Project overview.pdf - Queensland Rail
Project overview.pdf - Queensland Rail
Project overview.pdf - Queensland Rail
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Darra to Springfield Transport Corridor<br />
Stage 2 Richlands to Springfield<br />
<strong>Project</strong> <strong>overview</strong><br />
The <strong>Queensland</strong> Government’s $475 million<br />
Darra to Springfield Transport Corridor Stage 2<br />
Richlands to Springfield <strong>Project</strong> is being delivered<br />
as an integrated road and rail project with the rail<br />
component scheduled for completion in late 2013,<br />
and the road component scheduled for completion in<br />
early 2014.<br />
The rail component of the project will see a 9.5 km<br />
dual track passenger rail line constructed between<br />
Richlands and Springfield, and two new stations<br />
at Springfield (opposite Woodcrest College) and<br />
Springfield Central (opposite Orion Town Centre).<br />
To Brisbane<br />
Richlands<br />
Boundary Road<br />
Carole Park<br />
Wacol<br />
Centenary<br />
Waterford Road<br />
Garden Road<br />
Highway<br />
Julie Road<br />
Progress Road<br />
Forest Lake<br />
Richlands Station<br />
Waterford Road<br />
Ellen Grove<br />
Legend<br />
Stage 1 rail completed in January 2011<br />
Stage 2 rail<br />
Stage 1 road completed in 2010<br />
Centenary Highway Upgrade<br />
New road bridges (3)<br />
New rail bridges (7)<br />
New stations (2)<br />
Considine Street<br />
Woogaroo Street<br />
The road component of the project includes<br />
upgrading the Centenary Highway between the<br />
Logan Motorway Interchange, Forest Lake and<br />
Springfield Parkway, Springfield. This includes:<br />
Logan Motorway<br />
Cobalt Street<br />
Roxwell Street<br />
Johnson Road<br />
Cobalt Street<br />
••<br />
making the existing dual carriage Centenary<br />
Highway into two southbound lanes from<br />
Logan Motorway to Springfield Parkway<br />
••<br />
a new southbound on-ramp from the Logan<br />
Motorway to the Centenary Highway<br />
••<br />
constructing two new northbound lanes from<br />
Springfield Parkway towards Johnson Road,<br />
Carole Park, the final extent to be confirmed<br />
••<br />
lengthening the Springfield Parkway<br />
northbound on-ramp to the Centenary Highway<br />
••<br />
a new central median to separate the<br />
southbound and northbound lanes.<br />
Springfield<br />
Station<br />
Camira<br />
S pringfield Parkway<br />
Woodcrest<br />
College<br />
Woodcrest Way<br />
Nev Smith Drive<br />
Centenary Highway<br />
Greenbank<br />
Springfield Lakes Boulevard<br />
Springfield<br />
Springfield<br />
Lakes<br />
Augusta Parkway<br />
Springfield Central<br />
Station<br />
Orion Town<br />
Centre<br />
Springfield Gre<br />
e<br />
nbank Arterial<br />
Sinnathamby Boulevard<br />
This map is not to scale and indicative only.
<strong>Project</strong> benefits<br />
<strong>Rail</strong><br />
The new rail line will improve accessibility to<br />
businesses in Brisbane’s central business district<br />
and other centres along the city rail network.<br />
Delivering sustainable public transport options will<br />
help manage the rapid growth in this region.<br />
The new infrastructure will help encourage<br />
business development and job creation. Around<br />
3200 jobs are expected to be created over the life<br />
of the project.<br />
Road<br />
Duplicating the Centenary Highway southbound<br />
will reduce congestion and improve travel times<br />
during afternoon peak periods.<br />
Duplicating the Centenary Highway northbound<br />
and lengthening the Springfield Parkway on-ramp<br />
will improve merging onto the highway, and reduce<br />
congestion on local roads during morning peak<br />
periods.<br />
Upgrading the Centenary Highway will improve<br />
safety with northbound and southbound traffic<br />
separated by a new central median.<br />
Fast facts<br />
<strong>Rail</strong><br />
Track km<br />
Stations<br />
Bus interchange<br />
<strong>Rail</strong> bridges<br />
Road<br />
Road km<br />
Road<br />
Road bridges<br />
On and<br />
off-ramps<br />
Safety<br />
improvements<br />
9.5 km dual track passenger rail line<br />
Two stations at Springfield and<br />
Springfield Central<br />
Integrated bus and rail interchange at<br />
Springfield Central Station<br />
Seven rail bridges<br />
5.5 km of road upgrade<br />
Centenary Highway duplicated between<br />
Logan Motorway Interchange and<br />
Springfield Parkway<br />
Three new road bridges<br />
A new southbound on-ramp from Logan<br />
Motorway to the Centenary Highway<br />
Lengthening the Springfield Parkway<br />
northbound on-ramp to the Centenary<br />
Highway<br />
A new central median will separate the<br />
southbound and northbound lanes of the<br />
Centenary Highway<br />
First bridge beam placement on the new rail bridge over the<br />
Logan Motorway Interchange.<br />
Contact us:<br />
Phone: 1800 067 684*<br />
Email:<br />
info@trackstar.com.au<br />
SMS/Email<br />
updates: Connect with the project by registering<br />
to receive SMS or email updates.<br />
Simply email or phone the project team<br />
to join.<br />
Web:<br />
Visitor centre:<br />
www.queenslandrail.com.au/projects<br />
Corner of Progress and Garden Roads,<br />
Richlands<br />
Monday to Friday 8.30 am—4.30 pm<br />
* Free call from anywhere in Australia, call charges apply for<br />
calls from mobile phones and payphones.