Appendix B – <strong>Barren</strong> <strong>River</strong> <strong>Area</strong> <strong>Development</strong> <strong>District</strong> • DRAFT<br />

The sewage treatment plant discharges into the Green <strong>River</strong>. It was built in 1980, to a total<br />

rated capacity of 0.500 mgd. The dry weather load on the plant is about 0.230 mgd, with a<br />

wet weather load of about 0.450 mgd. There is an industrial pre-treatment program in place<br />

and it works very well. There are nine lift stations in the system, which serve both the<br />

residential and industrial customers. A study has shown that most of the infiltration/inflow<br />

comes from the older parts of the system which were constructed around 1935.<br />

Randell Gaskey who reports to the Morgantown Utility Board operates the sanitary sewer<br />

system. Sewer rates for residential and commercial customers are set at 110% of the total<br />

water bill.<br />

The treatment plant generally meets its permit requirements and the only problems<br />

experienced are from power failures, due to inclement weather.<br />

The capacity of the sewer treatment plant is great enough to support any future<br />

development. Currently, there are no plans to expand the capacity of the sewer treatment<br />

plant.<br />

Funds are needed to extend the collector system to households which are not currently<br />

served by Morgantown Utilities Sanitary Sewer System. Also, funds are needed for general<br />

maintenance and upkeep of the system.<br />

Proposed Projects 2000-2005<br />

SX21031001<br />

Priority Project Owner Cost Estimates Customers<br />

I MU $50,000 2<br />

This 1,000 linear feet sewer main, along Middle Ferry Road, will extend sanitary sewer<br />

services to two existing households.<br />

SX21031002<br />

Priority Project Owner Cost Estimates Customers<br />

I MU $100,000 5<br />

This 465 linear feet sewer main, along North Taylor Street, will connect existing sewer<br />

mains, to improve flow, and will serve an additional five households in the area.<br />

SX21031003<br />

Priority Project Owner Cost Estimates Customers<br />

I MU $90,000 8<br />