SUBSEA LIFTING OPERATIONS
SUBSEA LIFTING OPERATIONS
SUBSEA LIFTING OPERATIONS
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Program<br />
Tuesday 29 th November<br />
Wednesday 30 th November<br />
09.00 Registration / Coffee<br />
Chairmen: Mr. Ole J Nordahl, Statoil and<br />
Mrs. Guro Løken, EMAS AMC<br />
10.00 the different phases of a subsea lift from an offshore<br />
construction vessel<br />
• Seafastening<br />
• Lifting from deck of the vessel<br />
• Lifting in air<br />
• Through the splash zone<br />
• Further lowering<br />
• Landing phase<br />
• Recovery to deck<br />
Mr. Erik Widding, emaS amC<br />
10.45 dnv Marine Operations Rules for Subsea Lift Operations<br />
• Brief overview of relevant DNV Publications<br />
• Capacity checks of lifting equipment<br />
• Hydrodynamic forces when lifting through wave zone<br />
• Dynamic forces during deepwater lifting operations<br />
Mr. Tormod Bøe, Det Norske Veritas<br />
11.45 Coffee Break<br />
12.15 analysis of subsea lifting operations<br />
• Influence from load on vessel motion<br />
• Large structures<br />
• Impulsive loads (slamming, snatch load and impact)<br />
• Varying conditions during lowering<br />
Mr. Peter Chr. Sandvik, maRINTEK<br />
13.00 Lunch<br />
14.00 experience from offshore construction vessel deck<br />
handling and rigging<br />
Mr. Terje Johnsen, Subsea7<br />
14.45 deployment in Ultra Deep Water – The Advantages and<br />
Use of Synthetic Ropes on Traction Systems<br />
• Reasons for choosing a synthetic system<br />
• Description of the winch<br />
• Description of the rope<br />
• Description of the Application<br />
• Inspection and Retirement Criteria<br />
Mr. Dennis Sharman, Samson Rope<br />
15.30 Coffee Break<br />
16.00 active Heave Compensation is becoming a standard for<br />
Subsea Lifting Operations. In general there are three<br />
different ways to achieve Active Heave Compensation<br />
(AHC)<br />
• AHC directly on the winch – hydraulic driven<br />
• AHC directly on the winch – electric driven<br />
• AHC via a hydraulic cylinder – combination of passive<br />
and active heave compensation<br />
Mr. Wilco Stavenuiter and Mr. Jan den Hertog, Huisman Equipment BV<br />
16.45 advantages of today’s simulators<br />
• How we use our simulators, achievements, trends and goals<br />
Mr. Robert Rylander, Aalesund University College<br />
17.30 end of Day 1<br />
19.00 Conference Dinner<br />
Chairmen: Mr. Thore Grønvik, Subsea 7 and<br />
Mr. Martin Ahlbäck, Technip<br />
08.30 Computational fluid dynamics (CFD) in subsea lifting<br />
analysis<br />
• How to establish hydrodynamic coefficients by CFD<br />
analysis<br />
• Experience from use CFD analysis<br />
• Advantages/disadvantages with CFD<br />
Mr. Petter Moen, Subsea 7<br />
09.00 template Lifting Operations – From Barge through<br />
Splash Zone<br />
• Time domain analysis with non-linear vessel motions<br />
including interaction and DP<br />
• Monitoring contact forces during template lift-off from<br />
the barge<br />
• Monitoring template behavior during crane swing<br />
• Monitoring hydrodynamic forces (drag, mass and<br />
slamming) during lowering through the shielded splash<br />
zone<br />
Mr. Volkert Oosterlaak, Teknisk Data AS<br />
09.45 Coffee Break<br />
10.15 sima - The new graphical interface for RIFLEX and SIMO<br />
• SIMA is a graphical user interface for the RIFLEX and<br />
SIMO software developed by Marintek for analyzing<br />
slender marines structures and simulation of marine<br />
operations. The presentation will give an update on:<br />
- Background<br />
- Status<br />
- Future plans<br />
Mr. Simen Moxnes, Statoil<br />
11.00 troll P12 Spool Installation - Installation of a 155 m 36”<br />
spool from a spool installation barge<br />
• Background and chosen method<br />
• Engineering Challenges<br />
• Operational Experience<br />
mr. Vegard Nedrevåg, Senior Project Engineer, Technip<br />
Stavanger<br />
11.45 Lunch<br />
13.00 Pencil Buoy Method - Installation and removal of subsea<br />
structures<br />
Mr. Henrik Mork, emaS amC<br />
13.30 goliat Template Submerged Tow-out and Installation<br />
Mr. Kjetil Gjøystdal, Technip<br />
14.00 Åsgard Subsea Compression Project, Installation &<br />
Intervention<br />
• Why subsea compression, a brief introduction.<br />
• Åsgard subsea compression plant, the main installation<br />
and intervention challenges<br />
• A look at different Intervention options for large modules<br />
• What does the future hold<br />
Mrs. Therese Bjarke, Statoil<br />
14.45 Closing / Adjourn<br />
15.00 bus transports to the Airport