2.1.2 Capacity Assessment<br />

To determine the current system load <strong>and</strong> its capacity for future expansion, a<br />

st<strong>and</strong>-alone assessment of the Woodlane sewerage was computed <strong>and</strong> is<br />

attached in Appendix E. Some assumed parameters of the assessment are as<br />

follows:<br />

Peak factor 3<br />

Average daily flow 490 L/connection/day<br />

The calculated flows for the pump stations are summarised below in Table 3.<br />

Table 3 – Pump Stations Summary<br />

Pump<br />

* Storage<br />

ADF Peak Flow Pump<br />

Time to Overflow Time to Overflow<br />

Station<br />

Capacity<br />

(L/d) (L/s) duty (L/s)<br />

(Local catchment) (System)<br />

No.<br />

(m 3 )<br />

1 28,910 1.004 4.00 12.79 15.28 hrs 10.62 hrs<br />

2 8,820 0.306 5.00 6.90 18.77 hrs 18.77 hrs<br />

* Total emergency storage consisting of both the pump sump (storage above high level<br />

alarm) <strong>and</strong> incoming drains (storage between inlet inverts <strong>and</strong> overflow levels).<br />

Note that for Pump Station 1, the time to overflow for the local catchment is<br />

greater than for the system. The reason for this is that if PS2 is operating then it<br />

will pump into pump station 1 reducing its storage time. If PS2 is not working<br />

i.e. a complete area wide power failure, then PS 1 only receives effluent from<br />

the gravity connections directly connected to the pump station catchment. This<br />

means that the storage time will be greater than if PS2 is pumping effluent into<br />

PS1.<br />

As there is no other contributing effluent into Pump Station 2 its storage time<br />

remains constant at 18.77 hrs.<br />

Table 4 presents the emergency storages available for the pump sumps only<br />

<strong>and</strong> could be considered the worst case scenario with no line storage included.<br />

Woodlane Waste<strong>water</strong> Disposal <strong>and</strong> Water Supply Preliminary Report<br />

Wallbridge & Gilbert/070250rp002RevB/January 2008 Page 14