Energy Recovery Unit Pre-Functional Checklist

Energy Recovery Unit Pre-Functional Checklist

Energy Recovery Unit Pre-Functional Checklist

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Energy</strong> <strong>Recovery</strong> <strong>Unit</strong> <strong>Pre</strong>-<strong>Functional</strong> <strong>Checklist</strong><br />

Project:<br />

Florida Marlin Ballpark<br />

Date:<br />

Tag:<br />

Project # 09815-00<br />

Location:<br />

Miami, Florida<br />

M = Mechanical E = Electrical TAB = Test & Balance C = Controls A = all Contractors<br />

Item No.<br />

Description<br />

<strong>Pre</strong>-Installation<br />

1 <strong>Unit</strong> is free from damage<br />

2 <strong>Unit</strong> stored above ground and protected from elements<br />

3 Doors are closed, openings sealed<br />

Equipment Installation<br />

1 Maintenance access acceptable for unit and<br />

2 Ducts are installed, tested, cleaned and labeled<br />

3 Filters installed<br />

4 All dampers installed correctly and close tightly<br />

5 All wheel(s) are clean and surfaces are in good<br />

condition<br />

6 Equipment has been installed in accordance to the<br />

requirements of applicable building codes.<br />

7 Field verification of as-built documentation<br />

8 Extra filters provided as specified<br />

Ctr.<br />

Y N N/A<br />

Comments<br />

Page 1 of 2


<strong>Energy</strong> <strong>Recovery</strong> <strong>Unit</strong> <strong>Pre</strong>-<strong>Functional</strong> <strong>Checklist</strong><br />

Project:<br />

Florida Marlin Ballpark<br />

Date:<br />

Tag:<br />

Project # 09815-00<br />

Location:<br />

Miami, Florida<br />

M = Mechanical E = Electrical TAB = Test & Balance C = Controls A = all Contractors<br />

Item No.<br />

Description<br />

Electrical Installation<br />

1 Disconnect enclosure is appropriate for space<br />

2 Disconnect location not subject to excessive<br />

temperatures, moisture or dirt<br />

3 Disconnect size matches motor size and efficiency is<br />

4 Power disconnects in place and labeled<br />

5 All electric connections tight<br />

6 Adequate lighting has been provided inside the unit<br />

7 Proper grounding installed for components and unit per<br />

specifications<br />

8 Disconnect has power, is wired to motor and interlocked<br />

with control system<br />

9 Starter overload breakers installed and correct size<br />

Automation Installation<br />

1 Control hardware complete per documents<br />

2 Control system interlocks hooked up and functional<br />

3 1. Min. Trending of all points started<br />

Startup and Operation<br />

1 Specified sequences of operation and operating<br />

schedules have been implemented .<br />

2 <strong>Pre</strong>liminary <strong>Functional</strong> Performance Test completed<br />

Test and Balance<br />

1 Balance is complete<br />

2 Test and Balance report submitted<br />

Final Documentation and checks<br />

1 <strong>Unit</strong>s labeled correctly per specifications<br />

2 Operation and maintenance information provided<br />

3 Manufacturers factory test performance data<br />

4 Control drawings<br />

5 Provide manufacturer's installation and operation data<br />

Ctr.<br />

Y N N/A Comments<br />

Page 2 of 2