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Hunli 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Hunli Desali Desali 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Desali 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Apanli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 63<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

26 C/o land protection work at Desha Nallah, Desali L / Dibang<br />

Valley.<br />

27 C/o Boulder wall at Aka Nallah at Chanli village L / Dibang<br />

Valley.<br />

28 C/o Boulder wall at Jamupani L / Dibang<br />

Valley.<br />

29 C/o CC retaining wall over Eya Nallah at Bridge point at L / Dibang<br />

Eyanli<br />

Valley.<br />

30 C/o CC retainig wall at <strong>Govt</strong>. Middle School, Hunli L / Dibang<br />

Valley.<br />

31 C/o Boulder wall at Hellipad at Hunli L / Dibang<br />

Valley.<br />

32 Procurement <strong>of</strong> barbed wire for plantation <strong>of</strong> cardamun L / Dibang<br />

crop at Donli and Taloni village<br />

Valley.<br />

33 C/o security fencing for cardamun plantation at Eyanli<br />

village<br />

34 C/o security fencing for plantation <strong>of</strong> cardamun crop<br />

plantation at Chillii Aow at Taloni<br />

35 C/o security fencing to protect the community agricultural<br />

field at Aloni / Ithungo<br />

36 C/o security fencing for plantation <strong>of</strong> cardamun crop<br />

plantation at Desali village<br />

37 C/o Security Fencing around <strong>Govt</strong>. Primary School,<br />

Adopowa.<br />

38 C/o security fencing around the Teacher's quarter at<br />

Adopowa Primary School<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley<br />

39 C/o additional teachers quarter(1 unit) at Jamupani<br />

residential Primary school<br />

L / Dibang<br />

Valley.<br />

40 C/o security fencing around Desali Medical Health Unit L / Dibang<br />

Valley.<br />

41 C/o Community Fish Pond at Donli Village. L / Dibang<br />

Valley.<br />

42 C/o Community Fish Pond at Pika Village. L / Dibang<br />

Valley.<br />

43 C/o piggery farming at Atingo village/5 km point L / Dibang<br />

Valley.<br />

44 C/o poultry farm at Eyanli village L / Dibang<br />

Valley.<br />

45 C/o Fish pond at Eyanli village L / Dibang<br />

Valley.<br />

46 Community Mithun farm at Adapowa village L / Dibang<br />

Valley.<br />

Hunli Desali Desali 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Chanli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Jamupani 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Hunli Desali Eyanli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Hunli 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Hunli Desali Hunli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Donli / Taloni 335775.00 31/3/2013 New 2012-13 Nil 335775.00<br />

Hunli Desali Eyanli 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Taloni 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Aloni/Ithungo 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Hunli Desali Desali 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Hunli Desali Adopowa 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Hunli Desali Adopowa 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Hunli Desali Jambupani 735775.00 31/3/2013 New 2012-13 Nil 735775.00<br />

Hunli Desali Desali 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Hunli Desali Donli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Pika 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Atingo/5 km 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

point<br />

Hunli Desali Eyanli 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Eyanli 70000.00 31/3/2013 New 2012-13 Nil 70000.00<br />

Hunli Desali Adapowa 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

BADP AAP 2012-13 for website


Page 64<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

47 C/o Community Mithun farm at Hunli L / Dibang<br />

Valley.<br />

48 C/o security fencing at Mayudia(65 km) for mithun Farm L / Dibang<br />

Valley.<br />

49 C/o public drain at Primary School Complex at Chanli L / Dibang<br />

Valley.<br />

50 C/o public drain at at You Nallah at Yumra village, Brinli L / Dibang<br />

Valley.<br />

51 C/o public drain from Rehko Building to RWD Road<br />

(village road)<br />

L / Dibang<br />

Valley.<br />

52 C/o public drain at Neeha village, Mitaka L / Dibang<br />

Valley.<br />

53 C/o public drain system at Chulungo village L / Dibang<br />

Valley.<br />

54 C/o public drain at Ruingo village L / Dibang<br />

Valley.<br />

55 C/o CC public drain at Kebaboli village L / Dibang<br />

Valley.<br />

56 C/o CC public drain within Mitaka village L / Dibang<br />

Valley.<br />

57 C/o Security Fencing around Veterinary Complex at<br />

Desali.<br />

L / Dibang<br />

Valley.<br />

58 C/o CC Footpath from New Elope to Brinli. L / Dibang<br />

Valley.<br />

59 C/o Log Bridge over Ikhu Afrah between Choroni and L / Dibang<br />

Maronggo Villages.<br />

Valley.<br />

60 C/o Log Bridge between Donli and Dopowa on Chili<br />

Machi.<br />

L / Dibang<br />

Valley.<br />

61 C/o CC Foot Path between Necha and Mitaka. L / Dibang<br />

Valley.<br />

62 C/o Hanging Bridge over Aku Machi between Eyanli and L / Dibang<br />

Penggo Villages.<br />

Valley.<br />

63 C/o Log Bridge over Ikhu Machi in between Penggo and<br />

Jumuli Villages.(Jambupani)<br />

64 C/o Log Bridge over Hrupa Nallah between Mitaka and<br />

Necha Villages.<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

65 C/o Foot Bridge over Chimaku Desabru, Desali. L / Dibang<br />

Valley.<br />

66 C/o CC pathway to Arondo Village (Hunli) from BRO L / Dibang<br />

Road/ 7 km Arondo<br />

Valley.<br />

Hunli Desali Hunli 135775.00 31/3/2013 New 2012-13 Nil 135775.00<br />

Hunli Desali Mayudia/65 km 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Hunli Desali Chanli 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Hunli Desali Brinli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Hunli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Mitaka 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Solungo 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Ruingo 86550.00 31/3/2013 New 2012-13 Nil 86550.00<br />

Hunli Desali Kebaboli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Mitaka 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli-Desali Desali 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Hunli Desali Brinli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Marango 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Hunli Desali Donli/Dopowa 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Mitaka 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Eyanli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Jambupani 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Mitaka 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Hunli Desali Desali 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Hunli Desali Aloni 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

BADP AAP 2012-13 for website


Page 65<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

67 C/o CC pathway to Maronggo Village from Ithun Afra L / Dibang<br />

Valley.<br />

68 C/o Log bridge at Chuyuni Model village L / Dibang<br />

Valley.<br />

69 C/o CC footpath at between Donli to Eponi at Donli L / Dibang<br />

village<br />

Valley.<br />

70 C/o CC footpath at Taloni village L / Dibang<br />

Valley.<br />

71 C/o 3 nos. culverts at New Elope L / Dibang<br />

Valley.<br />

72 C/o CC footpath at Chulugu village(5 km point) L / Dibang<br />

Valley.<br />

73 C/o CC footpath at Kebaboli village, Punli L / Dibang<br />

Valley.<br />

74 C/o CC footpath at Ellugo/Aloni L / Dibang<br />

Valley.<br />

75 C/o Log bridge in between Eyanli to Endini village L / Dibang<br />

Valley.<br />

76 C/o Log bridge over Cheta Nallah at Aloni to Eyanli via L / Dibang<br />

Ithungo village<br />

Valley.<br />

77 C/o 2(two) nos. security fencing around electric<br />

transformer at Ithungo/Aloni village<br />

L / Dibang<br />

Valley.<br />

78 C/o CC Footpath at New Elope L / Dibang<br />

Valley.<br />

79 C/o Hanging Bridge over Aha river at Elope village L / Dibang<br />

Valley.<br />

80 C/o CC Footpath at Dopowa village L / Dibang<br />

Valley.<br />

81 C/o Log bridge over chesa Nallah at Chuingoi village L / Dibang<br />

Valley.<br />

82 C/o security fencing for Anganwadi building at Eyanli L / Dibang<br />

village<br />

Valley.<br />

Hunli Desali Marango 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Chuyuni 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Donli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Hunli Desali Taloni 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali New Elope 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Hunli Desali Solungo / 5 km 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

point<br />

Hunli Desali Kebaboli / Punli 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Ellubio/Aloni 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Eyanli 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Aloni / Eyanli 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Ithungo / Aloni 135775.00 31/3/2013 New 2012-13 Nil 135775.00<br />

Hunli Desali New ELope 107325.00 31/3/2013 New 2012-13 Nil 107325.00<br />

Hunli Desali Elope 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Dopowa 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Chuingo 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali Eyanli 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

83 C/o security fencing around Anganwadi Centre at Brinli<br />

village<br />

L / Dibang<br />

Valley.<br />

Hunli Desali Brinli 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

84 C/o security fencing around Anganwadi Centre at<br />

Dopowa village<br />

L / Dibang<br />

Valley.<br />

85 C/o public toilet at Eyanli village L / Dibang<br />

Valley.<br />

86 C/o public toilet at Mitaka village L / Dibang<br />

Valley.<br />

87 C/o public toilet at Rango village L / Dibang<br />

Valley.<br />

Hunli Desali Dopowa 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Hunli Desali Eyanli 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Mitaka 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Hunli Desali Rango 65000.00 31/3/2013 New 2012-13 Nil 65000.00<br />

BADP AAP 2012-13 for website


Page 66<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

88 C/o Public toilet at Chipigu(Desali) L / Dibang<br />

Valley.<br />

89 C/o Rehko (Community Hall) at Dopowa Village. L / Dibang<br />

Valley.<br />

90 C/o meeting hall at New Eyanli Rehko (Community L / Dibang<br />

Centre).<br />

Valley.<br />

91 Extension <strong>of</strong> Rehko Building(Idu Cultural) at Chanli<br />

village<br />

92 C/o Security fencing around Tourist Lodge and<br />

Community Hall<br />

93 C/o security fencing for Rehko building at Endini(Eyanli)<br />

village<br />

94 C/o Security fencing around Rehko Cultural Building at<br />

Brinli village<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

L / Dibang<br />

Valley.<br />

95 Training programme on Tailoring L / Dibang<br />

Valley.<br />

96 Training programme on Food processing & pickle L / Dibang<br />

making<br />

Valley.<br />

97 Training programme on weaving & Knitting L / Dibang<br />

Valley.<br />

98 C/o CC Drainage in and around the ITBP Campus at L / Dibang<br />

Hunli<br />

Valley.<br />

99 C/o Security fencing around the ITBP Complex at Hunli L / Dibang<br />

Valley.<br />

Hunli Desali Desali 70000.00 31/3/2013 New 2012-13 Nil 70000.00<br />

Hunli Desali Dopowa 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Hunli Desali Eyanli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Hunli Desali Chanli 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hunli Desali New Elope 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Hunli Desali Eyanli 180000.00 31/3/2013 New 2012-13 Nil 180000.00<br />

Hunli Desali Brinli 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Hunli Desali Hunli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Hunli Desali Hunli 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Hunli Desali Hunli 322500.00 31/3/2013 New 2012-13 Nil 322500.00<br />

Hunli Desali Hunli 673500.00 31/3/2013 New 2012-13 Nil 673500.00<br />

Hunli Desali Hunli 785750.00 31/3/2013 New 2012-13 Nil 785750.00<br />

100 C/o Retaining wall at ITBP Complex Hunli L / Dibang Hunli Desali Hunli 785750.00 31/3/2013 New 2012-13 Nil 785750.00<br />

Valley.<br />

Total Lower Dibang Valley Districe = 22450000.00<br />

1 Special maintenance <strong>of</strong> Foot Suspension Bridges / Log<br />

Bridges / Mule Tracks on different defence patrolling<br />

tracks within the block<br />

2 Special maintenance <strong>of</strong> Porter Tracks on different<br />

defence patrolling tracks (created during 2006-07) within<br />

the block<br />

3 C/o RCC culverts 9 (nine) nos. on differenct defence<br />

patrolling tracks within the Hayuliang<br />

4 C/o Porter Tracks on different defence patrolling tracks<br />

within the Hayuliang block<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

5 C/o Anganwadi Centres within the Hayuliang block Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 67<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

