Ministry of Relief, Rehabilitation & Reconstruction Loan
Ministry of Relief, Rehabilitation & Reconstruction Loan
Ministry of Relief, Rehabilitation & Reconstruction Loan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Ministry</strong> <strong>of</strong> <strong>Relief</strong>, <strong>Rehabilitation</strong> & <strong>Reconstruction</strong><br />
<strong>Loan</strong><br />
Implementing Agency Project Agreement<br />
Date/Closing Date<br />
Donor Main activities Currency<br />
Amount in mn<br />
Total<br />
loan<br />
Dis. up to<br />
31/03/05<br />
Total<br />
loan<br />
In US$ mn<br />
Dis. up to<br />
31/03/05<br />
Current Status<br />
M / <strong>Rehabilitation</strong><br />
<strong>Rehabilitation</strong> <strong>of</strong> Bridges<br />
Resettlement & Refugees in the North & East<br />
Contact Person<br />
Mr. Harim Peiris, Director<br />
General (Team Leader for<br />
the project) <strong>Ministry</strong> <strong>of</strong> <strong>Relief</strong>,<br />
<strong>Rehabilitation</strong> &<br />
Reconciliation<br />
Tel :2384112<br />
Miss. B. Nallathambi, Project<br />
Director Tel: 2392236<br />
04.06.2003<br />
29.06.2006<br />
HSBC<br />
Supply and construction <strong>of</strong><br />
89 bridges & 2 ferries in the<br />
North & East.<br />
JPK 3.7 3.1 34.9 29.1 Project implementation commenced.<br />
M / <strong>Rehabilitation</strong><br />
Resettlement & Refugees<br />
<strong>Rehabilitation</strong> <strong>of</strong><br />
Bridges(mobilisation) in<br />
Contact Person<br />
Mr. Harim Peiris, Director<br />
General (Team Leader for<br />
the project) <strong>Ministry</strong> <strong>of</strong> <strong>Relief</strong>,<br />
<strong>Rehabilitation</strong> &<br />
Reconciliation<br />
Tel :2384112<br />
the North & East ,<br />
M / <strong>Rehabilitation</strong><br />
Resettlement & Refugees<br />
Second North East<br />
Irrigated Agriculture<br />
Project II<br />
04.06.2003<br />
04.12.2003<br />
10.03.2003<br />
30.06.2008<br />
HSBC Do JPK 0.7 O.7 5.8 5.8 Project implementation commenced.<br />
WB<br />
Support conflict affected<br />
communities in North & East<br />
and the adjoining areas to<br />
restore livelihood, enhance<br />
agricultural and other<br />
productions and incomes,<br />
and build their capacity for<br />
sustainable, social and<br />
economic re-integration.<br />
SDR 44.6 0.0 67.4 0.0 * Preparation work completed.<br />
* Development Credit Agreement signed in<br />
July 2004.<br />
* Project Agreement between IDA and<br />
NEPC signed in Sept. 2004.<br />
* Project Agreement between WB & NEPC<br />
signed in September 2004.
Implementing Agency Project Agreement<br />
Date/Closing Date<br />
Donor Main activities Currency<br />
Amount in mn<br />
Total<br />
loan<br />
Dis. up to<br />
31/03/05<br />
Total<br />
loan<br />
In US$ mn<br />
Dis. up to<br />
31/03/05<br />
Current Status<br />
North East Coastal<br />
Community<br />
Contact Person:<br />
Development Project<br />
Project Director: Mr.<br />
S.M.Croos<br />
Tel:<br />
ERD : Ms Suranga Vithanage,<br />
AD<br />
Tele : 2484714 , Fax :<br />
2447633<br />
e-mail : suranga@erd.gov.lk<br />
16.06.2004<br />
31.12.2009<br />
ADB<br />
Sustainable livelihood<br />
improvement.<br />
Resource management in 3<br />
special management areas<br />
(SMAs- Trincomalee bay,<br />
Batticoloa lagoon, Southern<br />
Ampara, Bio diversity zone).<br />
Coastal Resource planning<br />
Fisheries Development<br />
SDR 14 0.4 21.2 0.7 Agreement were signed. Relevant<br />
documents forwarded to Attorney Generals<br />
Department to obtain legal opinion.<br />
Subsidiary loan agreement prepared and<br />
forwarded it to the ADB for comments and<br />
final draft forwarded to NDTF.
