Specification Sheets
Specification Sheets
Specification Sheets
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ACCESSORIES—UPFLOW<br />
VENT TERMINATION KITS<br />
CONCENTRIC: Vertical/Horizontal = RXGY-E03<br />
HORIZONTAL TWO PIPE: RXGY-D02, RXGY-D03, RXGY-D04<br />
RXGP-F03<br />
TWINNING KIT—is for use with WeatherKing 90 Gas Furnaces for<br />
parallel operation requirements.<br />
FOSSIL FUEL KIT: RXPF-F01<br />
RXPF-F02 (TVA)<br />
*HIGH ALTITUDE KIT: RXGY-F04 (105 MBH)<br />
RXGY-F05 (120 MBH)<br />
RXGY-F06 (45 MBH/60 MBH)<br />
RXGY-F07 (75 MBH)<br />
*For installations over 5000 ft.<br />
Includes orifices required on furnaces 8,001 ft. and above.<br />
WARNING: IMPORTANT NOTICE<br />
A SOLID METAL BASE PLATE (SEE TABLE) MUST BE IN PLACE WHEN THE FURNACE<br />
IS INSTALLED WITH SIDE OR REAR AIR RETURN DUCTS. FAILURE TO INSTALL A<br />
BASE PLATE COULD CAUSE PRODUCTS OF COMBUSTION TO BE CIRCULATED INTO<br />
THE LIVING SPACE AND CREATE POTENTIALLY HAZARDOUS CONDITIONS.<br />
FURNACE<br />
BASE<br />
SOLID BOTTOM BASE<br />
WIDTH<br />
PLATE SIZE<br />
KIT NO. PLATE NO.<br />
IN. [mm]<br />
IN. [mm]<br />
17 1 /2 [445] RXGB-D17 AE-61874-02 15 1 /8 x 23 9 /16 [384 x 598]<br />
21 [533] RXGB-D21 AE-61874-03 18 5 /8 x 23 9 /16 [473 x 598]<br />
24 1 /2 [622] RXGB-D24 AE-61874-04 25 5 /8 x 23 9 /16 [651 x 598]<br />
[ ] Designates Metric Conversions<br />
6 WeatherKing L.L.C.