09.01.2015 Views

Project overview.pdf - Queensland Rail

Project overview.pdf - Queensland Rail

Project overview.pdf - Queensland Rail

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Darra to Springfield Transport Corridor<br />

Stage 2 Richlands to Springfield<br />

<strong>Project</strong> <strong>overview</strong><br />

The <strong>Queensland</strong> Government’s $475 million<br />

Darra to Springfield Transport Corridor Stage 2<br />

Richlands to Springfield <strong>Project</strong> is being delivered<br />

as an integrated road and rail project with the rail<br />

component scheduled for completion in late 2013,<br />

and the road component scheduled for completion in<br />

early 2014.<br />

The rail component of the project will see a 9.5 km<br />

dual track passenger rail line constructed between<br />

Richlands and Springfield, and two new stations<br />

at Springfield (opposite Woodcrest College) and<br />

Springfield Central (opposite Orion Town Centre).<br />

To Brisbane<br />

Richlands<br />

Boundary Road<br />

Carole Park<br />

Wacol<br />

Centenary<br />

Waterford Road<br />

Garden Road<br />

Highway<br />

Julie Road<br />

Progress Road<br />

Forest Lake<br />

Richlands Station<br />

Waterford Road<br />

Ellen Grove<br />

Legend<br />

Stage 1 rail completed in January 2011<br />

Stage 2 rail<br />

Stage 1 road completed in 2010<br />

Centenary Highway Upgrade<br />

New road bridges (3)<br />

New rail bridges (7)<br />

New stations (2)<br />

Considine Street<br />

Woogaroo Street<br />

The road component of the project includes<br />

upgrading the Centenary Highway between the<br />

Logan Motorway Interchange, Forest Lake and<br />

Springfield Parkway, Springfield. This includes:<br />

Logan Motorway<br />

Cobalt Street<br />

Roxwell Street<br />

Johnson Road<br />

Cobalt Street<br />

••<br />

making the existing dual carriage Centenary<br />

Highway into two southbound lanes from<br />

Logan Motorway to Springfield Parkway<br />

••<br />

a new southbound on-ramp from the Logan<br />

Motorway to the Centenary Highway<br />

••<br />

constructing two new northbound lanes from<br />

Springfield Parkway towards Johnson Road,<br />

Carole Park, the final extent to be confirmed<br />

••<br />

lengthening the Springfield Parkway<br />

northbound on-ramp to the Centenary Highway<br />

••<br />

a new central median to separate the<br />

southbound and northbound lanes.<br />

Springfield<br />

Station<br />

Camira<br />

S pringfield Parkway<br />

Woodcrest<br />

College<br />

Woodcrest Way<br />

Nev Smith Drive<br />

Centenary Highway<br />

Greenbank<br />

Springfield Lakes Boulevard<br />

Springfield<br />

Springfield<br />

Lakes<br />

Augusta Parkway<br />

Springfield Central<br />

Station<br />

Orion Town<br />

Centre<br />

Springfield Gre<br />

e<br />

nbank Arterial<br />

Sinnathamby Boulevard<br />

This map is not to scale and indicative only.


<strong>Project</strong> benefits<br />

<strong>Rail</strong><br />

The new rail line will improve accessibility to<br />

businesses in Brisbane’s central business district<br />

and other centres along the city rail network.<br />

Delivering sustainable public transport options will<br />

help manage the rapid growth in this region.<br />

The new infrastructure will help encourage<br />

business development and job creation. Around<br />

3200 jobs are expected to be created over the life<br />

of the project.<br />

Road<br />

Duplicating the Centenary Highway southbound<br />

will reduce congestion and improve travel times<br />

during afternoon peak periods.<br />

Duplicating the Centenary Highway northbound<br />

and lengthening the Springfield Parkway on-ramp<br />

will improve merging onto the highway, and reduce<br />

congestion on local roads during morning peak<br />

periods.<br />

Upgrading the Centenary Highway will improve<br />

safety with northbound and southbound traffic<br />

separated by a new central median.<br />

Fast facts<br />

<strong>Rail</strong><br />

Track km<br />

Stations<br />

Bus interchange<br />

<strong>Rail</strong> bridges<br />

Road<br />

Road km<br />

Road<br />

Road bridges<br />

On and<br />

off-ramps<br />

Safety<br />

improvements<br />

9.5 km dual track passenger rail line<br />

Two stations at Springfield and<br />

Springfield Central<br />

Integrated bus and rail interchange at<br />

Springfield Central Station<br />

Seven rail bridges<br />

5.5 km of road upgrade<br />

Centenary Highway duplicated between<br />

Logan Motorway Interchange and<br />

Springfield Parkway<br />

Three new road bridges<br />

A new southbound on-ramp from Logan<br />

Motorway to the Centenary Highway<br />

Lengthening the Springfield Parkway<br />

northbound on-ramp to the Centenary<br />

Highway<br />

A new central median will separate the<br />

southbound and northbound lanes of the<br />

Centenary Highway<br />

First bridge beam placement on the new rail bridge over the<br />

Logan Motorway Interchange.<br />

Contact us:<br />

Phone: 1800 067 684*<br />

Email:<br />

info@trackstar.com.au<br />

SMS/Email<br />

updates: Connect with the project by registering<br />

to receive SMS or email updates.<br />

Simply email or phone the project team<br />

to join.<br />

Web:<br />

Visitor centre:<br />

www.queenslandrail.com.au/projects<br />

Corner of Progress and Garden Roads,<br />

Richlands<br />

Monday to Friday 8.30 am—4.30 pm<br />

* Free call from anywhere in Australia, call charges apply for<br />

calls from mobile phones and payphones.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!