Barren River Area Development District - Kentucky: Infrastructure ...
Barren River Area Development District - Kentucky: Infrastructure ...
Barren River Area Development District - Kentucky: Infrastructure ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Appendix B – <strong>Barren</strong> <strong>River</strong> <strong>Area</strong> <strong>Development</strong> <strong>District</strong> • DRAFT<br />
Proposed Projects 2000-2005<br />
SX21141015<br />
Priority Project Owner Cost Estimates Customers<br />
I Adairville $300,000 1,320<br />
This project consists of correcting the inflow and infiltration problem of the original system<br />
built in the 1960’s.<br />
SX21141016<br />
Priority Project Owner Cost Estimates Customers<br />
I Adairville $155,000 7<br />
This 240 linear feet sewer main extension, along Red <strong>River</strong> Drive and First Street, will<br />
extend sanitary sewer services to 7 existing households and enhance growth in the area.<br />
Proposed Projects 2006-2020<br />
SX21141017<br />
Priority Project Owner Cost Estimates Customers<br />
L Adairville $500,000 1,320<br />
This 5,100 linear feet sewer main extension and lift stations, near the Industrial Park, will<br />
extend sanitary sewer services to 1,320 existing households and enhance growth in the area.<br />
SX21141018<br />
Priority Project Owner Cost Estimates Customers<br />
L Adairville $175,000 20<br />
This 2,000 linear feet sewer main extension, near the Franklynn Hills subdivision, will<br />
extend sanitary sewer services to 20 existing households and enhance growth in the area.<br />
SX21141019<br />
Priority Project Owner Cost Estimates Customers<br />
L Adairville $200,000 25<br />
This 1,600 linear feet sewer main extension, along Railroad Street and School Avenue, will<br />
extend sanitary sewer services to 25 existing households and enhance growth in the area.<br />
SX21141020<br />
Priority Project Owner Cost Estimates Customers<br />
L Adairville $100,000 System-wide<br />
This 2,500 linear feet sewer main extension, along Cemetery Street, will improve sanitary<br />
sewer services to the entire system and enhance growth in the area.<br />
SX21141021<br />
Priority Project Owner Cost Estimates Customers<br />
L Adairville $200,000 System-wide<br />
This 2,500 linear feet sewer main extension, near the northern city limits, will improve<br />
sanitary sewer services to the entire system and enhance growth in the area.<br />
9:14 AM 29 04/06/00