6 Development <strong>of</strong> Poultry farming / fishery / Pig farming Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

within the block<br />

7 C/o RCC double unit teachers quarter at Nillang school Anjaw Hayuliang Nillang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

8 C/o RCC double unit teachers quarter at Tafraliang Anjaw Hayuliang Tafraliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

9 C/o RCC Headmaster quarter at <strong>Govt</strong>. Me School, Anjaw Hayuliang Supliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Supliang<br />

10 C/o RCC teacher quarter at Gamliang ME School Anjaw Hayuliang Gamliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

11 C/o RCC Hostel Building at <strong>Govt</strong>. ME School, Supliang Anjaw Hayuliang Supliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

12 Provision for purchase <strong>of</strong> school furnitures for Middle<br />

Schools, Primary schools and Residential schools within<br />

the block<br />

13 Provision for purchase <strong>of</strong> Science apparatus and sports<br />

equipments for different schools within the CD block<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayuliang Hayuliang 871875.00 31/3/2013 New 2012-13 Nil 871875.00<br />

14 Special maintenance <strong>of</strong> school infrastructure (assets<br />

created during 2006 and 2007 ) within the Hayuliang<br />

block<br />

15 Provision for purchase <strong>of</strong> medicine / essential life saving<br />

drugs for Community Health Centres, Primary Health<br />

units and Sub - Centres within the block<br />

16 Development <strong>of</strong> Horticulture activities like Plantation <strong>of</strong><br />

Bamboo, Cardamom, Orange, Kiwi etc. within the CD<br />

Block<br />

17 C/o RCC drainage system and protection work near<br />

boys hostel at HS School, Hayuliang<br />

18 Improvement and extension <strong>of</strong> water supply in different<br />

villages within the Hayuliang block<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayuliang Hayuliang 650000.00 31/3/2013 New 2012-13 Nil 650000.00<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

19 Provision <strong>of</strong> Social Forestry at Hayuliang township Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

20 Improvement <strong>of</strong> approach road from main PWD road to<br />

Gamliang ME School<br />

21 Capacity building training cum skilled development to<br />

rural artisan in handloom and handicrafts with local<br />

inputs<br />

22 C/o RCC double unit staff quarter for Health <strong>Department</strong><br />

at Amliang<br />

23 Providing <strong>of</strong> Solar lamps in different hostels <strong>of</strong> IV and<br />

ME schools and Health centres within the Hayulaing<br />

block<br />

Anjaw Hayuliang Hayuliang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Anjaw Hayuliang Hayuliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayuliang Amliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Hayulaing Hayulaing 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 68<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

24 Training cum skilled development to rural unemployed<br />

youth craftsmanship - wood carving and bamboo crafts<br />

with local inputs<br />

1 Providing <strong>of</strong> Solar lamps in different hostels <strong>of</strong> IV and<br />

ME schools and Health centres within the Chalagam<br />

block<br />

2 Capacity building training cum skilled development to<br />

rural artisans in handloom and handicrafts with local<br />

inputs<br />

Anjaw Hayulaing Hayulaing 128125.00 31/3/2013 New 2012-13 Nil 128125.00<br />

Sub total = 22450000.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

3 Provision <strong>of</strong> Social Forestry at Chaglagam township Anjaw Chaglagam Chaglagam 850000.00 31/3/2013 New 2012-13 Nil 850000.00<br />

4 Improvement and extension <strong>of</strong> water supply in different<br />

villages within the Chaglagam block<br />

5 Development <strong>of</strong> Horticulture activities like Plantation <strong>of</strong><br />

Bamboo, Cardamom, Orange, Kiwi etc. within the CD<br />

Block<br />

6 Provision for purchase <strong>of</strong> medicine / essential life saving<br />

drugs for Community Health Centres, Primary Health<br />

units and Sub - Centres within the block<br />

7 Provision for purchase <strong>of</strong> school furnitures for Middle<br />

Schools, Primary schools and Residential schools within<br />

the block<br />

8 Provision for purchase <strong>of</strong> Science apparatus and sports<br />

equipments for different schools within the CD block<br />

9 Special maintenance <strong>of</strong> school infrastructure (assets<br />

created during 2006 and 2007 ) within the Chaglagam<br />

block<br />

10 C/o RCC double unit teacher quarter at Kromna IV<br />

school<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 871875.00 31/3/2013 New 2012-13 Nil 871875.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Kromna 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

11 C/o double unit teacher quarter at Taflagam Anjaw Chaglagam Taflagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

12 C/o RCC teacher quarter at Metengliang school Anjaw Chaglagam Metengliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

13 C/o School building at Taimna Pry School Anjaw Chaglagam Taimna 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

14 C/o RCC Sub-Centre building cum store at Metengliang Anjaw Chaglagam Metengliang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

15 C/o RCC Sub-Centre building cum store at Kromna Anjaw Chaglagam Kromna 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

16 Development <strong>of</strong> Poultry farming / fishery / Pig farming<br />

within the block<br />

17 Provision for protection <strong>of</strong> Foot Suspension Bridge at<br />

Roiliang<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Roiliang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

BADP AAP 2012-13 for website


Page 69<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

18 C/o Pathways at Chaglagam Anjaw Chaglagam Chaglagam 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

19 C/o Anganwadi Centres within the Chaglagam block Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

20 C/o RCC Community Hall at Roiliang Anjaw Chaglagam Roiliang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

21 Special maintenance <strong>of</strong> Foot Suspension Bridges / Log<br />

Bridges / Mule Tracks on different defence patrolling<br />

tracks within the block<br />

22 Special maintenance <strong>of</strong> Porter Tracks on different<br />

defence patrolling tracks (created during 2006-07) within<br />

the block<br />

23 C/o RCC culverts 9 (nine) nos. on differenct defence<br />

patrolling tracks within the Chaglagam CD block<br />

24 C/o Porter Tracks on different defence patrolling tracks<br />

within the Chaglagam block<br />

25 Training cum skilled development to rural unemployed<br />

youth craftsmanship - wood carving and bamboo crafts<br />

with local inputs<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Chaglagam Chaglagam 128125.00 31/3/2013 New 2012-13 Nil 128125.00<br />

Sub total = 22450000.00<br />

1 Special maintenance <strong>of</strong> Foot Suspension Bridges / Log<br />

Bridges / Mule Tracks on different defence patrolling<br />

tracks within the block<br />

2 Special maintenance <strong>of</strong> Porter Tracks on different<br />

defence patrolling tracks (created during 2006-07) within<br />

the block<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

3 C/o RCC culverts 9 (nine) nos. on differenct defence<br />

patrolling tracks within the Manchal CD block<br />

4 C/o Porter Tracks on different defence patrolling tracks<br />

within the Manchal block<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

5 C/o Anganwadi Centres within the Manchal block Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

6 Providing electricity at Ramdom village Anjaw Manchal Ramdom 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

7 Providing electricity at Hutong village Anjaw Manchal Hutong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

8 C/o RCC pathways at Quibang school and community<br />

Hall<br />

Anjaw Manchal Quibang 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

9 C/o RCC pathways at Hayam Anjaw Manchal Hayam 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

10 C/o RCC pathways at Plotong Anjaw Manchal Plotong 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

11 Development <strong>of</strong> Poultry farming / fishery / Pig farming<br />

within the block<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 70<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

12 C/o RCC double unit teacher quarter at Chambab Anjaw Manchal Chambab 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

13 C/o double unit teacher quarter at Chellang Anjaw Manchal Chellang 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

14 C/o Hostel Building at <strong>Govt</strong>. Upper Primary School,<br />

Chambab<br />

15 Provision for purchase <strong>of</strong> school furnitures for Middle<br />

Schools, Primary schools and Residential schools within<br />

the block<br />

16 Provision for purchase <strong>of</strong> Science apparatus and sports<br />

equipments for different schools within the CD block<br />

Anjaw Manchal Chambab 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Manchal Manchal 871875.00 31/3/2013 New 2012-13 Nil 871875.00<br />

17 Special maintenance <strong>of</strong> school infrastructure (assets<br />

created during 2006 and 2007 ) within the Manchal block<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

18 Provision for purchase <strong>of</strong> medicine / essential life saving<br />

drugs for Community Health Centres, Primary Health<br />

units and Sub - Centres within the block<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

19 C/o RCC Sub-Centre building cum store at Manchal Anjaw Manchal Manchal 850000.00 31/3/2013 New 2012-13 Nil 850000.00<br />

20 C/o RCC Sub-Centre building cum store at Quibang Anjaw Manchal Quibang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

21 Development <strong>of</strong> Horticulture activities like Plantation <strong>of</strong><br />

Bamboo, Cardamom, Orange, Kiwi etc. within the CD<br />

Block<br />

22 Improvement and extension <strong>of</strong> water supply in different<br />

villages within the Manchal block<br />

23 Capacity building training cum skilled development to<br />

rural artisans in handloom and handicrafts with local<br />

inputs<br />

24 Providing <strong>of</strong> Solar lamps in different hostels <strong>of</strong> IV and<br />

ME schools and Health centres within the Manchal block<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Manchal Manchal 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Anjaw Manchal Manchal 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

25 Training cum skilled development to rural unemployed<br />

youth craftsmanship and bamboo crafts with local inputs<br />

Anjaw Manchal Manchal 128125.00 31/3/2013 New 2012-13 Nil 128125.00<br />

Sub total = 22450000.00<br />

1 Capacity building training cum skilled development to<br />

rural artisan in handloom and handicrafts with local<br />

inputs<br />

Anjaw<br />

Hawai<br />

Walong<br />

2 Providing Water Supply at Sung Village Anjaw Hawai<br />

Walong<br />

3 Development <strong>of</strong> Water Body at Hawai Anjaw Hawai<br />

Walong<br />

Hawai Walong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Sung 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Hawai 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 71<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

4 Development <strong>of</strong> Horticulture activities like Plantation <strong>of</strong><br />

Bamboo, Cardamom, Orange, Kiwi etc. within the CD<br />

Block<br />

Anjaw<br />

Hawai<br />

Walong<br />

5 C/o RCC Sub-Centre building cum store at Yassong Anjaw Hawai<br />

Walong<br />

6 C/o RCC Sub-Centre building cum store at Kibithoo Anjaw Hawai<br />

Walong<br />

7 C/o RCC Sub-Centre building cum store at Wamliang Anjaw Hawai<br />

Walong<br />

8 C/o RCC Sub-Centre building cum store at Kherang Anjaw Hawai<br />

Walong<br />

9 C/o RCC Sub-Centre building cum store at Halaikong Anjaw Hawai<br />

Walong<br />

10 Provision for purchase <strong>of</strong> medicine / essential life saving Anjaw Hawai<br />

drugs for Community Health Centres, Primary Health<br />

Walong<br />

units and Sub - Centres within the block<br />

11 Provision for purchase <strong>of</strong> school furnitures for Middle<br />

Schools, Primary schools and Residential schools within<br />

the block<br />

12 Special maintenance <strong>of</strong> school infrastructure (assets<br />

created during 2006 and 2007 ) within the Manchal block<br />

Anjaw<br />

Anjaw<br />

Hawai<br />

Walong<br />

Hawai<br />

Walong<br />

13 C/o RCC Double unit teacher quarter at Sarti School Anjaw Hawai<br />

Walong<br />

14 C/o RCC Teacher Quarter at Halaikong Anjaw Hawai<br />

Walong<br />

15 Development <strong>of</strong> Poultry farming / fishery / Pig farming<br />

within the block<br />

16 C/o Foot Suspension Bridge over Landwong river at<br />

Mangung and Yealang<br />

Anjaw<br />

Anjaw<br />

Hawai<br />

Walong<br />

Hawai<br />

Walong<br />

17 C/o CC steps at Kamdi Anjaw Hawai<br />

Walong<br />

18 Improvement <strong>of</strong> Pathways at Hawai Anjaw Hawai<br />

Walong<br />

19 C/o double unit staff quarter for Health <strong>Department</strong> at<br />

Yassong<br />

20 C/o double unit staff quarter for Health <strong>Department</strong> at<br />

Walong<br />

21 Special maintenance <strong>of</strong> Foot Suspension Bridges / Log<br />

Bridges / Mule Tracks on different defence patrolling<br />

tracks within the block<br />

Anjaw<br />

Anjaw<br />

Anjaw<br />

Hawai<br />

Walong<br />

Hawai<br />

Walong<br />

Hawai<br />

Walong<br />

Hawai Walong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Yassong 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Kibithoo 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Wamliang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Kherang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Halaikong 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Hawai Walong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Hawai Walong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Hawai Walong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Sarti 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Halaikong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Hawai Walong 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Mangung and<br />

