Analysis of the Kabul Distribution System Final Draft Report - Afghan

Analysis of the Kabul Distribution System Final Draft Report - Afghan

Analysis of the Kabul Distribution System Final Draft Report - Afghan

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

AEAI-<strong>Kabul</strong>-2<br />

<strong>Analysis</strong> <strong>of</strong> <strong>the</strong> <strong>Kabul</strong> <strong>Distribution</strong> <strong>System</strong><br />

<strong>Final</strong> <strong>Draft</strong> <strong>Report</strong><br />

Prepared for<br />

Advanced Engineering Associates<br />

Inc.<br />

Submitted by:<br />

Nelson J Bacalao<br />

Mathias Roidl<br />

December 2007<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

1482 Erie Boulevard • P.O. Box 1058<br />

Schenectady, New York 12301-1058 US<br />

Tel: 518-395-5000 • Fax: 518-346-2777<br />

www.siemens.com/power-technologies


This page intentionally left blank.


Contents<br />

Legal Notice...............................................................................................................ix<br />

Executive Summary .................................................................................................xi<br />

Section 1 Introduction...............................................................................................1<br />

Section 2 Load Modeling ..........................................................................................2<br />

Section 3 Network Modeling.....................................................................................5<br />

Section 4 Preliminary Network <strong>Analysis</strong>.................................................................6<br />

4.1 Case_07_B1: 2007 Estimated Loading Conditions in Existing Network ............... 10<br />

4.2 Case_07_B2: 2007 Reduced Loading Conditions in Existing Network................. 10<br />

4.3 Case_07_B3: 2007 Estimated Loading Conditions in Modified Network .............. 15<br />

Section 5 Strategic Network <strong>Analysis</strong>...................................................................17<br />

5.1 Planning Criteria....................................................................................................... 17<br />

5.2 <strong>System</strong> Overview..................................................................................................... 20<br />

5.3 New Substation Location including <strong>the</strong> “unsupplied load.”..................................... 22<br />

5.4 New Substation Location not including <strong>the</strong> “unsupplied load.”............................... 24<br />

Section 6 <strong>Analysis</strong> <strong>of</strong> <strong>the</strong> Medium Term <strong>System</strong> .................................................30<br />

6.1 Overview .................................................................................................................. 30<br />

6.2 Switching and Reliability Assessment..................................................................... 34<br />

6.3 Feeder overview and switching strategy: General Comments............................... 42<br />

6.3.1 Feeder Example ........................................................................................ 42<br />

6.4 Feeder overview and switching strategy: Central Substation ................................ 44<br />

6.4.1 Feeder C-510............................................................................................. 46<br />

6.4.2 Feeder C-511............................................................................................. 47<br />

6.4.3 Feeder C-512............................................................................................. 49<br />

6.4.4 Feeder C-513............................................................................................. 50<br />

6.4.5 Feeder C-514............................................................................................. 52<br />

6.4.6 Feeder C-515............................................................................................. 53<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

i


Contents<br />

6.4.7 Feeder C-516............................................................................................. 54<br />

6.4.8 Feeder C-517............................................................................................. 55<br />

6.4.9 Feeder C-518............................................................................................. 57<br />

6.4.10 Feeder C-519............................................................................................. 58<br />

6.4.11 Feeder C-520............................................................................................. 59<br />

6.4.12 Feeder C-521............................................................................................. 60<br />

6.5 Breshna Kot Substation........................................................................................... 62<br />

6.5.1 Feeder BK-510 .......................................................................................... 64<br />

6.5.2 Feeder BK-511 .......................................................................................... 65<br />

6.5.3 Feeder BK-512 .......................................................................................... 67<br />

6.5.4 Feeder BK-513 .......................................................................................... 68<br />

6.5.5 Feeder BK-514 .......................................................................................... 69<br />

6.5.6 Feeder BK-515 .......................................................................................... 71<br />

6.5.7 Feeder BK-516 .......................................................................................... 73<br />

6.5.8 Feeder BK-517 .......................................................................................... 75<br />

6.5.9 Feeder BK-518 .......................................................................................... 77<br />

6.5.10 Feeder BK-519 .......................................................................................... 79<br />

6.6 South West Substation ............................................................................................ 80<br />

6.6.1 Feeder SW-510 ......................................................................................... 82<br />

6.6.2 Feeder SW-511 ......................................................................................... 83<br />

6.6.3 Feeder SW-512 ......................................................................................... 85<br />

6.6.4 Feeder SW-513 ......................................................................................... 86<br />

6.6.5 Feeder SW-514 ......................................................................................... 87<br />

6.6.6 Feeder SW-515 ......................................................................................... 88<br />

6.7 East Substation ........................................................................................................ 89<br />

6.7.1 Feeder E-511............................................................................................. 91<br />

6.7.2 Feeder E-513............................................................................................. 93<br />

6.7.3 Feeder E-515............................................................................................. 95<br />

6.7.4 Feeder E-519............................................................................................. 96<br />

6.7.5 Feeder E-521............................................................................................. 97<br />

6.7.6 Feeder E-523............................................................................................. 98<br />

6.7.7 Feeder E-531............................................................................................. 99<br />

6.7.8 Feeder E-541........................................................................................... 100<br />

6.8 North West Substation........................................................................................... 101<br />

6.8.1 Feeder NW-513, NW-517 and NW-518 ................................................ 103<br />

ii<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International


Contents<br />

6.8.2 Feeder NW-514 ....................................................................................... 106<br />

6.8.3 Feeder NW-515 ....................................................................................... 108<br />

6.8.4 Feeder NW-516 ....................................................................................... 109<br />

6.8.5 Feeder NW-524, NW-526 and NW-527 ................................................ 110<br />

6.8.6 Feeder NW-525 ....................................................................................... 114<br />

6.9 North Substation .................................................................................................... 116<br />

6.9.1 Feeder N-511 and N-513 ........................................................................ 118<br />

6.9.2 Feeder N-512........................................................................................... 120<br />

6.9.3 Feeder N-514........................................................................................... 121<br />

6.9.4 Feeder N-515........................................................................................... 123<br />

6.9.5 Feeder N-516........................................................................................... 124<br />

6.9.6 Feeder N-517........................................................................................... 125<br />

6.9.7 Feeder N-518........................................................................................... 127<br />

6.9.8 Feeder N-519........................................................................................... 128<br />

6.9.9 Feeder N-520........................................................................................... 129<br />

6.9.10 Feeder N-528........................................................................................... 131<br />

6.9.11 Feeder N-529........................................................................................... 133<br />

Section 7 <strong>Analysis</strong> <strong>of</strong> <strong>the</strong> Short Term <strong>System</strong>....................................................136<br />

7.1 Overview ................................................................................................................ 136<br />

7.2 Switching and Reliability Assessment................................................................... 139<br />

Section 8 New Substations and Expansions......................................................145<br />

8.1 Central Substation.................................................................................................. 145<br />

8.2 Breshna Kot Substation......................................................................................... 148<br />

8.3 South West Substation .......................................................................................... 151<br />

8.4 East Substation ...................................................................................................... 154<br />

8.5 North West Substation........................................................................................... 157<br />

8.6 North Substation .................................................................................................... 160<br />

8.7 Junction Stations.................................................................................................... 163<br />

Section 9 Medium Voltage Investments..............................................................166<br />

9.1 Medium Term Investments for Central Substation ............................................... 166<br />

9.1.1 Feeder C-510........................................................................................... 167<br />

9.1.2 Feeder C-511........................................................................................... 170<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

iii


Contents<br />

9.1.3 Feeder C-512........................................................................................... 172<br />

9.1.4 Feeder C-513........................................................................................... 175<br />

9.1.5 Feeder C-514........................................................................................... 178<br />

9.1.6 Feeder C-515........................................................................................... 180<br />

9.1.7 Feeder C-516........................................................................................... 181<br />

9.1.8 Feeder C-517........................................................................................... 182<br />

9.1.9 Feeder C-518........................................................................................... 184<br />

9.1.10 Feeder C-519........................................................................................... 187<br />

9.1.11 Feeder C-520 and C-521 ........................................................................ 187<br />

9.2 Short Term Investments for Central Substation.................................................... 190<br />

9.2.1 Conductors with reduced cross sections. ............................................... 191<br />

9.2.2 Rearrangement <strong>of</strong> Junction Station # 2 .................................................. 193<br />

9.2.3 Medium Term Investments to be advanced to <strong>the</strong> Short Term ............. 193<br />

9.2.4 Voltage Support....................................................................................... 197<br />

9.3 Medium Term Investments for Breshna Kot Substation...................................... 200<br />

9.3.1 Re-arrangement <strong>of</strong> Junction Station 3.................................................... 200<br />

9.3.2 Feeder BK-510 ........................................................................................ 201<br />

9.3.3 Feeder BK-511 ........................................................................................ 202<br />

9.3.4 Feeder BK-512 ........................................................................................ 205<br />

9.3.5 Feeder BK-513 ........................................................................................ 205<br />

9.3.6 Feeder BK-514 ........................................................................................ 208<br />

9.3.7 Feeder BK-515 ........................................................................................ 209<br />

9.3.8 Feeder BK-516 ........................................................................................ 210<br />

9.3.9 Feeder BK-517 ........................................................................................ 210<br />

9.3.10 Feeder BK-518 ........................................................................................ 216<br />

9.3.11 Feeder BK-519 ........................................................................................ 216<br />

9.4 Short Term Investments for Breshna Kot Substation ........................................... 216<br />

9.4.1 Conductors with reduced cross sections. ............................................... 217<br />

9.4.2 Rearrangement <strong>of</strong> Junction Station # 3 .................................................. 217<br />

9.4.3 Medium Term Investments to be advanced to <strong>the</strong> Short Term ............. 219<br />

9.5 Medium Term Investments for South West Substation........................................ 224<br />

9.5.1 Feeder SW-514 ....................................................................................... 224<br />

9.5.2 Feeder SW-513 ....................................................................................... 227<br />

9.5.3 Feeder SW-512 ....................................................................................... 229<br />

9.5.4 Feeder SW-511 ....................................................................................... 231<br />

iv<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International


Contents<br />

9.5.5 Feeder SW-515 ....................................................................................... 234<br />

9.5.6 Feeder SW-510 ....................................................................................... 236<br />

9.6 Short Term Investments for South West Substation ............................................ 238<br />

9.6.1 Rearrangement <strong>of</strong> Junction Station # 4 .................................................. 238<br />

9.6.2 Medium Term Investments to be advanced to <strong>the</strong> Short Term ............. 238<br />

9.6.3 Voltage Support....................................................................................... 241<br />

9.7 Medium Term Investments for East Substation.................................................... 243<br />

9.7.1 Feeder E-511........................................................................................... 243<br />

9.7.2 Feeder E-513........................................................................................... 246<br />

9.7.3 Feeder E-523........................................................................................... 246<br />

9.7.4 Feeder E-519........................................................................................... 249<br />

9.7.5 Feeder E-521........................................................................................... 251<br />

9.7.6 Feeder E-531........................................................................................... 253<br />

9.7.7 Feeder E-536........................................................................................... 253<br />

9.7.8 Feeder E-541........................................................................................... 253<br />

9.7.9 Feeder E-515........................................................................................... 257<br />

9.8 Short Term Investments for East Substation ........................................................ 257<br />

9.8.1 Conductors with reduced cross sections. ............................................... 257<br />

9.8.2 Medium Term Investments to be advanced to <strong>the</strong> Short Term ............. 257<br />

9.9 Medium Term Investments for North West Substation ........................................ 262<br />

9.9.1 Feeder NW-513, NW-517 and NW-518 ................................................. 262<br />

9.9.2 Feeder NW-514 ....................................................................................... 268<br />

9.9.3 Feeder NW-515 ....................................................................................... 269<br />

9.9.4 Feeder NW-516 ....................................................................................... 271<br />

9.9.5 Feeder NW-524 ....................................................................................... 271<br />

9.9.6 Feeder NW-525 ....................................................................................... 273<br />

9.9.7 Feeder NW-526 and NW-527 ................................................................. 275<br />

9.10 Short Term Investments for North West Substation............................................. 276<br />

9.10.1 Conductors with reduced cross sections. ............................................... 276<br />

9.10.2 Medium Term Investments to be advanced to <strong>the</strong> Short Term ............. 277<br />

9.11 Medium Term Investments for North Substation.................................................. 283<br />

9.11.1 Feeder N-511........................................................................................... 283<br />

9.11.2 Feeder N-512........................................................................................... 285<br />

9.11.3 Feeder N-513........................................................................................... 286<br />

9.11.4 Feeder N-514........................................................................................... 288<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

v


Contents<br />

9.11.5 Feeder N-515........................................................................................... 289<br />

9.11.6 Feeder N-516........................................................................................... 291<br />

9.11.7 Feeder N-517........................................................................................... 291<br />

9.11.8 Feeder N-518........................................................................................... 292<br />

9.11.9 Feeder N-519........................................................................................... 293<br />

9.11.10 Feeder N-520........................................................................................... 294<br />

9.11.11 Feeder N-528........................................................................................... 296<br />

9.11.12 Feeder N-529........................................................................................... 297<br />

9.12 Short Term Investments for North Substation ...................................................... 298<br />

9.12.1 Conductors with reduced cross sections. ............................................... 298<br />

9.12.2 Rearrangement <strong>of</strong> Junction Station # 5 .................................................. 299<br />

9.12.3 Medium Term Investments to be advanced to <strong>the</strong> Short Term ............. 299<br />

Section 10 Investment Evaluation .......................................................................302<br />

10.1 Medium Terms Investments .................................................................................. 302<br />

10.1.1 Total Investments Medium Voltage Networks........................................ 302<br />

10.1.2 Investments by Substations .................................................................... 305<br />

10.2 Short Term Investments ........................................................................................ 309<br />

10.2.1 Total Investments Medium Voltage Networks........................................ 309<br />

10.2.2 Investments by Substations .................................................................... 312<br />

10.3 O<strong>the</strong>r Investments.................................................................................................. 316<br />

10.4 Investment in Substations...................................................................................... 317<br />

Section 11 <strong>Kabul</strong> Diesel Generation Impact .......................................................318<br />

11.1 Study Assumptions and Criteria ............................................................................ 318<br />

11.1.1 Electricity Sources ................................................................................... 318<br />

11.1.2 <strong>Kabul</strong> 110 kV network.............................................................................. 319<br />

11.1.3 <strong>System</strong> Load............................................................................................ 320<br />

11.1.4 Planning Criteria ...................................................................................... 321<br />

11.1.5 Study Cases............................................................................................. 321<br />

11.2 Results.................................................................................................................... 322<br />

11.2.1 Turkmenistan Supply Option................................................................... 322<br />

11.2.2 Uzbekistan Supply Option....................................................................... 322<br />

11.2.3 Uzbekistan Supply Option....................................................................... 322<br />

11.2.4 Tajikistan Supply Option.......................................................................... 323<br />

vi<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International


Contents<br />

11.2.5 Tajikistan Supply Option.......................................................................... 323<br />

Appendix A Load Flow results for Case_07_B1 ................................................A-1<br />

Appendix B Load Flow results for Case_07_B2 ................................................B-1<br />

Appendix C Load Flow Results & Investments for <strong>the</strong> Short Term.................C-1<br />

Appendix D Load Flow Results & Investments for <strong>the</strong> mid term.....................D-1<br />

Appendix E ...................................................................................................................<br />

Turkmenistan One line Diagrams (with 100 MW diesel unit in <strong>Kabul</strong>).............E-1<br />

Appendix.......................................................................................................................<br />

Uzbekistan One line Diagrams (with 100 MW diesel unit in <strong>Kabul</strong>) ................. F-1<br />

Appendix G...................................................................................................................<br />

Tajikistan One line Diagrams (with 100 MW diesel unit in <strong>Kabul</strong>)....................G-1<br />

Appendix H Cost <strong>of</strong> Medium Term Investments by Project..............................H-1<br />

Appendix I Cost <strong>of</strong> Short Term Investments by Project..................................... I-1<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

vii


Legal Notice<br />

This document was prepared by Siemens Power Transmission & <strong>Distribution</strong>, Inc., Power<br />

Technologies International (Siemens PTI), solely for <strong>the</strong> benefit <strong>of</strong> Advanced Engineering<br />

Associates Inc.. Nei<strong>the</strong>r Siemens PTI, nor parent corporation or its or <strong>the</strong>ir affiliates, nor<br />

Advanced Engineering Associates Inc., nor any person acting in <strong>the</strong>ir behalf (a) makes any<br />

warranty, expressed or implied, with respect to <strong>the</strong> use <strong>of</strong> any information or methods<br />

disclosed in this document; or (b) assumes any liability with respect to <strong>the</strong> use <strong>of</strong> any<br />

information or methods disclosed in this document.<br />

Any recipient <strong>of</strong> this document, by <strong>the</strong>ir acceptance or use <strong>of</strong> this document, releases<br />

Siemens PTI, its parent corporation and its and <strong>the</strong>ir affiliates, and Advanced Engineering<br />

Associates Inc. from any liability for direct, indirect, consequential or special loss or damage<br />

whe<strong>the</strong>r arising in contract, warranty, express or implied, tort or o<strong>the</strong>rwise, and irrespective <strong>of</strong><br />

fault, negligence, and strict liability.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

ix


Legal Notice<br />

This page intentionally left blank.<br />

x<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International


Executive Summary<br />

This report presents <strong>the</strong> results <strong>of</strong> <strong>the</strong> analysis conducted for <strong>the</strong> <strong>Kabul</strong> distribution<br />

system for both <strong>the</strong> short term (one year out) and medium term (3 or more years) as<br />

well as our estimation <strong>of</strong> <strong>the</strong> necessary investments to provide adequate quality <strong>of</strong><br />

service to <strong>the</strong> final customers under both timeframes.<br />

These results were obtained based on a detailed model for <strong>the</strong> medium voltage<br />

system produced in PSSSincal starting from field information on asset<br />

parameters and network topology. This model also incorporated load<br />

measurements and our own estimations on <strong>the</strong> likely load that will materialize in <strong>the</strong><br />

system once <strong>the</strong> existing generation restrictions are lifted, by <strong>the</strong> implementation <strong>of</strong><br />

<strong>the</strong> NEPS and <strong>the</strong> addition <strong>of</strong> new local generation.<br />

This report also covers <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> 110 kV network with <strong>the</strong> incorporation <strong>of</strong><br />

100 MW <strong>of</strong> diesel fired generation located to <strong>the</strong> north and east <strong>of</strong> East <strong>Kabul</strong><br />

substation.<br />

We summarize <strong>the</strong> main findings <strong>of</strong> this report below;<br />

Load Modeling<br />

We estimated <strong>the</strong> load by transformer based on <strong>the</strong> field measurements <strong>of</strong> a large<br />

number <strong>of</strong> residential transformers and <strong>the</strong> hourly consumption curves for<br />

residential and commercial/government loads.<br />

For <strong>the</strong> Commercial/Government transformers we decided to estimate <strong>the</strong>ir peak<br />

load using a conservatively a peak utilization factor <strong>of</strong> 80% for <strong>the</strong>se customers’<br />

transformers.<br />

Based on <strong>the</strong>se assumptions and measurements we estimated 2007 total<br />

coincident load <strong>of</strong> 278 MVA with a power factor <strong>of</strong> 0.9. The power factor used was<br />

estimated and we are assuming in our calculations that if any load has a power<br />

factor lower than 0.9 it will be compensated locally.<br />

It should be mentioned that this simultaneous peak load has probably not yet<br />

materialized in <strong>the</strong> system due to <strong>the</strong> generation limitations that prevent to serve all<br />

<strong>the</strong> loads simultaneously.<br />

<strong>Final</strong>ly as <strong>the</strong>re are no reliable load projections for <strong>Kabul</strong> we are assuming for <strong>the</strong><br />

medium term a peak load equivalent to 100% utilization factor <strong>of</strong> <strong>the</strong> existing<br />

transformers. See Section 2 for additional details<br />

Preliminary Network <strong>Analysis</strong><br />

The network analysis was conducted in phases; a preliminary network analysis, a<br />

short term network analysis and a medium term network analysis.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

xi


The preliminary network analysis considered only <strong>the</strong> existing facilities in service in<br />

<strong>the</strong> system and <strong>the</strong> estimated coincident load for 2007. This analysis identified that<br />

<strong>the</strong> distribution system is not in condition to supply <strong>the</strong> estimated load without mayor<br />

investments. Also we identified a group <strong>of</strong> conductors that had cross sections<br />

inconsistent with <strong>the</strong> network design. But even replacing <strong>the</strong>se conductors by <strong>the</strong><br />

expected ones <strong>the</strong>re was a large number <strong>of</strong> overloads and near voltage collapse in<br />

<strong>the</strong> network. So we estimated that in order for <strong>the</strong> network to operate in feasible but<br />

poor conditions (overloads less than 110% and voltage above 85%) it would be<br />

necessary to reduce <strong>the</strong> load in some feeders by 30 to 50% and a total system-wide<br />

load reduction <strong>of</strong> 4%.<br />

Section 4 presents <strong>the</strong>se preliminary results.<br />

Strategic Planning<br />

Based on our preliminary network analysis we identified that <strong>the</strong> existing<br />

substations in <strong>the</strong> system appeared to be insufficient to attend <strong>the</strong> expected load<br />

and that <strong>the</strong>y were over extended, which resulted in long feeders, poor voltage and<br />

losses.<br />

Therefore we conducted Strategic Network <strong>Analysis</strong> and it is included in Section 5<br />

<strong>of</strong> this report In this section we outline <strong>the</strong> method used for system planning, <strong>the</strong><br />

planning criteria and <strong>the</strong> results <strong>of</strong> a top down analysis that was used to identify <strong>the</strong><br />

need <strong>of</strong> new substations in <strong>the</strong> system. Based on this analysis it became clear that<br />

at least two new 110/15 kV substations will be needed in <strong>the</strong> medium term (3 years)<br />

to supply <strong>the</strong> target load. These substations; <strong>Kabul</strong> Central and <strong>Kabul</strong> South West<br />

should be located close to Junction Station #2 <strong>the</strong> first and close to Junction Station<br />

# 4 <strong>the</strong> second.<br />

Also in <strong>the</strong> phase <strong>of</strong> <strong>the</strong> analysis we reviewed <strong>the</strong> proposed location for <strong>the</strong> new 100<br />

MW <strong>of</strong> diesel generation and found that this location does not lend itself to support<br />

<strong>the</strong> distribution system and hence we would have to rely on <strong>the</strong> 110 kV system to<br />

bring <strong>the</strong> power from this source to <strong>the</strong> load. The analysis <strong>of</strong> <strong>the</strong> 110 kV system is<br />

also presented in this document.<br />

Medium Term <strong>System</strong><br />

Consistent with our distribution planning methodology we designed a Medium Term<br />

<strong>System</strong> (3 to 4 years in <strong>the</strong> future) that is able to supply all <strong>of</strong> <strong>the</strong> connected<br />

transformers to 100 % <strong>of</strong> <strong>the</strong>ir respective capacity in compliance with <strong>the</strong> adopted<br />

planning criteria. In Section 6 we present <strong>the</strong> results <strong>of</strong> <strong>the</strong> assessment <strong>of</strong> this<br />

system were we demonstrate that with <strong>the</strong> recommended investments <strong>the</strong> system<br />

would be in compliance with industry accepted practices and it would have <strong>the</strong><br />

flexibility to transfer substantially all <strong>the</strong> load from any feeder to o<strong>the</strong>r adjacent<br />

feeders in <strong>the</strong> case <strong>of</strong> emergencies. This system is hence <strong>the</strong> target system towards<br />

<strong>the</strong> <strong>Kabul</strong> distribution system should move and was <strong>the</strong> basis for <strong>the</strong> selection <strong>of</strong> <strong>the</strong><br />

short term investments.<br />

The selected investments for <strong>the</strong> substations are presented in Section 8 and for <strong>the</strong><br />

medium voltage system in Section 9.<br />

xii<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International


Short Term <strong>System</strong><br />

In <strong>the</strong> short term (2008) <strong>the</strong>re is no time to implement all <strong>of</strong> <strong>the</strong> recommended<br />

investments for <strong>the</strong> medium term, hence we prioritized <strong>the</strong> investments identified for<br />

<strong>the</strong> long term and produced a set <strong>of</strong> minimum investments that would allow serving<br />

<strong>the</strong> 2007/2008 load estimated to exist in <strong>the</strong> system with adequate quality <strong>of</strong> service<br />

(voltages and overloads within planning criteria) but with somewhat less operational<br />

flexibility than <strong>the</strong> Medium Term <strong>System</strong>. The assessment <strong>of</strong> this system is<br />

presented in Section 7 where it can be observed that with <strong>the</strong>se minimum<br />

investments <strong>the</strong>re would not be overloads in <strong>the</strong> system and all voltages would be<br />

above <strong>the</strong> 95% threshold. The necessary investments are presented in Section 9.<br />

Network Investments<br />

Section 8 presents <strong>the</strong> necessary investments in substations in <strong>the</strong> system which<br />

will be necessary in <strong>the</strong> short to medium term. These investments can be<br />

summarized as follows:<br />

• Central Substation: 4 new transformers 25 MVA each.<br />

• Breshna Kot Substation: 2 new transformers 25 MVA each.<br />

• South West Substation: 3 new transformers 25 MVA each.<br />

• East Substation: 2 new transformers 25 MVA each.<br />

• North West Substation: 1 new transformer 25 MVA each.<br />

• North Substation: 1 new transformer 40 MVA.<br />

The medium voltage network investments for <strong>the</strong> short and medium term are<br />

presented in section 9.<br />

These investments while including some capacitor banks and one voltage regulator,<br />

<strong>the</strong> vast majority <strong>of</strong> <strong>the</strong>m are new line sections or reconductoring <strong>of</strong> overhead lines<br />

or replacement <strong>of</strong> cables (toge<strong>the</strong>r upgrades.)<br />

Table 1 below shows <strong>the</strong> length and investments for both cables and overhead lines<br />

ei<strong>the</strong>r added to <strong>the</strong> system (New) or Upgraded (reconductor) in <strong>the</strong> short term plan.<br />

This table is presented by conductor cross section and we also include <strong>the</strong><br />

investments in voltage regulating equipment, capacitors and switches.<br />

In this table we note that <strong>the</strong>re is approximately US$ 1 million in investments<br />

required. It should be noted that <strong>the</strong>se investments only include <strong>the</strong> medium voltage<br />

and high voltage to medium voltage substations and do not include potential<br />

investments in new distribution transformers or low voltage systems. These last set<br />

<strong>of</strong> investments address local problems, are heavily dependent on <strong>the</strong> actual load<br />

distribution and are <strong>the</strong>refore normally addressed by <strong>the</strong> host utility.<br />

Also <strong>the</strong>re is quite a bit <strong>of</strong> uncertainty regarding <strong>the</strong> cost <strong>of</strong> <strong>the</strong> investments in<br />

<strong>Afghan</strong>istan and <strong>the</strong> routes <strong>of</strong> cables so to add a contingency <strong>of</strong> 25 % would not be<br />

unreasonable.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

xiii


Table 2 presents <strong>the</strong> total investments expected to be carried out in <strong>the</strong> medium<br />

voltage network over <strong>the</strong> medium term. These investments include <strong>the</strong> short term<br />

(high priority) investments and are representative <strong>of</strong> <strong>the</strong> required level <strong>of</strong><br />

expenditures required to attend <strong>the</strong> load with adequate quality <strong>of</strong> service.<br />

Table 3 shows <strong>the</strong> total investments in <strong>the</strong> network including our estimation <strong>of</strong> <strong>the</strong><br />

cost for upgrading <strong>the</strong> existing HV/MV substations and <strong>the</strong> construction <strong>of</strong> <strong>the</strong> new<br />

<strong>Kabul</strong> Central and <strong>Kabul</strong> South West substations. In this table we observe that we<br />

are recommending investments in <strong>the</strong> order <strong>of</strong> US$ 40 million and <strong>the</strong>se<br />

investments could reach US$ 50 million including contingency.<br />

Action<br />

Table 1: Short Term Investments in <strong>the</strong> Medium Voltage Network<br />

Conductor Type<br />

Conductor<br />

Size (mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New Overhead 70 1.46 90,174<br />

New Overhead 120 0.05 7,218<br />

New Overhead 185 3.053 206,319<br />

Reconductor Overhead 70 2.317 30,990<br />

Reconductor Overhead 120 6.233 86,564<br />

Reconductor Overhead 185 12.531 189,742<br />

New Cable 50 0 0<br />

New Cable 95 0.925 204,592<br />

New Cable 120 0 0<br />

New Cable 240 0 0<br />

Reconductor Cable 50 0 0<br />

Reconductor Cable 95 0 0<br />

Reconductor Cable 120 0 0<br />

Reconductor Cable 240 0.255 47,776<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Capacitor<br />

900 kVar<br />

Switched N/A 3 10,890<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 4 14,520<br />

Switch Switch N/A 6 21,000<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10%<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10% N/A 1 9,500<br />

TOTAL 41 919,286<br />

xiv<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International


Table 2: Medium Term Investment in <strong>the</strong> Medium Voltage Network.<br />

Action<br />

Conductor Type<br />

Conductor<br />

Size<br />

(mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New Overhead 70 3.71 244,018<br />

New Overhead 120 9.05 588,373<br />

New Overhead 185 19.77 1,296,306<br />

Reconductor Overhead 70 3.46 46,238<br />

Reconductor Overhead 120 18.98 263,637<br />

Reconductor Overhead 185 26.72 404,619<br />

New Cable 50 1.70 293,988<br />

New Cable 95 0.83 178,791<br />

New Cable 120 1.04 218,643<br />

New Cable 240 5.72 1,159,745<br />

Reconductor Cable 50 2.26 344,301<br />

Reconductor Cable 95 1.34 245,679<br />

Reconductor Cable 120 2.37 438,537<br />

Reconductor Cable 240 19.98 3,743,363<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Capacitor<br />

900 kVar<br />

Switched N/A 4.00 14,520<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 6.00 21,780<br />

Switch Switch N/A 46.00 161,000<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10%<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10% N/A 1.00 9,500<br />

TOTAL 9,673,037<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

xv


Table 3: Total Investment over <strong>the</strong> medium term.<br />

Substation Equipment Quantity<br />

Total<br />

Substation<br />

Investment<br />

(US$)<br />

MV Networks<br />

Investment<br />

(US$)<br />

Total<br />

Investment<br />

(US$)<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 4 3,400,000<br />

Central S/S Cells 20 kV (15 kV) 19 570,000<br />

Cells 110 kV 6 4,230,000<br />

Total 8,200,000 4,123,158 12,323,158<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 2 1,700,000<br />

Breshna Kot S/S Cells 20 kV (15 kV) 3 90,000<br />

Cells 110 kV 2 1,410,000<br />

Total 3,200,000 1,652,979 4,852,979<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 3 2,550,000<br />

South West S/S Cells 20 kV (15 kV) 5 150,000<br />

Cells 110 kV 11 7,755,000<br />

Total 10,455,000 1,751,836 12,206,836<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 2 1,700,000<br />

East S/S Cells 20 kV (15 kV) 3 90,000<br />

Cells 110 kV 2 1,410,000<br />

Total 3,200,000 861,205 4,061,205<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 1 850,000<br />

North West S/S Cells 20 kV (15 kV) 2 60,000<br />

Cells 110 kV 1 705,000<br />

Total 1,615,000 597,044 2,212,044<br />

Transformer 110/ 20 (15) kV<br />

40 MVA 1 1,360,000<br />

North S/S Cells 20 kV (15 kV) 2 60,000<br />

Cells 110 kV 1 705,000<br />

Total 2,125,000 686,816 2,811,816<br />

Junction Station #3 Cells 20 kV (15 kV) 7 210,000<br />

Transformers 110/ 20 (15) kV 13 11,560,000<br />

TOTAL<br />

Cells 20 kV (15 kV) 41 1,230,000<br />

Cells 110 kV 23 16,215,000<br />

Total 29,005,000 9,673,038 38,678,038<br />

Considerations Regarding <strong>Kabul</strong> Central<br />

<strong>Kabul</strong> Central is indicated before is in <strong>the</strong> central are <strong>of</strong> <strong>the</strong> city, which can be congested<br />

and with lower land availability. However it is exactly for <strong>the</strong>se reasons that <strong>the</strong> substation<br />

is necessary; <strong>the</strong> load is <strong>the</strong>re and <strong>the</strong>re are no o<strong>the</strong>r sources <strong>of</strong> supply.<br />

In order to deal with <strong>the</strong> cost <strong>of</strong> land and reduced right <strong>of</strong> ways one option would be to<br />

build <strong>Kabul</strong> Central using modular compact substations, which have <strong>the</strong> double<br />

advantage <strong>of</strong> having a much smaller foot print that conventional substations plus can be<br />

built much quicker.<br />

The 110 kV transmission lines can also be built using compact 110 kV lines on poles that<br />

have <strong>the</strong> same footprint as distribution line, but with taller poles. Moreover 110 kV cables<br />

xvi<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International


are quite within <strong>the</strong> state <strong>of</strong> <strong>the</strong> art and could be used if necessary can be used to bridge<br />

<strong>the</strong> final stretch to <strong>the</strong> location <strong>of</strong> <strong>Kabul</strong> Central.<br />

The 15 kV yard <strong>of</strong> <strong>Kabul</strong> Central can and maybe should be Junction Station #2, which<br />

would have to be expanded to receive <strong>the</strong> 4 lines (cables) from <strong>the</strong> 4 transformers at<br />

<strong>Kabul</strong> Central.<br />

If for any reason <strong>Kabul</strong> Central could not be built one option would be to bring express<br />

feeders from North S/S and Breshna Kot S/S. This option is not recommended and if<br />

selected it would need to be optimized. However, we present a first approximation below.<br />

To implement this option it would be necessary to bring 3 x 300 sqmm overhead lines<br />

from Breshna Kot and 3 x 300 sqmm lines from North Substation. The additional cost <strong>of</strong><br />

this investment is over 2.5 million dollars including underground lines to reach Junction<br />

Station 2.<br />

<strong>Analysis</strong> <strong>of</strong> <strong>the</strong> 110 kV network<br />

Section 11 presents <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> high voltage 110 kV system including <strong>the</strong><br />

incorporation <strong>of</strong> 100 MW diesel. In this section it is demonstrated that with <strong>the</strong><br />

recommended arrangement <strong>the</strong>re would not be problems in <strong>the</strong> system with <strong>the</strong><br />

incorporation <strong>of</strong> <strong>the</strong> 100 MW generation and <strong>the</strong> new substation indicated above.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International<br />

xvii


Section<br />

1<br />

Introduction<br />

This report presents <strong>the</strong> results <strong>of</strong> <strong>the</strong> analysis conducted for <strong>the</strong> <strong>Kabul</strong> distribution system<br />

for both <strong>the</strong> short and medium term and, based on this, our estimation <strong>of</strong> <strong>the</strong> necessary<br />

investments to provide adequate quality <strong>of</strong> service to <strong>the</strong> final customers.<br />

These results were obtained based on a detailed model for <strong>the</strong> medium voltage system<br />

produced in PSSSincal starting from field information on asset parameters and network<br />

topology. This model also incorporated load measurements and our own estimations on <strong>the</strong><br />

likely load that will materialize in <strong>the</strong> system once <strong>the</strong> existing generation restrictions are<br />

lifted, by <strong>the</strong> import <strong>of</strong> electric power and <strong>the</strong> addition <strong>of</strong> new local generation.<br />

This report also covers <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> 110 kV network with <strong>the</strong> incorporation <strong>of</strong> 100<br />

MW <strong>of</strong> diesel fired generation located to <strong>the</strong> north and east <strong>of</strong> East <strong>Kabul</strong> substation.<br />

This report is organized in <strong>the</strong> following sections:<br />

• Executive Summary<br />

• Introduction<br />

• Load Modeling<br />

• Network Modeling<br />

• Preliminary Network <strong>Analysis</strong><br />

• Strategic Network <strong>Analysis</strong><br />

• <strong>Analysis</strong> <strong>of</strong> <strong>the</strong> Medium Term <strong>System</strong><br />

• <strong>Analysis</strong> <strong>of</strong> <strong>the</strong> Short Term <strong>System</strong><br />

• New Substations and Expansions<br />

• Medium Voltage Investments<br />

• KABUL DIESEL GENERATION IMPACT<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 1


Section<br />

2<br />

Load Modeling<br />

We estimated <strong>the</strong> load by transformer based on <strong>the</strong> field measurements <strong>of</strong> a large number<br />

<strong>of</strong> residential transformers and <strong>the</strong> hourly consumption curves for residential and<br />

commercial/government loads.<br />

There were several residential transformers for which we did not have measurements and<br />

in this case we estimated <strong>the</strong>ir associated load based on <strong>the</strong> observed utilization factor for<br />

those residential transformers for which we did have measurements (utilization factor =<br />

Load / Capacity)<br />

For <strong>the</strong> Commercial/Government transformers we had some measurements but not for all<br />

<strong>of</strong> <strong>the</strong>m. As <strong>the</strong>se transformers generally feed one customer and <strong>the</strong>y should be more or<br />

less appropriately sized, we decided to use conservatively a peak utilization factor <strong>of</strong> 80%<br />

for <strong>the</strong>se customers.<br />

<strong>Final</strong>ly Siemens PTI was given hourly loading information for selected days on feeders that<br />

supplied mostly residential loads and mostly commercial/governmental loads.<br />

Figure 1and Figure 2 below shows <strong>the</strong> corresponding load pr<strong>of</strong>iles for <strong>the</strong>se loads as well<br />

as <strong>the</strong> total combined load at <strong>the</strong> North Substation. In <strong>the</strong>se figure we note that <strong>the</strong><br />

<strong>System</strong>’s peak occurs at <strong>the</strong> 20 to 21 h and it coincides with <strong>the</strong> peak residential load<br />

(100% coincidence factor). Commercial / Governmental loads on <strong>the</strong> o<strong>the</strong>r hand have <strong>the</strong>ir<br />

peak consumption between 10 to 14 hours and <strong>the</strong>ir load is reduced in average to 60% <strong>of</strong><br />

this peak by <strong>the</strong> time <strong>of</strong> <strong>the</strong> <strong>System</strong>’s peak (60% coincidence factor.) We used this<br />

information to create a coincident peak load on <strong>the</strong> feeders.<br />

Table 4 below shows <strong>the</strong> measured load by substation and feeder as well as our estimated<br />

load and <strong>the</strong> coincident load in MVA. In creating this table we used <strong>the</strong> correspondence<br />

supplied from <strong>the</strong> field by “main feeders” (i.e. those initiated at <strong>the</strong> HV/MV substations) and<br />

those that are supplied from <strong>the</strong> Junction Stations.<br />

Currently <strong>the</strong> values to be used to represent <strong>the</strong> load’s power factor are uncertain.<br />

<strong>Report</strong>edly one reason for this is that current measurements do not include <strong>the</strong> new<br />

commercial and industrial loads that will start using more <strong>the</strong> distribution system as <strong>the</strong><br />

generation becomes available and <strong>the</strong> reliability <strong>of</strong> supply improves. Also Siemens PTI has<br />

been informed that <strong>the</strong> power factor could be as low as 0.8, but it could also be much<br />

higher.<br />

One way to deal with this uncertainty is to establish that <strong>the</strong> system will be designed for a<br />

power factor <strong>of</strong> at least 0.9 and if any local loads have a lower power factor <strong>the</strong>n it will be<br />

compensated. It should be mentioned here that 0.9 is conservative and many utilities<br />

demand power factors <strong>of</strong> 0.95 or higher.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 2


Figure 1: Hourly Residential Consumption for selected feeders and Total Load for North Substation<br />

(Amps.)<br />

200<br />

180<br />

160<br />

140<br />

Feeder 528_Residential<br />

Feeder 514-Residential<br />

Feeder 520_Residential<br />

76% residential Feeder 517<br />

Total (A)<br />

1600<br />

1400<br />

1200<br />

120<br />

1000<br />

100<br />

800<br />

80<br />

600<br />

60<br />

40<br />

400<br />

20<br />

200<br />

0<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24<br />

0<br />

Figure 2: Hourly Residential Consumption for selected feeders and Total Load for North Substation<br />

(Amps.)<br />

250<br />

200<br />

Feeder 518<br />

Feeder 515<br />

Total (A)<br />

1600<br />

1400<br />

1200<br />

150<br />

1000<br />

800<br />

100<br />

600<br />

50<br />

400<br />

200<br />

0<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24<br />

0<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 3


Table 4: Current Load Estimation<br />

Feeder<br />

Measured Load (MVA) Estimated Peak Load MVA Estimated Coincident Load MVA<br />

Residential Comm /Gov Total Residential Comm /Gov Total Residential Comm /Gov Total<br />

Northwest<br />

NW-513 8.1 0.0 8.1 11.8 2.3 14.1 11.8 1.4 13.1<br />

NW-518 7.4 0.0 7.4 8.0 12.8 20.9 8.0 7.7 15.7<br />

NW-516 0.7 0.0 0.7 1.0 0.3 1.3 1.0 0.2 1.2<br />

NW-525 7.2 0.0 7.2 7.2 1.8 9.0 7.2 1.1 8.3<br />

NW-526 0.0 0.0 0.0 8.0 0.6 8.7 8.0 0.4 8.4<br />

NW-524 4.5 0.0 4.5 5.0 0.5 5.5 5.0 0.3 5.3<br />

NW-515 6.4 0.0 6.4 6.4 3.4 9.7 6.4 2.0 8.4<br />

NW-514 6.7 0.0 6.7 6.7 1.7 8.4 6.7 1.0 7.7<br />

NW-527 0.0 0.0 0.0 6.5 0.5 7.0 6.5 0.3 6.8<br />

NW-517 3.8 0.0 3.8 3.8 0.2 4.1 3.8 0.1 4.0<br />

Total 44.7 0.0 44.7 64.4 24.3 88.7 64.4 14.5 78.9<br />

44.7<br />

North<br />

N-512 5.9 0 5.9 7.0 3.0 10.1 7.0 1.8 8.9<br />

N-513 6.6 0 6.6 6.6 4.4 10.9 6.6 2.6 9.2<br />

N-514 5.9 0 5.9 5.9 0.0 5.9 5.9 0.0 5.9<br />

N-515 1.4 0 1.4 1.4 9.9 11.4 1.4 6.0 7.4<br />

N-516 7.2 0 7.2 7.2 4.5 11.7 7.2 2.7 9.9<br />

N-517 6.8 0 6.8 6.8 2.2 9.0 6.8 1.3 8.1<br />

N-518 6.1 0 6.1 6.8 9.1 15.9 6.8 5.4 12.3<br />

N-519 0.0 0 0.0 6.7 0.7 7.4 6.7 0.4 7.1<br />

N-520 7.5 0 7.5 7.5 0.0 7.5 7.5 0.0 7.5<br />

N-528 8.6 0 8.6 8.6 0.0 8.6 8.6 0.0 8.6<br />

N-529 7.3 0 7.3 7.3 3.8 11.1 7.3 2.3 9.6<br />

Total 63.3 0.0 63.3 71.8 37.7 109.5 71.8 22.6 94.4<br />

Breshnakot<br />

BK-512 0.0 0 0.0 0.0 0.2 0.2 0.0 0.1 0.1<br />

BK-513 2.7 0 2.7 2.7 0.0 2.7 2.7 0.0 2.7<br />

BK-514 3.8 0 3.8 4.2 1.8 6.0 4.2 1.1 5.3<br />

BK-515 4.3 0 4.3 4.8 1.9 6.8 4.8 1.2 6.0<br />

BK-516 4.3 0 4.3 5.4 1.6 7.0 5.4 1.0 6.4<br />

BK-517 7.9 0 7.9 9.9 4.2 14.1 9.9 2.5 12.4<br />

BK-518 8.4 0 8.4 10.6 5.1 15.6 10.6 3.0 13.6<br />

BK-519 9.9 0 9.9 11.1 4.6 15.7 11.1 2.8 13.9<br />

Total 41.3 0.0 41.3 48.7 19.5 68.2 48.7 11.7 60.4<br />

East<br />

E-519 4.6 0 4.6 8.1 8.6 16.7 8.1 5.2 13.3<br />

E-541 11.0 0 11.0 11.0 7.7 18.7 11.0 4.6 15.6<br />

E-531 2.9 0 2.9 3.4 0.3 3.8 3.4 0.2 3.6<br />

E-513 0.0 0 0.0 2.0 1.5 3.5 2.0 0.9 2.9<br />

E-521 0.0 0 0.0 0.0 9.6 9.6 0.0 5.8 5.8<br />

E-523 0.0 0 0.0 0.0 2.2 2.2 0.0 1.3 1.3<br />

E-511 0.0 0 0.0 0.0 1.3 1.3 0.0 0.8 0.8<br />

E-515 0.0 0 0.0 0.8 0.0 0.8 0.8 0.0 0.8<br />

E-536 0.0 0 0.0 0.1 0.2 0.3 0.1 0.1 0.2<br />

Total 18.5 0.0 18.5 25.5 31.4 56.9 25.5 18.8 44.3<br />

Total 167.9 0.0 167.9 210.4 112.8 323.2 210.4 67.6 278.0<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

4 Power Technologies International


Section<br />

3<br />

Network Modeling<br />

The distribution network <strong>of</strong> <strong>the</strong> city <strong>of</strong> <strong>Kabul</strong> was modeled using our proprietary program PSSSincal<br />

The 15 kV network was modeled in detail as well as <strong>the</strong> MV/LV transformation. The low voltage grid<br />

was not modeled but instead an equivalent load was connected to <strong>the</strong> low voltage side <strong>of</strong> <strong>the</strong><br />

transformers.<br />

The model created is geographically accurate and each node in <strong>the</strong> system was located using its<br />

latitude and longitude coordinates.<br />

The data used for modeling was received from <strong>the</strong> field and it was post processed by us in order to<br />

incorporate it into <strong>the</strong> model.<br />

The main results <strong>of</strong> this task are <strong>the</strong> PSSSincal files that represent <strong>the</strong> network under its current<br />

conditions. These files were <strong>the</strong>n modified to reflect <strong>the</strong> short term and medium term conditions<br />

expected in <strong>the</strong> system.<br />

Appendix H contains <strong>the</strong> forms received from <strong>the</strong> field and our processed results.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 5


Section<br />

4<br />

Preliminary Network <strong>Analysis</strong><br />

The load in Table 4 was modeled in PSSSincal and we found two types <strong>of</strong> problems in<br />

<strong>the</strong> network:<br />

a) There were sections <strong>of</strong> feeder that had conductor diameters much smaller than<br />

those <strong>of</strong> <strong>the</strong> subsequent (downstream) sections and that were heavily overloaded<br />

with <strong>the</strong> loading assumption described above. The diameter information <strong>of</strong> <strong>the</strong>se<br />

conductors is <strong>the</strong>refore inconsistent network design. We changed <strong>the</strong>se conductors<br />

to a minimum estimated value (see Table 5) and <strong>the</strong>n during <strong>the</strong> long term study we<br />

verified <strong>the</strong> adequacy <strong>of</strong> this value and it was increased if appropriate. The final<br />

recommended value is also presented in Table 5 and in Section 9 <strong>of</strong> this report<br />

(Medium Voltage Project Description) under short term investments.<br />

There were several sections <strong>of</strong> cables indicated as having aluminum conductors,<br />

which is inconsistent with DABM’s standards and with <strong>the</strong> vast majority <strong>of</strong> <strong>the</strong> cables<br />

in <strong>the</strong> network which have copper conductors. Moreover some <strong>of</strong> <strong>the</strong>se aluminum<br />

sections were inconsistent with downstream elements creating bottle necks. Table 6<br />

below shows <strong>the</strong>se cables as well as <strong>the</strong> rating that <strong>the</strong>y would have if <strong>the</strong>y were<br />

replaced by copper conductors (approximately 29 % higher rating.) This table also<br />

shows <strong>the</strong> expected loading on <strong>the</strong>se cables short term and medium term and <strong>the</strong><br />

percentage loading <strong>of</strong> <strong>the</strong> conductor if <strong>the</strong>y were aluminum. We observe in this table<br />

that <strong>the</strong>re are several cables that would be severely overload if <strong>the</strong>y had aluminum<br />

conductor but only would be slightly overloaded or not overloaded if <strong>the</strong>y had copper<br />

conductor. Note that those cables that appear overloaded using cooper conductor<br />

will be replaced anyway in <strong>the</strong> mid term so should be no concern. However those<br />

cables that are overloaded with aluminum but not with copper conductors must be<br />

slated for replacement. These cables are included under short term investments in<br />

Section 9 <strong>of</strong> this report.<br />

b) The second type <strong>of</strong> problems relates to overloaded circuits beyond what reasonably<br />

could be withstand without damaging <strong>the</strong> conductors (assumed approximately 10%<br />

over normal rating) or severe under voltages. In <strong>the</strong>se instances <strong>the</strong> total load<br />

served was reduced so that <strong>the</strong> distribution lines were not overloaded beyond 10%<br />

or <strong>the</strong> minimum voltages were not below 80% nominal<br />

We discuss in additional detail <strong>the</strong> problems identified below and <strong>the</strong> adjustments made to <strong>the</strong><br />

loads in <strong>the</strong> system.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 6


Table 5: Conductor Inconsistent with Network Design<br />

Original<br />

x-Section<br />

[mm²] Rating Conductor Type<br />

Replacement<br />

Minimum<br />

x-Section<br />

[mm²]<br />

Recommende<br />

d x-Section<br />

[mm²]<br />

Estimated<br />

Loading<br />

Network 2007 Conditions<br />

Loading with<br />

Current<br />

Conductor<br />

Loading with<br />

Rcom'd<br />

Conductor<br />

Substation Feeder From To Conductor Type<br />

Rating<br />

North 513 N-513 N-513-2 Overhead 95 330 Overhead 150 150 425 351 106% 83%<br />

North 513 N-513-35 N-513-39 Overhead 35 165 Overhead 70 185 490 228 138% 47%<br />

North 513 N-513-39 N-513-43 Overhead 35 165 Overhead 70 185 490 228 138% 47%<br />

North 513 N-513-43 N-513-46 Overhead 35 165 Overhead 70 185 490 192 116% 39%<br />

North 513 N-513-46 N-513-47 Overhead 35 165 Overhead 70 185 490 192 116% 39%<br />

North 513 N-513-47 N-513-53 Overhead 35 165 Overhead 70 185 490 192 116% 39%<br />

North 516 N-516 N-516-3 Overhead 70 270 Overhead 120 185 490 396 147% 81%<br />

North 516 N-516-41 N-516-63 Overhead 70 270 Overhead 120 120 365 376 139% 103%<br />

North 516 N-516-63 N-516-66 Overhead 70 270 Overhead 120 120 365 376 139% 103%<br />

North 516 N-516-66 N-516-76 Overhead 70 270 Overhead 120 120 365 376 139% 103%<br />

North 516 N-516-76 N-516-85 Overhead 70 270 Overhead 120 120 365 376 139% 103%<br />

North 517 N-517 N-517-3 Overhead 70 270 Overhead 120 185 490 368 136% 75%<br />

North 517 N-517-41 N-517-63 Overhead 70 270 Overhead 120 120 365 368 136% 101%<br />

North 517 N-517-63 N-517-66 Overhead 70 270 Overhead 120 120 365 368 136% 101%<br />

North 517 N-517-66 N-517-76 Overhead 70 270 Overhead 120 120 365 368 136% 101%<br />

North 517 N-517-76 N-517-85 Overhead 70 270 Overhead 120 120 365 368 136% 101%<br />

North 527 N-527-24 N-527-32 Overhead 50 200 Overhead 70 70 270 238 119% 88%<br />

North 528 N-528-10 N-528-12 Overhead 50 200 Overhead 70 70 270 235 118% 87%<br />

North 529 N-529 N-529-3 Overhead 70 270 Overhead 150 185 490 421 156% 86%<br />

North 529 N-529-79 JS#5-N-529 3 Cables on Duct 95 330 Cable 95 240 532 393 119% 74%<br />

Breshna Kot 517 BK-517-64 BK-517-71 Overhead 70 270 Overhead 185 185 490 402 149% 82%<br />

Breshna Kot 517 BK-517-111 BK-517-116 Overhead 50 200 Overhead 185 185 490 325 162% 66%<br />

Breshna Kot 518 BK-518-12 BK-518-15 3 Cables on Duct 70 270 1 Cables on Duct 185 185 498 488 181% 98%<br />

Breshna Kot 519 BK-519-12 BK-519-15 3 Cables on Duct 70 270 1 Cable per Duct 185 185 498 499 185% 100%<br />

North West 514 NW-514-6 NW-514-7 Overhead 70 270 Overhead 120 120 365 399 148% 109%<br />

North West 514 NW-514-7 NW-514-10 Overhead 70 270 Overhead 120 120 365 399 148% 109%<br />

North West 518 S/S North West NW-518 3 Cables on Duct 150 425 1 Cable per Duct 185 185 490 606 143% 124%<br />

North West 518 NW-518 NW-518-7 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-7 NW-518-18 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-18 NW-518-26 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-26 NW-518-32 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-32 NW-518-40 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-40 NW-518-47 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-47 NW-518-51 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-51 NW-518-52 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-52 NW-518-59A Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-59A NW-518-61.1 Overhead 70 270 Overhead 185 185 490 591 219% 121%<br />

North West 518 NW-518-65 NW-518-61.1 Overhead 70 270 Overhead 185 185 490 572 212% 117%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 7


Table 6: Cables with <strong>Report</strong>ed Aluminum Conductors<br />

Substation From To<br />

Current Rating<br />

Expected Loading (kA) Mid term Mid term<br />

x-Section Length <strong>Report</strong>ed<br />

with Al with Cu<br />

Loading if Al Loading if Cu<br />

[mm2] [km] Material<br />

Cu/Al Short Term Mid Term<br />

conductor conductor<br />

conductor conductor<br />

North N-529-79 JS#5-N-529 95 0.027 Al 0.251 0.323 29% 0.384 0.401 160% 124%<br />

North N-519-22 JS#10-N 95 0.077 Al 0.251 0.323 29% 0.281 0.342 136% 106%<br />

North S/S North West NW-515 150 0.144 Al 0.319 0.409 28% 0.342 0.432 135% 106%<br />

North S/S North N-529 185 0.077 Al 0.361 0.461 28% 0.442 0.474 131% 103%<br />

North N-512-T#1 Wazir akbar khan JS#2-N-515 50 2.389 Al 0.172 0.222 29% 0.184 0.230 107% 83%<br />

North S/S North N-528 185 0.021 Al 0.361 0.461 28% 0.364 0.376 104% 82%<br />

North S/S North N-520 185 0.087 Al 0.361 0.461 28% 0.307 0.338 94% 73%<br />

North JS#10-N N-527-24 185 0.598 Al 0.361 0.461 28% 0.260 0.316 88% 69%<br />

North S/S North N-514 185 0.040 Al 0.361 0.461 28% 0.211 0.274 76% 60%<br />

North N-517-159 JS#12-N-517 185 0.126 Al 0.361 0.461 28% 0.293 0.194 54% 42%<br />

North S/S North N-516 185 0.054 Al 0.361 0.461 28% 0.416 0.193 54% 42%<br />

North N-527-32 N-527-No-10 Zamini Tr 1&2 95 0.030 Al 0.251 0.323 29% 0.109 0.132 53% 41%<br />

North N-527-No-10 Zamini Tr 1&2 N-527-10-E1 95 0.211 Al 0.251 0.323 29% 0.061 0.075 30% 23%<br />

North N-527-48 N-527-No-9 Zamini Tr 1&2 95 0.017 Al 0.251 0.323 29% 0.047 0.058 23% 18%<br />

North N-520-38 N-520-No-13 Zamini # 1&2 95 0.009 Al 0.251 0.323 29% 0.052 0.058 23% 18%<br />

North N-520-27 N-520-No-12 Zamini # 1&2 95 0.011 Al 0.251 0.323 29% 0.052 0.058 23% 18%<br />

North N-514-19-C12 N-514-No-6 Proja Wazir Abad 2 95 0.028 Al 0.251 0.323 29% 0.038 0.052 21% 16%<br />

North N-514-19-A5 N-514-No-1 Proja Wazir Abad 1 95 0.052 Al 0.251 0.323 29% 0.038 0.052 21% 16%<br />

North N-520-48 N-520-Borj Sera mina # 1&2 95 0.007 Al 0.251 0.323 29% 0.046 0.051 20% 16%<br />

North N-529_JS5_B_2_5-No_1_Zamini Karte Ariana N-529_JS5_B_2_5-1 50 0.016 Al 0.172 0.222 29% 0.012 0.032 19% 15%<br />

North N-514-29-B9 N-514-No-7 Proja Wazir Abad 1 95 0.086 Al 0.251 0.323 29% 0.034 0.045 18% 14%<br />

North N-516-516-B4 N-516-Academey Nezame 95 0.103 Al 0.251 0.323 29% 0.027 0.040 16% 12%<br />

North N-529-49A6 N-529-Borj 5 Chamni Babrak 95 0.088 Al 0.251 0.323 29% 0.023 0.032 13% 10%<br />

North N-527-38-A11 N-527-Sarwar Kaynat 95 0.151 Al 0.251 0.323 29% 0.027 0.032 13% 10%<br />

North N-514-19-B3 N-514-No-2 Proja Wazir Abad 1&2 95 0.162 Al 0.251 0.323 29% 0.022 0.028 11% 9%<br />

North N-516-No-1-Qwai Hawaye N-516-No-2-Qwai Hawaye 95 0.184 Al 0.251 0.323 29% 0.017 0.025 10% 8%<br />

North N-520-20 N-520-No-12 Taqweatee 95 0.190 Al 0.251 0.323 29% 0.023 0.025 10% 8%<br />

North N-527-10-E 29 N-527-Shahrak Police 185 0.311 Al 0.361 0.461 28% 0.026 0.032 9% 7%<br />

North N-512-108 N-512-Nowabad BiBi Mahro 95 0.262 Al 0.251 0.323 29% 0.019 0.025 8% 8%<br />

North N-516-133-d1 N-516-T/s Riasat Amniat <strong>Kabul</strong> 95 0.061 Al 0.251 0.323 29% 0.011 0.016 6% 5%<br />

North N-527-10-E-25-7 N-527-Hotel Shame Paris 50 0.012 Al 0.172 0.222 29% 0.008 0.010 6% 5%<br />

North N-514-19-C12 N-514-19-C-15 185 0.367 Al 0.361 0.461 28% 0.011 0.014 4% 3%<br />

North N-529-79-B16 N-529-Bland manzel Gulzad 95 0.123 Al 0.251 0.323 29% 0.005 0.006 3% 2%<br />

North S/S North N-518 185 0.046 Al 0.361 0.461 28% 0.462 0.006 2% 1%<br />

North N-517-517-A3 N-517-Taleem Wa Tarbia 95 0.016 Al 0.251 0.323 29% 0.003 0.004 2% 1%<br />

North S/S North N-515 185 0.058 Al 0.361 0.461 28% 0.297 0.001 0% 0%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

8 Power Technologies International


Table 6: Cables with <strong>Report</strong>ed Aluminum Conductors (cont)<br />

Substation From To<br />

Current Rating<br />

Expected Loading (kA) Mid term Mid term<br />

x-Section Length <strong>Report</strong>ed<br />

with Al with Cu<br />

Loading if Al Loading if Al<br />

[mm2] [km] Material<br />

Cu/Al Short Term Mid Term<br />

conductor conductor<br />

conductor conductor<br />

Nort West S/S North West NW-524 185 0.163 Al 0.361 0.461 28% 0.214 0.327 91% 71%<br />

Nort West NW-515-74 NW-515-Borj_1_Parwan She 70 0.087 Al 0.21 0.271 29% 0.030 0.042 20% 15%<br />

Nort West NW-526-42_3 NW-526-No_17_Projhe Jadeed # 1&2 70 0.239 Al 0.21 0.271 29% 0.106 0.137 65% 50%<br />

Nort West NW-514-84 JS#5-NW-514 120 0.023 Al 0.285 0.367 29% 0.109 0.143 50% 39%<br />

Nort West NW-526-No_17_Projhe Jadeed # 1&2 NW-526-No_18_Projhe Jadeed # 1&2 70 0.388 Al 0.21 0.271 29% 0.076 0.097 46% 36%<br />

Nort West NW-514-30 NW-514-Borj_1_Tahia Maskan 95 0.246 Al 0.251 0.323 29% 0.081 0.106 42% 33%<br />

Nort West NW-524-23_5 NW-524-Borj_2_Zamini # 1&2 35 0.225 Al 0.147 0.189 29% 0.033 0.051 34% 27%<br />

Nort West NW-514-Borj_1_Tahia Maskan NW-514-Borj_2_Tahia Maskan 95 0.116 Al 0.251 0.323 29% 0.056 0.074 29% 23%<br />

Nort West NW-524-32_2 NW-524-Borj_3_Markazi Hasee Awal # 1&2 50 0.044 Al 0.172 0.222 29% 0.032 0.048 28% 22%<br />

