Action Plan 2000<br />
on Climate Change<br />
FACILITATING GREATER REUSE AND RECYCLING OF STRUCTURAL STEEL IN THE CONSTRUCTION AND DEMOLITION PROCESS<br />
<strong>Reuse</strong>-<strong>Steel</strong> Case Study 5<br />
<strong>The</strong> <strong>Development</strong> <strong>of</strong> <strong>the</strong> <strong>Angus</strong> Technopôle <strong>Building</strong><br />
Montréal, Québec<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Project summary<br />
Client<br />
Contractor<br />
Architects<br />
Structural engineers<br />
Mechanical and electrical<br />
engineers<br />
Environmental consultants<br />
Project cost<br />
Société de Développement <strong>Angus</strong><br />
Construction C&G Beaulieu Incorporated<br />
AEdifica<br />
Guy Favreau (partner-in-charge)<br />
Dessau Soprin (phase 1)<br />
SNC-Lavalin Environnement<br />
Incorporated (phase 2)<br />
Dessau Soprin (phase 1)<br />
Pellemon Incorporated (phase 2)<br />
SNC-Lavalin environnement Incorporated<br />
$10 million (phase 1)<br />
$10 million (phase 2)<br />
www.reuse-steel.org
Action Plan 2000<br />
on Climate Change<br />
FACILITATING GREATER REUSE AND RECYCLING OF STRUCTURAL STEEL IN THE CONSTRUCTION AND DEMOLITION PROCESS<br />
<strong>Reuse</strong>-<strong>Steel</strong> Case Study 5<br />
<strong>The</strong> <strong>Development</strong> <strong>of</strong> <strong>the</strong> <strong>Angus</strong> Technopôle <strong>Building</strong><br />
Montréal, Québec<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
Project summary<br />
Client<br />
Contractor<br />
Architects<br />
Structural engineers<br />
Mechanical and electrical<br />
engineers<br />
Environmental consultants<br />
Project cost<br />
Société de Développement <strong>Angus</strong><br />
Construction C&G Beaulieu Incorporated<br />
AEdifica<br />
Guy Favreau (partner-in-charge)<br />
Dessau Soprin (phase 1)<br />
SNC-Lavalin Environnement<br />
Incorporated (phase 2)<br />
Dessau Soprin (phase 1)<br />
Pellemon Incorporated (phase 2)<br />
SNC-Lavalin environnement Incorporated<br />
$10 million (phase 1)<br />
$10 million (phase 2)<br />
www.reuse-steel.org
TM<br />
TM 1<br />
TM