Yealang<br />

900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Kamdi 1000000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Hawai 1000000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Yassong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Walong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Hawai Walong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 72<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

22 Special maintenance <strong>of</strong> Porter Tracks on different<br />

defence patrolling tracks (created during 2006-07) within<br />

the block<br />

23 C/o RCC culverts 9 (nine) nos. on differenct defence<br />

patrolling tracks within the Hawai - Walong CD block<br />

24 C/o Porter Tracks on different defence patrolling tracks<br />

within the Hawai Walong block<br />

25 Training cum skilled development to rural unemployed<br />

youth craftsmanship - wood carving and bamboo crafts<br />

with local inputs<br />

Anjaw<br />

Anjaw<br />

Anjaw<br />

Anjaw<br />

Hawai<br />

Walong<br />

Hawai<br />

Walong<br />

Hawai<br />

Walong<br />

Hawai<br />

Walong<br />

Hawai Walong 871875.00 31/3/2013 New 2012-13 Nil 871875.00<br />

Hawai Walong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Hawai Walong 950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

Hawai Walong 128125.00 31/3/2013 New 2012-13 Nil 128125.00<br />

Sub total = 22450000.00<br />

Total Anjaw District = 89800000.00<br />

1 C/o Chowkiders quarter for <strong>Govt</strong>. M.E. School, M’Pen Changlang Khagam M’Pen 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

2 C/o Residential Quarter for Medical Officer at<br />

Vijaynagar.<br />

3 C/o Log bridge over Namphai Nalla at Namphai Singpho<br />

village.<br />

Changlang Khagam Vijaynagar 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Changlang Khagam Namphai<br />

Singpho<br />

200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

4 C/o Hanging bridge at Burma nallah, 49 th Mile Changlang Khagam Miao circle 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

5 C/o Hanging bridge over Noa Dehing river at 52th Mile Changlang Khagam Miao circle 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

6 C/o Hanging bridge over Noa Dehing river at 61th Mile Changlang Khagam Miao circle 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

7 C/o Hanging bridge over Noa Dehing river , at 77 th Mile Changlang Khagam Miao circle 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

8 C/o Hanging bridge over Noa Dehing river , at 84 th Mile Changlang Khagam Miao circle 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

9 C/o Hanging bridge with RCC Pillar over Boa Dehing<br />

river, at Daragoan lower segment.<br />

10 C/o Hanging bridge with RCC Pillar over Boa Dehing<br />

river, at Papharbari upper segment.<br />

11 C/o Hanging bridge with RCC Pillar over Boa Dehing<br />

river, at Gaherigoan.<br />

12 C/o Hanging bridge with RCC Pillar over Noa Dehing<br />

river in between Ramnagar and Chidudi.<br />

13 C/o Hanging bridge with RCC Pillar over Preeti river , at<br />

Topi Hill.<br />

14 C/o Hanging bridge with RCC Pillar over Boa Dehing<br />

river in between Papharbari and Hazolo.<br />

Changlang Khagam Vijayanagar 508000.00 31/3/2013 New 2012-13 Nil 508000.00<br />

Changlang Khagam Vijayanagar 510000.00 31/3/2013 New 2012-13 Nil 510000.00<br />

Changlang Khagam Vijayanagar 508000.00 31/3/2013 New 2012-13 Nil 508000.00<br />

Changlang Khagam Vijayanagar 508000.00 31/3/2013 New 2012-13 Nil 508000.00<br />

Changlang Khagam Vijayanagar 508000.00 31/3/2013 New 2012-13 Nil 508000.00<br />

Changlang Khagam Vijayanagar 508000.00 31/3/2013 New 2012-13 Nil 508000.00<br />

BADP AAP 2012-13 for website


Page 73<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

15 C/o Veterinary aid centre at Songking Changlang Khagam Songking 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

16 C/o Anti erosion work at Miao behind residential area. Changlang Khagam Miao 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

17 C/o Outlet drainage and Hume Pipe at New Khamlang Changlang Khagam New Khamlang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

18 C/o Double unit Teachers Quarter for <strong>Govt</strong>. ME School,<br />

M’Pen.<br />

19 Purchase <strong>of</strong> life savings drugs for the villagers <strong>of</strong><br />

Vijaynagar Circle<br />

20 Purchase <strong>of</strong> life saving drugs for the villagers <strong>of</strong> Miao &<br />

Kharsang Circle<br />

Changlang Khagam M’ Pen 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Changlang Khagam Vijaynagar 925000.00 31/3/2013 New 2012-13 Nil 925000.00<br />

Changlang Khagam Miao 950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

21 C/o Fish Pond at Namphai and New Yanman. Changlang Khagam Namphai & 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Yanman<br />

22 Providing <strong>of</strong> water supply for KGBV School, Kharsang Changlang Khagam Kharsang 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

23 Providing <strong>of</strong> drinking water supply for Gara line, Miao Changlang Khagam Miao 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

24 Augmentation & maintenance <strong>of</strong> drinking water supply at<br />

Miao Subdivision<br />

Changlang Khagam Miao 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

25 Maintenance <strong>of</strong> water supply in Upper Miao Changlang Khagam Upper Miao 416875.00 31/3/2013 New 2012-13 Nil 416875.00<br />

26 Improvement and miaitenance <strong>of</strong> water supply at<br />

Vijaynagar Circle<br />

27 C/o drinking well at Kharsang, Nayeng, New Khamlang,<br />

Namphai-I and Songking village.<br />

Changlang Khagam Vijaynagar 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Changlang Khagam Kharsang<br />

Circle<br />

1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

28 C/o Link road at Two-hut and Budha Mandir Changlang Khagam Two-Hut 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

29 C/o slab culvert at Samkhedong near J.P. Tea Garden. Changlang Khagam Samkhedong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

30 C/o approach road from Namphuk Nallah road to<br />

residential area near Presbyterian Church, Kharsang.<br />

Changlang Khagam Kharsang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

31 C/o approach road to Kendra Vidyalaya, Miao Changlang Khagam Miao 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

32 C/o slab culvert at Kaikhepother over Longbang Nallah Changlang Khagam Kaikhe-pother 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

33 C/o link road within village at New Plon Changlang Khagam Plone 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

34 C/o link road from Neirong link road to Paddy field Changlang Khagam Neirong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

35 C/o link road within village at Neotan. Changlang Khagam Neotan 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

36 C/o link road within Samkhedong village Changlang Khagam Samkhedong 251875.00 31/3/2013 New 2012-13 Nil 251875.00<br />

37 C/o link road from M.V. road to Police colony. Changlang Khagam Miao 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

38 Purchase <strong>of</strong> Solar Lamp for Vijayanagar Circle Changlang Khagam Vijaynagar 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Circle<br />

39 C/o Community Hall at Mazgoan Changlang Khagam Mazgoan 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

40 C/o Community Hall at Chidudi Changlang Khagam Chidudi 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

BADP AAP 2012-13 for website


Page 74<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

41 Capacity building training for training cum production<br />

and design diversification <strong>of</strong> traditional Handloom<br />

product by introducing Jacquard Dobby loom / exposure<br />

and training in bamboo craft and furniture for self<br />

employment / training in carpet weaving etc alongwith<br />

tools and machineries.<br />

Changlang Khagam Khagam 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

42 Teaching Aids for Anganwadi and Primary Schools Changlang Khagam Khagam 475000.00 31/3/2013 New 2012-13 Nil 475000.00<br />

43 Employment Oriented vocational training in computer<br />

and other related skills<br />

Changlang Khagam Khagam 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

1 Capacity building training for training cum production<br />

and design diversification <strong>of</strong> traditional Handloom<br />

product by introducing Jacquard Dobby loom / exposure<br />

and training in bamboo craft and furniture for self<br />

employment / training in carpet weaving etc alongwith<br />

tools and machineries.<br />

Sub total = 24168750.00 24168750.00<br />

Changlang Khimiyang Khimiyang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

2 C/o Community Hall at Thamlom village Changlang Khimiyang Thamlom 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

3 C/o approach road from Changlang-Khimiyang road to<br />

Secondary school at Yanman<br />

Changlang Khimiyaang Yanman 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

4 C/o RLR from Changlang – Ranglum road to old<br />

Rangran village.<br />

Changlang Khimiyaang Ranglum 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

5 Widening <strong>of</strong> RLR from Rima to Junglim Pother village. Changlang Khimiyaang Junglim Pother 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

6 C/o 2 Mtrs span slab culvert at Bubang-III Changlang Khimiyaang Bubang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

7 Improvement & maintenance <strong>of</strong> drinking water supply in<br />

Longlung Water supply section<br />

8 Augmentation & improvement <strong>of</strong> drinking water supply at<br />

Khimiyang Circle<br />

Changlang Khimiyang Longlung 550000.00 31/3/2013 New 2012-13 Nil 550000.00<br />

Changlang Khimiyang Khimiyang 950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

9 Extension <strong>of</strong> water supply at Old Sallang Changlang Khimiyang Old Sallang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

10 Extension <strong>of</strong> water supply at Old Rangran Changlang Khimiyang Old Rangran 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

11 C/o Head work <strong>of</strong> water recovery tank at new Songkhu-<br />

Havi village<br />

Changlang Khimiyang New Sungkhu<br />

Havi<br />

400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

12 C/o ILC Type Teachers quarter at New Longkey village. Changlang Khimiyang Longkey 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

13 Community plantation (including training) and planting<br />

materials <strong>of</strong> large cardamom with materials at the<br />

following villages.<br />

Changlang Khimiyang Thamlom ,<br />

Longsang, and<br />

T/Havi villages<br />

800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

BADP AAP 2012-13 for website


Page 75<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

14 Community plantation (including training) and planting<br />

materials <strong>of</strong> large cardamom with materials at the<br />

following villages.<br />

Changlang Khimiyang Khimiyang,<br />

Longkey and<br />

Wafang villages<br />

800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

15 Community plantation (including training) and planting<br />

materials <strong>of</strong> large cardamom with materials at the<br />

following villages.<br />

Changlang Khimiyang Yanman,<br />

Bubang,<br />

S/Laktong, and<br />

Chingsa villages<br />

800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

16 Community plantation (including training) and planting<br />

materials <strong>of</strong> large cardamom with materials at the<br />

following villages.<br />

17 Community plantation and planting materials <strong>of</strong> large<br />

cardamom with the materials at the following villages.<br />

Changlang Khimiyang Saching,<br />

Jungsam,Old<br />

sallang, and<br />

Ngechang vill.<br />

Changlang Khimiyang Old Rangra,<br />

N/Rangran,<br />

Longlung and<br />

Kantang village<br />

800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

18 C/o MIC at Khupsum Thamlom village. Changlang Khimiyang Thamlom 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

19 C/o MIC at Jongtok-Lubing, Jongji-Havi village Changlang Khimiyang Jongji-Havi 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