Nort West NW-526-51_15 NW-526-No_14_Panjsad Family # 1&2 70 0.059 Al 0.21 0.271 29% 0.045 0.058 28% 21%<br />

Nort West NW-526-54 NW-526-No_16_Panjsad Family # 1&2 70 0.009 Al 0.21 0.271 29% 0.045 0.058 28% 21%<br />

Nort West NW-526-No_18_Projhe Jadeed # 1&2 NW-526-No_24_Projhe Jadeed # 1&2 70 0.393 Al 0.21 0.271 29% 0.038 0.049 23% 18%<br />

Nort West NW-524-21_5 NW-524-Borj_1_Hesa Awal Khirkhana 35 0.022 Al 0.147 0.189 29% 0.021 0.032 22% 17%<br />

Nort West NW-526-51_17 NW-526-No_15_Maktab Sangi # 1&2 70 0.017 Al 0.21 0.271 29% 0.033 0.042 20% 15%<br />

Nort West NW-518-104.16 NW-518-No-2 Khoshhalkhan 1&2 50 0.016 Al 0.172 0.222 29% 0.019 0.032 19% 15%<br />

Nort West NW-526-51_4 NW-526-No_20_Panjsad Family # 1&2 70 0.023 Al 0.21 0.271 29% 0.030 0.038 18% 14%<br />

Nort West NW-514-Borj_2_Tahia Maskan NW-514-Borj_3_Tahia Maskan 1&2 95 0.071 Al 0.251 0.323 29% 0.032 0.042 17% 13%<br />

Nort West NW-514-60 NW-514-Borj_3_Parwan she 240 0.012 Al 0.417 0.532 28% 0.049 0.065 16% 12%<br />

Nort West NW-525-82.4 NW-525-Qasemi Vin House 50 0.250 Al 0.172 0.222 29% 0.022 0.026 15% 11%<br />

Nort West JS#8-NW-517 NW-F-Bus hai barqi-Bus Hai Barqi 120 0.527 Al 0.285 0.367 29% 0.028 0.033 11% 9%<br />

Nort West NW-514-49 NW-514-Borj_2_Parwan she 95 0.023 Al 0.251 0.323 29% 0.019 0.025 10% 8%<br />

Nort West NW-524-41 NW-524-Jawar Mokhaberat Khairkhana 95 0.047 Al 0.251 0.323 29% 0.017 0.025 10% 8%<br />

Nort West NW-515-63_6 NW-515-Maiwand Market 50 0.055 Al 0.172 0.222 29% 0.012 0.016 9% 7%<br />

Nort West NW-515-Borj_1_Parwan She NW-515-Haji Aadam khan 50 0.222 Al 0.172 0.222 29% 0.011 0.016 9% 7%<br />

Nort West NW-525-Taimani No-1 NW-525-Nasajy Maqsody 120 0.463 Al 0.285 0.367 29% 0.014 0.016 6% 4%<br />

Nort West NW-514-55 NW-514-Sarai Kantinery_1&2 95 0.101 Al 0.251 0.323 29% 0.010 0.013 5% 4%<br />

Nort West NW-524-41 NW-524-Mokhaberat Khairkhana 70 0.018 Al 0.21 0.271 29% 0.007 0.010 5% 4%<br />

Breshna Kot BK-513-44_49 BK-513-Chaman Hozory 150 0.113 Al 0.319 0.409 28% 0.008 0.013 4% 3%<br />

East E-521-19_21 E-521-Sangi Jeke 35 0.059 Al 0.166 0.213 28% 0.008 0.016 10% 8%<br />

East E-521-28_7 E-521-Kaka Khil Traso 35 0.108 Al 0.166 0.213 28% 0.005 0.010 6% 5%<br />

East E-521-19_9 E-521-Marmar Khalid 35 0.132 Al 0.147 0.189 29% 0.004 0.008 5% 4%<br />

East E-521-28_7 E-521-Rahim Suhak 35 0.055 Al 0.166 0.213 28% 0.004 0.008 5% 4%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 9


4.1 Case_07_B1: 2007 Estimated Loading Conditions in Existing<br />

Network<br />

In order to initiate <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> network we connected to each <strong>of</strong> <strong>the</strong> MV/LV transformers in <strong>the</strong><br />

system a loading consistent with <strong>the</strong> loads in Table 4, which we believe are consistent with <strong>the</strong><br />

loading that would simultaneously appear in <strong>the</strong> network if <strong>the</strong>re were no limitation on supply and that<br />

results in an average utilization factor for all MV/LV transformers in <strong>the</strong> system <strong>of</strong> 71%. The case thus<br />

created was identified as Case_07_B1<br />

Table 7 presents <strong>the</strong> main conditions in <strong>the</strong> network for Case_07_B1. In this table it can be observed<br />

that <strong>the</strong> selected loading results in unsustainable operating conditions; i.e. feeder loadings as high as<br />

310% nominal and voltages as low as 51.8% nominal. In fact for feeder East 541 approximately 8<br />

MW <strong>of</strong> load had to be disconnected to allow <strong>the</strong> loadflow to converge (clear sign <strong>of</strong> voltage collapse)<br />

and even with this load shedding <strong>the</strong> voltage in this feeder would be 55.8% nominal. For feeder North<br />

West 513 we had to disconnect 1.2 MW <strong>of</strong> load for <strong>the</strong> case to converge; <strong>the</strong> voltage in this case was<br />

<strong>the</strong> lowest observed in <strong>the</strong> network: 51.76%.<br />

Figure 3 presents an overview <strong>of</strong> <strong>the</strong> network situation for this case where we observe that <strong>the</strong><br />

existing substations are not able to reach <strong>the</strong> loads located in <strong>the</strong> center <strong>of</strong> <strong>Kabul</strong> without incurring in<br />

heavy overloads, voltage drop and losses. In fact below in this document we will demonstrate that all<br />

<strong>of</strong> <strong>the</strong>se substations are poorly located to supply <strong>the</strong> loads in central <strong>Kabul</strong>. One consequence <strong>of</strong> this<br />

fact is <strong>the</strong> relative long length <strong>of</strong> <strong>the</strong> existing feeders as shown in Table 7<br />

Appendix A provides detailed large format maps <strong>of</strong> <strong>the</strong> load flow results <strong>of</strong> this case.<br />

4.2 Case_07_B2: 2007 Reduced Loading Conditions in Existing<br />

Network<br />

As shown above if we tried to supply <strong>the</strong> 2007 estimated load levels with <strong>the</strong> existing network <strong>the</strong>re<br />

would be unsustainable conditions in <strong>the</strong> network. Therefore we decided to evaluate what would be<br />

<strong>the</strong> maximum load that could be served with this network by curtailing part <strong>of</strong> <strong>the</strong> load in some circuits<br />

so that no circuit would be loaded above 110% <strong>of</strong> its <strong>the</strong>rmal rating or resulted in voltages below<br />

85%.<br />

It should be indicated that we are not implying here that <strong>the</strong>se are acceptable operating conditions,<br />

but ra<strong>the</strong>r operating conditions that we have seen in o<strong>the</strong>r stretched systems elsewhere in <strong>the</strong> world.<br />

Table 8 below shows <strong>the</strong> main results for this case and Table 9 show <strong>the</strong> reduction in loading that<br />

was necessary to achieve <strong>the</strong>se results. In this last table <strong>the</strong> loading is presented as a percentage <strong>of</strong><br />

<strong>the</strong> installed transformation capacity.<br />

In Table 8 we observe that <strong>the</strong>re are still some important feeders loaded at or above 100%, but with<br />

<strong>the</strong> exception <strong>of</strong> feeder NW-515 all <strong>of</strong> <strong>the</strong> loading is below 110%. In <strong>the</strong> case <strong>of</strong> feeder NW-515 <strong>the</strong>re<br />

is a small lateral loaded to 114%, but we decided not to correct it at this time.<br />

<strong>Final</strong>ly <strong>the</strong> losses in this case are 8.9% which is extremely high for a distribution network, which again<br />

may be indicative <strong>of</strong> long feeders and overextended substations.<br />

Appendix B presents detailed large format drawings <strong>of</strong> <strong>the</strong> results for this case.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

10 Power Technologies International


Table 7: Feeder <strong>Analysis</strong> for Current Loading in Case_07_B1<br />

Voltages<br />

Minimum Reserve Margin (MRM)<br />

(Minimum <strong>of</strong> Actual Current - Nominal)<br />

Most Loaded Section (MLS)<br />

(Minimum <strong>of</strong> Actual Current / Nominal Current)<br />

Feeder Parameters<br />

Substation<br />

Feeder ID<br />

At most<br />

distant node<br />

Minimum in<br />

Feeder<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Margin<br />

(A)<br />

X-Section<br />

mm²<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Maximum X-Section<br />

Loading % mm²<br />

MRM at<br />

MLS <br />

Minimum x-<br />

section<br />

mm²<br />

Maximum x-<br />

section<br />

mm²<br />

S/S North N-512 87.57 83.63 394 270 -124.0 70 394 270.0 145.9 70 TRUE 50 185 16.76<br />

S/S North N-516 89.64 86.21 441 365 -76.1 120 441 365.0 120.8 120 TRUE 50 185 10.89<br />

S/S North N-518 96.58 93.53 470 409 -60.9 150 470 409.0 114.9 150 TRUE 35 185 7.82<br />

S/S North West NW-515 97.09 93.68 188 165 -23.1 35 188 165.0 114.0 35 TRUE 50 185 6.84<br />

S/S North N-529 96.20 92.73 393 360 -33.0 95 393 360.0 109.2 95 TRUE 70 185 8.30<br />

S/S North N-515 97.89 95.47 207 222 15.1 50 207 222.0 93.2 50 TRUE 50 185 9.10<br />

S/S North N-519 101.87 98.13 238 270 31.6 70 238 270.0 88.3 70 TRUE 35 185 4.58<br />

S/S North N-528 99.83 95.09 235 270 34.9 70 235 270.0 87.1 70 TRUE 70 185 4.35<br />

S/S North N-517 94.60 91.18 310 365 55.3 120 310 365.0 84.8 120 TRUE 35 185 9.20<br />

S/S North N-513 98.60 94.97 228 270 41.7 70 228 270.0 84.5 70 TRUE 70 185 8.85<br />

S/S North N-514 103.70 100.76 201 270 68.9 70 201 270.0 74.5 70 TRUE 50 185 2.58<br />

S/S North N-520 102.60 98.49 292 425 132.8 150 292 425.0 68.7 150 TRUE 35 150 3.20<br />

S/S North West NW-513 58.29 51.76 748 270 -478.0 70 748 270.0 277.0 70 TRUE 25 70 19.69<br />

S/S North West NW-518 86.05 82.91 655 490 -164.9 185 655 490.0 133.7 185 TRUE 25 240 11.42<br />

S/S North West NW-514 98.41 94.83 399 365 -33.7 120 399 365.0 109.2 120 TRUE 35 240 6.38<br />

S/S North West NW-525 94.95 90.59 345 365 20.1 120 345 365.0 94.5 120 TRUE 35 120 8.79<br />

S/S North West NW-526 96.88 93.14 343 365 22.4 120 343 365.0 93.9 120 TRUE 50 185 6.08<br />

S/S North West NW-527 93.34 89.43 254 365 110.8 120 254 365.0 69.7 120 TRUE 16 185 11.44<br />

S/S North West NW-524 102.54 99.60 80 135 55.5 25 80 135.0 58.9 25 TRUE 35 185 3.10<br />

S/S North West NW-517 99.31 95.26 102 200 98.1 50 102 200.0 51.0 50 TRUE 35 185 8.42<br />

S/S North West NW-516 104.58 101.41 22 165 142.8 35 60 365.0 16.5 70 FALSE 25 150 3.55<br />

S/S Breshna Kot BK-517 87.79 84.10 578 490 -87.7 185 578 490.0 117.9 185 TRUE 35 240 13.08<br />

S/S Breshna Kot BK-518 99.71 96.29 487 461 -26.2 185 487 461.0 105.7 185 TRUE 70 95 11.52<br />

S/S Breshna Kot BK-519 101.23 95.94 499 490 -8.5 185 499 490.0 101.7 185 TRUE 50 240 11.28<br />

S/S Breshna Kot BK-515 102.10 99.97 216 271 55.2 70 216 271.0 79.6 70 TRUE 35 240 5.95<br />

S/S Breshna Kot BK-514 101.80 98.79 201 271 69.8 70 201 271.0 74.2 70 TRUE 50 240 7.59<br />

S/S Breshna Kot BK-516 103.64 100.17 19 200 181.0 50 192 365.0 52.7 150 FALSE 35 185 4.46<br />

S/S Breshna Kot BK-513 103.17 100.25 16 200 184.2 50 102 365.0 28.0 150 FALSE 35 185 6.88<br />

S/S Breshna Kot BK-512 104.99 102.98 5 303 297.6 70 5 303.0 1.8 70 TRUE 50 240 0.35<br />

S/S East E-541 65.34 55.80 838 270 -567.5 70 838 270.0 310.2 70 TRUE 50 150 15.97<br />

S/S East E-519 86.78 83.57 520 330 -190.0 95 520 330.0 157.6 95 TRUE 120 185 23.97<br />

S/S East E-521 102.53 99.02 183 200 16.9 50 183 200.0 91.5 50 TRUE 70 240 5.69<br />

S/S East E-513 100.22 97.09 114 270 156.4 70 114 270.0 42.1 70 TRUE 50 95 7.59<br />

S/S East E-531 101.66 98.08 12 270 257.6 70 126 365.0 34.5 150 FALSE 70 150 9.19<br />

S/S East E-523 103.68 101.64 36 222 185.7 50 36 222.0 16.4 50 TRUE 120 120 7.64<br />

S/S East E-511 104.52 102.50 41 270 229.4 70 41 270.0 15.0 70 TRUE 50 120 4.22<br />

S/S East E-515 104.35 100.35 32 365 333.4 120 32 365.0 8.6 120 TRUE 35 95 6.42<br />

S/S East E-536 105.00 105.00 0 365 364.8 120 334 365.0 91.5 120 TRUE 35 95 7.75<br />

Longest<br />

Section<br />

km<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 11


Figure 3: Overview <strong>of</strong> Case_07_B1<br />

(All loadings are presented as percentage <strong>of</strong> <strong>the</strong> feeder’s <strong>the</strong>rmal rating)<br />

North West S/S<br />

North S/S<br />

116% Loading<br />

90% Loading 120% Loading<br />

305% Loading<br />

East S/S<br />

100% Loading<br />

Breshna Kot S/S<br />

127% Loading<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

12 Power Technologies International


Table 8: Feeder <strong>Analysis</strong> for Reduced Loading in Case_07_B2<br />

Voltages<br />

Minimum Reserve Margin (MRM)<br />

(Minimum <strong>of</strong> Actual Current - Nominal)<br />

Most Loaded Section (MLS)<br />

(Minimum <strong>of</strong> Actual Current / Nominal Current)<br />

Feeder Parameters<br />

Substation<br />

Feeder ID<br />

Most distant<br />

node<br />

Minimum in<br />

Feeder<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Margin<br />

(A)<br />

X-Section<br />

mm²<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Maximum X-Section<br />

Loading % mm²<br />

MRM at<br />

MLS <br />

Minimum x-<br />

section<br />

mm²<br />

Maximum x-<br />

section<br />

mm²<br />

S/S North N-529 96.20 92.73 393 360 -33.0 95 393 360.0 109.2 95 TRUE 35 185 8.30<br />

S/S North N-518 97.48 94.76 421 409 -11.7 150 421 409.0 102.9 150 TRUE 50 185 7.82<br />

S/S North N-512 93.04 90.39 272 270 -2.3 70 272 270.0 100.8 70 TRUE 35 185 16.76<br />

S/S North N-516 92.51 89.73 362 365 2.8 120 362 365.0 99.2 120 TRUE 50 185 10.89<br />

S/S North N-515 97.89 95.47 207 222 15.1 50 207 222.0 93.2 50 TRUE 70 185 9.10<br />

S/S North N-519 101.87 98.13 238 270 31.6 70 238 270.0 88.3 70 TRUE 50 185 4.58<br />

S/S North N-528 99.83 95.09 235 270 34.9 70 235 270.0 87.1 70 TRUE 35 185 4.35<br />

S/S North N-517 94.60 91.18 310 365 55.3 120 310 365.0 84.8 120 TRUE 70 185 9.20<br />

S/S North N-513 98.60 94.97 228 270 41.7 70 228 270.0 84.5 70 TRUE 35 185 8.85<br />

S/S North N-514 103.70 100.76 201 270 68.9 70 201 270.0 74.5 70 TRUE 70 185 2.58<br />

S/S North N-520 102.60 98.49 292 425 132.8 150 292 425.0 68.7 150 TRUE 50 185 3.20<br />

S/S North West NW-515 97.09 93.68 188 165 -23.1 35 188 165.0 114.0 35 TRUE 35 150 6.84<br />

S/S North West NW-514 98.79 95.43 376 365 -11.1 120 376 365.0 103.0 120 TRUE 25 70 6.38<br />

S/S North West NW-518 91.02 88.71 492 490 -2.5 185 492 490.0 100.5 185 TRUE 25 240 11.42<br />

S/S North West NW-513 87.41 85.69 269 270 1.3 70 269 270.0 99.5 70 TRUE 35 240 20.39<br />

S/S North West NW-525 94.95 90.59 345 365 20.1 120 345 365.0 94.5 120 TRUE 35 120 8.79<br />

S/S North West NW-526 96.88 93.14 343 365 22.4 120 343 365.0 93.9 120 TRUE 50 185 6.08<br />

S/S North West NW-527 93.34 89.43 254 365 110.8 120 254 365.0 69.7 120 TRUE 16 185 11.44<br />

S/S North West NW-524 102.54 99.60 80 135 55.5 25 80 135.0 58.9 25 TRUE 35 185 3.10<br />

S/S North West NW-517 99.31 95.26 102 200 98.1 50 102 200.0 51.0 50 TRUE 35 185 8.42<br />

S/S North West NW-516 104.58 101.41 22 165 142.8 35 44 270.0 16.5 70 FALSE 25 150 3.55<br />

S/S Breshna Kot BK-518 99.88 96.56 473 461 -11.6 185 473 461.0 102.5 185 TRUE 35 240 11.52<br />

S/S Breshna Kot BK-519 101.23 95.94 499 490 -8.5 185 499 490.0 101.7 185 TRUE 70 95 11.28<br />

S/S Breshna Kot BK-517 90.99 88.00 477 490 13.5 185 477 490.0 97.2 185 TRUE 50 240 13.08<br />

S/S Breshna Kot BK-515 102.10 99.97 216 271 55.2 70 216 271.0 79.6 70 TRUE 35 240 5.95<br />

S/S Breshna Kot BK-514 101.80 98.79 201 271 69.8 70 201 271.0 74.2 70 TRUE 50 240 7.59<br />

S/S Breshna Kot BK-516 103.64 100.17 19 200 181.0 50 216 409.0 52.7 150 FALSE 35 185 4.46<br />

S/S Breshna Kot BK-513 103.17 100.25 16 200 184.2 50 115 409.0 28.0 150 FALSE 35 185 6.88<br />

S/S Breshna Kot BK-512 104.99 102.98 5 303 297.6 70 5 303.0 1.8 70 TRUE 50 240 0.35<br />

S/S East E-519 93.65 91.71 333 330 -3.0 95 333 330.0 100.9 95 TRUE 50 150 23.97<br />

S/S East E-541 92.46 89.19 269 270 0.8 70 269 270.0 99.7 70 TRUE 120 185 15.97<br />

S/S East E-521 102.53 99.02 183 200 16.9 50 183 200.0 91.5 50 TRUE 70 240 5.69<br />

S/S East E-513 100.22 97.09 114 270 156.4 70 114 270.0 42.1 70 TRUE 50 95 7.59<br />

S/S East E-531 101.66 98.08 12 270 257.6 70 141 409.0 34.5 150 FALSE 70 150 9.19<br />

S/S East E-523 103.68 101.64 36 222 185.7 50 36 222.0 16.4 50 TRUE 120 120 7.64<br />

S/S East E-511 104.52 102.50 41 270 229.4 70 41 270.0 15.0 70 TRUE 50 120 4.22<br />

S/S East E-515 104.35 100.35 32 365 333.4 120 32 365.0 8.6 120 TRUE 35 95 6.42<br />

S/S East E-536 105.00 105.00 0 365 364.8 120 334 365.0 91.5 120 TRUE 35 95 7.75<br />

Longest<br />

Section<br />

km<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 13


Table 9: Reduced Loading for Case_07_B2<br />

(Loading presented as % <strong>of</strong> connected transformation capacity)<br />

Feeder<br />

Total Loading<br />

Actual Load Reduced Load<br />

Northwest<br />

NW-513 71% 34%<br />

NW-518 59% 47%<br />

NW-516 73% 73%<br />

NW-525 89% 89%<br />

NW-526 79% 79%<br />

NW-524 67% 67%<br />

NW-515 73% 73%<br />

NW-514 77% 73%<br />

NW-527 79% 79%<br />

NW-517 87% 87%<br />

Total 72%<br />

North<br />

N-512 74% 55%<br />

N-513 78% 78%<br />

N-514 75% 75%<br />

N-515 53% 53%<br />

N-516 67% 57%<br />

N-517 71% 71%<br />

N-518 65% 59%<br />

N-519 83% 83%<br />

N-520 91% 91%<br />

N-528 97% 97%<br />

N-529 73% 73%<br />

Total 73%<br />

Breshnakot<br />

BK-512 48% 48%<br />

BK-513 66% 66%<br />

BK-514 68% 68%<br />

BK-515 49% 49%<br />

BK-516 79% 79%<br />

BK-517 70% 60%<br />

BK-518 75% 73%<br />

BK-519 67% 67%<br />

Total 68%<br />

East<br />

E-519 61% 41%<br />

E-541 81% 36%<br />

E-531 80% 80%<br />

E-513 69% 69%<br />

E-521 48% 48%<br />

E-523 48% 48%<br />

E-511 48% 48%<br />

E-515 87% 87%<br />

E-536 65% 65%<br />

Total 66%<br />

Total 71% 67%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

14 Power Technologies International


4.3 Case_07_B3: 2007 Estimated Loading Conditions in Modified<br />

Network<br />

As shown in Table 7 <strong>the</strong> <strong>Kabul</strong> <strong>Distribution</strong> Network in its current condition is unable to supply <strong>the</strong><br />

estimated load, without major improvements, including new substations as will be presented below in<br />

this document. However, based on our initial review we identified that <strong>the</strong>re are some conditions in<br />

<strong>the</strong> network that prevent its full utilization and it would be wrong to initiate our analysis with <strong>the</strong>se<br />

impediments still in place.<br />

Therefore, we decided to create a 2007 base case (called Case_07_B3 from now on) that<br />

incorporates minor improvements that facilitates <strong>the</strong> full utilization <strong>of</strong> <strong>the</strong> existing network.<br />

The general approach was to balance load among different feeders by shifting load to <strong>the</strong><br />

neighboring feeders through:<br />

• switching,<br />

• streng<strong>the</strong>ning small sections <strong>of</strong> <strong>the</strong> feeders taking over <strong>the</strong> load especially near <strong>the</strong> switching<br />

points,<br />

• adding sections where necessary to provide a link for such load transfer<br />

• Increasing conductor sizes where <strong>the</strong>y are reduced suddenly without any branching.<br />

Also we upgraded all <strong>the</strong> sections <strong>of</strong> feeder in Table 5 with a conductor equal to <strong>the</strong> minimum<br />

recommended section as a first approximation.<br />

With <strong>the</strong>se changes we were able to supply <strong>the</strong> entirety <strong>of</strong> <strong>the</strong> load in <strong>the</strong> system (please recall that<br />

with <strong>the</strong> network in its original condition we had to disconnect some load associated with feeder NW-<br />

513 and E-541.)<br />

Table 10 below presents <strong>the</strong> corresponding feeder loading and conditions for this modified case. In<br />

this table we note that while <strong>the</strong>re are still severe overloads in <strong>the</strong> network <strong>the</strong>se are much less<br />

pronounced than before.<br />

The investments made in this system were rolled up in <strong>the</strong> short term plan <strong>of</strong> <strong>the</strong> system and will be<br />

discussed in <strong>the</strong> appropriate sections below.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 15


Table 10: Feeder <strong>Analysis</strong> for Modified Case_07_B3 (current estimated load conditions)<br />

Voltages<br />

Minimum Reserve Margin (MRM)<br />

(Minimum <strong>of</strong> Actual Current - Nominal C)<br />

Most Loaded Section (MLS)<br />

Maximum <strong>of</strong> Actual Current / Nominal Current<br />

Feeder Parameters<br />

Substation<br />

Feeder ID<br />

Most distant<br />

node<br />

Minimum in<br />

Feeder<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Margin<br />

(A)<br />

X-Section<br />

mm²<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Maximum X-Section<br />

Loading % mm²<br />

MRM at<br />

MLS <br />

Minimum x-<br />

section<br />

mm²<br />

Maximum x-<br />

section<br />

mm²<br />

S/S North N-518 97.11 94.09 436 409 -26.6 150 436 409.0 106.5 150 TRUE 35 185 7.82<br />

S/S North N-516 91.61 88.26 376 365 -11.0 120 376 365.0 103.0 120 TRUE 50 185 10.06<br />

S/S North N-517 92.33 88.66 368 365 -2.7 120 368 365.0 100.7 120 TRUE 35 185 10.44<br />

S/S North N-529 96.25 92.78 421 425 4.3 150 421 425.0 99.0 150 TRUE 50 185 8.30<br />

S/S North N-515 97.89 95.47 207 222 15.1 50 207 222.0 93.2 50 TRUE 70 185 9.10<br />

S/S North N-519 101.87 98.14 238 270 31.6 70 238 270.0 88.3 70 TRUE 50 185 4.58<br />

S/S North N-512 94.00 90.38 233 270 36.8 70 237 270.0 87.7 95 FALSE 35 185 16.23<br />

S/S North N-528 99.83 95.09 235 270 34.9 70 235 270.0 87.1 70 TRUE 70 185 4.35<br />

S/S North N-513 98.60 94.97 228 270 41.7 70 228 270.0 84.5 70 TRUE 35 185 8.85<br />

S/S North N-514 103.76 100.82 191 270 79.3 70 191 270.0 70.6 70 TRUE 70 185 2.58<br />

S/S North N-520 102.60 98.49 292 425 132.8 150 292 425.0 68.7 150 TRUE 50 185 3.20<br />

S/S North West NW-513 68.37 63.20 479 270 -208.6 70 479 270.0 177.2 70 TRUE 35 150 20.39<br />

S/S North West NW-518 87.98 84.92 606 490 -116.4 185 606 490.0 123.8 185 TRUE 25 70 11.42<br />

S/S North West NW-515 97.09 93.68 188 165 -23.1 35 188 165.0 114.0 35 TRUE 25 240 6.84<br />

S/S North West NW-514 98.41 94.83 399 365 -33.7 120 399 365.0 109.2 120 TRUE 35 240 6.38<br />

S/S North West NW-525 94.95 90.59 345 365 20.1 120 345 365.0 94.5 120 TRUE 35 120 8.79<br />

S/S North West NW-526 96.88 93.14 343 365 22.4 120 343 365.0 93.9 120 TRUE 50 185 6.08<br />

S/S North West NW-517 87.96 83.58 395 425 30.2 150 395 425.0 92.9 150 TRUE 16 185 14.16<br />

S/S North West NW-527 93.34 89.43 254 365 110.8 120 254 365.0 69.7 120 TRUE 35 185 11.44<br />

S/S North West NW-524 102.54 99.60 80 135 55.5 25 80 135.0 58.9 25 TRUE 35 185 3.10<br />

S/S North West NW-516 104.58 101.41 22 165 142.8 35 60 365.0 16.5 70 FALSE 25 150 3.55<br />

S/S Breshna Kot BK-519 101.23 95.94 499 490 -8.5 185 499 490.0 101.7 185 TRUE 35 240 11.28<br />

S/S Breshna Kot BK-518 98.25 94.54 488 490 2.3 185 488 490.0 99.5 185 TRUE 70 95 11.52<br />

S/S Breshna Kot BK-517 90.89 87.35 465 490 25.1 185 465 490.0 94.9 185 TRUE 50 240 11.31<br />

S/S Breshna Kot BK-513 91.48 87.36 397 425 28.0 150 397 425.0 93.4 150 TRUE 35 240 11.41<br />

S/S Breshna Kot BK-514 101.29 98.27 232 271 39.3 70 232 271.0 85.5 70 TRUE 50 240 7.59<br />

S/S Breshna Kot BK-516 100.97 97.59 347 425 77.9 150 298 365.0 81.7 150 TRUE 35 185 6.22<br />

S/S Breshna Kot BK-515 102.10 99.97 216 271 55.2 70 291 365.0 79.6 70 TRUE 35 185 5.95<br />

S/S Breshna Kot BK-512 104.99 102.98 5 303 297.6 70 5 303.0 1.8 70 TRUE 50 240 0.35<br />

S/S East E-519 88.30 85.15 314 255 -58.6 70 314 255.0 123.0 70 TRUE 50 150 23.97<br />

S/S East E-521 100.05 97.32 183 200 16.6 50 183 200.0 91.7 50 TRUE 120 185 12.78<br />

S/S East E-541 95.83 91.83 247 270 22.8 70 247 270.0 91.5 70 TRUE 70 240 8.37<br />

S/S East E-531 98.99 94.01 89 200 110.9 50 130 200.0 64.8 150 FALSE 50 95 9.19<br />

S/S East E-513 100.22 97.09 114 270 156.4 70 154 365.0 42.1 70 TRUE 70 150 7.59<br />

S/S East E-511 104.04 101.84 15 200 185.5 50 56 200.0 28.0 95 FALSE 120 120 5.68<br />

S/S East E-523 103.68 101.64 36 222 185.7 50 36 222.0 16.4 50 TRUE 50 120 7.64<br />

S/S East E-515 104.35 100.35 32 365 333.4 120 32 365.0 8.6 120 TRUE 35 95 6.42<br />

S/S East E-536 105.00 105.00 0 365 364.8 120 334 365.0 91.5 120 TRUE 35 95 7.75<br />

Longest<br />

Section<br />

km<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

16 Power Technologies International


Section<br />

5<br />

Strategic Network <strong>Analysis</strong><br />

Siemens PTI method for analyzing and planning power systems consists <strong>of</strong> producing a horizon<br />

system configuration and <strong>the</strong>n selecting <strong>the</strong> short and medium term expansions based on this<br />

horizon configuration. This method is called Jump Forward and Stage Back and in <strong>the</strong> case <strong>of</strong> <strong>the</strong><br />

<strong>Kabul</strong> <strong>Distribution</strong> <strong>System</strong> will take <strong>the</strong> form <strong>of</strong> <strong>the</strong> following phases:<br />

a) Long Term Network Design. This is also called <strong>the</strong> vision <strong>of</strong> <strong>the</strong> system and in it by<br />

considering high level parameters as load density, maximum substation size and substations<br />

sphere <strong>of</strong> influence, we estimate where new 110/MV substations will be required in <strong>the</strong><br />

medium term (3 years) and in <strong>the</strong> long term (over 3 years)<br />

b) Medium Term Network Design. In this case we will produce a network design that will<br />

provide reliable service to <strong>the</strong> term load (considered equal to 100% <strong>of</strong> <strong>the</strong> installed MV/LV<br />

transformation capacity) and that should materialize perhaps 3 years out. This design will<br />

take into consideration existing and new substations whose need is clear (based on <strong>the</strong> Long<br />

Term Design.) The design includes details on feeder configuration as for example route,<br />

conductor size and type, switching arrangements, reactive compensation and MV/LV<br />

transformers. <strong>Final</strong>ly all decisions with respect <strong>of</strong> new facilities are made so that <strong>the</strong> Medium<br />

Term Network Design is consistent with <strong>the</strong> Long Term Design.<br />

c) Short Term Network Design. This design consists <strong>of</strong> those system investments that need<br />

be implemented immediately. They generally do not include new substations but typically are<br />

geared to resolving <strong>the</strong> most pressing bottle necks in <strong>the</strong> system. This design is consistent<br />

with <strong>the</strong> Medium Term Design<br />

In this section <strong>of</strong> <strong>the</strong> report we present our initial considerations with respect <strong>of</strong> <strong>the</strong> Long Term<br />

Network Design. In <strong>the</strong> following sections on New Substations and Medium Voltage Investments we<br />

provide <strong>the</strong> details on <strong>the</strong> recommended projects for <strong>the</strong> short and medium terms.<br />

5.1 Planning Criteria<br />

Siemens PTI proposed to adopt <strong>the</strong> following “Planning Criteria” in conducting our network expansion<br />

plan:<br />

• 15 kilovolt (kV) is <strong>the</strong> nominal voltage <strong>of</strong> <strong>the</strong> network, although in <strong>the</strong> long term it may be<br />

increased to 20 kV. Therefore all new facilities will be designed considering <strong>the</strong> possibility <strong>of</strong><br />

operating at that voltage in <strong>the</strong> long term.<br />

• Substation transformers have automatic tap changers that can raise <strong>the</strong> voltage up to 105<br />

percent (%) nominal during maximum load conditions. The range <strong>of</strong> <strong>the</strong> tap changers is<br />

plus/minus 25%.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 17


• Power factor <strong>of</strong> 0.95 at substations. If necessary <strong>the</strong> required compensation will be provided.<br />

.<br />

• The maximum allowable voltage drop is 5% in primary urban feeders and 6% in rural areas.<br />

This means that in urban feeders, with <strong>the</strong> substation at 105% nominal, <strong>the</strong>re can be up to<br />

10% drop in primary plus 5% to drop in <strong>the</strong> transformer and secondary network and still<br />

achieve 95% nominal at <strong>the</strong> service entrance. For rural areas <strong>the</strong> drop across <strong>the</strong> transformer<br />

and secondary is normally much less (due to shorter secondary and lighter transformer<br />

loading) and 6% drop can be allowed in <strong>the</strong> primary and achieve 95% nominal at <strong>the</strong> service<br />

entrance. Note that this criteria still leaves <strong>the</strong> use <strong>of</strong> <strong>the</strong> distribution transformers taps to finetune<br />

<strong>the</strong> voltage at <strong>the</strong> different delivery points. The effect <strong>of</strong> voltage boosters in long feeders<br />

is considered in this evaluation.<br />

• Under peak conditions <strong>the</strong> mainline loading should be below 66% <strong>of</strong> <strong>the</strong> emergency rating to<br />

allow for load transfers during emergencies. If <strong>the</strong> 66% limit cannot be reasonably met or<br />

<strong>the</strong>re is no real possibility <strong>of</strong> load transfers, <strong>the</strong>n <strong>the</strong> limit becomes 100% <strong>of</strong> normal rating<br />

(e.g., for laterals <strong>the</strong> limit is 100% <strong>of</strong> normal rating).<br />

• All critical loads should be on an open ring configuration and with auto transfer. In selecting<br />

<strong>the</strong> number <strong>of</strong> transformers in a loop its size and importance <strong>of</strong> <strong>the</strong> load should be taken into<br />

consideration.<br />

• Service should be restored to all loads with a maximum <strong>of</strong> 4 switching operations following a<br />

substation breaker trip whenever practicable (in rural areas this may be not feasible for<br />

certain contingencies).<br />

• Express feeders between substations should be incorporated in <strong>the</strong> design to transfer load<br />

between <strong>the</strong>m in <strong>the</strong> case <strong>of</strong> transformer outages.<br />

• The preferred start point <strong>of</strong> a feeder is a primary substation, but in case that this is not<br />

practical <strong>the</strong>n <strong>the</strong> concept <strong>of</strong> a Joint Station will be utilized.<br />

• Joint Stations will be connected to primary substations with express lines whenever possible<br />

and loaded so that <strong>the</strong> outage on one line does not implies <strong>the</strong> overloading <strong>of</strong> <strong>the</strong> parallel<br />

lines.<br />

• For substations <strong>the</strong> loading criteria listed below will apply.<br />

o For <strong>the</strong> extended outage <strong>of</strong> any substation transformer, no facility will be<br />

loaded in excess <strong>of</strong> its Emergency Rating. Immediately following a forced<br />

outage, loading within <strong>the</strong> Emergency Rating will be permitted for <strong>the</strong> time<br />

required to perform switching operations to reduce <strong>the</strong> loading to <strong>the</strong> Normal<br />

Rating. No load shedding should be necessary to achieve this reduction.<br />

o<br />

o<br />

For <strong>the</strong> extended outage <strong>of</strong> a substation, no facility will be loaded in excess <strong>of</strong><br />

its Normal Rating after <strong>the</strong> first load cycle and after allowing for load transfers.<br />

For emergency substation transformer loadings under N-1 conditions,<br />

assume a loading <strong>of</strong> 1/2% loss <strong>of</strong> life for 4 hours in accordance with <strong>the</strong> ANSI<br />

standard loading tables (Table 11).<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

18 Power Technologies International


Table 11: Allowable Transformer Loading<br />

OA/FA/FA<br />

ANSI C57.92<br />

Table 3(p)<br />

Transformers<br />

Summer Rating<br />

Transformers<br />

Winter Ratings<br />

Normal<br />

Peak Load<br />

Design<br />

Long Term 24 Hr.<br />

Emergency<br />

Short Term 8 Hr.<br />

Emergency<br />

Short Term 1 Hr.<br />

Emergency<br />

90% 118% 128% 149%<br />

90% 131% 141% 168%<br />

OA/FOA/FOA<br />

ANSI C57.92<br />

Table 3(t)<br />

Transformers<br />

Summer Rating<br />

Transformers<br />

Winter Ratings<br />

Normal Design<br />

Peak Load<br />

Long Term 24 Hr.<br />

Emergency<br />

Short Term 8 Hr.<br />

Emergency<br />

Short Term 1 Hr.<br />

Emergency<br />

90% 117% 126% 148%<br />

90% 129% 138% 164%<br />

• For <strong>the</strong> expansions to <strong>the</strong> network <strong>the</strong> following standard equipment will be utilized in<br />

accordance with <strong>the</strong> DABM Standards. In <strong>the</strong>se tables <strong>the</strong> preferred conductor sizes will be<br />

used for all new installations and expansions. Occasionally o<strong>the</strong>r sizes may be considered<br />

only for small additions to existing installations to match <strong>the</strong> conductor. In this last case if <strong>the</strong><br />

selected conductor is not available <strong>the</strong>n <strong>the</strong> next size up must be selected.<br />

Underground Cables<br />

Table 12: Standardized Equipment<br />

Overhead Lines<br />

Type N2XS2Y Conductor ACSR<br />

Material Cu 70<br />

240 120<br />

Cross<br />

Section<br />

mm 2<br />

(Preferred)<br />

Cross<br />

Section<br />

mm 2<br />

(o<strong>the</strong>r)<br />

Cross<br />

Section<br />

mm2<br />

(Preferre<br />

d)<br />

120 185<br />

95 150<br />

50 95<br />

185 50<br />

150 35<br />

Cross Section<br />

mm 2 (o<strong>the</strong>r)<br />

70 25<br />

35<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 19


Transformers<br />

Capacitor Banks<br />

Connection Dy5 Size kVAr Units Type<br />

Impedance 4% to 6% 300 3 units fixed<br />

Tap positions (1) 5 600 6 units fixed<br />

Tap steps 2.50% 900 9 units switched<br />

250<br />

Capacity<br />

(kVA)<br />

(1) Centered 2 up and 2 down<br />

400<br />

630<br />

1000<br />

O<strong>the</strong>r Equipment in use<br />

Reclosers<br />

Load Break SW<br />

Disconnect Switch<br />

Disconnect Switch<br />

Ring Main Units<br />

Junction Stations<br />

Yes<br />

Yes<br />

Yes<br />

Yes<br />

yes<br />

yes<br />

5.2 <strong>System</strong> Overview<br />

As presented above Electric <strong>Distribution</strong> <strong>System</strong> in <strong>Kabul</strong> has severe transmission constraints that<br />

prevent <strong>the</strong> electric power to reach <strong>the</strong> load centers within <strong>the</strong> city with <strong>the</strong> required reliability.<br />

The first step in investigating <strong>the</strong> best way to solve <strong>the</strong>se problems is to form a view <strong>of</strong> how <strong>the</strong><br />

system should look over <strong>the</strong> long term and in particular where new substations (if any) should be<br />

located. Figure 4 shows an overview <strong>of</strong> <strong>the</strong> load density in <strong>Kabul</strong> as well as <strong>the</strong> load center; red color<br />

indicates high load concentrations.<br />

Based on <strong>the</strong> load obtained from measurements and our own estimations, our analysis indicates that<br />

<strong>the</strong> overall load density in <strong>the</strong> city (colored area in Figure 4 ) is approximately 1.5 MVA/km 2 which<br />

corresponds to a relatively low load density urbanized area.<br />

Based on this load density practice indicates that <strong>the</strong> HV/MV substations should be apart<br />

approximately 7.0 km and each should supply a load in <strong>the</strong> order <strong>of</strong> 60 MW.<br />

In Figure 4 <strong>the</strong> circles around <strong>the</strong> substations indicate <strong>the</strong> <strong>the</strong>oretical area <strong>of</strong> influence <strong>of</strong> each<br />

substation and here we observe <strong>the</strong> following:<br />

a) The load center <strong>of</strong> <strong>the</strong> city is located in <strong>the</strong> sou<strong>the</strong>rnmost border <strong>of</strong> <strong>the</strong> area <strong>of</strong> influence <strong>of</strong> <strong>the</strong><br />

North Substation. This last substation supplies 84 MW in Case_07_B1and as indicated<br />

before <strong>the</strong> main feeders heading south from this substation are overloaded.<br />

b) The highest load concentration occurs outside <strong>the</strong> areas <strong>of</strong> influence <strong>of</strong> all <strong>of</strong> <strong>the</strong> existing<br />

substations.<br />

c) There are two substations; North West and East Substation, whose area <strong>of</strong> influence covers<br />

mostly rural areas and that are currently using ra<strong>the</strong>r long feeders to reach <strong>the</strong> load centers <strong>of</strong><br />

Central <strong>Kabul</strong> for East (e.g. Makrorayani) and West <strong>Kabul</strong> (e.g. <strong>Kabul</strong> University) for North<br />

West. The feeders from <strong>the</strong>se substations are also highly loaded and North West supplies<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

20 Power Technologies International


over 76 MW and East 42 MW in Case_07_B1. As will be shown below <strong>the</strong>se two substations<br />

also have <strong>the</strong> highest losses in <strong>the</strong> system<br />

d) There is a significant overlap <strong>of</strong> <strong>the</strong> areas <strong>of</strong> influence <strong>of</strong> North and North West, which also<br />

translate in overlapping <strong>of</strong> feeders.<br />

e) Breshna Kot substation appears to be well located to supply <strong>the</strong> south <strong>of</strong> <strong>Kabul</strong>. This<br />

substation supplies 52 MW in our Case_07_B1.<br />

f) There are two areas that appear not to be supplied. These areas (assuming that <strong>the</strong>y have<br />

average density) ere estimated to have approximately 30 MW <strong>of</strong> load (westernmost area)<br />

and 15 MW (easternmost area.)<br />

g) Junction Station # 2 is located very close <strong>the</strong> load center <strong>of</strong> <strong>Kabul</strong> and <strong>the</strong>re are quite a large<br />

number <strong>of</strong> feeders connecting to it.<br />

h) The proposed location <strong>of</strong> <strong>the</strong> 100 MW <strong>of</strong> diesel generation is outside <strong>the</strong> main load area and<br />

does not lend itself for <strong>the</strong> location <strong>of</strong> a new HV/MV substation.<br />

Based on <strong>the</strong> observations above it can be concluded that <strong>the</strong> substations in <strong>the</strong> system are<br />

overextended and with respect <strong>of</strong> <strong>the</strong> load <strong>the</strong>y supply and it may be necessary to add at least one<br />

new substation and perhaps two to alleviate this problem. We analyze this below.<br />

Table 13 shows <strong>the</strong> power balance for <strong>the</strong> four substations that supply <strong>Kabul</strong> where we observe that:<br />

a) As indicated above <strong>the</strong> losses in East and North West are extremely high and only Breshna<br />

Kot substation has losses in <strong>the</strong> range that we would expect;<br />

b) The average power supplied by substation is in this case 64 MW (254/4) which indicates that<br />

even if we could redistribute <strong>the</strong> load, <strong>the</strong> substations would be close to maximum<br />

recommended load served (60 MW)<br />

c) There is not enough transformation capacity at <strong>the</strong> substations to serve <strong>the</strong> estimated load<br />

and major investments are required to add transformation capacity and to compensate <strong>the</strong><br />

reactive power. Note that at pf=1 <strong>the</strong>re would not be severe overloads under normal<br />

operating conditions at <strong>the</strong> substations with <strong>the</strong> exception <strong>of</strong> East. All substations would have<br />

severe overloads under n-1 conditions.<br />

Table 13: Power Balance at <strong>the</strong> existing substations<br />

Connected Load Supplied Power at S/S Losses HV/MV Transformation<br />

Substation MW MVA MVAr MW MVA MVAr % MVA Loading<br />

North 79.0 49.0 93.0 84.0 60.0 103.2 6.0% 80 129%<br />

Breshna Kot 49.6 31.0 58.5 51.5 37.0 63.5 3.8% 50 127%<br />

East 36.0 22.3 42.4 42.3 31.9 53.0 14.9% 25 212%<br />

North West 68.3 42.3 80.3 76.5 58.2 96.1 10.8% 70 137%<br />

Total 232.9 144.6 274.1 254.4 187.2 315.8 8.5% 225.0 140%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 21


Considering that our horizon load is equal to <strong>the</strong> load that can be served with <strong>the</strong> existing MV/LV<br />

transformation capacity we observe below that in order to serve this load we would need 6<br />

substations in <strong>the</strong> short term and 7 substations in <strong>the</strong> long term. This last observation when<br />

combined with <strong>the</strong> observations above that <strong>the</strong> existing substations are over extended, that <strong>the</strong>re are<br />

high electrical losses and that <strong>the</strong> location <strong>of</strong> <strong>the</strong> load centers is outside <strong>the</strong> areas <strong>of</strong> influence <strong>of</strong> <strong>the</strong><br />

existing substations; allows us to come to <strong>the</strong> firm conclusion that this system requires new 110 kV/<br />

MV substations and our planning must take this into account.<br />

Connected MV/LV Transformation 395.0 MVA<br />

Connected MW (1) 355.5 MW<br />

MV Losses (2) 11.0 MW<br />

Active Power at S/S 366.5<br />

Number <strong>of</strong> S/S (3) 6<br />

Additional Load (3) 46.4 MW<br />

Long term Active Power at S/S 412.9 MW<br />

Long term 7<br />

Notes:<br />

(1) Assume compensation to PF =0.9<br />

(2) Assumed 3% losses<br />

(3) 60 MW per substation<br />

(4) Currently disconnected load 15 & 30 MW plus 3% losses<br />

In <strong>the</strong> following section we estimate <strong>the</strong> exact number <strong>of</strong> substations to be considered in our plan and<br />

<strong>the</strong>ir approximate location. Note that <strong>the</strong> location <strong>of</strong> <strong>the</strong> 100 MW <strong>of</strong> diesel generation will not be<br />

considered as a candidate for a new substation as this location is distant from <strong>the</strong> load centers and<br />

<strong>the</strong>re is only one ra<strong>the</strong>r small distribution MV line in its vicinity,<br />

5.3 New Substation Location including <strong>the</strong> “unsupplied load.”<br />

The first step in defining candidate sites for <strong>the</strong> new substations is to identify what would be <strong>the</strong> areas<br />

<strong>of</strong> influence <strong>of</strong> <strong>the</strong> new and existing substations over <strong>the</strong> long term. For this we considered <strong>the</strong><br />

locations <strong>of</strong> <strong>the</strong> distribution transformers and <strong>the</strong>ir associated loads as well as <strong>the</strong> location <strong>of</strong> existing<br />

substation and to certain degree <strong>the</strong> feeders that connect to <strong>the</strong>m. Also in defining <strong>the</strong>se areas we<br />

gave consideration to <strong>the</strong> unsupplied areas <strong>of</strong> <strong>the</strong> city and <strong>the</strong> general objective to limit <strong>the</strong> substation<br />

sizes to <strong>the</strong> 60 to 70 MW load levels.<br />

Based on this we selected <strong>the</strong> areas shown in Figure 5 where we show for each area <strong>the</strong> total load<br />

within <strong>the</strong> area (in MW), <strong>the</strong> area load center, <strong>the</strong> corresponding load center and <strong>the</strong> location <strong>of</strong> <strong>the</strong><br />

existing substations and proposed new substations.<br />

In this figure we observe that <strong>the</strong>re are three new substations which we discuss below:<br />

Central Substation: This substation has <strong>the</strong> potential <strong>of</strong> being <strong>the</strong> most important addition in our<br />

plan for reliability quality <strong>of</strong> service improvements and technical loss reduction. This new substation<br />

would be centrally located in one <strong>the</strong> highest load density area <strong>of</strong> <strong>Kabul</strong> (6.72 MVA/km 2 ), which<br />

allows to supply some 60 MW <strong>of</strong> load via relatively short feeders. The final location <strong>of</strong> this substation<br />

is to be decided but it should be at or very close to <strong>the</strong> Joint Station # 2.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

22 Power Technologies International


Figure 4: Overview <strong>of</strong> Loads and HV/MV substation locations<br />

North West S/S<br />

North S/S<br />

100 MW Diesel<br />

East S/S<br />

Load Center<br />

Breshna Kot S/S<br />

Unsupplied Zone 1:<br />

30 MW (estimated)<br />

Unsupplied Zone 2:<br />

15 MW (estimated)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 23


South West Substation: This new substation has <strong>the</strong> multiple role <strong>of</strong> a) relieving some <strong>of</strong> <strong>the</strong><br />

overloads <strong>of</strong> <strong>the</strong> feeders coming from North West substation to supply loads in <strong>the</strong> southwest, b)<br />

reducing <strong>the</strong> length <strong>of</strong> feeders from Breshna Kot (BK) that currently supply loads in this area, largely<br />

out <strong>of</strong> Breshna Kot’s expected area <strong>of</strong> influence (e.g. Feeder 517 whose longest section has 13 km<br />

and severe voltage drops) and c) provide a point <strong>of</strong> supply for <strong>the</strong> approximately 30 MW <strong>of</strong><br />

unsupplied load in <strong>the</strong> southwest. The expected load in <strong>the</strong> area <strong>of</strong> influence <strong>of</strong> <strong>the</strong> South West<br />

substation is 57 MW (including 30 MW <strong>of</strong> unsupplied load) and <strong>the</strong> load density is 2.15 MVA/km 2<br />

South West Substation: This new substation has <strong>the</strong> multiple role <strong>of</strong> a) relieving some <strong>of</strong> <strong>the</strong><br />

overloads <strong>of</strong> <strong>the</strong> feeders coming from North West substation to supply loads in <strong>the</strong> southwest, b)<br />

reducing <strong>the</strong> length <strong>of</strong> feeders from Breshna Kot (BK) that currently supply loads in this area, largely<br />

out <strong>of</strong> Breshna Kot’s expected area <strong>of</strong> influence (e.g. Feeder 517 whose longest section has 13 km<br />

and severe voltage drops) and c) provide a point <strong>of</strong> supply for <strong>the</strong> approximately 30 MW <strong>of</strong><br />

unsupplied load in <strong>the</strong> southwest. The expected load in <strong>the</strong> area <strong>of</strong> influence <strong>of</strong> <strong>the</strong> South West<br />

substation is 57 MW (including 30 MW <strong>of</strong> unsupplied load) and <strong>the</strong> load density is 2.15 MVA/km 2 .<br />

The final location <strong>of</strong> this substation should be a function <strong>of</strong> both existing and unsupplied load. For our<br />

study we will assume it located at or close to <strong>the</strong> point identified at NW-4-6-1 between Joint Stations<br />

4 and 6.<br />

South East Substation: This new substation like <strong>the</strong> substation above has <strong>the</strong> dual role <strong>of</strong> a)<br />

relieving some <strong>of</strong> <strong>the</strong> overloads <strong>of</strong> <strong>the</strong> feeders coming from East substation and to provide a point <strong>of</strong><br />

supply for <strong>the</strong> approximately 15 MW <strong>of</strong> unsupplied load in <strong>the</strong> sou<strong>the</strong>ast. The expected load in <strong>the</strong><br />

area <strong>of</strong> influence <strong>of</strong> <strong>the</strong> South East substation is 43 MW (including 15 MW <strong>of</strong> unsupplied load) and<br />

<strong>the</strong> load density is 2.2 MVA/km 2 .<br />

As can be observed in Figure 5 with <strong>the</strong> investments above <strong>the</strong> existing substations are expected to<br />

be loaded in <strong>the</strong> order <strong>of</strong> 60 MW and <strong>the</strong>ir assigned areas largely coincide with <strong>the</strong> <strong>the</strong>oretical areas<br />

<strong>of</strong> influence. Two special cases are <strong>the</strong> East and West substations that have <strong>the</strong> dual role <strong>of</strong><br />

supplying urban and rural loads, hence <strong>the</strong>ir extended areas <strong>of</strong> influence.<br />

5.4 New Substation Location not including <strong>the</strong> “unsupplied load.”<br />

The timing and mode in which <strong>the</strong> unsupplied load in <strong>Kabul</strong> is to be connected to <strong>the</strong> grid is uncertain<br />

at this time. Therefore <strong>the</strong> recommendations regarding <strong>the</strong> substations above need to be revised to<br />

account for <strong>the</strong> possibility that this load is not connected within <strong>the</strong> timeframe <strong>of</strong> our study.<br />

In <strong>the</strong> case <strong>of</strong> <strong>the</strong> South East Substation a substantial part <strong>of</strong> <strong>the</strong> load to be supplied by this new<br />

substation is currently unsupplied and if it were not to be connected to <strong>the</strong> grid <strong>the</strong>n <strong>the</strong> need for this<br />

substation can be postponed as <strong>the</strong> current load can be served efficiently from Breshna Kot and East<br />

substations.<br />

On <strong>the</strong> o<strong>the</strong>r hand, South West substation does not require <strong>the</strong> addition <strong>of</strong> <strong>the</strong> unsupplied load to be<br />

necessary. As shown in Figure 6 by re-arranging <strong>the</strong> areas <strong>of</strong> influence <strong>of</strong> Breshna Kot and South<br />

West, <strong>the</strong> total load in <strong>the</strong> area <strong>of</strong> influence <strong>of</strong> South West is 66 MW and ignoring <strong>the</strong> unsupplied load<br />

this implies a load <strong>of</strong> 36 MW, which still justifies this substation. In fact if we do not consider <strong>the</strong><br />

unsupplied load, <strong>the</strong> load center <strong>of</strong> <strong>the</strong> existing load displaces slightly to <strong>the</strong> east and north <strong>of</strong> <strong>the</strong><br />

proposed location <strong>of</strong> <strong>the</strong> new South West substation.<br />

In summary we will assume for <strong>the</strong> Medium Term Network Design that <strong>the</strong>re will be two new<br />

substations; <strong>the</strong> Central <strong>Kabul</strong> Substation located at or near JS#2 and <strong>the</strong> South West <strong>Kabul</strong><br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

24 Power Technologies International


substation located close to point NW-4-6-1 in our maps. These substations are discussed in greater<br />

detail in <strong>the</strong> New Substation Section <strong>of</strong> this report.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

25 Power Technologies International


Figure 5: Substation areas <strong>of</strong> influence over <strong>the</strong> long term including unsupplied zones (long term network design.)<br />

North West S/S<br />

North S/S<br />

100 MW Diesel<br />

Central S/S<br />

(new)<br />

East S/S<br />

South West S/S<br />

(new)<br />

South East S/S<br />

(new)<br />

Breshna Kot S/S<br />

Unsupplied Zone 1:<br />

30 MW (estimated)<br />

Unsupplied Zone 2:<br />

15 MW (estimated)<br />

Load Centers<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

26 Power Technologies International


Figure 6: Substation areas <strong>of</strong> influence over <strong>the</strong> long term not considering unsupplied load (Medium Term Network Design.)<br />

North West S/S<br />

North S/S<br />

100 MW Diesel<br />

Central S/S<br />

(new)<br />

East S/S<br />

South West S/S<br />

(new)<br />

Breshna Kot S/S<br />

Unsupplied Zone 1:<br />

30 MW (estimated)<br />

Unsupplied Zone 2:<br />

15 MW (estimated)<br />

Load Center w/o<br />

unsupplied load<br />

Load Centers<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 27


Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 28


Strategic Network <strong>Analysis</strong><br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 29


Section<br />

6<br />

<strong>Analysis</strong> <strong>of</strong> <strong>the</strong> Medium Term <strong>System</strong><br />

In this section we present <strong>the</strong> results <strong>of</strong> our analysis <strong>of</strong> <strong>the</strong> proposed medium term system.<br />

Here we demonstrate that such system once built should be able to supply all <strong>of</strong> <strong>the</strong><br />

connected transformers to 100 % <strong>of</strong> <strong>the</strong>ir respective capacity in compliance with <strong>the</strong> planning<br />

criteria described before. Also in this section we demonstrate <strong>the</strong> switching sequences that<br />

would enable DAMB to transfer load out <strong>of</strong> one feeder to <strong>the</strong> adjacent feeders during<br />

emergencies.<br />

6.1 Overview<br />

Figure 7 shows an overview <strong>of</strong> <strong>the</strong> medium term system. The locations <strong>of</strong> <strong>the</strong> substations are<br />

indicated.<br />

In this figure any node that had voltage below 94% would shown as a red point (<strong>the</strong>re are<br />

none) and <strong>the</strong> color <strong>of</strong> <strong>the</strong> lines is as follows: green lines indicate loading below 70% nominal,<br />

blue indicates loading between 70% and 100%, orange 100% to 110% and red above 110%.<br />

As can be observed that almost all <strong>of</strong> <strong>the</strong> lines are green, which means <strong>the</strong>y are loaded lower<br />

than 70 %. This indicated that <strong>the</strong> system we propose is quite flexible in shifting load to<br />

adjacent feeders in case <strong>of</strong> emergency conditions. There are single blue feeders which are<br />

loaded over 70 % but still below 100 %. We will show later in this chapter that it is possible to<br />

shift <strong>the</strong> load from <strong>the</strong>se feeders to neighboring feeders during emergencies. To load <strong>the</strong>se<br />

feeders below 70 % would have caused unnecessary investments.<br />

Table 14 and Table 15 show <strong>the</strong> main results for <strong>the</strong> medium term system where we observe<br />

that all nodes have voltages near or above 95%, most <strong>of</strong> <strong>the</strong>m even well over 97%, and no<br />

lines are loaded above 100%. We note that <strong>the</strong>re are still some long feeders in <strong>the</strong> network,<br />

but <strong>the</strong> longest ones (NW-513 20 km and E-519) are rural feeders that cannot be<br />

economically shorten. Voltage in <strong>the</strong>se feeders is supported by voltage regulators and<br />

capacitor banks.<br />

The total load in this system is 338 MW and <strong>the</strong> supplied power to it is 346 MW which means<br />

that <strong>the</strong> losses are about 2.3% (2% not considering <strong>the</strong> above mentioned rural feeders) which<br />

is a good value for <strong>the</strong> medium voltage network. To this value we would need to add <strong>the</strong><br />

losses in <strong>the</strong> MV/LV transformers (typically 3%) and in <strong>the</strong> LV system (ano<strong>the</strong>r 3%) for an<br />

expected distribution technical losses <strong>of</strong> 8.5%.<br />

Appendix 4 contains large format drawings <strong>of</strong> this system.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 30


Figure 7: Overview <strong>of</strong> <strong>the</strong> Medium Term <strong>System</strong><br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 31


Table 14: Feeder <strong>Analysis</strong> for <strong>the</strong> Medium Term <strong>System</strong> (for Substations Breshna Kot, Central and East)<br />

Voltages<br />

Minimum Reserve Margin (MRM)<br />

(Minimum <strong>of</strong> Actual Current - Nominal C)<br />

Most Loaded Section (MLS)<br />

Maximum <strong>of</strong> Actual Current / Nominal Current<br />

Feeder Parameters<br />

Substation<br />

Feeder ID<br />

Most distant<br />

node<br />

Minimum in<br />

Feeder<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Margin<br />

(A)<br />

X-Section<br />

mm²<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Maximum<br />

Loading %<br />

X-Section<br />

mm²<br />

MRM at<br />

MLS <br />

Minimum x-<br />

section<br />

mm²<br />

Maximum x-<br />

section<br />

mm²<br />

S/S Breshna Kot BK-510 98.57 97.66 72 200 128.0 50 285 490.0 58.1 185 FALSE 35 240 10.77<br />

S/S Breshna Kot BK-511 101.16 101.16 305 490 184.7 185 305 490.0 62.3 185 TRUE 70 185 6.03<br />

S/S Breshna Kot BK-512 104.99 104.99 11 303 292.1 70 11 303.0 3.6 70 TRUE 70 95 0.23<br />

