TEST RESULTS AND DISCUSSION<br />
_____________________________________<br />
1. <strong>Pall</strong> MF Performance and Operation:<br />
<strong>For</strong> the duration of pilot program, the MF was evaluated under the operational parameters and<br />
characteristics summarized in Table III.<br />
TABLE III<br />
Date<br />
Cycle<br />
#<br />
Interval<br />
(days)<br />
Membrane Operational Characteristics<br />
TMP<br />
initial/final<br />
(psi)<br />
Flux<br />
(GFD)<br />
Date of<br />
CIP<br />
Temp<br />
Range<br />
(C)<br />
Feed<br />
NTU<br />
Recovery<br />
(%)<br />
3/30-4/5 1 7 3/7 27.9 0.7-1.2 1-4 96.2<br />
4/5-5/3 28 9/21 32.6 5/3 0.5-4.2 2-8 95.7<br />
5/4-5/18 2 14 5/33 32.6 5/18 (a) 3.0-9.4 6-8 96.4<br />
5/18-5/21 3 16/22 32.6 5/22 8.1-10.7 6-8 96.0<br />
5/22-5/30 3 8 3/8 32.6 8.3-12.8 3-6 96.2<br />
5/30-6/8 10 9/11 39.8 8.8-13.1 3-4 97.1<br />
6/8-6/12 4 12/25 43.4 6/14 (b) 11.7-14.5 2-3 97.2<br />
6/14-6/17 3 12/34 43.4 6/18 8.8-11.6 2-3 97.2<br />
6/19-7/11 4 22 5/18 (c) 39.8 97.0<br />
(a); (b); maintenance clean of 0.5% citric RF flush for 15 min<br />
(c); 2-ppm chlorine added to SASRF and RF starting on 7/2<br />
a. Cycle 1 (March 30 to May 3):<br />
<strong>The</strong> cycle started on March 30 with a flux of 27.9 GFD with an initial TMP 3 psid.<br />
<strong>The</strong> TMP increase was a minimal 4-psi after 7 days. <strong>The</strong> flux was increased to 32.6 GFD on<br />
April 5. <strong>The</strong> run continued until May 3 with a TMP increase to 21 psid. <strong>The</strong> total run time for<br />
cycle 1 was 35 days (Figure II). <strong>The</strong> feed turbidity was 1 to 8 NTU with a temperature range<br />
of 0.7 to 4.2C. <strong>The</strong> filtrate turbidity was consistently 0.02 to 0.04 NTU with a particle count<br />
of < 1 count/ml for particle sizes > 2µm. <strong>The</strong> pilot was CIP on May 3.<br />
b. Cycle 2: (May 4 to May 21):<br />
<strong>The</strong> cycle started on May 4 with a flux of 32.6 GFD with an initial TMP of 5 psid. <strong>The</strong> cycle<br />
continued for 14 days until terminal TMP of 33 psid was reached. A maintenance clean<br />
consisting of a 2% citric acid recirculation for 1 hour was then performed. This was successful<br />
in reducing the TMP to 16 psid. <strong>The</strong> microfiltration pilot was restarted and the cycle was<br />
continued until May 21 with a final TMP of 22 psid. <strong>The</strong> total time for cycle 2 was 17 days<br />
This report is proprietary to PALL CORPORATION and is furnished in Confidence for the Private use of the intended recipient, for the sole purpose of evaluating PALL<br />
technology. It may not be copied nor disclosed, in whole or in part, without the prior express approval of PALL CORPORATION.