20 C/o Mukjong MIC at Khimiyang Changlang Khimiyang Khimiyang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

21 C/o MIC <strong>of</strong> Phangsathing at Longlung village Changlang Khimiyang Longlung 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

22 C/o Bahthung Nallah MIC at Wafang Changlang Khimiyang Wafang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

23 C/o MIC at Khotumthung WRC field at Saching Changlang Khimiyang Saching 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

24 C/o CC Channel for Saike WRC field at Chingsa village. Changlang Khimiyang Chingsa 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

25 C/o CC Head work at Rajut Nallah Changlang Khimiyang Rima 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

26 Embankment <strong>of</strong> Tirap river for Rima WRC field. Changlang Khimiyang Rima 925000.00 31/3/2013 New 2012-13 Nil 925000.00<br />

27 Land protection at Panlom, Tongthung Havi Longsang,<br />

Jungji Havi & Khimiyang<br />

Changlang Khimiyang Khimiyang<br />

Circle<br />

1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

28 Flood protection work to protect Cholphong WRC field at<br />

Longkey vill.<br />

29 Flood protection work to protect Jongphok WRC field at<br />

Kantang vill.<br />

30 Construction <strong>of</strong> Headwork with CC channel for<br />

protection <strong>of</strong> Longbinthung community WRC filed.<br />

31 Providing <strong>of</strong> power supply for 63 KVA, 11/0.415KV, DT<br />

Sub-Station and distribution lines at Khimiyang.<br />

32 Electrification to provide power supply to newly<br />

constructed <strong>Govt</strong>. residential quarter at Khimiyang<br />

Changlang Khimiyang Longkey 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Changlang Khimiyang Kantang 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Changlang Khimiyang Hydel Tinali 451875.00 31/3/2013 New 2012-13 Nil 451875.00<br />

Changlang Khimiyang Khimiyang 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Changlang Khimiyang Khimiyang 920000.00 31/3/2013 New 2012-13 Nil 920000.00<br />

BADP AAP 2012-13 for website


Page 76<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

33 External electrification to provide power supply to newly<br />

constructed EAC <strong>of</strong>fice building at Khimiyang.<br />

Changlang Khimiyang Khimiyang 980000.00 31/3/2013 New 2012-13 Nil 980000.00<br />

34 C/o CC step at Kantang village 150 mtrs Changlang Khimiyang Kantang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

35 C/o CC step at Jungsam village 100 mtrs Changlang Khimiyang Jungsam 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

36 C/o CC step at Old Ngechang 150 mtrs Changlang Khimiyang Ngechang 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

37 C/o CC step at old Jukhi village 100 mtrs Changlang Khimiyang Old Jukhi 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

38 C/o CC step Khimiyang to Yanchang vill Changlang Khimiyang Yanchang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

39 C/o Sanitary Public toilet at Khimiyang Cultural Hall Changlang Khimiyang Khimiyang 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

40 Provision <strong>of</strong> Solar lights for the AR Camp at Khimiyang . Changlang Khimiyang Khimiyang 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

41 Construction <strong>of</strong> cemented base vehicle parking at<br />

Khimiyang COB<br />

Changlang Khimiyang Khimiyang 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

42 Improvement <strong>of</strong> Porter track from Changra to Thumjang Changlang Khimiyang Khimiyang 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

43 Provision <strong>of</strong> Solar lights to 10 mile camp Changlang Khimiyang Khimiyang 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

44 Construction <strong>of</strong> drainage at 10 mile camp <strong>of</strong> Assam Changlang Khimiyang Khimiyang 266875.00 31/3/2013 New 2012-13 Nil 266875.00<br />

Rifles<br />

45 Provision <strong>of</strong> Solar lights to 1 mile camp <strong>of</strong> Assam Rifles Changlang Khimiyang Khimiyang 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

46 Solar electricity transformer for the newly created BSNL Changlang Khimiyang Khimiyang 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

tower<br />

47 Teaching Aids for Anganwadi and Primary schools Changlang Khimiyang Khimiyang 225000.00 31/3/2013 New 2012-13 Nil 225000.00<br />

Sub total = 24168750.00 24168750.00<br />

1 Improvement <strong>of</strong> Porter track from Borsatam to Hetman Changlang Manmao Manmao 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

2 Provision <strong>of</strong> Solar at road connection to Manmao COB Changlang Manmao Manmao 425000.00 31/3/2013 New 2012-13 Nil 425000.00<br />

3 Augmentation <strong>of</strong> water supply to Manmao COB Changlang Manmao Manmao 675000.00 31/3/2013 New 2012-13 Nil 675000.00<br />

4 Construction <strong>of</strong> retaining wall on road leading to Helipad<br />

at Manmao<br />

5 Construction <strong>of</strong> cemented base for vehicle parking at<br />

Manmao .<br />

6 Extension <strong>of</strong> LT power line from main road to Taipong<br />

Primary school including electrification & fittings <strong>of</strong> the<br />

school building.<br />

7 C/o 250 mtr. C.C. pathway from Manmao road to<br />

Sinwang village<br />

8 C/o a 70 mtr. Length wire rope suspension bridge with<br />

RCC pillar & wooden deck on Tipong Nallah in between<br />

Old Longtoi & Phinbiro-I &II<br />

Changlang Manmao Manmao 517750.00 31/3/2013 New 2012-13 Nil 517750.00<br />

Changlang Manmao Manmao 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Changlang Manmao Taipong 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Changlang Manmao Sinwang 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Changlang Manmao Old Longtoi 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

BADP AAP 2012-13 for website


Page 77<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

9 C/o wire rope suspension bridge over Joting river in<br />

between Tengman & Sasum near Tengman village<br />

Changlang Manmao Tengman 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

10 C/o a Log bridge over Joting Nallah at Jotin-Juda village Changlang Manmao Jotin-Juda 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

11 C/o a Log bridge over Junghuk Nallah in between<br />

Borsatam village & WRC field.<br />

12 Protection <strong>of</strong> 8 mtrX6mtr X 4 mtr erosion <strong>of</strong> soil near<br />

Khamsong Wa Nallah to protect community WRC land<br />

<strong>of</strong> Taipong village<br />

13 C/o 60 mtr. Land protection work to protect soil erosion<br />

at Tengman colony <strong>of</strong> Manmao<br />

14 C/o <strong>of</strong> 50 mtr. flood protection work with boulder and<br />

sausage wire binding etc near Ngashi WRC field at<br />

Borsatam area.<br />

15 C/o 60 mtr. Flood protection boulder created wall with<br />

sausage wire binding on Tirap river bank near New<br />

Longtoi village<br />

16 C/o 120 Mtr. Boulder created sausage wire binding flood<br />

protection wall on Tirap river bank near Lyngok village<br />

Changlang Manmao Borsatam 75000.00 31/3/2013 New 2012-13 Nil 75000.00<br />

Changlang Manmao Taipong 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Changlang Manmao Manmao 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Changlang Manmao Borsatam 225000.00 31/3/2013 New 2012-13 Nil 225000.00<br />

Changlang Manmao New Longtoi 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Changlang Manmao Lyngok 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

17 C/o 2 Km Minor Irrigation Channel from Kamkai Nallah to<br />

Kamkai WRC field to cover 10 Hector command area at<br />

Old Longoi village<br />

18 Construction <strong>of</strong> a RCC Type-II Teachers Qtr with<br />

electricity, water supply, fencing & furniture at Longman<br />

for the teachers <strong>of</strong> Longman Primary school.<br />

Changlang Manmao Old Longtoi 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

Changlang Manmao Longman 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

19 Construction <strong>of</strong> a RCC Type-II Teachers Qtr with<br />

electricity, water supply, fencing & furniture at New<br />

Khamdu for the teachers <strong>of</strong> New Khamdu Primary<br />

school.<br />

20 Providing <strong>of</strong> electrification, water supply, sanitation,<br />

fencing, drainage & furniture to the new 4 unit double<br />

storied type-II teacher’s Qtr <strong>of</strong> Kovin Sec. school<br />

constructed under BADP during 2011-12<br />

21 Construction <strong>of</strong> a RCC Type-II Teacher’s Qtr for school<br />

teacher <strong>of</strong> newly upgraded Kovin Secondary school<br />

Changlang Manmao New Khamdu 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Changlang Manmao Kovin 644000.00 31/3/2013 New 2012-13 Nil 644000.00<br />

Changlang Manmao Kovin 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

22 Constrn. <strong>of</strong> a RCC Type-I Teachers Qtr at Tengmo Changlang Manmao Tengmo 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

23 Constn. <strong>of</strong> a MIBT Teachers Qtr at Phinbiro-I Changlang Manmao Phinbiro-I 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

24 Constn. <strong>of</strong> a MIBT Teachers Qtr at Phinbiro-II Changlang Manmao Phinbiro-II 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 78<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

25 Procurement <strong>of</strong> 30 pairs desks & benches, 1 almirah<br />

and 1-pair table-chair for Longman Primary school.<br />

26 Procurement <strong>of</strong> 12-pairs desk & benches, 1-table & 2-<br />

chairs for Chamro Primary school.<br />

27 Procurement & supply <strong>of</strong> 15 pairs desk & benches, 1<br />

no.table & 2 nos. chairs for Old Khamdu Primary school.<br />

28 Procurement & supply <strong>of</strong> 20 pairs desk & benches, 2<br />

nos chairs & 4 nos. table for New Khamdu M.E.School<br />

Changlang Manmao Longman 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Changlang Manmao Chamro 55000.00 31/3/2013 New 2012-13 Nil 55000.00<br />

Changlang Manmao Old Khamdu 65000.00 31/3/2013 New 2012-13 Nil 65000.00<br />

Changlang Manmao New Khamdu 80000.00 31/3/2013 New 2012-13 Nil 80000.00<br />

29 Procurement <strong>of</strong> 10 pairs 3-seater wooden desk &<br />

benches and one pair table7chair for Anganwadi school<br />

at Longshon village.<br />

30 Establishment <strong>of</strong> one community Piggery unit including<br />

procurement <strong>of</strong> piglets & shed etc at Taipong village<br />

Changlang Manmao LongChong 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Changlang Manmao Taipong 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

31 Establishment <strong>of</strong> one community Piggery unit including<br />

procurement <strong>of</strong> piglets & shed etc at Kovin village<br />

32 Establishment <strong>of</strong> one community Piggery unit including<br />

procurement <strong>of</strong> piglets & shed etc at Honkap village<br />

Changlang Manmao Kovin 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Changlang Manmao Honkap 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

33 Constn. <strong>of</strong> 2(two) Nos community fish pond one each at<br />

Upper Kamlao & Lower Kamlao <strong>of</strong> New Kamlao village<br />

@ 70,000/- each<br />

Changlang Manmao New Kamlao 140000.00 31/3/2013 New 2012-13 Nil 140000.00<br />

34 Constn. <strong>of</strong> 1(one) community fish pond at Old Dokpey Changlang Manmao Old Dokpey 70000.00 31/3/2013 New 2012-13 Nil 70000.00<br />

village<br />

35 Constn. <strong>of</strong> 1(one) community fish pond at Old Kamlao Changlang Manmao Old Kamlao 70000.00 31/3/2013 New 2012-13 Nil 70000.00<br />

village<br />

36 Constn. Of a community poultry farm house with 500 Changlang Manmao Longsong 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

nos. broiler chick & feeds<br />

37 C/o 300 mtr. CC drainage at Longman village Changlang Manmao Longman 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

38 C/o 150 mtr. CC drainage from Manmao-Jairampur road Changlang Manmao New Kamlao 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

to Primary school at New Kamlao<br />

39 Augmentation & improvement <strong>of</strong> water supply at Changlang Manmao Manmao 875000.00 31/3/2013 New 2012-13 Nil 875000.00<br />

