08.01.2015 Views

Dynetek / Rau - StorHy Hydrogen Storage

Dynetek / Rau - StorHy Hydrogen Storage

Dynetek / Rau - StorHy Hydrogen Storage

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Expert Session 1 − Workshop1<br />

Commercialisation Roadmap<br />

Perspectives and Gaps for <strong>Hydrogen</strong> <strong>Storage</strong><br />

C-H2 Session: Vessel manufacturing & mass<br />

production scale-up<br />

S. <strong>Rau</strong>, DYNETEK GmbH<br />

STORHY<br />

FINAL EVENT<br />

June 3-4, 2008<br />

Poissy, France<br />

Date: Author: 1


Impact of carbon fibre<br />

‣ 4 kg H2 / passenger car system<br />

: 5% (specific weight)<br />

Cylinder weight 80 kg<br />

Composite<br />

60 kg<br />

Liner<br />

20 kg<br />

Carbon fibre<br />

42 kg<br />

Resin<br />

18 kg<br />

‣ Cost target with mass production:<br />

carbon fibre costs = app. 75 % of total costs<br />

42 kg * 25 €/kg / 0.75 = 1,400 €<br />

‣ Carbon fibre consumption vs. production:<br />

- Production capacity 2008 = app. 30,000 t/a<br />

- annual vehicle production of cars and<br />

light commercial vehicles = app. 65,000,000<br />

→ 1% of vehicle production as H2 vehicles<br />

would require 27,300 t carbon fibre<br />

Date: 30.05.2008 Author: Dr. Steffen <strong>Rau</strong> 2


Welded, Seamed Steel<br />

Compliance<br />

with Testing<br />

Requirements<br />

New Designs<br />

Roadworthiness<br />

of “Systems”<br />

Leak Testing<br />

Cylinder Assemblies<br />

Manufacturing & Testing<br />

Workplace<br />

Accidents<br />

Valves Design<br />

Materials Integrity<br />

Unplanned<br />

Fuel Release<br />

Over the Road Fuel Carriage<br />

Cylinder Assembly<br />

Designs<br />

Accidents<br />

Corrosion<br />

Protection<br />

Requirements<br />

for<br />

Higher Pressures<br />

Materials<br />

Size & Weight<br />

Fuel Capacity<br />

CNG & H2 Cylinder<br />

Issues<br />

Shield Protection<br />

Cylinder<br />

Assemblies<br />

Impacts of Road<br />

Hazards<br />

In-Use Inspection,<br />

Maintenance and<br />

Compliance<br />

Inspection Methods<br />

Hydro-Static<br />

Magnetic<br />

Ultra-Sonic<br />

Global (Acoustic)<br />

Imaging<br />

Standards & Regulations:<br />

Development & Implementation<br />

Synergies Between<br />

H2 & CNG<br />

Lessons<br />

learned Materials<br />

Installation & In-Use<br />

Practice<br />

Valves<br />

Failure Analysis<br />

Deactivate Y/N<br />

Inspection Intervals<br />

Handling Fires<br />

Harmonization<br />

ISO & ECE<br />

Ref /<br />

Amend<br />

Compliance in<br />

Emerging Markets<br />

Inspection<br />

Training<br />

Costs vs. Safety<br />

Regulations Pipes Valves<br />

Inspection of<br />

Stationary<br />

<strong>Storage</strong>& vessels<br />

Roads Tunnels Bridges<br />

Positioning PRDs Positioning PRDs & Valves<br />

on Cylinders<br />

Cylinders<br />

Date: 30.05.2008<br />

& Fuel Lines<br />

Author: Dr. Steffen<br />

on Vehicles<br />

<strong>Rau</strong> Moisture Other Damage<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!