20.01.2015 Views

(IMD) was established in - India Meteorological Department

(IMD) was established in - India Meteorological Department

(IMD) was established in - India Meteorological Department

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>India</strong> <strong>Meteorological</strong> <strong>Department</strong><br />

2. Numerical Weather Prediction (NWP) Centre<br />

Global Forecast System (GFS) at T382L64 ( 35 km) resolution has been implemented at <strong>IMD</strong> Delhi on IBM based<br />

High Performance Comput<strong>in</strong>g Systems (HPCS). The new GFS is runn<strong>in</strong>g 2 times a day (00 and 12 UTC) with global<br />

data assimilation and forecast for 7 days. This new higher resolution global forecast model and the correspond<strong>in</strong>g<br />

assimilation system are adopted from NCEP, USA.<br />

Weather Research & Forecast (WRF-Var) System : The regional mesoscale analysis system (WRF-Var) is<br />

<strong>in</strong>stalled on HPCS at <strong>IMD</strong>, Delhi with its all components i.e. pre-process<strong>in</strong>g programs, observation assimilation<br />

program (WRF-Var), boundary condition updation and forecast<strong>in</strong>g model. The model runs with 2 doma<strong>in</strong>s (27 km<br />

and 9 km) at 00 and 12 UTC and forecasts for 3 days.<br />

WRF Non-hydrostatic Mesoscale Model (WRF-<br />

NMM) for tropical cyclone forecast. Run at the time of<br />

tropical cyclone over the <strong>India</strong>n Seas.<br />

Polar WRF for predict<strong>in</strong>g weather conditions over<br />

Antarctica (Maitri), implemented <strong>in</strong> <strong>IMD</strong> <strong>in</strong> October<br />

2010. Forecast of 10m w<strong>in</strong>ds and 2m Temperature for<br />

24 hours over Maitri region.<br />

Extreme Temperature Forecast<strong>in</strong>g : <strong>IMD</strong> from beg<strong>in</strong>n<strong>in</strong>g of 2010 has implemented extreme temperature (Maximum<br />

& M<strong>in</strong>imum) determ<strong>in</strong>istic forecast for two weeks and the monthly probability forecast of extreme temperatures<br />

us<strong>in</strong>g the ensemble members of coupled model outputs.<br />

0<br />

Forecast maximum temperature ( C) anomaly<br />

Based on 08 Apr 2010, valid for 12-18 Apr 2010<br />

0<br />

Forecast m<strong>in</strong>imum temperature ( C) anomaly<br />

Based on 30 Dec 2010, valid for 3-9 Jan 2011<br />

Porbability (%) of Below Normal Maximum Temp<br />

Valid for December 2010 (Based on Nov. 2010)<br />

Porbability (%) of Below Normal M<strong>in</strong>imum Temp<br />

Valid for December 2010 (Based on Nov. 2010)<br />

4<br />

In the Service of Nation S<strong>in</strong>ce 1875

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!