Manmao township<br />

40 Renovation & augmentation <strong>of</strong> existing water supply at<br />

Chamro<br />

Changlang Manmao Chamro 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

41 C/o RCC elevated 20000 ltr. Capacity water storage tank<br />

with GI pipe connection from main line at 16 KM<br />

Changlang Manmao 16 KM,<br />

Jairampur<br />

500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

BADP AAP 2012-13 for website


Page 79<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

42 Renovation & extension <strong>of</strong> existing water lifting system<br />

near AR area<br />

43 Lifting water supply arrangement by electric motor 3 HP<br />

pump including electrification and 300 running mtr.<br />

Delivery GI pipe 40mm dia.<br />

44 C/o a 15000 Ltr. Capacity water storage tank with<br />

augmentation <strong>of</strong> existing water supply system at Hetman<br />

village<br />

45 Community tea plantation on 1.5 Hector land including<br />

land preparation near Longman village.<br />

Changlang Manmao AR Camp 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Changlang Manmao Tengmo 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Changlang Manmao Hetman 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Changlang Manmao Longman 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

46 Community Tea plantation at Chamro village Changlang Manmao Chamro 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

47 Community Tea plantation at Old Khamdu village Changlang Manmao Old Khamdu 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

48 Community tea plantation on 1.0 Hector land including<br />

land preparation near New Khamdu village<br />

Changlang Manmao New Khamdu 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

49 Community tea plantation on 1.0 Hector land including<br />

land preparation & supply <strong>of</strong> tea saplings at Tengmo<br />

village<br />

50 Plantation <strong>of</strong> large cardamom on 3.0 hector land with<br />

land preparation and seedlings at Sasum<br />

Changlang Manmao Tengmo 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Changlang Manmao Sasum 177000.00 31/3/2013 New 2012-13 Nil 177000.00<br />

51 Community Tea plantation at Lalpur Changlang Manmao Lalpur 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

52 Community Rubber plantation at Renuk. Changlang Manmao Renuk 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

53 Procurement, supply & plantation <strong>of</strong> 500 Nos. Rubber<br />

saplings for Community rubber plantation on 1.5 hector<br />

land at Chumpon village<br />

54 C/o 300 mtr. Length X 5 mtr. Width approach road from<br />

New Khamdu village to Graveyard<br />

55 C/o 700 mtr. Village Link road with slab culvert from Old<br />

Taipong to New Taipong<br />

56 C/o 2 nos RCC culvert in between Jairampur-Manmao<br />

road to Primary school at New Kamlao<br />

57 C/o 350 mtr. Approach road from IB Manmao to<br />

electrical power house with CC drainage.<br />

58 C/o 400 mtr. Approach road from Renuk-Borsatam road<br />

to Renuk Health sub-centre.<br />

59 Construction <strong>of</strong> Rural link road from main road <strong>of</strong><br />

Longchong to Lower Longchong village<br />

60 C/o a RCC toilet cum bathroom with CGI sheet ro<strong>of</strong>ing<br />

near Community Hall at Longman.<br />

Changlang Manmao Chumpon 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Changlang Manmao New Khamdu 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Changlang Manmao Taipong 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Changlang Manmao New Kamlao 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Changlang Manmao Manmao 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Changlang Manmao Renuk 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Changlang Manmao Longchong 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Changlang Manmao Longman 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

BADP AAP 2012-13 for website


Page 80<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

61 C/o a RCC toilet cum bathroom with CGI sheet ro<strong>of</strong>ing<br />

at Primary school Longman.<br />

62 C/o a RCC toilet cum bathroom with CGI sheet ro<strong>of</strong>ing<br />

near Chamro Community Hall at Chamro.<br />

63 C/o a community toilet cum bathroom at Manmao upper<br />

Colony<br />

64 C/o 2(two) nos. community bathroom cum toilet at<br />

Sasum-I and Sasum-II<br />

Changlang Manmao Longman 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Changlang Manmao Chamro 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Changlang Manmao Manmao 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Changlang Manmao Sasum 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

65 C/o 3(three) nos. community bathroom cum toilet in Changlang Manmao Sinwang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

three different locations <strong>of</strong> Sinwang village.<br />

66 C/o 2(two) Nos. community toilet cum bathroom at Changlang Manmao Chumpon 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Chumpon village.<br />

67 C/o 2 nos. bathroom cum toilet at Phinbiro-II Changlang Manmao Phinbiro-II 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

68 C/o a MIBT Anganwadi school building at Ranghill Changlang Manmao Ranghill 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

69 C/o a SPT community Hall at Phinbiro-I Changlang Manmao Phinbiro-I 450000.00 31/3/2013 New 2012-13 Nil 450000.00<br />

70 Capacity building training for training cum production<br />

and design diversification <strong>of</strong> traditional Handloom<br />

product by introducing Jacquard Dobby loom / exposure<br />

and training in bamboo craft and furniture for self<br />

employment / training in carpet weaving etc. alongwith<br />

tools and machineries.<br />

Changlang Manmao Manmao 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

71 Employment Oriented vocational training in computer<br />

and other related skills<br />

Changlang Manmao Manmao 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

72 Teaching aids for Anganwadi and primary schools Changlang Manmao Manmao 575000.00 31/3/2013 New 2012-13 Nil 575000.00<br />

1 C/o a MIBT Community Weaving Centre at Mossang<br />

Khamlang village.<br />

2 Capacity building training for training cum production<br />

and design diversification <strong>of</strong> traditional Handloom<br />

product by introducing Jacquard Dobby loom / exposure<br />

and training in bamboo craft and furniture for self<br />

employment / training in carpet weaving etc. alongwith<br />

tools and machineries.<br />

Changlang Nampong Mossang<br />

Khamlang<br />

Sub total = 24168750.00 24168750.00<br />

300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Changlang Nampong Nampong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

3 Teaching aids for Anganwadi and primary schools Changlang Nampong Nampong 423000.00 31/3/2013 New 2012-13 Nil 423000.00<br />

4 Employment Oriented vocational training in computer<br />

and other related skills<br />

Changlang Nampong Nampong 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

BADP AAP 2012-13 for website


Page 81<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

5 Construction <strong>of</strong> Community Hall at Machum, Phase-II. Changlang Nampong Machum 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

6 Supply <strong>of</strong> 100 Nos plastic chairs for the Cultural Centre<br />

at Tikhak Taipy.<br />

7 C/o a RCC community toilet cum bathroom at Tengpum<br />

village.<br />

Changlang Nampong Longshong 60000.00 31/3/2013 New 2012-13 Nil 60000.00<br />

Changlang Nampong Tengpung 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

8 C/o a Community toilet cum bathroom at Nongthey-II. Changlang Nampong Nongthey-II 125000.00 31/3/2013 New 2012-13 Nil 125000.00<br />

9 C/o 2 (two) Nos. Community toilet cum bathroom at<br />

Lungpang village.<br />

Changlang Nampong Lungpang 250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

10 C/o a SPT community toilet cum bathroom at Old Putok Changlang Nampong Old Putok 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

11 C/o a SPT Community toilet cum bathroom at Motongsa. Changlang Nampong Motongsa 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

12 C/o Community toilet cum bathroom at Machum village. Changlang Nampong Machum 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

13 C/o SPT Toilet cum Bathroom at Wintong village. Changlang Nampong Wintong 125000.00 31/3/2013 New 2012-13 Nil 125000.00<br />

14 C/o a R.C.C. with CGI sheet ro<strong>of</strong>ing community toilet<br />

cum bathroom at Old Longchong.<br />

15 C/o 2 km approach road / link road from community<br />

WRC field to Motongsa village.<br />

16 C/o 2 Km village link road from Community WRC field to<br />

New Longchong village.<br />

17 C/o Approach road from Nampong main road to end <strong>of</strong><br />

Namgoi village.(Approx 700mtr)<br />

18 C/o 15 mtr x 1 mtr R.C.C. slab culvert on Khamlang<br />

Nallah at Tikhak- Khamlang village area.<br />

19 C/o RCC approach slab 20 mtr x 1.5 mtr over Namku<br />

Nallah in between Longvi Link road and NH-153 link<br />

road.<br />

20 Procurement & plantation <strong>of</strong> Tea saplings on 3 Hector<br />

Community land including land preparation, fencing etc<br />

at Rima village.<br />

21 Development <strong>of</strong> Community Bamboo plantation on one<br />

acre land at Mossang putok village area.<br />

22 Procurement & plantation <strong>of</strong> Tea saplings on 3 ½<br />

hector community land including land preparation at<br />

Khamkhai.<br />

23 Raising <strong>of</strong> Community Tea garden on 5 hector<br />

community land providing Tea sapling, land preparation<br />

etc.<br />

Changlang Nampong Old-Longchong 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Changlang Nampong Motongsa 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Changlang Nampong New-Longchong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Changlang Nampong Namgoi 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Changlang Nampong Tikhak<br />

Khamlang<br />

250000.00 31/3/2013 New 2012-13 Nil 250000.00<br />

Changlang Nampong Longvi 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Changlang Nampong Rima 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Changlang Nampong Mossang Putok 70000.00 31/3/2013 New 2012-13 Nil 70000.00<br />

Changlang Nampong Khamkhai 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Changlang Nampong Machum 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

BADP AAP 2012-13 for website


Page 82<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

24 Augmentation & improvement <strong>of</strong> drinking water supply at<br />

Nampong township<br />

25 Improvement & maintenance <strong>of</strong> drinking water supply in<br />

Rima Putok Circle<br />

26 Extension, augmentation <strong>of</strong> existing water supply system<br />

and construction <strong>of</strong> 15000 Ltr capacity RCC water<br />

storage Tank for the inhabitants <strong>of</strong> Nampong-II and the<br />

students <strong>of</strong> Kiddy’s Play & Foundation School.<br />

27 Extension & augmentation including Construction <strong>of</strong> a<br />

platform <strong>of</strong> existing water supply system at Horu Putok<br />

village.<br />

28 C/o Community Ring well to supplement existing drinking<br />

water system at Songwal Khamlang village<br />

29 C/o a 10000 ltr capacity RCC water supply storage tank<br />

at Kenyam village.<br />

Changlang Nampong Nampong 950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

Changlang Nampong Rima putok 950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

Changlang Nampong Nampong 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Changlang Nampong Horu Putok 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Changlang Nampong Songwal<br />

Khamlang<br />

30 C/o Ring well at Tikhak Khamlang village Changlang Nampong Tikhak<br />

Khamlang<br />

31 C/o a 10,000 Ltr capacity water storage tank for water<br />

supply at Nonkey.<br />

32 C/o a 5000 ltr capacity water storage tank on ground at<br />

Rima IV school.<br />

33 Procurement <strong>of</strong> 100 pair 3 seater Desk + Benches, 10<br />

Nos table & chair and 50 Nos plastic chairs for class<br />

rooms and school auditorium <strong>of</strong> Nampong Higher<br />

Secondary School.<br />

34 Providing <strong>of</strong> water supply, sanitation, electrification,<br />

fencing, furniture & drainage for newly constructed 4 unit<br />

double storied teachers Qtr under BADP 2011-12 at<br />

Nampong.<br />

200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Changlang Nampong Kenyam 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Changlang Nampong Nongkey 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Changlang Nampong Rima 50000.00 31/3/2013 New 2012-13 Nil 50000.00<br />

Changlang Nampong Nampong 360000.00 31/3/2013 New 2012-13 Nil 360000.00<br />

Changlang Nampong Nampong 644000.00 31/3/2013 New 2012-13 Nil 644000.00<br />

35 C/o a MIBT Teacher’s Qtr with toilet at Lungtang village. Changlang Nampong Lungtang 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

36 Extension one SPT class room for Namgoi Pry. School. Changlang Nampong Namgoi 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

