Energy Recovery Unit Pre-Functional Checklist
Energy Recovery Unit Pre-Functional Checklist
Energy Recovery Unit Pre-Functional Checklist
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Energy</strong> <strong>Recovery</strong> <strong>Unit</strong> <strong>Pre</strong>-<strong>Functional</strong> <strong>Checklist</strong><br />
Project:<br />
Florida Marlin Ballpark<br />
Date:<br />
Tag:<br />
Project # 09815-00<br />
Location:<br />
Miami, Florida<br />
M = Mechanical E = Electrical TAB = Test & Balance C = Controls A = all Contractors<br />
Item No.<br />
Description<br />
<strong>Pre</strong>-Installation<br />
1 <strong>Unit</strong> is free from damage<br />
2 <strong>Unit</strong> stored above ground and protected from elements<br />
3 Doors are closed, openings sealed<br />
Equipment Installation<br />
1 Maintenance access acceptable for unit and<br />
2 Ducts are installed, tested, cleaned and labeled<br />
3 Filters installed<br />
4 All dampers installed correctly and close tightly<br />
5 All wheel(s) are clean and surfaces are in good<br />
condition<br />
6 Equipment has been installed in accordance to the<br />
requirements of applicable building codes.<br />
7 Field verification of as-built documentation<br />
8 Extra filters provided as specified<br />
Ctr.<br />
Y N N/A<br />
Comments<br />
Page 1 of 2
<strong>Energy</strong> <strong>Recovery</strong> <strong>Unit</strong> <strong>Pre</strong>-<strong>Functional</strong> <strong>Checklist</strong><br />
Project:<br />
Florida Marlin Ballpark<br />
Date:<br />
Tag:<br />
Project # 09815-00<br />
Location:<br />
Miami, Florida<br />
M = Mechanical E = Electrical TAB = Test & Balance C = Controls A = all Contractors<br />
Item No.<br />
Description<br />
Electrical Installation<br />
1 Disconnect enclosure is appropriate for space<br />
2 Disconnect location not subject to excessive<br />
temperatures, moisture or dirt<br />
3 Disconnect size matches motor size and efficiency is<br />
4 Power disconnects in place and labeled<br />
5 All electric connections tight<br />
6 Adequate lighting has been provided inside the unit<br />
7 Proper grounding installed for components and unit per<br />
specifications<br />
8 Disconnect has power, is wired to motor and interlocked<br />
with control system<br />
9 Starter overload breakers installed and correct size<br />
Automation Installation<br />
1 Control hardware complete per documents<br />
2 Control system interlocks hooked up and functional<br />
3 1. Min. Trending of all points started<br />
Startup and Operation<br />
1 Specified sequences of operation and operating<br />
schedules have been implemented .<br />
2 <strong>Pre</strong>liminary <strong>Functional</strong> Performance Test completed<br />
Test and Balance<br />
1 Balance is complete<br />
2 Test and Balance report submitted<br />
Final Documentation and checks<br />
1 <strong>Unit</strong>s labeled correctly per specifications<br />
2 Operation and maintenance information provided<br />
3 Manufacturers factory test performance data<br />
4 Control drawings<br />
5 Provide manufacturer's installation and operation data<br />
Ctr.<br />
Y N N/A Comments<br />
Page 2 of 2