15.01.2015 Views

Engr. Ali Javed - University of Engineering and Technology, Taxila

Engr. Ali Javed - University of Engineering and Technology, Taxila

Engr. Ali Javed - University of Engineering and Technology, Taxila

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The S<strong>of</strong>tware Teams<br />

24<br />

<br />

Mantei describes seven factors that should be considered when<br />

planning team structure:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Difficulty <strong>of</strong> task<br />

Size <strong>of</strong> resultant code (no. <strong>of</strong> lines)<br />

Time that team will stay together<br />

Degree <strong>of</strong> modularization<br />

Required quality <strong>and</strong> reliability <strong>of</strong> the system being built<br />

Rigidity <strong>of</strong> delivery date (schedule)<br />

Degree <strong>of</strong> communication<br />

<strong>Engr</strong>. <strong>Ali</strong> <strong>Javed</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!