National Certificate <strong>of</strong> Line Mechanic Transmission Level 4<br />
<strong>Letters</strong> <strong>of</strong> <strong>Attestation</strong><br />
<strong>Letters</strong> <strong>of</strong> <strong>Attestation</strong> are assessment tasks. A letter <strong>of</strong> attestation is confirmation<br />
that you consistently perform the tasks <strong>of</strong> the unit standard.<br />
Ask your supervisor or assessor who, in the company, will attest to your<br />
skill and knowledge.<br />
See over for instructions<br />
<strong>Letters</strong> <strong>of</strong> <strong>Attestation</strong> must be completed for all <strong>of</strong> the following unit standards<br />
Contents<br />
10509 Climb and work on electricity network structures.<br />
10510 Use lines machinery plant and equipment in an electricity network<br />
environment.<br />
10512 Joint electricity network overhead conductors.<br />
10521 Install and replace electricity network pole structures.<br />
12295 Apply earths to and remove earths from overhead electric line<br />
conductors.<br />
17602 Apply hazard identification and risk assessment procedures in the<br />
workplace.<br />
18276 Operate light lifting and rigging equipment in the electricity supply<br />
environment.<br />
20420 Replace transmission tower steel.<br />
24746 Rig electrical network structures.<br />
24747 Install and replace insulators and fittings.<br />
24749 Restore electricity network lines using emergency structures.<br />
E1 OPTIONAL STRAND<br />
14284 Carry out soil resistivity test for high voltage earth system.<br />
E3 OPTIONAL STRAND<br />
14287 Use and maintain test instruments used within the high voltage<br />
electrical industry.<br />
18025 Reconduct and install electricity network overhead conductors over<br />
50kV.<br />
<br />
24680 Plan and manage helicopter overhead lines operations<br />
<br />
20419<br />
Use a conductor trolley on de-energised transmission line<br />
conductors.
How to use the Letter <strong>of</strong> <strong>Attestation</strong> sheets<br />
Instructions<br />
You must have one letter <strong>of</strong> attestation for each unit standard.<br />
Complete your<br />
observations<br />
Do this first - have you been observed three times<br />
Letter <strong>of</strong><br />
<strong>Attestation</strong><br />
Have your letter <strong>of</strong> attestation completed and signed<br />
by a supervisor or company authorised person that<br />
knows your work.<br />
You must complete one letter <strong>of</strong> attestation for each<br />
unit standard.<br />
Block Course<br />
Take your completed letter <strong>of</strong> attestation to your<br />
block course.<br />
You will be assessed on your block course.<br />
Trainers will require your completed attestation<br />
letters and observation sheets.<br />
You may have to complete questionnaires.
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
10509v4<br />
Climb and work on electricity network structures<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working practices<br />
and adherence to codes <strong>of</strong> practice and organisational policies and procedures over a<br />
period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, attitudes<br />
and knowledge to perform the tasks required in this Unit Standard consistently, in a<br />
competent manner.<br />
Carry out pre-climbing checks on electricity network structures.<br />
Select electricity network structure climbing equipment<br />
Use electricity network structure climbing equipment<br />
Carry out work on electricity network structures<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 3 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
10509v4<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 4 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
10510v4<br />
Use machinery, plant and equipment in an electricity network<br />
environment<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills,<br />
attitudes and knowledge to perform the tasks required in this unit standard<br />
consistently, in a competent manner.<br />
Plans work and prepares electricity network lines machinery for operation.<br />
Operates electricity network lines machinery, plant and equipment<br />
Reports electricity network lines machinery operation<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 5 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 6 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
10512v4<br />
Joint electricity network overhead conductors<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working practices and<br />
adherence to codes <strong>of</strong> practice and organisational policies and procedures over a period <strong>of</strong> time<br />
and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and knowledge to<br />
perform the following tasks consistently and in a competent manner.<br />
Interpret the scope <strong>of</strong> work for jointing electricity network overhead conductors<br />
Prepare electricity network conductors for jointing<br />
Joint electricity network conductors<br />
Report electricity network conductor jointing work<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 7 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 8 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
10521v4<br />
Install and replace electricity network pole structures<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Interpret the scope <strong>of</strong> work for electricity network pole structures.<br />
Install electricity network pole hardware.<br />
Erect pole and replace electricity network pole structures.<br />
Report work on electricity network pole structures.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 9 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 10 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
12295v5<br />
Apply earths to and remove earths from overhead electric line<br />
conductors<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the tasks required in this unit standard consistently, in a<br />
competent manner.<br />
Demonstrate knowledge <strong>of</strong> earthing requirements for overhead<br />
electric line conductors<br />
Prepare to apply earths to overhead line conductors <strong>of</strong> all voltages<br />
Prove earthing point de-energised<br />
Apply and remove the earths from overhead electric line<br />
conductors<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 11 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 12 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
17602v3<br />
Apply hazard identification and risk assessment procedures in the<br />
workplace<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Describe hazards that may harm workers, the work environment, and<br />
organisations.<br />
Explain health and safety requirements for hazard control.<br />
Describe hazard control methods.<br />
Identify hazards and apply risk assessment procedures.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 13 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 14 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
18276v3<br />
Operate light lifting and rigging equipment in the electricity supply<br />
environment<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills and<br />
knowledge to perform the tasks required in this Unit Standard consistently, in a<br />
competent manner.<br />
Demonstrates knowledge <strong>of</strong> ropes slings knots used in the<br />
electricity supply industry.<br />
Identify, describe and explain the use <strong>of</strong> light lifting and rigging<br />
equipment used in the electricity supply environment.<br />
Use light lifting and rigging equipment used in the electricity supply<br />
environment.<br />
Use lifting and rigging documentation, standards and reporting<br />
