DELIVERABLES<br />
Two copies <strong>of</strong> a written report <strong>and</strong> an electronic file <strong>of</strong> the documentation<br />
detailing assessment processes. A matrix shall be included in the report<br />
comparing the Beaches Energy Services program with the FRCC Compliance<br />
Program. The questions included in the FRCC Assessment Worksheet shall be<br />
fully addressed in the written report. An overall assessment <strong>of</strong> the Beaches<br />
Energy Services Compliance Program Plan shall be delivered. Recommendations<br />
shall be developed for each deficiency identified with enough clarity that<br />
corrective actions are readily understood <strong>and</strong> can be implemented by internal<br />
staff. The final report shall include recommendations to balance compliance<br />
efforts <strong>and</strong> operations in a seamless, quantifiable manner. It is essential the final<br />
report is written in sufficient detail to provide a clear underst<strong>and</strong>ing <strong>of</strong> the<br />
recommendations <strong>and</strong> direction to achieve <strong>project</strong> <strong>goals</strong> <strong>and</strong> <strong>objectives</strong>.<br />
SCHEDULE<br />
The assessment must be completed within 60 days <strong>of</strong> Beaches Energy Services<br />
issuing a PO. The final report must be completed within 90 days <strong>of</strong> issuing the<br />
purchase order notification. A formal presentation will be required to<br />
review/discuss the final report.<br />
EVALUATION<br />
Proposals will be evaluated separately <strong>and</strong> will receive a numeric score based on<br />
the values associated with the criteria identified below. Points will be totaled for<br />
a final score. The proposal awarded the most points will be recommended for<br />
award. Proposals that omit any <strong>of</strong> the items may be rejected as non-responsive.<br />
Each proposer who submits a response does so solely at the proposer’s cost, risk<br />
<strong>and</strong> expense.<br />
Factor<br />
Point<br />
Range<br />
Responsiveness to the RFP format, 10%<br />
content <strong>and</strong> <strong>scope</strong> <strong>of</strong> <strong>work</strong>.<br />
Consultant’s experience in successfully 40%<br />
performing similar <strong>work</strong>. Must demonstrate<br />
a broad knowledge <strong>of</strong> NERC <strong>and</strong> FRCC Reliability St<strong>and</strong>ards<br />
<strong>and</strong> compliance procedures.<br />
Quantifiable cost-efficiency methodology. 20%<br />
Experience in electric utility operations <strong>and</strong> maintenance. 30%