11.01.2015 Views

wastewater disposal and water supply preliminary report woodlane

wastewater disposal and water supply preliminary report woodlane

wastewater disposal and water supply preliminary report woodlane

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. WATER SUPPLY SYSTEM<br />

3.1 GENERAL<br />

According to the Secon drawings the major components of the <strong>water</strong><br />

reticulation system are as follows:<br />

472m of 80mm diameter uPVC reticulation mains (sub-division)<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

130m of 40mm diameter uPVC reticulation mains (sub-division)<br />

226m of 80mm diameter uPVC reticulation mains (shacks area)<br />

28m of 25mm diameter uPVC pumping main (from river)<br />

41 connections, 25 mm diameter uPVC (sub-division)<br />

18 connections, 20 mm diameter uPVC (shacks area)<br />

1 <strong>water</strong> treatment plant<br />

2 booster <strong>water</strong> pumps, DAB Jet 100 MX, 0.4m 3 /hr–3.3 m 3 /hr, 1 Hp,<br />

51m head max (river)<br />

Lot 19 of the Mypolonga shack area is not connected to the <strong>water</strong> <strong>supply</strong>, <strong>and</strong><br />

the toilet block is believed to connect to the <strong>supply</strong> system as may have been<br />

indicated on Drawing 91632/P02 (as-constructed) <strong>and</strong> suggested from the<br />

feedback received from SA Water.<br />

Two Council-owned DAB Jet 100 MX booster pumps situated in a shed by the<br />

River Murray draws the river <strong>water</strong> to the <strong>water</strong> treatment plant via a 25mm<br />

pumping main with 0.75L/s duty at 6m head (see Appendix P Photo 28).<br />

3.2 WATER TREATMENT PLANT<br />

A flocculation <strong>and</strong> filtration plant, the FFA 75 atmospheric type <strong>water</strong> treatment<br />

plant at Woodlane was manufactured <strong>and</strong> installed in October 1998 by Abtech<br />

Environmental Services Pty Ltd.<br />

Council holds a copy of the Abtech Operation <strong>and</strong> Maintenance Manual for the<br />

plant (dated 12 October 1998), including diagnosis charts, technical data <strong>and</strong><br />

recommended chlorine dosage rates. A specification sheet of the plant is also<br />

available to Council (refer Appendix K) <strong>and</strong> based on the sheet <strong>and</strong> Secon as-<br />

Woodlane Waste<strong>water</strong> Disposal <strong>and</strong> Water Supply Preliminary Report<br />

Wallbridge & Gilbert/070250rp002RevB/January 2008 Page 20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!