Tablelands Information Pack - Issue 1 - 04 Sep ... - Queensland Rail
Tablelands Information Pack - Issue 1 - 04 Sep ... - Queensland Rail
Tablelands Information Pack - Issue 1 - 04 Sep ... - Queensland Rail
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
(#) Steel sleepered track and timber sleepered track with interspersed steel sleepers shall<br />
be regarded as equivalent to timber sleepered track for track stability.<br />
Speed restrictions may also be put in place after maintenance activities in accordance<br />
with QR Safety Standards.<br />
On this system, the design neutral temperature is higher than elsewhere in the State<br />
resulting in less operational constraints at higher air temperatures.<br />
The extent of restriction will depend upon the type of maintenance activity and risk of track<br />
misalignments.<br />
Force Majeure Events will also see the imposition of speed restrictions, the extent and<br />
severity of the restrictions being dependent on the event.<br />
TRACKSIDE DETECTION EQUIPMENT<br />
Dragging Equipment Detectors (DED)<br />
There are no dragging equipment detectors on this System.<br />
Hot Box / Hot Wheel Detectors (HBD/HWD)<br />
There are no Hot Box / Hot Wheel Detectors on this System.<br />
Axle Counters<br />
There are no axle counters used on this System.<br />
Over Height Container Detector and Signal<br />
Located at 8.6 km with associated two aspect Red/Green Signal at 9.9 km on the Cairns<br />
- Redlynch section, to detect containers over 2.65 m in height. Over height containers,<br />
once identified are detached at Redlynch.<br />
WEIGHBRIDGES<br />
The are no weighbridges on this System.<br />
INFORMATION SYSTEMS<br />
Operator performance is monitored (trains passing selected sites) throughout the system,<br />
with details of performance uploaded to QR’s mainframe based Freight Management<br />
System (FMS), Normanton - Croydon excluded.<br />
Train consist details, wagon and loading details as well as locations are available from<br />
QR’s mainframe based Yard Control System (YCS). Details of all rollingstock passed by<br />
the Rollingstock Authorisation Process are entered into the YCS, preventing the illegal<br />
entry of non-authorised traffic onto the system.<br />
Real-time monitoring of train loading data allows management of overload issues.<br />
TABLELANDS SYSTEM INFORMATION PACK<br />
ISSUE 1 - DATE <strong>04</strong>-09-2002<br />
20