National Certificate <strong>of</strong> Line Mechanic Transmission Level 4<br />

<strong>Letters</strong> <strong>of</strong> <strong>Attestation</strong><br />

<strong>Letters</strong> <strong>of</strong> <strong>Attestation</strong> are assessment tasks. A letter <strong>of</strong> attestation is confirmation<br />

that you consistently perform the tasks <strong>of</strong> the unit standard.<br />

Ask your supervisor or assessor who, in the company, will attest to your<br />

skill and knowledge.<br />

See over for instructions<br />

<strong>Letters</strong> <strong>of</strong> <strong>Attestation</strong> must be completed for all <strong>of</strong> the following unit standards<br />

Contents<br />

10509 Climb and work on electricity network structures.<br />

10510 Use lines machinery plant and equipment in an electricity network<br />

environment.<br />

10512 Joint electricity network overhead conductors.<br />

10521 Install and replace electricity network pole structures.<br />

12295 Apply earths to and remove earths from overhead electric line<br />

conductors.<br />

17602 Apply hazard identification and risk assessment procedures in the<br />

workplace.<br />

18276 Operate light lifting and rigging equipment in the electricity supply<br />

environment.<br />

20420 Replace transmission tower steel.<br />

24746 Rig electrical network structures.<br />

24747 Install and replace insulators and fittings.<br />

24749 Restore electricity network lines using emergency structures.<br />

E1 OPTIONAL STRAND<br />

14284 Carry out soil resistivity test for high voltage earth system.<br />

E3 OPTIONAL STRAND<br />

14287 Use and maintain test instruments used within the high voltage<br />

electrical industry.<br />

18025 Reconduct and install electricity network overhead conductors over<br />

50kV.<br />

<br />

24680 Plan and manage helicopter overhead lines operations<br />

<br />

20419<br />

Use a conductor trolley on de-energised transmission line<br />

conductors.


How to use the Letter <strong>of</strong> <strong>Attestation</strong> sheets<br />

Instructions<br />

You must have one letter <strong>of</strong> attestation for each unit standard.<br />

Complete your<br />

observations<br />

Do this first - have you been observed three times<br />

Letter <strong>of</strong><br />

<strong>Attestation</strong><br />

Have your letter <strong>of</strong> attestation completed and signed<br />

by a supervisor or company authorised person that<br />

knows your work.<br />

You must complete one letter <strong>of</strong> attestation for each<br />

unit standard.<br />

Block Course<br />

Take your completed letter <strong>of</strong> attestation to your<br />

block course.<br />

You will be assessed on your block course.<br />

Trainers will require your completed attestation<br />

letters and observation sheets.<br />

You may have to complete questionnaires.


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

10509v4<br />

Climb and work on electricity network structures<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working practices<br />

and adherence to codes <strong>of</strong> practice and organisational policies and procedures over a<br />

period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, attitudes<br />

and knowledge to perform the tasks required in this Unit Standard consistently, in a<br />

competent manner.<br />

Carry out pre-climbing checks on electricity network structures.<br />

Select electricity network structure climbing equipment<br />

Use electricity network structure climbing equipment<br />

Carry out work on electricity network structures<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 3 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

10509v4<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 4 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

10510v4<br />

Use machinery, plant and equipment in an electricity network<br />

environment<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills,<br />

attitudes and knowledge to perform the tasks required in this unit standard<br />

consistently, in a competent manner.<br />

Plans work and prepares electricity network lines machinery for operation.<br />

Operates electricity network lines machinery, plant and equipment<br />

Reports electricity network lines machinery operation<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 5 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 6 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

10512v4<br />

Joint electricity network overhead conductors<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working practices and<br />

adherence to codes <strong>of</strong> practice and organisational policies and procedures over a period <strong>of</strong> time<br />

and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and knowledge to<br />

perform the following tasks consistently and in a competent manner.<br />

Interpret the scope <strong>of</strong> work for jointing electricity network overhead conductors<br />

Prepare electricity network conductors for jointing<br />

Joint electricity network conductors<br />

Report electricity network conductor jointing work<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 7 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 8 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

10521v4<br />

Install and replace electricity network pole structures<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Interpret the scope <strong>of</strong> work for electricity network pole structures.<br />

Install electricity network pole hardware.<br />

Erect pole and replace electricity network pole structures.<br />

Report work on electricity network pole structures.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 9 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 10 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

12295v5<br />

Apply earths to and remove earths from overhead electric line<br />

conductors<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the tasks required in this unit standard consistently, in a<br />

competent manner.<br />

Demonstrate knowledge <strong>of</strong> earthing requirements for overhead<br />

electric line conductors<br />

Prepare to apply earths to overhead line conductors <strong>of</strong> all voltages<br />

Prove earthing point de-energised<br />

Apply and remove the earths from overhead electric line<br />

conductors<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 11 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 12 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

17602v3<br />

Apply hazard identification and risk assessment procedures in the<br />

workplace<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Describe hazards that may harm workers, the work environment, and<br />

organisations.<br />

Explain health and safety requirements for hazard control.<br />

Describe hazard control methods.<br />

Identify hazards and apply risk assessment procedures.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 13 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 14 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

