David Leong - Appendix 1 - Environment Canterbury
David Leong - Appendix 1 - Environment Canterbury
David Leong - Appendix 1 - Environment Canterbury
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
TONKIN & TAYLOR LTD<br />
<strong>Environment</strong>al and Engineering Consultants<br />
• Bukit Tagar Landfill, Klang Valley, Malaysia<br />
Berjaya Corporation Limited, 2004<br />
Senior Hydrologist<br />
Responsible for a detailed hydrological impact assessment and the stormwater drainage master plan for this<br />
large and modern landfill located 50 km north of Kuala Lumpur. The landfill has a 260 hectare footprint<br />
and capacity for 120 million tonnes of refuse, sufficient to handle the entire solid waste generated in Kuala<br />
Lumpur and Selangor for the next 50 years. This project won the 2008 Institute of Engineers Malaysia’s<br />
Outstanding Engineering Award and the 2008 Association of Consulting Engineers of Malaysia’s Gold<br />
Medal Award.<br />
• South Coast and East Coast Roads, Western Samoa<br />
Downer Construction, 1997<br />
Senior Engineer<br />
Responsible for hydrological design and detailed drainage design of culverts and fords for 22 km of<br />
roading for the island of Upolu, Western Samoa in design-build contract.<br />
• Silverstream Landfill<br />
Hutt City Council, 2003-2004<br />
Senior Engineer<br />
Responsible for design of overall drainage concept, individual drainage elements (including diversion<br />
channels, drop structures, berm drains, culverts and energy dissipating structures) and sedimentation ponds<br />
for the Silverstream landfill in Upper Hutt.<br />
• Kate Valley Landfill<br />
Transwaste <strong>Canterbury</strong> Ltd, 2001 & 2004<br />
Senior Hydrologist<br />
Review of site hydrology (Kate Creek) and water source and storage options for construction water supply.<br />
Review of hydrological design of the water supply dam and silt dam.<br />
• Grey River Rail Bridge<br />
Tranz Rail Ltd, 1996-2004<br />
Senior Hydrologist / Hydraulic Engineer<br />
Reviewed flood hydrology of the Grey River and assessed hydraulic impacts, particularly backwater<br />
effects, of the proposed replacement rail bridge crossing of the Grey River, Greymouth. Pier scour<br />
computations, for both the existing and replacement bridges, and abutment protection design.<br />
• Redvale Sanitary Landfill: River Flow Monitoring Station<br />
Waste Management New Zealand Ltd<br />
Senior Engineer<br />
Site investigation, design and specification of a permanent flow monitoring station on the Rangitopuni<br />
Stream below the Dairy Flat landfill, Rodney.<br />
• Puwera Landfill<br />
Whangarei District Council, 2000-2001<br />
Senior Engineer<br />
Design of overall drainage concept, individual drainage elements (diversion channels, drop structures,<br />
berm drains, culverts, etc) and sedimentation ponds for proposed Puwera landfill near Whangarei.<br />
<br />
Cypress Coalfield Development<br />
West Coast Regional Council, 2004<br />
Peer Reviewer Hydrology<br />
Review of Solid Energy’s assessment of hydrological effects in its consent develop and operate an open<br />
cast coal mine within the Waimangaroa Mining Permit Area on the West Coast of the South Island. The<br />
hydrological component of the review considered water quality, water management and dam safety aspects<br />
(St Patricks Dam).<br />
10<br />
<strong>David</strong> <strong>Leong</strong>