S/S Breshna Kot BK-513 99.84 99.80 279 425 146.3 150 279 425.0 65.6 150 TRUE 35 240 7.01<br />

S/S Breshna Kot BK-514 102.84 102.02 120 222 101.9 50 300 490.0 61.1 185 FALSE 35 240 6.63<br />

S/S Breshna Kot BK-515 101.21 101.21 102 189 87.4 35 336 490.0 68.7 185 FALSE 35 240 5.94<br />

S/S Breshna Kot BK-516 103.81 103.81 249 425 175.9 150 249 425.0 58.6 150 TRUE 50 240 3.80<br />

S/S Breshna Kot BK-517 100.36 100.36 24 200 176.0 50 257 490.0 52.5 185 FALSE 50 240 7.95<br />

S/S Breshna Kot BK-518 101.44 101.44 186 360 173.5 95 288 490.0 58.8 185 FALSE 50 240 5.37<br />

S/S Breshna Kot BK-519 101.45 101.45 179 360 181.5 95 250 490.0 50.9 185 FALSE 50 240 6.20<br />

Central S/S C-510 97.59 97.59 106 200 94.0 50 386 568.0 68.0 240 FALSE 35 240 5.98<br />

Central S/S C-511 98.48 98.37 133 222 89.1 50 378 568.0 66.6 240 FALSE 35 240 3.79<br />

Central S/S C-512 97.85 97.85 333 490 156.8 185 333 490.0 68.0 185 TRUE 35 240 5.01<br />

Central S/S C-513 98.62 98.62 78 222 144.1 50 342 568.0 60.2 240 FALSE 50 240 4.64<br />

Central S/S C-514 97.10 96.25 326 490 164.4 185 326 490.0 66.5 185 TRUE 50 240 4.84<br />

Central S/S C-515 97.67 97.67 156 270 113.8 70 353 490.0 72.1 185 FALSE 50 240 4.43<br />

Central S/S C-516 99.46 99.46 71 222 151.4 50 225 490.0 46.0 185 FALSE 50 240 2.57<br />

Central S/S C-517 98.61 98.55 186 250 64.4 50 186 250.0 74.2 50 TRUE 35 240 3.84<br />

Central S/S C-518 98.35 98.35 62 189 126.5 35 304 568.0 53.6 240 FALSE 35 240 4.58<br />

Central S/S C-519 98.91 98.91 147 222 74.9 50 147 222.0 66.3 50 TRUE 35 185 2.96<br />

Central S/S C-520 99.95 99.95 24 323 298.8 95 24 323.0 7.5 95 TRUE 95 185 0.77<br />

Central S/S C-521 99.82 99.82 54 222 167.7 50 54 222.0 24.4 50 TRUE 50 185 1.99<br />

S/S East E-511 103.24 103.09 23 200 176.8 50 278 568.0 48.9 240 FALSE 50 240 5.44<br />

S/S East E-513 98.46 98.46 201 270 69.4 70 201 270.0 74.3 70 TRUE 35 185 7.47<br />

S/S East E-515 104.15 104.15 35 365 330.3 120 35 365.0 9.5 120 TRUE 120 240 6.01<br />

S/S East E-519 95.36 95.36 170 270 99.6 70 365 490.0 74.5 185 FALSE 70 240 16.92<br />

S/S East E-521 102.99 101.88 195 200 4.6 50 195 200.0 97.7 50 TRUE 35 240 4.16<br />

S/S East E-523 102.69 102.42 75 222 147.2 50 75 222.0 33.7 50 TRUE 50 240 7.90<br />

S/S East E-531 102.04 102.04 15 270 255.1 70 146 425.0 34.5 150 FALSE 70 240 7.36<br />

S/S East E-536 105.00 105.00 0 365 364.8 120 0 365.0 0.1 120 TRUE 120 240 7.95<br />

S/S East E-541 99.36 99.36 249 270 20.5 70 249 270.0 92.4 70 TRUE 35 240 6.03<br />

Longest<br />

Section<br />

km<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

32 Power Technologies International


Table 15: Feeder <strong>Analysis</strong> for <strong>the</strong> Medium Term <strong>System</strong> (for Substations North , North West and Southwest)<br />

Voltages<br />

Minimum Reserve Margin (MRM)<br />

(Minimum <strong>of</strong> Actual Current - Nominal C)<br />

Most Loaded Section (MLS)<br />

Maximum <strong>of</strong> Actual Current / Nominal Current<br />

Feeder Parameters<br />

Substation<br />

Feeder ID<br />

Most distant<br />

node<br />

Minimum in<br />

Feeder<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Margin<br />

(A)<br />

X-Section<br />

mm²<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Maximum<br />

Loading %<br />

X-Section<br />

mm²<br />

MRM at<br />

MLS <br />

Minimum x-<br />

section<br />

mm²<br />

Maximum x-<br />

section<br />

mm²<br />

S/S North N-511 101.49 101.49 136 200 63.9 50 402 490.0 82.1 185 FALSE 35 240 3.88<br />

S/S North N-512 103.84 103.84 15 200 185.3 50 67 365.0 18.3 120 FALSE 50 185 6.68<br />

S/S North N-513 100.14 100.14 76 200 123.9 50 247 425.0 58.0 150 FALSE 35 185 8.82<br />

S/S North N-514 101.95 101.79 385 490 105.5 185 385 490.0 78.5 185 TRUE 35 240 3.87<br />

S/S North N-515 101.25 100.00 60 200 140.4 50 242 425.0 57.0 150 FALSE 35 240 5.30<br />

S/S North N-516 101.60 101.46 146 365 219.5 120 175 425.0 41.1 150 FALSE 95 185 8.06<br />

S/S North N-517 97.11 97.11 257 365 107.5 120 257 365.0 70.5 120 TRUE 70 185 8.27<br />

S/S North N-518 100.75 100.00 324 425 101.4 150 324 425.0 76.1 150 TRUE 35 185 7.33<br />

S/S North N-519 104.78 104.77 15 200 185.4 50 40 347.7 11.5 95 FALSE 50 240 1.97<br />

S/S North N-520 102.53 102.53 336 425 89.2 150 336 425.0 79.0 150 TRUE 70 185 3.17<br />

S/S North N-528 101.52 101.52 149 270 121.1 70 257 425.0 60.5 150 FALSE 50 185 4.36<br />

S/S North N-529 98.58 98.39 426 490 63.6 185 426 490.0 87.0 185 TRUE 50 240 6.68<br />

S/S North West NW-513 94.72 94.72 425 490 65.3 185 425 490.0 86.7 185 TRUE 25 240 20.36<br />

S/S North West NW-514 101.58 101.57 308 365 56.7 120 308 365.0 84.5 120 TRUE 25 240 4.10<br />

S/S North West NW-515 104.11 104.09 15 165 150.3 35 80 365.0 21.9 120 FALSE 35 185 3.30<br />

S/S North West NW-516 104.45 104.45 29 165 135.7 35 59 274.1 21.7 70 FALSE 35 120 3.55<br />

S/S North West NW-517 97.15 97.15 300 425 125.5 150 300 425.0 70.5 150 TRUE 50 240 9.61<br />

S/S North West NW-518 97.62 97.62 197 270 73.0 70 399 490.0 81.3 185 FALSE 50 240 6.41<br />

S/S North West NW-524 102.31 102.30 296 365 69.4 120 296 365.0 81.0 120 TRUE 16 185 3.60<br />

S/S North West NW-525 101.94 101.94 245 365 120.0 120 245 365.0 67.1 120 TRUE 50 240 4.52<br />

S/S North West NW-526 100.50 100.50 159 165 6.1 35 159 165.0 96.3 35 TRUE 35 240 5.26<br />

S/S North West NW-527 100.02 100.02 86 200 114.4 50 235 365.0 64.4 120 FALSE 25 240 4.94<br />

S/S South West SW-510 103.71 103.71 30 200 170.5 50 56 365.0 15.4 120 FALSE 50 185 5.79<br />

S/S South West SW-511 103.00 102.84 51 165 113.7 35 335 490.0 68.3 185 FALSE 35 240 3.62<br />

S/S South West SW-512 103.19 103.14 47 222 175.4 50 312 568.0 55.0 240 FALSE 50 240 4.44<br />

S/S South West SW-513 103.24 103.24 151 250 99.1 50 235 347.7 67.6 95 FALSE 50 240 4.05<br />

S/S South West SW-514 97.86 97.86 127 200 72.8 50 178 274.1 64.8 70 FALSE 50 240 8.31<br />

S/S South West SW-515 102.24 102.24 168 200 32.0 50 168 200.0 84.0 50 TRUE 35 240 4.18<br />

Longest<br />

Section<br />

km<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 33


6.2 Switching and Reliability Assessment.<br />

One important characteristic <strong>of</strong> a distribution system is <strong>the</strong> way its feeders are interconnected<br />

and <strong>the</strong> ability to transfer load from one feeder to <strong>the</strong> adjacent feeders during emergencies. In<br />

fact to achieve <strong>the</strong> loadings and voltages indicated in <strong>the</strong> previous section it is important for<br />

DABM to operate <strong>the</strong> system in a way generally consistent with our assumptions.<br />

The large format drawings in Appendix 4 show <strong>the</strong> way <strong>the</strong> system is interconnected and<br />

Figure 8 below shows an overview <strong>of</strong> <strong>the</strong> different feeders in <strong>the</strong> network.<br />

However we realize that it may be complicated to identify <strong>the</strong> open points where one feeder<br />

meets its neighbors, <strong>the</strong>refore in Table 16 to Table 20 we show <strong>the</strong> open switching points for<br />

all feeders in <strong>the</strong> system. This table contains <strong>the</strong> following information:<br />

a) Feeder 1: Maximum Current in Feeder, Nominal Current at <strong>the</strong> section that has <strong>the</strong><br />

Minimum Reserve Margin (MRM) 1 , Minimum Reserve Margin.<br />

b) Feeder 2: Maximum Current in Feeder, Nominal Current at <strong>the</strong> section that has <strong>the</strong><br />

Minimum Reserve Margin (MRM), Minimum Reserve Margin.<br />

c) Percentage <strong>of</strong> <strong>the</strong> maximum load in Feeder 1 that could be taken over by feeder 2<br />

given its minimum reserve margin.<br />

d) The name <strong>of</strong> <strong>the</strong> nodes where <strong>the</strong>se two feeders meet.<br />

As can be seen above Table 16 to Table 20 can also be used to identify how much <strong>of</strong> <strong>the</strong><br />

feeder load can be transferred to <strong>the</strong> adjacent feeder at each point where <strong>the</strong>y come<br />

toge<strong>the</strong>r.<br />

However it should be mentioned that <strong>the</strong> load transferring capability should be taken as<br />

indicative as it was determined based on <strong>the</strong> minimum reserve in <strong>the</strong> adjacent feeder and it is<br />

conservative in this respect; if <strong>the</strong> feeders meet above <strong>the</strong> point where <strong>the</strong> minimum reserve<br />

happens it may be possible to transfer additional load. Also 100% <strong>of</strong> <strong>the</strong> feeder load would<br />

have to be transferred only if <strong>the</strong> contingency happened near <strong>the</strong> substation. If it happened<br />

later along <strong>the</strong> feeder <strong>the</strong> amount <strong>of</strong> load that would have to be transferred is less. On <strong>the</strong><br />

o<strong>the</strong>r hand for this transfer to happen <strong>the</strong> element in outage must be before an<br />

interconnection point. If it is downstream <strong>the</strong>n no transfers would be feasible.<br />

<strong>Final</strong>ly Table 21 provides an overview <strong>of</strong> <strong>the</strong> systems flexibility by showing <strong>the</strong> total<br />

percentage <strong>of</strong> each feeder load that could be taken by adjacent feeders. Here we note that in<br />

average 159 % 2 <strong>of</strong> <strong>the</strong> load could be transferred out which indicates a really high flexibility <strong>of</strong><br />

<strong>the</strong> system.<br />

1 Reserve Margin is <strong>the</strong> difference between <strong>the</strong> nominal current and <strong>the</strong> actual current in an element.<br />

2 This average includes only <strong>the</strong> non-cero values.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 34


Figure 8: Overview <strong>of</strong> <strong>the</strong> feeder and <strong>the</strong> substations <strong>of</strong> <strong>the</strong> Medium Term <strong>System</strong><br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 35


Table 16: : Open Switching Points between feeders (Central Substation)<br />

Name Maximum<br />

Current (A)<br />

Feeder 1 (F1)<br />

Nominal<br />

Current @<br />

MRM<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

(A)<br />

Name<br />

Feeder2 (F2)<br />

Nominal<br />

Current @<br />

MRM (A)<br />

Maximum<br />

Current (A)<br />

Minimum<br />

Reserve<br />

Margin<br />

% Load in F1<br />

taken by F2<br />

(A) Node1 Node2<br />

C-510 362 200 94 C-512 490 334 157 43% E-541-135 E-541-132<br />

C-510 362 200 94 C-512 490 334 157 43% E-541-No-1 Macrorayan Awal E-541-No-6 Macrorayan Awal<br />

C-510 362 200 94 C-512 490 334 157 43% E-541-No_3_ Macrorayan Awal E-541-No_4_Macrorayan Awal<br />

C-510 362 200 94 BK-513 425 279 146 40% E-541-157 E-541-164<br />

C-511 354 222 89 BK-514 222 300 102 29% N-518_JS2_E_1_2-Pashtoonistan Wath BK-JS-1-E 1,2-Pul-e-Kheshtee<br />

C-511 354 222 89 C-518 189 285 127 36% N-518_JS2_B_1_2-Khetabkhana Aama Khetabkana_SW<br />

C-512 334 490 157 C-513 222 320 144 43% N-516-12_1 N-516-No-12Macroryan<br />

C-512 334 490 157 E-531 270 146 255 76% E-531-70 E-531-67<br />

C-512 334 490 157 C-515 270 348 114 34% E-541-128 E-541-120<br />

C-512 334 490 157 C-510 200 362 94 28% E-541-132 E-541-135<br />

C-512 334 490 157 C-510 200 362 94 28% E-541-No-6 Macrorayan Awal E-541-No-1 Macrorayan Awal<br />

C-512 334 490 157 C-510 200 362 94 28% E-541-No_4_Macrorayan Awal E-541-No_3_ Macrorayan Awal<br />

C-513 320 222 144 C-514 490 326 164 51% N-512-128 N-512-125<br />

C-513 320 222 144 C-514 490 326 164 51% N-512-400 Bester 1&2 N-512-Wazir akbar khan hospital<br />

C-513 320 222 144 C-519 222 147 75 23% N-512-Sehat Tefl N-512-Ministry <strong>of</strong> health<br />

C-513 320 222 144 C-514 490 326 164 51% N-512-T#3 Wazir akbar khan N-512-Wazir akbar khan hospital<br />

C-513 320 222 144 C-515 270 348 114 36% N-516-No-9Macroryan N-516-No-8 Macroryan<br />

C-513 320 222 144 C-512 490 334 157 49% N-516-No-12Macroryan N-516-12_1<br />

C-514 326 490 164 N-512 200 67 185 57% N-512-Bibi Mahro Muqabel N-512-Qalai Wakil<br />

C-514 326 490 164 C-513 222 320 144 44% N-512-125 N-512-128<br />

C-514 326 490 164 C-513 222 320 144 44% N-512-Wazir akbar khan hospital N-512-400 Bester 1&2<br />

C-514 326 490 164 C-513 222 320 144 44% N-512-Wazir akbar khan hospital N-512-T#3 Wazir akbar khan<br />

C-514 326 490 164 N-517 365 257 108 33% N-517-No-20 Macroryan JS#12-N-517<br />

C-514 326 490 164 C-515 270 348 114 35% N-516-No-11 Macroryan N-516-No-11-Macroy-SW<br />

C-515 348 270 114 C-513 222 320 144 41% N-516-No-8 Macroryan N-516-No-9Macroryan<br />

C-515 348 270 114 E-541 270 293 21 6% E-541-106 E-541-94<br />

C-515 348 270 114 C-512 490 334 157 45% E-541-120 E-541-128<br />

C-515 348 270 114 N-516 365 175 219 63% N-516-516-18 N-516-159<br />

C-515 348 270 114 C-514 490 326 164 47% N-516-No-11-Macroy-SW N-516-No-11 Macroryan<br />

C-516 225 222 151 C-521 222 54 168 74% N-518_JS2_A_1_2-Haji Yahqoob # 1&2 N-518_JS2_A_1_2-Qalai Fatullah # 1<br />

C-516 225 222 151 C-517 250 259 64 29% N-518_JS2_B_2_5-Gulkhana Park shahrnow N-518_JS2_B_2_5-Tank Teel Shahr now<br />

C-516 225 222 151 C-517 250 259 64 29% N-518_JS2_A_1_2-Haji Yahqoob # 1&2 N-518_JS2_B_2_5-Tank Teel Shahr now<br />

C-517 259 250 64 N-529 490 426 64 25% N-529_JS5_B_2_5-Borj Zamini Market Kona N-529_JS5_B_2_5-Sarak Awal Baharestan<br />

C-517 259 250 64 C-518 189 285 127 49% N-529_JS5_B_2_5-Borj Zamini Market Kona N-529_JS5_B_2_5-No_1_Zamini Karte Ariana<br />

C-517 259 250 64 C-516 222 225 151 59% N-518_JS2_B_2_5-Tank Teel Shahr now N-518_JS2_B_2_5-Gulkhana Park shahrnow<br />

C-517 259 250 64 N-518 425 324 101 39% NW-515-Shahraara NW-515-Baraki Shahraara<br />

C-517 259 250 64 C-518 189 285 127 49% N-518_JS2_A_1_2-Moqabel Wezarat Dakhela BK-JS-1-A-1,2-Welaayat<br />

C-517 259 250 64 C-516 222 225 151 59% N-518_JS2_B_2_5-Tank Teel Shahr now N-518_JS2_A_1_2-Haji Yahqoob # 1&2<br />

C-517 259 250 64 C-518 189 285 127 49% N-529_JS5_B_2_5-Amneiat Hospital BK-JS-1-A-1,2-Qolabchakkan 1<br />

C-517 259 250 64 C-518 189 285 127 49% N-518_JS2_A_1_2-Moqabel Wezarat Dakhela N-518_JS2_E_1_2-Jamhoriat Hospital<br />

C-518 285 189 127 C-517 250 259 64 23% N-529_JS5_B_2_5-No_1_Zamini Karte Ariana N-529_JS5_B_2_5-Borj Zamini Market Kona<br />

C-518 285 189 127 BK-514 222 300 102 36% BK-JS-1-A-1,2-Mohammad Jan Khan BK-JS-1-A-1,2-Shaadoshamshera<br />

C-518 285 189 127 BK-514 222 300 102 36% BK-JS-1-A-1,2-15 BK-JS-1-A-1,2-21<br />

C-518 285 189 127 C-517 250 259 64 23% BK-JS-1-A-1,2-Welaayat N-518_JS2_A_1_2-Moqabel Wezarat Dakhela<br />

C-518 285 189 127 C-511 222 354 89 31% Khetabkana_SW N-518_JS2_B_1_2-Khetabkhana Aama<br />

C-518 285 189 127 C-517 250 259 64 23% BK-JS-1-A-1,2-Qolabchakkan 1 N-529_JS5_B_2_5-Amneiat Hospital<br />

C-518 285 189 127 C-517 250 259 64 23% N-518_JS2_E_1_2-Jamhoriat Hospital N-518_JS2_A_1_2-Moqabel Wezarat Dakhela<br />

C-519 147 222 75 C-513 222 320 144 98% N-512-Ministry <strong>of</strong> health N-512-Sehat Tefl<br />

C-520 24 323 299 N-515 200 243 140 579% NW-525-Charahy Shaheed NW-525-Qalah Mosa No-1<br />

C-521 54 222 168 C-516 222 225 151 279% N-518_JS2_A_1_2-Qalai Fatullah # 1 N-518_JS2_A_1_2-Haji Yahqoob # 1&2<br />

Where<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

36 Power Technologies International


Table 17: Open Switching Points between feeders (Bresna Kot Substation)<br />

Name Maximum<br />

Current (A)<br />

Feeder 1 (F1)<br />

Nominal<br />

Current @<br />

MRM<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

(A)<br />

Name<br />

Feeder2 (F2)<br />

Nominal<br />

Current @<br />

MRM (A)<br />

Maximum<br />

Current (A)<br />

Minimum<br />

Reserve<br />

Margin<br />

% Load in F1<br />

taken by F2<br />

(A) Node1 Node2<br />

BK-517 257 200 176 BK-510 200 285 128 50% BK-517-137 JS#6-BK-517<br />

BK-517 257 200 176 BK-510 200 285 128 50% BK-517-102.7 BK-New 2-4<br />

BK-517 257 200 176 BK-510 200 285 128 50% BK-517-48 BK-New 2-3<br />

BK-513 279 425 146 C-510 200 362 94 34% E-541-164 E-541-157<br />

BK-513 279 425 146 BK-515 189 317 87 31% E-541-Bala Hesar BK-C-1,2-Takhta Pul<br />

BK-519 250 360 181 BK-516 425 249 176 70% BK-516-De Murad Khan BK-516-68<br />

BK-519 250 360 181 BK-518 360 288 174 69% JS#3-BK-519 JS#3-BK-518<br />

BK-518 288 360 174 SW-512 222 312 175 61% BK-Behind Madrasa-Mustaghni BK-Behind Madrasa-Alibad 2<br />

BK-518 288 360 174 BK-519 360 250 181 63% JS#3-BK-518 JS#3-BK-519<br />

BK-518 288 360 174 BK-511 490 305 185 64% JS#3-BK-518 JS#3-BK-511<br />

BK-518 288 360 174 BK-511 490 305 185 64% BK-3_6-Moqabili Sifarat Russia Sifarat SW<br />

BK-518 288 360 174 BK-516 425 249 176 61% BK-518-9 BK-516-2B25<br />

BK-515 317 189 87 BK-514 222 300 102 32% BK-Charda Manzela JS_1-Charda Manzila BK-Charda Manzela JS_1-Central Poly Clinic<br />

BK-515 317 189 87 BK-514 222 300 102 32% JS#1-BK-515 JS#1-BK-514<br />

BK-515 317 189 87 BK-513 425 279 146 46% BK-C-1,2-Takhta Pul E-541-Bala Hesar<br />

BK-515 317 189 87 BK-511 490 305 185 58% JS#1-BK-515 JS#1-5<br />

BK-514 300 222 102 C-511 222 354 89 30% BK-JS-1-E 1,2-Pul-e-Kheshtee N-518_JS2_E_1_2-Pashtoonistan Wath<br />

BK-514 300 222 102 C-518 189 285 127 42% BK-JS-1-A-1,2-Shaadoshamshera BK-JS-1-A-1,2-Mohammad Jan Khan<br />

BK-514 300 222 102 C-518 189 285 127 42% BK-JS-1-A-1,2-21 BK-JS-1-A-1,2-15<br />

BK-514 300 222 102 BK-515 189 317 87 29% BK-Charda Manzela JS_1-Central Poly Clinic BK-Charda Manzela JS_1-Charda Manzila<br />

BK-514 300 222 102 BK-515 189 317 87 29% JS#1-BK-514 JS#1-BK-515<br />

BK-514 300 222 102 BK-511 490 305 185 62% JS#1-BK-514 JS#1-5<br />

BK-516 249 425 176 BK-519 360 250 181 73% BK-516-68 BK-516-De Murad Khan<br />

BK-516 249 425 176 BK-518 360 288 174 70% BK-516-2B25 BK-518-9<br />

BK-516 249 425 176 BK-510 200 285 128 51% BK-516-Jangalak BK-510-2<br />

BK-516 249 425 176 BK-510 200 285 128 51% BK-516-46 BK-New 2-3<br />

BK-511 305 490 185 SW-513 250 330 99 32% BK-Jamal maina-Jamal Mina BK-Jamal mina-Karte 5<br />

BK-511 305 490 185 SW-515 200 305 32 10% BK-Aqabe Barq <strong>Kabul</strong>-7 BK-Aqabe Barq <strong>Kabul</strong>-15<br />

BK-511 305 490 185 BK-510 200 285 128 42% BK-6_3-Joye Raeis BK-6_3-Moqabel Wezarat Energy wa Aob<br />

BK-511 305 490 185 BK-514 222 300 102 33% JS#1-5 JS#1-BK-514<br />

BK-511 305 490 185 BK-515 189 317 87 29% JS#1-5 JS#1-BK-515<br />

BK-511 305 490 185 BK-518 360 288 174 57% JS#3-BK-511 JS#3-BK-518<br />

BK-511 305 490 185 BK-518 360 288 174 57% Sifarat SW BK-3_6-Moqabili Sifarat Russia<br />

BK-511 305 490 185 SW-512 222 312 175 57% BK-Rabiya Balkhi-Behind Police Station N14828<br />

BK-511 305 490 185 SW-513 250 330 99 32% BK-Jamal maina-Jamal Mina NW-Pohantoon-Takhnic Sanawee No-2<br />

BK-510 285 200 128 SW-511 165 335 114 40% BK-4_6-18 BK-4_6-30<br />

BK-510 285 200 128 BK-517 200 257 176 62% JS#6-BK-517 BK-517-137<br />

BK-510 285 200 128 BK-511 490 305 185 65% BK-6_3-Moqabel Wezarat Energy wa Aob BK-6_3-Joye Raeis<br />

BK-510 285 200 128 BK-516 425 249 176 62% BK-510-2 BK-516-Jangalak<br />

BK-510 285 200 128 BK-517 200 257 176 62% BK-New 2-4 BK-517-102.7<br />

BK-510 285 200 128 BK-516 425 249 176 62% BK-New 2-3 BK-516-46<br />

BK-510 285 200 128 BK-517 200 257 176 62% BK-New 2-3 BK-517-48<br />

Where<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 37


Table 18: Open Switching Points between feeders (East and South West Substations)<br />

Name Maximum<br />

Current (A)<br />

Feeder 1 (F1)<br />

Nominal<br />

Current @<br />

MRM<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

(A)<br />

Name<br />

Feeder2 (F2)<br />

Nominal<br />

Current @<br />

MRM (A)<br />

Maximum<br />

Current (A)<br />

Minimum<br />

Reserve<br />

Margin<br />

% Load in F1<br />

taken by F2<br />

(A) Node1 Node2<br />

E-513 201 270 69 N-513 200 247 124 62% E-513-127 N-513-154<br />

E-513 201 270 69 E-521 200 333 5 2% E-513-19-2 E-521-28<br />

E-519 365 270 100 E-511 200 278 177 48% E-F-519 -35_1 E-F-519 -<strong>Afghan</strong>i constraction Company<br />

E-519 365 270 100 E-511 200 278 177 48% E-F-519 -78 E-F-519 -78_A<br />

E-519 365 270 100 E-521 200 333 5 1% E-F-519 -10 E-F-519 -10-2<br />

E-519 365 270 100 E-511 200 278 177 48% E-F-519 -39-2 E-F-519 -39<br />

E-519 365 270 100 E-511 200 278 177 48% E-F-519 -51-2 E-F-519 -51<br />

E-541 293 270 21 E-521 200 333 5 2% E-F-519 -23 E-F-519 -10-2<br />

E-541 293 270 21 C-515 270 348 114 39% E-541-94 E-541-106<br />

E-541 293 270 21 E-521 200 333 5 2% E-541-69 E-521-Tawlid Aard Janat<br />

E-515 35 365 330 E-523 222 103 147 423% E-515-62 E-515-76<br />

E-531 146 270 255 C-512 490 334 157 107% E-531-67 E-531-70<br />

E-521 333 200 5 E-541 270 293 21 6% E-F-519 -10-2 E-F-519 -23<br />

E-521 333 200 5 E-519 270 365 100 30% E-F-519 -10-2 E-F-519 -10<br />

E-521 333 200 5 E-513 270 201 69 21% E-521-28 E-513-19-2<br />

E-521 333 200 5 E-541 270 293 21 6% E-521-Tawlid Aard Janat E-541-69<br />

E-511 278 200 177 E-519 270 365 100 36% E-F-519 -<strong>Afghan</strong>i constraction Company E-F-519 -35_1<br />

E-511 278 200 177 E-519 270 365 100 36% E-F-519 -78_A E-F-519 -78<br />

E-511 278 200 177 E-519 270 365 100 36% E-F-519 -39 E-F-519 -39-2<br />

E-511 278 200 177 E-519 270 365 100 36% E-F-519 -51 E-F-519 -51-2<br />

E-523 103 222 147 E-515 365 35 330 321% E-515-76 E-515-62<br />

SW-515 305 200 32 BK-511 490 305 185 61% BK-Aqabe Barq <strong>Kabul</strong>-15 BK-Aqabe Barq <strong>Kabul</strong>-7<br />

SW-515 305 200 32 NW-517 425 300 125 41% NW-518-115 NW-518-108<br />

SW-515 305 200 32 SW-513 250 330 99 33% NW-518-134 BK-Jamal maina-Red Cross Hospital<br />

SW-513 330 250 99 BK-511 490 305 185 56% BK-Jamal mina-Karte 5 BK-Jamal maina-Jamal Mina<br />

SW-513 330 250 99 BK-511 490 305 185 56% NW-Pohantoon-Takhnic Sanawee No-2 BK-Jamal maina-Jamal Mina<br />

SW-513 330 250 99 SW-515 200 305 32 10% BK-Jamal maina-Red Cross Hospital NW-518-134<br />

SW-512 312 222 175 SW-511 165 335 114 36% BK-4_6-Masjidi Safed BK-4_6-47.15<br />

SW-512 312 222 175 BK-518 360 288 174 56% BK-Behind Madrasa-Alibad 2 BK-Behind Madrasa-Mustaghni<br />

SW-512 312 222 175 SW-511 165 335 114 36% NW-4_6-Kote Sangi_SW512 NW-4_6-1_SW513<br />

SW-512 312 222 175 SW-511 165 335 114 36% NW-4_6-Sare-e- Kariz Qalahe shada NW-4_6-22-12<br />

SW-512 312 222 175 BK-511 490 305 185 59% N14828 BK-Rabiya Balkhi-Behind Police Station<br />

SW-511 335 165 114 BK-510 200 285 128 38% BK-4_6-30 BK-4_6-18<br />

SW-511 335 165 114 SW-512 222 312 175 52% BK-4_6-47.15 BK-4_6-Masjidi Safed<br />

SW-511 335 165 114 SW-512 222 312 175 52% NW-4_6-1_SW513 NW-4_6-Kote Sangi_SW512<br />

SW-511 335 165 114 SW-512 222 312 175 52% NW-4_6-22-12 NW-4_6-Sare-e- Kariz Qalahe shada<br />

SW-514 259 200 73 NW-513 490 425 65 25% NW-513-107-20 NW-513-107-12<br />

SW-514 259 200 73 SW-510 200 56 170 66% NW-513-107-27 NW-513-107-27-3<br />

SW-514 259 200 73 NW-517 425 300 125 48% NW-4_7-4 NW-4_7-1<br />

SW-510 56 200 170 SW-514 200 259 73 130% NW-513-107-27-3 NW-513-107-27<br />

Where<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

38 Power Technologies International


Table 19: Open Switching Points between feeders (North West Substation)<br />

Name Maximum<br />

Current (A)<br />

Feeder 1 (F1)<br />

Nominal<br />

Current @<br />

MRM<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

(A)<br />

Name<br />

Feeder2 (F2)<br />

Nominal<br />

Current @<br />

MRM (A)<br />

Maximum<br />

Current (A)<br />

Minimum<br />

Reserve<br />

Margin<br />

% Load in F1<br />

taken by F2<br />

(A) Node1 Node2<br />

NW-515 80 165 150 N-514 490 385 105 132% NW-515-50 NW-515-55<br />

NW-515 80 165 150 NW-514 365 308 57 71% NW-515-18 NW-514-18<br />

NW-515 80 165 150 NW-525 365 245 120 150% NW-515-15 NW-525-15<br />

NW-514 308 365 57 N-529 490 426 64 21% NW-514-60 NW-514-65<br />

NW-514 308 365 57 NW-515 165 80 150 49% NW-514-18 NW-515-18<br />

NW-517 300 425 125 N-529 490 426 64 21% N-529_JS5_4_5-Borj Intercontinental # 1&2 N-529_JS5_4_5-Borj Baghe Bala # 1&2<br />

NW-517 300 425 125 NW-518 270 399 73 24% N-529_JS5_4_5-Borj Awal Karte Mamoreen N-529_JS5_4_5-Borj Politechnice # 1&2<br />

NW-517 300 425 125 NW-518 270 399 73 24% NW-518-97.1 NW-518-97<br />

NW-517 300 425 125 SW-515 200 305 32 11% NW-518-108 NW-518-115<br />

NW-517 300 425 125 SW-514 200 259 73 24% NW-4_7-1 NW-4_7-4<br />

NW-517 300 425 125 NW-518 270 399 73 24% NW-517-56 NW-517-56.1<br />

NW-517 300 425 125 NW-518 270 399 73 24% NW-517-56a NW-518-59b<br />

NW-517 300 425 125 NW-518 270 399 73 24% NW-517-56a NW-518-61.1a<br />

NW-524 296 365 69 NW-526 165 237 6 2% NW-524-56 NW-526-21<br />

NW-525 245 365 120 N-519 200 38 185 76% N-527-32 N-527-24<br />

NW-525 245 365 120 N-520 425 336 89 36% N-527-38-A11 N-527-Sarwar Kaynat<br />

NW-525 245 365 120 N-514 490 385 105 43% NW-525-47 NW-525-55<br />

NW-525 245 365 120 NW-515 165 80 150 61% NW-525-15 NW-515-15<br />

NW-527 235 200 114 NW-526 165 237 6 3% NW-527-18 NW-526-18a<br />

NW-527 235 200 114 NW-526 165 237 6 3% NW-527-33 NW-526-33a<br />

NW-527 235 200 114 NW-526 165 237 6 3% NW-527-40 NW-526-40<br />

NW-527 235 200 114 NW-526 165 237 6 3% NW-527-40 NW-526-40a<br />

NW-526 237 165 6 N-511 200 402 64 27% NW-526-42 NW-526-48<br />

NW-526 237 165 6 NW-527 200 235 114 48% NW-526-18a NW-527-18<br />

NW-526 237 165 6 NW-524 365 296 69 29% NW-526-21 NW-524-56<br />

NW-526 237 165 6 NW-527 200 235 114 48% NW-526-33a NW-527-33<br />

NW-526 237 165 6 NW-527 200 235 114 48% NW-526-40 NW-527-40<br />

NW-526 237 165 6 NW-527 200 235 114 48% NW-526-40a NW-527-40<br />

NW-513 425 490 65 SW-514 200 259 73 17% NW-513-107-12 NW-513-107-20<br />

NW-513 425 490 65 NW-518 270 399 73 17% NW-513-57 NW-518-65<br />

NW-518 399 270 73 NW-517 425 300 125 31% N-529_JS5_4_5-Borj Politechnice # 1&2 N-529_JS5_4_5-Borj Awal Karte Mamoreen<br />

NW-518 399 270 73 NW-517 425 300 125 31% NW-518-97 NW-518-97.1<br />

NW-518 399 270 73 NW-513 490 425 65 16% NW-518-65 NW-513-57<br />

NW-518 399 270 73 NW-517 425 300 125 31% NW-517-56.1 NW-517-56<br />

NW-518 399 270 73 NW-517 425 300 125 31% NW-518-59b NW-517-56a<br />

NW-518 399 270 73 NW-517 425 300 125 31% NW-518-61.1a NW-517-56a<br />

Where<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 39


Table 20: Open Switching Points between feeders (North Substation)<br />

Name Maximum<br />

Current (A)<br />

Feeder 1 (F1)<br />

Nominal<br />

Current @<br />

MRM<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

(A)<br />

Name<br />

Feeder2 (F2)<br />

Nominal<br />

Current @<br />

MRM (A)<br />

Maximum<br />

Current (A)<br />

Minimum<br />

Reserve<br />

Margin<br />

% Load in F1<br />

taken by F2<br />

(A) Node1 Node2<br />

N-512 67 200 185 N-517 365 257 108 161% N-512-93 N-517-Hawa Shenase<br />

N-512 67 200 185 C-514 490 326 164 247% N-512-Qalai Wakil N-512-Bibi Mahro Muqabel<br />

N-516 175 365 219 N-517 365 257 108 62% N-516-159 JS#12-N-517<br />

N-516 175 365 219 C-515 270 348 114 65% N-516-159 N-516-516-18<br />

N-517 257 365 108 N-512 200 67 185 72% N-517-Hawa Shenase N-512-93<br />

N-517 257 365 108 C-514 490 326 164 64% JS#12-N-517 N-517-No-20 Macroryan<br />

N-517 257 365 108 N-516 365 175 219 85% JS#12-N-517 N-516-159<br />

N-529 426 490 64 C-517 250 259 64 15% N-529_JS5_B_2_5-Sarak Awal Baharestan N-529_JS5_B_2_5-Borj Zamini Market Kona<br />

N-529 426 490 64 NW-517 425 300 125 29% N-529_JS5_4_5-Borj Baghe Bala # 1&2 N-529_JS5_4_5-Borj Intercontinental # 1&2<br />

N-529 426 490 64 NW-514 365 308 57 13% NW-514-65 NW-514-60<br />

N-529 426 490 64 N-514 490 385 105 25% N-529-63a NW-515-63_1a<br />

N-528 257 270 121 N-518 425 324 101 39% N-528-42 N-528-47<br />

N-518 324 425 101 N-528 270 257 121 37% N-528-47 N-528-42<br />

N-518 324 425 101 N-514 490 385 105 33% N-514-19-B3 N-514-19<br />

N-518 324 425 101 N-514 490 385 105 33% NW-515-63_16 NW-515-63_6<br />

N-518 324 425 101 C-517 250 259 64 20% NW-515-Baraki Shahraara NW-515-Shahraara<br />

N-518 324 425 101 N-515 200 243 140 43% NW-515-63_23 N14892<br />

N-518 324 425 101 N-515 200 243 140 43% N-518-31 N-515-31<br />

N-518 324 425 101 N-515 200 243 140 43% N-518-13 N-515-13<br />

N-519 38 200 185 NW-525 365 245 120 315% N-527-24 N-527-32<br />

N-513 247 200 124 E-513 270 201 69 28% N-513-154 E-513-127<br />

N-513 247 200 124 N-511 200 402 64 26% N-513-53 N-511-5<br />

N-513 247 200 124 N-511 200 402 64 26% N-513-43 N-513-43-C1<br />

N-513 247 200 124 N-511 200 402 64 26% N-513-27a N-511-3<br />

N-513 247 200 124 N-511 200 402 64 26% N-513-19 N-513-19a<br />

N-515 243 200 140 N-514 490 385 105 43% NW-525-82 NW-525-76<br />

N-515 243 200 140 C-520 323 24 299 123% NW-525-Qalah Mosa No-1 NW-525-Charahy Shaheed<br />

N-515 243 200 140 N-518 425 324 101 42% N14892 NW-515-63_23<br />

N-515 243 200 140 N-518 425 324 101 42% N-515-31 N-518-31<br />

N-515 243 200 140 N-518 425 324 101 42% N-515-13 N-518-13<br />

N-520 336 425 89 NW-525 365 245 120 36% N-527-Sarwar Kaynat N-527-38-A11<br />

N-520 336 425 89 N-511 200 402 64 19% N-520-51 NW-526-49<br />

N-514 385 490 105 N-518 425 324 101 26% N-514-19 N-514-19-B3<br />

N-514 385 490 105 NW-515 165 80 150 39% NW-515-55 NW-515-50<br />

N-514 385 490 105 N-518 425 324 101 26% NW-515-63_6 NW-515-63_16<br />

N-514 385 490 105 NW-525 365 245 120 31% NW-525-55 NW-525-47<br />

N-514 385 490 105 N-515 200 243 140 37% NW-525-76 NW-525-82<br />

N-514 385 490 105 N-529 490 426 64 17% NW-515-63_1a N-529-63a<br />

N-511 402 200 64 NW-526 165 237 6 2% NW-526-48 NW-526-42<br />

N-511 402 200 64 N-520 425 336 89 22% NW-526-49 N-520-51<br />

N-511 402 200 64 N-513 200 247 124 31% N-511-5 N-513-53<br />

N-511 402 200 64 N-513 200 247 124 31% N-513-43-C1 N-513-43<br />

N-511 402 200 64 N-513 200 247 124 31% N-511-3 N-513-27a<br />

N-511 402 200 64 N-513 200 247 124 31% N-513-19a N-513-19<br />

Where<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

40 Power Technologies International


Table 21: Percentage <strong>of</strong> Feeder load that could be taken by adjacent Feeders<br />

% Taken by<br />

adjacent<br />

Feeders<br />

% Taken by<br />

adjacent<br />

Feeders<br />

Feeder<br />

Feeder<br />

BK-510 414% N-511 54%<br />

BK-511 294% N-512 408%<br />

BK-512 0% N-513 54%<br />

BK-513 65% N-514 176%<br />

BK-514 163% N-515 208%<br />

BK-515 137% N-516 127%<br />

BK-516 194% N-517 221%<br />

BK-517 50% N-518 133%<br />

BK-518 249% N-519 315%<br />

BK-519 140% N-520 55%<br />

C-510 84% N-528 39%<br />

C-511 64% N-529 83%<br />

C-512 182% NW-513 34%<br />

C-513 210% NW-514 69%<br />

C-514 169% NW-515 354%<br />

C-515 203% NW-516 0%<br />

C-516 103% NW-517 105%<br />

C-517 328% NW-518 79%<br />

C-518 135% NW-524 2%<br />

C-519 98% NW-525 216%<br />

C-520 579% NW-526 153%<br />

C-521 279% NW-527 3%<br />

E-511 36% SW-510 130%<br />

E-513 64% SW-511 91%<br />

E-515 423% SW-512 188%<br />

E-519 98% SW-513 66%<br />

E-521 63% SW-514 139%<br />

E-523 321% SW-515 134%<br />

E-531 107%<br />

E-541 42% Average(1) 159%<br />

(1) Only non zero values<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 41


6.3 Feeder overview and switching strategy: General Comments<br />

In <strong>the</strong> next sections we present for each <strong>of</strong> <strong>the</strong> substations in <strong>the</strong> system an overview <strong>of</strong> <strong>the</strong><br />

feeders connected to it and <strong>the</strong> switching strategy that could be used by DABM to transfer load<br />

out <strong>of</strong> ach feeder during emergencies.<br />

The feeder overview highlights <strong>the</strong> area covered by each feeder under normal operating<br />

conditions and <strong>the</strong> switching strategy indicates which feeders could take <strong>the</strong> entire load <strong>of</strong> <strong>the</strong><br />

affected feeder if <strong>the</strong>re is an outage in <strong>the</strong> worst possible point (i.e. <strong>the</strong> substation exit) and <strong>the</strong><br />

switching points.<br />

It must be stressed that it would not be practical or feasible to cover here all possible outages in<br />

each feeder, but ra<strong>the</strong>r what we seek is to demonstrate that in <strong>the</strong> system <strong>the</strong>re is enough<br />

flexibility to handle <strong>the</strong> worst possible contingency and o<strong>the</strong>r contingencies should also result<br />

on acceptable loss <strong>of</strong> load 3 .<br />

In <strong>the</strong> description <strong>of</strong> each feeder we will use <strong>the</strong> following format<br />

6.3.1 Feeder Example<br />

We will present initially a figure showing <strong>the</strong> area covered by each <strong>of</strong> <strong>the</strong> feeders by highlighting<br />

<strong>the</strong> feeder in red. In <strong>the</strong> following figure we show C-510 as an example. Note that red will<br />

always represent <strong>the</strong> original feeder in all <strong>the</strong> figures.<br />

Figure 9: Overview <strong>of</strong> feeder C-510 in normal operation conditions.<br />

3 There is always some unavoidable loss <strong>of</strong> load for example in <strong>the</strong> case <strong>of</strong> permanent faults on a radial<br />

section <strong>of</strong> feeder beyond <strong>the</strong> last interconnection point.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 42


Next, we present we present a figure showing how <strong>the</strong> load in <strong>the</strong> feeder can be supplied by<br />

adjacent feeders. The following figure shows <strong>the</strong> case for feeder C-510. Note that in this figure<br />

we can still see <strong>the</strong> outline <strong>of</strong> C-510 in red.<br />

Figure 10: Emergency operation conditions. Feeder C-510 is disconnected at <strong>the</strong><br />

substation and feeder C-512 and BK-513 fully supply <strong>the</strong> connected load. The necessary<br />

switching operations are indicated by arrows.<br />

The superimposed colors (green and blue), are used to indicate to which feeder sections <strong>of</strong> <strong>the</strong><br />

original feeder (C-510 in <strong>the</strong> example) are transferred (blue to C-512 and Green to BK-513.)<br />

Also in this figure it is very easy to deduct <strong>the</strong> type <strong>of</strong> operation done at each arrow:<br />

• The arrows that show continuity in <strong>the</strong> superimposed colors (blue and green) indicates<br />

switches that need to be closed to transfer sections <strong>of</strong> <strong>the</strong> original feeder (C-510) to<br />

o<strong>the</strong>r feeders (C-512 or BK-513.)<br />

• The arrows that indicate a point where <strong>the</strong> superimposed colors come toge<strong>the</strong>r indicate<br />

a position where a switch must be opened, so that <strong>the</strong> feeders is split in sections and its<br />

load transferred to different feeders. There are two such arrows in <strong>the</strong> figure above.<br />

In <strong>the</strong> following sections we provide <strong>the</strong> details for all and substations in <strong>the</strong> network. Also<br />

should be mentioned that switching point location is also highlighted in <strong>the</strong> detailed maps by<br />

arrows as in <strong>the</strong> example below.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 43


Figure 11: example <strong>of</strong> a switching point in a detailed map.<br />

6.4 Feeder overview and switching strategy: Central Substation<br />

Figure 12 and Figure 13 show an overview <strong>of</strong> Central Substation and <strong>the</strong> feeders supplying its<br />

service area.<br />

Figure 12: Overview <strong>of</strong> Central Substation.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

44 Power Technologies International


Figure 13: Overview <strong>of</strong> <strong>the</strong> area <strong>of</strong> Central Substation. All feeders are highlighted in different colors.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 45


6.4.1 Feeder C-510<br />

The following figure highlights in red <strong>the</strong> area covered by feeder C-510. This feeder supplies<br />

<strong>the</strong> area identified as Microrayani which has significant load.<br />

Figure 14: Overview <strong>of</strong> feeder C-510 in normal operation conditions.<br />

Figure 15: Emergency operation conditions. Feeder C-510 is disconnected at <strong>the</strong> substation and<br />

feeder C-512 and BK-513 fully supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 46


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

6.4.2 Feeder C-511<br />

Figure 16: Overview <strong>of</strong> feeder C-511 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 47


Figure 17: Emergency operation conditions. Feeder C-511 is disconnected at <strong>the</strong> substation and<br />

feeder C-518 and BK-514 fully supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

48 Power Technologies International


6.4.3 Feeder C-512<br />

Figure 18: Overview <strong>of</strong> feeder C-512 in normal operation conditions.<br />

This feeder goes to <strong>the</strong> east <strong>of</strong> central <strong>Kabul</strong> supplying various loads along <strong>the</strong> way.<br />

Figure 19: Emergency operation conditions. Feeder C-512 is disconnected at <strong>the</strong> substation and<br />

feeder C-513 and BK-513 fully supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 49


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

6.4.4 Feeder C-513<br />

Figure 20: Overview <strong>of</strong> feeder C-513 in normal operation conditions.<br />

This feeder supplies several hospitals in central <strong>Kabul</strong> as well as o<strong>the</strong>r important loads in <strong>the</strong><br />

area, so its backup is very important.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

50 Power Technologies International


Figure 21: Emergency operation conditions. Feeder C-513 is disconnected at <strong>the</strong> substation and<br />

feeder C-514, C-512 and C-515 fully supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

This feeder is one <strong>of</strong> those rare cases where we require 3 feeders to fully back it up. However<br />

it is fully connected in a loop scheme so close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under<br />

most circumstances. See section “Feeder overview and switching strategy: General<br />

Comment” for additional discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations<br />

above.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 51


6.4.5 Feeder C-514<br />

Figure 22: Overview <strong>of</strong> feeder C-514 in normal operation conditions.<br />

Figure 23 shows <strong>the</strong> emergency operation <strong>of</strong> this feeder and in section “Feeder overview and<br />

switching strategy: General Comment” we provide additional discussion on <strong>the</strong> format used<br />

to describe <strong>the</strong> switching operations in this figure.<br />

Note that this feeder has an spur going north (Abrasani) that would not be possible to supply<br />

if it were to fail beyond <strong>the</strong> connection to <strong>the</strong> mainlines. The total load here is ra<strong>the</strong>r small<br />

however (0.84 MW)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

52 Power Technologies International


Figure 23: Emergency operation conditions. Feeder C-514 is disconnected at <strong>the</strong> substation and<br />

feeder C-513 and C-515 fully supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

6.4.6 Feeder C-515<br />

Figure 24: Overview <strong>of</strong> feeder C-515 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 53


Figure 25: Emergency operation conditions. Feeder C-515 is disconnected at <strong>the</strong> substation and<br />

feeder C-513 and N-516 fully supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

6.4.7 Feeder C-516<br />

Figure 26: Overview <strong>of</strong> feeder C-516 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

54 Power Technologies International


Figure 27: Emergency operation conditions. Feeder C-516 is disconnected at <strong>the</strong> substation and<br />

feeder C-517 fully supplies <strong>the</strong> connected load. The necessary switching operations are indicated by<br />

arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

6.4.8 Feeder C-517<br />

Figure 28: Overview <strong>of</strong> feeder C-510 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 55


Figure 29: Emergency operation conditions. Feeder C-517 is disconnected at <strong>the</strong> substation and<br />

feeder C-516 and C-518 fully supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points<br />

shown and even in most cases <strong>the</strong> radial sections can be transferred to o<strong>the</strong>r feeders beyond<br />

those shown (e.g. N-518.) Therefore, it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be<br />

supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

56 Power Technologies International


6.4.9 Feeder C-518<br />

Figure 30: Overview <strong>of</strong> feeder C-518 in normal operation conditions.<br />

Figure 31: Emergency operation conditions. Feeder C-518 is disconnected at <strong>the</strong> substation and<br />

feeder C-517, C-511 and BK-514 fully supply <strong>the</strong> connected load. The necessary switching<br />

operations are indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 57


This feeder is one <strong>of</strong> those rare cases where we require 3 feeders to fully back it up. However<br />

close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances. See section “Feeder<br />

overview and switching strategy: General Comment” for additional discussion on <strong>the</strong> format<br />

used to describe <strong>the</strong> switching operations above.<br />

6.4.10 Feeder C-519<br />

Figure 32: Overview <strong>of</strong> feeder C-519 in normal operation conditions.<br />

Figure 33 shows <strong>the</strong> emergency conditions fro this feeder and section “Feeder overview and<br />

switching strategy: General Comment” presents additional discussion on <strong>the</strong> format used to<br />

describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

58 Power Technologies International


Figure 33: Emergency operation conditions. Feeder C-519 is disconnected at <strong>the</strong> substation and<br />

feeder C-513 supplies <strong>the</strong> connected load. The necessary switching operations are indicated by<br />

arrows.<br />

6.4.11 Feeder C-520<br />

Figure 34: Overview <strong>of</strong> feeder C-520 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 59


Figure 35: Emergency operation conditions. Feeder C-520 is disconnected at <strong>the</strong> substation and<br />

feeder N-515 fully supplies <strong>the</strong> connected load. The necessary switching operations are indicated by<br />

arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

6.4.12 Feeder C-521<br />

Figure 36: Overview <strong>of</strong> feeder C-521 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

60 Power Technologies International


Figure 37: Emergency operation conditions. Feeder C-521 is disconnected at <strong>the</strong> substation and<br />

feeder C-516 fully supplies <strong>the</strong> connected load. The necessary switching operations are indicated by<br />

arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 61


6.5 Breshna Kot Substation<br />

Figure 38 and Figure 39 show an overview <strong>of</strong> Central Substation and <strong>the</strong> feeders supplying<br />

its service area.<br />

Figure 38: Overview <strong>of</strong> Breshna Kot Substation. The feeders with <strong>the</strong>ir loadings (absolute<br />

and relative to <strong>the</strong> capacity <strong>of</strong> <strong>the</strong> first section) are shown.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

62 Power Technologies International


Figure 39: Overview <strong>of</strong> <strong>the</strong> area <strong>of</strong> Breshna Kot Substation. All feeders are highlighted in different colors.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 63


6.5.1 Feeder BK-510<br />

Figure 40: Overview <strong>of</strong> feeder BK-510 in normal operation conditions.<br />

Figure 41: Emergency operation conditions. Feeder BK-510 is disconnected at <strong>the</strong> substation<br />

and feeder SW-511 and BK-517 fully supply <strong>the</strong> connected load. The necessary switching<br />

operations are indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 64


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder is ra<strong>the</strong>r long but it only has relatively small radial sections beyond <strong>the</strong><br />

interconnection points so it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under<br />

most circumstances (ei<strong>the</strong>r from BK substation directly or <strong>the</strong> feeders identified above) .<br />

6.5.2 Feeder BK-511<br />

Figure 42: Overview <strong>of</strong> feeder BK-511 in normal operation conditions.<br />

Figure 43: Emergency operation conditions. Feeder BK-511 is disconnected at <strong>the</strong> substation<br />

and feeder BK-518 and BK-518 fully supply <strong>the</strong> connected load. Load at <strong>the</strong> junction station 3<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 65


etween <strong>the</strong> supplying Feeders BK-518 and BK-519 was shifted. The necessary switching<br />

operations are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has long radial sections beyond <strong>the</strong> interconnection point at Junction<br />

Station #3, however each <strong>of</strong> <strong>the</strong>se radial sections ends at ano<strong>the</strong>r feeders, so it is very likely<br />

that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

66 Power Technologies International


6.5.3 Feeder BK-512<br />

Figure 44: Overview <strong>of</strong> feeder BK-513 in normal operation conditions. No emergency support<br />

<strong>of</strong> this feeder with only a single transformer is possible.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 67


6.5.4 Feeder BK-513<br />

Figure 45: Overview <strong>of</strong> feeder BK-513 in normal operation conditions.<br />

Figure 46: Emergency operation conditions. Feeder BK-513 is disconnected at <strong>the</strong> substation<br />

and feeder BK-515 and C-510 fully supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

68 Power Technologies International


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

This feeder has relatively long section going to <strong>the</strong> sou<strong>the</strong>ast that cannot be baked up from<br />

o<strong>the</strong>r feeders if it were to fail (see lower part <strong>of</strong> <strong>the</strong> fork in <strong>the</strong> figure above.) However <strong>the</strong> load<br />

in this section is in <strong>the</strong> order <strong>of</strong> 1.4 MW.<br />

6.5.5 Feeder BK-514<br />

Figure 47: Overview <strong>of</strong> feeder BK-514 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 69


Figure 48: Emergency operation conditions. Feeder BK-514 is disconnected at <strong>the</strong> substation<br />

and feeder BK-511 and BK-515 fully supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has some radial sections beyond <strong>the</strong> interconnection point (Junction<br />

Station 1); however each <strong>of</strong> <strong>the</strong>se radial sections ends at ano<strong>the</strong>r feeders, so it is very likely<br />

that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

70 Power Technologies International


6.5.6 Feeder BK-515<br />

Figure 49: Overview <strong>of</strong> feeder BK-510 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 71


Figure 50: Emergency operation conditions. Feeder BK-515 is disconnected at <strong>the</strong> substation<br />

and feeder BK-511 and BK-514 fully supply <strong>the</strong> connected load. Load at <strong>the</strong> junction station 1 to BK-<br />

511 has been done. The necessary switching operations are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has some radial sections beyond <strong>the</strong> interconnection points; however<br />

each <strong>of</strong> <strong>the</strong>se radial sections ei<strong>the</strong>r ends at ano<strong>the</strong>r feeder or it is limited in length (maximum<br />

load 2.3 MW)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

72 Power Technologies International


6.5.7 Feeder BK-516<br />

Figure 51: Overview <strong>of</strong> feeder BK-516 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 73


Figure 52: Emergency operation conditions. Feeder BK-511 is disconnected at <strong>the</strong> substation<br />

and feeder BK-518 and N-510 fully supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

74 Power Technologies International


6.5.8 Feeder BK-517<br />

Figure 53: Overview <strong>of</strong> feeder BK-517 and Feeder BK-510 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 75


Figure 54: Emergency operation conditions. Feeder BK-517 is disconnected at <strong>the</strong> substation<br />

and feeder SW-511 and BK-510 fully supply <strong>the</strong> connected load. The necessary switching<br />

operations are indicated by arrows.<br />

Figure 33 shows <strong>the</strong> emergency conditions fro this feeder and section “Feeder overview and<br />

switching strategy: General Comment” presents additional discussion on <strong>the</strong> format used to<br />

describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

76 Power Technologies International


6.5.9 Feeder BK-518<br />

Figure 55: Overview <strong>of</strong> feeder BK-518 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 77


Figure 56: Emergency operation conditions. Feeder BK-518 is disconnected at <strong>the</strong> substation<br />

and feeder BK-511 and BK-519 fully supply <strong>the</strong> connected load. Load at <strong>the</strong> junction station 3<br />

between <strong>the</strong> supplying Feeders BK-518 and BK-519 was shifted. The necessary switching<br />

operations are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

78 Power Technologies International


6.5.10 Feeder BK-519<br />

Figure 57: Overview <strong>of</strong> feeder BK-519 in normal operation conditions.<br />

Figure 58: Emergency operation conditions. Feeder BK-519 is disconnected at <strong>the</strong> substation<br />

and feeder BK-511 and BK-518 fully supply <strong>the</strong> connected load. Load at <strong>the</strong> junction station 3<br />

between <strong>the</strong> supplying Feeders BK-518 and BK-519 was shifted. The necessary switching<br />

operations are indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 79


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has some radial sections beyond <strong>the</strong> interconnection points; however<br />

each <strong>of</strong> <strong>the</strong>se radial sections ends at ano<strong>the</strong>r feeder, so it is very likely that close to 100% <strong>of</strong><br />

<strong>the</strong> load can be supplied under most circumstances.<br />

6.6 South West Substation<br />

Figure 59 and Figure 60 show an overview <strong>of</strong> Central Substation and <strong>the</strong> feeders supplying<br />

its service area.<br />

Figure 59: Overview <strong>of</strong> South West Substation.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

80 Power Technologies International


Figure 60: Overview <strong>of</strong> <strong>the</strong> area <strong>of</strong> South West Substation. All feeders are highlighted in different colors.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 81


To show <strong>the</strong> flexibility and reliability <strong>of</strong> <strong>the</strong> proposed medium term network each <strong>of</strong> <strong>the</strong><br />

feeders will be disconnected directly at <strong>the</strong> substation and we verify that <strong>the</strong> connected<br />

load could be supplied by adjacent feeders without any severe overloads. The involved<br />

feeders and <strong>the</strong> switching operations are indicated.<br />

6.6.1 Feeder SW-510<br />

Figure 61: Overview <strong>of</strong> feeder SW-510 in normal operation conditions.<br />

Figure 62: Emergency conditions. Feeder SW-510 is disconnected at <strong>the</strong> substation and feeder<br />

SW-514 fully supplies <strong>the</strong> connected load. The necessary switching operations are indicated by<br />

arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 82


Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

6.6.2 Feeder SW-511<br />

Figure 63: Overview <strong>of</strong> feeder SW-511 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 83


Figure 64: : Emergency operation conditions. Feeder SW-511 is disconnected at <strong>the</strong> substation<br />

and feeder SW-512 and BK-510 supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

84 Power Technologies International


6.6.3 Feeder SW-512<br />

Figure 65: Overview <strong>of</strong> feeder SW-512 in normal operation conditions.<br />

Figure 66: Emergency operation conditions. Feeder SW-511 is disconnected at <strong>the</strong> substation<br />

and feeder SW-511 and BK-511 supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 85


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

6.6.4 Feeder SW-513<br />

Figure 67: Overview <strong>of</strong> feeder SW-513 in normal operation conditions.<br />

Figure 68: Emergency operation conditions. Feeder SW-513 is disconnected at <strong>the</strong> substation<br />

and feeder SW-515 and BK-511 supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

86 Power Technologies International


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder is fully looped so it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be<br />

supplied under most circumstances.<br />

6.6.5 Feeder SW-514<br />

Figure 69: Overview <strong>of</strong> feeder SW-514 in normal operation conditions.<br />

Figure 70: Emergency operation conditions. Feeder SW-514 is disconnected at <strong>the</strong> substation<br />

and feeder SW-510 and NW-510 supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 87


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder long radial sections beyond <strong>the</strong> interconnection point, however <strong>the</strong> load<br />

in this section is under 3 MW and <strong>the</strong>re are no economic ways <strong>of</strong> backing it up.<br />

6.6.6 Feeder SW-515<br />

Figure 71: Overview <strong>of</strong> feeder SW-515 in normal operation conditions.<br />

