07.01.2015 Views

St. Louis presentation

St. Louis presentation

St. Louis presentation

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Overview<br />

Client<br />

• East West Gateway Council of Governments<br />

• Loop Trolley Company<br />

Government Coordination<br />

• FTA<br />

• City of <strong>St</strong>. <strong>Louis</strong><br />

• City of University City<br />

• <strong>St</strong>. <strong>Louis</strong> County<br />

• MetroLink & MetroBus<br />

• Forest Park<br />

• Great Rivers Greenway District


Project Overview<br />

Client<br />

• Loop Trolley Company<br />

• East West Gateway Council of Governments<br />

Government Coordination<br />

• FTA<br />

• City of <strong>St</strong>. <strong>Louis</strong><br />

• City of University City<br />

• <strong>St</strong>. <strong>Louis</strong> County<br />

• MetroLink & MetroBus<br />

• Forest Park<br />

• Great Rivers Greenway District


Project Team<br />

CH2M HILL, Inc. – Management, Civil Design, Utility<br />

Coordination, Maintenance Facility Design<br />

Subconsultants<br />

• URS – Civil/Bridge Design<br />

• <strong>St</strong>one Consulting – Project Management, Guideway<br />

• ABNA - Surveying<br />

• Geotechnology – Subsurface Utility Investigations<br />

• TSI – Geotech Investigations<br />

• UTRS – Corrosion<br />

• Kwame Engineering - Constructability<br />

• Webb Engineering - Mechanical<br />

• Core10 Architecture - Architecture<br />

• KPFF Engineers - <strong>St</strong>ructural<br />

• Hudson and Associates – Public Involvement


Project History<br />

Below:<br />

DeBaliviere Ave/Pershing Ave Intersection, 1964<br />

(Source Unknown)<br />

Above:<br />

DeBaliviere Ave/Pershing Ave Intersection, 1964<br />

(Source Unknown)


Project History<br />

Below:<br />

West on Delmar Blvd, 1940<br />

(Source Unknown)<br />

Above:<br />

East on Delmar Blvd in University City, 1962<br />

(Source Unknown)


Project History<br />

Looking east on Delmar Blvd to the DeBaliviere Ave Intersection, 1959<br />

(Source Unknown)


Project Map


Delmar Boulevard<br />

Track Location<br />

• Concrete track slab with a 2” mill and overlay<br />

• Located over old Trolley Tracks<br />

• Single Track – 8’ wide track slab; Double Track – 19’ wide track slab


DeBaliviere Ave.<br />

• 100’ R/W Multi-Modal Corridor<br />

• Road diet 5 lanes to 3 lanes<br />

Track Location<br />

• 11’ wide Trolley corridor on turf track within 30’ wide green space<br />

• Trolley runs adjacent to 16’ wide Great Rivers Greenway shared use<br />

path


Track Location


DeBaliviere Ave.<br />

DeBaliviere looking<br />

north at Waterman<br />

Varies<br />

~ 8’<br />

~ 36’<br />

~ 19’<br />

~ 11’<br />

~ 16’<br />

Ex-Ped<br />

Realm<br />

to<br />

Remain<br />

New<br />

Parking<br />

Lane<br />

3 Lanes for Cars<br />

Green Space,<br />

<strong>St</strong>ation <strong>St</strong>op Areas<br />

Trolley Located to<br />

Reduce Utility<br />

Conflicts<br />

Multi-Use<br />

Trail/Ped<br />

Realm on<br />

East Side


DeBaliviere Ave.<br />

• DeBaliviere Ave – Great Rivers Greenway


DeBaliviere Ave.<br />

• DeBaliviere Ave – Turf Track (Kenosha, WI)


Project Connectivity<br />

DEBALIVIERE AVE.


Track Location<br />

Forest Park Parkway to History Museum <strong>St</strong>op<br />

• Contra-flow trolley lane<br />

FOREST PARK PKWY<br />

TROLLEY<br />

DEBALIVIERE AVE.


Contra Flow Section


10 <strong>St</strong>ation <strong>St</strong>ops along corridor<br />

Delmar Boulevard (6 <strong>St</strong>ation <strong>St</strong>ops)<br />

• Kingsland Avenue (University City Library)<br />

• Leland Avenue<br />

• Limit Avenue<br />

• Pageant Theatre<br />

• Metrolink-Delmar (Des Peres Avenue/Hodiamont Avenue<br />

• Laurel <strong>St</strong>reet<br />

DeBaliviere Avenue (4 <strong>St</strong>ation <strong>St</strong>ops)<br />

• DeBaliviere Avenue/Delmar Intersection<br />

• Kingsbury Place (Crossroads School)<br />

• Metrolink-Forest Park<br />

• MO History Museum/Forest Park<br />

<strong>St</strong>ation <strong>St</strong>ops


<strong>St</strong>ation <strong>St</strong>ops


Maintenance and <strong>St</strong>orage Facility<br />

• Former Delmar High School<br />

and originally car dealership<br />

• Build is on National Historic<br />

Register


Maintenance and <strong>St</strong>orage Facility


Maintenance and <strong>St</strong>orage Facility


Maintenance and <strong>St</strong>orage Facility<br />

26,705 SF – First floor remodeled area<br />

Second floor unfinished – Potential future office or<br />

retail space<br />

5 employees initially expanding to 17 in future<br />

Four track bays –<br />

• Two Trolley Maintenance Bays<br />

• Trolley Washing Bay<br />

• Paint Booth Bay (Future)


Trinity Ave Round-a-bout<br />

Round-a-bout with Landscape Enhancements


<strong>St</strong>reet Cars<br />

Rehabilitated Historical Double Ended <strong>St</strong>reet Car


Headways<br />

Trolley Operations<br />

• 20 minute headways initially<br />

• Consider shorter headways after operations are established<br />

• 20 – 30 second average duration of station stop<br />

Ticketing<br />

• Pricing similar to MetroLink<br />

• No automated ticket sales<br />

• Tickets will be sold at retail outlets and on board the Trolley<br />

Hours of Operation<br />

• Sunday - Thursday: 11:00AM to Midnight<br />

• Friday - Saturday: 11:00AM to 1:00AM<br />

• Possible to flex hours of operation due to special events


COST ESTIMATE &<br />

CONSTRUCTION SCHEDULE<br />

Cost Estimate – $42 million overall cost<br />

• FTA grant - $25 million<br />

• DeBaliviere Bridge Grant - $4.7 million<br />

• Great Rivers Greenway Grant and Match- $3 million<br />

• Round-a-bout CMAQ Grant - $1.25 million<br />

• Private Donations<br />

Construction Schedule<br />

• 18 month construction schedule<br />

• DeBaliviere Bridge – Close DeBaliviere Ave at Forest Park Pkwy<br />

• Demo and Construct DeBaliviere during bridge construction<br />

• Construct trolley rails along Delmar at 1-2 block intervals to<br />

limit interruptions


Traffic Model Simulation Video<br />

Traffic <strong>St</strong>udy


Questions<br />

Tim Nittler<br />

Tim.Nittler@ch2m.com<br />

314 335 3034<br />

Chris Boyd<br />

Christopher.Boyd@ch2m.com<br />

314 335 3047<br />

Conclusion

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!