Protect the heart of the <strong>photovoltaic</strong> <strong>system</strong><br />
Our <strong>system</strong> <strong>solutions</strong> <strong>for</strong> the protection of the inverter<br />
Buildings without external lightning protection<br />
Surge protection <strong>for</strong> the current inverter<br />
– the heart of the <strong>system</strong> – is<br />
particularly important on buildings<br />
without external lightning protection.<br />
A protection <strong>system</strong> should cover<br />
6<br />
Location Description U DC max Type Article No. Figure<br />
A<br />
B<br />
C<br />
3-pin complete unit 1,000 V V20-C/3-PH-1000 509460 8<br />
2-pin complete unit 1,000 V V20-C/2-PH-1000 509461 7<br />
System solution in housing 1,000 V VG-C/DC-PH-MS 1000 5088 69 1<br />
System solution in housing with<br />
MC 4 connector<br />
745 V VG-C/DC-PH 550 5088 69 0<br />
230 V (L, N, PE) V20-C/1+NPE-280 509465 0<br />
230/400 V (L1, L2, L3, N, PE) V20-C/3+NPE-280 5094 656<br />
Equipotential bonding rail<br />
VDE-tested<br />
all at-risk lines that are connected to<br />
the current inverter. The DC surge<br />
arrester (protection circuits up to<br />
1,000 V DC available) must be<br />
matched to the maximum no-load<br />
External lightning protection is not necessary or required. A type 2 surge protection is sufficient.<br />
Solar module Power inverter<br />
DC<br />
protection<br />
PAS<br />
AC<br />
protectio<br />
Main distribution<br />
voltage of the solar module. The<br />
maximum no-load voltage is typically<br />
up to 20% above the indicated noload<br />
voltage (U OC STC ).<br />
Energy<br />
network<br />
tributor box with protection device is greater<br />
than 10 m line length<br />
1801 VDE 5015 650<br />
Note: An equipotential qu bonding between the metallic PV framework and the main m equipotential bonding g should be created.<br />
*<br />
-