Figure 72: Emergency operation conditions. Feeder SW-515 is disconnected at <strong>the</strong> substation<br />

and feeder SW-513 and BK-511 supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

88 Power Technologies International


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

6.7 East Substation<br />

Figure 73 and Figure 74 show an overview <strong>of</strong> Central Substation and <strong>the</strong> feeders supplying<br />

its service area.<br />

Figure 73: Overview <strong>of</strong> East Substation.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 89


Figure 74: Overview <strong>of</strong> <strong>the</strong> area <strong>of</strong> East Substation. All feeders are highlighted in different colors.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 90


To show <strong>the</strong> flexibility and reliability <strong>of</strong> <strong>the</strong> proposed medium term network each <strong>of</strong> <strong>the</strong><br />

feeders will be disconnected directly at <strong>the</strong> substation and we verify that <strong>the</strong> connected<br />

load could be supplied by adjacent feeders without any severe overloads. The involved<br />

feeders and <strong>the</strong> switching operations are indicated.<br />

6.7.1 Feeder E-511<br />

Figure 75: Overview <strong>of</strong> feeder E-511 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 91


Figure 76: Emergency operation conditions. Feeder E-511 is disconnected at <strong>the</strong> substation and<br />

feeder E-519 supplies part <strong>of</strong> <strong>the</strong> connected load. The necessary switching operations are indicated<br />

by arrows. It would be not economic to build an extra backup line to reliable support this load we<br />

assume to be rural.<br />

Note that only a part <strong>of</strong> E-511 can be supplied from E-519 and approximately 4.3 MW<br />

will need to be disconnected in order not to overload E-519. We think that this is an<br />

acceptable solution and it would be not economic to build an extra backup line to reliable<br />

support this rural load.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

92 Power Technologies International


6.7.2 Feeder E-513<br />

Figure 77: Overview <strong>of</strong> feeder E-513 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 93


Figure 78: Emergency operation conditions. Feeder E-513 is disconnected at <strong>the</strong> substation and<br />

feeder E-521supplies <strong>the</strong> connected load. The necessary switching operations are indicated by<br />

arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

94 Power Technologies International


6.7.3 Feeder E-515<br />

Figure 79<br />

left: Overview <strong>of</strong> feeder E-515 in normal operation conditions.<br />

right: Emergency operation conditions. Feeder E-515 is disconnected at <strong>the</strong> substation and<br />

feeder E-523 supply <strong>the</strong> connected load. The necessary switching operations are indicated<br />

by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has a radial sections beyond <strong>the</strong> interconnection points; however this<br />

section has very little load (0.8 MW).<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 95


6.7.4 Feeder E-519<br />

Figure 80: Overview <strong>of</strong> feeder E-519 in normal operation conditions.<br />

Figure 81 Emergency operation conditions. Feeder E-519 is disconnected at <strong>the</strong> substation and<br />

feeder E-521 and E-511 supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

Figure 33 shows <strong>the</strong> emergency conditions fro this feeder and section “Feeder overview and<br />

switching strategy: General Comment” presents additional discussion on <strong>the</strong> format used to<br />

describe <strong>the</strong> switching operations above.<br />

Note that this feeder has a long section with approximately 3.8 MW that is radial and could<br />

not be economically backed up if it were to fail beyond <strong>the</strong> switching point above..<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

96 Power Technologies International


6.7.5 Feeder E-521<br />

Figure 82 Overview <strong>of</strong> feeder E-521 in normal operation conditions.<br />

Figure 83: Emergency operation conditions. Feeder E-521 is disconnected at <strong>the</strong> substation and<br />

feeder E-513, E-519 and E-541 supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 97


This feeder is one <strong>of</strong> those rare cases where we require 3 feeders to fully back it up. It also<br />

has some radial sections that could not be backed up if <strong>the</strong>y were to fail beyond <strong>the</strong><br />

interconnection point (4 MW). See section “Feeder overview and switching strategy: General<br />

Comment” for additional discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations<br />

above.<br />

6.7.6 Feeder E-523<br />

Figure 84<br />

left: Overview <strong>of</strong> feeder E-515 in normal operation conditions.<br />

right: Emergency operation conditions. Feeder E-515 is disconnected at <strong>the</strong> substation and<br />

feeder E-523 supply <strong>the</strong> connected load. The necessary switching operations are indicated by<br />

arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has some radial sections beyond <strong>the</strong> interconnection points but <strong>the</strong> load<br />

is small and it would not justify reinforcement.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

98 Power Technologies International


6.7.7 Feeder E-531<br />

Figure 85 Overview <strong>of</strong> feeder E-531 in normal operation conditions.<br />

Figure 86: Emergency operation conditions. Feeder E-531 is disconnected at <strong>the</strong> substation and<br />

feeder C-512 supplies <strong>the</strong> connected load. The necessary switching operations are indicated by<br />

arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 99


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has some radial sections beyond <strong>the</strong> interconnection points but <strong>the</strong> load<br />

is small (1.4 MW) and it would not justify reinforcement.<br />

6.7.8 Feeder E-541<br />

Figure 87: Overview <strong>of</strong> feeder E-541 in normal operation conditions.<br />

Figure 88: Emergency operation conditions. Feeder E-541 is disconnected at <strong>the</strong> substation and<br />

feeder C-515 and E-521 supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

100 Power Technologies International


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has a radial section beyond <strong>the</strong> interconnection point with approximately<br />

3.4 MW, whoever <strong>the</strong>re it no feeders in <strong>the</strong> vicinity to provide back up and it would be uneconomical<br />

to build a new one.<br />

6.8 North West Substation<br />

Figure 89 and Figure 90 show an overview <strong>of</strong> Central Substation and <strong>the</strong> feeders supplying<br />

its service area.<br />

Figure 89: Overview <strong>of</strong> North West Substation.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 101


Figure 90: Overview <strong>of</strong> <strong>the</strong> area <strong>of</strong> North West. All feeders are highlighted in different colors.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 102


6.8.1 Feeder NW-513, NW-517 and NW-518<br />

Figure 91: Overview <strong>of</strong> <strong>the</strong> feeders NW-513, NW-517 and NW-518 in normal operation<br />

conditions.<br />

Figure 92: Close-up <strong>of</strong> <strong>the</strong> marked area <strong>of</strong> Figure 91.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 103


Figure 93: : Emergency operation conditions. Feeder NW-513 is disconnected at <strong>the</strong> substation<br />

and feeder NW-518 fully supplies <strong>the</strong> connected load. In order to do so, load shifting between from<br />

feeder NW-518 to NW-517 and from NW-518 to SW-514 and SW-515 was done.<br />

Figure 94: Close-up <strong>of</strong> Figure 93. The necessary switching operations are indicated by arrows.<br />

This feeder is one <strong>of</strong> those rare cases where we require 3 feeders to fully back it up, also it<br />

has a long radial tail with 5 MW <strong>of</strong> load that is rural and could not be supplied if it were to fail<br />

beyond <strong>the</strong> interconnection point. See section “Feeder overview and switching strategy:<br />

General Comment” for additional discussion on <strong>the</strong> format used to describe <strong>the</strong> switching<br />

operations above.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

104 Power Technologies International


Figure 95: Feeder NW-517 is disconnected at <strong>the</strong> substation and feeder SW-514 and SW 515 fully<br />

supply <strong>the</strong> connected load. The necessary switching operations are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has some radial sections beyond <strong>the</strong> interconnection points; however<br />

each <strong>of</strong> <strong>the</strong>se radial sections ends at ano<strong>the</strong>r feeder, so it is very likely that close to 100% <strong>of</strong><br />

<strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 105


6.8.2 Feeder NW-514<br />

Figure 96: Overview <strong>of</strong> feeder NW-514 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

106 Power Technologies International


Figure 97: Emergency operation conditions. Feeder NW-514 is disconnected at <strong>the</strong> substation<br />

and feeder NW-515 and N-529 fully supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 107


6.8.3 Feeder NW-515<br />

Figure 98: Overview <strong>of</strong> feeder NW-515 in normal operation conditions.<br />

Figure 99: Emergency operation conditions. Feeder NW-515 is disconnected at <strong>the</strong> substation<br />

and feeder N-514 fully supply <strong>the</strong> connected load. The necessary switching operations are indicated<br />

by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

108 Power Technologies International


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

6.8.4 Feeder NW-516<br />

Figure 100:<br />

This feeder supplies rural loads totaling 1.4 MW approximately and it cannot be economically backed<br />

up.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 109


6.8.5 Feeder NW-524, NW-526 and NW-527<br />

Figure 101: Overview <strong>of</strong> <strong>the</strong> Feeder NW-24, NW-526 and NW-527 in normal operation<br />

conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

110 Power Technologies International


Figure 102: MW-524 Emergency operation conditions. Feeder NW-524 is disconnected at <strong>the</strong><br />

substation and feeder N-526 fully supplies <strong>the</strong> connected load. Load was shifted from N-526 to N-<br />

511 in order to avoid overloads. Also load needs to be transferred form N-511 to N-513 (see orange<br />

element below.) The necessary switching operations are indicated by arrows.<br />

Three feeders are required to fully back up this feeder basically to de-load <strong>the</strong> feeders that will take<br />

overt its load.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 111


Figure 103: NW-526 Emergency operation conditions. Feeder NW-526 is disconnected at <strong>the</strong><br />

substation and feeder N-527 and N-511 fully supply <strong>the</strong> connected load. Load needs to be<br />

transferred form N-511 to N-513 (see orange element below) to avoid overload <strong>of</strong> N-511. The<br />

necessary switching operations are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

112 Power Technologies International


Figure 104: NW-527 Emergency operation conditions. Feeder NW-527 is disconnected at <strong>the</strong><br />

substation and feeder N-526 fully supplies <strong>the</strong> connected load. Load was shifted to N-511 in order to<br />

do so. Also load needs to be transferred form N-511 to N-513 (see orange element below) to avoid<br />

overload <strong>of</strong> N-511. The necessary switching operations are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 113


6.8.6 Feeder NW-525<br />

Figure 105: Overview <strong>of</strong> feeder NW-525 in normal operation conditions.<br />

Figure 106 shows <strong>the</strong> emergency conditions fro this feeder and section “Feeder overview and<br />

switching strategy: General Comment” presents additional discussion on <strong>the</strong> format used to<br />

describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points or<br />

all <strong>the</strong> sections end in ano<strong>the</strong>r feeders, so it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can<br />

be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

114 Power Technologies International


Figure 106: Emergency operation conditions. Feeder NW-515 is disconnected at <strong>the</strong> substation<br />

and feeder N-520 and N-519 fully supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 115


6.9 North Substation<br />

Figure 107 and Figure 108 show an overview <strong>of</strong> Central Substation and <strong>the</strong> feeders<br />

supplying its service area.<br />

Figure 107: Overview <strong>of</strong> North Substation.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

116 Power Technologies International


Figure 108: Overview <strong>of</strong> <strong>the</strong> area <strong>of</strong> North Substation. All feeders are highlighted in different<br />

colors.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 117


6.9.1 Feeder N-511 and N-513<br />

Figure 109: Overview <strong>of</strong> <strong>the</strong> feeder N-511 and N-513 in normal operation conditions.<br />

Figure 110: N-511 Emergency operation conditions. Feeder N-511 is disconnected at <strong>the</strong><br />

substation and feeder N-513 fully supplies <strong>the</strong> connected load. Load was shifted to E-513 in order to<br />

do so. The necessary switching operations are indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

118 Power Technologies International


Note that this feeder a radial section with 3.2 MW that could not be supplied if it fails beyond<br />

<strong>the</strong> interconnection point with <strong>the</strong> mainline. Ignoring this event most <strong>of</strong> <strong>the</strong> load in this feeder<br />

can be backed up.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Figure 111: N-513 Emergency operation conditions. Feeder N-513 is disconnected at <strong>the</strong><br />

substation and feeder N-511 and E-513 fully supplies <strong>the</strong> connected load. Load was shifted from N-<br />

511 to NW-526 in order to do so. The necessary switching operations are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 119


6.9.2 Feeder N-512<br />

Figure 112: Overview <strong>of</strong> feeder N-512 in normal operation conditions.<br />

Figure 113: Emergency operation conditions. Feeder N-512 is disconnected at <strong>the</strong> substation<br />

and feeder C-514 fully supply <strong>the</strong> connected load. The necessary switching operations are indicated<br />

by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

120 Power Technologies International


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

6.9.3 Feeder N-514<br />

Figure 114: Overview <strong>of</strong> feeder N-514 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 121


Figure 115: Emergency operation conditions. Feeder N-514 is disconnected at <strong>the</strong> substation<br />

and feeder N-518, NW-525 and NW-515 fully supply <strong>the</strong> connected load. The necessary switching<br />

operations are indicated by arrows.<br />

This feeder is one <strong>of</strong> those rare cases where we require 3 feeders to fully back it up.<br />

Note that this feeder has some radial sections beyond <strong>the</strong> interconnection points but ei<strong>the</strong>r<br />

<strong>the</strong> load is small and it would not justify reinforcement or <strong>the</strong>y finish in o<strong>the</strong>r feeders.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

122 Power Technologies International


6.9.4 Feeder N-515<br />

Figure 116: Overview <strong>of</strong> feeder N-515 in normal operation conditions. In emergency conditions<br />

<strong>the</strong> feeder can be connected to Central substation which can fully take over <strong>the</strong> load.<br />

Note that this feeder has some radial sections but ei<strong>the</strong>r <strong>the</strong> load is small and it would not<br />

justify reinforcement or <strong>the</strong>y finish in o<strong>the</strong>r feeders.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 123


6.9.5 Feeder N-516<br />

Figure 117: Overview <strong>of</strong> feeder N-516 in normal operation conditions.<br />

Figure 118: Emergency operation conditions. Feeder N-516 is disconnected at <strong>the</strong> substation<br />

and feeder C-515 fully supply <strong>the</strong> connected load. In order to do so part <strong>of</strong> <strong>the</strong> load from C-515 has<br />

been shifted to E-541. The necessary switching operations are indicated by arrows.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

124 Power Technologies International


See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

6.9.6 Feeder N-517<br />

Figure 119: : Overview <strong>of</strong> feeder N-517 in normal operation conditions.<br />

Figure 120 shows <strong>the</strong> emergency conditions fro this feeder and section “Feeder overview and<br />

switching strategy: General Comment” presents additional discussion on <strong>the</strong> format used to<br />

describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 125


Figure 120: Emergency operation conditions. Feeder N-517 is disconnected at <strong>the</strong> substation<br />

and feeder N-512 and C-515 fully supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

Note that this feeder has some radial sections but ei<strong>the</strong>r <strong>the</strong> load is small and it would not<br />

justify reinforcement or <strong>the</strong>y finish in o<strong>the</strong>r feeders.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

126 Power Technologies International


6.9.7 Feeder N-518<br />

Figure 121: Overview <strong>of</strong> feeder N-518 in normal operation conditions. In emergency conditions<br />

<strong>the</strong> feeder can be connected to Central substation which can fully take over <strong>the</strong> load.<br />

Note that this feeder has some radial sections but ei<strong>the</strong>r <strong>the</strong> load is small and it would not<br />

justify reinforcement or <strong>the</strong>y finish in o<strong>the</strong>r feeders.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 127


6.9.8 Feeder N-519<br />

Figure 122: Overview <strong>of</strong> feeder N-519 in normal operation conditions.<br />

Figure 123: Emergency operation conditions. Feeder N-519 is disconnected at <strong>the</strong> substation<br />

and feeder NW-525 fully supply <strong>the</strong> connected load. The necessary switching operations are<br />

indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

128 Power Technologies International


6.9.9 Feeder N-520<br />

Figure 124: Overview <strong>of</strong> feeder N-520 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 129


Figure 125: Emergency operation conditions. Feeder N-520 is disconnected at <strong>the</strong> substation<br />

and feeder N-511 and NW-525 fully supply <strong>the</strong> connected load. The necessary switching operations<br />

are indicated by arrows.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Note that this feeder has relatively small radial sections beyond <strong>the</strong> interconnection points so<br />

it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most circumstances.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

130 Power Technologies International


6.9.10 Feeder N-528<br />

Figure 126: Overview <strong>of</strong> <strong>the</strong> feeders N-518 and N-528 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 131


Figure 127: : Emergency operation conditions. Feeder N-528 is disconnected at <strong>the</strong> substation<br />

and feeder N-518 fully supplies <strong>the</strong> connected load. In order to do so, part <strong>of</strong> N-518 is supplied by<br />

Central Substation. The necessary switching operations are indicated by arrows.<br />

2.5 MW that could not be supplied if it fails beyond <strong>the</strong> interconnection point with <strong>the</strong> mainline.<br />

Ignoring this event most <strong>of</strong> <strong>the</strong> load in this feeder can be backed up.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

132 Power Technologies International


6.9.11 Feeder N-529<br />

Figure 128: Overview <strong>of</strong> feeder N-529 in normal operation conditions.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 133


Figure 129: Emergency operation conditions. Feeder N-529 is disconnected at <strong>the</strong> substation<br />

and feeder NW-514, NW-517, NW-515 and NW-C-517 fully supply <strong>the</strong> connected load.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

134 Power Technologies International


Figure 130: Close-up <strong>of</strong> <strong>the</strong> indicated area <strong>of</strong> Figure 129. The necessary switching operations<br />

are indicated by arrows.<br />

To back up this feeder we require 4, but several connections are done in one place (Junction<br />

Station # 5). There are some relatively small radial sections beyond <strong>the</strong> interconnection<br />

points so it is very likely that close to 100% <strong>of</strong> <strong>the</strong> load can be supplied under most<br />

circumstances.<br />

See section “Feeder overview and switching strategy: General Comment” for additional<br />

discussion on <strong>the</strong> format used to describe <strong>the</strong> switching operations above.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 135


Section<br />

7<br />

<strong>Analysis</strong> <strong>of</strong> <strong>the</strong> Short Term <strong>System</strong><br />

In this section we present <strong>the</strong> results <strong>of</strong> our analysis <strong>of</strong> <strong>the</strong> system once <strong>the</strong> short term<br />

investments described in Section 9 are implemented<br />

Here we demonstrate that such system should be able to supply <strong>the</strong> load estimated to exist in<br />

<strong>the</strong> network without overloading any facility and with adequate voltages in all nodes. The load<br />

considered is shown in Table 4 and it corresponds to <strong>the</strong> load that should materialize once<br />

<strong>the</strong> generation restrictions are lifted.<br />

7.1 Overview<br />

Figure 131 shows an overview <strong>of</strong> <strong>the</strong> short term system, also called 2008 conditions as it<br />

should be possible to implement most <strong>of</strong> <strong>the</strong> recommended changes by <strong>the</strong> end <strong>of</strong> that year.<br />

In this figure any node that had voltage below 94% would shown as a red point (<strong>the</strong>re are<br />

none) and <strong>the</strong> color <strong>of</strong> <strong>the</strong> lines is as follows: green lines indicate loading below 70% nominal,<br />

blue indicates loading between 70% and 100%, orange 100% to 110% and red above 110%.<br />

As can be observed in this figure all lines are ei<strong>the</strong>r blue or green which means that <strong>the</strong>re are<br />

no overloaded lines. However we note as well that several <strong>of</strong> <strong>the</strong> mainlines going out <strong>of</strong> <strong>the</strong><br />

substations are blue indicating high loading. The consequence <strong>of</strong> this is that <strong>the</strong> system does<br />

not have yet <strong>the</strong> flexibility that would be expected <strong>of</strong> a reliable system and <strong>the</strong> outage <strong>of</strong> one<br />

section <strong>of</strong> feeder (particularly a mainline close to a substation) can result in a temporary<br />

interruption <strong>of</strong> service to <strong>the</strong> customers. This is due to <strong>the</strong> limited ability <strong>of</strong> neighboring<br />

feeders to take over <strong>the</strong> load <strong>of</strong> <strong>the</strong> affected feeder (more on this in <strong>the</strong> next section)<br />

Table 22 show <strong>the</strong> main results for <strong>the</strong> feeders in this case where we observe that all nodes<br />

have voltages near or above 95% and no lines are loaded above 100%. We note that <strong>the</strong>re<br />

are still some long feeders in <strong>the</strong> network, but <strong>the</strong> longest ones (NW-513 20 km and E-511)<br />

are rural feeders that cannot be economically shorten.<br />

The total load in this system is 246.2 MW and <strong>the</strong> supplied power to it is 256 MW which<br />

means that <strong>the</strong> losses are 3.8 % which is reasonable for <strong>the</strong> medium voltage network. To this<br />

value we would need to add <strong>the</strong> losses in <strong>the</strong> MV/LV transformers (typically 3%) and in <strong>the</strong><br />

LV system (ano<strong>the</strong>r 3%) for an expected distribution technical losses <strong>of</strong> 10%.<br />

Appendix C contains large format drawings <strong>of</strong> this system.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 136


Figure 131: Overview <strong>of</strong> Short Term <strong>System</strong><br />

North West S/S<br />

North S/S<br />

East S/S<br />

Breshna Kot S/S<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 137


Table 22: Feeder <strong>Analysis</strong> for <strong>the</strong> Short Term <strong>System</strong> (2008 estimated load conditions)<br />

Voltages<br />

Minimum Reserve Margin (MRM)<br />

(Minimum <strong>of</strong> Actual Current - Nominal C)<br />

Most Loaded Section (MLS)<br />

Maximum <strong>of</strong> Actual Current / Nominal Current<br />

Feeder Parameters<br />

Substation<br />

Feeder ID<br />

Most distant<br />

node<br />

Minimum in<br />

Feeder<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Margin<br />

(A)<br />

X-Section<br />

mm²<br />

Actual<br />

Current<br />

(A)<br />

Nominal<br />

Current<br />

(A)<br />

Maximum X-Section<br />

Loading % mm²<br />

MRM at<br />

MLS <br />

Minimum x-<br />

section<br />

mm²<br />

Maximum x-<br />

section<br />

mm²<br />

S/S North N-515 97.10 97.10 207 222 15.2 50 207 222.0 93.2 50 TRUE 35 50 9.09<br />

S/S North N-517 94.77 94.77 335 365 30.2 120 335 365.0 91.7 120 TRUE 50 185 10.44<br />

S/S North N-516 96.38 96.38 320 365 44.6 120 320 365.0 87.8 120 TRUE 70 185 10.05<br />

S/S North N-518 98.63 98.63 356 409 53.1 150 356 409.0 87.0 150 TRUE 35 150 7.81<br />

S/S North N-519 102.04 102.04 235 270 35.4 70 235 270.0 86.9 70 TRUE 50 185 4.45<br />

S/S North N-512 94.61 94.61 228 270 41.6 70 309 360.0 85.9 95 FALSE 50 185 16.16<br />

S/S North N-529 97.47 97.47 419 490 71.4 185 419 490.0 85.4 185 TRUE 35 240 8.29<br />

S/S North N-528 100.15 99.96 230 270 39.9 70 230 270.0 85.2 70 TRUE 50 185 4.36<br />

S/S North N-513 98.92 98.92 224 270 45.6 70 224 270.0 83.1 70 TRUE 35 185 8.85<br />

S/S North N-514 103.77 103.77 199 270 71.2 70 199 270.0 73.6 70 TRUE 50 185 2.58<br />

S/S North N-520 102.78 102.78 287 425 137.8 150 287 425.0 67.6 150 TRUE 70 185 3.20<br />

S/S North West NW-514 99.70 99.70 364 365 1.0 120 364 365.0 99.7 120 TRUE 25 240 5.43<br />

S/S North West NW-525 95.60 95.60 337 365 28.2 120 337 365.0 92.3 120 TRUE 35 185 8.77<br />

S/S North West NW-526 97.35 97.35 174 200 26.2 50 336 365.0 92.1 120 FALSE 35 185 6.08<br />

S/S North West NW-515 98.59 98.59 319 365 46.3 120 319 365.0 87.3 120 TRUE 35 185 6.84<br />

S/S North West NW-518 94.63 94.53 405 490 85.2 185 405 490.0 82.6 185 TRUE 35 240 11.74<br />

S/S North West NW-513 98.05 95.24 392 490 98.2 185 392 490.0 80.0 185 TRUE 25 240 20.39<br />

S/S North West NW-517 96.41 95.89 127 200 73.1 50 321 421.0 76.2 150 FALSE 50 240 14.15<br />

S/S North West NW-527 100.44 100.44 8 135 127.3 25 234 365.0 64.2 120 FALSE 25 150 4.94<br />

S/S North West NW-524 102.62 102.62 79 135 56.4 25 79 135.0 58.2 25 TRUE 16 185 3.10<br />

S/S North West NW-516 104.59 104.59 22 165 143.0 35 44 271.7 16.3 70 FALSE 35 120 3.55<br />

S/S Breshna Kot BK-513 95.20 95.20 383 425 41.7 150 383 425.0 90.2 150 TRUE 35 240 8.45<br />

S/S Breshna Kot BK-518 98.05 98.04 304 360 55.5 95 304 360.0 84.6 95 TRUE 50 300 8.37<br />

S/S Breshna Kot BK-514 101.50 101.50 229 271 41.9 70 229 271.0 84.5 70 TRUE 35 185 6.74<br />

S/S Breshna Kot BK-511 100.01 100.01 413 490 77.0 185 413 490.0 84.3 185 TRUE 50 185 6.29<br />

S/S Breshna Kot BK-519 99.90 99.90 396 490 93.5 185 396 490.0 80.9 185 TRUE 35 185 10.27<br />

S/S Breshna Kot BK-516 101.27 101.27 342 425 83.0 150 342 425.0 80.5 150 TRUE 50 240 6.23<br />

S/S Breshna Kot BK-515 102.21 102.21 214 271 56.8 70 214 271.0 79.1 70 TRUE 35 185 5.95<br />

S/S Breshna Kot BK-517 96.43 96.43 334 490 156.1 185 334 490.0 68.1 185 TRUE 35 240 11.32<br />

S/S Breshna Kot BK-512 104.98 104.98 5 303 297.7 70 5 303.0 1.8 70 TRUE 70 95 0.78<br />

S/S East E-521 102.54 101.91 182 200 18.4 50 182 200.0 90.8 50 TRUE 35 120 5.53<br />

S/S East E-541 96.17 96.10 243 270 27.4 70 243 270.0 89.9 70 TRUE 35 185 8.38<br />

S/S East E-511 96.65 96.65 226 270 43.7 70 226 270.0 83.8 70 TRUE 50 185 17.97<br />

S/S East E-531 98.78 98.78 87 200 113.2 50 267 421.0 63.4 150 FALSE 50 240 7.67<br />

S/S East E-519 102.35 102.35 107 255 148.4 70 114 255.0 44.8 70 TRUE 70 120 4.38<br />

S/S East E-513 100.46 100.46 112 270 158.0 70 112 270.0 41.5 70 TRUE 70 150 7.47<br />

S/S East E-523 103.77 103.77 36 222 186.0 50 36 222.0 16.2 50 TRUE 50 150 7.63<br />

S/S East E-515 104.39 104.24 31 365 333.9 120 334 365.0 91.5 120 TRUE 120 185 6.42<br />

S/S East E-536 105.00 105.00 0 365 364.8 120 338 365.0 92.5 120 TRUE 120 120 7.92<br />

Longest<br />

Section<br />

km<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

138 Power Technologies International


7.2 Switching and Reliability Assessment.<br />

One important characteristic <strong>of</strong> a distribution system is <strong>the</strong> way its feeders are interconnected<br />

and <strong>the</strong> ability to transfer load from one feeder to <strong>the</strong> adjacent feeders during emergencies. In<br />

fact to achieve <strong>the</strong> loadings and voltages indicated in <strong>the</strong> previous section it is important for<br />

DABM to operate <strong>the</strong> system in a way generally consistent with our assumptions.<br />

The large format drawings in Appendix C show <strong>the</strong> way <strong>the</strong> system is interconnected and<br />

Figure 132 below shows an overview <strong>of</strong> <strong>the</strong> coverage <strong>of</strong> <strong>the</strong> substations and Figure 133<br />

shows <strong>the</strong> different feeders in <strong>the</strong> network.<br />

However we realize that it may be complicated to identify <strong>the</strong> open points where one feeder<br />

meets its neighbors, <strong>the</strong>refore in Table 23 we show <strong>the</strong> open switching points for all feeders<br />

in <strong>the</strong> system. This table contains <strong>the</strong> following information:<br />

e) Feeder 1: Maximum Current in Feeder, Nominal Current at <strong>the</strong> section that has <strong>the</strong><br />

Minimum Reserve Margin (MRM) 4 , Minimum Reserve Margin.<br />

f) Feeder 2: Maximum Current in Feeder, Nominal Current at <strong>the</strong> section that has <strong>the</strong><br />

Minimum Reserve Margin (MRM), Minimum Reserve Margin.<br />

g) Percentage <strong>of</strong> <strong>the</strong> maximum load in Feeder 1 that could be taken over by feeder 2<br />

given its minimum reserve margin<br />

h) The name <strong>of</strong> <strong>the</strong> nodes where <strong>the</strong>se two feeders meet.<br />

As can be seen above Table 23 can also be used to identify how much <strong>of</strong> <strong>the</strong> feeder load can<br />

be transferred to <strong>the</strong> adjacent feeder at each point where <strong>the</strong>y come toge<strong>the</strong>r.<br />

However it should be mentioned that <strong>the</strong> load transferring capability should be taken as<br />

indicative as it was determined based on <strong>the</strong> minimum reserve in <strong>the</strong> adjacent feeder and it is<br />

conservative in this respect; if <strong>the</strong> feeders meet above <strong>the</strong> point where <strong>the</strong> minimum reserve<br />

happens it may be possible to transfer additional load. Also 100% <strong>of</strong> <strong>the</strong> feeder load would<br />

have to be transferred only if <strong>the</strong> contingency happened near <strong>the</strong> substation. If it happened<br />

later along <strong>the</strong> feeder <strong>the</strong> amount <strong>of</strong> load that would have to be transferred is less. On <strong>the</strong><br />

o<strong>the</strong>r hand for this transfer to happen <strong>the</strong> element in outage must be before an<br />

interconnection point. If it is downstream <strong>the</strong>n no transfers would be feasible.<br />

<strong>Final</strong>ly Table 24 provides an overview <strong>of</strong> <strong>the</strong> systems flexibility by showing <strong>the</strong> total<br />

percentage <strong>of</strong> each feeder load that could be taken by adjacent feeders. Her we note that in<br />

average 47 % 5 <strong>of</strong> <strong>the</strong> load could be transferred out which is quite good considering that this<br />

evaluation is somewhat conservative and that this system is not yet in its final configuration<br />

(i.e. substations need to be incorporated)<br />

4 Reserve Margin is <strong>the</strong> difference between <strong>the</strong> nominal current and <strong>the</strong> actual current in an element.<br />

5 This average includes only <strong>the</strong> non-cero values.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 139


Figure 132: Overview <strong>of</strong> Substation Coverage distribution for <strong>the</strong> Short Term <strong>System</strong><br />

North West S/S<br />

North S/S<br />

East S/S<br />

Breshna Kot S/S<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 140


Figure 133: Overview <strong>of</strong> Feeder distribution for <strong>the</strong> Short Term <strong>System</strong><br />

North West S/S<br />

North S/S<br />

East S/S<br />

Breshna Kot S/S<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 141


Feeder 1 (F1)<br />

Nominal<br />

Current @<br />

MRM<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

(A)<br />

Table 23: Open Switching Points between feeders<br />

Feeder2 (F2)<br />

Nominal<br />

Current @<br />

MRM (A)<br />

Maximum<br />

Current<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

% Load in<br />

F1 taken by<br />

Name Maximum<br />

Name<br />

F2<br />

Current (A)<br />

(A) Node1 Node2<br />

N-512 312 270 42 N-517 365 335 30 10% N-512-93 N-517-Hawa Shenase<br />

N-512 312 270 42 N-517 365 335 30 10% N-512-Bibi Mahro Muqabel N-512-94<br />

N-512 312 270 42 N-517 365 335 30 10% N-512-108 N-512-107<br />

N-512 312 270 42 N-515 222 352 15 5% N-512-T#1 Wazir akbar khan N-512<br />

N-512 312 270 42 N-516 365 340 45 14% N-512-400 Bester 1 N-516-No-12Macroryan<br />

N-512 312 270 42 N-516 365 340 45 14% N-512-Sehat Tefl N-516-No-12Macroryan<br />

N-512 312 270 42 N-518 409 360 53 17% N-512-Ministry <strong>of</strong> health N-518_JS2_517-<strong>Afghan</strong>istan Natil TV_Tr 1&2<br />

N-516 340 365 45 N-512 270 312 42 12% N-516-No-12Macroryan N-512-400 Bester 1<br />

N-516 340 365 45 N-512 270 312 42 12% N-516-No-12Macroryan N-512-Sehat Tefl<br />

N-516 340 365 45 E-541 270 267 27 8% N-516-No-12Macroryan N-516-12_1<br />

N-516 340 365 45 N-517 365 335 30 9% N-516-159 JS#12-N-517<br />

N-517 335 365 30 N-512 270 312 42 12% N-517-Hawa Shenase N-512-93<br />

N-517 335 365 30 N-512 270 312 42 12% N-512-94 N-512-Bibi Mahro Muqabel<br />

N-517 335 365 30 N-512 270 312 42 12% N-512-107 N-512-108<br />

N-517 335 365 30 N-516 365 340 45 13% JS#12-N-517 N-516-159<br />

N-529 419 490 71 NW-515 365 319 46 11% N-529_JS5_B_2_5-Zamini Qowae Markaz NW-515-Moqabel Zaeeshghah<br />

N-529 419 490 71 NW-518 490 405 85 20% N-529_JS5_4_5-Borj Politechnice # 1&2 NW-518-Lailia Polytechnic 1&2<br />

N-529 419 490 71 NW-514 365 364 1 0% JS#5-N-529 JS#5-NW-514<br />

N-518 360 409 53 NW-525 365 337 28 8% NW-525 NW-525-Charahy Shaheed<br />

N-518 360 409 53 N-515 222 352 15 4% JS#2-N-518 JS#2-N-515<br />

N-518 360 409 53 N-512 270 312 42 12% N-518_JS2_517-<strong>Afghan</strong>istan Natil TV_Tr 1&2 N-512-Ministry <strong>of</strong> health<br />

N-518 360 409 53 BK-514 271 229 42 12% N-518_JS2_A_1_2-Moqabel Wezarat Dakhela BK-JS-1-A-1,2-Welaayat<br />

N-513 345 270 46 E-513 270 112 158 46% N-513-154 E-513-127<br />

N-515 352 222 15 N-512 270 312 42 12% N-512 N-512-T#1 Wazir akbar khan<br />

N-515 352 222 15 BK-515 271 214 57 16% N-518_JS2_E_1_2-Pashtoonistan Wath BK-JS-1-E 1,2-Pul-e-Kheshtee<br />

N-515 352 222 15 N-518 409 360 53 15% JS#2-N-515 JS#2-N-518<br />

N-515 352 222 15 BK-514 271 229 42 12% N-518_JS2_B_1_2-Khetabkhana Aama Khetabkana_SW<br />

NW-515 319 365 46 N-529 490 419 71 22% NW-515-Moqabel Zaeeshghah N-529_JS5_B_2_5-Zamini Qowae Markaz<br />

NW-513 392 490 98 NW-517 200 324 73 19% NW-513-107-12 NW-513-107-20<br />

NW-514 364 365 1 N-529 490 419 71 20% JS#5-NW-514 JS#5-N-529<br />

NW-518 405 490 85 BK-517 490 334 156 39% BK-4_6-54 BK-4_6-47<br />

NW-518 405 490 85 N-529 490 419 71 18% NW-518-Lailia Polytechnic 1&2 N-529_JS5_4_5-Borj Politechnice # 1&2<br />

NW-518 405 490 85 BK-511 490 413 77 19% JS#4-NW-518 NW-Pohantoon-Lailia Dokhtaran 1&2<br />

NW-518 405 490 85 BK-519 490 397 94 23% JS#4-NW-518 JS#4-BK-519<br />

NW-518 405 490 85 NW-517 200 324 73 18% NW-518-97.1 JS#8-NW-517<br />

NW-517 324 200 73 NW-513 490 392 98 30% NW-513-107-20 NW-513-107-12<br />

NW-517 324 200 73 NW-518 490 405 85 26% JS#8-NW-517 NW-518-97.1<br />

NW-525 337 365 28 N-518 409 360 53 16% NW-525-Charahy Shaheed NW-525<br />

Where<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

142 Power Technologies International


Feeder 1 (F1)<br />

Nominal<br />

Current @<br />

MRM<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

(A)<br />

Table 23: Open Switching Points between feeders (Cont)<br />

Feeder2 (F2)<br />

Nominal<br />

Current @<br />

MRM (A)<br />

Maximum<br />

Current<br />

(A)<br />

Minimum<br />

Reserve<br />

Margin<br />

% Load in<br />

F1 taken by<br />

Name Maximum<br />

Name<br />

F2<br />

Current (A)<br />

(A) Node1 Node2<br />

BK-517 334 490 156 BK-518 360 409 56 17% BK-4_6-18 BK-4_6-18.7<br />

BK-517 334 490 156 NW-518 490 405 85 26% BK-4_6-47 BK-4_6-54<br />

BK-517 334 490 156 BK-518 360 409 56 17% BK-6_3-Stera Mahkama BK-6_3-Cure Hospital<br />

BK-513 383 425 42 E-531 200 269 113 30% E-541-No-1 Macrorayan Awal E-541-143-3<br />

BK-513 383 425 42 E-531 200 269 113 30% E-541-154 E-541-148<br />

BK-513 383 425 42 E-531 200 269 113 30% E-541-No-6 Macrorayan Awal E-541-132-7<br />

BK-513 383 425 42 E-531 200 269 113 30% E-541-No_5_Macrorayan Awal E-541-132-7-a<br />

BK-513 383 425 42 BK-515 271 214 57 15% E-541-Bala Hesar BK-C-1,2-Takhta Pul<br />

BK-519 397 490 94 BK-511 490 413 77 19% JS#4-BK-519 BK-Jamal maina-Red Cross Hospital<br />

BK-519 397 490 94 BK-511 490 413 77 19% BK-Debori-New Bangashidar 1&2 BK-Behind Madrasa-Alibad 1<br />

BK-519 397 490 94 BK-518 360 409 56 14% JS#3-BK-519 JS#3-BK-518<br />

BK-519 397 490 94 NW-518 490 405 85 21% JS#4-BK-519 JS#4-NW-518<br />

BK-518 409 360 56 BK-517 490 334 156 38% BK-4_6-18.7 BK-4_6-18<br />

BK-518 409 360 56 BK-516 425 342 83 20% BK-Guzarga-1 BK-Guzarga-6<br />

BK-518 409 360 56 BK-517 490 334 156 38% BK-6_3-Cure Hospital BK-6_3-Stera Mahkama<br />

BK-518 409 360 56 BK-519 490 397 94 23% JS#3-BK-518 JS#3-BK-519<br />

BK-515 214 271 57 N-515 222 352 15 7% BK-JS-1-E 1,2-Pul-e-Kheshtee N-518_JS2_E_1_2-Pashtoonistan Wath<br />

BK-515 214 271 57 BK-514 271 229 42 20% JS#1-BK-515 JS#1-BK-514<br />

BK-515 214 271 57 BK-513 425 383 42 19% BK-C-1,2-Takhta Pul E-541-Bala Hesar<br />

BK-514 229 271 42 BK-515 271 214 57 25% JS#1-BK-514 JS#1-BK-515<br />

BK-514 229 271 42 N-518 409 360 53 23% BK-JS-1-A-1,2-Welaayat N-518_JS2_A_1_2-Moqabel Wezarat Dakhela<br />

BK-514 229 271 42 N-515 222 352 15 7% Khetabkana_SW N-518_JS2_B_1_2-Khetabkhana Aama<br />

BK-516 342 425 83 BK-518 360 409 56 16% BK-Guzarga-6 BK-Guzarga-1<br />

BK-511 413 490 77 BK-519 490 397 94 23% BK-Jamal maina-Red Cross Hospital JS#4-BK-519<br />

BK-511 413 490 77 BK-519 490 397 94 23% BK-Behind Madrasa-Alibad 1 BK-Debori-New Bangashidar 1&2<br />

BK-511 413 490 77 NW-518 490 405 85 21% NW-Pohantoon-Lailia Dokhtaran 1&2 JS#4-NW-518<br />

E-531 269 200 113 E-541 270 267 27 10% E-541-132 E-541-129<br />

E-531 269 200 113 BK-513 425 383 42 15% E-541-143-3 E-541-No-1 Macrorayan Awal<br />

E-531 269 200 113 BK-513 425 383 42 15% E-541-148 E-541-154<br />

E-531 269 200 113 BK-513 425 383 42 15% E-541-132-7 E-541-No-6 Macrorayan Awal<br />

E-531 269 200 113 BK-513 425 383 42 15% E-541-132-7-a E-541-No_5_Macrorayan Awal<br />

E-511 272 270 44 E-519 255 139 148 55% E-F-519 -78 E-F-519 -74<br />

E-511 272 270 44 E-519 255 139 148 55% E-F-519 -39 E-F-519 -39-2<br />

E-511 272 270 44 E-519 255 139 148 55% E-F-519 -51 E-F-519 -51-2<br />

E-513 112 270 158 N-513 270 345 46 41% E-513-127 N-513-154<br />

E-519 139 255 148 E-511 270 272 44 31% E-F-519 -74 E-F-519 -78<br />

E-519 139 255 148 E-521 200 296 18 13% E-F-519 -10 E-F-519 -10-2<br />

E-519 139 255 148 E-511 270 272 44 31% E-F-519 -39-2 E-F-519 -39<br />

E-519 139 255 148 E-511 270 272 44 31% E-F-519 -51-2 E-F-519 -51<br />

E-541 267 270 27 N-516 365 340 45 17% N-516-12_1 N-516-No-12Macroryan<br />

E-541 267 270 27 E-531 200 269 113 42% E-541-129 E-541-132<br />

E-521 296 200 18 E-519 255 139 148 50% E-F-519 -10-2 E-F-519 -10<br />

Where<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 143


Table 24: Percentage <strong>of</strong> Feeder load that could be taken by adjacent Feeders<br />

% Taken by<br />

adjacent<br />

Feeder Feeders<br />

N-515 55%<br />

N-517 26%<br />

N-516 29%<br />

N-518 35%<br />

N-519 0%<br />

N-512 46%<br />

N-529 32%<br />

N-528 0%<br />

N-513 46%<br />

N-514 0%<br />

N-520 0%<br />

NW-514 20%<br />

NW-525 16%<br />

NW-526 0%<br />

NW-515 22%<br />

NW-518 116%<br />

NW-513 19%<br />

NW-517 57%<br />

NW-527 0%<br />

NW-524 0%<br />

NW-516 0%<br />

BK-513 44%<br />

BK-518 119%<br />

BK-514 55%<br />

BK-511 43%<br />

BK-519 55%<br />

BK-516 16%<br />

BK-515 46%<br />

BK-517 59%<br />

BK-512 0%<br />

E-521 50%<br />

E-541 59%<br />

E-511 55%<br />

E-531 26%<br />

E-519 76%<br />

E-513 41%<br />

E-523 0%<br />

E-515 0%<br />

E-536 0%<br />

Average(1) 47%<br />

(1) Only non cero values<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 144


Section<br />

8<br />

New Substations and Expansions<br />

In this section <strong>of</strong> <strong>the</strong> report we describe <strong>the</strong> new substations that should be added to <strong>the</strong><br />

system as soon as practical, which we are assuming to happen in a period <strong>of</strong> 3 to 4 years, as<br />

well as <strong>the</strong> expansions to <strong>the</strong> existing substations.<br />

8.1 Central Substation<br />

Central Substation is a new substation to be located at or near Junction Station # 2. This<br />

substation is estimated to have 12 feeders as described in Section 8 (Medium Voltage<br />

Investments)<br />

This substation medium voltage yard will operate 15 kV but it is possible that in <strong>the</strong> long term<br />

it will be converted to 20 kV so <strong>the</strong> equipment should be selected taking this final voltage in<br />

consideration.<br />

The Medium Voltage side <strong>of</strong> <strong>the</strong> substation should have a principal and transfer bus<br />

arrangement and it should be divided in individual section for each transformer, with auto<br />

transfer..<br />

We estimate that this substation should have four 25 MVA transformers based on <strong>the</strong><br />

planning criteria presented above and <strong>the</strong> following analysis.<br />

According to our planning criteria <strong>the</strong>re should be enough transformation capacity in any<br />

given substation so that upon <strong>the</strong> failure <strong>of</strong> a transformer <strong>the</strong>re is no load shedding; initially by<br />

using <strong>the</strong> overload capability <strong>of</strong> <strong>the</strong> remaining transformers and later by transferring load out<br />

<strong>of</strong> <strong>the</strong> substation.<br />

Table 25 below shows <strong>the</strong> proposed transformers to be installed in this substation and Table<br />

26 shows <strong>the</strong> substation peak load, <strong>the</strong> amount <strong>of</strong> load that could be transferred out and <strong>the</strong><br />

total transformation capacity under normal and n-1 operating conditions. Based on this two<br />

tables Table 27 shows <strong>the</strong> margins over normal and emergency (N-1) condition requirements<br />

that are obtained with <strong>the</strong> proposed installation. In this table we observe that <strong>the</strong> resulting<br />

margins are smaller than <strong>the</strong> capacity <strong>of</strong> one individual transformer demonstrating that<br />

proposed number is appropriate.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 145


Table 25: Proposed Transformers<br />

Transformers at Substation<br />

New New New New<br />

Primary Voltage (kV) 110.0 110.0 110.0 110.0<br />

Secondary Voltage (kV) 15 / 20 15 / 20 15 / 20 15 / 20<br />

MVA 25.0 25 25 25<br />

Connection Yd5 Yd5 Yd5 Yd5<br />

Impedance 12.0% 12.0% 12.0% 12.0%<br />

Regulation Range ± 15.9% 15.9% 15.8% 15.8%<br />

Tap Steps 19.0 19.0 19.0 19.0<br />

Size 1.77% 1.77% 1.75% 1.75%<br />

Table 26: Substation Loading & Transformation<br />

Load in Substation<br />

Peak Demand at Substation 78.0 MVA<br />

Available Load Transfers (1) 13.0 MVA<br />

Remaining Load After Transfers 65.0 MVA<br />

(1) This level <strong>of</strong> load transfer can be achieved by transfers to Feeders N-515, N-518 at Central and BK-<br />

514 from C-511<br />

Total Transformation in Substation<br />

Installed Transformation 0.0 MVA<br />

Additional Transformation 100.0 MVA<br />

Total 100.0 MVA<br />

N-1 Condition 75.0 MVA<br />

Table 27: Margin Calculations with proposed transformers.<br />

N-1 Conditions<br />

Normal (1) Short Term (2) Long term (3)<br />

Total Transformation 90.0 87.75 75.0<br />

Required (3) 78.0 78.0 65.0<br />

Margin 12.0 9.8 10.0<br />

(1) Transformers to be loaded to 90% <strong>of</strong> name plate rating<br />

(2) Assumed 117% 24 hours overload capability (ANSI C57.92)<br />

(3) For Long term load is assumed to be transferred out.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

146 Power Technologies International


Figure 134: Single line diagram <strong>of</strong> Central Substation<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 147


8.2 Breshna Kot Substation<br />

Breshna Kot Substation is an existing substation and it is estimated to have 10 feeders as<br />

described in Section 8 (Medium Voltage Investments)<br />

This substation medium voltage yard will operate 15 kV but it is possible that in <strong>the</strong> long term<br />

it will be converted to 20 kV so <strong>the</strong> equipment should be selected taking this final voltage in<br />

consideration.<br />

This substation has two 25 MVA transformers and requires at least two more, However it is<br />

possible that in <strong>the</strong> future <strong>the</strong> exiting transformers will be replaced for operation at 20 kV.<br />

The following analysis justifies <strong>the</strong> addition <strong>of</strong> two new transformers to this substation.<br />

According to our planning criteria <strong>the</strong>re should be enough transformation capacity in any<br />

given substation so that upon <strong>the</strong> failure <strong>of</strong> a transformer <strong>the</strong>re is no load shedding; initially by<br />

using <strong>the</strong> overload capability <strong>of</strong> <strong>the</strong> remaining transformers and later by transferring load out<br />

<strong>of</strong> <strong>the</strong> substation.<br />

Table 28 below shows <strong>the</strong> proposed transformers to be installed in this substation and Table<br />

29 shows <strong>the</strong> substation peak load, <strong>the</strong> amount <strong>of</strong> load that could be transferred out and <strong>the</strong><br />

total transformation capacity under normal and n-1 operating conditions. Based on this two<br />

tables Table 30 shows <strong>the</strong> margins over normal and emergency (N-1) condition requirements<br />

that are obtained with <strong>the</strong> proposed installation. In this table we observe that <strong>the</strong> resulting<br />

margins are smaller than <strong>the</strong> capacity <strong>of</strong> one individual transformer demonstrating that<br />

proposed number is appropriate.<br />

Table 28: Proposed Transformers<br />

Transformers at Substation<br />

Existing Existing New New<br />

Primary Voltage (kV) 110.0 110.0 110.0 110.0<br />

Secondary Voltage (kV) 15 / 20 15 / 20 15 / 20 15 / 20<br />

MVA 25 25 25 25<br />

Connection Yd5 Yd5 Yd5 Yd5<br />

Impedance 10.7% 10.7% 10.7% 10.7%<br />

Regulation Range ± 15.9% 15.9% 15.9% 15.9%<br />

Tap Steps 19.0 19.0 19.0 19.0<br />

Size 1.77% 1.77% 1.75% 1.75%<br />

Table 29: Substation Loading & Transformation<br />

Load in Substation<br />

Peak Demand at Substation 70.0 MVA<br />

Available Load Transfers (1) 14.0 MVA<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 148


Remaining Load After Transfers 56.0 MVA<br />

(1) This level <strong>of</strong> load transfer can be achieved by transfers from BK-519 and BK-518 to South West S/S (link to<br />

JS #3)<br />

Total Transformation in Substation<br />

Installed Transformation 25.0 MVA<br />

Additional Transformation 75.0 MVA<br />

Total 100.0 MVA<br />

N-1 Condition 75.0 MVA<br />

Table 30: Margin Calculations with proposed transformers.<br />

N-1 Conditions<br />

Normal (1) Short Term (2) Long term (3)<br />

Total Transformation 90.0 87.75 75.0<br />

Required (3) 70.0 70.0 56.0<br />

Margin 20.0 17.8 19.0<br />

(1) Transformers to be loaded to 90% <strong>of</strong> name plate rating<br />

(2) Assumed 117% 24 hours overload capability (ANSI C57.92)<br />

(3) For Long term load is assumed to be transferred out.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 149


Figure 135: Single line diagram <strong>of</strong> Breshna Kot Substation<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 150


8.3 South West Substation<br />

South West Substation is a new substation to be located near Junction Station # 4. This<br />

substation is estimated to have 6 feeders initially as described in Section 8 (Medium Voltage<br />

Investments)<br />

This substation medium voltage yard will operate 15 kV but it is possible that in <strong>the</strong> long term<br />

it will be converted to 20 kV so <strong>the</strong> equipment should be selected taking this final voltage in<br />

consideration.<br />

The Medium Voltage side <strong>of</strong> <strong>the</strong> substation should have a principal and transfer bus<br />

arrangement and it should be divided in individual section for each transformer, with auto<br />

transfer.<br />

We estimate that this substation should have three 25 MVA transformers based on <strong>the</strong><br />

planning criteria presented above and <strong>the</strong> following analysis.<br />

According to our planning criteria <strong>the</strong>re should be enough transformation capacity in any<br />

given substation so that upon <strong>the</strong> failure <strong>of</strong> a transformer <strong>the</strong>re is no load shedding; initially by<br />

using <strong>the</strong> overload capability <strong>of</strong> <strong>the</strong> remaining transformers and later by transferring load out<br />

<strong>of</strong> <strong>the</strong> substation.<br />

Table 31 below shows <strong>the</strong> proposed transformers to be installed in this substation and Table<br />

32 shows <strong>the</strong> substation peak load, <strong>the</strong> amount <strong>of</strong> load that could be transferred out and <strong>the</strong><br />

total transformation capacity under normal and n-1 operating conditions. Based on this two<br />

tables Table 33 shows <strong>the</strong> margins over normal and emergency (N-1) condition requirements<br />

that are obtained with <strong>the</strong> proposed installation. In this table we observe that <strong>the</strong> resulting<br />

margins are smaller than <strong>the</strong> capacity <strong>of</strong> one individual transformer demonstrating that<br />

proposed number is appropriate.<br />

Table 31: Proposed Transformers<br />

Transformers at Substation<br />

New New New<br />

Primary Voltage (kV) 110.0 110.0 110.0<br />

Secondary Voltage (kV) 15 / 20 15 / 20 15 / 20<br />

MVA 25.0 25 25<br />

Connection Yd5 Yd5 Yd5<br />

Impedance 12.0% 12.0% 12.0%<br />

Regulation Range ± 15.9% 15.9% 15.9%<br />

Tap Steps 19.0 19.0 19.0<br />

Size 1.77% 1.77% 1.77%<br />

Table 32: Substation Loading & Transformation<br />

Load in Substation<br />

Peak Demand at Substation 45.0 MVA<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 151


Available Load Transfers (1) 13.0 MVA<br />

Remaining Load After Transfers 32.0 MVA<br />

(1) This level <strong>of</strong> load transfer can be achieved by transfers to Feeders BK-519 via JS #3 and from SW-<br />

513 to BK-511<br />

Total Transformation in Substation<br />

Installed Transformation 0.0 MVA<br />

Additional Transformation 75.0 MVA<br />

Total 75.0 MVA<br />

N-1 Condition 50.0 MVA<br />

Table 33: Margin Calculations with proposed transformers.<br />

N-1 Conditions<br />

Normal (1) Short Term (2) Long term (3)<br />

Total Transformation 67.5 58.5 50.0<br />

Required (3) 45.0 45.0 32.0<br />

Margin 22.5 13.5 18.0<br />

(1) Transformers to be loaded to 90% <strong>of</strong> name plate rating<br />

(2) Assumed 117% 24 hours overload capability (ANSI C57.92)<br />

(3) For Long term load is assumed to be transferred out.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

152 Power Technologies International


Figure 136: Single line diagram <strong>of</strong> South West Substation<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 153


8.4 East Substation<br />

East Substation is an existing substation and it is estimated to remain with 9 feeders as<br />

described in Section 8 (Medium Voltage Investments)<br />

This substation medium voltage yard will operate 15 kV but it is possible that in <strong>the</strong> long term<br />

it will be converted to 20 kV so <strong>the</strong> equipment should be selected taking this final voltage in<br />

consideration.<br />

This substation has one 25 MVA transformer and requires at least two more, However it is<br />

possible that in <strong>the</strong> future <strong>the</strong> exiting transformer will be replaced for operation at 20 kV.<br />

The following analysis justifies <strong>the</strong> addition <strong>of</strong> two new transformers to this substation.<br />

According to our planning criteria <strong>the</strong>re should be enough transformation capacity in any<br />

given substation so that upon <strong>the</strong> failure <strong>of</strong> a transformer <strong>the</strong>re is no load shedding; initially by<br />

using <strong>the</strong> overload capability <strong>of</strong> <strong>the</strong> remaining transformers and later by transferring load out<br />

<strong>of</strong> <strong>the</strong> substation.<br />

Table 34 below shows <strong>the</strong> proposed transformers to be installed in this substation and Table<br />

35 shows <strong>the</strong> substation peak load, <strong>the</strong> amount <strong>of</strong> load that could be transferred out and <strong>the</strong><br />

total transformation capacity under normal and n-1 operating conditions. Based on this two<br />

tables Table 36 shows <strong>the</strong> margins over normal and emergency (N-1) condition requirements<br />

that are obtained with <strong>the</strong> proposed installation. In this table we observe that <strong>the</strong> resulting<br />

margins are smaller than <strong>the</strong> capacity <strong>of</strong> one individual transformer demonstrating that<br />

proposed number is appropriate.<br />

Table 34: Proposed Transformers<br />

Transformers at Substation<br />

Existing New New<br />

Primary Voltage (kV) 110.0 110.0 110.0<br />

Secondary Voltage (kV) 15 / 20 15 / 20 15 / 20<br />

MVA 25.0 25 25<br />

Connection Yd5 Yd5 Yd5<br />

Impedance 14.8% 12.0% 12.0%<br />

Regulation Range ± 16.2% 16.2% 16.2%<br />

Tap Steps 19.0 19.0 19.0<br />

Size 1.80% 1.75% 1.75%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 154


Table 35: Substation Loading & Transformation<br />

Load in Substation<br />

Peak Demand at Substation 47.0 MVA<br />

Available Load Transfers (1) 10.0 MVA<br />

Remaining Load After Transfers 37.0 MVA<br />

(1) This level <strong>of</strong> load transfer can be achieved by load transfers from E-531 to C-512 and E-513 to C-<br />

514<br />

Total Transformation in Substation<br />

Installed Transformation 25.0 MVA<br />

Additional Transformation 50.0 MVA<br />

Total 75.0 MVA<br />

N-1 Condition 50.0 MVA<br />

Table 36: Margin Calculations with proposed transformers.<br />

N-1 Conditions<br />

Normal (1) Short Term (2) Long term (3)<br />

Total Transformation 67.5 58.5 50.0<br />

Required (3) 47.0 47.0 37.0<br />

Margin 20.5 11.5 13.0<br />

(1) Transformers to be loaded to 90% <strong>of</strong> name plate rating<br />

(2) Assumed 117% 24 hours overload capability (ANSI C57.92<br />

(3) For Long term load is assumed to be transferred out.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 155


Figure 137: Single line diagram <strong>of</strong> East Substation<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 156


8.5 North West Substation<br />

North West Substation is an existing substation and it is estimated to remain with 10 feeders<br />

as described in Section 8 (Medium Voltage Investments)<br />

This substation medium voltage yard will operate 15 kV but it is possible that in <strong>the</strong> long term<br />

it will be converted to 20 kV so <strong>the</strong> equipment should be selected taking this final voltage in<br />

consideration.<br />

This substation has two 25 MVA transformers and one 20 MVA and requires at least one<br />

more. However in this case <strong>the</strong> 20 MVA transformer as different vector group that <strong>the</strong> o<strong>the</strong>r<br />

two (Yd11 versus Yd5) and as this complicates <strong>the</strong> operation it is possible that it will be<br />

replaced in <strong>the</strong> short term 6 . Also it is possible that in <strong>the</strong> future <strong>the</strong> o<strong>the</strong>r exiting transformers<br />

will be replaced for operation at 20 kV.<br />

The following analysis justifies <strong>the</strong> addition <strong>of</strong> one new transformers to this substation.<br />

According to our planning criteria <strong>the</strong>re should be enough transformation capacity in any<br />

given substation so that upon <strong>the</strong> failure <strong>of</strong> a transformer <strong>the</strong>re is no load shedding; initially by<br />

using <strong>the</strong> overload capability <strong>of</strong> <strong>the</strong> remaining transformers and later by transferring load out<br />

<strong>of</strong> <strong>the</strong> substation.<br />

Table 37 below shows <strong>the</strong> proposed transformers to be installed in this substation and Table<br />

38shows <strong>the</strong> substation peak load, <strong>the</strong> amount <strong>of</strong> load that could be transferred out and <strong>the</strong><br />

total transformation capacity under normal and n-1 operating conditions. Based on this two<br />

tables Table 39 shows <strong>the</strong> margins over normal and emergency (N-1) condition requirements<br />

that are obtained with <strong>the</strong> proposed installation. In this table we observe that <strong>the</strong> resulting<br />

margins are smaller than <strong>the</strong> capacity <strong>of</strong> one individual transformer demonstrating that<br />

proposed number is appropriate.<br />

Table 37: Proposed Transformers<br />

Existing Existing Existing New<br />

Primary Voltage (kV) 110.0 110.0 110.0 110.0<br />

Secondary Voltage (kV) 15 / 20 15 / 20 15 / 20 15 / 20<br />

MVA 25 20 25 25<br />

Connection Yd5 Yd11 Yd5 Yd5<br />

Impedance 7.0% 10.5% 12.0% 12.0%<br />

Regulation Range ± 15.8% 15.8% 15.8% 15.8%<br />

Tap Steps 19.0 19.0 19.0 19.0<br />

Size 1.75% 1.75% 1.75% 1.75%<br />

6 Different vector groups force operations to keep track <strong>of</strong> which sections <strong>of</strong> feeder are connected to <strong>the</strong><br />

Yd11 transformer to prevent accidental connection in parallel to o<strong>the</strong>r sections connected to <strong>the</strong> Yd5.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 157


Table 38: Substation Loading & Transformation<br />

Load in Substation<br />

Peak Demand at Substation 70.0 MVA<br />

Available Load Transfers (1) 14.0 MVA<br />

Remaining Load After Transfers 56.0 MVA<br />

(1) This level <strong>of</strong> load transfer can be achieved by load transfers from NW-525 to N-519 and NW 517 to<br />

