TONKIN & TAYLOR LTD<br />

<strong>Environment</strong>al and Engineering Consultants<br />

• Bukit Tagar Landfill, Klang Valley, Malaysia<br />

Berjaya Corporation Limited, 2004<br />

Senior Hydrologist<br />

Responsible for a detailed hydrological impact assessment and the stormwater drainage master plan for this<br />

large and modern landfill located 50 km north of Kuala Lumpur. The landfill has a 260 hectare footprint<br />

and capacity for 120 million tonnes of refuse, sufficient to handle the entire solid waste generated in Kuala<br />

Lumpur and Selangor for the next 50 years. This project won the 2008 Institute of Engineers Malaysia’s<br />

Outstanding Engineering Award and the 2008 Association of Consulting Engineers of Malaysia’s Gold<br />

Medal Award.<br />

• South Coast and East Coast Roads, Western Samoa<br />

Downer Construction, 1997<br />

Senior Engineer<br />

Responsible for hydrological design and detailed drainage design of culverts and fords for 22 km of<br />

roading for the island of Upolu, Western Samoa in design-build contract.<br />

• Silverstream Landfill<br />

Hutt City Council, 2003-2004<br />

Senior Engineer<br />

Responsible for design of overall drainage concept, individual drainage elements (including diversion<br />

channels, drop structures, berm drains, culverts and energy dissipating structures) and sedimentation ponds<br />

for the Silverstream landfill in Upper Hutt.<br />

• Kate Valley Landfill<br />

Transwaste <strong>Canterbury</strong> Ltd, 2001 & 2004<br />

Senior Hydrologist<br />

Review of site hydrology (Kate Creek) and water source and storage options for construction water supply.<br />

Review of hydrological design of the water supply dam and silt dam.<br />

• Grey River Rail Bridge<br />

Tranz Rail Ltd, 1996-2004<br />

Senior Hydrologist / Hydraulic Engineer<br />

Reviewed flood hydrology of the Grey River and assessed hydraulic impacts, particularly backwater<br />

effects, of the proposed replacement rail bridge crossing of the Grey River, Greymouth. Pier scour<br />

computations, for both the existing and replacement bridges, and abutment protection design.<br />

• Redvale Sanitary Landfill: River Flow Monitoring Station<br />

Waste Management New Zealand Ltd<br />

Senior Engineer<br />

Site investigation, design and specification of a permanent flow monitoring station on the Rangitopuni<br />

Stream below the Dairy Flat landfill, Rodney.<br />

• Puwera Landfill<br />

Whangarei District Council, 2000-2001<br />

Senior Engineer<br />

Design of overall drainage concept, individual drainage elements (diversion channels, drop structures,<br />

berm drains, culverts, etc) and sedimentation ponds for proposed Puwera landfill near Whangarei.<br />

<br />

Cypress Coalfield Development<br />

West Coast Regional Council, 2004<br />

Peer Reviewer Hydrology<br />

Review of Solid Energy’s assessment of hydrological effects in its consent develop and operate an open<br />

cast coal mine within the Waimangaroa Mining Permit Area on the West Coast of the South Island. The<br />

hydrological component of the review considered water quality, water management and dam safety aspects<br />

(St Patricks Dam).<br />