DELIVERABLES<br />

Two copies <strong>of</strong> a written report <strong>and</strong> an electronic file <strong>of</strong> the documentation<br />

detailing assessment processes. A matrix shall be included in the report<br />

comparing the Beaches Energy Services program with the FRCC Compliance<br />

Program. The questions included in the FRCC Assessment Worksheet shall be<br />

fully addressed in the written report. An overall assessment <strong>of</strong> the Beaches<br />

Energy Services Compliance Program Plan shall be delivered. Recommendations<br />

shall be developed for each deficiency identified with enough clarity that<br />

corrective actions are readily understood <strong>and</strong> can be implemented by internal<br />

staff. The final report shall include recommendations to balance compliance<br />

efforts <strong>and</strong> operations in a seamless, quantifiable manner. It is essential the final<br />

report is written in sufficient detail to provide a clear underst<strong>and</strong>ing <strong>of</strong> the<br />

recommendations <strong>and</strong> direction to achieve <strong>project</strong> <strong>goals</strong> <strong>and</strong> <strong>objectives</strong>.<br />

SCHEDULE<br />

The assessment must be completed within 60 days <strong>of</strong> Beaches Energy Services<br />

issuing a PO. The final report must be completed within 90 days <strong>of</strong> issuing the<br />

purchase order notification. A formal presentation will be required to<br />

review/discuss the final report.<br />

EVALUATION<br />

Proposals will be evaluated separately <strong>and</strong> will receive a numeric score based on<br />

the values associated with the criteria identified below. Points will be totaled for<br />

a final score. The proposal awarded the most points will be recommended for<br />

award. Proposals that omit any <strong>of</strong> the items may be rejected as non-responsive.<br />

Each proposer who submits a response does so solely at the proposer’s cost, risk<br />

<strong>and</strong> expense.<br />

Factor<br />

Point<br />

Range<br />

Responsiveness to the RFP format, 10%<br />

content <strong>and</strong> <strong>scope</strong> <strong>of</strong> <strong>work</strong>.<br />

Consultant’s experience in successfully 40%<br />

performing similar <strong>work</strong>. Must demonstrate<br />

a broad knowledge <strong>of</strong> NERC <strong>and</strong> FRCC Reliability St<strong>and</strong>ards<br />

<strong>and</strong> compliance procedures.<br />

Quantifiable cost-efficiency methodology. 20%<br />

Experience in electric utility operations <strong>and</strong> maintenance. 30%