SW-514<br />

Total Transformation in Substation<br />

Installed Transformation 70.0 MVA<br />

Additional Transformation 25.0 MVA<br />

Total 95.0 MVA<br />

N-1 Condition 70.0 MVA<br />

Table 39: Margin Calculations with proposed transformers.<br />

N-1 Conditions<br />

Normal (1) Short Term (2) Long term (3)<br />

Total Transformation 85.5 81.9 70.0<br />

Required (3) 70.0 70.0 56.0<br />

Margin 15.5 11.9 14.0<br />

(1) Transformers to be loaded to 90% <strong>of</strong> name plate rating<br />

(2) Assumed 117% 24 hours overload capability (ANSI C57.92)<br />

(3) For Long term load is assumed to be transferred out.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

158 Power Technologies International


Figure 138: Single line diagram <strong>of</strong> North West Substation<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 159


8.6 North Substation<br />

North Substation is an existing substation and it is estimated to have 12 feeders as described<br />

in Section 8 (Medium Voltage Investments)<br />

This substation medium voltage yard will operate 15 kV but it is possible that in <strong>the</strong> long term<br />

it will be converted to 20 kV so <strong>the</strong> equipment should be selected taking this final voltage in<br />

consideration.<br />

This substation has two 40 MVA transformers and requires at least one more. However <strong>the</strong>re<br />

is an issue with this substation as <strong>the</strong> transformer’s vector group is different than <strong>the</strong><br />

corresponding vector group for most transformers in <strong>the</strong> system (Yy0 versus Yd5.) This<br />

complicates <strong>the</strong> operation as to transfer load out <strong>of</strong> North substation it is necessary to deenergize<br />

it and re-energize it to avoid parallel operation. Also it is possible that in <strong>the</strong> future<br />

<strong>the</strong> exiting transformers will be replaced for operation at 20 kV. Therefore If <strong>the</strong>re is a trend<br />

towards standardization <strong>the</strong> possibly <strong>the</strong> new transformer should have a Yd5 vector group<br />

provided that <strong>the</strong> o<strong>the</strong>r transformers are slated for replacement in <strong>the</strong> short to medium term.<br />

The following analysis justifies <strong>the</strong> addition <strong>of</strong> one new transformers to this substation.<br />

According to our planning criteria <strong>the</strong>re should be enough transformation capacity in any<br />

given substation so that upon <strong>the</strong> failure <strong>of</strong> a transformer <strong>the</strong>re is no load shedding; initially by<br />

using <strong>the</strong> overload capability <strong>of</strong> <strong>the</strong> remaining transformers and later by transferring load out<br />

<strong>of</strong> <strong>the</strong> substation.<br />

Table 40 below shows <strong>the</strong> proposed transformers to be installed in this substation and Table<br />

41 shows <strong>the</strong> substation peak load, <strong>the</strong> amount <strong>of</strong> load that could be transferred out and <strong>the</strong><br />

total transformation capacity under normal and n-1 operating conditions. Based on this two<br />

tables Table 42 shows <strong>the</strong> margins over normal and emergency (N-1) condition requirements<br />

that are obtained with <strong>the</strong> proposed installation. In this table we observe that <strong>the</strong> resulting<br />

margins are smaller than <strong>the</strong> capacity <strong>of</strong> one individual transformer demonstrating that<br />

proposed number is appropriate.<br />

Table 40: Proposed Transformers<br />

Transformers at Substation<br />

Existing Existing New<br />

Primary Voltage (kV) 110.0 110.0 110.0<br />

Secondary Voltage (kV) 15 / 20 15 / 20 15 / 20<br />

MVA 40 40 40<br />

Connection Yy0 Yy0 Yy0<br />

Impedance (1) 12.2% 12.2% 12.2%<br />

Regulation Range ± 15.8% 15.8% 15.8%<br />

Number <strong>of</strong> Tap Steps 19.0 19.0 19.0<br />

Size 1.75% 1.75% 1.75%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 160


Table 41: Substation Loading & Transformation<br />

Load in Substation<br />

Peak Demand at Substation 86.0 MVA<br />

Available Load Transfers (1) 14.0 MVA<br />

Remaining Load After<br />

Transfers 72.0 MVA<br />

(1) This level <strong>of</strong> load transfer can be achieved by switching Feeder N-518 and N-515 to Central<br />

S/S<br />

Total Transformation in Substation<br />

Installed Transformation 80.0 MVA<br />

Additional Transformation 40.0 MVA<br />

Total 120.0 MVA<br />

N-1 Condition 80.0 MVA<br />

Table 42: Margin Calculations with proposed transformers.<br />

N-1 Conditions<br />

Normal (1) Short Term (2) Long term (3)<br />

Total Transformation 108.0 93.6 80.0<br />

Required (3) 86.0 86.0 72.0<br />

Margin 22.0 7.6 8.0<br />

(1) Transformers to be loaded to 90% <strong>of</strong> name plate rating<br />

(2) Assumed 117% 24 hours overload capability (ANSI C57.92)<br />

(3) For Long term load is assumed to be transferred out.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 161


Figure 139: Single line diagram <strong>of</strong> North Substation<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 162


8.7 Junction Stations<br />

<strong>Final</strong>ly as shown during <strong>the</strong> description <strong>of</strong> <strong>the</strong> Medium Voltage Investments <strong>the</strong>re are is some<br />

re-arrangement necessary at various Junction Stations. However this re-arrangement should<br />

be performed without major investments (beyond those necessary to rehabilitate <strong>the</strong> stations)<br />

However one exception is Junction Station 3 that will need to be expanded to account for 3<br />

active incoming lines. This means that <strong>the</strong> station will have to be split in 3 segments and each<br />

segment should be connected to one incoming feeder. Also each segment should be<br />

arranged in a principal bust –transfer bus scheme to allow for transferring load between<br />

sections.<br />

8.8 Additional Considerations Regarding <strong>Kabul</strong> Central<br />

8.8.1 Options to deal with reduced spaces and land availability.<br />

<strong>Kabul</strong> Central is indicated before is in <strong>the</strong> central are <strong>of</strong> <strong>the</strong> city, which can be congested and<br />

with lower land availability. However it is exactly for <strong>the</strong>se reasons that <strong>the</strong> substation is<br />

necessary; <strong>the</strong> load is <strong>the</strong>re and <strong>the</strong>re are no o<strong>the</strong>r sources <strong>of</strong> supply.<br />

In order to deal with <strong>the</strong> cost <strong>of</strong> land and reduced right <strong>of</strong> ways one option would be to build<br />

<strong>Kabul</strong> Central using modular compact substations, which have <strong>the</strong> double advantage <strong>of</strong><br />

having a much smaller foot print that conventional substations plus can be built much quicker.<br />

The 110 kV transmission lines can also be built using compact 110 kV lines on poles that<br />

have <strong>the</strong> same footprint as distribution line, but with taller poles. Moreover 110 kV cables are<br />

quite within <strong>the</strong> state <strong>of</strong> <strong>the</strong> art and could be used if necessary can be used to bridge <strong>the</strong> final<br />

stretch to <strong>the</strong> location <strong>of</strong> <strong>Kabul</strong> Central.<br />

The 15 kV yard <strong>of</strong> <strong>Kabul</strong> Central can and maybe should be Junction Station #2, which would<br />

have to be expanded to receive <strong>the</strong> 4 lines (cables) from <strong>the</strong> 4 transformers at <strong>Kabul</strong> Central.<br />

8.8.2 An alternative to <strong>Kabul</strong> Central.<br />

If for any reason <strong>Kabul</strong> Central could not be built one option would be to bring express<br />

feeders from North S/S and Breshna Kot S/S. This option is not recommended and if<br />

selected it would need to be optimized. However, we present a first approximation below.<br />

Figure 140 below presents an overview <strong>of</strong> this option where we note that it would be<br />

necessary to bring 3 300 sqmm overhead lines from Breshna Kot and 3 300 sqmm lines from<br />

North Substation. In this case we are fur<strong>the</strong>r assuming that <strong>the</strong> last section <strong>of</strong> <strong>the</strong>se express<br />

feeders would have to go underground and in this case 400 sqmm cables would be required.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 163


Figure 140: Possible Plan in Case <strong>Kabul</strong> Central could not be developed<br />

North<br />

Substation<br />

3x300 mm² OH<br />

3x400 mm² Cable<br />

Junction Station #2<br />

3x300 mm² OH<br />

Breshna Kot<br />

Substation<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 164


Table 43 below shows a summary <strong>of</strong> <strong>the</strong> additional cons that this option would command.<br />

These costs are on top <strong>of</strong> <strong>the</strong> total costs presented in Section Error! Reference source not<br />

found. and would represent a significant increase on <strong>the</strong> investments in <strong>the</strong> MV network and<br />

would result in higher losses and less reliability than <strong>the</strong> recommended option.<br />

Cables<br />

Table 43: Additional Investments in <strong>the</strong> case <strong>Kabul</strong> Central cannot be developed<br />

Overhead Lines<br />

Unit Cost<br />

$/km<br />

Number <strong>of</strong><br />

circuits<br />

length km<br />

(per circuit)<br />

Total<br />

Conductor 76,000 3 1.2 273,600<br />

3 3.5 798,000<br />

Duct 65,000 1.5 1.2 117,000<br />

1.5 3.5 341,250<br />

Conductor 15,000 3 3 135,000<br />

3 2 90,000<br />

Poles 51,200 3 3 460,800<br />

3 2 307,200<br />

Total Lines 2,215,650.00<br />

Additional Investment in JS 7 30000 210,000<br />

Total 2,425,650.00<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 165


Section<br />

9<br />

Medium Voltage Investments<br />

In this section <strong>of</strong> <strong>the</strong> report we describe substation by substation <strong>the</strong> improvements<br />

recommended for <strong>the</strong> <strong>Kabul</strong> distribution network in <strong>the</strong> medium term. As indicated before,<br />

<strong>the</strong>se improvements allow <strong>the</strong> system to supply all existing Medium Voltage to Low Voltage<br />

(MV/LV) transformers with a load equivalent to 100 % <strong>of</strong> <strong>the</strong>ir connected capacity.<br />

The description <strong>of</strong> <strong>the</strong> medium term investments is followed by a description <strong>of</strong> those<br />

investments that are necessary in <strong>the</strong> short term and in general include a sub-set <strong>of</strong> <strong>the</strong><br />

investments identified for <strong>the</strong> long term, but may include temporary investments to account<br />

for <strong>the</strong> fact that <strong>the</strong>re is no time to build new substations.<br />

It should be mentioned that while we are recommended are quite a number <strong>of</strong> new feeder<br />

sections, many <strong>of</strong> <strong>the</strong> improvements consists <strong>of</strong> reconductor <strong>of</strong> sections to accommodate to<br />

increase loading. This is identified by <strong>the</strong> instruction “replace or upgrade” cable in <strong>the</strong> case <strong>of</strong><br />

a cable section or “reconductor” in <strong>the</strong> case <strong>of</strong> an overhead line.<br />

Detailed engineering <strong>of</strong> each <strong>of</strong> <strong>the</strong> investments presented here is beyond <strong>the</strong> scope <strong>of</strong> our<br />

work and it is recommended that <strong>the</strong> DAMB proceeds immediately to produce a detailed<br />

survey <strong>of</strong> <strong>the</strong> cable locations and poles associated with <strong>the</strong> sections <strong>of</strong> feeder identified for<br />

replacement.<br />

Also while we are assuming here that <strong>the</strong> underground cables will be replaced, if <strong>the</strong> existing<br />

cables are in good condition <strong>the</strong>n it may be possible to “double” <strong>the</strong>m up; that is to connect in<br />

parallel a smaller capacity cable, so that <strong>the</strong> combination has <strong>the</strong> same capacity as <strong>the</strong><br />

recommended new cable. This would be practical, in particular, if to install <strong>the</strong> new proposed<br />

cables it would be necessary to install new conduits; i.e. <strong>the</strong> new cables do not fit in <strong>the</strong><br />

existing conduits or <strong>the</strong> existing cable was buried directly.<br />

<strong>Final</strong>ly please note that although we have created new feeders (for example associated to<br />

Central S/S); we have not changed <strong>the</strong> names <strong>of</strong> <strong>the</strong> nodes and <strong>the</strong>y still keep <strong>the</strong> structure:<br />

Substation (N, NW, E or BK) – Feeder Number or Name – Pole Number or Transformer.<br />

Therefore <strong>the</strong> node names can be used to identify <strong>the</strong> feeder and substations to which <strong>the</strong><br />

transferred sections formerly belong<br />

9.1 Medium Term Investments for Central Substation<br />

This is a new substation located at or near Junction Station # 2 and <strong>the</strong>refore <strong>the</strong>re are major<br />

upgrades associated with its interconnection to <strong>the</strong> network. Moreover, given <strong>the</strong> strategic<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 166


location <strong>of</strong> Central and <strong>the</strong> fact that it is going to be a new substation we are recommending<br />

installing large conductors so that <strong>the</strong> new feeders have significant reserve.<br />

Central is envisioned to have 14 feeders with a total load (including losses) <strong>of</strong> 69 MW. Two <strong>of</strong><br />

<strong>the</strong>se feeders N-515 and N-518 provide connection with North S/S.<br />

The following figure shows an overview <strong>of</strong> this substation<br />

Figure 141: North Substation<br />

Section 8 above provides details on <strong>the</strong> investments to be made in <strong>the</strong> substation itself and<br />

we describe below <strong>the</strong> investments to be made on <strong>the</strong> medium voltage distribution network.<br />

These investments are also documented in <strong>the</strong> drawings attached as Appendix 4.<br />

9.1.1 Feeder C-510<br />

Feeder 510 goes to <strong>the</strong> sou<strong>the</strong>ast <strong>of</strong> Central substation and is expected to be loaded slightly<br />

above 8 MVA. Figure 142 presents an overview <strong>of</strong> this feeder and drawings B-4 and C-4 in<br />

Appendix 4 present it in much greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 167


In this feeder <strong>the</strong> following investments are necessary.<br />

510<br />

Qasr Delkosha #<br />

1&2<br />

Qasr Delkosha #<br />

1&2<br />

Ariana Hotel<br />

Project P-B4-9: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Exit <strong>of</strong> Central C- N-515_JS2_531- Cable 240 1570 Replace<br />

Project P-C4-4: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-515_JS2_531- N-515_JS2_531- Cable 240 770 Replace<br />

Project P-C4-5: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-515_JS2_531- E-541-Andimark Cable 240 970 Replace<br />

Ariana Hotel<br />

Project P-C4-6: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-Andimark E-541-148 Overhead 185 420 Reconductor<br />

E-541-148 E-541-145 Overhead 120 150 Reconductor<br />

E-541-145 E-541-143 Overhead 120 80 Reconductor<br />

E-541-143 E-541-135 Overhead 120 420 Reconductor<br />

E-541-135 E-541-132 Overhead 120 110 Reconductor<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

168 Power Technologies International


Figure 142: Overview <strong>of</strong> Feeder C 510<br />

B-4<br />

C-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 169


The objective <strong>of</strong> all <strong>of</strong> <strong>the</strong> investments above is to increase <strong>the</strong> load carrying capability <strong>of</strong><br />

Feeder C-510 to: a) attend forecasted mid-term load, b) add operational flexibility (so that<br />

load can be transferred to it during emergencies) and c) provide spare capacity for future<br />

growth.<br />

Project P-C4-12: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-148 E-541-154 Overhead 120 240 Reconductor<br />

E-541-154 E-541-156 Overhead 120 110 Reconductor<br />

E-541-156 E-541-157 Overhead 120 110 Reconductor<br />

E-541-157 E-541-164 Overhead 120 340 Reconductor<br />

E-541-164 E-541-166 Overhead 120 120 Reconductor<br />

E-541-166 E-541-170 Overhead 120 250 Reconductor<br />

E-541-170 E-541-171 Overhead 120 50 Reconductor<br />

E-541-171 E-541-183 Overhead 120 50 Reconductor<br />

The objective <strong>the</strong>se investments are to reinforce <strong>the</strong> connection with Breshna Kot feeder BK-<br />

513 so that load can be transferred from and to it during emergencies.<br />

9.1.2 Feeder C-511<br />

Feeder 511 goes to <strong>the</strong> south <strong>of</strong> Central substation and is expected to be loaded slightly<br />

above 9 MVA. Figure 143 presents an overview <strong>of</strong> this feeder and drawings B-4, C-3 and C-4<br />

in Appendix 4 present it in much greater detail.<br />

In this feeder <strong>the</strong> following investments are necessary.<br />

Project P-B4-8: Location: Map B-4 and C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Exit <strong>of</strong> Central C- N-<br />

Cable 240 1980 Replace<br />

511<br />

518_JS2_E_1_2 -<br />

Adare Omor<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 170


Project P-C4-3: Location: Map C-4<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

N-<br />

518_JS2_E_1_2-<br />

Kartografi<br />

N-<br />

518_JS2_E_1_2 -<br />

Adare Omor<br />

N-<br />

518_JS2_E_1_2-<br />

Kartografi<br />

N-<br />

518_JS2_E_1_2-<br />

Kartografi<br />

N-<br />

518_JS2_E_1_2-<br />

Wezarat Mahdan<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 360 Replace<br />

Cable 240 40 Replace<br />

N/A Add new<br />

switches to<br />

separate <strong>the</strong><br />

feeder in 3<br />

sections<br />

The objective <strong>of</strong> <strong>the</strong> investments above is to increase <strong>the</strong> load carrying capability <strong>of</strong> Feeder<br />

C-511 to: a) attend forecasted mid-term load, b) add operational flexibility and c) provide<br />

spare capacity for future growth. The switches added in project P-C4-3 have to function <strong>of</strong><br />

facilitating <strong>the</strong> back-up <strong>of</strong> this feeder by allowing splitting it in independent sections.<br />

Project P-C4-9: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-<br />

N-<br />

Cable 50 220 Add new cable<br />

518_JS2_E_1_2-<br />

De <strong>Afghan</strong>istan<br />

Bank<br />

518_JS2_B_1_2-<br />

Bank Melye<br />

sections to create<br />

this connection.<br />

The objective <strong>of</strong> <strong>the</strong>se investments is to simplify <strong>the</strong> connections <strong>of</strong> <strong>the</strong> loads in this area <strong>of</strong><br />

<strong>the</strong> network<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 171


Figure 143: Overview <strong>of</strong> Feeder C-511<br />

B-3<br />

B-4<br />

C-3<br />

C-4<br />

9.1.3 Feeder C-512<br />

Feeder 512 goes to <strong>the</strong> east and slightly to <strong>the</strong> south <strong>of</strong> Central substation and is expected to<br />

be loaded slightly above 8.7 MVA. Figure 144 presents an overview <strong>of</strong> this feeder and<br />

drawings B-4 and C-4 in Appendix 4 present it in greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

172 Power Technologies International


Project P-B4-5: Location: Map B-4 and C-4<br />

From<br />

(node name)<br />

Exit <strong>of</strong> Central C-<br />

512<br />

To<br />

(node name)<br />

Project P-C4-1: Location: Map C-4<br />

From<br />

(node name)<br />

N-<br />

515_JS2_D_2_7-<br />

Ehsaya Markazi (<br />

CSO ) # 1&2<br />

N-<br />

515_JS2_D_2_7-<br />

Ehsaya Markazi (<br />

CSO ) # 1&2<br />

To<br />

(node name)<br />

N-516-Shash<br />

Darak<br />

Project P-C4-2*: Location: Map C-4<br />

From<br />

(node name)<br />

N-516-Shash<br />

Darak<br />

To<br />

(node name)<br />

N-516-Ryasat<br />

Amneyat # 16<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 1590 Replace<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 330 Replace<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 750 Replace<br />

* Note: There is a possibility that <strong>the</strong> existing cable has 185 sqmm cross section and if this is<br />

<strong>the</strong> case and it is in good condition, <strong>the</strong>n no replacement is necessary. Also in this case <strong>the</strong><br />

cables below should in principle be replaced by 185 sqmm cross section cables instead <strong>of</strong><br />

240, but <strong>the</strong> 185 sqmm cable is not in <strong>the</strong> standards.<br />

Project P-B4-3: Location: Map B-4<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type<br />

N-516-Ryasat<br />

Amneyat # 16<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

N-516-12_8 Cable 240 170 Replace. Probably<br />

new riser required<br />

N-516-12_8 N-516-12_1 Overhead 185 170 Reconductor<br />

N-516-12_1 N-516-12_8 Riser N/A N/A New riser and<br />

reconnect cable to<br />

N-516-Emalat<br />

khana Ordo<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 173


Figure 144: Overview <strong>of</strong> Feeder C 512<br />

B-4<br />

C-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 174


Project P-B4-10: Location: Map B-4<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

N-516-12_8 E-541-128 Overhead 185 400 New section<br />

The objective <strong>of</strong> <strong>the</strong> investments above is to increase <strong>the</strong> load carrying capability <strong>of</strong> Feeder<br />

C-512 to: a) attend forecasted mid-term load, b) add operational flexibility and c) provide<br />

spare capacity for future growth. It should be mentioned that n this case we extended larger<br />

cross section <strong>of</strong> <strong>the</strong> mainline to point E-541-128 as from this point <strong>the</strong> feeder branches out to<br />

connect to C-510, C-515 and E-531, and this is necessary to provide back up to those<br />

feeders or receive it from any <strong>of</strong> <strong>the</strong>m.<br />

Project P-B4-11: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-128 E-541-129 Overhead 120 90 Reconductor<br />

E-541-129 E-541-132 Overhead 120 160 Reconductor<br />

This investment is necessary to streng<strong>the</strong>n <strong>the</strong> connection with feeder C - 510 and E-531<br />

Project P-C4-7: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-132-7-a E-531-70 Overhead 120 530 Reconductor<br />

Project P-C4-8: Location: Map B-4 and C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-132 E-541-132-7 Overhead 120 300 Reconductor<br />

E-541-132-7 E-541-132-7-a Overhead 120 110 Reconductor<br />

The two investments above are necessary to streng<strong>the</strong>n <strong>the</strong> connection with feeder E-531<br />

9.1.4 Feeder C-513<br />

Feeder 513 goes to <strong>the</strong> east and slightly to <strong>the</strong> north <strong>of</strong> Central substation and is expected to<br />

be loaded at 8.3 MVA. Figure 145 presents an overview <strong>of</strong> this feeder and drawing B-4 in<br />

Appendix 4 presents it in much greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 175


Figure 145: Overview <strong>of</strong> Feeder C-513<br />

B-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 176


Figure 146: Overview <strong>of</strong> Feeder C-514<br />

B-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 177


Project P-B4-1: Location: Map B-4<br />

From<br />

(node name)<br />

Exit <strong>of</strong> Central C-<br />

513<br />

To<br />

(node name)<br />

N-512-T#2 Wazir<br />

akbar khan<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 1410 Replace<br />

akbar khan<br />

N-512-T#1 Wazir<br />

akbar khan<br />

12Macroryan<br />

Project P-B4-2: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-512-T#2 Wazir N-516-No- Cable 240 1000 Replace cable and<br />

N-516-No-<br />

12Macroryan<br />

reconnect to # 12<br />

Macroryan is<br />

necessary<br />

Cable 240 140 New cable section<br />

The objective <strong>of</strong> <strong>the</strong> investments above is to increase <strong>the</strong> load carrying capability <strong>of</strong> Feeder<br />

C-513 to: a) attend forecasted mid-term load, b) add operational flexibility and c) provide<br />

spare capacity for future growth.<br />

9.1.5 Feeder C-514<br />

Feeder 514 goes to <strong>the</strong> nor<strong>the</strong>ast <strong>of</strong> Central substation and is expected to be loaded at 8.5<br />

MVA. Figure 146 presents an overview <strong>of</strong> this feeder and drawing B-4 in Appendix 4 presents<br />

it in much greater detail.<br />

This is a new feeder not previously connected to Junction Station # 2 and <strong>the</strong> objective <strong>of</strong> <strong>the</strong><br />

investments below is to connect loads formerly supplied by North S/S to Central Substation.<br />

Project P-B4-13: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Exit <strong>of</strong> Central C- N-512-121 Overhead 185 1350 New Section<br />

514<br />

Project P-B4-14: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-512-121 N-512-108 Overhead 185 890 Reconductor<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 178


Figure 147: Overview <strong>of</strong> Feeder C-515<br />

B-4<br />

C-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 179


Project P-B4-15: Location: Map B-4<br />

From<br />

(node name)<br />

N-512-108<br />

To<br />

(node name)<br />

N-512-Bibi Mahro<br />

Muqabel<br />

Project P-B4-16: Location: Map B-4<br />

From<br />

(node name)<br />

N-512-94<br />

To<br />

(node name)<br />

N-512-Bibi Mahro<br />

Muqabel<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 185 430 New Section<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 185 60 Reconductor<br />

N-512-94 N-512-98 Overhead 185 270 Reconductor<br />

Project P-B4-17: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-512-98<br />

N-517-No-20 Overhead 185 470 New Section<br />

Macroryan<br />

Project P-B4-19: Location: Map B-4<br />

From<br />

(node name)<br />

N-516-No-11<br />

Macroryan<br />

To<br />

(node name)<br />

N-517-No-17<br />

Macroryan<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 185 210 New Section<br />

9.1.6 Feeder C-515<br />

Feeder 515 goes to <strong>the</strong> east <strong>of</strong> Central substation and is expected to be loaded at 8.5 MVA.<br />

Figure 147 presents an overview <strong>of</strong> this feeder and drawing B-4 in Appendix 4 presents it in<br />

much greater detail.<br />

This is a new feeder not previously connected to Junction Station # 2 and <strong>the</strong> objective <strong>of</strong> <strong>the</strong><br />

projects detailed below is to achieve its connection (Project P-B4-18) and streng<strong>the</strong>n <strong>the</strong><br />

interconnection with C-512 (Project P-B4-11)<br />

Project P-B4-18: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Exit <strong>of</strong> Central C- N-516-Stera cable 240 1800 New Section<br />

515<br />

Mahkama<br />

Project P-B4-11: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-120 E-541-128 overhead 120 310 Reconductor<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 180


Project P-B4-12: Location: Map B-4<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

N-516-516-18 N/A overhead 1 New switches<br />

reconnect to line<br />

between E-541-<br />

119 and E-541-<br />

120.<br />

9.1.7 Feeder C-516<br />

Feeder 516 goes to <strong>the</strong> west <strong>of</strong> Central substation and is expected to be loaded at 5.9 MVA.<br />

Figure 148 presents an overview <strong>of</strong> this feeder and drawing B-4 and B-3in Appendix 4<br />

presents it in much greater detail. This is an extension to a short feeder to <strong>the</strong> Emergency<br />

Hospital to convert it into a new feeder with <strong>the</strong> investments indicated below.<br />

The main objective in introducing this new feeder is to reconnect <strong>the</strong> loads to <strong>the</strong> west <strong>of</strong><br />

Central to <strong>the</strong> new substations with much shorter cable runs and provide back up to o<strong>the</strong>r<br />

feeders in <strong>the</strong> area (C-521 and C-517)<br />

Project P-B3-9: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Exit <strong>of</strong> Central C- N-<br />

cable 240 190 Replace<br />

516<br />

Project P-B3-8: Location: MapB-4 and B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

cable 240 800 New Section<br />

Project P-B3-7: Location: Map B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

515_JS2_D_2_7-<br />

Emergency<br />

Hospital<br />

N-<br />

518_JS2_A_1_2-<br />

Bland manzel<br />

Asrar<br />

N-<br />

515_JS2_D_2_7-<br />

Emergency<br />

Hospital<br />

N-<br />

518_JS2_A_1_2-<br />

Bland manzel<br />

Asrar<br />

N-<br />

518_JS2_B_2_5-<br />

<strong>Kabul</strong> City Center<br />

# 1&2<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

cable 120 470 New Section<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 181


Figure 148: Overview <strong>of</strong> Feeder C-516<br />

B-4<br />

C-4<br />

9.1.8 Feeder C-517<br />

Feeder 517 goes to <strong>the</strong> west <strong>of</strong> Central substation and is expected to be loaded at 6.7 MVA.<br />

Figure 149 presents an overview <strong>of</strong> this feeder and drawing B-3, B-4, C-3 and C-4in<br />

Appendix 4 presents it in much greater detail.<br />

We describe <strong>the</strong> projects associated with this feeder below<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

182 Power Technologies International


Figure 149: Overview <strong>of</strong> Feeder C-517<br />

B-3<br />

B-4<br />

C-3<br />

C-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 183


Project P-C3-1a: Location: Map B-4, C-4, C-3 and B-3<br />

From<br />

(node name)<br />

Exit <strong>of</strong> Central C-<br />

517<br />

To<br />

(node name)<br />

N-<br />

518_JS2_B_2_5-<br />

Markaz<br />

Lesan(American<br />

Center)<br />

N-<br />

518_JS2_B_2_5-<br />

Markaz<br />

Lesan(American<br />

Center)<br />

N-<br />

518_JS2_B_2_5-<br />

Tank Teel Shahr<br />

now<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

cable 240 730 Replace<br />

cable 240 470 Replace<br />

As is <strong>the</strong> case for most <strong>of</strong> <strong>the</strong> exiting connections to Junction Station 2; <strong>the</strong> objective <strong>of</strong> <strong>the</strong>se<br />

investments, is to increase <strong>the</strong> load carrying capability <strong>of</strong> Feeder C-517 to: a) attend<br />

forecasted mid-term load, b) add operational flexibility and c) provide spare capacity for future<br />

growth.<br />

Project P-B3-1: Location: Map B-3<br />

From<br />

(node name)<br />

N-<br />

518_JS2_B_2_5-<br />

Tank Teel Shahr<br />

now<br />

To<br />

(node name)<br />

N/A<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

Open Cable Haji<br />

Yahqoob to Tank<br />

Teel Shahr<br />

reconnect at this<br />

point and install<br />

Switches<br />

This investment will allow a connection with feeder C-516.<br />

Project P-C3-2a: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-<br />

N-<br />

cable 50 330 New Section<br />

518_JS2_A_1_2-<br />

Mokhaberat<br />

Shahre now<br />

529_JS5_B_2_5-<br />

Zamini Qowae<br />

Markaz<br />

This investment is necessary to connect load to this reinforced feeder.<br />

9.1.9 Feeder C-518<br />

Feeder 518 goes to <strong>the</strong> southwest <strong>of</strong> Central substation and is expected to be loaded at 8.6<br />

MVA. Figure 150 presents an overview <strong>of</strong> this feeder and drawing B-4, C-3 and C-4 in<br />

Appendix 4 presents it in much greater detail.<br />

We describe <strong>the</strong> projects associated with this feeder below<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 184


Project P-B4-19: Location: Map B-4 and C-4<br />

From<br />

(node name)<br />

Exit <strong>of</strong> Central C-<br />

518<br />

To<br />

(node name)<br />

Project P-C4-10: Location: Map C-4 and C-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

N-<br />

518_JS2_B_1_2-<br />

Sedarat<br />

N-<br />

518_JS2_B_1_2-<br />

Sedarat<br />

Khetabkana_SW<br />

(near N-<br />

518_JS2_B_1_2-<br />

Khetabkhana<br />

Aama)<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

cable 240 970 Replace<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

cable 240 550 Replace<br />

Figure 150: Overview <strong>of</strong> Feeder C-518<br />

B-3<br />

B-4<br />

C-3<br />

C-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 185


Again <strong>the</strong> objective <strong>of</strong> <strong>the</strong> investments above is to increase <strong>the</strong> load carrying capability <strong>of</strong><br />

Feeder C-518 to: a) attend forecasted mid-term load, b) add operational flexibility and c)<br />

provide spare capacity for future growth.<br />

Project P-C3-2: Location: Map C-3<br />

From<br />

(node name)<br />

Khetabkana_SW<br />

(near N-<br />

518_JS2_B_1_2-<br />

Khetabkhana<br />

Aama)<br />

To<br />

(node name)<br />

N/A<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

Rearrange<br />

connections and<br />

install switches.<br />

Mohammad<br />

Khan<br />

Jan<br />

Project P-C3-4a: Location: Map C-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

(near N-<br />

518_JS2_B_1_2-<br />

Khetabkhana<br />

Aama)<br />

These switches will allow transfer load to C-511<br />

Project P-C3-5a: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Khetabkana_SW BK-JS-1-A-1,2- Cable 95 290 Replace<br />

BK-JS-1-A-1,2-<br />

Mohammad Jan<br />

Khan<br />

BK-JS-1-A-1,2-<br />

Welaayat<br />

BK-JS-1-A-1,2-<br />

Welaayat<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 95 670 Replace<br />

Cable 50 840 Replace<br />

Qolabchakkan 1<br />

Project P-C3-6a: Location: Map C-3<br />

From<br />

(node name)<br />

BK-JS-1-A-1,2-<br />

Qolabchakkan 1<br />

Project P-C3-3a: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

BK-JS-1-A-1,2- N-<br />

Cable 50 660 New Section<br />

529_JS5_B_2_5-<br />

Amneiat Hospital<br />

N-<br />

529_JS5_B_2_5-<br />

No_2_ Karte<br />

Ariana<br />

To<br />

type Cross Section Length Action<br />

(node name)<br />

mm 2<br />

mts<br />

BK-JS-1-A-1,2-5 Overhead 70 610 New Section<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

186 Power Technologies International


All <strong>of</strong> <strong>the</strong> projects above starting with Project P-C3-5a are necessary to connect load to this<br />

feeder and allow providing support to feeder C-517 and BK-514<br />

9.1.10 Feeder C-519<br />

Feeder 519 goes to <strong>the</strong> south and <strong>the</strong>n east <strong>of</strong> Central substation and is expected to be<br />

loaded at 3.8 MVA. Figure 151 presents an overview <strong>of</strong> this feeder and drawing B-4and C-4<br />

in Appendix 4 presents it in much greater detail. This feeder was formerly N-518_JS2_517<br />

and will retain <strong>the</strong> same cables currently used by this feeder (no projects)<br />

9.1.11 Feeder C-520 and C-521<br />

These two feeders C-520 and C-521 both go north <strong>of</strong> Central Substation and <strong>the</strong>n veer to <strong>the</strong><br />

south. These feeders will retain <strong>the</strong> same cables currently used by <strong>the</strong> feeders to which <strong>the</strong>y<br />

currently belong (NW-525 and N-518_JS2_A_1_2.) The intended roles for <strong>the</strong>se feeders are<br />

to provide back-up to o<strong>the</strong>r feeders (C-516 and N-515) and are normally lightly loaded.<br />

Figure 152 and Figure 153 present an overview <strong>of</strong> <strong>the</strong>se feeders and drawing B-3and B-4 in<br />

Appendix 4 present <strong>the</strong>m in greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 187


Figure 151: Overview <strong>of</strong> Feeder C-519<br />

B-4<br />

C-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 188


Figure 152: Overview <strong>of</strong> Feeder C-520<br />

B-3<br />

B-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 189


Figure 153: Overview <strong>of</strong> Feeder C-521<br />

B-3<br />

B-4<br />

9.2 Short Term Investments for Central Substation<br />

As shown in network analysis section <strong>of</strong> this report <strong>the</strong> feeders leading towards central <strong>Kabul</strong><br />

from North and East Substations are long and are estimated to be at or near <strong>the</strong>ir capacity<br />

under current loading conditions. Therefore to attend any future load growth Central<br />

substation should be commissioned and we are proposing this to be done as soon as<br />

practicable.<br />

However in <strong>the</strong> short term it is possible to provide adequate service to <strong>the</strong> load estimated to<br />

exist in <strong>the</strong> area that will be served in <strong>the</strong> future by Central Substation with <strong>the</strong> minimum<br />

investments described below.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

190 Power Technologies International


The adequacy <strong>of</strong> <strong>the</strong>se investments was presented above under <strong>the</strong> section on <strong>Analysis</strong> <strong>of</strong><br />

<strong>the</strong> Short Term <strong>System</strong>, where it was observed that <strong>the</strong>se investments yield adequate<br />

loading and voltage pr<strong>of</strong>ile under normal conditions although some load may have to be shed<br />

during outage conditions (i.e. <strong>the</strong> system is not yet n-1 compliant) .<br />

9.2.1 Conductors with reduced cross sections.<br />

In Section 4 it was mentioned that <strong>the</strong>re were several cables whose cross section was<br />

inconsistent with <strong>the</strong> network design and we proposed a new minimum cross section for<br />

those cables.<br />

Table 44 shows <strong>the</strong>se conductors in <strong>the</strong> context <strong>of</strong> North Substation, <strong>the</strong> substation to which<br />

most <strong>of</strong> <strong>the</strong> feeders in Central substation currently belong. In this table we present <strong>the</strong> initially<br />

assumed minimum cross section as well as <strong>the</strong> recommended cross section based on our<br />

long term plan. The replacement <strong>of</strong> <strong>the</strong>se conductors is a strong priority as can be noted by<br />

observing <strong>the</strong> level <strong>of</strong> overload that <strong>the</strong>y will have under current loading conditions (once<br />

generation is available.)<br />

<strong>Final</strong>ly, Table 44 also shows that in some cases with <strong>the</strong> new conductor are still some slight<br />

overloads, however in this case those overloads are corrected with <strong>the</strong> reconfiguration <strong>of</strong> <strong>the</strong><br />

substations once Central is in service.<br />

There are no cables with aluminum conductor that needs to be replaced with a like conductor<br />

but made with copper. The reason for this is that all such conductors in North substation<br />

ei<strong>the</strong>r are not overloaded or were slated for replacement with a larger conductor.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 191


Table 44: Conductors with Reduced cross sections in North Substation<br />

Original<br />

x-Section<br />

[mm²] Rating Conductor Type<br />

Replacement<br />

Minimum<br />

x-Section<br />

[mm²]<br />

Recommende<br />

d x-Section<br />

[mm²]<br />

Estimated<br />

Loading<br />

Network 2007 Conditions<br />

Loading with<br />

Current<br />

Conductor<br />

Loading with<br />

Rcom'd<br />

Conductor<br />

Substation Feeder From To Conductor Type<br />

Rating<br />

North 513 N-513 N-513-2 Overhead 95 330 Overhead 150 150 425 351 106% 83%<br />

North 513 N-513-35 N-513-39 Overhead 35 165 Overhead 70 185 490 228 138% 47%<br />

North 513 N-513-39 N-513-43 Overhead 35 165 Overhead 70 185 490 228 138% 47%<br />

North 513 N-513-43 N-513-46 Overhead 35 165 Overhead 70 185 490 192 116% 39%<br />

North 513 N-513-46 N-513-47 Overhead 35 165 Overhead 70 185 490 192 116% 39%<br />

North 513 N-513-47 N-513-53 Overhead 35 165 Overhead 70 185 490 192 116% 39%<br />

North 516 N-516 N-516-3 Overhead 70 270 Overhead 120 185 490 396 147% 81%<br />

North 516 N-516-41 N-516-63 Overhead 70 270 Overhead 120 120 365 376 139% 103%<br />

North 516 N-516-63 N-516-66 Overhead 70 270 Overhead 120 120 365 376 139% 103%<br />

North 516 N-516-66 N-516-76 Overhead 70 270 Overhead 120 120 365 376 139% 103%<br />

North 516 N-516-76 N-516-85 Overhead 70 270 Overhead 120 120 365 376 139% 103%<br />

North 517 N-517 N-517-3 Overhead 70 270 Overhead 120 185 490 368 136% 75%<br />

North 517 N-517-41 N-517-63 Overhead 70 270 Overhead 120 120 365 368 136% 101%<br />

North 517 N-517-63 N-517-66 Overhead 70 270 Overhead 120 120 365 368 136% 101%<br />

North 517 N-517-66 N-517-76 Overhead 70 270 Overhead 120 120 365 368 136% 101%<br />

North 517 N-517-76 N-517-85 Overhead 70 270 Overhead 120 120 365 368 136% 101%<br />

North 527 N-527-24 N-527-32 Overhead 50 200 Overhead 70 70 270 238 119% 88%<br />

North 528 N-528-10 N-528-12 Overhead 50 200 Overhead 70 70 270 235 118% 87%<br />

North 529 N-529 N-529-3 Overhead 70 270 Overhead 150 185 490 421 156% 86%<br />

North 529 N-529-79 JS#5-N-529 3 Cables on Duct 95 330 Cable 95 240 532 393 119% 74%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 192


9.2.2 Rearrangement <strong>of</strong> Junction Station # 2<br />

Junction Station # 2 should be rearranged as indicated in <strong>the</strong> following figure to achieve a<br />

more uniform loading <strong>of</strong> feeders N-518 and N-515 which supply each <strong>of</strong> <strong>the</strong> two buses <strong>of</strong><br />

Junction Station # 2. The investments associated with this should be ra<strong>the</strong>r small.<br />

Figure 154: Rearrangement <strong>of</strong> Junction Station # 2<br />

9.2.3 Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

Some <strong>of</strong> <strong>the</strong> investments presented in <strong>the</strong> previous section need to be implemented<br />

immediately for <strong>the</strong> system to be able to attend <strong>the</strong> estimated load in <strong>the</strong> system with<br />

adequate quality <strong>of</strong> service and without severely exceeding <strong>the</strong> normal ratings <strong>of</strong> facilities.<br />

These investments are presented below and in detail in <strong>the</strong> drawings in Appendix D.<br />

Project P-C4-7: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-132-7-a E-531-70 Overhead 120 530 Reconductor<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 193


Project P-C4-8: Location: Map B-4 and C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-132 E-541-132-7 Overhead 120 300 Reconductor<br />

E-541-132-7 E-541-132-7-a Overhead 120 110 Reconductor<br />

The two investments above are necessary to transfer load from Feeder E 541 which is<br />

heavily overloaded to E-531. The following figure provides and overview <strong>of</strong> <strong>the</strong>se projects.<br />

Figure 155: Overview <strong>of</strong> Project P-C4-7 and P-C4-8 in Map C-4<br />

Project P-B4-15: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-512-108 N-512-Bibi Mahro Overhead 185 430 New Section<br />

Muqabel<br />

Project P-B4-17: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

N-512-98<br />

N-517-No-20 Overhead 185 470 New Section<br />

Macroryan<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

194 Power Technologies International


These projects allow transferring load from feeder N-512 to N-517 improving <strong>the</strong> loading <strong>of</strong><br />

both and <strong>the</strong> voltage pr<strong>of</strong>ile in <strong>the</strong> affected regions. The following figures show an overview <strong>of</strong><br />

<strong>the</strong>se projects,<br />

Figure 156: Overview <strong>of</strong> P-B4-15 and P-B4-17 in Map B-4<br />

Project P-B4-10: Location: Map B-4<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

N-516-12_8 E-541-128 Overhead 185 400 New section<br />

This investment allows transferring load from Feeder N-516 to E-541 which will have spare<br />

capacity when <strong>the</strong> investments described above (P-B4-15 and 17) are implemented.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 195


Figure 157: Overview <strong>of</strong> Project P-B4-10 on Map B-4<br />

Project P-C3-2: Location: Map C-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

Khetabkana_SW<br />

(near N-<br />

518_JS2_B_1_2-<br />

Khetabkhana<br />

Aama)<br />

N/A<br />

Rearrange<br />

connections and<br />

install switches.<br />

These connections allow transferring some load from Feeder N-518 from to Breshna Kot<br />

feeder BK-JS-1-A-1, 2 (Junction Station # 1)<br />

The following figure shows <strong>the</strong>se investments:<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

196 Power Technologies International


Figure 158: Project P-C3-2 in Map C-3<br />

9.2.4 Voltage Support<br />

Given <strong>the</strong> fact that Central Substation will not be ready in at least a period <strong>of</strong> 3 years <strong>the</strong>re<br />

are some investments that will need to be made in <strong>the</strong> short term to be able to supply <strong>the</strong><br />

load that it is likely to materialize once generation is available.<br />

We describe in this section such investments, which <strong>of</strong> course were minimized due to <strong>the</strong>ir<br />

relatively short time span.<br />

There is a group <strong>of</strong> transformers associated with Junction Station # 12 and <strong>the</strong> Macroryan<br />

area that have low voltage as <strong>the</strong>y are located at <strong>the</strong> end <strong>of</strong> long feeders from North S/S. We<br />

propose to use capacitor banks to support <strong>the</strong> voltage in <strong>the</strong>se areas as indicated below.<br />

It should be mentioned that we are not recommending using transformer voltage boosters as<br />

<strong>the</strong>re is <strong>the</strong> possibility <strong>of</strong> back-feeding <strong>the</strong>se feeders in which case <strong>the</strong> voltage booster would<br />

be supplied in reverse with <strong>the</strong> risk <strong>of</strong> damaging <strong>the</strong> equipment. Additionally if <strong>the</strong> power<br />

factor <strong>of</strong> <strong>the</strong> load is below 0.9 it is possible that more capacitors are necessary.<br />

Project P-ST-B4-1: Location: Map B-4<br />

Node Equipment Size type<br />

JS#12-N-517 Capacitor 1200 kVar Switched<br />

This capacitor provides support to Junction Station # 12 and I shown in <strong>the</strong> following figure;<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 197


Figure 159: Capacitors at Junction Station # 12<br />

Project P-ST-B4-2: Location: Map B-4<br />

Node Equipment Size type<br />

N-516-15<br />

Macroryan # 1&2<br />

N-516-No-11<br />

Macroryan<br />

N-516-No-13<br />

Macroryan<br />

Capacitor 900 kVar Switched<br />

Capacitor 900 kVar Switched<br />

Capacitor 900 kVar Switched<br />

The figure below show <strong>the</strong> location <strong>of</strong> <strong>the</strong> capacitors above.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

198 Power Technologies International


Figure 160: Location <strong>of</strong> Short term Capacitors at Macroryan (Map B04)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 199


9.3 Medium Term Investments for Breshna Kot Substation<br />

This is an existing substation and due <strong>the</strong> incorporation <strong>of</strong> Central and South West<br />

substations <strong>the</strong>re is some important re-arrangement <strong>of</strong> <strong>the</strong> feeders in this substation as well<br />

as in Junction Station # 3. Also we are proposing to add two new feeders to this substation<br />

in order to distribute better <strong>the</strong> loads. Hence Breshna Kot is envisioned to have 10 feeders<br />

with a total load (including losses) <strong>of</strong> 60 MW.<br />

The following figure shows an overview <strong>of</strong> this substation<br />

Figure 161: Breshna Kot S/S<br />

Section 8 provides details on <strong>the</strong> investments to be made in <strong>the</strong> substation itself (as well as<br />

in Junction Station 3) and we describe <strong>the</strong> investments to be made on <strong>the</strong> associated<br />

medium voltage distribution network below. These investments are also documented in <strong>the</strong><br />

drawings attached as Appendix 4.<br />

9.3.1 Re-arrangement <strong>of</strong> Junction Station 3<br />

As presented in Section 8, Junction Station 3 will be split into 3 sections and <strong>the</strong> feeders<br />

should be re-arranged as shown in Figure 162 below to achieve close to uniform loading in<br />

<strong>the</strong> three incoming feeders. This is very important for <strong>the</strong> correct operation <strong>of</strong> <strong>the</strong><br />

recommended circuit design.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

200 Power Technologies International


Figure 162<br />

9.3.2 Feeder BK-510<br />

Feeder 510 is a new feeder at this substation; it goes <strong>the</strong> southwest <strong>of</strong> Breshna Kot and<br />

connects to Junction Station # 6. This is an important feeder and it is expected to be loaded<br />

approximately at 7.7 MVA. Figure 163 presents an overview <strong>of</strong> this feeder and drawings D-3<br />

and E-3 in Appendix 4 present it in much greater detail.<br />

The roll <strong>of</strong> this feeder is to alleviate <strong>the</strong> overloads in feeders BK-517 and BK-4-6, which<br />

currently connect to Junction Station # 6. The feeder will also provide back up to feeder BK-<br />

516 and BK-517<br />

In this feeder <strong>the</strong> following investments are necessary.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 201


Project P-D3-3: Location: Map D-3 and E-3<br />

From<br />

(node name)<br />

Exit <strong>of</strong> Breshna<br />

Kot BK-510<br />

BK-510-2 (near<br />

BK-516-Jangalak)<br />

BK-510-2 (close to<br />

BK-516-Jangalak)<br />

BK-New 2-2 (near<br />

to BK-516-Aqa Ali<br />

Shams 2)<br />

BK-New 2-3 (near<br />

BK-516-46)<br />

BK-New 2-3 (near<br />

BK-516-46)<br />

BK-New 2-3 (near<br />

BK-516-46)<br />

BK-New 2-4 (near<br />

BK-517-102.7)<br />

BK-New 2-4 (near<br />

BK-517-102.7)<br />

To<br />

(node name)<br />

BK-510-2 (near<br />

BK-516-Jangalak)<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 185 1000 New Section<br />

BK-516-Jangalak Overhead New<br />

Switches<br />

BK-New 2-2 (near Overhead 185 780 New Section<br />

BK-516-Aqa<br />

Shams 2)<br />

Ali<br />

BK-New 2-3 (near<br />

BK-516-46)<br />

Overhead 185 510 New Section<br />

BK-516-46 Overhead New<br />

Switches<br />

BK-517-48 Overhead New<br />

Switches<br />

BK-New 2-4 (near Overhead 185 2440 New Section<br />

BK-517-102.7)<br />

JS#6-BK-517<br />

(Junction S # 6)<br />

9.3.3 Feeder BK-511<br />

Overhead 185 2100 New Section<br />

BK-517-102.7 Overhead New<br />

Switches<br />

Feeder 511 is also a new feeder that will supply one <strong>of</strong> <strong>the</strong> 3 busses into which Junction<br />

Station # 3 is proposed to be split (see Section 8.) From this point feeder BK-511 branches<br />

out to <strong>the</strong> north, west and south. This is an important feeder and it is expected to be loaded<br />

approximately at 8.3 MVA. Figure 164 presents an overview <strong>of</strong> this feeder and drawings C-3<br />

and D-3 in Appendix 4 present it in much greater detail.<br />

In this feeder <strong>the</strong> following investments are necessary.<br />

Project P-D3-8: Location: Map D-3 and C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Breshna Kot S/S Junction Station # Overhead 185 2130 New Section<br />

exit BK-511<br />

3 exit JS#3-BK-<br />

511<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

202 Power Technologies International


Figure 163: Overview <strong>of</strong> Feeder BK-510<br />

D-3<br />

E-3<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 203


Figure 164: Overview <strong>of</strong> Feeder BK-511<br />

C-3<br />

D-3<br />

Project P-C3-4: Location: Map C-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

JS#3-BK-511 JS#1-5 Overhead 185 950 New Section<br />

This investments allows providing back up to JS # 1 from JS # 3<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 204


Project P-D3-2: Location: Map D-3<br />

From<br />

(node name)<br />

BK-3_6-Moqabili<br />

Sifarat Russia<br />

To<br />

(node name)<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

Sifarat SW Cables Install switches to<br />

transformer<br />

This investments allows providing back up to Moqabili Sifarat Russia transformer<br />

9.3.4 Feeder BK-512<br />

Feeder 512 goes firs to <strong>the</strong> south <strong>of</strong> Breshna Kot and no investments are associated with it.<br />

Figure 165 shows this feeder.<br />

Figure 165: Overview <strong>of</strong> Feeder BK-512<br />

9.3.5 Feeder BK-513<br />

Feeder 513 goes to <strong>the</strong> east and <strong>the</strong>n branches out and goes to <strong>the</strong> north and south <strong>of</strong><br />

Breshna Kot. This is an important feeder and it is expected to be loaded approximately at 7.6<br />

MVA. To <strong>the</strong> north it has an interconnection with Central Substation Feeder C-51, which was<br />

reinforced for it to be effective. Figure 166 presents an overview <strong>of</strong> this feeder and drawings<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 205


D-3, D-4 and C-4 in Appendix 4 present it in much greater detail. In Figure 166 we note that<br />

this feeder supplies to <strong>the</strong> east <strong>the</strong> outskirts <strong>of</strong> one <strong>of</strong> <strong>the</strong> areas identified as unsupplied.<br />

In this feeder <strong>the</strong> following investments are necessary to attend <strong>the</strong> connected load, provide<br />

operational flexibility and attend future growth.<br />

Project P-C4-11: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

BK-513-44_49 E-541-Kenar Overhead 120 140 Reconductor<br />

E-541-Kenar<br />

Chaman<br />

Chaman<br />

E-541-183 Overhead 120 740 Reconductor<br />

The following investments are necessary to reinforce <strong>the</strong> connection with Feeder C-510 and<br />

<strong>the</strong>se investments were already reported when presenting that feeder and we show <strong>the</strong>m<br />

here again for completeness.<br />

Project P-C4-12: Location: Map C-4 (same project as in Central S/S C-510)<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-148 E-541-154 Overhead 120 240 Reconductor<br />

E-541-154 E-541-156 Overhead 120 110 Reconductor<br />

E-541-156 E-541-157 Overhead 120 110 Reconductor<br />

E-541-157 E-541-164 Overhead 120 340 Reconductor<br />

E-541-164 E-541-166 Overhead 120 120 Reconductor<br />

E-541-166 E-541-170 Overhead 120 250 Reconductor<br />

E-541-170 E-541-171 Overhead 120 50 Reconductor<br />

E-541-171 E-541-183 Overhead 120 50 Reconductor<br />

Note: this project includes sections currently assigned to Central Feeder C-510.<br />

The following investments are necessary to reinforce <strong>the</strong> connection with Feeder BK-515.<br />

Project P-C4-13: Location: Map C-4<br />

From<br />

(node name)<br />

E-541-Kenar<br />

Chaman<br />

To<br />

type Cross Section Length Action<br />

(node name)<br />

mm 2<br />

mts<br />

E-541-188 Overhead 120 340 Reconductor<br />

E-541-188 E-541-189 Overhead 120 40 Reconductor<br />

E-541-189 EE-541-192 Overhead 120 170 Reconductor<br />

EE-541-192 E-541-Bala Hesar Overhead 120 660 Reconductor<br />

E-541-Bala Hesar<br />

BK-C-1,2-Takhta<br />

Pul<br />

Overhead 120 50 New section,<br />

risers and<br />

switches<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

206 Power Technologies International


Figure 166: Overview <strong>of</strong> Feeder BK-513<br />

C-3<br />

C-4<br />

D-3<br />

D-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 207


9.3.6 Feeder BK-514<br />

Feeder 514 goes to <strong>the</strong> north <strong>of</strong> Breshna Kot and supplies one buses <strong>of</strong> Junction Station # 1.<br />

The load in this feeder is approximately at 8.2 MVA. To <strong>the</strong> north this feeder it has an<br />

interconnection with Central Substation Feeder C-511, which has to be reinforced for it to be<br />

effective. Figure 167 presents an overview <strong>of</strong> this feeder and drawings D-3, C-3 and C-4 in<br />

Appendix 4 present it in much greater detail.<br />

Figure 167: Overview <strong>of</strong> Feeder BK-514<br />

C-3<br />

C-4<br />

D-3<br />

D-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 208


In this feeder <strong>the</strong> following investments are necessary.<br />

Project P-C3-1: Location: Map C-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 70 900 New Section<br />

The objective <strong>of</strong> this section is to provide a second source <strong>of</strong> supply to <strong>the</strong> TV and radio<br />

transmitters on top <strong>of</strong> <strong>the</strong> hill.<br />

Project P-C3-3: Location: Map C-3<br />

From<br />

(node name)<br />

BK-JS-1-A-1,2-<br />

BBC<br />

BK-JS-1-A-1,2-<br />

Shaadoshamshera<br />

BK-Charda<br />

Manzela JS_1-<br />

Central Poly Clinic<br />

To<br />

(node name)<br />

BK-JS-1-E 1,2-<br />

Mestorat Hospital<br />

1&2<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

cable 50 490 New Section<br />

The objective <strong>of</strong> <strong>the</strong> new cable section above is to provide a second source <strong>of</strong> supply to<br />

Manzela Central Polyclinic and Mestorat Hospital.<br />

Project P-C4-10: Location: Map C-4<br />

From<br />

(node name)<br />

BK-JS-1-E 1,2-<br />

Chindawol<br />

BK-JS-1-E 1,2-<br />

Pakhta Feroshi<br />

BK-JS-1-E 1,2-<br />

Pul-e-Kheshtee<br />

To<br />

(node name)<br />

BK-JS-1-E 1,2-<br />

Pakhta Feroshi<br />

BK-JS-1-E 1,2-Pul-e-<br />

Kheshtee<br />

N-518_JS2_E_1_2-<br />

Pashtoonistan Wath<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

cable 50 430 Replace<br />

cable 50 380 Replace<br />

cable 50 610 Replace<br />

The objective <strong>of</strong> <strong>the</strong> reinforcements above is to increase <strong>the</strong> capability <strong>of</strong> transferring load to<br />

and from feeder C-511.<br />

9.3.7 Feeder BK-515<br />

Feeder 515 also goes to <strong>the</strong> north <strong>of</strong> Breshna Kot and supplies one buses <strong>of</strong> Junction Station<br />

# 1. The load in this feeder is approximately at 8.7 MVA. This feeder has interconnections<br />

with BK-514 and BK-513. From Junction Station #1 onwards this feeder has relatively thin<br />

cables to <strong>the</strong> point <strong>of</strong> connection with BK-513 (35 sqmm). This cable needs to be replaced to<br />

supply <strong>the</strong> feeder load and provide back up service to BK 513. This is <strong>the</strong> most significant<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 209


investment associated with this feeder. Figure 168 presents an overview <strong>of</strong> this feeder and<br />

drawings D-3, C-3 and C-4 in Appendix 4 present it in much greater detail.<br />

We describe <strong>the</strong> investments associated with this feeder below:<br />

Project P-C4-15: Location: Map C-4<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

JS#1-BK-515 BK-C-1,2-Guzar e<br />

Azrat<br />

BK-C-1,2-Guzar<br />

e Azrat<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 120 2060 Replacement<br />

BK-C-1,2-1 Cable 120 50 Replacement<br />

Project P-C4-14: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

BK-C-1,2-1 BK-C-1,2-Takhta Pul Overhead 120 502 Reconductor<br />

9.3.8 Feeder BK-516<br />

Feeder 516 goes to <strong>the</strong> north <strong>of</strong> and south west Breshna Kot substation and it is expected to<br />

have a load <strong>of</strong> approximately at 8.7 MVA. There are no investments associated with this<br />

feeder with <strong>the</strong> exception <strong>of</strong> a few switches and small sections to connect it to neighboring<br />

feeders. As those investments were described before we will not repeat <strong>the</strong>m here.<br />

Figure 169 presents an overview <strong>of</strong> this feeder and drawings D-3 and C-3 in Appendix 4<br />

present it in much greater detail.<br />

9.3.9 Feeder BK-517<br />

Feeder 517 goes to <strong>the</strong> south and <strong>the</strong>n to <strong>the</strong> west <strong>of</strong> Breshna Kot substation and it is<br />

expected to have a load <strong>of</strong> approximately at 7.0 MVA. There are no investments associated<br />

with this feeder with <strong>the</strong> exception <strong>of</strong> a few switches and small sections to connect it to<br />

neighboring feeders. As those investments were described before we will not repeat <strong>the</strong>m<br />

here.<br />

Figure 170 presents an overview <strong>of</strong> this feeder and drawings D-3 and E-3 in Appendix 4<br />

present it in much greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

210 Power Technologies International


Figure 168: Overview <strong>of</strong> Feeder BK-515<br />

C-3<br />

C-4<br />

D-3<br />

D-4<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 211


Figure 169: Overview <strong>of</strong> Feeder BK-516<br />

C-3<br />

D-3<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 212


Figure 170: Overview <strong>of</strong> Feeder BK-517<br />

D-3<br />

E-3<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 213


Figure 171: Overview <strong>of</strong> Feeder BK-518<br />

C-3<br />

D-3<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

214 Power Technologies International


Figure 172: Overview <strong>of</strong> Feeder BK-519<br />

C-3<br />

D-3<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 215


9.3.10 Feeder BK-518<br />

Feeder 518 goes to <strong>the</strong> north <strong>of</strong> Breshna Kot substation to Junction Station # 3 where it<br />

branches out largely towards <strong>the</strong> south west. It is expected to have a load <strong>of</strong> approximately at<br />

7.9 MVA. There are only small investments associated with this feeder which include small<br />

sections to connect it to neighboring feeders (already described) and a short section<br />

described below, which is used to transfer load to this feeder and connect to Feeder BK –<br />

511.<br />

Figure 171 presents an overview <strong>of</strong> this feeder and drawings C-3 and D-3 in Appendix 4<br />

present it in greater detail.<br />

9.3.11 Feeder BK-519<br />

Feeder 519 also goes to <strong>the</strong> north <strong>of</strong> Breshna Kot substation to Junction Station # 3 where it<br />

branches out towards <strong>the</strong> south west. Also at Junction Station # 3 <strong>the</strong>re is a connection that<br />

currently goes to Junction Station # 4 and will have to be extended to <strong>the</strong> new Southwest<br />

Substation. This feeder is expected to have a load <strong>of</strong> 6.8 MVA.<br />

