07.01.2015 Views

ISG143/05 Line Loss Factors for a Distribution System ... - Elexon

ISG143/05 Line Loss Factors for a Distribution System ... - Elexon

ISG143/05 Line Loss Factors for a Distribution System ... - Elexon

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>ISG143</strong>/<strong>05</strong><br />

<strong>Line</strong> <strong>Loss</strong> <strong>Factors</strong> <strong>for</strong> a <strong>Distribution</strong><br />

<strong>System</strong> Connection Point – Metering<br />

<strong>System</strong> ID 7185<br />

Meeting Name<br />

Imbalance Settlement Group<br />

Meeting Date 26 March 2013<br />

Purpose of paper<br />

Summary<br />

For Decision<br />

Following a change to the Aggregation Rules <strong>for</strong> Metering <strong>System</strong> ID 7185 to include a <strong>Line</strong><br />

<strong>Loss</strong> Factor, this paper seeks the ISG’s approval of Site Specific Central Volume Allocation<br />

<strong>Line</strong> <strong>Loss</strong> <strong>Factors</strong> calculated by UK Power Networks (LOND) Licensed <strong>Distribution</strong> <strong>System</strong><br />

Operator to apply <strong>for</strong> the BSC Year 01 April 2013 to 31 March 2014.<br />

1. Introduction<br />

1.1 The Trading Disputes Committee (TDC) requested that ELEXON re-validate the Aggregation Rules <strong>for</strong> all<br />

Central Volume Allocation (CVA) BM Units against up-to-date single line electrical diagrams which identify<br />

the Boundary Points, Meter locations and the electrical configurations at all CVA sites.<br />

1.2 Through re-validation we identified that Wembley (II_WEMBLEY) is a <strong>Distribution</strong> <strong>System</strong> Connection<br />

Point connected at 11kV and the Balancing and Settlement Code (BSC) Section R3.3.2 requires that<br />

‘Where any Aggregation Rules relate to any Metering <strong>System</strong> which is connected to a <strong>Distribution</strong><br />

<strong>System</strong>, the Aggregation Rules shall specify, or enable the CDCA to determine, which <strong>Line</strong> <strong>Loss</strong> Factor(s)<br />

are to be applied, and how they are to be applied, to metered data in determining Metered Volumes.’<br />

The original Aggregation Rule <strong>for</strong> Wembley had no <strong>Line</strong> <strong>Loss</strong> Factor (LLF) applied.<br />

1.3 A change to the Aggregation Rule has been made to include a LLF and the Licensed <strong>Distribution</strong> <strong>System</strong><br />

Operator (LDSO) has submitted a Site Specific LLF to ELEXON. ELEXON has audited the Site Specific LLF<br />

submission <strong>for</strong> Metering <strong>System</strong> ID (MSID) 7185 (Wembley - Gibbons Road Main Substation) in<br />

accordance with BSCP128 1 <strong>for</strong> the 2013-2014 BSC Year.<br />

2. BSCP128 Audit<br />

2.1 UK Power Networks (LOND) has submitted the Long Format (CVA LLF) files <strong>for</strong> audit and approval. An<br />

audit has been per<strong>for</strong>med in accordance with BSCP128. ELEXON has validated the LLF file to ensure that<br />

the structure of the file and the LLF values submitted comply with the audit scope of Section 3.5 of<br />

1 ‘Production, Submission, Audit and Approval of <strong>Line</strong> <strong>Loss</strong> <strong>Factors</strong>’<br />

<strong>ISG143</strong>/<strong>05</strong> v1.0<br />

Page 1 of 2 © ELEXON 2013


<strong>ISG143</strong>/<strong>05</strong><br />

BSCP128. The submitted LLF file has passed validation. ELEXON invites the ISG to note the audit was<br />

completed successfully and invites the ISG to approve the LLF <strong>for</strong> use in Settlement.<br />

2.2 The summary report <strong>for</strong> the LLF submissions is available on the ELEXON Portal.<br />

2.3 Once approved by the ISG, ELEXON will send the LLF files to the CDCA <strong>for</strong> use in Settlement from 01<br />

April 2013.<br />

2.4 UKPN has also submitted Generic LLFs <strong>for</strong> Enfield Centre (MSID: 7074 in EELC) and Taylors Lane (MSID:<br />

5538 in LOND) which also involved changes to the Aggregation Rules. These Generic LLFs have already<br />

been approved by the ISG (ISG Paper 142/01).<br />

2.5 All three Aggregation Rule changes will be investigated to see whether a Trading Dispute should be<br />

raised.<br />

3. Recommendations<br />

3.1 ELEXON invites you to:<br />

a) NOTE that the audit processes carried out by ELEXON have been completed successfully;<br />

b) APPROVE the proposed LLF <strong>for</strong> MSID 7185 <strong>for</strong> use in Settlement <strong>for</strong> the BSC Year 01 April 2013<br />

to 31 March 2014.<br />

For more in<strong>for</strong>mation, please contact:<br />

Oliver Xing, Market Analyst<br />

oliver.xing@elexon.co.uk<br />

020 7380 4276<br />

<strong>ISG143</strong>/<strong>05</strong> v1.0<br />

Page 2 of 2 © ELEXON 2013