18276v3<br />

Operate light lifting and rigging equipment in the electricity supply<br />

environment<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills and<br />

knowledge to perform the tasks required in this Unit Standard consistently, in a<br />

competent manner.<br />

Demonstrates knowledge <strong>of</strong> ropes slings knots used in the<br />

electricity supply industry.<br />

Identify, describe and explain the use <strong>of</strong> light lifting and rigging<br />

equipment used in the electricity supply environment.<br />

Use light lifting and rigging equipment used in the electricity supply<br />

environment.<br />

Use lifting and rigging documentation, standards and reporting<br />

procedures.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 15 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 16 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

20420v2<br />

Replace transmission tower steel<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Demonstrate knowledge <strong>of</strong> transmission tower steel replacement in accordance<br />

with industry requirements.<br />

Plan the replacement <strong>of</strong> transmission tower steel in accordance with industry<br />

requirements.<br />

Replace transmission tower steel, and complete job record, in accordance with<br />

industry requirements.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 17 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 18 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

24746v2<br />

Rig electrical network structures<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Demonstrate knowledge <strong>of</strong> the principles <strong>of</strong> rigging that relate to an electrical<br />

structure.<br />

Use and maintain rigging equipment.<br />

Plan electrical network structure rigging work.<br />

Select and inspect electrical network structure rigging work tools and equipment.<br />

Move electrical network structure load.<br />

Please comment on the trainee's performance<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 19 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 20 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

24747v1<br />

Install and replace insulators and fittings<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Determine the load on the conductor and tension configuration in accordance with<br />

industry requirements.<br />

Select insulators and fittings to install or replace in accordance with industry<br />

requirements.<br />

Install or replace insulators and fittings on standard poles and structures, and<br />

complete job record, in accordance with industry requirements.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 21 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 22 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

24749v1<br />

Restore electricity network lines using emergency structures<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Describe the structure, components, and specifications <strong>of</strong> different types <strong>of</strong><br />

emergency towers, in accordance with industry requirements.<br />

Transport, store, and handle the different types <strong>of</strong> emergency towers in<br />

accordance with industry requirements.<br />

Plan for emergency tower erection in accordance with industry requirements.<br />

Erect emergency transmission tower and complete job record in accordance with<br />

industry requirements.<br />

Please comment on the trainee's performance<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 23 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 24 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

14284v4<br />

Carry out soil resistivity tests for high voltage earth system<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Prepare for soil resistivity tests for high voltage earth system in accordance<br />

with industry requirements.<br />

Set up test equipment in accordance with industry requirements.<br />

Perform soil resistivity test and document results in accordance with industry<br />

requirements.<br />

Interpret and analyse test results in accordance with industry requirements.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 25 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 26 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

14287v4<br />

Use and maintain test instruments used within the high voltage<br />

electrical industry<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Interpret technical specifications for test equipment and explain the<br />

principles <strong>of</strong> equipment operation.<br />

Carry out calibration checks and apply correction factors.<br />

Use test equipment to carry out tests.<br />

Maintain and handle test equipment in the approved manner.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 27 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 28 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

18025v3<br />

String, install, and attach transmission network conductors<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Prepare lines stringing equipment for installing transmission conductors in<br />

accordance with industry requirements.<br />

String transmission network conductors in accordance with industry<br />

requirements.<br />

Tension and terminate transmission network conductors in accordance<br />

with industry requirements.<br />

Install and attach transmission network conductors, and complete job<br />

record, in accordance with industry requirements.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 29 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 30 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

24680v1<br />

Plan and manage helicopter overhead lines operation<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Plan a helicopter overhead lines operation.<br />

Organise resources and equipment for a helicopter overhead lines operation.<br />

Establish working areas for overhead lines works accessed by helicopter.<br />

Manage a helicopter overhead lines operation.<br />

Please comment on the trainee's performance<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 31 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 32 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

20419v2<br />

Use a conductor trolley on de-energised transmission line<br />

conductors<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Plan the use <strong>of</strong> a conductor trolley in accordance with industry requirements.<br />

Place and remove conductor trolley in accordance with industry requirements.<br />

Please comment on the trainee's performance<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 33 <strong>of</strong> <strong>35</strong>


This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />

Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page 34 <strong>of</strong> <strong>35</strong>


Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />

24748v1<br />

Erect electricity transmission towers<br />

This attestation must be completed and signed by a person with the appropriate<br />

organisational authority for the work being undertaken.<br />

Please consider whether the trainee has consistently demonstrated safe working<br />

practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />

procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />

Verification Statement<br />

I verify that the trainee [……………………………………………….] has the ability, skills, and<br />

knowledge to perform the following tasks consistently and in a competent<br />

manner.<br />

Describe the purpose and characteristics <strong>of</strong> different transmission tower types in<br />

accordance with industry requirements.<br />

Plan for transmission tower erection in accordance with industry requirements.<br />

Erect transmission tower and complete job record, in accordance with industry<br />

requirements.<br />

Please comment on the trainee’s performance.<br />

Employer Verification<br />

Signature:<br />

Date:<br />

Name:<br />

Company:<br />

Position:<br />

This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />

one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />

Page <strong>35</strong> <strong>of</strong> <strong>35</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!