The only investments associated with this feeder are <strong>the</strong> extension <strong>of</strong> <strong>the</strong> connection to JS #4<br />

to <strong>the</strong> Southwest substation.<br />

Figure 172 presents an overview <strong>of</strong> this feeder and drawings C-3 and D-3 in Appendix 4<br />

present it in much greater detail.<br />

We describe <strong>the</strong> investment associated with this feeder below:<br />

Project P-C3-10: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Close to JS # 4 S/S South West Cable 240 1000 New Section<br />

9.4 Short Term Investments for Breshna Kot Substation<br />

As shown in network analysis section <strong>of</strong> this report two feeders going out <strong>of</strong> Breshna Kot<br />

towards Junction Station # 3 and Junction Station # 6 are overloaded and <strong>the</strong>re are large<br />

areas within <strong>the</strong> network with depressed voltages.<br />

In order to solve <strong>the</strong>se issues several <strong>of</strong> <strong>the</strong> investments described above need to be given<br />

priority and implemented it <strong>the</strong> short term. These investments are discussed in this section<br />

and <strong>the</strong>y are described in detail in <strong>the</strong> drawings in Appendix D.<br />

The most important investment associated with Breshna Kot is <strong>the</strong> upgrade <strong>of</strong> <strong>the</strong> Junction<br />

station #3 and its interconnection with Breshna Kot trough <strong>the</strong> new feeder BK-511.<br />

In addition <strong>the</strong>re are several investments identified for <strong>the</strong> medium term that need to be<br />

implemented in <strong>the</strong> short term to alleviate overloads and resolve low voltage situations.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 216


We describe <strong>the</strong>se investments below.<br />

9.4.1 Conductors with reduced cross sections.<br />

As was <strong>the</strong> case for Central S/S above we also found in Breshna Kot medium voltage system<br />

several cables whose cross section is inconsistent with <strong>the</strong> network design and it is<br />

necessary to rectify this situation as soon as possible. Table 45 shows <strong>the</strong>se cables and <strong>the</strong><br />

recommended cross section to be implemented.<br />

9.4.2 Rearrangement <strong>of</strong> Junction Station # 3<br />

It is crucial to expand and re-arrange Junction Station # 3 as shown below. The<br />

rearrangement shown is necessary to achieve uniform loading <strong>of</strong> <strong>the</strong> feeders.<br />

Figure 173: Rearrangement <strong>of</strong> Junction Station # 2<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 217


Table 45: Conductors with reduced cross sections in Breshna Kot Substation<br />

Original<br />

x-Section<br />

[mm²] Rating Conductor Type<br />

Replacement<br />

Minimum<br />

x-Section<br />

[mm²]<br />

Recommende<br />

d x-Section<br />

[mm²]<br />

Estimated<br />

Loading<br />

Network 2007 Conditions<br />

Loading with<br />

Current<br />

Conductor<br />

Loading with<br />

Rcom'd<br />

Conductor<br />

Substation Feeder From To Conductor Type<br />

Rating<br />

Breshna Kot 517 BK-517-64 BK-517-71 Overhead 70 270 Overhead 185 185 490 402 149% 82%<br />

Breshna Kot 517 BK-517-111 BK-517-116 Overhead 50 200 Overhead 185 185 490 325 162% 66%<br />

Breshna Kot 518 BK-518-12 BK-518-15 3 Cables on Duct 70 270 1 Cables on Duct 185 185 498 488 181% 98%<br />

Breshna Kot 519 BK-519-12 BK-519-15 3 Cables on Duct 70 270 1 Cable per Duct 185 185 498 499 185% 100%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 218


9.4.3 Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

The following is a list <strong>of</strong> <strong>the</strong> investments that were identified as necessary in <strong>the</strong> medium term<br />

that are also necessary in <strong>the</strong> short term.<br />

Project P-D3-8: Location: Map D-3 and C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

Breshna Kot S/S Junction Station # Overhead 185 2130 New Section<br />

exit BK-511<br />

3 exit JS#3-BK-<br />

511<br />

This is <strong>the</strong> new feeder section to connect Breshna Kot with Junction Station #3 and it is<br />

shown in <strong>the</strong> following figure.<br />

Figure 174: New Feeder BK-511<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 219


Project P-C4-11: Location: Map C-4<br />

From<br />

(node name)<br />

BK-513-44_49<br />

E-541-Kenar<br />

Chaman<br />

To<br />

(node name)<br />

E-541-Kenar<br />

Chaman<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 120 140 Reconductor<br />

E-541-183 Overhead 120 740 Reconductor<br />

Project P-C4-12: Location: Map C-4 (same project as in Central S/S C-510)<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-157 E-541-164 Overhead 120 340 Reconductor<br />

E-541-164 E-541-166 Overhead 120 120 Reconductor<br />

E-541-166 E-541-170 Overhead 120 250 Reconductor<br />

E-541-170 E-541-171 Overhead 120 50 Reconductor<br />

E-541-171 E-541-183 Overhead 120 50 Reconductor<br />

These investments (P-C4-11 and P-C4-12) are used to transfer load from East feeder E-541<br />

to BK -513 and are shown in <strong>the</strong> following figure.<br />

Project P-C4-13: Location: Map C-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-Bala Hesar BK-C-1,2-Takhta Overhead 120 50 New section,<br />

Pul<br />

risers<br />

switches<br />

and<br />

This small section is used to provide mutual support between feeders BK-513 and BK-C-1-2.<br />

The capacity <strong>of</strong> this backup will be much higher in <strong>the</strong> medium term when <strong>the</strong> entire<br />

reinforcements proposed are implemented and Central is in service. However as <strong>the</strong>se two<br />

sections are very close <strong>the</strong> connection is recommended to be implemented in <strong>the</strong> short term.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

220 Power Technologies International


Figure 175: Projects P-C4-11 and P-C4-12 (Map C-4)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 221


Figure 176: Project P-C4-13<br />

Jamal Mina<br />

Project C3-P4: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-Pohantoon- BK-Jamal maina- Cable 95 200 New Section<br />

Takhnic Sanawee<br />

No-2<br />

NW-Pohantoon-<br />

Takhnic Sanawee<br />

No-2<br />

NW-Pohantoon-<br />

Takhnic Sanawee<br />

No-1<br />

Cable 95 180 New Section<br />

The investments above are very important as <strong>the</strong>y will be used to transfer <strong>the</strong> load <strong>of</strong> <strong>the</strong><br />

University to <strong>the</strong> upgraded Junction Station # 3.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

222 Power Technologies International


Figure 177: Project P-C3-4b<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 223


9.5 Medium Term Investments for South West Substation<br />

This is a new substation used to provide service to <strong>the</strong> southwest part <strong>of</strong> <strong>Kabul</strong> currently<br />

being supplied by ra<strong>the</strong>r long feeders from Breshna Kot and North West substations. This<br />

substation is also envisioned that it will provide service to a large unsupplied area (some 30<br />

MW <strong>of</strong> prospective load) in Southwest <strong>Kabul</strong>.<br />

The substation will have initially 7 feeders with an estimated load <strong>of</strong> 38 MW; lower than <strong>the</strong><br />

average <strong>of</strong> o<strong>the</strong>r substations in <strong>the</strong> system due to <strong>the</strong> fact that this substation should take <strong>the</strong><br />

additional 30 MW <strong>of</strong> unsupplied load. The substation should be located at or close to or close<br />

to <strong>the</strong> existing Junction Station # 4<br />

The following figure shows an overview <strong>of</strong> this substation.<br />

Figure 178: South West Substation<br />

9.5.1 Feeder SW-514<br />

Feeder 514 goes to <strong>the</strong> northwest <strong>of</strong> <strong>the</strong> South West S/S and is expected to be loaded at<br />

7.04 MVA. Figure 179 presents an overview <strong>of</strong> this feeder and drawing C-2 and C-3 in<br />

Appendix 4 presents it in much greater detail. This feeder supplies area which was earlier<br />

supplied by NW substation by feeders NW513 and NW517. This entire load has been shifted<br />

to this new feeder. A significant investment is augmentation indicated in project C2-P2. This<br />

was necessary to have a good interconnection between NW and SW substations.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 224


We present <strong>the</strong> associated projects below<br />

Project C3-P1a: Location: Map C 3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-4_7-1 NW-4_7-4 Overhead 185 180 Reconductor<br />

NW-4_7-4 NW-4_7-6 Overhead 185 100 Reconductor<br />

Project C3-P7: Location: Map C 3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

SW-514 NW-4_7-12-14 Cable 240 726 New feeder<br />

section.<br />

Project C2-P2: Location: Map C-2<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-4_7-12-14 NW-4_7-12-9 Overhead 185 270 Reconductor<br />

NW-4_7-12-9 NW-4_7-12-8 Overhead 185 50 Reconductor<br />

NW-4_7-12-8 NW-4_7-12-7 Overhead 185 100 Reconductor<br />

NW-4_7-12-7 NW-4_7-12-4 Overhead 185 170 Reconductor<br />

NW-4_7-12-4 NW-4_7-12 Overhead 185 180 Reconductor<br />

Project C3-P5: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-4_7-12 NW-4_7-11 Overhead 185 90 Reconductor<br />

NW-4_7-11 NW-4_7-6 Overhead 185 180 Reconductor<br />

Project C3-P3: Location: Map C-2<br />

From<br />

(node name)<br />

NW-4_7-39<br />

To<br />

(node name)<br />

NW-513-107-20-<br />

11<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 70 1460 New section<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 225


Figure 179: Overview <strong>of</strong> Feeder SW-514<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 226


9.5.2 Feeder SW-513<br />

Feeder 513 goes to <strong>the</strong> Nor<strong>the</strong>ast region and is expected to be loaded at 9.0 MVA. Figure 24<br />

presents an overview <strong>of</strong> this feeder and drawing C-3 in Appendix 4 presents it in much<br />

greater detail.<br />

Most <strong>of</strong> <strong>the</strong> investments in this region are related to streng<strong>the</strong>ning <strong>the</strong> interconnection to <strong>the</strong><br />

neighboring Breshna Kot S/S feeders and transferring load to <strong>the</strong> South West substation<br />

including <strong>the</strong> load <strong>of</strong> <strong>the</strong> <strong>Kabul</strong> University. A significant investment is <strong>the</strong> connection <strong>of</strong> <strong>the</strong><br />

existing feeders from Junction Station # 4 to <strong>the</strong> new South West substation.<br />

We present <strong>the</strong> projects associated with this feeder below<br />

Project C3-P11: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

SW-513 SW511 Cable 240 114 New section<br />

SW511 SW511-2 Cable 240 776 New section<br />

Project C 3-P 4: Location: Map C-3<br />

From<br />

(node name)<br />

NW-518-134<br />

To<br />

(node name)<br />

BK-Jamal maina-<br />

Red Cross<br />

Hospital<br />

NW-Pohantoon-<br />

Takhnic Sanawee<br />

No-1<br />

NW-Pohantoon-<br />

Takhnic Sanawee<br />

No-2<br />

NW-Pohantoon-<br />

Takhnic Sanawee<br />

No-2<br />

BK-Jamal maina-<br />

Jamal Mina<br />

type Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

Cable 120 296 New section<br />

Cable 95 176 Upgraded<br />

Cable 95 204 Upgraded<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 227


Figure 24: Overview <strong>of</strong> Feeder SW-513<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 228


9.5.3 Feeder SW-512<br />

Feeder 512 goes to <strong>the</strong> east and south region and is expected to be loaded at 8.50 MVA.<br />

Figure 25 presents an overview <strong>of</strong> this feeder and drawing C-3 and D-3 in Appendix 4<br />

presents it in much greater detail.<br />

This feeder takes part <strong>of</strong> <strong>the</strong> load served by currently by BK-519 that now falls under <strong>the</strong> area<br />

<strong>of</strong> influence <strong>of</strong> Southwest substation. Interconnecting sections to <strong>the</strong> nearby feeders are also<br />

some <strong>of</strong> <strong>the</strong> investments.<br />

The investments are described below<br />

Project C 3-P12: Location: Map C-3<br />

From<br />

(node name)<br />

SW exit SW-512<br />

To<br />

(node name)<br />

NW-4_6-Kote<br />

Sangi_SW512<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 186 Replaced<br />

Project C 3-P13: Location: Map C-3<br />

From<br />

(node name)<br />

NW-4_6-Kote<br />

Sangi_SW512<br />

BK-Debori-Debori<br />

TS<br />

BK-Debori-Old<br />

Bangashidar 1<br />

To<br />

(node name)<br />

BK-Debori-Debori<br />

TS<br />

BK-Debori-Old<br />

Bangashidar 1<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 896 Upgraded<br />

Cable 240 744 Upgraded<br />

BK-Debori-1 Cable 240 831 Upgraded<br />

Project C 3-P14: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

BK-Debori-1 N14828 Switch New switch<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 229


Figure 25: Overview <strong>of</strong> Feeder SW-512<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 230


Project C 3-P15 : Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

BK-Debori-1 BK-Debori-2 Overhead 185 28 Reconductor<br />

BK-Debori-2<br />

BK-Debori-New<br />

Bangashidar 1&2<br />

Cable 240 549 Upgraded<br />

Project D3 - P4: Location: Map D-3<br />

From<br />

(node name)<br />

BK-Debori-New<br />

Bangashidar 1&2<br />

To<br />

(node name)<br />

BK-Debori-Imam<br />

Zaman<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 120 256 Upgraded<br />

Project C 3-P16: Location: Map C-3<br />

From<br />

(node name)<br />

BK-Debori-New<br />

Bangashidar 1&2<br />

To<br />

(node name)<br />

NW-4_6-Sare-e-<br />

Kariz Qalahe<br />

shada<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 120 905 New<br />

Project D 3-P 7: Location: Map D-3<br />

From<br />

(node name)<br />

BK-Debori-Imam<br />

Zaman<br />

To<br />

(node name)<br />

BK-4_6-Masjidi<br />

Safed<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 120 494 New<br />

9.5.4 Feeder SW-511<br />

Feeder SW- 511 goes to <strong>the</strong> sou<strong>the</strong>rn region <strong>of</strong> South West S/S and is expected to be<br />

loaded at 9.1 MVA. Figure 26 presents an overview <strong>of</strong> this feeder and drawing C-3, D-3, C-2<br />

and D-2 in Appendix 4 presents it in much greater detail.<br />

The investments in this feeder are mostly interconnecting sections served by BK-519 and<br />

NW-518 to SW 511.<br />

Project C 3-P 8: Location: Map C-3<br />

From<br />

(node name)<br />

SW-511<br />

To<br />

(node name)<br />

NW-4_6-<br />

1_SW513<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 187 New<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 231


Project C 3-P 18: Location: Map C-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

NW-4_6-14 NW-Dashte e<br />

Barchee-8<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 240 75 New<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

232 Power Technologies International


Figure 26: Overview <strong>of</strong> Feeder SW-511<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 233


Project C 3-P 17: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-4_6-22-1 NW-4_6-22-4 Overhead 120 155 Reconductored<br />

NW-4_6-22-4 NW-4_6-22-5 Overhead 120 75 Reconductored<br />

NW-4_6-22-5 NW-4_6-22-12 Overhead 120 321 Reconductored<br />

NW-4_6-22-12<br />

NW-4_6-Sare-e-<br />

Kariz Qalahe<br />

shada<br />

Overhead 120 205 Reconductored<br />

9.5.5 Feeder SW-515<br />

Feeder SW-515 goes to <strong>the</strong> central and eastern region <strong>of</strong> South West S/S and is expected to<br />

be loaded at 8.3 MVA. Figure 27 presents an overview <strong>of</strong> this feeder and drawing C-3 in<br />

Appendix 4 presents it in much greater detail.<br />

Most <strong>of</strong> <strong>the</strong> investments in this feeder are directed to connecting <strong>the</strong> load served by feeders<br />

BK-519 and Bk-518 that falls within <strong>the</strong> area <strong>of</strong> influence <strong>of</strong> South West S/S to this new<br />

substation.<br />

The investments are described below:<br />

Project C 3-P 9: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

SW-515 SW514 Cable 240 105 added a<br />

feeder<br />

Project C 3-P 4a: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-518-134 BK-Ataturk-15 Cable 95 287 Connected<br />

Section to<br />

node BK-<br />

Ataturk-15 to<br />

feeder SW515<br />

instead <strong>of</strong> JS 4<br />

to this node<br />

and upgraded<br />

NW-518-129 BK-Denow- Cable - - New junction.<br />

Tangkash<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 234


Figure 27: Overview <strong>of</strong> Feeder SW-515<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 235


Project C 3-1: Location: Map C-3<br />

From<br />

(node name)<br />

BK-Ataturk-<br />

Ministry<br />

Agricultural<br />

To<br />

(node name)<br />

BK-Aqabe<br />

<strong>Kabul</strong>-Aqab<br />

Wez.Zeraat<br />

Barq<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 70 228 New Section<br />

9.5.6 Feeder SW-510<br />

Feeder SW-510 goes to <strong>the</strong> west region <strong>of</strong> <strong>the</strong> South West S/S and is expected to be loaded<br />

at 1.53 MVA. Figure 27 presents an overview <strong>of</strong> this feeder and drawing C-3 and C-2 in<br />

Appendix 4 presents it in much greater detail.<br />

This feeder was created to take some <strong>of</strong> <strong>the</strong> load <strong>of</strong> SW-514 feeder and to provide strong<br />

backup to feeder SW-514. Also it can become a point <strong>of</strong> supply to <strong>the</strong> un-served load in <strong>the</strong><br />

region.<br />

Project C 2-1: Location: Map C-3 and C-2<br />

From<br />

(node name)<br />

SW-510<br />

To<br />

(node name)<br />

NW-513-No-3<br />

Abrasani<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 120 3918 New section<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 236


Figure 28: Overview <strong>of</strong> Feeder SW-510<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 237


9.6 Short Term Investments for South West Substation<br />

South West substation will probably take approximately 3 or more years to develop, hence it<br />

is necessary to advance some <strong>of</strong> <strong>the</strong> investments identified above to adequately supply <strong>the</strong><br />

load in <strong>the</strong> area. Of course <strong>the</strong>se investments are not a substitute for <strong>the</strong> substation and in<br />

general <strong>the</strong> reliability <strong>of</strong> supply will not be <strong>the</strong> same, as <strong>the</strong> possibility <strong>of</strong> providing back-up is<br />

limited without this new substation. This comment, in general, applies to <strong>the</strong> short term<br />

system <strong>of</strong> all substations presented in this document.<br />

We describe <strong>the</strong>se investments below.<br />

9.6.1 Rearrangement <strong>of</strong> Junction Station # 4<br />

Junction Station # 4 should be rearranged as shown in Figure 180 to achieve an appropriate<br />

division <strong>of</strong> load between Breshna Kot and North West substations.<br />

Figure 180: Junction Station # 4<br />

9.6.2 Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

The following is a list <strong>of</strong> <strong>the</strong> investments that were identified as necessary in <strong>the</strong> medium term<br />

that are also necessary in <strong>the</strong> short term.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 238


Project C3-P1a: Location: Map C 3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-4_7-1 NW-4_7-4 Overhead 185 180 Reconductor<br />

NW-4_7-4 NW-4_7-6 Overhead 185 100 Reconductor<br />

Project C3-P5: Location: Map C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-4_7-12 NW-4_7-11 Overhead 185 90 Reconductor<br />

NW-4_7-11 NW-4_7-6 Overhead 185 180 Reconductor<br />

Project C3-P3: Location: Map C-2<br />

From<br />

(node name)<br />

NW-4_7-39<br />

To<br />

(node name)<br />

NW-513-107-20-<br />

11<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 70 1460 New section<br />

These investments are used to connect to Junction Station # 8 approximately 4 MW <strong>of</strong> load<br />

that is being supplied from North West S/S resulting in extremely low voltages (less than 70<br />

% nominal) and heavy overloads (over 200% in some cases)<br />

The following figures show <strong>the</strong>se projects.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 239


Figure 181: Project C3-P1a and Project C3-P5 (Map C-3)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

240 Power Technologies International


Figure 182: Project C3-P3<br />

9.6.3 Voltage Support<br />

These is a group <strong>of</strong> transformers associated with Junction Station # 8 in <strong>the</strong> short term that<br />

have low voltage as <strong>the</strong>y are located at <strong>the</strong> end <strong>of</strong> a long feeders that cannot be easily<br />

reinforced before <strong>the</strong> entry <strong>of</strong> South West Substation. In this case we are recommending<br />

installing capacitors as shown below.<br />

It should be indicated that if <strong>the</strong> power factor <strong>of</strong> <strong>the</strong> load is below 0.9 it is possible that more<br />

capacitors will be necessary.<br />

Project P-ST-C3-1: Location: Map C-3<br />

Node Equipment Size type<br />

Capacitor 1200 kVar Switched<br />

Project P-ST-C3-2: Location: Map C-3<br />

Node Equipment Size type<br />

NW-513-107-20-<br />

11<br />

NW-513-107-27-<br />

39<br />

Capacitor 1200 kVar Switched<br />

Project P-ST-C3-3: Location: Map C-3<br />

Node Equipment Size type<br />

NW-513-107-37 Capacitor 1200 kVar Switched<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 241


The following figures highlight <strong>the</strong>se projects.<br />

Figure 183: Projects P-ST-C3-1 and P-ST-C3-3<br />

Figure 184: Projects P-ST-C3-2<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

242 Power Technologies International


9.7 Medium Term Investments for East Substation<br />

East substation is an existing substation and has 9 feeders associated with it. It serves largely<br />

rural areas and some <strong>of</strong> its feeders were extensively reconfigured by reconnecting <strong>the</strong>m to<br />

Central and Breshna Kot substations resulting in smaller distances from substation to load.<br />

East is expected to remain with a load <strong>of</strong> approximately 42 MW.<br />

The following figure presents an overview <strong>of</strong> East substations.<br />

Figure 185: Overview <strong>of</strong> East Substation<br />

9.7.1 Feeder E-511<br />

Feeder E-511 goes to <strong>the</strong> north-east region <strong>of</strong> <strong>the</strong> East SS and is expected to be loaded at<br />

7.56 MVA. Figure 186 presents an overview <strong>of</strong> this feeder and drawing B-5 and A-5 in<br />

Appendix 4 presents it in much greater detail.<br />

Major investments have been made in upgrading this feeder so that it can take some load<br />

form <strong>the</strong> heavily loaded E-519 feeder. Also, a strong interconnection between E-519 and E-<br />

511 is included in <strong>the</strong>se projects.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 243


Project P-B5-3-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-511 E-511-2 Cable 240 1218 Upgraded<br />

E-511-2 E-511-2 Cable 240 631 Upgraded<br />

Project P-B5-16-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-511-2 E-F-519 -39 Cable 95 118 New section<br />

Project P B5-17 -: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-511-2<br />

E-F-519 -<strong>Afghan</strong>i Overhead 70 245 New<br />

construction<br />

Company<br />

Project P-B5-4 -: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-511-16 E-511-16-35 Overhead 185 670 Reconductor<br />

E-511-2 E-511-16-35 Overhead 185 856 Reconductor<br />

ed<br />

Project P-B5-5 -: Location: Map B-5<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

E-511-16-35 E-F-519 - Refa<br />

Construction<br />

Company<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 185 1078 New section<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

244 Power Technologies International


Figure 186: Overview <strong>of</strong> Feeder E-511<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 245


9.7.2 Feeder E-513<br />

Feeder E- 513 goes to <strong>the</strong> northwest region <strong>of</strong> <strong>the</strong> East S/S and is expected to be loaded at<br />

5.46 MVA. Figure 187 presents an overview <strong>of</strong> this feeder and drawing B-5 A-5 and A-4 in<br />

Appendix 4 presents it in greater detail.<br />

There is no major investment except for a switching junction provided near <strong>the</strong> place where it<br />

passes close to E-521. Using this interconnection some load from E-521 has been shifted to<br />

E-513.<br />

Project P-B5-10-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-513-19-2 E-513-19-3 Switch - - New<br />

9.7.3 Feeder E-523<br />

Feeder 523 goes to <strong>the</strong> south region <strong>of</strong> <strong>the</strong> East S/S and is expected to be loaded at 2.80<br />

MVA. Figure 188 presents an overview <strong>of</strong> this feeder and drawing B-5 C-5 and D-5 in<br />

Appendix 4 presents it in much greater detail.<br />

The only investment in this section is <strong>the</strong> interconnection to E-515.<br />

Project P-D5-1-: Location: Map D-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-523-94 E-515-94 Overhead 185 993 New section<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 246


Figure 187: Overview <strong>of</strong> Feeder E-513<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 247


Figure 188: Overview <strong>of</strong> Feeder E-523<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 248


9.7.4 Feeder E-519<br />

Feeder E-519 goes to <strong>the</strong> East and central region <strong>of</strong> <strong>the</strong> East SS and is expected to be<br />

loaded at 11.13 MVA, making it one <strong>of</strong> <strong>the</strong> heaviest loaded feeders in this substation. Also<br />

this feeder covers mostly rural areas making it difficult to transfer load out <strong>of</strong> it as <strong>the</strong>re are no<br />

o<strong>the</strong>r facilities nearby in most <strong>of</strong> its route.<br />

Figure 189 presents an overview <strong>of</strong> this feeder and drawing B-5 B-6 B-7 and A-7 in Appendix<br />

4 presents it in h greater detail.<br />

Major investments in this feeder consist <strong>of</strong> reconductoring to attend <strong>the</strong> increased load in <strong>the</strong><br />

feeder plus a few new sections to bypass some load which has been transferred to E-511.<br />

Additionally we are recommending 900 kVAr switched capacitor bank to support <strong>the</strong> voltage<br />

close to <strong>the</strong> end <strong>of</strong> <strong>the</strong> feeder. .<br />

Project P-B5-1-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

S/S East E-519 Cable 240 66.82 Upgraded<br />

Project P-B5-2-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-519 E-F-519 -3 Overhead 185 31 Reconductor<br />

E-F-519 -3 E-F-519 -6 Overhead 185 144 Reconductor<br />

E-F-519 -6 E-F-519 -10 Overhead 185 472 Reconductor<br />

E-F-519 -10 E-F-519 -11 Overhead 185 48 Reconductor<br />

E-F-519 -11 E-F-519 -20 Overhead 185 397 Reconductor<br />

E-F-519 -20 E-F-519 -21 Overhead 185 31 Reconductor<br />

E-F-519 -21 E-F-519-35a Overhead 185 757 Reconductor<br />

E-F-519-35a E-F-519 -39-2 Overhead 185 203 Reconductor<br />

Project P-B5-14-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-F-519 -39-2 E-F-519 -51-2 Overhead 185 675 New section<br />

E-F-519 -39 E-F-519 -39-2 Switch - - New<br />

Project P-B5-6 Location: Map B-5<br />

Node Equipment Size type<br />

E-F-519 -178 Capacitor 900 kVar Switched<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 249


Figure 189: Overview <strong>of</strong> Feeder E-519<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 250


9.7.5 Feeder E-521<br />

Feeder 521 goes to <strong>the</strong> North-East region <strong>of</strong> <strong>the</strong> East SS and is expected to be loaded at<br />

9.07 MVA. Figure 190 presents an overview <strong>of</strong> this feeder and drawing B-5 B-4 and A-5 in<br />

Appendix 4 presents it in much greater detail.<br />

We present and discuss <strong>the</strong> investments in this feeder below:<br />

Project P-B5-8-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-521 E-521-1 Cable 240 496 Upgraded<br />

Project P-B5-9-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-521-1 E-521-5 Overhead 185 241 Reconductor<br />

E-521-5 E-521-8 Overhead 185 194 Reconductor<br />

E-521-8 E-521-15 Overhead 185 181 Reconductor<br />

E-521-15 E-521-19 Overhead 185 472 Reconductor<br />

E-521-19 E-521-25 Overhead 185 332 Reconductor<br />

E-521-25 E-521-28 Overhead 185 255 Reconductor<br />

The investments above are necessary to reinforce <strong>the</strong> feeder and to attend <strong>the</strong> increased<br />

load.<br />

Project P-B5-15-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-521-1 E-521-2 Cable 95 427 New section<br />

E-F-519 -10-2 E-521-2 Switch - - New<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 251


Figure 190: Overview <strong>of</strong> Feeder E-521<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 252


9.7.6 Feeder E-531<br />

Feeder 531 goes to <strong>the</strong> south-West region <strong>of</strong> <strong>the</strong> East SS and is expected to be loaded at<br />

9.07 MVA. Figure 191 presents an overview <strong>of</strong> this feeder and drawing B-5 C-5 and C-4 in<br />

Appendix 4 presents it in m detail.<br />

There is no investment in this feeder.<br />

9.7.7 Feeder E-536<br />

Feeder 536 goes to <strong>the</strong> south-East region <strong>of</strong> <strong>the</strong> East SS and is expected to be loaded at<br />

0.01 MVA. Figure 192 presents an overview <strong>of</strong> this feeder and drawing B-5 C-5 and C-6 in<br />

Appendix 4 presents it in much greater detail.<br />

There is no investment in this feeder<br />

9.7.8 Feeder E-541<br />

Feeder 541 goes to <strong>the</strong> west region <strong>of</strong> <strong>the</strong> East SS and is expected to be loaded at 7.20 MVA. Figure<br />

193 presents an overview <strong>of</strong> this feeder and drawing B-5 and B-4 in Appendix 4 presents it in much<br />

greater detail.<br />

Major investments in this section are in reconductoring its initial sections and providing<br />

interconnections to <strong>the</strong> nearby feeders, namely E-521.<br />

Project P-B5-11-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541 E-541-2 Cable 240 128 Upgraded<br />

Project P-B5-12-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-541-Hodkhel-1 E-541-7 Overhead 185 165 Reconductor<br />

E-541-7 E-541-8 Overhead 185 81 Reconductor<br />

E-541-8 E-541-12 Overhead 185 104 Reconductor<br />

E-541-12 E-541-13 Overhead 185 73 Reconductor<br />

E-541-13 E-541-16 Overhead 185 80 Reconductor<br />

E-541-16 E-541-37 Overhead 185 162 Reconductor<br />

E-541-37 E-541-69 Overhead 185 883 Reconductor<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 253


Figure 191: Overview <strong>of</strong> Feeder E-531<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 254


Figure 192: Overview <strong>of</strong> Feeder E-536<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 255


Figure 193: Overview <strong>of</strong> Feeder E-541<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 256


Project P-B5-7-: Location: Map B-5<br />

From<br />

(node name)<br />

E-541-69<br />

To<br />

(node name)<br />

E-521-Tawlid Aard<br />

Janat<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Overhead 185 170 New section<br />

Project P-D5-1: Location: Map B-4<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-F-519 -23 E-541-70 Overhead 185 156 New section<br />

and switch<br />

9.7.9 Feeder E-515<br />

Feeder 515 goes to <strong>the</strong> sou<strong>the</strong>rn region <strong>of</strong> <strong>the</strong> East SS and is expected to be loaded at 0.95<br />

MVA. Figure 194 presents an overview <strong>of</strong> this feeder and drawing B-5 C-5and C-4 in<br />

Appendix 4 presents it in much greater detail. There are no investments in this feeder.<br />

9.8 Short Term Investments for East Substation<br />

9.8.1 Conductors with reduced cross sections.<br />

No cables with inconsistent cross sections were found in <strong>the</strong> medium voltage system served<br />

by East substation<br />

9.8.2 Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

As shown in <strong>the</strong> network analysis section <strong>of</strong> this report <strong>the</strong> feeders coming out <strong>of</strong> East<br />

substation will become heavily overloaded in <strong>the</strong> short term if <strong>the</strong>y are not reinforced. This is<br />

particularly true for feeder E-519 (160% loading) and feeder E-541 (335 % loading.)<br />

Feeder E-541 overload was solved by transferring part <strong>of</strong> <strong>the</strong> load served to o<strong>the</strong>r feeders<br />

associated with Central (currently North) and Breshna Kot substations with investments<br />

described above. The overloads in feeder E-519 are proposed to be solved with <strong>the</strong><br />

implementation in <strong>the</strong> short term <strong>of</strong> <strong>the</strong> following investments which were identified for <strong>the</strong><br />

medium term<br />

Project P-B5-14-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-F-519 -39-2 E-F-519 -51-2 Overhead 185 675 New section<br />

E-F-519 -39 E-F-519 -39-2 Switch - - New<br />

Project P-B5-16-: Location: Map B-5<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type<br />

Cross Section<br />

mm 2<br />

Length<br />

mts<br />

Action<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 257


E-511-2 E-F-519 -39 Cable 95 118 New section<br />

The projects above allow transferring approximately 1.1 MW <strong>of</strong> load from feeder E-519 to<br />

feeder E-511. Figure 195 shows an overview <strong>of</strong> <strong>the</strong>se investments.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

258 Power Technologies International


Figure 194: Overview <strong>of</strong> Feeder E-515<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 259


Figure 195: Project P-B5-14<br />

Project P-B5-15-: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-521-1 E-521-2 Cable 95 427 New section<br />

E-F-519 -10-2 E-521-2 Switch - - New<br />

These investments allow transferring 3 MW <strong>of</strong> load from E-519 to E-521 and are shown in<br />

Figure 196.<br />

Project P-B5-5 -: Location: Map B-5<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

E-511-16-35 E-F-519 - Refa Overhead 185 1078 New section<br />

Construction<br />

Company<br />

This investment transfers a large approximately 4.4 MW <strong>of</strong> load from E-519 to E-511 that has<br />

spare capacity and is shown in Figure 197.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 260


Figure 196: Project P-B5-15<br />

Figure 197: Project P-B5-5<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 261


9.9 Medium Term Investments for North West Substation<br />

This is an existing substation and <strong>the</strong>re are no major changes at <strong>the</strong> substation itself, but as<br />

indicated before this substation is over extended and its service area overlaps with North S/S.<br />

Therefore we reduce <strong>the</strong> extension <strong>of</strong> <strong>the</strong> supplied area in <strong>the</strong> south with <strong>the</strong> new South West<br />

substation and in <strong>the</strong> East with transfers to North and Central substations. Also <strong>the</strong><br />

overlapping with <strong>the</strong> areas covered by North and North West substations and <strong>the</strong> circuit<br />

overloads are resolved.<br />

The following figure presents an overview <strong>of</strong> North West Substation<br />

Figure 198: North West Substation<br />

9.9.1 Feeder NW-513, NW-517 and NW-518<br />

Feeder NW-513, NW-517 and NW-518 cover <strong>the</strong> South and West <strong>of</strong> <strong>the</strong> area <strong>of</strong> influence <strong>of</strong><br />

North West Substation. All three run south toge<strong>the</strong>r for about 4 km before <strong>the</strong>y go apart and<br />

supply load. It is possible to supply all connected load with any two <strong>of</strong> <strong>the</strong> feeders (and a<br />

supporting line from South West Substation) by switching load to each o<strong>the</strong>r without <strong>the</strong> need<br />

<strong>of</strong> building an additional line from North West substation. Because <strong>of</strong> this interconnection, <strong>the</strong><br />

descriptions <strong>of</strong> <strong>the</strong> projects <strong>of</strong> <strong>the</strong>se three feeders are combined in one section.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

262 Power Technologies International


The three feeders are expected to have an overall loading <strong>of</strong> 25 MW. The allocation under<br />

normal operation condition is: NW-513: 9.6 MW, NW-517: 6.7 MW and NW-518: 8.9 MW.<br />

Figure 199 to Figure 201 present an overview <strong>of</strong> <strong>the</strong> feeder and drawings A-1, A-2, A-3, B-1,<br />

B-2, B-3, C-2 and C-3 in Appendix D present it in much greater detail.<br />

Figure 199: Overview <strong>of</strong> Feeder NW-517<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 263


Figure 200: Overview <strong>of</strong> Feeder NW-513<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 264


Figure 201: Overview <strong>of</strong> Feeder NW-518<br />

We describe <strong>the</strong> investments associated with <strong>the</strong>se feeders below:<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 265


Project P-B2-1a: Location: Map B-2<br />

Node Equipment Size type<br />

NW-513-107 Voltage Regulator 300 Amps 32 steps +-<br />

minimum 10%<br />

NW-513-95 Capacitor 1200 kVar Switched<br />

NW-513-92 Capacitor 1200 kVar Switched<br />

Feeder F-513 is with over 18 km in length which is too long to supply all <strong>the</strong> assumed load<br />

without any measures to maintain <strong>the</strong> voltage. Therefore a voltage regulator (on <strong>the</strong><br />

maximum tap to boost <strong>the</strong> voltage by 10%) and two capacitor banks (each 1200 kVAr) are<br />

suggested.<br />

Project P-B2-1: Location: Map A-3, B-3, B-2, C-2<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-513 NW-513-2 Cable 240 178 Reconductor<br />

NW-513-2 NW-513-5 Overhead 185 170 Reconductor<br />

NW-513-5 NW-513-13 Overhead 185 619 Reconductor<br />

NW-513-13 NW-513-32 Overhead 185 1480 Reconductor<br />

NW-513-32 NW-513-43 Overhead 185 527 Reconductor<br />

NW-513-43 NW-513-56 Overhead 185 929 Reconductor<br />

NW-513-56 NW-513-57 Overhead 185 26 Reconductor<br />

NW-513-57 NW-513-58 Overhead 185 121 Reconductor<br />

NW-513-58 NW-513-61 Overhead 185 208 Reconductor<br />

NW-513-61 NW-513-64 Overhead 185 206 Reconductor<br />

NW-513-64 NW-513-72 Overhead 185 491 Reconductor<br />

NW-513-72 NW-513-74 Overhead 185 114 Reconductor<br />

NW-513-74 NW-513-79 Overhead 185 318 Reconductor<br />

NW-513-79 NW-513-80 Overhead 185 75 Reconductor<br />

NW-513-80 NW-513-84 Overhead 185 255 Reconductor<br />

NW-513-84 NW-513-86 Overhead 185 138 Reconductor<br />

NW-513-86 NW-513-92 Overhead 185 399 Reconductor<br />

NW-513-92 NW-513-93 Overhead 185 33 Reconductor<br />

NW-513-93 NW-513-95 Overhead 185 148 Reconductor<br />

NW-513-95 NW-513-96 Overhead 185 82 Reconductor<br />

NW-513-96 NW-513-101 Overhead 185 354 Reconductor<br />

NW-513-101 NW-513-107 Overhead 185 439 Reconductor<br />

NW-513-107a NW-513-Deh Overhead 120 596 Reconductor<br />

NW-513-Deh<br />

Araban hawahe<br />

Araban hawahe<br />

NW-513-Deh<br />

Araban Monari<br />

Overhead 120 1295 Reconductor<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

266 Power Technologies International


From<br />

(node name)<br />

NW-513-Deh<br />

Araban Monari<br />

To<br />

type Cross Section Length Action<br />

(node name)<br />

mm 2<br />

mts<br />

NW-513-143 Overhead 120 633 Reconductor<br />

NW-513-143 NW-513-149 Overhead 120 413 Reconductor<br />

NW-513-149 NW-513-159 Overhead 120 666 Reconductor<br />

NW-513-159 NW-513-172 Overhead 70 861 Reconductor<br />

NW-513-172 NW-513-Bande Overhead 70 414 Reconductor<br />

NW-513-Bande<br />

Qargha<br />

Qargha<br />

NW-513-181 Overhead 70 294 Reconductor<br />

NW-513-181 NW-513-182 Overhead 70 93 Reconductor<br />

NW-513-182 NW-513-187 Overhead 70 474 Reconductor<br />

NW-513-187 NW-513-Deh Overhead 70 181 Reconductor<br />

Ponba<br />

To be able to supply 10 MW load which is connected to Feeder NW-513 it is necessary to<br />

reconductor over 13 km overhead line as shown above. An alternative is to build a parallel<br />

feeder, but this new facility would need to follow <strong>the</strong> fNW-513 most <strong>of</strong> <strong>the</strong> way. Hence<br />

reconductoring is suggested.<br />

Project P-B3-1: Location: Map B-3 and C-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

type<br />

Cross<br />

Section mm 2<br />

Length<br />

mts<br />

Action<br />

NW-517-56 NW-517-56.1 Overhead 120 40 new<br />

NW-517-56.1 NW-517-56.2 Overhead 120 11 new<br />

NW-517-56.2 NW-517-56.3 Overhead 120 216 new<br />

NW-517-56.3 NW-517-56.4 Overhead 120 806 new<br />

NW-517-56.4 NW-517-56.5 Overhead 120 321 new<br />

NW-517-56.1 NW-518-66 Switch new<br />

NW-513-58 NW-517-56.2 Reconnect to NW<br />

517<br />

NW-518-61 NW-517-56.3 Reconnect to NW<br />

517<br />

NW-518-61 NW-517-56.3 Reconnect to NW<br />

517<br />

NW-513-74 NW-517-56.4 Reconnect to NW<br />

517<br />

NW-517-56.5 NW-517-56.5 Reconnect to NW<br />

517<br />

These measures relieve <strong>the</strong> overloads in Feeder NW-513 by transferring to NW-517.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 267


Project P-B2-2: Location: Map B-3 and C-3<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-518-59b NW-518-59A Switch new<br />

NW-518-59b NW-517-56a Switch new<br />

NW-518-61.1a NW-518-61.1 Switch new<br />

NW-518-61.1a NW-517-56a Switch new<br />

NW-518-65 NW-513-57 Switch new<br />

Project P-B2-3 provides <strong>the</strong> possibility to switching loads between <strong>the</strong> three feeders.<br />

Project P-C3-1: Location: Map C-3<br />

From<br />

(node name)<br />

NW-518-108<br />

To<br />

(node name)<br />

N-529_JS5_4_5-<br />

Borj Siloy Markaz<br />

type Cross Section Length Action<br />

mm 2<br />

mts<br />

Cable 70 272 272<br />

This last investment transfers to NW-518 load currently served by N-529 that falls under <strong>the</strong><br />

area <strong>of</strong> influence <strong>of</strong> North West.<br />

9.9.2 Feeder NW-514<br />

Feeder NW-514 goes sou<strong>the</strong>ast <strong>of</strong> North West Substation and is expected to be loaded at<br />

7.2 MW. Figure 202 presents an overview <strong>of</strong> this feeder and drawing A-3, and B-3 in<br />

Appendix D presents it in much greater detail.<br />

We describe <strong>the</strong> project associated with this feeder below.<br />

Project P-A3-3: Location: Map A-3<br />

From To<br />

Type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

Mts<br />

NW-514-18 NW-515-18 switch new<br />

This switch is necessary to create a connection between feeders NW-514 and NW-515 at<br />

this point. This connection will be normally open and used during emergencies.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

268 Power Technologies International


Figure 202: Overview <strong>of</strong> Feeder NW-514<br />

9.9.3 Feeder NW-515<br />

Feeder NW-515 goes sou<strong>the</strong>ast (north <strong>of</strong> NW-514) <strong>of</strong> North West Substation, and is<br />

expected to be loaded at 1.9 MVA. Figure 203 presents an overview <strong>of</strong> this feeder and<br />

drawing A-3, and B-3 in Appendix D presents it in much greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 269


Figure 203: Overview <strong>of</strong> Feeder NW-515<br />

Because <strong>of</strong> <strong>the</strong> relatively low loading this feeder it is able to provide back up to NW-525 as<br />

well as N-514 during emergency conditions.<br />

We describe <strong>the</strong> projects associated with this feeder below.<br />

Project P-A3-3a Location: Map A-3<br />

From To<br />

Type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

Mts<br />

NW-515-15 NW-525-15 switch new<br />

This switch is necessary to create a connection between feeders NW-515 and NW-525 at<br />

this point. This connection will be normally open and used during emergencies.<br />

Also Project P-A3-3 <strong>of</strong> feeder NW-514 affects this feeder.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

270 Power Technologies International


9.9.4 Feeder NW-516<br />

Feeder NW-516 goes northwest <strong>of</strong> North West Substation, and is expected to be loaded at<br />

1.4 MW. Figure 204 presents an overview <strong>of</strong> this feeder and drawing A-3, and B-3 in<br />

Appendix D presents it in much greater detail.<br />

There are no investments in this feeder<br />

9.9.5 Feeder NW-524<br />

Feeder NW-524 goes nor<strong>the</strong>ast <strong>of</strong> North West Substation, and is expected to be loaded at<br />

6.9 MW. Figure 205 presents an overview <strong>of</strong> this feeder and drawing A-3 in Appendix D<br />

presents it in much greater detail.<br />

We describe <strong>the</strong> project associated with this feeder below.<br />

Project P-A3-7 Location: Map A-3<br />

From To<br />

Type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

Mts<br />

NW-524-32 NW-524-32 Overhead 70 272 reconductor<br />

NW-524-41 NW-524-52 Overhead 70 504 reconductor<br />

NW-524-52 NW-524-56 Overhead 70 203 reconductor<br />

NW-524-56 NW-526-21 Overhead 120 530 new<br />

These investments will reinforce this feeder to attend its connected load. Also <strong>the</strong> last section<br />

creates an interconnection between NW-524 and NW-526 which allows to for mutual support<br />

during emergencies.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 271


Figure 204: Overview <strong>of</strong> Feeder NW-516<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 272


Figure 205: Overview <strong>of</strong> Feeder NW-524<br />

9.9.6 Feeder NW-525<br />

Feeder NW-525 goes east <strong>of</strong> North West substation, and is expected to be loaded at 5.7<br />

MW. Figure 206 presents an overview <strong>of</strong> this feeder and drawings A-3 in Appendix D<br />

presents it in much greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 273


Figure 206: Overview <strong>of</strong> Feeder NW-525<br />

This feeder currently serves load that is within North substation’s area <strong>of</strong> influence, but it<br />

passes relatively close to areas where <strong>the</strong>re are loads that are feed from North (feeder N-<br />

527) inside North West’s area <strong>of</strong> influence. Therefore with <strong>the</strong> investments below <strong>the</strong>sis last<br />

load is reconnected to this feeder that would o<strong>the</strong>rwise become unloaded as its load is taken<br />

over by N-514 from North. This feeder loading is expected to be 5.7 MW.<br />

Project P-A3-2: Location: Map A-3<br />

From To<br />

Type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

Mts<br />

NW-525-15 N-527-32 Overhead 185 1529 new<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

274 Power Technologies International


9.9.7 Feeder NW-526 and NW-527<br />

Feeder NW-526 and NW-527 are going nor<strong>the</strong>ast <strong>of</strong> North West substation, and are<br />

expected to be loaded at 11.1 MW (5.5 MW at NW-526 and 5.4 MW at NW-527). The<br />

mainlines <strong>of</strong> <strong>the</strong>se feeders go parallel all <strong>the</strong> time and <strong>the</strong> proposed project contains<br />

measures to switch <strong>the</strong> load between <strong>the</strong>se two feeders. Figure 207 and Figure 208 presents<br />

an overview <strong>of</strong> this feeder and drawings A-3 in Appendix D presents it in much greater detail.<br />

Figure 207: Overview <strong>of</strong> Feeder NW-526<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 275


Figure 208: Overview <strong>of</strong> Feeder NW-527<br />

We describe below <strong>the</strong> projects associated with this feeder which are basically geared<br />

towards making connections between <strong>the</strong>m.<br />

Project P-A3-1: Location: Map A-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

NW-527-40 NW-526-40 switch new<br />

Action<br />

9.10 Short Term Investments for North West Substation<br />

9.10.1 Conductors with reduced cross sections.<br />

In Section 4 it was mentioned that <strong>the</strong>re were several cables/conductors whose cross section<br />

was inconsistent with <strong>the</strong> network design and we proposed a new minimum cross section for<br />

those cables/conductors. In particular for this substation feeder NW-518 seems to have a<br />

very small cross section (70 sqmm) because even considering that this feeder should<br />

have185 sqmm conductor it would be currently overloaded. Table 46 shows <strong>the</strong> conductors<br />

in question and <strong>the</strong>ir replacement / reconductoring must be a priority. Note that feeder N-518<br />

is still overloaded with a 185 sqmm conductor, but with <strong>the</strong> investments presented above for<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

276 Power Technologies International


<strong>the</strong> short term (e.g. transferring <strong>the</strong> load <strong>of</strong> <strong>the</strong> University to Breshna Kot) this feeder would<br />

have acceptable loadings; provided that it has a 185 sqmm conductor..<br />

9.10.2 Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

As shown in <strong>the</strong> network analysis section <strong>of</strong> this report <strong>the</strong> feeders coming out <strong>of</strong> North West<br />

substation would become extremely overloaded (over 270% loading) if <strong>the</strong>y were to supply<br />

<strong>the</strong> estimated load in <strong>the</strong> system simultaneously. Also some <strong>of</strong> <strong>the</strong> feeders (NW-513 in<br />

particular) are very long and do not have voltage compensation which results in unacceptably<br />

low voltages.<br />

In order to solve <strong>the</strong>se issues some <strong>of</strong> <strong>the</strong> medium term investments presented above need<br />

to be implemented in <strong>the</strong> short term. These investments are described below and are in<br />

addition to <strong>the</strong> resolving <strong>of</strong> <strong>the</strong> issues with <strong>the</strong> conductors with reduced cross sections (see<br />

previous section.) Also <strong>the</strong>se investments need to be complemented with <strong>the</strong> short term<br />

investments described for North and Breshna Kot.<br />

Project P-B2-1a: Location: Map B-2<br />

Node Equipment Size type<br />

NW-513-107 Voltage Regulator 300 Amps<br />

minimum<br />

32 steps +-<br />

10%<br />

Project P-B2-1: Location: Map A-3, B-3, B-2, C-2<br />

From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-513 NW-513-2 Cable 240 178 Reconductor<br />

NW-513-2 NW-513-5 Overhead 185 170 Reconductor<br />

NW-513-5 NW-513-13 Overhead 185 619 Reconductor<br />

NW-513-13 NW-513-32 Overhead 185 1480 Reconductor<br />

NW-513-32 NW-513-43 Overhead 185 527 Reconductor<br />

NW-513-43 NW-513-56 Overhead 185 929 Reconductor<br />

NW-513-56 NW-513-57 Overhead 185 26 Reconductor<br />

NW-513-57 NW-513-58 Overhead 185 121 Reconductor<br />

NW-513-58 NW-513-61 Overhead 185 208 Reconductor<br />

NW-513-61 NW-513-64 Overhead 185 206 Reconductor<br />

NW-513-64 NW-513-72 Overhead 185 491 Reconductor<br />

NW-513-72 NW-513-74 Overhead 185 114 Reconductor<br />

NW-513-74 NW-513-79 Overhead 185 318 Reconductor<br />

NW-513-79 NW-513-80 Overhead 185 75 Reconductor<br />

NW-513-80 NW-513-84 Overhead 185 255 Reconductor<br />

NW-513-84 NW-513-86 Overhead 185 138 Reconductor<br />

NW-513-86 NW-513-92 Overhead 185 399 Reconductor<br />

NW-513-92 NW-513-93 Overhead 185 33 Reconductor<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 277


From To<br />

type Cross Section Length Action<br />

(node name) (node name)<br />

mm 2<br />

mts<br />

NW-513-93 NW-513-95 Overhead 185 148 Reconductor<br />

NW-513-95 NW-513-96 Overhead 185 82 Reconductor<br />

NW-513-96 NW-513-101 Overhead 185 354 Reconductor<br />

NW-513-101 NW-513-107 Overhead 185 439 Reconductor<br />

NW-513-107a NW-513-Deh Overhead 120 596 Reconductor<br />

NW-513-Deh<br />

Araban hawahe<br />

NW-513-Deh<br />

Araban Monari<br />

Araban hawahe<br />

NW-513-Deh<br />

Araban Monari<br />

Overhead 120 1295 Reconductor<br />

NW-513-143 Overhead 120 633 Reconductor<br />

NW-513-143 NW-513-149 Overhead 120 413 Reconductor<br />

NW-513-149 NW-513-159 Overhead 120 666 Reconductor<br />

NW-513-159 NW-513-172 Overhead 70 861 Reconductor<br />

NW-513-172 NW-513-Bande Overhead 70 414 Reconductor<br />

NW-513-Bande<br />

Qargha<br />

Qargha<br />

NW-513-181 Overhead 70 294 Reconductor<br />

NW-513-181 NW-513-182 Overhead 70 93 Reconductor<br />

NW-513-182 NW-513-187 Overhead 70 474 Reconductor<br />

NW-513-187 NW-513-Deh Overhead 70 181 Reconductor<br />

Ponba<br />

Figure 209 to Figure 211 show an overview <strong>of</strong> <strong>the</strong>se investments.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

278 Power Technologies International


Table 46: Conductors with Reduced cross sections in North West Substation<br />

Original<br />

x-Section<br />

[mm²] Rating Conductor Type<br />

Replacement<br />

Minimum<br />

x-Section<br />

[mm²]<br />

Recommende<br />

d x-Section<br />

[mm²]<br />

Estimated<br />

Loading<br />

Network 2007 Conditions<br />

Loading with<br />

Current<br />

Conductor<br />

Loading with<br />

Rcom'd<br />

Conductor<br />

Substation Feeder From To Conductor Type<br />

Rating<br />

North West 514 NW-514-6 NW-514-7 Overhead 70 270 Overhead 120 120 365 399 148% 109%<br />

North West 514 NW-514-7 NW-514-10 Overhead 70 270 Overhead 120 120 365 399 148% 109%<br />

North West 518 S/S North West NW-518 3 Cables on Duct 150 425 1 Cable per Duct 185 185 490 606 143% 124%<br />

North West 518 NW-518 NW-518-7 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-7 NW-518-18 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-18 NW-518-26 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-26 NW-518-32 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-32 NW-518-40 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-40 NW-518-47 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-47 NW-518-51 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-51 NW-518-52 Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-52 NW-518-59A Overhead 70 270 Overhead 185 185 490 606 225% 124%<br />

North West 518 NW-518-59A NW-518-61.1 Overhead 70 270 Overhead 185 185 490 591 219% 121%<br />

North West 518 NW-518-65 NW-518-61.1 Overhead 70 270 Overhead 185 185 490 572 212% 117%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 279


Figure 209: Project P-B2-1 – First Section Out <strong>of</strong> Substation<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 280


Figure 210: Project P-B2-1 – Second Section<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 281


Figure 211: Project P-B2-1 – Third Section<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

282 Power Technologies International


9.11 Medium Term Investments for North Substation<br />

This is an existing substation. One new feeder going north has been added. The area<br />

serviced by this substation was reduced mainly through transfers to <strong>the</strong> new Central<br />

substation. Also <strong>the</strong> overlapping <strong>of</strong> <strong>the</strong> areas covered by North and North West substations<br />

was cleared. The following figure shows an overview <strong>of</strong> North S/S, where we can observe<br />

that it has approximately 75 MW <strong>of</strong> load connected (including losses.)<br />

Figure 212: North Substation<br />

9.11.1 Feeder N-511<br />

N-511 is a new feeder going directly north for 2 km from North substation parallel to feeder N-<br />

513 and <strong>the</strong>n to <strong>the</strong> West. It is expected to be loaded at 10.9 MVA. Figure 213 presents an<br />

overview <strong>of</strong> this feeder and drawing A-3 in Appendix D presents it in greater detail.<br />

The investments in this feeder are basically geared towards taking part <strong>of</strong> <strong>the</strong> load served by<br />

N-513, and NW-526.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 283


Figure 213: Overview <strong>of</strong> Feeder N-511<br />

We describe <strong>the</strong> project associated with this feeder below.<br />

Project P-A3-5: Location: Map A-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

N-511 N-511-2 Overhead 185 837 new<br />

N-511-2 N-511-3 Overhead 185 365 new<br />

N-511-3 N-511-4 Overhead 185 757 new<br />

N-511-4 N-511-5 Overhead 185 504 new<br />

N-511-5 NW-526-51_8 Overhead 185 179 new<br />

Action<br />

This investments are <strong>the</strong> initial part <strong>of</strong> <strong>the</strong> feeder going north.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

284 Power Technologies International


Project P-A3-6: Location: Map A-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

N-511-2 N-513-19a switch new<br />

N-513-19 N-513-19a switch new<br />

N-511-5 N-513-53 switch new<br />

Action<br />

With <strong>the</strong>se new switches it is possible to switch load between <strong>the</strong> feeders F-511 and N-513.<br />

Project P-A3-8: Location: Map A-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

NW-526-51_8 NW-526-51_7 overhead 120 76 reconductor<br />

NW-526-51_7 NW-526-51_4 overhead 120 239 reconductor<br />

NW-526-51_4 NW-526-51_3 overhead 120 72 reconductor<br />

NW-526-51_3 NW-526-51_2 overhead 120 103 reconductor<br />

NW-526-51_2 NW-526-51 overhead 120 140 reconductor<br />

NW-526-51 NW-526-49 overhead 70 161 reconductor<br />

Project P-A3-8 streng<strong>the</strong>ns <strong>the</strong> feeder to be able to be connected to adjacent feeders for<br />

emergency backup operation.<br />

Project P-A3-8a Location: Map A-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

NW-526-49 N-520-51 overhead 70 270 new<br />

Action<br />

Project P-A3-8a provides a connection to feeder N-520.<br />

9.11.2 Feeder N-512<br />

Feeder N-512 goes east and <strong>the</strong>n south to <strong>the</strong> area <strong>of</strong> Central substation. It is expected to be<br />

loaded at 1.8 MVA and its main role is to provide back up to C-514 in emergency conditions.<br />

Figure 214 presents an overview <strong>of</strong> this feeder and drawings A-3, A4 and B-4 in Appendix D<br />

present it in much greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 285


Figure 214: Overview <strong>of</strong> Feeder N-512<br />

We describe <strong>the</strong> project associated with this feeder below. These investments are mostly<br />

necessary for <strong>the</strong> short term but will streng<strong>the</strong>n <strong>the</strong> capability <strong>of</strong> this feeder to provide back up<br />

over <strong>the</strong> long term.<br />

Project P-A3-1a: Location: Map A-3 and B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

N-512-2 N-512-21 Overhead 120 898 reconductor<br />

N-512-21 N-512-39 Overhead 120 971 reconductor<br />

N-512-39 N-512-40 Overhead 120 54 reconductor<br />

N-512-40 N-512-47 Overhead 120 411 reconductor<br />

N-512-47 N-512-63 Overhead 120 877 reconductor<br />

N-512-63 N-512-66 Overhead 120 221 reconductor<br />

N-512-66 N-512-68 Overhead 120 109 reconductor<br />

N-512-68 N-512-72 Overhead 120 178 reconductor<br />

N-512-72 N-512-80 Overhead 120 625 reconductor<br />

N-512-80 N-512-87 Overhead 120 544 reconductor<br />

9.11.3 Feeder N-513<br />

Feeder N-513 goes directly north for 2 km from North substation parallel to feeder N-511 and<br />

<strong>the</strong>n ano<strong>the</strong>r 2 km east to <strong>the</strong> area <strong>of</strong> substation East. It is expected to be loaded at 6.7 MVA.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

286 Power Technologies International


Figure 215 presents an overview <strong>of</strong> this feeder and drawings A-3 and A-4 in Appendix D<br />

present it in much greater detail.<br />

Figure 215: Overview <strong>of</strong> Feeder N-513<br />

The investments shown below are necessary to increase this feeder load carrying capability<br />

as well as its ability to provide support to adjacent feeders.<br />

Project P-A3-11: Location: Map A-3 and A-4<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

N-513-35 N-513-39 Overhead 185 164 upgrade<br />

N-513-39 N-513-43 Overhead 185 196 upgrade<br />

N-513-43 N-513-46 Overhead 185 148 upgrade<br />

N-513-46 N-513-47 Overhead 185 65 upgrade<br />

N-513-47 N-513-53 Overhead 185 287 upgrade<br />

N-513-53 N-513-71 Overhead 185 885 upgrade<br />

N-513-71 N-513-79 Overhead 185 491 upgrade<br />

N-513-79 N-513-84 Overhead 185 323 upgrade<br />

N-513-84 N-513-99 Overhead 120 594 upgrade<br />

N-513-99 N-513-101 Overhead 120 91 upgrade<br />

N-513-121 N-513-124 Overhead 120 196 upgrade<br />

N-513-124 N-513-125 Overhead 120 84 upgrade<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 287


9.11.4 Feeder N-514<br />

Feeder N-514 goes southwest from North substation. It is expected to be loaded at 10.5<br />

MVA. Figure 216 presents an overview <strong>of</strong> this feeder and drawings A-3 and B-3 in Appendix<br />

D present it in greater detail.<br />

Figure 216 Overview <strong>of</strong> Feeder N-514<br />

The investments in this feeder are basically for increasing its load carrying capabilities and<br />

creating connections with adjacent feeders. We describe <strong>the</strong>se projects below.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

288 Power Technologies International


Project P-B3-15: Location: Map A-3 and B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