Implementing Agency Project Agreement<br />
Date/Closing Date<br />
Donor Main activities Currency<br />
Amount in mn<br />
Total<br />
loan<br />
Dis. up to<br />
31/03/05<br />
Total<br />
loan<br />
In US$ mn<br />
Dis. up to<br />
31/03/05<br />
Current Status<br />
M / RRR<br />
Contact Person:<br />
Project Dir: Mr.<br />
P.Ramanathan<br />
Tel: 026-2222468 Fax: 026-<br />
2224006<br />
026- 2224005<br />
e-mail: neiap@sltnet.lk<br />
ERD- Ms.R.A.Champika, AD<br />
Tel: 2484793 Fax: 2447633<br />
e-mail: champika@erd.gov.lk<br />
North East Irrigated<br />
Agricultural Project II<br />
23.07.2004<br />
30.06.2011<br />
WB<br />
<strong>Rehabilitation</strong> <strong>of</strong> 400 small<br />
irrigation schemes with area<br />
<strong>of</strong> 16,000 ha.<br />
NGO support for Social<br />
Mobilization<br />
Community level small<br />
construction and training <strong>of</strong><br />
beneficiaries and<br />
<strong>Rehabilitation</strong> <strong>of</strong> 1200 Km <strong>of</strong><br />
rural roads.<br />
Construction <strong>of</strong> 300 nos.<br />
drinking water wells.<br />
Feasibility study for<br />
rehabilitation <strong>of</strong> 10 selected<br />
major/medium irrigation<br />
schemes<br />
1. DCA has been amended to facilitate<br />
livelihood support activities in January<br />
2003<br />
2. <strong>Rehabilitation</strong> <strong>of</strong> small scalle irrigation<br />
schemes-191 completed, 193 to be<br />
completed.<br />
3. <strong>Rehabilitation</strong> <strong>of</strong> rural roads-698 Km<br />
completed, 526 Km to be completed.<br />
4. Drinking water wells -438 completed,<br />
356 to be completed.<br />
5. Common assets (Multi purpose<br />
Buildings) - 212 completed, 163 to be<br />
completed.<br />
6. Individual Assets (Livelihood Support<br />
Activities) - 10431 individual projects<br />
completed, 7824 to be completed.<br />
7. Vehicles & Equipments cleared by the<br />
W.B have been delivered.<br />
8. Workplan for Jaffna: The consultants<br />
have completed a rapid assessment study<br />
to streame line the planning and<br />
implementation <strong>of</strong> project intervention in<br />
Jaffna district. It is now accepted for<br />
implementation.<br />
9. Chief Secretary <strong>of</strong> NEPC has initiated<br />
the process to expand the project for<br />
phase II with a credit allocation <strong>of</strong> Rs 7,000<br />
mn.
Implementing Agency Project Agreement<br />
Date/Closing Date<br />
Donor Main activities Currency<br />
Amount in mn<br />
Total<br />
loan<br />
Dis. up to<br />
31/03/05<br />
Total<br />
loan<br />
In US$ mn<br />
Dis. up to<br />
31/03/05<br />
Current Status<br />
<strong>Ministry</strong> <strong>of</strong> RRR<br />
North East Housing<br />
Contact Person<br />
<strong>Reconstruction</strong><br />
Mr S.M. Crooz 0777 227341 Programme<br />
Chief Secretary’s Office<br />
Inner Harbour Rd.,<br />
Tricomalee<br />
Tel : 026 225325<br />
Fax : 026 2225335<br />
E-mail pdepccdp@sltnet.lk<br />
WB<br />
1. Environmental and Social<br />
Assessment<br />
2. Land Surveys<br />
3. Programme Management<br />
and Preparation<br />
4. Consultation<br />
5. Other Project Preparation<br />
Studies<br />
Agreement is readay to be signed soon.<br />
Grant<br />
Implementing Agency Project Agreement<br />
Date/Closing Date<br />
Donor<br />
Main activities<br />
Currency<br />
Amount in mn<br />
Total<br />
grant<br />
Dis. up to<br />
31/03/05<br />
Total<br />
grant<br />
In US$ mn<br />
Dis. up to<br />
31/03/05<br />
Current Status<br />
M / <strong>Relief</strong>, <strong>Rehabilitation</strong> &<br />
Reconciliation<br />
Contact Person<br />
Project Dir : Mr. T.<br />
Lankanesan<br />
Tel : 026 2222511 , Fax : 026<br />
2227555<br />
ERD : Mr S M Piyatissa, AD<br />
Tel : 484788 , Fax : 447633<br />
e-mail : piyatissa@erd.gov.lk<br />
<strong>Rehabilitation</strong> Measures<br />
in the North & East<br />
24.06.2003<br />
03.06.2005<br />
Germany<br />
[gtz]<br />
Provide technical assistance<br />
for the authorities at national,<br />
provincial, district level and<br />
also NGO self-help groups,<br />
to plan with the involvement<br />
<strong>of</strong> the population, and<br />
implement rehabilitation and<br />
reconstruction measures in<br />
the North -East.<br />
EUR 4.0 2.3 5.2 3.0 Assistance has been provided in planning<br />
and capacity development <strong>of</strong> partner<br />
organisations. A series <strong>of</strong> tailar-made<br />
capacity building workshops for small and<br />
medium size contractors <strong>of</strong> North and<br />
East.
