7800 Col. H. Weir Cook Memorial Dr.<br />

<strong>Indianapolis</strong>, Indiana 46241<br />

office 317.487.9594<br />

fax 317.487.5034<br />

<strong>Pre</strong>-<strong>Bid</strong> <strong>Meeting</strong> <strong>Agenda</strong><br />

Demolition of Old Terminal and Associated Structures<br />

IAA Project #I-13-026<br />

February 5, 2013, 9:00 am<br />

1. Introduction<br />

Project Name:<br />

Project Number:<br />

Demolition of Old Terminal and Associated Structures<br />

IAA Project; #I-13-026-3097<br />

A. <strong>Bid</strong>ding Documents<br />

• Plans<br />

• Specifications (One Volume)<br />

• <strong>Bid</strong> Proposal (One Volume)<br />

B. <strong>Bid</strong> Time / Date / Location February 21, 2013 @ 3:30 pm at the Building 60,<br />

Conf Room #1<br />

2. Project Representatives<br />

A. Owner: <strong>Indianapolis</strong> <strong>Airport</strong> Authority<br />

B. Designer: DLZ Indiana, LLC<br />

C. Attendee Introduction (Include Company Name, identify if XBE)<br />

3. <strong>Bid</strong>ding Procedure<br />

A. Sealed opaque envelope marked outside with:<br />

• <strong>Bid</strong>der's name<br />

• Project name<br />

• Date & time bids are due<br />

Fatal Flaws<br />

B. <strong>Bid</strong> Proposal Package Items:<br />

• Form 96 –Contractor’s <strong>Bid</strong> for Public Works<br />

• Financial Statement<br />

• <strong>Bid</strong> Bond or Certified Check totaling 5% of <strong>Bid</strong><br />

• Contract Signature Page<br />

All must be completed in<br />

their entirety; else the<br />

bid will not be read and<br />

will not be given further<br />

consideration<br />

C. Contractor Questionnaire Form<br />

D. <strong>Bid</strong> questions – Must use the bid question form provided<br />

E. Last day to submit questions: (10) calendar days prior to bid day<br />

• Any questions on <strong>Bid</strong>ding Procedure<br />

www.indianapolisairport.com


4. XBE Participation Goals - Corey Wilson, Director of Supplier Diversity,<br />

cwilson@indianapolisairport.com, 317.487.5374<br />

• Participation goals are 30% MBE and/or WBE and 2% VBE<br />

• Any questions regarding the XBE Targets<br />

• Indiana Plan Requirements – certification in bid proposal<br />

5. Project Plans & Specifications Review<br />

A. General Scope of Work:<br />

a. <strong>Bid</strong>der Qualification Requirements<br />

b. Performance Based Specifications<br />

c. <strong>Bid</strong> Items: Lumps Sum, Allowances, Alternates<br />

B. Project Description<br />

C. Site Logistics: Staging Area, Entrance Locations, Work Hours<br />

D. FAA Operational Requirements<br />

E. Security Considerations: Contractor will not be allowed on the AOA<br />

F. Demolition Excavation Removal Limits<br />

G. Environmental Requirements<br />

H. Waste Disposal Requirements<br />

I. Backfill Requirements<br />

J. Unsatisfactory Soil Removal and Disposal<br />

K. Dust Control Requirements<br />

L. Utility Abandonment Procedures<br />

M. Storm Sewer Protection<br />

N. Safety Plan<br />

O. Work Permit: Contractor will obtain an <strong>Airport</strong> Work Permit from Robert Jones<br />

P. Project Time: Project completion is due on/or before December 31, 2013<br />

6. Site Visit Logistics<br />

7. Review of Insurance Program<br />

A. As listed in GP, Section 70 (Non-AOA)<br />

B. Successful <strong>Bid</strong>der: * Include IAA and Engineer as additional insured<br />

* Send directly to the IAA (Attn Project Manager)<br />

• Any questions regarding the Insurance Program<br />

8. Project Start-up<br />

• Execution of contract anticipated at March 15, 2013 IAA Board meeting<br />

• GP 30-6 bonds within 10 days of contract<br />

• GP 80-02 contractor expected to start work within 3 days of date in Notice to Proceed<br />

• GP 80-03-01 contractor to submit schedule within ten (10) days of contract award<br />

• GP 50-03-01 Shop Drawing Schedule to be submitted no later than seven (7) day after<br />

contract award<br />

9. Questions<br />

10. XBE Networking Session - Immediately following meeting<br />

www.indianapolisairport.com