S/S North N-514 Cable 240 53 change<br />

N-514 N-514-2 Overhead 185 81 reconductor<br />

N-514-2 N-514-3 Overhead 185 67 reconductor<br />

N-514-3 N-514-8 Overhead 185 275 reconductor<br />

N-514-8 N-514-9 Overhead 185 43 reconductor<br />

N-514-9 N-514-19 Overhead 185 491 reconductor<br />

N-514-19 N-514-28 Overhead 185 493 reconductor<br />

N-514-28 N-514-29 Overhead 185 51 reconductor<br />

N-514-29 N-514-36 Overhead 185 440 reconductor<br />

N-514-36 NW-525-72 Overhead 185 188 new<br />

NW-525-72 NW-515-63 Overhead 185 720 new<br />

NW-515-63 NW-515-63_1 Overhead 185 37 reconductor<br />

NW-515-63_1a NW-515-63_4 Overhead 185 182 reconductor<br />

NW-515-63_4 NW-515-63_6 Overhead 185 183 reconductor<br />

NW-515-63_6 NW-515-63_16 Overhead 185 553 reconductor<br />

Project P-B3-19: Location: Map B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

N-529-63a NW-515-63_1 switch new<br />

Action<br />

9.11.5 Feeder N-515<br />

Feeder N-514 goes south from North substation. It is expected to be loaded at 6.6 MVA.<br />

Figure 217 presents an overview <strong>of</strong> this feeder and drawings A-3 and B-3 in Appendix D<br />

present it in greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 289


Figure 217 Overview <strong>of</strong> Feeder N-515<br />

There are very little investments associated with this feeder and <strong>the</strong>y a basically switches to<br />

facilitate <strong>the</strong> interconnection with adjacent feeders. We describe <strong>the</strong>m below.<br />

Project P-B3-13: Location: Map B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

N-515-13 N-518-13 Switch new<br />

N-518-24a N-528-50 Switch new<br />

N-515-31 N-518-31 Switch new<br />

Action<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

290 Power Technologies International


9.11.6 Feeder N-516<br />

Feeder N-516 goes east from North substation and <strong>the</strong>n south to <strong>the</strong> area <strong>of</strong> Central<br />

substation. It is expected to be loaded at 4.8 MVA. Figure 218 presents an overview <strong>of</strong> this<br />

feeder and drawings A-3, A-4 and B-4 in Appendix D present it in much greater detail.<br />

Figure 218 Overview <strong>of</strong> Feeder N-516<br />

There are no investments associated with this feeder in <strong>the</strong> medium term.<br />

9.11.7 Feeder N-517<br />

Feeder N-517 goes parallel to N-516 east from North substation and <strong>the</strong>n south to <strong>the</strong> area <strong>of</strong><br />

Central substation. It is expected to be loaded at 7 MVA. Figure 219 presents an overview <strong>of</strong><br />

this feeder and drawings A-3, A-4 and B-4 in Appendix D present it in much greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 291


Figure 219 Overview <strong>of</strong> Feeder N-517<br />

There are no investments associated with this feeder in <strong>the</strong> medium term.<br />

9.11.8 Feeder N-518<br />

Feeder N-518 goes south from North substation. It is expected to be loaded at 8.8 MVA.<br />

Figure 220 presents an overview <strong>of</strong> this feeder and drawings A-3, B-3 and B-4 in Appendix D<br />

present it in much greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

292 Power Technologies International


Figure 220 Overview <strong>of</strong> Feeder N-518<br />

There is only one investment associated with this feeder and it is to streng<strong>the</strong>n <strong>the</strong><br />

interconnection with feeder N-528. It is described below.<br />

Project P-B3-1a: Location: Map B3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

N-528-47 N-528-50 Overhead 120 461 reconductor<br />

9.11.9 Feeder N-519<br />

Feeder N-519 goes west from North substation. It is expected to be loaded at 1 MVA. Figure<br />

221 presents an overview <strong>of</strong> this feeder and drawing A-3 in Appendix D presents it in much<br />

greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 293


Figure 221 Overview <strong>of</strong> Feeder N-519<br />

The role <strong>of</strong> this feeder is to provide back up to feeder NW-525 and for this only one small<br />

cable section will need to be upgraded with by a larger conductor. We describe <strong>the</strong> project<br />

associated with this feeder below.<br />

Project P-A3-4a: Location: Map A3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

N-519-22 JS#10-N Cable 240 76 replace<br />

9.11.10 Feeder N-520<br />

Feeder N-520 goes northwest from North substation. It is expected to be loaded at 9.1 MVA.<br />

Figure 222 presents an overview <strong>of</strong> this feeder and drawing A-3 in Appendix D presents it in<br />

greater detail.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

294 Power Technologies International


Figure 222 Overview <strong>of</strong> Feeder N-520<br />

We describe <strong>the</strong> project associated with this feeder below.<br />

Project P-A3-10: Location: Map A3<br />

From<br />

(node name)<br />

N-527-Sarwar<br />

Kaynat<br />

To<br />

(node name)<br />

N-520-No-12<br />

Taqweatee<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Overhead 120 423 new<br />

Action<br />

The objective <strong>of</strong> this investment is to create a connection with feeder NW-525<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 295


9.11.11 Feeder N-528<br />

Feeder N-528 goes sou<strong>the</strong>ast from North substation. It is expected to be loaded at 7 MVA.<br />

Figure 223 presents an overview <strong>of</strong> this feeder and drawings A-3, A-4 and B-4 in Appendix D<br />

present it in much greater detail.<br />

Figure 223 Overview <strong>of</strong> Feeder N-528<br />

We describe <strong>the</strong> project associated with this feeder below.<br />

Project P-B4-1a: Location: Map A3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

N-528-38 N-528-42 Overhead 120 129 reconductor<br />

N-528-42 N-528-47 Overhead 120 159 reconductor<br />

These investments will reinforce <strong>the</strong> interconnection with feeder N-518.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

296 Power Technologies International


9.11.12 Feeder N-529<br />

Feeder N-529 goes south from North substation. It is expected to be loaded at 11.6 MVA.<br />

Figure 224 presents an overview <strong>of</strong> this feeder and drawings A-3 and B-3 in Appendix D<br />

present it in much greater detail.<br />

Figure 224: Overview <strong>of</strong> Feeder N-529<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 297


This feeder is <strong>the</strong> main source <strong>of</strong> supply to Junction Station # 5 and as shown in <strong>the</strong> network<br />

analysis section <strong>of</strong> this report; without <strong>the</strong> investments below it would become overloaded. In<br />

fact for this investment it would be better to use a 240 sqmm overhead conductor than <strong>the</strong><br />

185 sqmm recommended below, but we did not choose <strong>the</strong> former because it was not<br />

included in <strong>the</strong> standards.<br />

Project P-B3-18: Location: Map A3 and B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

S/S North N-529 Cable 240 50 change<br />

N-529 N-529-3 Overhead 185 51 reconductor<br />

N-529-3 N-529-8 Overhead 185 309 reconductor<br />

N-529-8 N-529-9 Overhead 185 42 reconductor<br />

N-529-9 N-529-19 Overhead 185 491 reconductor<br />

N-529-19 N-529-28 Overhead 185 499 reconductor<br />

N-529-28 N-529-36 Overhead 185 502 reconductor<br />

N-529-36 N-529-49 Overhead 185 594 reconductor<br />

N-529-49 N-529-63a Overhead 185 257 reconductor<br />

N-529-63a N-529-63 Overhead 185 493 reconductor<br />

N-529-63 N-529-64 Overhead 185 33 reconductor<br />

N-529-64 N-529-66 Overhead 185 193 reconductor<br />

N-529-66 N-529-71 Overhead 185 211 reconductor<br />

N-529-71 N-529-77 Overhead 185 154 reconductor<br />

N-529-77 N-529-79 Overhead 185 160 reconductor<br />

N-529-79 JS#5-N-529 Cable 240 27 change<br />

Project P-B3-20: Location: Map A3 and B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

NW-515-62 NW-515-62 Overhead 120 1338 new<br />

Action<br />

9.12 Short Term Investments for North Substation<br />

9.12.1 Conductors with reduced cross sections.<br />

In Section 4 it was mentioned that <strong>the</strong>re were several cables/conductors whose cross section<br />

was inconsistent with <strong>the</strong> network design and we proposed a new minimum cross section for<br />

those cables/conductors. In particular for this substation feeder NW-513, 516 and 517 have<br />

long sections with reduced cross section that would create problems in <strong>the</strong> short term.<br />

Moreover for feeder N-513 <strong>the</strong> minimum estimated cross section is not adequate over <strong>the</strong><br />

long term and as indicated above we are proposing to increase it to 185 sqmm.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

298 Power Technologies International


Table 44 presented in <strong>the</strong> context <strong>of</strong> Central substation (page 4) shows <strong>the</strong> conductors in<br />

question and <strong>the</strong>ir replacement / reconductoring must be a priority.<br />

9.12.2 Rearrangement <strong>of</strong> Junction Station # 5<br />

Junction Station # 5 should be rearranged as indicated in <strong>the</strong> following figure to limit <strong>the</strong><br />

loading <strong>of</strong> NW-514. The investments associated with this should be ra<strong>the</strong>r small.<br />

Figure 225: Rearrangement <strong>of</strong> Junction Station # 5<br />

9.12.3 Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

In addition <strong>of</strong> <strong>the</strong> investments associated with changing <strong>the</strong> conductors with reduced cross<br />

sections <strong>the</strong> following investments are necessary in <strong>the</strong> short term to prevent overloads in <strong>the</strong><br />

system.<br />

Project P-A3-11: Location: Map A-3 and A-4 (see note below)<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

N-513-35 N-513-39 Overhead 185 164 upgrade<br />

N-513-39 N-513-43 Overhead 185 196 upgrade<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 299


From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

N-513-43 N-513-46 Overhead 185 148 upgrade<br />

N-513-46 N-513-47 Overhead 185 65 upgrade<br />

N-513-47 N-513-53 Overhead 185 287 upgrade<br />

Note: The investments above are only necessary if <strong>the</strong> conductor is smaller than 70 sqmm. If<br />

<strong>the</strong> conductor is 70 sqmm or larger <strong>the</strong>n <strong>the</strong>se investments in feeder N-513 can be<br />

postponed for <strong>the</strong> medium tem .<br />

Project P-B3-18: Location: Map A3 and B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

Action<br />

S/S North N-529 Cable 240 50 change<br />

N-529 N-529-3 Overhead 185 51 reconductor<br />

N-529-3 N-529-8 Overhead 185 309 reconductor<br />

N-529-8 N-529-9 Overhead 185 42 reconductor<br />

N-529-9 N-529-19 Overhead 185 491 reconductor<br />

N-529-19 N-529-28 Overhead 185 499 reconductor<br />

N-529-28 N-529-36 Overhead 185 502 reconductor<br />

N-529-36 N-529-49 Overhead 185 594 reconductor<br />

N-529-49 N-529-63a Overhead 185 257 reconductor<br />

N-529-63a N-529-63 Overhead 185 493 reconductor<br />

N-529-63 N-529-64 Overhead 185 33 reconductor<br />

N-529-64 N-529-66 Overhead 185 193 reconductor<br />

N-529-66 N-529-71 Overhead 185 211 reconductor<br />

N-529-71 N-529-77 Overhead 185 154 reconductor<br />

N-529-77 N-529-79 Overhead 185 160 reconductor<br />

N-529-79 JS#5-N-529 Cable 240 27 change<br />

Project P-B3-13: Location: Map B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

N-515-13 N-518-13 Switch new<br />

N-518-24a N-528-50 Switch new<br />

N-515-31 N-518-31 Switch new<br />

Action<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

300 Power Technologies International


Project P-B3-19: Location: Map B-3<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section<br />

mm 2<br />

Length<br />

Mts<br />

N-529-63a NW-515-63_1 switch new<br />

Action<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 301


Section<br />

10<br />

Investment Evaluation<br />

In this section we present a summary <strong>of</strong> <strong>the</strong> necessary investments to carry out <strong>the</strong> projects<br />

presented in Section 9. As before <strong>the</strong> projects were organized in two groups: medium term<br />

investments and short term investments and Appendices H and I contain <strong>the</strong> cost estimation<br />

project by project.<br />

It must be stressed that <strong>the</strong> projects presented below only include <strong>the</strong> medium voltage and<br />

high voltage to medium voltage substations and do not include potential investments in new<br />

distribution transformers or low voltage systems. These last set <strong>of</strong> investments address local<br />

problems, are heavily dependent on <strong>the</strong> actual load distribution and are <strong>the</strong>refore normally<br />

addressed by <strong>the</strong> host utility.<br />

10.1 Medium Terms Investments<br />

The medium terms investments figures to be presented in this section, includes also <strong>the</strong><br />

investments identified for <strong>the</strong> short term. There are some investments that were identified for<br />

<strong>the</strong> short term only (not required in <strong>the</strong> medium term) and <strong>the</strong>y are also included here for<br />

completeness. Hence <strong>the</strong> total values presented are <strong>the</strong> entirety <strong>of</strong> <strong>the</strong> investment required<br />

for <strong>the</strong> network. Short terms investments are also identified in sub-section 10.2<br />

10.1.1 Total Investments Medium Voltage Networks<br />

Table 47 shows <strong>the</strong> total investment in medium voltage networks organized by type:<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 302


Action<br />

Table 47: Investment Medium Voltage Networks<br />

Conductor Type<br />

Conductor<br />

Size<br />

(mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New Overhead 70 3.71 244,018<br />

New Overhead 120 9.05 588,373<br />

New Overhead 185 19.77 1,296,306<br />

Reconductor Overhead 70 3.46 46,238<br />

Reconductor Overhead 120 18.98 263,637<br />

Reconductor Overhead 185 26.72 404,619<br />

New Cable 50 1.70 293,988<br />

New Cable 95 0.83 178,791<br />

New Cable 120 1.04 218,643<br />

New Cable 240 5.72 1,159,745<br />

Reconductor Cable 50 2.26 344,301<br />

Reconductor Cable 95 1.34 245,679<br />

Reconductor Cable 120 2.37 438,537<br />

Reconductor Cable 240 19.98 3,743,363<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Capacitor<br />

900 kVar<br />

Switched N/A 4.00 14,520<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 6.00 21,780<br />

Switch Switch N/A 46.00 161,000<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10%<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10% N/A 1.00 9,500<br />

TOTAL 9,673,037<br />

The total investment adds up to US$ 9.6 millions. Figure 228 to Figure 229 shows how <strong>the</strong><br />

investment is distributed between <strong>the</strong> different categories. It can be concluded that:<br />

• More than 97% <strong>of</strong> <strong>the</strong> investment is concentrated in <strong>the</strong> medium voltage feeders.<br />

57% in re-conductor and 41% in new feeders.<br />

• 70% <strong>of</strong> <strong>the</strong> feeder investment is associated with cables and <strong>the</strong> rest with overhead<br />

lines.<br />

• Overhead feeder investment is 60% concentrated in conductors with 185 mm 2 cross<br />

section.<br />

• Cable investment is 74% concentrated in conductors with 240 mm 2 cross section.<br />

<strong>Final</strong>ly <strong>the</strong> investments above have a large degree <strong>of</strong> uncertainty given <strong>the</strong> difficulty <strong>of</strong><br />

working in <strong>Afghan</strong>istan and <strong>the</strong> fact that some cables routes were estimated. Therefore a<br />

contingency should be added to <strong>the</strong>m and maybe 25% contingency would not be<br />

unreasonable.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 303


Figure 226 Medium Voltage Networks Investment <strong>Distribution</strong><br />

14,520,<br />

0.15%<br />

161,000,<br />

1.66%<br />

21,780,<br />

0.23%<br />

9,500,<br />

0.10%<br />

3,979,863,<br />

41.14%<br />

5,486,374,<br />

56.72%<br />

New Reconductor Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Switch<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10%<br />

Figure 227 Medium Voltage Feeders Investment <strong>Distribution</strong><br />

2,843,191,<br />

30.04%<br />

6,623,046,<br />

69.96%<br />

Overhead<br />

Cable<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

304 Power Technologies International


Figure 228 Medium Voltage Overhead Feeders Investment <strong>Distribution</strong><br />

290,255,<br />

10.21%<br />

1,700,925,<br />

59.82%<br />

852,010,<br />

29.97%<br />

70 120 185<br />

Figure 229 Medium Voltage Cable Feeders Investment <strong>Distribution</strong><br />

638,289,<br />

9.64%<br />

424,469,<br />

6.41%<br />

657,180,<br />

9.92%<br />

4,903,108,<br />

74.03%<br />

50 95 120 240<br />

10.1.2 Investments by Substations<br />

Figure 230 shows <strong>the</strong> previously discussed medium voltage networks investments, now<br />

organized by <strong>the</strong> substations in which <strong>the</strong> networks are originated.<br />

43% <strong>of</strong> <strong>the</strong> distribution investments are related with <strong>the</strong> new central substation. Breshna Kot<br />

and South West concentrate o<strong>the</strong>r 35% <strong>of</strong> <strong>the</strong> investments. The remaining 22% is split<br />

between East, North West and North substations. This is to be expected as Central is a new<br />

substation that will serve one <strong>of</strong> <strong>the</strong> most heavily loaded areas <strong>of</strong> <strong>Kabul</strong>.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 305


Table 48to Table 53 shows <strong>the</strong> detailed investments in each substation.<br />

Figure 230 Medium Voltage Network Investments by Substation<br />

861,205,<br />

8.90%<br />

597,044,<br />

6.17%<br />

686,816,<br />

7.10%<br />

4,123,158,<br />

42.63%<br />

1,751,836,<br />

18.11%<br />

1,652,979,<br />

17.09%<br />

Central Breshna Kot South West East North West North<br />

Table 48 Medium Voltage Network Investments - Central Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size<br />

(mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New Central Overhead 70 0.61 40,150<br />

New Central Overhead 120 0 0<br />

New Central Overhead 185 2.86 194,620<br />

Reconductor Central Overhead 70 0 0<br />

Reconductor Central Overhead 120 3.53 49,025<br />

Reconductor Central Overhead 185 1.81 27,407<br />

New Central Cable 50 1.21 210,588<br />

New Central Cable 95 0 0<br />

New Central Cable 120 0.47 95,864<br />

New Central Cable 240 2.74 539,609<br />

Reconductor Central Cable 50 0.84 127,970<br />

Reconductor Central Cable 95 0.96 176,009<br />

Reconductor Central Cable 120 0 0<br />

Reconductor Central Cable 240 13.85 2,594,897<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Central<br />

Capacitor<br />

900 kVar<br />

Switched N/A 3 10,890<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 1 3,630<br />

Central<br />

Switch Central Switch N/A 15 52,500<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% Central<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 4,123,158<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

306 Power Technologies International


Table 49 Medium Voltage Network Investments – Breshna Kot Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size<br />

(mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New Breshna Kot Overhead 70 0.9 57,217<br />

New Breshna Kot Overhead 120 0.05 7,218<br />

New Breshna Kot Overhead 185 9.91 630,483<br />

Reconductor Breshna Kot Overhead 70 0 0<br />

Reconductor Breshna Kot Overhead 120 3.862 53,636<br />

Reconductor Breshna Kot Overhead 185 0 0<br />

New Breshna Kot Cable 50 0.49 83,399<br />

New Breshna Kot Cable 95 0 0<br />

New Breshna Kot Cable 120 0 0<br />

New Breshna Kot Cable 240 1 196,107<br />

Reconductor Breshna Kot Cable 50 1.42 216,331<br />

Reconductor Breshna Kot Cable 95 0 0<br />

Reconductor Breshna Kot Cable 120 2.11 391,088<br />

Reconductor Breshna Kot Cable 240 0 0<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Breshna Kot<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 0 0<br />

Breshna Kot<br />

Switch Breshna Kot Switch N/A 5 17,500<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% Breshna Kot<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 1,652,979<br />

Table 50 Medium Voltage Network Investments – South West Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size<br />

(mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New South West Overhead 70 1.688 107,842<br />

New South West Overhead 120 5.317 328,394<br />

New South West Overhead 185 0 0<br />

Reconductor South West Overhead 70 0 0<br />

Reconductor South West Overhead 120 0.756 10,499<br />

Reconductor South West Overhead 185 1.348 20,411<br />

New South West Cable 50 0 0<br />

New South West Cable 95 0.287 61,369<br />

New South West Cable 120 0.296 63,614<br />

New South West Cable 240 1.983 424,029<br />

Reconductor South West Cable 50 0 0<br />

Reconductor South West Cable 95 0.38 69,670<br />

Reconductor South West Cable 120 0.256 47,450<br />

Reconductor South West Cable 240 3.206 600,667<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

South West<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 3 10,890<br />

South West<br />

Switch South West Switch N/A 2 7,000<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% South West<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 1,751,836<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 307


Table 51 Medium Voltage Network Investments – East Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size<br />

(mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New East Overhead 70 0.245 18,669<br />

New East Overhead 120 0 0<br />

New East Overhead 185 1.923 129,320<br />

Reconductor East Overhead 70 0 0<br />

Reconductor East Overhead 120 0 0<br />

Reconductor East Overhead 185 6.988 105,811<br />

New East Cable 50 0 0<br />

New East Cable 95 0.545 117,422<br />

New East Cable 120 0 0<br />

New East Cable 240 0 0<br />

Reconductor East Cable 50 0 0<br />

Reconductor East Cable 95 0 0<br />

Reconductor East Cable 120 0 0<br />

Reconductor East Cable 240 2.53982 475,854<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

East<br />

Capacitor<br />

900 kVar<br />

Switched N/A 1 3,630<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 0 0<br />

East<br />

Switch East Switch N/A 3 10,500<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% East<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 861,205<br />

Table 52 Medium Voltage Network Investments – North West Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size<br />

(mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New North West Overhead 70 0 0<br />

New North West Overhead 120 1.924 139,718<br />

New North West Overhead 185 1.529 96,936<br />

Reconductor North West Overhead 70 3.296 44,084<br />

Reconductor North West Overhead 120 3.603 50,039<br />

Reconductor North West Overhead 185 7.132 107,991<br />

New North West Cable 50 0 0<br />

New North West Cable 95 0 0<br />

New North West Cable 120 0.272 59,165<br />

New North West Cable 240 0 0<br />

Reconductor North West Cable 50 0 0<br />

Reconductor North West Cable 95 0 0<br />

Reconductor North West Cable 120 0 0<br />

Reconductor North West Cable 240 0.178 33,350<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

North West<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 2 7,260<br />

North West<br />

Switch North West Switch N/A 14 49,000<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% North West<br />

32 steps +- 10% N/A 1 9,500<br />

TOTAL 597,044<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

308 Power Technologies International


Table 53 Medium Voltage Network Investments – North Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size<br />

(mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New North Overhead 70 0.27 20,140<br />

New North Overhead 120 1.761 113,042<br />

New North Overhead 185 3.55 244,947<br />

Reconductor North Overhead 70 0.161 2,153<br />

Reconductor North Overhead 120 7.232 100,439<br />

Reconductor North Overhead 185 9.444 142,999<br />

New North Cable 50 0 0<br />

New North Cable 95 0 0<br />

New North Cable 120 0 0<br />

New North Cable 240 0 0<br />

Reconductor North Cable 50 0 0<br />

Reconductor North Cable 95 0 0<br />

Reconductor North Cable 120 0 0<br />

Reconductor North Cable 240 0.206 38,596<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

North<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 0 0<br />

North<br />

Switch North Switch N/A 7 24,500<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% North<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 686,816<br />

10.2 Short Term Investments<br />

The following sections present <strong>the</strong> cost investments that are considered high priority and<br />

should be implemented in <strong>the</strong> short term.<br />

10.2.1 Total Investments Medium Voltage Networks<br />

Table 54 shows <strong>the</strong> total investment in medium voltage networks organized by type:<br />

The total short term investment adds up to US$ 0.9 millions (not including contingency which<br />

could be 25% or more). Figure 231 to Figure 234 shows how <strong>the</strong> investment is distributed<br />

between <strong>the</strong> different categories. It can be concluded that:<br />

• More than 94% <strong>of</strong> <strong>the</strong> investment is concentrated in <strong>the</strong> medium voltage feeders.<br />

39% in re-conductor and 55% in new feeders.<br />

• 71% <strong>of</strong> <strong>the</strong> feeder investment is associated with overhead lines and <strong>the</strong> rest with<br />

cables.<br />

• Overhead feeder investment is 65% concentrated in conductors with 185 mm 2 cross<br />

section.<br />

• Cable investment is 81% concentrated in conductors with 95 mm 2 cross section.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 309


Action<br />

Table 54 Short Term Medium Voltage Network Investments<br />

Conductor Type<br />

Conductor<br />

Size (mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New Overhead 70 1.46 90,174<br />

New Overhead 120 0.05 7,218<br />

New Overhead 185 3.053 206,319<br />

Reconductor Overhead 70 2.317 30,990<br />

Reconductor Overhead 120 6.233 86,564<br />

Reconductor Overhead 185 12.531 189,742<br />

New Cable 50 0 0<br />

New Cable 95 0.925 204,592<br />

New Cable 120 0 0<br />

New Cable 240 0 0<br />

Reconductor Cable 50 0 0<br />

Reconductor Cable 95 0 0<br />

Reconductor Cable 120 0 0<br />

Reconductor Cable 240 0.255 47,776<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Capacitor<br />

900 kVar<br />

Switched N/A 3 10,890<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 4 14,520<br />

Switch Switch N/A 6 21,000<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10%<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10% N/A 1 9,500<br />

TOTAL 41 919,286<br />

Figure 231 Medium Voltage Networks Short Term Investment <strong>Distribution</strong><br />

10,890,<br />

1.18%<br />

14,520,<br />

1.58%<br />

21,000,<br />

2.28%<br />

9,500,<br />

1.03%<br />

355,072,<br />

38.62%<br />

508,303,<br />

55.29%<br />

New Reconductor Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Switch<br />

Voltage Regulator<br />

300 Amps minimum<br />

32 steps +- 10%<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

310 Power Technologies International


Figure 232 Medium Voltage Feeders Short Term Investment <strong>Distribution</strong><br />

252,368,<br />

29.23%<br />

611,008,<br />

70.77%<br />

Overhead<br />

Cable<br />

Figure 233 Medium Voltage Overhead Feeders Short Term Investment <strong>Distribution</strong><br />

121,164,<br />

19.83%<br />

396,061,<br />

64.82%<br />

93,783,<br />

15.35%<br />

70 120 185<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 311


Figure 234 Medium Voltage Cable Feeders Short Term Investment <strong>Distribution</strong><br />

47,776,<br />

19%<br />

0, 0%<br />

0, 0%<br />

204,592,<br />

81%<br />

50 95 120 240<br />

10.2.2 Investments by Substations<br />

Figure 235 shows <strong>the</strong> previously discussed medium voltage networks short term<br />

investments, now organized by <strong>the</strong> substations in which <strong>the</strong> networks are originated.<br />

51% <strong>of</strong> <strong>the</strong> short term distribution investments are related with East and North West<br />

substations. The remaining 49% is split almost even in <strong>the</strong> rest <strong>of</strong> <strong>the</strong> substations.<br />

Table 55 to Table 60 show <strong>the</strong> detailed investments in each substation.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

312 Power Technologies International


Figure 235 Medium Voltage Network Investments by Substation<br />

101,849,<br />

11.08%<br />

119,129,<br />

12.96%<br />

231,870,<br />

25.22%<br />

117,859,<br />

12.82%<br />

109,392,<br />

11.90%<br />

239,186,<br />

26.02%<br />

Central Breshna Kot South West East North West North<br />

Table 55 Medium Voltage Short Term Network Investments - Central Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size (mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New Central Overhead 70 0 0<br />

New Central Overhead 120 0 0<br />

New Central Overhead 185 1.3 91,554<br />

Reconductor Central Overhead 70 0 0<br />

Reconductor Central Overhead 120 0.94 13,055<br />

Reconductor Central Overhead 185 0 0<br />

New Central Cable 50 0 0<br />

New Central Cable 95 0 0<br />

New Central Cable 120 0 0<br />

New Central Cable 240 0 0<br />

Reconductor Central Cable 50 0 0<br />

Reconductor Central Cable 95 0 0<br />

Reconductor Central Cable 120 0 0<br />

Reconductor Central Cable 240 0 0<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Central<br />

Capacitor<br />

900 kVar<br />

Switched N/A 3 10,890<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 1 3,630<br />

Central<br />

Switch Central Switch N/A 0 0<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% Central<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 6 119,129<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 313


Table 56 Medium Voltage Short Term Network Investments – Breshna Kot Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size (mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New Breshna Kot Overhead 70 0 0<br />

New Breshna Kot Overhead 120 0.05 7,218<br />

New Breshna Kot Overhead 185 0 0<br />

Reconductor Breshna Kot Overhead 70 0 0<br />

Reconductor Breshna Kot Overhead 120 1.69 23,471<br />

Reconductor Breshna Kot Overhead 185 0 0<br />

New Breshna Kot Cable 50 0 0<br />

New Breshna Kot Cable 95 0.38 87,170<br />

New Breshna Kot Cable 120 0 0<br />

New Breshna Kot Cable 240 0 0<br />

Reconductor Breshna Kot Cable 50 0 0<br />

Reconductor Breshna Kot Cable 95 0 0<br />

Reconductor Breshna Kot Cable 120 0 0<br />

Reconductor Breshna Kot Cable 240 0 0<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

Breshna Kot<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 0 0<br />

Breshna Kot<br />

Switch Breshna Kot Switch N/A 0 0<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% Breshna Kot<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 2 117,859<br />

Table 57 Medium Voltage Short Term Network Investments – South West Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size (mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New South West Overhead 70 1.46 90,174<br />

New South West Overhead 120 0 0<br />

New South West Overhead 185 0 0<br />

Reconductor South West Overhead 70 0 0<br />

Reconductor South West Overhead 120 0 0<br />

Reconductor South West Overhead 185 0.55 8,328<br />

New South West Cable 50 0 0<br />

New South West Cable 95 0 0<br />

New South West Cable 120 0 0<br />

New South West Cable 240 0 0<br />

Reconductor South West Cable 50 0 0<br />

Reconductor South West Cable 95 0 0<br />

Reconductor South West Cable 120 0 0<br />

Reconductor South West Cable 240 0 0<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

South West<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 3 10,890<br />

South West<br />

Switch South West Switch N/A 0 0<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% South West<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 5 109,392<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

314 Power Technologies International


Table 58 Medium Voltage Short Term Network Investments – East Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size (mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New East Overhead 70 0 0<br />

New East Overhead 120 0 0<br />

New East Overhead 185 1.753 114,765<br />

Reconductor East Overhead 70 0 0<br />

Reconductor East Overhead 120 0 0<br />

Reconductor East Overhead 185 0 0<br />

New East Cable 50 0 0<br />

New East Cable 95 0.545 117,422<br />

New East Cable 120 0 0<br />

New East Cable 240 0 0<br />

Reconductor East Cable 50 0 0<br />

Reconductor East Cable 95 0 0<br />

Reconductor East Cable 120 0 0<br />

Reconductor East Cable 240 0 0<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

East<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 0 0<br />

East<br />

Switch East Switch N/A 2 7,000<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% East<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 4 239,186<br />

Table 59 Medium Voltage Short Term Network Investments – North West Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size (mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New North West Overhead 70 0 0<br />

New North West Overhead 120 0 0<br />

New North West Overhead 185 0 0<br />

Reconductor North West Overhead 70 2.317 30,990<br />

Reconductor North West Overhead 120 3.603 50,039<br />

Reconductor North West Overhead 185 7.132 107,991<br />

New North West Cable 50 0 0<br />

New North West Cable 95 0 0<br />

New North West Cable 120 0 0<br />

New North West Cable 240 0 0<br />

Reconductor North West Cable 50 0 0<br />

Reconductor North West Cable 95 0 0<br />

Reconductor North West Cable 120 0 0<br />

Reconductor North West Cable 240 0.178 33,350<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

North West<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 0 0<br />

North West<br />

Switch North West Switch N/A 0 0<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% North West<br />

32 steps +- 10% N/A 1 9,500<br />

TOTAL 14 231,870<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 315


Table 60 Medium Voltage Short Term Network Investments – North Substation<br />

Action Substation Conductor Type<br />

Conductor<br />

Size (mm2)<br />

Length<br />

(Km) or #<br />

units<br />

Total Cost<br />

(US$)<br />

New North Overhead 70 0 0<br />

New North Overhead 120 0 0<br />

New North Overhead 185 0 0<br />

Reconductor North Overhead 70 0 0<br />

Reconductor North Overhead 120 0 0<br />

Reconductor North Overhead 185 4.849 73,423<br />

New North Cable 50 0 0<br />

New North Cable 95 0 0<br />

New North Cable 120 0 0<br />

New North Cable 240 0 0<br />

Reconductor North Cable 50 0 0<br />

Reconductor North Cable 95 0 0<br />

Reconductor North Cable 120 0 0<br />

Reconductor North Cable 240 0.077 14,427<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

1200 kVar<br />

Switched<br />

North<br />

Capacitor<br />

900 kVar<br />

Switched N/A 0 0<br />

Capacitor<br />

1200 kVar<br />

Switched N/A 0 0<br />

North<br />

Switch North Switch N/A 4 14,000<br />

Voltage Regulator<br />

Voltage Regulator<br />

300 Amps minimum<br />

300 Amps minimum<br />

32 steps +- 10% North<br />

32 steps +- 10% N/A 0 0<br />

TOTAL 9 101,849<br />

10.3 O<strong>the</strong>r Investments<br />

During analysis some sections in selected feeders were identified as having cross section<br />

inconsistent with <strong>the</strong> network design. This data need to be verified on field; however an<br />

investment estimate was executed in order to analyze <strong>the</strong> impact <strong>of</strong> changing <strong>the</strong> conductors<br />

that turn out to really have wrong cross sections. Results are shown in Table 61<br />

Table 61 Wrong Cross Section Investments<br />

S/S<br />

Cross<br />

section<br />

(mm2)<br />

Length<br />

(km)<br />

Cost<br />

(US$)<br />

North 70 0.60 8,057<br />

North 120 3.96 55,014<br />

North 150 0.05 649<br />

North 185 1.09 16,513<br />

North 240 0.03 5,041<br />

Total 85,273<br />

Cross<br />

section<br />

(mm2)<br />

Cost<br />

(US$)<br />

S/S<br />

Length<br />

(km)<br />

Breshna Kot 185 1.79 236,686<br />

Total 236,686<br />

Cross<br />

section<br />

(mm2)<br />

Cost<br />

(US$)<br />

S/S<br />

Length<br />

(km)<br />

North West 120 0.37 5,080<br />

North West 185 4.06 93,453<br />

Total 98,533<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

316 Power Technologies International


10.4 Investment in Substations<br />

As presented before in this report <strong>the</strong>re are some important investments to be carried out in<br />

<strong>the</strong> substations 110 kV / MV, particularly in <strong>the</strong> new Central and Southwest substations.<br />

A cost estimate was conducted for <strong>the</strong>se substations and <strong>the</strong> results are shown in Table 62<br />

which also shows <strong>the</strong> previously discussed distribution networks investments and <strong>the</strong> total<br />

investments.<br />

In this table we observe that over <strong>the</strong> medium term we are recommending investments that in<br />

<strong>the</strong> order <strong>of</strong> US$ 39 million and that could reach US$ 50 million including contingency.<br />

Table 62 110 kV Substations Investments<br />

Substation Equipment Quantity<br />

Total<br />

Substation<br />

Investment<br />

(US$)<br />

MV Networks<br />

Investment<br />

(US$)<br />

Total<br />

Investment<br />

(US$)<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 4 3,400,000<br />

Central S/S Cells 20 kV (15 kV) 19 570,000<br />

Cells 110 kV 6 4,230,000<br />

Total 8,200,000 4,123,158 12,323,158<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 2 1,700,000<br />

Breshna Kot S/S Cells 20 kV (15 kV) 3 90,000<br />

Cells 110 kV 2 1,410,000<br />

Total 3,200,000 1,652,979 4,852,979<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 3 2,550,000<br />

South West S/S Cells 20 kV (15 kV) 5 150,000<br />

Cells 110 kV 11 7,755,000<br />

Total 10,455,000 1,751,836 12,206,836<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 2 1,700,000<br />

East S/S Cells 20 kV (15 kV) 3 90,000<br />

Cells 110 kV 2 1,410,000<br />

Total 3,200,000 861,205 4,061,205<br />

Transformer 110/ 20 (15) kV<br />

25 MVA 1 850,000<br />

North West S/S Cells 20 kV (15 kV) 2 60,000<br />

Cells 110 kV 1 705,000<br />

Total 1,615,000 597,044 2,212,044<br />

Transformer 110/ 20 (15) kV<br />

40 MVA 1 1,360,000<br />

North S/S Cells 20 kV (15 kV) 2 60,000<br />

Cells 110 kV 1 705,000<br />

Total 2,125,000 686,816 2,811,816<br />

Junction Station #3 Cells 20 kV (15 kV) 7 210,000<br />

Transformers 110/ 20 (15) kV 13 11,560,000<br />

TOTAL<br />

Cells 20 kV (15 kV) 41 1,230,000<br />

Cells 110 kV 23 16,215,000<br />

Total 29,005,000 9,673,038 38,678,038<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 317


Section<br />

11<br />

<strong>Kabul</strong> Diesel Generation Impact<br />

In order to support <strong>the</strong> short term load requirements in <strong>the</strong> <strong>Kabul</strong> area, a diesel base power<br />

plant is under construction close to <strong>the</strong> East substation. This power plant with a 100 MW<br />

capacity will be interconnected to <strong>the</strong> 110 kV transmission network using <strong>the</strong> two existing<br />

lines that link North substation with East substation.<br />

The impact <strong>of</strong> this power plant over <strong>the</strong> transmission network was analyzed under steady<br />

state conditions and <strong>the</strong> results are summarized in this section.<br />

Also we included in this evaluation <strong>the</strong> connection <strong>of</strong> Central and South West substations to<br />

<strong>the</strong> system.<br />

11.1 Study Assumptions and Criteria<br />

11.1.1 Electricity Sources<br />

In a previous study developed by Siemens PTI, “<strong>Afghan</strong>istan’s NEPS Transmission <strong>System</strong><br />

Power <strong>System</strong> <strong>Analysis</strong>”, several options were analyzed for <strong>the</strong> long term power supply to<br />

<strong>Afghan</strong>istan considering three alternatives sources: Turkmenistan, Uzbekistan and<br />

Tajiskistan. In agreement with AEAI engineers <strong>the</strong> following options were selected as <strong>the</strong><br />

basis for <strong>the</strong> analysis:<br />

• Turkmenistan Source Option 1: based in a single 500 kV circuit from Serder<br />

substation in Turkmenistan to a new substation near Andkhoy in <strong>Afghan</strong>istan. At this<br />

substation a power transformer steps down <strong>the</strong> incoming 500 kV power supply to 220<br />

kV. A double circuit is taken from this substation to Sheberghan and from<br />

Sheberghan to Naibabad. Naibabad is <strong>the</strong>n interconnected to Chimtalah in <strong>the</strong> North<br />

<strong>of</strong> <strong>Kabul</strong> with a double circuit in 220 kV with an intermediate substation in Pul-e-kumri.<br />

• Uzbekistan Source Option 2: based in a 220 kV double circuit transmission line from<br />

Surkhan substation in Uzbekistan to Naibabad switchyard in <strong>Afghan</strong>istan. Naibabad<br />

is <strong>the</strong>n interconnected to Chimtalah in <strong>the</strong> North <strong>of</strong> <strong>Kabul</strong> with a double circuit in 220<br />

kV with an intermediate substation in Pul-e-kumri.<br />

• Tajikistan Source: The interconnection point in Tajikistan will be <strong>the</strong> Sangtuda 220 kV<br />

substation. Two new 220 kV circuits will go from Sangtuda to <strong>the</strong> border and from<br />

<strong>the</strong>re to Kunduz and to Pul-e-kumri. Pul-e-kumri is <strong>the</strong> interconnected to Chimtala<br />

substation.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 318


11.1.2 <strong>Kabul</strong> 110 kV network<br />

Figure 236 shows <strong>the</strong> proposed 110 kV network for <strong>the</strong> <strong>Kabul</strong> area.<br />

Figure 236 <strong>Kabul</strong> 110 kV Network<br />

The load is distributed in seven substations:<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 319


• 4 existing substations: <strong>Kabul</strong> North, <strong>Kabul</strong> North West, Breshna Kot and <strong>Kabul</strong> East<br />

• 1 substation under construction: Chimtalah<br />

• 2 future substation proposed as a result <strong>of</strong> <strong>the</strong> distribution system analysis: <strong>Kabul</strong><br />

South West and <strong>Kabul</strong> Central<br />

The new substation <strong>Kabul</strong> South West is proposed to be supplied from <strong>Kabul</strong> North West<br />

with a double circuit line in 110 kV.<br />

The new substation <strong>Kabul</strong> Central is proposed to be supplied from two 110 kV single circuit<br />

lines: one from <strong>Kabul</strong> North and one Breshna Kot. An alternative option evaluated was for<br />

Central to be supplied by a double circuit line from North. However this option proved to have<br />

less advantages that <strong>the</strong> proposed one.<br />

The new diesel power plant is located in <strong>the</strong> <strong>Kabul</strong> Diesel substation which is assumed to be<br />

interconnected with a 6 km double circuit 110 kV transmission line to <strong>Kabul</strong> East and with a<br />

double circuit 110 kV transmission line to <strong>Kabul</strong> North. One <strong>of</strong> <strong>the</strong>se lines with a 21 km length<br />

goes directly to <strong>Kabul</strong> North. The o<strong>the</strong>r line with 23 km length has a tap 2 km before arriving<br />

to North substation which interconnects North with <strong>Kabul</strong> North West.<br />

These line lengths were estimated based on <strong>the</strong> approximate location provided for <strong>the</strong> Diesel<br />

Generating Station.<br />

11.1.3 <strong>System</strong> Load<br />

Table 63 <strong>System</strong> Loadshows <strong>the</strong> load in <strong>the</strong> <strong>Kabul</strong> area including active (MW) and reactive<br />

power (MVAR). These loads were calculated integrating with <strong>the</strong> appropriate coincidences<br />

factor <strong>the</strong> load associated to <strong>the</strong> distribution feeders.<br />

Table 63 <strong>System</strong> Load<br />

Bus<br />

Number<br />

Bus Name P (MW) Q (MW)<br />

101 CHIMTALAH 110.00 57.56 35.73<br />

102 KABUL NW 110.00 63.00 30.51<br />

104 KABUL NORTH 110.00 76.50 37.05<br />

105 KABUL EAST 110.00 45.00 21.79<br />

120 BRESHNA KOT 110.00 35.97 22.33<br />

526 KABUL SW 110.00 40.50 19.62<br />

527 KABUL CENTRL110.00 72.00 34.87<br />

TOTALS<br />

390.53 201.90<br />

The loads at <strong>the</strong> <strong>Kabul</strong> substations and Breshna Kot are consistent with <strong>the</strong> distribution<br />

planning study.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

320 Power Technologies International


11.1.4 Planning Criteria<br />

11.1.4.1 Voltage Range<br />

• Normal Conditions: all <strong>the</strong> elements in <strong>the</strong> systems are in service<br />

‣ Between 0.95 P.U. to 1.05 P.U.<br />

• Emergency: a single element in <strong>the</strong> system out <strong>of</strong> service<br />

‣ Between 0.90 P.U. to 1.10 P.U.<br />

11.1.4.2 Thermal Overloads<br />

Under normal and contingency conditions lines should not be loaded over <strong>the</strong>ir normal<br />

<strong>the</strong>rmal ratings. The <strong>the</strong>rmal ratings <strong>of</strong> <strong>the</strong> 110 kV lines in <strong>Kabul</strong> area is 100 MVA.<br />

11.1.4.3 Reliability<br />

The Load Flow Studies were carried out under <strong>the</strong> criteria that <strong>the</strong> system should withstand<br />

<strong>the</strong> loss <strong>of</strong> a single element with minimal load interruption while maintaining <strong>the</strong> voltage and<br />

<strong>the</strong>rmal criteria.<br />

11.1.5 Study Cases<br />

The following cases were analyzed for each supply option:<br />

• Normal Condition<br />

• Loss <strong>of</strong> one line <strong>Kabul</strong> Diesel – <strong>Kabul</strong> East<br />

• Loss <strong>of</strong> one line <strong>Kabul</strong> Diesel – <strong>Kabul</strong> North<br />

• Loss <strong>of</strong> <strong>the</strong> line <strong>Kabul</strong> East – Breshna Kot<br />

• Loss <strong>of</strong> <strong>the</strong> line <strong>Kabul</strong> Central – Breshna Kot<br />

• Loss <strong>of</strong> <strong>the</strong> line <strong>Kabul</strong> Central – North<br />

• Loss <strong>of</strong> <strong>the</strong> major generation unit in <strong>Kabul</strong> North West<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 321


11.2 Results<br />

11.2.1 Turkmenistan Supply Option<br />

The results <strong>of</strong> Turkmenistan supply option for normal conditions are included in Appendix E.<br />

The following conclusions can be obtained from <strong>the</strong> analysis.<br />

11.2.1.1 Import Power to <strong>Kabul</strong><br />

With <strong>the</strong> addition <strong>of</strong> 100 MW in <strong>Kabul</strong> Diesel plus <strong>the</strong> existing hydro and <strong>the</strong>rmal generation<br />

in <strong>the</strong> area <strong>the</strong> power imported through Chimtalah is 169 MW. It is necessary to point out that<br />

Chimtalah substation has two 160 MVA transformer. Therefore in <strong>the</strong> event <strong>of</strong> <strong>the</strong> loss <strong>of</strong> one<br />

transformer it will be necessary to implement a load shedding strategy.<br />

11.2.1.2 Reactive Power Compensation<br />

The original reactive compensation included in this case was oriented to allow maximum<br />

transfer <strong>of</strong> power to <strong>Kabul</strong> thorough <strong>the</strong> 220 kV network. With <strong>the</strong> new diesel plant in <strong>Kabul</strong><br />

<strong>the</strong> import power is reduced in around 80 MW, <strong>the</strong>refore reactive compensation was adjusted<br />

accordingly in o<strong>the</strong>r to guarantee an adequate voltage pr<strong>of</strong>ile.<br />

The following reactive compensation adjustments were implemented:<br />

• Chimtalah 220 kV shunt capacitors were reduced from 80 MVAR to 10 MVAR<br />

• Pul-e-kumri 220 kV shunt capacitors (10 MVAR) were disconnected<br />

• Andkhoy 500 kV reactor was upgraded from 260 MVAR to 300 MVAR<br />

• Serder 500 kV reactor was upgraded from 240 MVAR to 300 MVAR<br />

11.2.1.3 <strong>System</strong> Performance<br />

As it can be seen in <strong>the</strong> Appendix no overloads were observed in any transmission line under<br />

normal conditions and contingencies.<br />

The voltage in <strong>the</strong> substations was always within <strong>the</strong> ranges indicated in <strong>the</strong> study criteria.<br />

The overall transmission losses is 26.3 MW<br />

11.2.2 Uzbekistan Supply Option<br />

11.2.3 Uzbekistan Supply Option<br />

The results <strong>of</strong> Uzbekistan supply option for normal conditions are included in Appendix F.<br />

The following conclusions can be obtained from <strong>the</strong> analysis.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

322 Power Technologies International


11.2.3.1 Import Power to <strong>Kabul</strong><br />

With <strong>the</strong> addition <strong>of</strong> 100 MW in <strong>Kabul</strong> Diesel plus <strong>the</strong> existing hydro and <strong>the</strong>rmal generation in<br />

<strong>the</strong> area <strong>the</strong> power imported through Chimtalah is 181 MW. It is necessary to point out that<br />

Chimtalah substation has two 160 MVA transformer. Therefore in <strong>the</strong> event <strong>of</strong> <strong>the</strong> loss <strong>of</strong> one<br />

transformer it will be necessary to implement a load shedding strategy.<br />

11.2.3.2 Reactive Power Compensation<br />

The original reactive compensation included in this case was oriented to allow maximum<br />

transfer <strong>of</strong> power to <strong>Kabul</strong> thorough <strong>the</strong> 220 kV network. With <strong>the</strong> new diesel plant in <strong>Kabul</strong><br />

<strong>the</strong> import power is reduced in around 60 MW, <strong>the</strong>refore reactive compensation was adjusted<br />

accordingly in o<strong>the</strong>r to guarantee an adequate voltage pr<strong>of</strong>ile.<br />

The following reactive compensation adjustments were implemented:<br />

• Pul-e-kumri 220 kV shunt capacitors (15 MVAR) were disconnected<br />

11.2.3.3 <strong>System</strong> Performance<br />

As it can be seen in <strong>the</strong> Appendix not overloads were observed in any transmission line<br />

under normal conditions and contingencies.<br />

The voltage in <strong>the</strong> substations was always within <strong>the</strong> ranges indicated in <strong>the</strong> study criteria.<br />

The overall transmission losses is 23.3 MW<br />

11.2.4 Tajikistan Supply Option<br />

11.2.5 Tajikistan Supply Option<br />

The results <strong>of</strong> Tajikistan supply option for normal conditions are included in Appendix G. The<br />

following conclusions can be obtained from <strong>the</strong> analysis.<br />

11.2.5.1 Import Power to <strong>Kabul</strong><br />

With <strong>the</strong> addition <strong>of</strong> 100 MW in <strong>Kabul</strong> Diesel plus <strong>the</strong> existing hydro and <strong>the</strong>rmal generation<br />

in <strong>the</strong> area <strong>the</strong> power imported through Chimtalah is 169 MW. It is necessary to point out that<br />

Chimtalah substation has two 160 MVA transformer. Therefore in <strong>the</strong> event <strong>of</strong> <strong>the</strong> loss <strong>of</strong> one<br />

transformer it will be necessary to implement a load shedding strategy.<br />

11.2.5.2 Reactive Power Compensation<br />

The original reactive compensation included in this case was oriented to allow maximum<br />

transfer <strong>of</strong> power to <strong>Kabul</strong> thorough <strong>the</strong> 220 kV network. With <strong>the</strong> new diesel plant in <strong>Kabul</strong><br />

<strong>the</strong> import power is reduced in around 60 MW, no reactive compensation at Chimtalah 220<br />

kV was required under this configuration.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 323


11.2.5.3 <strong>System</strong> Performance<br />

As it can be seen in <strong>the</strong> Appendix not overloads were observed in any transmission line<br />

under normal conditions and contingencies.<br />

The voltage in <strong>the</strong> substations was always within <strong>the</strong> ranges indicated in <strong>the</strong> study criteria.<br />

The overall transmission losses is 42 MW<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

324 Power Technologies International


Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International 325


Appendix<br />

A<br />

Load Flow results for Case_07_B1<br />

Estimated Loading Conditions in Existing Network<br />

Please see file Case_07_B1.pdf or use hyper-link below.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International A-1


