TEST RESULTS AND DISCUSSION<br />

_____________________________________<br />

1. <strong>Pall</strong> MF Performance and Operation:<br />

<strong>For</strong> the duration of pilot program, the MF was evaluated under the operational parameters and<br />

characteristics summarized in Table III.<br />

TABLE III<br />

Date<br />

Cycle<br />

#<br />

Interval<br />

(days)<br />

Membrane Operational Characteristics<br />

TMP<br />

initial/final<br />

(psi)<br />

Flux<br />

(GFD)<br />

Date of<br />

CIP<br />

Temp<br />

Range<br />

(C)<br />

Feed<br />

NTU<br />

Recovery<br />

(%)<br />

3/30-4/5 1 7 3/7 27.9 0.7-1.2 1-4 96.2<br />

4/5-5/3 28 9/21 32.6 5/3 0.5-4.2 2-8 95.7<br />

5/4-5/18 2 14 5/33 32.6 5/18 (a) 3.0-9.4 6-8 96.4<br />

5/18-5/21 3 16/22 32.6 5/22 8.1-10.7 6-8 96.0<br />

5/22-5/30 3 8 3/8 32.6 8.3-12.8 3-6 96.2<br />

5/30-6/8 10 9/11 39.8 8.8-13.1 3-4 97.1<br />

6/8-6/12 4 12/25 43.4 6/14 (b) 11.7-14.5 2-3 97.2<br />

6/14-6/17 3 12/34 43.4 6/18 8.8-11.6 2-3 97.2<br />

6/19-7/11 4 22 5/18 (c) 39.8 97.0<br />

(a); (b); maintenance clean of 0.5% citric RF flush for 15 min<br />

(c); 2-ppm chlorine added to SASRF and RF starting on 7/2<br />

a. Cycle 1 (March 30 to May 3):<br />

<strong>The</strong> cycle started on March 30 with a flux of 27.9 GFD with an initial TMP 3 psid.<br />

<strong>The</strong> TMP increase was a minimal 4-psi after 7 days. <strong>The</strong> flux was increased to 32.6 GFD on<br />

April 5. <strong>The</strong> run continued until May 3 with a TMP increase to 21 psid. <strong>The</strong> total run time for<br />

cycle 1 was 35 days (Figure II). <strong>The</strong> feed turbidity was 1 to 8 NTU with a temperature range<br />

of 0.7 to 4.2C. <strong>The</strong> filtrate turbidity was consistently 0.02 to 0.04 NTU with a particle count<br />

of < 1 count/ml for particle sizes > 2µm. <strong>The</strong> pilot was CIP on May 3.<br />

b. Cycle 2: (May 4 to May 21):<br />

<strong>The</strong> cycle started on May 4 with a flux of 32.6 GFD with an initial TMP of 5 psid. <strong>The</strong> cycle<br />

continued for 14 days until terminal TMP of 33 psid was reached. A maintenance clean<br />

consisting of a 2% citric acid recirculation for 1 hour was then performed. This was successful<br />

in reducing the TMP to 16 psid. <strong>The</strong> microfiltration pilot was restarted and the cycle was<br />

continued until May 21 with a final TMP of 22 psid. <strong>The</strong> total time for cycle 2 was 17 days<br />

This report is proprietary to PALL CORPORATION and is furnished in Confidence for the Private use of the intended recipient, for the sole purpose of evaluating PALL<br />

technology. It may not be copied nor disclosed, in whole or in part, without the prior express approval of PALL CORPORATION.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!