Guideline to the Waste Management Plan - Department of Housing ...
Guideline to the Waste Management Plan - Department of Housing ...
Guideline to the Waste Management Plan - Department of Housing ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Guideline</strong> <strong>to</strong> <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong> 2012-2014 Page 5 <strong>of</strong> 16<br />
Specialist practices<br />
Apart from <strong>the</strong> <strong>of</strong>fice practices which apply <strong>to</strong> all service areas <strong>of</strong> <strong>the</strong> department, <strong>the</strong>re are<br />
also more specialist measures which are managed by relevant service areas in accordance<br />
with <strong>the</strong>ir core activities. Some examples are:<br />
Avoidance:<br />
• Managing work and disposal practices for hazardous materials, for example<br />
managing asbes<strong>to</strong>s-containing materials in accordance with whole-<strong>of</strong>-Government<br />
Asbes<strong>to</strong>s <strong>Management</strong> and Control Policy for Government Buildings - QBuild,<br />
Project Services (Building and Asset Services after 1 July 2013), Technical Services<br />
• Promoting <strong>the</strong> use <strong>of</strong> ecologically sustainable fit out guidelines in all <strong>of</strong>fice fi<strong>to</strong>uts –<br />
Accommodation Office<br />
• Recycling or reuse <strong>of</strong> surplus materials on construction/demolition sites – Project<br />
Services, QBuild (Building and Asset Services after 1 July 2013).<br />
Reuse:<br />
• Composting green waste generated at nurseries for use on outdoor landscaped<br />
areas – QBuild (Building and Asset Services after 1 July 2013)<br />
• Managing reuse <strong>of</strong> surplus materials on construction/demolition sites – Project<br />
Services, QBuild (Building and Asset Services after 1 July 2013).<br />
Recycling:<br />
• Managing recycling <strong>of</strong> surplus materials on construction/demolition sites – Project<br />
Services, QBuild (Building and Asset Services after 1 July 2013)<br />
• Promoting specific recycling initiatives – Accommodation Office, Project Services,<br />
QBuild (Building and Asset Services after 1 July 2013), Technical Services,<br />
QGCPO.<br />
6 The <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong><br />
The <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong> 2012-2014 is based around five main objectives, with each<br />
objective having a small number <strong>of</strong> strategies <strong>to</strong> guide approaches <strong>to</strong> achieving those<br />
objectives.<br />
The <strong>Plan</strong> acts as a concise generic template <strong>to</strong> which fur<strong>the</strong>r detail can be added <strong>to</strong> form a<br />
specific waste management action plan tailored <strong>to</strong> <strong>the</strong> core functions <strong>of</strong> an individual<br />
service area if required. Each strategy can be fur<strong>the</strong>r elaborated upon by specific activities,<br />
as illustrated by a Service Area <strong>Waste</strong> <strong>Management</strong> Action <strong>Plan</strong> template provided as an<br />
appendix <strong>to</strong> <strong>the</strong> <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong>.<br />
7 Responsibilities <strong>of</strong> Service Areas<br />
Generally, each individual service area in <strong>the</strong> department is required <strong>to</strong> moni<strong>to</strong>r and record<br />
its own waste management activities in accordance with <strong>the</strong> objectives and strategies<br />
outlined in <strong>the</strong> departmental <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong>.<br />
A table summarising <strong>the</strong> responsibilities <strong>of</strong> individual service areas for each strategy within<br />
each objective as per <strong>the</strong> <strong>Waste</strong> <strong>Management</strong> <strong>Plan</strong> is provided as Appendix 1.<br />
Technical Services April 2013