07.01.2015 Views

St. Louis presentation

St. Louis presentation

St. Louis presentation

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Project Overview<br />

Client<br />

• East West Gateway Council of Governments<br />

• Loop Trolley Company<br />

Government Coordination<br />

• FTA<br />

• City of <strong>St</strong>. <strong>Louis</strong><br />

• City of University City<br />

• <strong>St</strong>. <strong>Louis</strong> County<br />

• MetroLink & MetroBus<br />

• Forest Park<br />

• Great Rivers Greenway District


Project Overview<br />

Client<br />

• Loop Trolley Company<br />

• East West Gateway Council of Governments<br />

Government Coordination<br />

• FTA<br />

• City of <strong>St</strong>. <strong>Louis</strong><br />

• City of University City<br />

• <strong>St</strong>. <strong>Louis</strong> County<br />

• MetroLink & MetroBus<br />

• Forest Park<br />

• Great Rivers Greenway District


Project Team<br />

CH2M HILL, Inc. – Management, Civil Design, Utility<br />

Coordination, Maintenance Facility Design<br />

Subconsultants<br />

• URS – Civil/Bridge Design<br />

• <strong>St</strong>one Consulting – Project Management, Guideway<br />

• ABNA - Surveying<br />

• Geotechnology – Subsurface Utility Investigations<br />

• TSI – Geotech Investigations<br />

• UTRS – Corrosion<br />

• Kwame Engineering - Constructability<br />

• Webb Engineering - Mechanical<br />

• Core10 Architecture - Architecture<br />

• KPFF Engineers - <strong>St</strong>ructural<br />

• Hudson and Associates – Public Involvement


Project History<br />

Below:<br />

DeBaliviere Ave/Pershing Ave Intersection, 1964<br />

(Source Unknown)<br />

Above:<br />

DeBaliviere Ave/Pershing Ave Intersection, 1964<br />

(Source Unknown)


Project History<br />

Below:<br />

West on Delmar Blvd, 1940<br />

(Source Unknown)<br />

Above:<br />

East on Delmar Blvd in University City, 1962<br />

(Source Unknown)


Project History<br />

Looking east on Delmar Blvd to the DeBaliviere Ave Intersection, 1959<br />

(Source Unknown)


Project Map


Delmar Boulevard<br />

Track Location<br />

• Concrete track slab with a 2” mill and overlay<br />

• Located over old Trolley Tracks<br />

• Single Track – 8’ wide track slab; Double Track – 19’ wide track slab


DeBaliviere Ave.<br />

• 100’ R/W Multi-Modal Corridor<br />

• Road diet 5 lanes to 3 lanes<br />

Track Location<br />

• 11’ wide Trolley corridor on turf track within 30’ wide green space<br />

• Trolley runs adjacent to 16’ wide Great Rivers Greenway shared use<br />

path


Track Location


DeBaliviere Ave.<br />

DeBaliviere looking<br />

north at Waterman<br />

Varies<br />

~ 8’<br />

~ 36’<br />

~ 19’<br />

~ 11’<br />

~ 16’<br />

Ex-Ped<br />

Realm<br />

to<br />

Remain<br />

New<br />

Parking<br />

Lane<br />

3 Lanes for Cars<br />

Green Space,<br />

<strong>St</strong>ation <strong>St</strong>op Areas<br />

Trolley Located to<br />

Reduce Utility<br />

Conflicts<br />

Multi-Use<br />

Trail/Ped<br />

Realm on<br />

East Side


DeBaliviere Ave.<br />

• DeBaliviere Ave – Great Rivers Greenway


DeBaliviere Ave.<br />

• DeBaliviere Ave – Turf Track (Kenosha, WI)


Project Connectivity<br />

DEBALIVIERE AVE.


Track Location<br />

Forest Park Parkway to History Museum <strong>St</strong>op<br />

• Contra-flow trolley lane<br />

FOREST PARK PKWY<br />

TROLLEY<br />

DEBALIVIERE AVE.


Contra Flow Section


10 <strong>St</strong>ation <strong>St</strong>ops along corridor<br />

Delmar Boulevard (6 <strong>St</strong>ation <strong>St</strong>ops)<br />

• Kingsland Avenue (University City Library)<br />

• Leland Avenue<br />

• Limit Avenue<br />

• Pageant Theatre<br />

• Metrolink-Delmar (Des Peres Avenue/Hodiamont Avenue<br />

• Laurel <strong>St</strong>reet<br />

DeBaliviere Avenue (4 <strong>St</strong>ation <strong>St</strong>ops)<br />

• DeBaliviere Avenue/Delmar Intersection<br />

• Kingsbury Place (Crossroads School)<br />

• Metrolink-Forest Park<br />

• MO History Museum/Forest Park<br />

<strong>St</strong>ation <strong>St</strong>ops


<strong>St</strong>ation <strong>St</strong>ops


Maintenance and <strong>St</strong>orage Facility<br />

• Former Delmar High School<br />

and originally car dealership<br />

• Build is on National Historic<br />

Register


Maintenance and <strong>St</strong>orage Facility


Maintenance and <strong>St</strong>orage Facility


Maintenance and <strong>St</strong>orage Facility<br />

26,705 SF – First floor remodeled area<br />

Second floor unfinished – Potential future office or<br />

retail space<br />

5 employees initially expanding to 17 in future<br />

Four track bays –<br />

• Two Trolley Maintenance Bays<br />

• Trolley Washing Bay<br />

• Paint Booth Bay (Future)


Trinity Ave Round-a-bout<br />

Round-a-bout with Landscape Enhancements


<strong>St</strong>reet Cars<br />

Rehabilitated Historical Double Ended <strong>St</strong>reet Car


Headways<br />

Trolley Operations<br />

• 20 minute headways initially<br />

• Consider shorter headways after operations are established<br />

• 20 – 30 second average duration of station stop<br />

Ticketing<br />

• Pricing similar to MetroLink<br />

• No automated ticket sales<br />

• Tickets will be sold at retail outlets and on board the Trolley<br />

Hours of Operation<br />

• Sunday - Thursday: 11:00AM to Midnight<br />

• Friday - Saturday: 11:00AM to 1:00AM<br />

• Possible to flex hours of operation due to special events


COST ESTIMATE &<br />

CONSTRUCTION SCHEDULE<br />

Cost Estimate – $42 million overall cost<br />

• FTA grant - $25 million<br />

• DeBaliviere Bridge Grant - $4.7 million<br />

• Great Rivers Greenway Grant and Match- $3 million<br />

• Round-a-bout CMAQ Grant - $1.25 million<br />

• Private Donations<br />

Construction Schedule<br />

• 18 month construction schedule<br />

• DeBaliviere Bridge – Close DeBaliviere Ave at Forest Park Pkwy<br />

• Demo and Construct DeBaliviere during bridge construction<br />

• Construct trolley rails along Delmar at 1-2 block intervals to<br />

limit interruptions


Traffic Model Simulation Video<br />

Traffic <strong>St</strong>udy


Questions<br />

Tim Nittler<br />

Tim.Nittler@ch2m.com<br />

314 335 3034<br />

Chris Boyd<br />

Christopher.Boyd@ch2m.com<br />

314 335 3047<br />

Conclusion

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!