15.01.2015 Views

Engr. Ali Javed - University of Engineering and Technology, Taxila

Engr. Ali Javed - University of Engineering and Technology, Taxila

Engr. Ali Javed - University of Engineering and Technology, Taxila

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The Process<br />

33<br />

<br />

<br />

A s<strong>of</strong>tware process provides the framework from which a<br />

comprehensive plan for s<strong>of</strong>tware development can be<br />

established.<br />

Common process framework activities which are applicable to<br />

all s<strong>of</strong>tware projects are:<br />

<br />

<br />

<br />

<br />

<br />

Communication<br />

Planning<br />

Modeling<br />

Construction<br />

Deployment<br />

<strong>Engr</strong>. <strong>Ali</strong> <strong>Javed</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!