Implementing Agency Project Agreement<br />
Date/Closing Date<br />
Donor Main activities Currency<br />
Amount in mn<br />
Total<br />
loan<br />
Dis. up to<br />
31/03/05<br />
Total<br />
loan<br />
In US$ mn<br />
Dis. up to<br />
31/03/05<br />
Current Status<br />
M/y <strong>of</strong> RRR<br />
Project Coordinator:<br />
Dr. Kunasingham<br />
Tel: 2372151<br />
Creating Dividend for<br />
Peace<br />
01/01/2003 to<br />
31/12/2004<br />
UNDP<br />
Purpose <strong>of</strong> the project is to<br />
strengthen the capacities at<br />
local, provincial & National<br />
levels for implementation <strong>of</strong><br />
RRR frame work.<br />
USD 0.2 0.1 0.2 0.1 Project in operation there are no major<br />
issues<br />
Project Coordinator:<br />
Dr. Kunasingham<br />
Support to the Sri Lanka<br />
National Mine Action<br />
Project<br />
15/03/2002 to<br />
31/12/2004<br />
UNDP<br />
The project is to strengthen<br />
Local and national capacity<br />
for minor action and provide<br />
advisory support to the<br />
Govt., NGOs and local<br />
institutions concerns in Mine<br />
Action.<br />
USD 0.8 0.8 0.8 0.8 Mine Action Programme is coordinated by<br />
the UNDP & M/y <strong>of</strong> RRR
Implementing Agency Project Agreement<br />
Date/Closing Date<br />
Donor Main activities Currency<br />
Amount in mn<br />
Total<br />
loan<br />
Dis. up to<br />
31/03/05<br />
Total<br />
loan<br />
In US$ mn<br />
Dis. up to<br />
31/03/05<br />
Current Status<br />
Tel.2392137<br />
2386772<br />
Fax.<br />
<strong>Relief</strong> recovery<br />
assistance to conflict<br />
areas<br />
5.3.2002<br />
31.12.2004<br />
WFP<br />
* <strong>Relief</strong> supply <strong>of</strong> individual<br />
rations to the most<br />
vulnerable <strong>of</strong> the conflict<br />
people.<br />
* Primary living in welfare<br />
centers, recovery activities.<br />
USD 22.9 8.3 22.9 8.3 The following world food items were<br />
received and delivered;<br />
-Rice - 6,574 MT (out <strong>of</strong> 37,892 MT).<br />
-Pulses - 645 MT (out <strong>of</strong> 4,210 MT).<br />
-Sugar - 479 (out <strong>of</strong> 2278 MT).<br />
-Additional canned fish - 28 MT.WFp is<br />
planning for the next phase <strong>of</strong> PRRO in<br />
2005-2006.<br />
ERD :Mr. H. N. Jayaweera,<br />
DD<br />
Tel: 2484695 Fax: 2447633<br />
e-mail: nelum@erd.gov.lk<br />
Jaffna Water<br />
Conservation &<br />
Environment<br />
Management Project<br />
30.07. 2003<br />
30.07. 2006<br />
Norway<br />
Enhance the social and<br />
economic development<br />
potential <strong>of</strong> the Jaffna District<br />
through the<br />
conservation,management<br />
and sustainable use <strong>of</strong> its<br />
water and related resources.<br />
NOK 13.0 3.0 2.1 0.5 Site Surveys and Structural Designs<br />
completed for Valukai Aru Scheme<br />
rehabilitation,Drainage and environmental<br />
rehabilitation <strong>of</strong> Jaffna MC area,<br />
<strong>Rehabilitation</strong> <strong>of</strong> Ariyalai barrage and<br />
seperation <strong>of</strong> bunds. Water quality<br />
Investigation & Rain water harvesting<br />
faciloities have been establish in Jaffna<br />
Town, Point Pedro and Velanai. Survey<br />
was completed for 18 ponds prioratised by<br />
Municipal Council. A location selected for<br />
compost making Factory. Preporatary work<br />
commenced<br />
M/<strong>Relief</strong>, <strong>Rehabilitation</strong> &<br />
Reconciliation<br />
Contact Person<br />
FAO Representative <strong>of</strong> Sri<br />
Lanka<br />
T.P. 011-2580798<br />
011-2588537 Fax :<br />
011-2587990<br />
ERD: Contact person Mr.<br />
T.M.J. BandaraTel: 94-11-<br />
2484791 Fax: 2447633<br />
e-mail:<br />
jayarathne@erd.gov.lk<br />
Emergency assistance June 2004<br />
for the rehabilitation <strong>of</strong> January 2005<br />
agriculture- based<br />
livelihoods <strong>of</strong> recently<br />
resettled IDP families in<br />
the districts <strong>of</strong><br />
Kilinochchi, Mulative and<br />
Trincomalee, North East<br />
Province <strong>of</strong> Sri Lanka<br />
FAO<br />
To provide training and<br />
agricultural inputs to 3.102<br />
vulnerable families<br />
as at 31.12.2004<br />
Work is in progress.