37 C/o a SPT boys / Girls hostel for IV school, Tikhak<br />

Putok<br />

38 Purchase <strong>of</strong> life savings drugs for the villagers <strong>of</strong><br />

Nampong Border Block.<br />

39 Procurement <strong>of</strong> Vetty. Medicine and ointment for Vetty.<br />

Aid Centre, Nampong.<br />

Changlang Nampong Tikhak Putok 900000.00 31/3/2013 New 2012-13 Nil 900000.00<br />

Changlang Nampong Nampong 927000.00 31/3/2013 New 2012-13 Nil 927000.00<br />

Changlang Nampong Nampong 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 83<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

40 C/o a 60 Cattle’s capacity cattle’s shed with RCC piller &<br />

CGI sheet ro<strong>of</strong>ing near Namgoi Nallah WRC field at<br />

Khamkhai.<br />

41 C/o a Community cattle shed with R.C.C. piller & CGI<br />

sheet ro<strong>of</strong>ing at Therimkan.<br />

42 Renovation <strong>of</strong> existing community Fish Pond at<br />

Nampong.<br />

43 7 (seven) hector Community Land Development for<br />

establishment <strong>of</strong> Community Orange Garden including<br />

jungle clearance, removing <strong>of</strong> stamped etc to boost<br />

horticulture in remote area as a area specific approach<br />

keeping in view to improve backward economy <strong>of</strong> Old<br />

Longsong village.<br />

44 8 (eight) hect. Community Land Development including<br />

land preparation, jungle clearance, removing <strong>of</strong> stamps<br />

etc for W.R cultivation for self reliance on food / rice<br />

production / cultivation being economically backward at<br />

Old –Putok area.<br />

45 C/o Minor irrigation channel (1 km) from Nongki nallah<br />

to WRC field <strong>of</strong> Nongkey village.<br />

46 C/o 50 mtr x 15 feet flood protection work with boulder &<br />

sausage wire on Khamsang river bank near Songwal<br />

Khamlang village.<br />

47 C/o Flood protection wall at Nampong Nallah (15 mtr x<br />

1.5 mtr x 2 mtr) by boulder and sausage wire at<br />

Machum.<br />

48 Flood protection works with boulders to protect WRC<br />

fields on the bank <strong>of</strong> Renon river at Rima village.<br />

Changlang Nampong Khamkhai 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

Changlang Nampong Therimkan 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Changlang Nampong Nampong 100000.00 31/3/2013 New 2012-13 Nil 100000.00<br />

Changlang Nampong Old Longsong 985000.00 31/3/2013 New 2012-13 Nil 985000.00<br />

Changlang Nampong Old Putok 990000.00 31/3/2013 New 2012-13 Nil 990000.00<br />

Changlang Nampong Nongkey 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Changlang Nampong Songwal<br />

Khamlang<br />

600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Changlang Nampong Machum 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Changlang Nampong Rima 950000.00 31/3/2013 New 2012-13 Nil 950000.00<br />

49 Development <strong>of</strong> a school children park with fixing <strong>of</strong> Changlang Nampong Songwal 237000.00 31/3/2013 New 2012-13 Nil 237000.00<br />

swing & slide etc.<br />

Khamlang<br />

50 Development <strong>of</strong> a Children Park with fixing <strong>of</strong> swing & Changlang Nampong Nongthey 240000.00 31/3/2013 New 2012-13 Nil 240000.00<br />

slide etc at Nongthey-I.<br />

51 Development <strong>of</strong> school Children park with fixing <strong>of</strong> Changlang Nampong Lungpang 350000.00 31/3/2013 New 2012-13 Nil 350000.00<br />

swing, slide & few other amenities for Lungpang Middle<br />

School.<br />

52 C/o a Log Bridge over Phoniyok Nallah in between<br />

Changlai-I & II.<br />

Changlang Nampong Changlai 70000.00 31/3/2013 New 2012-13 Nil 70000.00<br />

53 C/o 10 mtr x 4 mtr slab culvert on Ngalanpha nallah in<br />

between Khamkhai village & WRC field.<br />

Changlang Nampong Khamkhai 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

54 C/o Log-bridge over Josha Nallah at Lungpang. Changlang Nampong Lungpang 70000.00 31/3/2013 New 2012-13 Nil 70000.00<br />

BADP AAP 2012-13 for website


Page 84<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

55 C/o a 5mtr x 4 mts Log Bridge on Khamkhai Nallah at<br />

Khamkhai village.<br />

56 C/o a 5mtr x 4 mts Log Bridge on Nampla Nallah near<br />

Khamkhai<br />

57 C/o 150 mtr Pathway from Nampong-I to Medical<br />

Colony.<br />

58 C/o a R.C.C. with CGI sheet ro<strong>of</strong>ing passenger ahed at<br />

Rima.<br />

59 C/o a wire rope suspension Bridge with RCC pillar on<br />

Langtop nallah in between New Longchong & WRC<br />

field.<br />

60 C/o a SPT staging hut with toilet etc at New Putok village<br />

for touring <strong>of</strong>ficials <strong>of</strong> education & health sector etc.<br />

Changlang Nampong Khamkhai 75000.00 31/3/2013 New 2012-13 Nil 75000.00<br />

Changlang Nampong Khamkhai 75000.00 31/3/2013 New 2012-13 Nil 75000.00<br />

Changlang Nampong Khamkhai 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

Changlang Nampong Rima 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

Changlang Nampong New Longchong 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Changlang Nampong New Putok 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

61 C/o a MIBT staging hut with toilet facility for touring<br />

<strong>of</strong>ficials <strong>of</strong> health & education sector <strong>of</strong>ficial at Lungtang<br />

village.<br />

62 C/o a SPT staging Hut with toilet facility for touring<br />

<strong>of</strong>ficial at Tikhak Taipy.<br />

63 Providing <strong>of</strong> Solar Lantren for the villagers <strong>of</strong> Nampong<br />

Border Block<br />

Changlang Nampong Lungtang 375000.00 31/3/2013 New 2012-13 Nil 375000.00<br />

Changlang Nampong Tikhak Taipy 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

Changlang Nampong Nampong 417750.00 31/3/2013 New 2012-13 Nil 417750.00<br />

Sub total = 24168750.00<br />

Total Changlang District = 96675000.00<br />

1 Provision <strong>of</strong> Bituminous Road from Circle Officer Office<br />

to Wakka Company Operation Base 800 mtrs<br />

2 C/o RCC Pharmacist quarter at Sub Health Centre at<br />

K/Noknu.<br />

3 C/o Girls Hostel building at <strong>Govt</strong>. Hr Sec School Wakka<br />

HQ.<br />

Longding Wakka Wakka 2416875.00 31/3/2013 New 2012-13 Nil 2416875.00<br />

Longding Wakka K/Noknu 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Longding Wakka Wakka HQ 1500000.00 31/3/2013 New 2012-13 Nil 1500000.00<br />

4 C/o multipurpose play field at Chop Village Longding Wakka Chop 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

5 Essential Medicines supply for PHC Wakka Longding Wakka Wakka 543437.00 31/3/2013 New 2012-13 Nil 543437.00<br />

6 Community orange and pineapple cultivation at Nginu<br />

village<br />

7 Community Large cardamom plantation at Khogla,<br />

Chop, Kaimoi, Kampong and Ngissa village (@ Rs.9.00<br />

lakhs each + Rs.4.00 lakhs for training)<br />

Longding Wakka Nginu 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Longding Wakka Khogla, Chop,<br />

Kaimoi,<br />

Kampong &<br />

Ngissa village<br />

4900000.00 31/3/2013 New 2012-13 Nil 4900000.00<br />

8 Community Tea plantation at Wakka, Nginu and Khanu<br />

(@ Rs.9.00 lakhs each + Rs.3.00 lakhs for training)<br />

Longding Wakka Wakka, Nginu &<br />

Khanu<br />

3000000.00 31/3/2013 New 2012-13 Nil 3000000.00<br />

BADP AAP 2012-13 for website


Page 85<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

9 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Nasib WRC field at Chongkho Village<br />

10 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Wanchun Gangam Agri field Nginu<br />

11 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Wangkhu Agri field at Longkai<br />

12 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Nefa Agri field at Ngissa<br />

Longding Wakka Chongkhow 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Longding Wakka Nginu 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Longding Wakka Longkai 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Longding Wakka Ngissa 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

13 Soil Conservation, Terrace Cutting & Horticulture works Longding Wakka Wakka 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

etc. at Phochai Agri field at Wakka<br />

14 C/o water supply from new source at Longkai Village Longding Wakka Longkai 2000000.00 31/3/2013 New 2012-13 Nil 2000000.00<br />

15 Extension and maintenance <strong>of</strong> RLR at Khanu,<br />

Longkai,Ngissa, Nginu and Chop villages<br />

Longding Wakka Khanu,<br />

Longkai,Ngissa,<br />

Nginu and Chop<br />

2500000.00 31/3/2013 New 2012-13 Nil 2500000.00<br />

16 C/o Slab Culvert 3 nos. at Kampong Village Longding Wakka Kampong 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

17 Black topping <strong>of</strong> RLR at Chongkhow village. Longding Wakka Chongkhow 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

18 C/o LT Line at Kaiho, Wakka Village Longding Wakka Kaiho 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

19 Facilitation Centre for assisting the Science students (<strong>of</strong><br />

XI and XII) to undertake entrance exams for pr<strong>of</strong>essional<br />

courses (M.B.B.S, B.D.S, AIEEE, Entrance exams<br />

conducted by other State <strong>Govt</strong>s.<br />

20 Facilitation Centre for assisting the Arts students (<strong>of</strong> XI<br />

and XII) to undertake entrance exams for pr<strong>of</strong>essional<br />

courses.<br />

21 Exposer and Training in bamboo craft and furniture for<br />

self employment<br />

Longding Wakka Wakka 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Longding Wakka Wakka 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Longding Wakka Wakka 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

22 Short term Computer Course training for youth Longding Wakka Wakka 208438.00 31/3/2013 New 2012-13 Nil 208438.00<br />

1 Facilitation Centre for assisting the Science students (<strong>of</strong><br />

XI and XII) to undertake entrance exams for pr<strong>of</strong>essional<br />

courses (M.B.B.S, B.D.S, AIEEE, Entrance exams<br />

conducted by other State <strong>Govt</strong>s.<br />

2 Facilitation Centre for assisting the Arts students (<strong>of</strong> XI<br />

and XII) to undertake entrance exams for pr<strong>of</strong>essional<br />

courses.<br />

Sub total = 24968750.00<br />

Longding Pongchau Pongchau 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Longding Pongchau Pongchau 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

3 Exposer and Training in bamboo craft and furniture for Longding Pongchau Pongchau 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

self employment<br />

4 Short term Computer Course training for youth Longding Pongchau Pongchau 208438.00 31/3/2013 New 2012-13 Nil 208438.00<br />

5 C/o multipurpose play field at Konsa Village Longding Pongchau Konsa 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

BADP AAP 2012-13 for website


Page 86<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

6 Essential Medicines supply for PHC Pongchau Longding Pongchau Pongchau 543437.00 31/3/2013 New 2012-13 Nil 543437.00<br />

7 Community Tea plantation at Pongchau in Bonia, Konsa,<br />

Jagan, K/Noksa, K/Noknu, Votnu, Khasa & Konnu<br />

(@Rs.7.5 lakhs each + Rs.3.00 lakhs for training)<br />

Longding Pongchau Bonia, Konsa,<br />

Jagan, K/Noksa,<br />

K/Noknu, Votnu,<br />

Khasa & Konnu<br />

6300000.00 31/3/2013 New 2012-13 Nil 6300000.00<br />

8 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Gangjam-Gangjop Agri field at Votnu<br />

9 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Angom Sungam Agri field at Bonia Village<br />

10 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc.at Gandau Agri field at Jagan<br />

11 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Linto Sakkam Agri field at Pongchau Village<br />

12 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Wangjing, Kanchijan Agri field at K/Noknu<br />