procedures.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 15 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 16 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
20420v2<br />
Replace transmission tower steel<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Demonstrate knowledge <strong>of</strong> transmission tower steel replacement in accordance<br />
with industry requirements.<br />
Plan the replacement <strong>of</strong> transmission tower steel in accordance with industry<br />
requirements.<br />
Replace transmission tower steel, and complete job record, in accordance with<br />
industry requirements.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 17 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 18 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
24746v2<br />
Rig electrical network structures<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Demonstrate knowledge <strong>of</strong> the principles <strong>of</strong> rigging that relate to an electrical<br />
structure.<br />
Use and maintain rigging equipment.<br />
Plan electrical network structure rigging work.<br />
Select and inspect electrical network structure rigging work tools and equipment.<br />
Move electrical network structure load.<br />
Please comment on the trainee's performance<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 19 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 20 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
24747v1<br />
Install and replace insulators and fittings<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Determine the load on the conductor and tension configuration in accordance with<br />
industry requirements.<br />
Select insulators and fittings to install or replace in accordance with industry<br />
requirements.<br />
Install or replace insulators and fittings on standard poles and structures, and<br />
complete job record, in accordance with industry requirements.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 21 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 22 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
24749v1<br />
Restore electricity network lines using emergency structures<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Describe the structure, components, and specifications <strong>of</strong> different types <strong>of</strong><br />
emergency towers, in accordance with industry requirements.<br />
Transport, store, and handle the different types <strong>of</strong> emergency towers in<br />
accordance with industry requirements.<br />
Plan for emergency tower erection in accordance with industry requirements.<br />
Erect emergency transmission tower and complete job record in accordance with<br />
industry requirements.<br />
Please comment on the trainee's performance<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 23 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 24 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
14284v4<br />
Carry out soil resistivity tests for high voltage earth system<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Prepare for soil resistivity tests for high voltage earth system in accordance<br />
with industry requirements.<br />
Set up test equipment in accordance with industry requirements.<br />
Perform soil resistivity test and document results in accordance with industry<br />
requirements.<br />
Interpret and analyse test results in accordance with industry requirements.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 25 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 26 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
14287v4<br />
Use and maintain test instruments used within the high voltage<br />
electrical industry<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Interpret technical specifications for test equipment and explain the<br />
principles <strong>of</strong> equipment operation.<br />
Carry out calibration checks and apply correction factors.<br />
Use test equipment to carry out tests.<br />
Maintain and handle test equipment in the approved manner.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 27 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 28 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
18025v3<br />
String, install, and attach transmission network conductors<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Prepare lines stringing equipment for installing transmission conductors in<br />
accordance with industry requirements.<br />
String transmission network conductors in accordance with industry<br />
requirements.<br />
Tension and terminate transmission network conductors in accordance<br />
with industry requirements.<br />
Install and attach transmission network conductors, and complete job<br />
record, in accordance with industry requirements.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 29 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 30 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
24680v1<br />
Plan and manage helicopter overhead lines operation<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Plan a helicopter overhead lines operation.<br />
Organise resources and equipment for a helicopter overhead lines operation.<br />
Establish working areas for overhead lines works accessed by helicopter.<br />
Manage a helicopter overhead lines operation.<br />
Please comment on the trainee's performance<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 31 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 32 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
20419v2<br />
Use a conductor trolley on de-energised transmission line<br />
conductors<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Plan the use <strong>of</strong> a conductor trolley in accordance with industry requirements.<br />
Place and remove conductor trolley in accordance with industry requirements.<br />
Please comment on the trainee's performance<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 33 <strong>of</strong> <strong>35</strong>
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only one<br />
Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page 34 <strong>of</strong> <strong>35</strong>
Assessment task: Letter <strong>of</strong> <strong>Attestation</strong><br />
24748v1<br />
Erect electricity transmission towers<br />
This attestation must be completed and signed by a person with the appropriate<br />
organisational authority for the work being undertaken.<br />
Please consider whether the trainee has consistently demonstrated safe working<br />
practices and adherence to codes <strong>of</strong> practice and organisational policies and<br />
procedures over a period <strong>of</strong> time and in a variety <strong>of</strong> on job situations.<br />
Verification Statement<br />
I verify that the trainee [……………………………………………….] has the ability, skills, and<br />
knowledge to perform the following tasks consistently and in a competent<br />
manner.<br />
Describe the purpose and characteristics <strong>of</strong> different transmission tower types in<br />
accordance with industry requirements.<br />
Plan for transmission tower erection in accordance with industry requirements.<br />
Erect transmission tower and complete job record, in accordance with industry<br />
requirements.<br />
Please comment on the trainee’s performance.<br />
Employer Verification<br />
Signature:<br />
Date:<br />
Name:<br />
Company:<br />
Position:<br />
This sheet is a duplicate <strong>of</strong> the Letter <strong>of</strong> <strong>Attestation</strong> sheet in the trainee assessment pack. Only<br />
one Letter <strong>of</strong> <strong>Attestation</strong> sheet for each unit standard must be completed.<br />
Page <strong>35</strong> <strong>of</strong> <strong>35</strong>