Barren River Area Development District - Kentucky: Infrastructure ...
Barren River Area Development District - Kentucky: Infrastructure ...
Barren River Area Development District - Kentucky: Infrastructure ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix B – <strong>Barren</strong> <strong>River</strong> <strong>Area</strong> <strong>Development</strong> <strong>District</strong> • DRAFT<br />
The sewage treatment plant discharges into the Green <strong>River</strong>. It was built in 1980, to a total<br />
rated capacity of 0.500 mgd. The dry weather load on the plant is about 0.230 mgd, with a<br />
wet weather load of about 0.450 mgd. There is an industrial pre-treatment program in place<br />
and it works very well. There are nine lift stations in the system, which serve both the<br />
residential and industrial customers. A study has shown that most of the infiltration/inflow<br />
comes from the older parts of the system which were constructed around 1935.<br />
Randell Gaskey who reports to the Morgantown Utility Board operates the sanitary sewer<br />
system. Sewer rates for residential and commercial customers are set at 110% of the total<br />
water bill.<br />
The treatment plant generally meets its permit requirements and the only problems<br />
experienced are from power failures, due to inclement weather.<br />
The capacity of the sewer treatment plant is great enough to support any future<br />
development. Currently, there are no plans to expand the capacity of the sewer treatment<br />
plant.<br />
Funds are needed to extend the collector system to households which are not currently<br />
served by Morgantown Utilities Sanitary Sewer System. Also, funds are needed for general<br />
maintenance and upkeep of the system.<br />
Proposed Projects 2000-2005<br />
SX21031001<br />
Priority Project Owner Cost Estimates Customers<br />
I MU $50,000 2<br />
This 1,000 linear feet sewer main, along Middle Ferry Road, will extend sanitary sewer<br />
services to two existing households.<br />
SX21031002<br />
Priority Project Owner Cost Estimates Customers<br />
I MU $100,000 5<br />
This 465 linear feet sewer main, along North Taylor Street, will connect existing sewer<br />
mains, to improve flow, and will serve an additional five households in the area.<br />
SX21031003<br />
Priority Project Owner Cost Estimates Customers<br />
I MU $90,000 8<br />
9:14 AM 18 04/06/00