13 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Longman-Japong Agri field at Khasa Village<br />

14 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Paisha-Longsah Agri field at Pongchau<br />

Longding Pongchau Votnu 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Longding Pongchau Bonia 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Longding Pongchau Jagan 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

Longding Pongchau Pongchau 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Longding Pongchau K/Noknu 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Longding Pongchau Khasa 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

Longding Pongchau Pongchau 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

15 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Phungam -Nyaigang- Lungchun Agri field at<br />

Khasa Village<br />

16 Soil Conservation, Terrace Cutting & Horticulture works<br />

etc. at Challai Kala Agri field at Khasa Village<br />

Longding Pongchau Khasa 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Longding Pongchau Khasa 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

17 C/o Slab Culvert 3 nos. at Khonnu-Thaknyah-Khonsa Longding Pongchau Khasa 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Nallah at Khasa Village<br />

18 C/o Slab Culvert 2 nos. at Tangnag Thomchikha at Longding Pongchau Khasa 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

Khasa Village<br />

19 Blacktopping <strong>of</strong> link road from BRTF road point to Bonia Longding Pongchau Bonia 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

Village<br />

20 Extension <strong>of</strong> RLR at K/Noksa village Longding Pongchau K/Noksa 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

21 Extension <strong>of</strong> Tangcho road at Pongchau township Longding Pongchau Pongchau 700000.00 31/3/2013 New 2012-13 Nil 700000.00<br />

22 Widening <strong>of</strong> PWD Helipad road at Pongchau township Longding Pongchau Pongchau 800000.00 31/3/2013 New 2012-13 Nil 800000.00<br />

BADP AAP 2012-13 for website


Page 87<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

23 C/o approach road from BRTF point to Apaw Colony at<br />

Bonia Village<br />

Longding Pongchau Bonia 500000.00 31/3/2013 New 2012-13 Nil 500000.00<br />

24 C/o Wired Rope Suspension Bridge over Chengo river in Longding Pongchau K/Noknu & 1800000.00 31/3/2013 New 2012-13 Nil 1800000.00<br />

between K/Noknu and Khanu village<br />

Khanu<br />

25 C/o LT Line at K/Noknu Village Longding Pongchau K/Noknu 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

26 C/o LT Line at Khamhee Paisah Colony at Pongchau<br />

Village<br />

Longding Pongchau Pongchau 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

27 Extension <strong>of</strong> LT Line at Jagan Village Longding Pongchau Jagan 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

28 C/o LT Line at Konsa Village Longding Pongchau Konsa 400000.00 31/3/2013 New 2012-13 Nil 400000.00<br />

29 Provision <strong>of</strong> Bituminous Road from main road to<br />

Pongchou Company Operation Base<br />

1 Procurement <strong>of</strong> Solar Water Heater for Company<br />

Operation Base at Lazu<br />

2 C/o 01xPFTs (15x8 m) with half brick wall at Lazu<br />

Company Operation Base<br />

Longding Pongchau Pongchau 2416875.00 31/3/2013 New 2012-13 Nil 2416875.00<br />

Sub total = 23368750.00<br />

Total Longding District = 48337500.00<br />

Tirap Lazu Lazu 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

Tirap Lazu Lazu 1416875.00 31/3/2013 New 2012-13 Nil 1416875.00<br />

3 C/o Greenhouse at Lonyan Village. Tirap Lazu Lonyan 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

4 C/o Girls Hostel for <strong>Govt</strong>. Middle school at Barap Tirap Lazu Barap 3000000.00 31/3/2013 New 2012-13 Nil 3000000.00<br />

5 C/o 30 (thirty) beded boys hostel at Middle School Barap Tirap Lazu Barap 3000000.00 31/3/2013 New 2012-13 Nil 3000000.00<br />

6 C/o class rooms at Pongkong Primary school Tirap Lazu Pongkong 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

7 C/o Class rooms at Old Kothung Primary School Tirap Lazu Old Kothung 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

8 C/o School Building at Nogna ME School Tirap Lazu Nogna 3000000.00 31/3/2013 New 2012-13 Nil 3000000.00<br />

9 C/o Teacher's quarter(T-II) at Upper Kolam ME school. Tirap Lazu Upper Kolam 1250000.00 31/3/2013 New 2012-13 Nil 1250000.00<br />

10 Procurement <strong>of</strong> Medicines for PHC Lazu Tirap Lazu Lazu 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

11 Water supply at Lower Kolam Village Tirap Lazu Lower Kolam 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

12 C/o Road from Lower Chinhan to Upper Chinhan Village Tirap Lazu Lower Chinhan, 2000000.00 31/3/2013 New 2012-13 Nil 2000000.00<br />

Upper Chinhan<br />

13 C/o CC Step at Longliang Village Tirap Lazu Longliang 300000.00 31/3/2013 New 2012-13 Nil 300000.00<br />

14 C/o CC Step at LangchenVillage Tirap Lazu Langchen 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

15 C/o CC Step at Raho Village Tirap Lazu Raho 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

16 C/o CC Step at Sinu Village Tirap Lazu Sinu 150000.00 31/3/2013 New 2012-13 Nil 150000.00<br />

17 C/o CC Step at Lower Chinhan Village Tirap Lazu Lower Chinhan 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

18 C/o Market Shed at Noglo Village Tirap Lazu Noglo 1000000.00 31/3/2013 New 2012-13 Nil 1000000.00<br />

19 Procrument <strong>of</strong> Solar Lamps for the villages under Lazu Tirap Lazu Lazu 1293437.00 31/3/2013 New 2012-13 Nil 1293437.00<br />

CD Block<br />

20 Medical Entrance facilitation Centre at Lazu Tirap Lazu Lazu 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

21 Engineering Entrance facilitation Centre at Lazu Tirap Lazu Lazu 200000.00 31/3/2013 New 2012-13 Nil 200000.00<br />

BADP AAP 2012-13 for website


Page 88<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

22 Establishment <strong>of</strong> Carreer counselling Cell at Lazu Tirap Lazu Lazu 208438.00 31/3/2013 New 2012-13 Nil 208438.00<br />

23 Career Trade fair Organising at Lazu Tirap Lazu Lazu 600000.00 31/3/2013 New 2012-13 Nil 600000.00<br />

Total Tirap District = 24168750.00<br />

A EDUCATION<br />

1<br />

2<br />

Primary School Building (Additional Room)<br />

Middle School Building (Additional Room)<br />

3<br />

4<br />

5<br />

Secondary / Higher Secondary School Building (Additional Room)<br />

C/o Residential accomodation for Teachers & allied staffs.<br />

C/o Hostel / Dormetories<br />

6 Development <strong>of</strong> play field<br />

7 Public Libraries& reading rooms<br />

Others :<br />

Total:- 0.00 0.00<br />

B<br />

8<br />

HEALTH<br />

9 Provision <strong>of</strong> equipment for Dental clinic<br />

10 Building infrastructure for (PHC / CHC)<br />

11<br />

Provision <strong>of</strong> Medical equipments <strong>of</strong> basic / elementry type, X-ray, ECG<br />

machine etc.<br />

Setting up <strong>of</strong> mobile dispensaries in rural areas by <strong>Govt</strong>. / Panchayat Raj<br />

Institution including telemedicine.<br />

Total:- 0.00 0.00<br />

C<br />

AGRICULTURE & ALLIED SECTORS<br />

12 Animals Husbandry<br />

13 Pisiculture<br />

14 Sericulture<br />

15<br />

Poultry farming / Fishery / pig / Goat / Sheep farming<br />

16 Farm forestry, Horticulture / floriculture,<br />

17 Desiling ponds in villages towns & cities<br />

18 Public drainage facilities<br />

19 C/o <strong>of</strong> irrigation embakement, or lift erragation or water table recharging<br />

facilities<br />

20 Minor irrigation work<br />

BADP AAP 2012-13 for website


Page 89<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

21<br />

22<br />

23<br />

24<br />

25<br />

26<br />

Soil conservation / protection <strong>of</strong> erosion - flood protection.<br />

Water conservation programme<br />

Social Forestry, JFM, Parks and Gardens, in <strong>Govt</strong>. and community land or<br />

other surrendered lands including pasturing yards<br />

Used <strong>of</strong> improved seeds, fertilizer and improve technology<br />

Veterinry Aid Centeres, artificial insemination Centres and<br />

breeding Centres. etc.<br />

Area specific approach keeping in view the economy <strong>of</strong> Scale - Backward -<br />

forward integration.<br />

D<br />

INFRASTRUCTURE<br />

Total:- 0.00 0.00<br />

27<br />

28<br />

29<br />

30<br />

Construction and Strengthing <strong>of</strong> approach roads, link roads (including<br />

culverts & bridges)<br />

Industries - Handloom, tiny units, handicraft, furniture making, tiny units,<br />

black smith works etc. and food processing industry<br />

Provision <strong>of</strong> civic amenties like elecrticity, water, pathways, ropeways, foot<br />

bridges, hanging bridges, public tiolets etc. in slum areas in SC / ST<br />

habitations and at tourist centers, bus stands etc.<br />

Development <strong>of</strong> infrastructure for weekly haats / bazaars and also for cultural<br />

activitis etc. in border areas.<br />

31<br />

Construction <strong>of</strong> buildings for recognised district or State Sports Associations<br />

and for Cultural and Sport Activities or for hospitals (provision <strong>of</strong> multi-gym<br />

facilities in gymnastic centres, sports association, physical education training<br />

instutions etc.)<br />

32<br />

33<br />

Construction <strong>of</strong> houses for <strong>of</strong>ficials engaged in education sector<br />

and health sector in remote border areas.<br />

Tourism / Sports / Adventure Sports scheme - creation world class infrastructure for tourism<br />

and sports in border block where ever feasible-like rock climbing, mountaineering river rafting,<br />

forest trekking, skiing and safaris ( car / bike race, camel safaris, yak riding, boating in Rann <strong>of</strong><br />

Kutch).<br />

34 Creation <strong>of</strong> new Tourist centers.<br />

BADP AAP 2012-13 for website


Page 90<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

35<br />

Construction <strong>of</strong> mini open stadium / indoor stadium /<br />

auditoriums.<br />

36<br />

New & Renewable electricity - Bio gas / Biomass gasification, Solar & Wind energy systems /<br />

devices for community use and related activities.<br />

E SOCIAL SECTOR<br />

37 Construction <strong>of</strong> Community centres<br />

Total:- 0.00 0.00<br />

38 Rural Sanitation blocks<br />

39 Cultural Centres / Community Halls<br />

40<br />

C/o Common shelters for the old or Handicapped<br />

41<br />

Capacity building programme by way <strong>of</strong> vocational studies & training for<br />

youth for self employment & skill upgradiation <strong>of</strong> artisans and weavers<br />

42<br />

Development <strong>of</strong> Model villages in border areas<br />

43<br />

E-chaupals / agrishops / mobile media vans / market yards.<br />

44<br />

Cluster approach wherever feasible<br />

Total:- 2713337811.00 978212806.00<br />

F<br />

SECURITY<br />

45<br />

Schemes sponsored by the Border Guarding Forces (i.e. by<br />

Armed forces / CPMFs as the case may be)<br />

Schemes proposed by ITBP<br />

BADP AAP 2012-13 for website


Page 91<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

Sub total ITBP = 0.00 0.00<br />

Schemes proposed by Assam Rifles<br />

Sub total Assam Rifles = 3127648436.00 ############<br />

Schemes proposed by the SSB<br />

Sub total SSB = 0.00 0.00<br />

Sub Total (Security sector) = 3127648436.00 ############<br />

GRAND TOTAL = 5840986247.00 ############<br />

SECTOR WISE DETAILS OF SCHEMES 925500000<br />

Name <strong>of</strong> the Sector<br />

No. <strong>of</strong><br />

Schemes<br />

Amount<br />

proposed<br />

Education 236 0.00 0.00<br />

Health 34 0.00 0.00<br />

Agriculture & Allied sectors 388 0.00 0.00<br />

Infrastructure 512 0.00 0.00<br />

Social 136 ########### 46.45<br />

Security Related 83 ########### 53.55<br />

Total = 1389 ########### 100.00<br />

%<br />

-4915486247<br />

BADP AAP 2012-13 for website


Page 92<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

BADP AAP 2012-13 for website


Page 93<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

BADP AAP 2012-13 for website


Page 94<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

BADP AAP 2012-13 for website


Page 95<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

BADP AAP 2012-13 for website


Page 96<br />

BADP AAP 2012-13 for website


Page 97<br />

BADP AAP 2012-13 for website


Page 98<br />

BADP AAP 2012-13 for website


Page 99<br />

BADP AAP 2012-13 for website


Page 100<br />

BADP AAP 2012-13 for website


Page 101<br />

BADP AAP 2012-13 for website


Page 102<br />

BADP AAP 2012-13 for website


Page 103<br />

BADP AAP 2012-13 for website


Page 104<br />

BADP AAP 2012-13 for website


Page 105<br />

BADP AAP 2012-13 for website


Page 106<br />

BADP AAP 2012-13 for website


Page 107<br />

BADP AAP 2012-13 for website


Page 108<br />

BADP AAP 2012-13 for website


Page 109<br />

BADP AAP 2012-13 for website


Page 110<br />

BADP AAP 2012-13 for website


Page 111<br />

BADP AAP 2012-13 for website


Page 112<br />

BADP AAP 2012-13 for website


Page 113<br />

BADP AAP 2012-13 for website


Page 114<br />

BADP AAP 2012-13 for website


Page 115<br />

BADP AAP 2012-13 for website


Page 116<br />

BADP AAP 2012-13 for website


Page 117<br />

BADP AAP 2012-13 for website


Page 118<br />

BADP AAP 2012-13 for website


Page 119<br />

BADP AAP 2012-13 for website


Page 120<br />

BADP AAP 2012-13 for website


Page 121<br />

BADP AAP 2012-13 for website


Page 122<br />

BADP AAP 2012-13 for website


Page 123<br />

BADP AAP 2012-13 for website


Page 124<br />

BADP AAP 2012-13 for website


Page 125<br />

BADP AAP 2012-13 for website


Page 126<br />

BADP AAP 2012-13 for website


Page 127<br />

BADP AAP 2012-13 for website


Page 128<br />

BADP AAP 2012-13 for website


Page 129<br />

BADP AAP 2012-13 for website


Page 130<br />

BADP AAP 2012-13 for website


Page 131<br />

BADP AAP 2012-13 for website


Page 132<br />

BADP AAP 2012-13 for website


Page 133<br />

BADP AAP 2012-13 for website


Page 134<br />

BADP AAP 2012-13 for website


Page 135<br />

BADP AAP 2012-13 for website


Page 136<br />

BADP AAP 2012-13 for website


Page 137<br />

BADP AAP 2012-13 for website


Page 138<br />

BADP AAP 2012-13 for website


Page 139<br />

BADP AAP 2012-13 for website


Page 140<br />

BADP AAP 2012-13 for website


Page 141<br />

BADP AAP 2012-13 for website


Page 142<br />

BADP AAP 2012-13 for website


Page 143<br />

BADP AAP 2012-13 for website


Page 144<br />

BADP AAP 2012-13 for website


Page 145<br />

BADP AAP 2012-13 for website


Page 146<br />

BADP AAP 2012-13 for website


Page 147<br />

BADP AAP 2012-13 for website


Page 148<br />

BADP AAP 2012-13 for website


Page 149<br />

BADP AAP 2012-13 for website


Page 150<br />

BADP AAP 2012-13 for website


Page 151<br />

BADP AAP 2012-13 for website


Page 152<br />

BADP AAP 2012-13 for website


Page 153<br />

BADP AAP 2012-13 for website


Page 154<br />

BADP AAP 2012-13 for website


Page 155<br />

BADP AAP 2012-13 for website


Page 156<br />

BADP AAP 2012-13 for website


Page 157<br />

BADP AAP 2012-13 for website


Page 158<br />

BADP AAP 2012-13 for website


Page 159<br />

BADP AAP 2012-13 for website


Page 160<br />

BADP AAP 2012-13 for website


Page 161<br />

BADP AAP 2012-13 for website


Page 162<br />

BADP AAP 2012-13 for website


Page 163<br />

BADP AAP 2012-13 for website


Page 164<br />

BADP AAP 2012-13 for website


Page 165<br />

BADP AAP 2012-13 for website


Page 166<br />

BADP AAP 2012-13 for website


Page 167<br />

BADP AAP 2012-13 for website


Page 168<br />

BADP AAP 2012-13 for website


Page 169<br />

BADP AAP 2012-13 for website


Page 170<br />

BADP AAP 2012-13 for website


Page 171<br />

DNA DNA<br />

-do-<br />

1,00,000/-<br />

-do-<br />

BADP AAP 2012-13 for website


Page 172<br />

-do-<br />

-do-<br />

BADP AAP 2012-13 for website


Page 173<br />

DNA<br />

BADP AAP 2012-13 for website


Page 174<br />

DNA DNA<br />

1,00,000/-<br />

BADP AAP 2012-13 for website


Page 175<br />

DNA DNA<br />

DNA<br />

1,50,000/-<br />

DNA<br />

BADP AAP 2012-13 for website


Page 176<br />

BADP AAP 2012-13 for website


Page 177<br />

BADP AAP 2012-13 for website


Page 178<br />

BADP AAP 2012-13 for website


Page 179<br />

BADP AAP 2012-13 for website


Page 180<br />

BADP AAP 2012-13 for website


Page 181<br />

BADP AAP 2012-13 for website


Page 182<br />

BADP AAP 2012-13 for website


Page 183<br />

BADP AAP 2012-13 for website


Page 184<br />

BADP AAP 2012-13 for website


Page 185<br />

BADP AAP 2012-13 for website


Page 186<br />

BADP AAP 2012-13 for website


Page 187<br />

BADP AAP 2012-13 for website


Page 188<br />

BADP AAP 2012-13 for website


Page 189<br />

BADP AAP 2012-13 for website


Page 190<br />

BADP AAP 2012-13 for website


Page 191<br />

BADP AAP 2012-13 for website


Page 192<br />

BADP AAP 2012-13 for website


Page 193<br />

BADP AAP 2012-13 for website


Page 194<br />

BADP AAP 2012-13 for website


Page 195<br />

BADP AAP 2012-13 for website


Page 196<br />

BADP AAP 2012-13 for website


Page 197<br />

BADP AAP 2012-13 for website


Page 198<br />

BADP AAP 2012-13 for website


Page 199<br />

BADP AAP 2012-13 for website


Page 200<br />

BADP AAP 2012-13 for website


Page 201<br />

BADP AAP 2012-13 for website


Page 202<br />

BADP AAP 2012-13 for website


Page 203<br />

BADP AAP 2012-13 for website


Page 204<br />

BADP AAP 2012-13 for website


Page 205<br />

BADP AAP 2012-13 for website


Page 206<br />

BADP AAP 2012-13 for website


Page 207<br />

BADP AAP 2012-13 for website


Page 208<br />

BADP AAP 2012-13 for website


Page 209<br />

BADP AAP 2012-13 for website


Page 210<br />

BADP AAP 2012-13 for website


Page 211<br />

BADP AAP 2012-13 for website


Page 212<br />

BADP AAP 2012-13 for website


Page 213<br />

BADP AAP 2012-13 for website


Page 214<br />

BADP AAP 2012-13 for website


Page 215<br />

BADP AAP 2012-13 for website


Page 216<br />

BADP AAP 2012-13 for website


Page 217<br />

BADP AAP 2012-13 for website


Page 218<br />

BADP AAP 2012-13 for website


Page 219<br />

BADP AAP 2012-13 for website


Page 220<br />

BADP AAP 2012-13 for website


Page 221<br />

BADP AAP 2012-13 for website


Page 222<br />

BADP AAP 2012-13 for website


Page 223<br />

BADP AAP 2012-13 for website


Page 224<br />

BADP AAP 2012-13 for website


Page 225<br />

BADP AAP 2012-13 for website


Page 226<br />

BADP AAP 2012-13 for website


Page 227<br />

BADP AAP 2012-13 for website


Page 228<br />

BADP AAP 2012-13 for website


Page 229<br />

BADP AAP 2012-13 for website


Page 230<br />

BADP AAP 2012-13 for website


Page 231<br />

BADP AAP 2012-13 for website


Page 232<br />

BADP AAP 2012-13 for website


Page 233<br />

BADP AAP 2012-13 for website


Page 234<br />

BADP AAP 2012-13 for website


Page 235<br />

BADP AAP 2012-13 for website


Page 236<br />

BADP AAP 2012-13 for website


Page 237<br />

BADP AAP 2012-13 for website


Page 238<br />

BADP AAP 2012-13 for website


Page 239<br />

BADP AAP 2012-13 for website


Page 240<br />

BADP AAP 2012-13 for website


Page 241<br />

BADP AAP 2012-13 for website


Page 242<br />

BADP AAP 2012-13 for website


Page 243<br />

BADP AAP 2012-13 for website


Page 244<br />

BADP AAP 2012-13 for website


Page 245<br />

BADP AAP 2012-13 for website


Page 246<br />

BADP AAP 2012-13 for website


Page 247<br />

BADP AAP 2012-13 for website


Page 248<br />

BADP AAP 2012-13 for website


Page 249<br />

BADP AAP 2012-13 for website


Page 250<br />

BADP AAP 2012-13 for website


Page 251<br />

BADP AAP 2012-13 for website


Page 252<br />

BADP AAP 2012-13 for website


Page 253<br />

BADP AAP 2012-13 for website


Page 254<br />

BADP AAP 2012-13 for website


Page 255<br />

BADP AAP 2012-13 for website


Page 256<br />

BADP AAP 2012-13 for website


Page 257<br />

BADP AAP 2012-13 for website


Page 258<br />

BADP AAP 2012-13 for website


Page 259<br />

BADP AAP 2012-13 for website


Page 260<br />

BADP AAP 2012-13 for website


Page 261<br />

BADP AAP 2012-13 for website


Page 262<br />

BADP AAP 2012-13 for website


Page 263<br />

BADP AAP 2012-13 for website


Page 264<br />

BADP AAP 2012-13 for website


Page 265<br />

BADP AAP 2012-13 for website


Page 266<br />

50,000/-<br />

BADP AAP 2012-13 for website


Page 267<br />

3,50,000/-<br />

BADP AAP 2012-13 for website


Page 268<br />

50,000/-<br />

BADP AAP 2012-13 for website


Page 269<br />

BADP AAP 2012-13 for website


Page 270<br />

3,00,000/-<br />

BADP AAP 2012-13 for website


Page 271<br />

BADP AAP 2012-13 for website


Page 272<br />

BADP AAP 2012-13 for website


Page 273<br />

BADP AAP 2012-13 for website


Page 274<br />

BADP AAP 2012-13 for website


Page 275<br />

BADP AAP 2012-13 for website


Page 276<br />

BADP AAP 2012-13 for website


Page 277<br />

BADP AAP 2012-13 for website


Page 278<br />

BADP AAP 2012-13 for website


Page 279<br />

BADP AAP 2012-13 for website


Page 280<br />

BADP AAP 2012-13 for website


Page 281<br />

BADP AAP 2012-13 for website


Page 282<br />

BADP AAP 2012-13 for website


Page 283<br />

BADP AAP 2012-13 for website


Page 284<br />

BADP AAP 2012-13 for website


Page 285<br />

BADP AAP 2012-13 for website

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!