1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8


7.05 %<br />

P-B2-1 Reconductor to 70 sqm<br />

P-B2-1 Reconductor to 70 sqm<br />

P-B2-1 Reconductor to 70 sqm<br />

P-B2-1 Reconductor to 70 sqm<br />

1.38 MVA<br />

43.61 %<br />

P-B2-1 Reconductor to 70 sqm<br />

1.39 MVA<br />

43.60 %<br />

P-B2-1 Reconductor to 120 sqm<br />

1.62 MVA<br />

50.63 %<br />

0.22 MVA<br />

7.04 %<br />

P-B2-1 Reconductor to 120 sqm<br />

1.63 MVA<br />

50.63 %<br />

0.14 MVA<br />

4.28 %<br />

P-B2-1 Reconductor to 120 sqm<br />

P-B2-1 Reconductor to 120 sqm<br />

0.14 MVA<br />

34.50 %<br />

0.14 MVA<br />

34.50 %<br />

0.22 MVA<br />

34.46 %<br />

0.12 MVA<br />

34.62 %<br />

0.07 MVA<br />

34.50 %<br />

0.14 MVA<br />

34.49 %<br />

0.12 MVA<br />

34.61 %<br />

0.14 MVA<br />

34.49 %<br />

0.07 MVA<br />

34.49 %<br />

0.09 MVA<br />

34.47 %<br />

0.14 MVA 0.22 MVA<br />

34.47 %<br />

0.03 MVA<br />

34.49 %<br />

0.03 MVA<br />

34.48 %<br />

4 MVA<br />

45 %<br />

0.22 MVA<br />

34.42 %<br />

0.22 MVA<br />

34.42 %<br />

0.14 MVA<br />

34.45 %<br />

1.77 MVA<br />

27.45 %<br />

2.01 MVA<br />

30.80 %<br />

0.22 MVA<br />

4.55 %<br />

0.22 MVA<br />

4.55 %<br />

0.14 MVA<br />

2.89 %<br />

1.34 MVA<br />

42.52 %<br />

1.33 MVA<br />

42.52 %<br />

1.33 MVA<br />

42.52 %<br />

0.22 MVA<br />

1.33 MVA<br />

42.52 %<br />

1.29 MVA<br />

20.71 %<br />

0.22 MVA<br />

7.05 %<br />

7.06 %<br />

0.09 MVA<br />

2.71 %<br />

0.09 MVA<br />

2.71 %<br />

0.09 MVA<br />

2.71 %<br />

1.29 MVA<br />

20.71 %<br />

1.29 MVA<br />

20.71 %<br />

1.28 MVA<br />

20.72 %<br />

0.88 MVA<br />

14.20 %<br />

0.14 MVA<br />

2.23 %<br />

0.33 MVA<br />

5.40 %<br />

0.74 MVA<br />

11.97 %<br />

0.22 MVA<br />

3.50 %<br />

0.33 MVA<br />

5.41 %<br />

0.14 MVA<br />

2.23 %<br />

0.60 MVA<br />

9.74 %<br />

0.60 MVA<br />

9.74 %<br />

0.22 MVA<br />

3.50 %<br />

0.60 MVA<br />

9.74 %<br />

0.22 MVA<br />

3.51 %<br />

0.60 MVA<br />

9.74 %<br />

0.53 MVA<br />

8.62 %<br />

0.12 MVA<br />

1.91 %<br />

0.12 MVA<br />

1.91 %<br />

0.22 MVA<br />

3.51 %<br />

0.53 MVA<br />

8.62 %<br />

0.12 MVA<br />

1.91 %<br />

0.14 MVA<br />

2.24 %<br />

0.39 MVA<br />

6.39 %<br />

0.39 MVA<br />

6.39 %<br />

0.39 MVA<br />

6.39 %<br />

0.39 MVA<br />

6.39 %<br />

0.28 MVA<br />

4.48 %<br />

0.28 MVA<br />

4.48 %<br />

0.22 MVA<br />

3.51 %<br />

0.14 MVA<br />

2.24 %<br />

0.22 MVA<br />

3.51 %<br />

0.14 MVA<br />

2.24 %<br />

0.14 MVA<br />

2.24 %<br />

0.14 MVA<br />

2.24 %<br />

0.14 MVA<br />

2.24 %<br />

0.14 MVA<br />

2.24 %<br />

0.28 MVA<br />

4.49 %<br />

0.28 MVA<br />

4.49 %<br />

0.14 MVA<br />

34.50 %<br />

0.14 MVA<br />

2.25 %<br />

0.14 MVA<br />

2.24 %<br />

0.14 MVA<br />

2.25 %<br />

0.14 MVA<br />

2.25 %<br />

NW-513-Khal NW-513-250-6-42 Dari 0.14 MVA<br />

87.52 87.53 %<br />

2.25 %<br />

NW-513-Qaria Borjak<br />

87.62 NW-513-289 %<br />

NW-513-288 87.62 %<br />

87.63 %<br />

NW-513-286<br />

87.63 %<br />

NW-513-283<br />

87.63 %<br />

NW-513-282<br />

87.67 %<br />

NW-513-275<br />

87.69 %<br />

0.14 MVA<br />

2.25 %<br />

NW-513-250-6-41<br />

87.53 %<br />

0.14 MVA<br />

2.25 %<br />

.<br />

NW-513-250-6-38<br />

87.53 %<br />

NW-513-250-6-33<br />

87.54 %<br />

NW-513-250-6-31<br />

87.55 %<br />

NW-513-Qalai Yos<strong>of</strong> Khaldari<br />

NW-513-250-6-20<br />

87.57 %<br />

87.57 %<br />

NW-513-Qaria Tolad<br />

88.01 %<br />

NW-513-250-6-16<br />

87.59 %<br />

NW-513-212-48<br />

88.04 %<br />

NW-513-212-47<br />

88.04 %<br />

NW-513-250-6-11<br />

87.62 %<br />

NW-513-250<br />

87.69 %<br />

NW-513-250-1<br />

87.68 %<br />

NW-513-250-2<br />

87.68 %<br />

NW-513-250-3<br />

87.66 %<br />

NW-513-250-6<br />

87.65 %<br />

NW-513-250-6-8<br />

87.63 %<br />

NW-513-250-12<br />

87.62 %<br />

NW-513-212-26<br />

88.13 %<br />

NW-513-212-25<br />

88.14 %<br />

NW-513-238<br />

87.87 %<br />

NW-513-Qaria Dalil<br />

87.83 %<br />

NW-513-244<br />

87.81 %<br />

NW-513-250-15<br />

87.61 %<br />

NW-513-Shamel Zaee<br />

87.61 %<br />

NW-513-212-16<br />

NW-513-Doda Mast<br />

88.17 88.17 % %<br />

NW-513-212-14<br />

88.18 %<br />

NW-513-Qalai Amir Mohammad<br />

NW-513-225<br />

88.02 %<br />

88.02 %<br />

NW-513-228<br />

87.99 %<br />

NW-513-229<br />

87.98 %<br />

NW-513-222<br />

88.06 %<br />

NW-513-Deh Arbab<br />

88.24 %<br />

NW-514-Qalai mirdad<br />

88.01 %<br />

NW-513-209<br />

88.34 %<br />

NW-513-203<br />

88.48 %<br />

NW-513-195<br />

88.70 %<br />

NW-513-159-40-2<br />

90.46 %<br />

NW-513-159-40-3<br />

90.46 %<br />

NW-513-Koshkak<br />

NW-513-159-40<br />

90.47<br />

90.47<br />

%<br />

%<br />

NW-513-Kamangar<br />

90.45 %<br />

NW-513-187<br />

88.97 %<br />

NW-513-Deh Ponba<br />

88.82 %<br />

NW-513-159-27<br />

90.57 %<br />

NW-513-182<br />

89.37 %<br />

NW-513-181<br />

89.45 %<br />

Branch Element<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


5.91 MVA<br />

87.96 %<br />

NW-526-No_18_Projhe Jadeed # 1&2<br />

98.29 %<br />

NW-526-No_24_Projhe Jadeed # 1&2<br />

98.24 %<br />

NW-526-No_19_Panjsad Family<br />

97.71 %<br />

NW-526-Hazare Baghal<br />

99.98 %<br />

NW-526-No_15_Maktab Sangi # 1&2<br />

97.01 %<br />

NW-526-33_15<br />

99.98 %<br />

NW-526-51_17<br />

97.01 %<br />

NW-526-51_16<br />

97.04 %<br />

NW-526-51_15<br />

97.07 %<br />

NW-526-No_17_Projhe Jadeed # 1&2<br />

98.40 %<br />

NW-526-No_14_Panjsad Family # 1&2<br />

97.06 %<br />

NW-526-No_16_Panjsad Family # 1&2<br />

97.78 %<br />

NW-526-54<br />

97.78 %<br />

NW-526-42_3<br />

98.49 %<br />

N-513-Garud Milli # 2<br />

99.50 %<br />

NW-526-42_2<br />

98.58 %<br />

NW-516-Mawad Nafti<br />

104.58 %<br />

NW-516-50<br />

104.59 %<br />

NW-526-33_2<br />

100.03 %<br />

NW-527-33<br />

101.66<br />

NW-526-33<br />

100.04 %<br />

NW-526-36<br />

99.66 %<br />

NW-527-36<br />

101.41 %<br />

NW-527-TR-61Taqweatee<br />

101.66 %<br />

NW-526-40<br />

99.06 %<br />

NW-527-40<br />

100.99 %<br />

NW-526-42<br />

NW-527-Tr-No-6- 98.82 % 1&2<br />

100.99 %<br />

NW-526-No_21_Projhe Jadeed<br />

98.57 %<br />

NW-526-48<br />

98.26 %<br />

NW-526-Nan Pazi Watan<br />

98.26 %<br />

NW-526-51<br />

97.95 %<br />

NW-526-49<br />

98.19 %<br />

NW-526-51_3<br />

97.73 %<br />

NW-526-51_4<br />

97.66 %<br />

NW-526-51_2<br />

97.82 %<br />

NW-526-No_20_Panjsad Family # 1&2<br />

97.66 %<br />

NW-526-51_7<br />

97.50 %<br />

NW-526-51_8<br />

97.45 %<br />

N-513-53<br />

101.64 %<br />

N-513-71<br />

100.56 %<br />

N-513-79<br />

100.01 %<br />

N-513-Reasat-e-Logiestic<br />

99.59 %<br />

N-513-Technic wa Asleh<br />

99.25 % N-513-99-J<br />

99.25 %<br />

NW-516-52<br />

104.59 %<br />

NW-527-30<br />

NW-526-30<br />

101.97 %<br />

100.51 %<br />

N-513-43-C15<br />

102.02 %<br />

N-513-43-C14<br />

102.03 %<br />

N-513-No-59 Taqweatee Khuja Bughra<br />

100.51 %<br />

N-513-No-59 Khuja Bughra-B<br />

102.00 %<br />

N-513-84<br />

99.68 %<br />

NW-527-44<br />

100.75 %<br />

NW-527-44.5<br />

100.66 %<br />

NW-527-44.15<br />

NW-527-44.13<br />

100.63 %<br />

100.63 %<br />

NW-527-Tr.No-8 Hawaee<br />

100.62 %<br />

N-513-47<br />

102.00 %<br />

N-513-43-C11<br />

102.08 %<br />

N-513-99-J2<br />

99.30 %<br />

NW-526-Lewai Babajan<br />

101.84 %<br />

NW-527-45 NW-527-Tr.No-6 Hawaee-1&2<br />

100.70 % 100.66 %<br />

NW-527-46<br />

100.66 %<br />

NW-527-Tr. No 6-ariana-1&2<br />

100.66 %<br />

N-520-51<br />

N-520-Borj Sera mina<br />

N-520-48<br />

# 1&2<br />

102.75<br />

102.77 %<br />

102.77 %<br />

N-520-43<br />

102.89 %<br />

N-513-46<br />

102.08 %<br />

N-513-No-62 Hawaee Khuja Bughra<br />

99.99 %<br />

N-513-99<br />

99.32 %<br />

NW-527-24<br />

NW-526-24<br />

102.62 %<br />

101.50 %<br />

N-513-43-C6<br />

102.15 %<br />

N-513-No-059 Khuja Bughra-A<br />

102.15 %<br />

NW-527-21 NW-526-21<br />

102.88 101.87 %%<br />

NW-524-Borj_4_Zamini # 1&2<br />

102.57 %<br />

NW-524-56<br />

102.57 %<br />

NW-524-52<br />

102.71 %<br />

NW-527-Tr.No 5-Hesa Awal -1&2<br />

100.22 %<br />

NW-527-52.12<br />

100.26 %<br />

NW-527-52.13<br />

100.24 %<br />

NW-527-52.8<br />

100.31 % NW-527-52<br />

100.57 %<br />

NW-527-Tr.Shafa Khane Khairkhana<br />

100.53 %<br />

NW-527-52.a.3<br />

100.54 %<br />

N-520-41<br />

102.94 % N-520-No-13 Zamini N-520-38 # 1&2<br />

103.01 % 103.01 %<br />

N-513-43-C1<br />

N-513-43 102.25 %<br />

102.26 %<br />

N-513-43-C4<br />

102.19 %<br />

NW-527-52.8.2<br />

100.28 %<br />

NW-527-TR-no-5 Khest hokhtif-1&2<br />

100.28 %<br />

NW-527-52.a.2<br />

100.55 %<br />

NW-516-40<br />

104.63 %<br />

NW-516-33<br />

104.67 %<br />

NW-527-18 NW-526-18<br />

103.14 102.28 %%<br />

NW-527-18.1<br />

103.12 %<br />

NW-527-18.2<br />

103.11<br />

NW-527-Tr-no-4<br />

%<br />

103.10 %<br />

N-520-Borj 8 Jeem N-520-57 # 1&2<br />

102.64 % 102.65 %<br />

N-513-39<br />

102.55 %<br />

N-513-35<br />

102.79 %<br />

NW-527-TR No-7 hesaee Dohm-1&2<br />

100.38 %<br />

NW-527-60<br />

100.40 %<br />

NW-516-20<br />

104.73 %<br />

NW-524-Borj_3_Markazi Hasee Awal # 1&2<br />

103.54 %<br />

NW-524-32_2<br />

103.54 % NW-524-32<br />

103.57 %<br />

NW-524-Mokhaberat Khairkhana<br />

103.05 % NW-524-41<br />

103.05 %<br />

NW-524-Jawar Mokhaberat Khairkhana<br />

103.05 %<br />

NW-524-38<br />

103.15 %<br />

NW-524-37<br />

103.26 %<br />

NW-524-38_3<br />

103.14 %<br />

NW-524-38_4<br />

103.14 %<br />

NW-524-Khedamat Takhniki Wezarat Mahdan<br />

103.13 %<br />

NW-524-38_5<br />

103.13 %<br />

NW-524-Stak Markazi Sehat Aama<br />

103.26 %<br />

N-527-43<br />

102.13 %<br />

N-527-No-9 Zamini<br />

N-527-48<br />

Tr 1&2<br />

102.03 %<br />

102.04 %<br />

N-520-29<br />

103.31 N-520-No-12 % Zamini N-520-27 # 1&2<br />

103.39 % 103.39 % N-520-25<br />

103.51 %<br />

N-513-27-B2<br />

103.17 %<br />

N-513-27-B1<br />

N-513-27 103.17 %<br />

103.18 %<br />

N-513-No-60 khuja Bughra<br />

103.16 %<br />

N-513-No-3 Zameni khuja Bughra<br />

102.88 %<br />

N-513-19-A25<br />

N-513-19-A27 102.90 %<br />

102.88 %<br />

N-513-19-A22<br />

102.93 %<br />

N-513-No-2 Hawaee Khuja Bughra<br />

N-513-19-A-19<br />

102.93 %<br />

102.98 %<br />

NW-516-12_5<br />

104.71 %<br />

NW-516-Borj_1_Hawaee<br />

104.71 %<br />

N-527-Qalhae Najara<br />

102.14 % N-527-38-C-10<br />

102.14 %<br />

N-527-No-22 Zamini<br />

102.19 % N-527-39-2<br />

102.19 % N-527-39<br />

102.21 N-527-38-A1 %<br />

102.22 %<br />

N-527-38<br />

102.23 %<br />

N-527-38-A11<br />

102.11 %<br />

N-527-Sarwar Kaynat<br />

102.10 %<br />

N-520-No-12 Taqweatee<br />

103.83 %<br />

N-520-20<br />

103.85 %<br />

N-513-19<br />

103.55 %<br />

N-513-19-A8<br />

N-513-No-1 Khuja Bughra<br />

103.18<br />

#<br />

%<br />

1<br />

103.19 %<br />

N-513-No-1 Taqweatee khuja Bughra<br />

103.16 %<br />

N-513-19-A-17<br />

103.02 %<br />

NW-516-12<br />

104.77 %<br />

NW-516-11<br />

104.78 %<br />

NW-516-11_1<br />

104.78 %<br />

NW-516-Borj_2_Hawaee<br />

104.78 %<br />

NW-524-Borj_1_Hesa Awal Khirkhana<br />

103.79 %<br />

NW-524-21_5<br />

103.79 %<br />

NW-524-23<br />

103.76 %<br />

NW-524-21_3<br />

103.81 %<br />

NW-524-23_5<br />

103.63 %<br />

NW-524-Borj_2_Zamini # 1&2<br />

103.59 %<br />

N-512-Leway Amniat<br />

103.35 %<br />

NW-516-6<br />

104.91 %<br />

NW-516<br />

104.97 %<br />

NW-518<br />

104.78 %<br />

13.35 MVA<br />

100.06 %<br />

13.37 MVA<br />

98.43 %<br />

NW-517<br />

104.95 %<br />

NW-527<br />

104.97 %<br />

7.29 MVA<br />

88.14 %<br />

NW-513<br />

104.81 %<br />

NW-527-3<br />

NW-525 104.83 %<br />

104.88 %<br />

NW-526<br />

104.75 %<br />

NW-526-3<br />

104.59 %<br />

NW-527-4<br />

104.70 NW-525-3 %<br />

NW-524-5<br />

104.69 % NW-524-4<br />

104.79 %<br />

NW-514-3<br />

104.83 %<br />

104.75 %<br />

NW-524<br />

NW-514<br />

NW-515-4<br />

104.92 %<br />

104.87 %<br />

104.69 %<br />

P-B2-1 Upgraded to 240 sqm<br />

NW-515<br />

104.89 %<br />

NW-527-7<br />

104.46<br />

NW-526-7<br />

%<br />

104.19 %<br />

S/S North West<br />

105.00 %<br />

NW-514-7<br />

NW-514-6 104.36 %<br />

104.49 %<br />

NW-524-6<br />

104.74 %<br />

NW-524-7<br />

104.61 %<br />

NW-525-9<br />

104.08 %<br />

NW-515-9<br />

104.25 %<br />

NW-515-Gaz Mayee<br />

104.25 %<br />

NW-524-21_2<br />

103.82 %<br />

NW-514-10<br />

103.82 % NW-524-12<br />

NW-524-10<br />

104.35 % NW-524-14<br />

104.43 %<br />

104.20 %<br />

NW-524-13<br />

NW-514-12<br />

104.28 %<br />

103.61 %<br />

NW-514-14<br />

103.44 %<br />

NW-525-15<br />

103.48 %<br />

NW-515-15<br />

103.70 %<br />

NW-524-21<br />

103.84 %<br />

NW-524-Borj_2_Dakhel Haweeli # 1&2<br />

104.11 %<br />

NW-524-14_4<br />

104.13 %<br />

NW-524-14_4_2<br />

104.11 %<br />

NW-524-14_12<br />

104.06 %<br />

NW-524-Borj_2_Hawee Qalah Najara<br />

104.06 %<br />

N-527-32-D4<br />

N-527-No-10 Zamini Tr 1&2<br />

102.43 %<br />

102.46 %<br />

N-527-32<br />

102.47 %<br />

N-527-32-D6 N-527-32-D7<br />

N-527-10-E1<br />

N-527-10-E6<br />

N-527-No-25 Hawaee 102.38 102.38 % %<br />

102.42 %<br />

102.29 %<br />

102.37 %<br />

N-527-10-E7<br />

102.27 %<br />

N-527-10-E8<br />

N-527-10-E9<br />

102.23<br />

102.23<br />

%<br />

N-527-No-23 N-527-10-E-10-1<br />

Hawaee Tr 1&2<br />

102.15 % 102.15 %<br />

N-527-10-E10<br />

102.17 %<br />

N-527-No-10 Hawaee<br />

103.20 % N-527-24<br />

103.20 %<br />

JS#10-N<br />

103.46 %<br />

N-519-22<br />

103.52 %<br />

N-JS10-Bland Manzel Mastora 1&2<br />

103.44 %<br />

N-520-15-A5 N-520-15-A4<br />

N-520-No-11 104.11 104.12 Zamini# % % 1&2<br />

N-520-15<br />

104.12 %<br />

104.18 % N-520-11<br />

104.39 %<br />

N-520-No-11 N-520-15-A10<br />

Hawaee<br />

104.08 % 104.08 %<br />

N-520-9<br />

104.49 % N-520-4<br />

104.76 %<br />

N-529-3<br />

N-516-19<br />

104.83<br />

N-520<br />

% N-517-19<br />

103.45 %<br />

P-B3-18-Reconductored to 185 sqm 104.94 %<br />

N-516-40 Metra Wazir 103.70 Abad%<br />

N-512-2<br />

103.45 %<br />

104.94 %<br />

N-513-2<br />

N-513-7 N-519-6<br />

104.86 %<br />

N-519-7<br />

104.43 %N-513-6 104.58 %<br />

N-519-8 104.53 %<br />

N-519-2<br />

N-516-3<br />

N-528-2<br />

104.51 %<br />

104.84 %<br />

104.80 N-515-2%<br />

104.85 %<br />

104.47 %<br />

104.87<br />

N-517-3<br />

%<br />

104.83 %<br />

N-518-4<br />

N-514-3<br />

104.80 %<br />

N-529-8<br />

N-514-8<br />

104.79 %<br />

104.27 %<br />

104.55 N-529-9<br />

N-514-9 104.21 %<br />

104.52 %<br />

P-B3-18-Reconductored to 185 sqm<br />

S/S North<br />

105.00 %<br />

N-515-7<br />

104.65 N-518-7 %<br />

104.48 %<br />

N-512-21<br />

103.37 %<br />

N-528-32<br />

102.66 %<br />

N-528-528-1<br />

102.47 %<br />

N-528-9N-528-10<br />

102.06 % 102.00 %<br />

N-528-10A2<br />

101.94 %<br />

N<br />

1<br />

NW-518-7<br />

104.21 NW-517-5 %<br />

104.70 %<br />

7.27 MVA<br />

98.94 %<br />

NW-513-5<br />

104.52 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-16<br />

103.20 %<br />

NW-515-18<br />

103.45 %<br />

NW-514-18<br />

NW-514-18_4<br />

NW-514-Borj Wakseensazi 102.98 %<br />

102.97 %<br />

102.97 %<br />

NW-525-18<br />

103.19 %<br />

N-527-10-E 15<br />

102.11 %<br />

N-514-No-1 Proja Wazir Abad 1<br />

104.03 %<br />

N-514-No-6 Proja Wazir Abad 2<br />

103.75 N-514-19-C11 % N-514-19-C12<br />

103.75 %<br />

103.78 %<br />

N-528-12<br />

101.82 %<br />

N-514-19-A5<br />

104.04 %<br />

N-515-13<br />

104.31 N-518-13 %<br />

103.96 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-Spin Ghar CC<br />

102.55 %<br />

NW-514-22<br />

102.55 %<br />

N-514-19<br />

104.10 %<br />

N-529-19<br />

103.30 %<br />

N-514-19-C5<br />

103.92 %<br />

N-514-19-C4<br />

103.94 %<br />

N-514-19-C6<br />

103.89 %<br />

13.27 MVA<br />

100.06 %<br />

7.25 MVA<br />

98.94 %<br />

NW-514-28_2<br />

NW-514-Mechaniza Zrahaty<br />

102.31 %<br />

102.31 %<br />

NW-514-24_7<br />

102.31 %<br />

NW-514-Reiasat Anasor Felezy<br />

102.44 %<br />

NW-514-23<br />

102.44 NW-515-24 %<br />

102.92 %<br />

NW-525-24<br />

102.62 %<br />

N-527-Shahrak Police<br />

101.92 %<br />

N-527-10-E 29<br />

101.93 %<br />

N-527-10-E 25<br />

102.01 %<br />

N-514-19-C2<br />

103.99 %<br />

N-514-19-C1<br />

N-514-19-B3<br />

104.01 %<br />

104.01 %<br />

N-514-19-C-15<br />

103.75 %<br />

N-514-19-C-16<br />

103.74 %<br />

NW-514-24<br />

102.32 %<br />

N-527-10-E 28<br />

101.97 %<br />

N-514-No-2 Proja Wazir Abad 1&2<br />

104.00 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-528-Mohamadya No-1<br />

100.84 %<br />

N-528-25-B7<br />

100.85 %<br />

N-528-21<br />

101.10 %<br />

NW-518-18<br />

103.00 %<br />

NW-517-13<br />

104.15 %<br />

NW-513-13<br />

103.45 %<br />

NW-514-Farm Morghdary<br />

101.85 %<br />

NW-514-28<br />

101.91 %<br />

N-527-Hotel Shame Paris<br />

101.97 N-527-10-E-25-7<br />

101.97<br />

%<br />

%<br />

N-514-29-B6<br />

N-514-No-7 Proja Wazir Abad 1<br />

103.85 %<br />

103.82 %<br />

N-514-29-B9<br />

103.83 N-514-29-B8 %<br />

103.83 %<br />

N-514-28 N-529-28<br />

N-514-29-B2103.91 102.40 %%<br />

103.89 %<br />

N-514-29-B1<br />

103.89 N-514-29 % N-514-28-A1<br />

103.90 103.90 % %<br />

N-514-No-3 Proja Wazir Abad 21<br />

103.87 %<br />

N-514-Salim Carwan<br />

103.72 %<br />

N-515-24<br />

103.17 N-518-24 %<br />

102.25 %<br />

N-528-25<br />

N-528-Mohamadya<br />

100.88 %<br />

No-2<br />

100.88 %<br />

N-528-25-B3<br />

100.88 %<br />

N-528-28<br />

100.69 %<br />

NW-518-26<br />

102.10 %<br />

13.12 MVA<br />

100.06 %<br />

NW-514-30<br />

101.68 %<br />

NW-514-Borj_1_Tahia Maskan<br />

101.63 %<br />

NW-514-Borj_2_Tahia Maskan<br />

101.61 %<br />

NW-514-Borj_3_Tahia Maskan 1&2<br />

101.60 %<br />

NW-525-37<br />

NW-515-37 101.27 %<br />

101.67 %<br />

NW-525-38<br />

101.14 %<br />

NW-515-38<br />

101.55 %<br />

NW-525-39<br />

NW-515-39<br />

100.97 %<br />

101.39 %<br />

NW-525-43<br />

100.70 %<br />

NW-515-43<br />

101.15 %<br />

NW-515-43_1<br />

101.14 %<br />

NW-515-45<br />

100.97 %<br />

NW-515-Azamatullah<br />

NW-515-43_4<br />

101.12 % 101.12 %<br />

NW-515-Haji Wazir<br />

NW-515-45_3<br />

Gul<br />

100.95 %<br />

100.95 %<br />

NW-525-45<br />

100.50 %<br />

NW-525-Market Mewa<br />

100.27 %<br />

NW-515-47 NW-525-47<br />

100.78 %<br />

100.27 %<br />

NW-515-Kochi Market<br />

100.53 % NW-515-50_8<br />

100.53 %<br />

NW-525-68.5<br />

97.97 %<br />

NW-525-Hakim Naser Khesro<br />

97.96 %<br />

NW-525-68<br />

97.99 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-514-No-4 Proja Wazir Abad<br />

N-514-36 103.86 %<br />

103.87<br />

N-529-36<br />

101.50 %<br />

NW-525-72<br />

97.59 %<br />

NW-525-Qabre Shahoon<br />

95.81 %<br />

N-528-Taqweyate<br />

N-528-50-E<br />

Wazir abad<br />

1<br />

99.74 %<br />

99.74 %<br />

N-528-Wazir Abad<br />

99.74 %<br />

N-528-50<br />

99.77 %<br />

N-528-Borje N-528-47 Tahire<br />

99.98 % 99.98 %<br />

N-528-32<br />

100.48 %<br />

N-528-38 N-528-36<br />

100.18 % 100.29 %<br />

N-528-Char Qala Wazir Abad # 21<br />

100.17 % N-528-37<br />

100.23 %<br />

N-528-42<br />

100.09 %<br />

N-528-37-c1<br />

100.20 %<br />

13.01 MVA<br />

100.06 %<br />

NW-517-23<br />

103.52 %<br />

7.18 MVA<br />

98.94 %<br />

NW-515-Proses Roda<br />

101.11 NW-515-Flezkary % Kargar<br />

101.12 %<br />

NW-515-43_6<br />

101.12 %<br />

NW-515-45_4<br />

100.95 %<br />

NW-515-45_5<br />

100.94 %<br />

NW-515-45_6<br />

100.94 %<br />

NW-515-Agha Shereen<br />

100.94 %<br />

NW-515-50<br />

100.54 %<br />

NW-525-Chaman Babrak No-8<br />

98.62 %<br />

NW-525-63<br />

98.63 %<br />

NW-525-76<br />

97.22 %<br />

NW-525-Taimani No-3<br />

97.22 %<br />

N-528-37-c4<br />

100.14 %<br />

NW-514-Zakhira Teel NW-514-40_5<br />

Badambagh<br />

100.92 %<br />

100.92 %<br />

NW-514-40_1<br />

100.93 %<br />

NW-514-40<br />

100.93 %<br />

NW-514-41<br />

100.90 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-518-32<br />

101.16 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-42<br />

100.83 %<br />

NW-514-42_1<br />

100.80 %<br />

NW-525-55<br />

99.51 %<br />

NW-515-55<br />

NW-515-Market 100.15 % mily<br />

100.15 %<br />

NW-525-58<br />

99.18 %<br />

NW-515-60<br />

99.87 %<br />

NW-515-Chaman Babrak<br />

99.60 %<br />

N-529-49<br />

100.43 %<br />

NW-525-Qasemi Vin House<br />

96.77 %<br />

NW-525-82<br />

96.83 %<br />

NW-525-kabul Paris<br />

96.83 %<br />

NW-525-82.1<br />

96.83 %<br />

N-515-31<br />

102.07 %<br />

N-518-31<br />

100.57 %<br />

N-518-Abrasani Wazir abad<br />

100.57 %<br />

N-528-Now Abad Qala Mosa<br />

100.04 %<br />

12.89 MVA<br />

100.06 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-Borj Deh Kepak 1&2<br />

100.71 %<br />

NW-514-Borj_2_Parwan NW-514-49 she<br />

100.40 % 100.41 %<br />

NW-514-Sarai Kantinery_1&2<br />

100.09 %<br />

NW-514-55<br />

100.09 %<br />

NW-515-Haji Aadam khan<br />

99.43 %<br />

NW-515-Borj_1_Parwan She<br />

99.44 %<br />

NW-515-74<br />

99.45 %<br />

P-B3-13-Reconductored to 150 sqm<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-515-62<br />

99.62 %<br />

N-529-49A6<br />

NW-515-63<br />

100.36 %<br />

99.55 NW-515-63_1<br />

%<br />

99.48 %<br />

N-529-Borj 5 Chamni Babrak<br />

100.35 %<br />

P-B3-13-Reconductored to 150 sqm<br />

NW-515-63_4<br />

99.08 %<br />

NW-525-82.4<br />

96.80 %<br />

NW-525-92<br />

96.10 %<br />

NW-525-Taimani No-2-1&2<br />

96.09 %<br />

NW-525-Nasajy Maqsody<br />

95.75 %<br />

NW-525-109<br />

95.54 %<br />

NW-525-108<br />

95.56 %<br />

NW-525-112<br />

95.43 %<br />

NW-525-111<br />

95.44 %<br />

NW-525-117<br />

95.25 %<br />

NW-525-Qalah Mosa No-1<br />

95.25 %<br />

NW-525-Qalah Mosa No-2<br />

95.19 %<br />

N-528-37-c15<br />

100.00 %<br />

N-528-37-C17<br />

99.97 %<br />

NW-518-47<br />

99.48 %<br />

NW-518-40<br />

100.13<br />

NW-517-32<br />

%<br />

102.83 %<br />

12.75 MVA<br />

100.06 %<br />

7.00 MVA<br />

98.95 %<br />

NW-513-32<br />

100.88 %<br />

P-B2-1 Reconductor to 185 sqm<br />

0<br />

NW-514-58<br />

99.95 %<br />

NW-514-Borj_3_Parwan she<br />

99.86 % NW-514-60<br />

99.86 %<br />

NW-515-67<br />

NW-515-Etebar khan<br />

99.49 %<br />

99.08 %<br />

NW-515-67_1<br />

NW-515-Hotel Sultan Qalbha<br />

99.48 %<br />

99.08 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-515-63_6<br />

98.75 %<br />

NW-515-67_3<br />

99.46 %<br />

NW-515-Maiwand Market<br />

98.75 %<br />

NW-515-67_4<br />

99.45 %<br />

NW-514-65<br />

99.69 %<br />

N-529-64<br />

NW-514-66<br />

99.10 %N-529-63<br />

99.65 %<br />

NW-515-Borj_4_Parwan NW-515-67_8<br />

99.15 %<br />

She<br />

99.39 % 99.39 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-514-69<br />

99.59 %<br />

NW-514-71<br />

99.52 %<br />

N-529-66<br />

NW-514-Chamandy Karte NW-514-71_1 Parwan_1&2<br />

98.77 %<br />

99.50 %<br />

99.50 %<br />

P-B3-13-Reconductored to 150 sqm<br />

NW-515-Hawaee Ansary<br />

97.80 %<br />

NW-515-63_16<br />

97.81 %<br />

NW-525-101<br />

95.81 %<br />

NW-525-102<br />

95.80 %<br />

NW-525-102.2<br />

95.76 %<br />

NW-525-Taimani No-1<br />

95.76 %<br />

N-515-35<br />

101.49 N-518-35 %<br />

99.71 %<br />

N-515-36<br />

101.40 N-518-36 %<br />

99.57 %<br />

NW-525-Charahy Shaheed<br />

95.15 %<br />

N-528-No-3 Qala Mosa<br />

N-528-37-C19<br />

99.93 %<br />

99.94 %<br />

N-518_JS2_A_1_2-Qalai Fatullah # 1<br />

98.11 %<br />

P-B3-18-Reconductored to 185 sqm<br />

12.67 MVA<br />

100.07 %<br />

NW-515-Blaak haee NW-515-63_16_2<br />

Shahraara<br />

97.66 % 97.66 %<br />

NW-518-51 NW-517-43 NW-513-43<br />

99.10102.36 99.97 % %<br />

12.62 MVA<br />

100.07 %<br />

NW-518-52<br />

98.98 %<br />

NW-514-77<br />

99.39 %<br />

NW-514-80<br />

99.33 %<br />

N-529-77<br />

98.15 %<br />

N-529-71<br />

98.41 %<br />

NW-515-63_16_3<br />

97.63 %<br />

NW-515-63_16_4<br />

97.58 %<br />

NW-515-Borj_2_Ansary<br />

NW-515-63_23<br />

97.57 NW-515-63_22 % 97.57 %<br />

97.59 %<br />

NW-513-Deh Araban hawahe<br />

92.86 %<br />

0.22 MVA<br />

34.41 %<br />

P-B2-1 Reconductor to 120 sqm<br />

2.23 MVA<br />

34.12 %<br />

NW-513-107-5<br />

93.05 %<br />

NW-513-5-G-OH<br />

93.02 %<br />

2.23 MVA<br />

46.18 %<br />

0.14 MVA<br />

34.44 %<br />

NW-513-107-2<br />

93.18 %<br />

2.24 MVA<br />

46.18 %<br />

NW-513-107<br />

93.25 %<br />

2.24 MVA<br />

46.18 %<br />

P-B2-1 Added a voltage regulator<br />

P-B2-1 Reconductor to 185 sqm<br />

4.49 MVA<br />

68.32 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-101<br />

93.77 %<br />

4.51 MVA<br />

68.32 %<br />

0.55 MVA<br />

10.10 %<br />

NW-513-95-2<br />

94.30 %<br />

NW-513-95<br />

94.30 %<br />

5.07 MVA<br />

76.63 %<br />

0.55 MVA<br />

8.30 %<br />

0.14 MVA<br />

2.77 %<br />

5.22 MVA<br />

78.68 %<br />

NW-513-96<br />

NW-513-93<br />

94.19 % NW-513-Family Rahmat 94.51 abad %<br />

NW-513-96-1 94.51 % NW-513-92<br />

94.19 %<br />

94.55 %<br />

NW-513-Aqeb tapa Rahmat abad<br />

94.29 %<br />

0.28 MVA<br />

5.61 %<br />

5.49 MVA<br />

82.83 %<br />

0.28 MVA<br />

34.43 %<br />

0.14 MVA<br />

2.50 %<br />

0.14 MVA<br />

34.43 %<br />

P-B2-1 Reconductor to 185 sqm<br />

5.53 MVA<br />

82.83 %<br />

NW-513-Wakseen Sazee<br />

95.11 %<br />

0.34 MVA<br />

6.24 %<br />

0.34 MVA<br />

34.42 %<br />

NW-513-86-1<br />

0.34 MVA<br />

95.13 95.13 % % 5.13 %<br />

NW-513-84<br />

95.34 %<br />

5.88 MVA<br />

87.96 %<br />

NW-513-80<br />

95.74 %<br />

P-B2-1 Reconductor to 185 sqm<br />

5.91 MVA<br />

87.96 %<br />

NW-513-79<br />

95.85 %<br />

6.16 MVA<br />

91.18 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-74<br />

96.36 %<br />

0.49 MVA<br />

9.83 %<br />

NW-513-74-1<br />

96.35 %<br />

6.67 NW-513-72<br />

MVA<br />

98.46 96.55 % %<br />

6.73 MVA<br />

98.46 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-518-Markaz-e-talimi<br />

NW-513-64<br />

97.21 % 97.40 %<br />

NW-518-Sara Miasht<br />

98.01 %<br />

NW-518-E-e-Adari Zamini 1&2<br />

97.22 % NW-518-65.3<br />

97.22 %<br />

6.75 MVA<br />

98.46 %<br />

0.38 MVA<br />

7.57 %<br />

0.38 MVA<br />

3.40 %<br />

0.38 MVA<br />

7.56 %<br />

0.30 MVA<br />

5.30 %<br />

NW-518-59.5<br />

98.02 %<br />

NW-513-61<br />

97.75 %<br />

NW-518-61<br />

97.24 %<br />

6.78 MVA<br />

98.46 %<br />

NW-518-70<br />

96.95 %<br />

P-B2-1 Reconductor to 185 sqm<br />

0.76 MVA<br />

11.21 %<br />

0.30 MVA<br />

4.36 %<br />

0.03 MVA<br />

0.50 %<br />

8.93 MVA<br />

72.14 %<br />

0.03 MVA<br />

34.39 %<br />

NW-518-59A<br />

98.05 %<br />

NW-518-61.1<br />

NW-518-M-e-H <strong>Afghan</strong> Korea 1&2 97.79 %<br />

97.78 %<br />

NW-513-W.P.Sara Miasht<br />

98.11 % NW-513-58<br />

98.11 %<br />

6.82 MVA<br />

98.96 %<br />

0.38 MVA<br />

4.96 %<br />

NW-518-66<br />

97.23 %<br />

11.72 MVA<br />

94.60 %<br />

8.94 MVA<br />

72.14 %<br />

12.19 MVA<br />

97.67 %<br />

NW-513-56<br />

98.34 %<br />

NW-518-65<br />

97.30 %<br />

12.61 MVA<br />

100.07 %<br />

6.83 MVA<br />

98.96 %<br />

6.94 MVA<br />

98.95 %<br />

2.02 MVA<br />

29.59 %<br />

NW-518-57<br />

97.25 NW-517-56 %<br />

101.51 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-518-59<br />

97.18 %<br />

NW-517-59<br />

101.33 %<br />

2.02 MVA<br />

29.59 %<br />

NW-518-59.3<br />

97.04 %<br />

NW-518-W.P Khoshhal khan<br />

97.04 %<br />

2.02 MVA<br />

29.59 %<br />

0.05 MVA<br />

0.70 %<br />

NW-518-59.22 NW-518-Afshar NW-518-59.21 Seelo<br />

96.67 % 96.66 % 96.68 %<br />

1.97 MVA<br />

28.89 %<br />

0.38 MVA<br />

7.61 %<br />

0.38 MVA<br />

7.61 %<br />

0.38 MVA<br />

7.61 %<br />

0.38 MVA<br />

7.61 %<br />

0.38 MVA<br />

7.61 %<br />

NW-518-59.19 NW-518-Academy Police<br />

96.69 96.69 % %<br />

NW-518-59.18<br />

96.70 %<br />

NW-518-59.17<br />

96.71 % NW-518-59.15<br />

96.71 %<br />

0.38 MVA<br />

7.61 %<br />

0.60 MVA<br />

11.90 %<br />

NW-518-59.10<br />

NW-518-P.Talim wa 96.82 Tarbeia %<br />

96.82 %<br />

0.30 MVA<br />

4.43 %<br />

1.96 MVA<br />

28.89 %<br />

NW-518-59.8<br />

96.88 %<br />

0.98 MVA<br />

19.51 %<br />

NW-518-59.13<br />

96.75 %<br />

1.66 MVA<br />

24.46 %<br />

0.68 MVA<br />

12.17 %<br />

NW-518-Lailia Polytechnic 1&2<br />

96.70 %<br />

N-529_JS5_4_5-Borj Intercontinental # 1&2<br />

96.60 %<br />

N-529_JS5_4_5-Borj Politechnice # 1&2<br />

96.31 %<br />

0.00 MVA<br />

0.06 %<br />

N-529_JS5_4_5-Borj Awal Karte Mamoreen<br />

96.35 %<br />

N-529_JS5_4_5-Mohamad Omar Khan # 1&2<br />

97.74 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-514-83<br />

99.23 %<br />

N-529_JS5_B_2_5-UK emb<br />

97.79 %<br />

JS#5-NW-514<br />

N-JS5-Milli Bus<br />

99.19 % 99.18 % JS#5-N-529<br />

N-529-79-B1<br />

97.81<br />

97.84 %<br />

%<br />

N-529_JS5_4_5-7<br />

97.66 %<br />

N-529_JS5_4_5-12<br />

97.60 %<br />

N-529-79-B14<br />

97.83 %<br />

N-529_JS5_4_5-34<br />

N-529_JS5_B_2_5-Noor TV station<br />

97.08 % N-529_JS5_4_5-13 97.57 %<br />

97.53 %<br />

N-529_JS5_4_5-Borj Baghe Bala # 1&2<br />

97.00 %<br />

NW-3_5-Omer Shaheed<br />

99.03 %<br />

N-529-Bland manzel Gulzad<br />

N-529-79-B16<br />

97.82 %<br />

97.82 %<br />

N-529_JS5_B_2_5-Hesa Awal Karteparwan<br />

97.41 %<br />

NW-515-63_16_9<br />

97.42 %<br />

NW-515-63_16_10<br />

97.40 %<br />

NW-515-Baraki Shahraara<br />

97.39 %<br />

N-529_JS5_B_2_5-Sarak Awal Baharestan<br />

97.23 %<br />

NW-515-63_16_7<br />

97.51 %<br />

NW-515-63_16_8<br />

97.47 %<br />

NW-515-Shahraara<br />

97.24 %<br />

N-529_JS5_B_2_5-Market Najeeb Zarab<br />

96.74 %<br />

N-529_JS5_B_2_5-Borj Zamini Market Kona<br />

96.75 %<br />

NW-515-Borj_1_Ansary<br />

97.52 %<br />

NW-515-Kolola Poshta<br />

97.44 %<br />

NW-515-63_26<br />

97.46 %<br />

NW-515-63_25<br />

NW-515-63_28<br />

97.47 %<br />

97.44 %<br />

NW-515-63_24<br />

97.48 %<br />

NW-515-63_25_3<br />

97.46 %<br />

NW-515-Blaasam Hospital # 1&2<br />

97.46 %<br />

NW-515-Moqabel Zaeeshghah<br />

97.19 %<br />

N-529_JS5_B_2_5-Technic wa Asleha Amneiat<br />

96.64 %<br />

N-529_JS5_B_2_5-Malalay Hospital<br />

96.65 %<br />

N-518_JS2_A_1_2-Bland manzel Omarzai<br />

97.74 %<br />

N-518_JS2_B_2_5-Konj Park shahrnow<br />

97.63 %<br />

N-518_JS2_A_1_2-Haji Yahqoob # 1<br />

97.75 %<br />

N-518_JS2_A_1_2-Bland manzel Asrar<br />

97.74 %<br />

N-518_JS2_B_2_5-Tank Teel Shahr now<br />

97.96 %<br />

N-518_JS2_B_2_5-Gulkhana Park shahrnow<br />

97.82 %<br />

19635126.814399999<br />

JS#2-N-518<br />

98.62 %<br />

N-515_JS2_D_2_7-Emergency Hospital<br />

100.73 %<br />

N-518_JS2_517-Sefarat Turkia<br />

98.37 %<br />

N-518_JS2_A_1_2-Naqlia Sheerpoor<br />

98.47 %<br />

JS#2-N-515<br />

100.74 %<br />

N-518_JS2_517-Sefarat Alman<br />

98.38 %<br />

N-518_JS2_517-Moqabel Sefarat Alm<br />

98.38 %<br />

2.09 MVA<br />

43.33 %<br />

NW-513-B. h-e-Cha Qumber 1&2<br />

94.15 %<br />

0.28 MVA<br />

34.43 %<br />

0.28 MVA<br />

34.43 %<br />

0.22 MVA<br />

4.35 %<br />

0.49 MVA<br />

9.83 %<br />

NW-5_6-No-6 Khoshalkhan<br />

99.77 %<br />

NW-5_6-15<br />

99.77 %<br />

NW-5_6-No-5 Khoshalkhan<br />

99.83 %<br />

NW-5_6-10<br />

99.83 %<br />

N-529_JS5_4_5-Borj Dwom Karte Mamoreen<br />

96.34 %<br />

NW-3_5-Hawahy Damane Koh<br />

98.90 %<br />

NW-3_5-Foundation-e-Zamini Damane Koh<br />

98.90 %<br />

N-529_JS5_B_2_5-Amneiat Hospital<br />

96.70 %<br />

N-529_JS5_B_2_5-Zamini Qowae Markaz<br />

96.66 %<br />

N-518_JS2_A_1_2-Wezarat Dakhela<br />

97.52 %<br />

N-518_JS2_A_1_2-Mokhaberat Shahre now<br />

97.53 %<br />

N-518_JS2_B_2_5-Markaz Lesan(American Center)<br />

98.17 N-518_JS2_B_2_5-Moqabel %<br />

Markaz Lesan<br />

98.17 %<br />

N-518_JS2_B_2_5-Sefarat Iran<br />

98.16 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


N-513-Mamr-e-Wuzarat Transport<br />

98.69 %<br />

a<br />

11<br />

N-513-Taharokat Transport<br />

99.16 %<br />

N-513-132<br />

98.87 %<br />

N-513-154<br />

98.76 %<br />

N-513-101-H4<br />

99.20 %<br />

E-513-No_3 Qasaba<br />

100.34 %<br />

N-513-Tasadee Kamaz<br />

98.91 %<br />

E-513-No_2 Qasaba<br />

100.35 %<br />

N-513-101<br />

99.26 %<br />

N-513-125<br />

98.91 %<br />

E-513-No_1 Qasaba<br />

100.37 %<br />

N-513-124<br />

98.93 %<br />

E-513-127<br />

100.40 %<br />

N-513-121<br />

98.99 %<br />

N-513-Regration<br />

98.91 %<br />

N-513-121-i10<br />

98.91 %<br />

E-513-No_2_KhanaSazee<br />

100.68 %<br />

E-513-109<br />

100.69 %<br />

E-513-108<br />

100.74 %<br />

E-513-106<br />

100.80 %<br />

E-513-No_1_KhanaSazee<br />

100.95 %<br />

E-513-101<br />

100.92 %<br />

E-513-100<br />

100.96 %<br />

E-513-Fabrica Qir<br />

101.08 %<br />

E-513-97<br />

101.10 %<br />

E-513-90<br />

101.42 %<br />

E-513-89<br />

101.46 %<br />

N-512-39<br />

01.73 %<br />

N-517-41<br />

N-516-41<br />

102.25<br />

101.83 N-512-40<br />

%<br />

101.63 %<br />

E-511-43<br />

104.47 %<br />

E-511-54<br />

104.42 %<br />

E-511-58<br />

104.40 %<br />

N-528-10A5<br />

101.85 %<br />

N-512-47<br />

100.89 %<br />

N-517-63 N-516-63<br />

101.50 100.99 %<br />

N-512-46<br />

100.90 %<br />

N-512-61 N-512-63 N-512-62<br />

99.42 99.40<br />

%<br />

%<br />

E-521-Sang Marmar Jamshed<br />

102.67 %<br />

E-521-54<br />

102.67 %<br />

N-512-66<br />

99.04 %<br />

E-513-65<br />

102.62 %<br />

N-528-Taqwiaty N-528-A13-3 Chamandy<br />

N-528-A13-1 101.53 % 101.53 %<br />

101.55 %<br />

N-512-68<br />

98.85 %<br />

N-516-No-1-Qwai Hawaye<br />

97.86 N-516-B6 %<br />

97.87 %<br />

E-513-64<br />

102.67 %<br />

N-528-10A10<br />

101.65 %<br />

N-528-10A13<br />

101.56 %<br />

N-516-85 N-517-85<br />

98.53 99.28 %<br />

N-512-72<br />

98.55 %<br />

N-516-516-B4<br />

97.89 %<br />

N-516-No-2-Qwai Hawaye<br />

97.84 %<br />

E-521-48<br />

102.70 %<br />

E-511-Tr. Gas maye Anardara<br />

104.35 %<br />

N-516-Academey Nezame<br />

97.88 %<br />

E-511-58.7<br />

104.35 %<br />

N-516-66<br />

N-517-66 100.00 %<br />

100.61 %<br />

N-516-76 N-517-76<br />

99.40 100.06 %<br />

N-512-chamandi<br />

98.54 %<br />

N-516-93<br />

97.94 %<br />

N-517-93<br />

98.75 %<br />

N-512-80<br />

97.53 %<br />

N-528-10-A22<br />

101.35 %<br />

N-528-10A23<br />

101.33 %<br />

N-528-Chamandi Hawaee<br />

101.25 %<br />

N-528-10A28<br />

101.26 %<br />

N-528-Sayed Nezam # 1&2<br />

101.34 %<br />

E-511-Tr -Alokozai kefayat<br />

104.51 %<br />

E-511-Tr,sherkat Paiman<br />

104.52 %<br />

N-512-80-c1<br />

N-512-80-c6<br />

97.51 %<br />

97.51 N-512-Blak hay Hawahy<br />

97.51 %<br />

N-517-111<br />

97.56 %<br />

N-516-111<br />

96.82 %<br />

N-512-87<br />

96.67 % N-517-Taleem Wa Tarbia<br />

N-516-113 N-517-113<br />

97.45 % N-517-517-A3<br />

97.48 %<br />

N-517-Do 96.75 Saraka % Maidan 97.45<br />

N-512-93<br />

%<br />

97.47 %<br />

96.67 %<br />

N-517-Hawa Shenase<br />

97.40 %<br />

N-517-517-A10<br />

97.40 %<br />

E-F-519 - Khowaja Rawash<br />

102.93 %<br />

E-F-519 -29.23<br />

102.93 %<br />

E-521-38<br />

102.76 %<br />

E-521-Rahim Suhak<br />

102.81 %<br />

E-521-Qasemi Felez<br />

102.76 %<br />

E-521-37<br />

102.81 %<br />

E-511-28.9<br />

104.51 %<br />

E-511-28.8<br />

104.52 %<br />

E-511-28<br />

104.55 %<br />

N-517-517-A13<br />

97.38 %<br />

E-521-28_7<br />

102.81 %<br />

E-521-Tawfiq<br />

102.83 %<br />

E-521- Zaher Plastic<br />

102.83 %<br />

E-521-TGM Transformer<br />

103.66 %<br />

E-521-28_2<br />

102.83 %<br />

E-521-28<br />

102.84 %<br />

N-512-Abrasani<br />

95.04 %<br />

N-517-T/SMarkazi N-516-T/SMarkazi Bolak Hawaye # 21<br />

95.49 95.48 %<br />

N-516-133-d1<br />

95.50 %<br />

N-516-T/s Riasat Amniat <strong>Kabul</strong><br />

95.50 %<br />

N-512-Qalai Wakil<br />

96.43 %<br />

N-517-517-A24<br />

97.32 %<br />

N-517-517-A27<br />

N-517-Qala N-517-517-A28<br />

wakeel 97.30 Jadeed %<br />

97.30 % 97.30 %<br />

N-517-517-A16<br />

N-517-517-A17 97.36 %<br />

97.36 %<br />

E-F-519 -50<br />

102.72 %<br />

E-F-519 -Qala-e Mir Abass Tr 1&2<br />

102.71 %<br />

E-F-519 -43<br />

102.74 %<br />

E-521-No_1_Park ha<br />

102.08 %<br />

E-521-19_23_5<br />

102.08 %<br />

E-521-Maihan Dost Factory<br />

102.09 %<br />

E-521-Kaka Khil Traso<br />

102.81 %<br />

E-521-Bahir Printing Press<br />

102.91 %<br />

E-521-25_3<br />

102.92 %<br />

E-521-25<br />

102.92 %<br />

E-521-15_8 E-521-15_8_5<br />

103.66 % 103.65 %<br />

E-521-Tr_4_Park ha<br />

102.92 %<br />

E-521-<strong>Afghan</strong> Aard factory<br />

103.65 %<br />

E-521-15_7<br />

103.71 %<br />

E-511-20<br />

104.64 %<br />

E-511-19<br />

104.66 %<br />

E-511-16<br />

104.70 %<br />

E-511<br />

104.75 %<br />

E-511-16-35<br />

104.70 %<br />

P-B5-5-New Overhead section 185 sqm<br />

E-F-519 - Refa Constraction Company<br />

99.07 %<br />

E-F-519 -Spengahr Oil Fectory Tr 1&2<br />

99.04 %<br />

E-F-519 -78_A3<br />

99.05 %<br />

E-F-<br />

99.0<br />

E-F-519 -78_<br />

99.10 %<br />

N-512-102-F17<br />

95.06 %<br />

N-512-qalai Khater N-512-102-F10<br />

95.07 % 95.07 %<br />

N-512-102-F7<br />

95.09 %<br />

N-512-102-F8<br />

95.09 %<br />

N-512-106<br />

N-512-107<br />

94.90 %<br />

94.86 %<br />

N-512-102-F2<br />

95.12 %<br />

N-512-102<br />

95.14 %<br />

N-512-Qalai khowaja<br />

95.29 %<br />

N-512-99<br />

95.42 %<br />

N-517-141<br />

N-512-98 N-516-141<br />

95.16 96.02 %<br />

95.50 %<br />

N-516-133 N-517-133<br />

95.57 96.43 %<br />

N-517-No-23 Macroryan<br />

94.95 %<br />

E-F-519 -35.6<br />

102.82 %<br />

E-F-519 -Zan Abad<br />

102.81 %<br />

E-F-519 -35<br />

102.83 %<br />

E-F-519 -29<br />

102.98 %<br />

E-521-19_29<br />

102.11 %<br />

E-521-Logistic Mahajereen<br />

102.11 %<br />

E-521-Ameriat Park ha<br />

102.10 %<br />

E-521-Park ha<br />

102.13 %<br />

E-521-19_22<br />

E-521-19_23_1 102.16 %<br />

102.13 %<br />

E-521-19_21<br />

102.19 %<br />

E-521-19_23<br />

E-521-19_27<br />

102.14 %<br />

102.13 %<br />

E-521-Sangi Jeke<br />

102.18 %<br />

E-521-19_28<br />

102.11 %<br />

E-521-Police Markazee<br />

102.11 %<br />

E-521-19_14<br />

102.38 %<br />

E-521-19_13<br />

102.41 %<br />

E-521-Tawlid Aard Janat<br />

102.64 %<br />

E-521-19<br />

E-521-Marmar Khalid<br />

103.10 %<br />

102.94 %<br />

E-521-19_9<br />

102.94 %<br />

E-521-19_6<br />

102.97 %<br />

E-521-19_7<br />

102.97 %<br />

E-521-Aard <strong>Kabul</strong><br />

102.96 %<br />

E-541-Fabrike Meno<br />

102.06 %<br />

E-521-15<br />

103.76 %<br />

E-521-8<br />

104.03 %<br />

E-F-519 -21-5<br />

103.19 %<br />

E-513-19<br />

104.36 %<br />

E-521-5<br />

104.33 %<br />

E-F-519 -21-7<br />

103.17 %<br />

E-F-519 -HodKhel No-2<br />

103.17 %<br />

E-F-519 -<strong>Afghan</strong>i constraction Company<br />

102.02 %<br />

E-F-519 - <strong>Kabul</strong> Nan Pazi<br />

101.02 %<br />

E-F-519 -<strong>Afghan</strong> Fruit Fectory<br />

100.84 %<br />

E-F-519 -Nebraska Priting Press<br />

99.88 %<br />

E-F-519 -Pashmina Bafi Fectory<br />

100.18 E-F-519 % -60_3<br />

100.18 %<br />

E-F-519 -Maweneat Takhink<br />

99.84 %<br />

E-F-519 - Workshop Urdo<br />

99.86 %<br />

E-F-519 -63_8B<br />

99.87 %<br />

E-F-519 -63_12B<br />

99.85 %<br />

E-F-519 -Poste Roda Factory<br />

99.23 %<br />

E-F-519 -63_9B<br />

99.86 %<br />

E-F-519 -63_7B<br />

99.87 %<br />

E-F-519 -Bamezai<br />

99.87 %<br />

E-F-519 -78<br />

99.25 %<br />

N-512-121<br />

93.80 %<br />

N-512-108<br />

94.78 %<br />

N-512-Nowabad BiBi Mahro<br />

94.77 %<br />

N-512-Bibi Mahro Muqabel<br />

95.89 %<br />

N-512-94<br />

95.82 %<br />

P-B4-17 New OH section 185 sqm<br />

N-516-147 N-517-147<br />

94.84 95.69 %<br />

N-517-No-19 Macroryan<br />

94.84 % N-517-No-20 Macroryan<br />

94.89 %<br />

N-517-No-22 Macroryan<br />

94.96 % N-517-No-21 Macroryan # 1&2<br />

94.96 %<br />

N-517-159<br />

95.06<br />

N-516-159<br />

94.26 %<br />

N-517-No-24 Macroryan<br />

95.00 %<br />

E-F-519 -43.15<br />

102.64 %<br />

E-F-519 -Yaka Toot Tr.1&2<br />

102.64 %<br />

E-541-70<br />

98.99 %<br />

E-F-519 -23<br />

103.08 %<br />

E-541-69<br />

102.06 %<br />

E-F-519 -11<br />

103.80 %<br />

E-F-519 -10<br />

103.88 %<br />

E-513-10<br />

104.67 %<br />

E-513-9<br />

104.78 %<br />

E-513-16<br />

104.50 % E-541-20<br />

103.67 %<br />

E-F-519 -20<br />

103.26 %<br />

E-F-519 -21<br />

103.22 %<br />

E-513-17<br />

E-521 104.44 %<br />

104.69 E-541-19 %<br />

E-541-37 103.73 %<br />

103.60 %<br />

E-541-16<br />

104.00 %<br />

E-541-13<br />

104.14 %<br />

E-541-12<br />

104.27 %<br />

E-541-8<br />

104.45 %<br />

E-F-519 -35_1<br />

102.04 %<br />

E-F-519-35a<br />

102.04 %<br />

E-F-519 -39<br />

101.70 %<br />

E-F-519 - oxygen Product<br />

101.70 %<br />

E-F-519 -42<br />

101.49 %<br />

E-F-519 -44<br />

E-F-519 -kabul Hend<br />

101.34 %<br />

101.49 %<br />

E-F-519 -Fanta Fectory<br />

101.32 %<br />

E-F-519 -48.1<br />

101.03 %<br />

E-F-519 -48<br />

101.03 %<br />

E-F-519 -51<br />

100.85 %<br />

E-F-519 -60<br />

100.19 %<br />

E-F-519 -63_5B_1<br />

99.89 %<br />

E-F-519 -63<br />

99.91 %<br />

E-F-519 -Paktia Kot No,1<br />

99.91 %<br />

E-F-519 -63_2B<br />

99.90 %<br />

E-F-519 -63_13<br />

99.89 %<br />

E-F-519 -63_1<br />

99.91 %<br />

E-F-519 - Gas Mahi-e Farahi<br />

99.41 %<br />

E-F-519 -72<br />

99.49 %<br />

E-F-519 - Paktia Kot No,2<br />

99.84 %<br />

N-512-129 N-512-125-H1<br />

93.49 %<br />

93.57 %<br />

N-512-Nursing<br />

93.49 N-512-128 %<br />

93.50 %<br />

N-512-Wazir akbar khan hospital<br />

93.52 %<br />

N-512-125<br />

93.58 %<br />

N-512-Sehat Tefl<br />

93.30 %<br />

N-512-400 Bester 21<br />

93.38 %<br />

N-517-No-18 Macroryan<br />

94.81 %<br />

N-512-T#3 Wazir akbar khan<br />

93.34 %<br />

N-517-No-17 Macroryan<br />

94.78 %<br />

N-517-No-16 Macroryan # 21<br />

94.77 %<br />

N-517-155<br />

N-516-155<br />

95.31 94.46 %<br />

N-517-Bukhar khana Macroryan # 1&2<br />

95.00 %<br />

JS#12-N-517<br />

95.01 %<br />

E-541-T.T.C<br />

95.25 %<br />

E-541-Mawj Mutawaset<br />

95.63 %<br />

E-541-106<br />

95.63 %<br />

E-541-Nasaji Amu<br />

96.78 %<br />

E-541-94<br />

96.60 %<br />

E-541-Septic Macrorayan<br />

96.59 %<br />

E-541-94-3<br />

96.58 %<br />

E-541-94-3-3<br />

E-541-Qalai 96.56 % Wazir<br />

96.56 %<br />

E-F-519 -Qabil BY<br />

103.06 %<br />

E-F-519 -6<br />

104.63 %<br />

E-513-2<br />

104.92 %<br />

E-F-519 -3<br />

104.88 % E-513<br />

104.97 %<br />

E-519<br />

104.94 %<br />

S/S East<br />

105.00 %<br />

E-531<br />

104.97 %<br />

E-515-3<br />

104.98 %<br />

E-541<br />

104.87 %<br />

E-541-Hodkhel-1<br />

104.87 %<br />

E-515<br />

104.99 %<br />

E-541-7<br />

104.59 %<br />

E-523-3<br />

104.95<br />

E-523-4<br />

%<br />

104.94 %<br />

E-523<br />

104.96 %<br />

N-516-No-11 Macroryan<br />

92.93 %<br />

E-541-Banaey<br />

95.12 %<br />

E-541-111<br />

95.25 %<br />

E-515-4<br />

104.97 %<br />

E-523-7<br />

104.90 %<br />

E-523-5<br />

104.93 %<br />

E-536<br />

105.00 %<br />

N-516-Stera Mahkama<br />

92.92 N-516-Macroryan %<br />

Communication<br />

92.83 %<br />

E-541-115<br />

95.03 %<br />

E-541-113<br />

95.12 %<br />

E-531-5<br />

104.83 %<br />

E-531-6<br />

104.82 %<br />

N-512-T#2 Wazir akbar khan<br />

93.27 %<br />

N-512-Ministry <strong>of</strong> health<br />

93.29 %<br />

N-516-No-9Macroryan<br />

92.84 %<br />

N-516-15 Macroryan # 21<br />

93.18 93.14 %<br />

E-541-113-1<br />

95.11 %<br />

E-541-119 E-541-Mawad -e- Mukhadera<br />

94.88 % 95.03 %<br />

N-512-T#1 Wazir akbar khan_LV<br />

91.21 %<br />

N-512-T#1 Wazir akbar khan<br />

93.17 %<br />

N-516-No-10 Macroryan<br />

92.94 %<br />

N-516-No-14 Macroryan<br />

93.05 %<br />

N-516-No-13 Macroryan<br />

93.03 %<br />

E-541-120<br />

94.61 %<br />

E-541-119-1<br />

N-516-516-18 E-541-Char 94.88 Burja %<br />

93.18 % 94.88 %<br />

E-541-Septic Qalai zamankhan<br />

96.54 %<br />

N-516-No-12Macroryan<br />

92.79 %<br />

N-516-No-8 Macroryan<br />

92.91 %<br />

N-516-12_1<br />

92.78 %<br />

N-516-Matbea # 1&2<br />

92.78 %<br />

E-541-128<br />

94.26 %<br />

E-536-11<br />

105.00 %<br />

N-518_JS2_517-<strong>Afghan</strong>istan Natil TV_Tr 1&2<br />

98.02 %<br />

N-518_JS2_517-R <strong>Afghan</strong>istan Tr 1&2<br />

98.03 %<br />

E-541-129<br />

94.15 %<br />

E-541-113-13-2<br />

94.96 %<br />

N-518_JS2_517-Hawa Nawardee<br />

98.05 %<br />

N-516-Emalat khana Ordo<br />

N-516-Garnizion 92.77 %<br />

92.77 %<br />

N-516-12_8<br />

92.71 %<br />

E-541-Maslakh Tr 1&2<br />

93.22 %<br />

E-541-132<br />

93.97 %<br />

E-541-113-13<br />

94.94 %<br />

E-541-No.55 Qalai Zamnkhan Tr 1&2<br />

94.93 %<br />

E-523-19<br />

104.75 %<br />

N-518_JS2_517-Kenare Lessee Am<br />

98.22 %<br />

N-518_JS2_517-<strong>Afghan</strong> Film<br />

98.19 %<br />

N-516-Ryasat Amneyat # 16<br />

92.70 %<br />

E-541-145-9<br />

93.22 %<br />

E-541-Riasat Amneiat<br />

93.21 E-541-Survey % Madan<br />

93.24 %<br />

E-541-145-8<br />

93.23 %<br />

E-541-145-7<br />

93.24 %<br />

E-541-135<br />

93.86 %<br />

E-541-Wezarat Fawaed Ama<br />

93.86 %<br />

E-541-113-14<br />

E-541-No.44 Qalai Zamankhan Tr 94.92 1&2 %<br />

94.92 %<br />

E-541-No_7_ Macrorayan Awal<br />

93.96 % E-541-132-7<br />

93.96 %<br />

P-C4-8 Reconductor to 120 sqm<br />

E-531-Dakhudai Dad<br />

103.12 %<br />

N-518_JS2_517-Lessee Amani<br />

98.21 %<br />

E-536-21<br />

105.00 %<br />

E-541-No_5_Macrorayan Awal<br />

93.28 %<br />

E-531-Daraz kocha<br />

102.68 %<br />

E-531-49-6<br />

102.69 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-F-519 -Dahni Tangi<br />

96.85 %<br />

E-F-519 -256<br />

96.85 %<br />

E-F-519 -234<br />

96.91 %<br />

-519 -78_A2<br />

07 %<br />

_A<br />

E-F-519 - Family Akadmi Takhnic<br />

98.68 %<br />

E-F-519 -105<br />

98.64 %<br />

E-F-519 - Lakan Khial<br />

97.47 %<br />

E-F-519 -166<br />

97.40 %<br />

E-F-519 -167<br />

97.39 %<br />

E-F-519 -57 Talime<br />

98.85 %<br />

E-F-519 -103<br />

98.68 %<br />

E-F-519 -147<br />

97.67 %<br />

E-F-519 -146<br />

97.69 %<br />

E-F-521-Keshmeshpaki Babak<br />

99.11 %<br />

E-F-519 -85<br />

99.04 %<br />

E-F-519 -<strong>Kabul</strong> plastic<br />

99.04 %<br />

E-F-519 -88<br />

98.96 %<br />

E-F-519 -Sange Marmar<br />

98.95 %<br />

E-F-519 -89<br />

98.95 %<br />

E-F-519 -129<br />

98.05 %<br />

E-F-519 -172<br />

97.30 %<br />

E-F-519 -173<br />

97.28 %<br />

E-F-519 -178<br />

97.20 %<br />

E-F-519 -178.3<br />

97.19 %<br />

E-F-519 - Pul-e Charkhi Tr 1&2<br />

97.18 %<br />

E-F-519 - Qaria-e Mulah Mohammad Sahib<br />

96.80 %<br />

E-F-519 -74<br />

99.41 %<br />

E-F-519 -Qala-e Gulbaz Tr.1&2<br />

98.05 %<br />

E-F-519 -141<br />

97.80 %<br />

E-F-519 -140<br />

97.84 %<br />

E-F-519 -178.5<br />

97.18 %<br />

E-F-519 - Paktia Kot No,3<br />

99.82 %<br />

E-F-519 -178.11<br />

97.14 %<br />

E-F-519 -Qali Jabar Khan<br />

97.12 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.14<br />

34.4<br />

0.43 MVA<br />

9.09 %<br />

0.14 MVA<br />

2.89 %<br />

0.28 MVA<br />

5.77 %<br />

0.28 MVA<br />

5.77 %<br />

NW-513-Qalai NW-513-107-37-7 Kashef<br />

91.92 91.92 % %<br />

NW-513-107-37-5<br />

91.93 %<br />

0.28 MVA<br />

34.45 %<br />

0.22 MVA<br />

4.55 %<br />

NW-513-107-48-1<br />

91.82 %<br />

0.14 MVA<br />

2.89 %<br />

NW-513-107-48<br />

91.82 %<br />

0.57 MVA<br />

11.98 %<br />

0.28 MVA<br />

5.77 %<br />

NW-513-A Godam hay Kampani<br />

91.69 %<br />

0.22 MVA<br />

34.42 %<br />

NW-513-107-44<br />

91.87 %<br />

NW-513-107-43<br />

91.88 %<br />

0.57 MVA<br />

11.98 %<br />

0.57 MVA<br />

11.98 %<br />

NW-513-107-37-A1<br />

91.95 %<br />

NW-513-107-37<br />

91.95 %<br />

0.22 MVA<br />

4.54 %<br />

1.07 MVA<br />

22.28 %<br />

NW-513-107-34<br />

92.05 %<br />

0.05 MVA<br />

1.14 %<br />

1.1<br />

23.4<br />

0.22 MVA<br />

4.54 %<br />

NW-513-Market Haji Sher<br />

92.05 %<br />

0.05 MVA<br />

34.19 %<br />

NW-513-107-37-A4<br />

NW-513-Sare 91.93 % kariz Kampani Hawahe<br />

91.93 %<br />

0.22 MVA<br />

4.54 %<br />

0.22 MVA<br />

34.42 %<br />

NW-513-No-4 Abrasani<br />

91.96 %<br />

0.05 MVA<br />

34.19 %<br />

0.05 MVA<br />

1.14 %<br />

N<br />

9<br />

NW-513-107-27-44<br />

91.97 %<br />

0<br />

1<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.22 MVA<br />

4.35 %<br />

0.19 MVA<br />

3.20 %<br />

P-C3-4- Upgraded cross section<br />

NW-513-107-12<br />

92.79 %<br />

1.87 MVA<br />

38.83 %<br />

0.22 MVA<br />

4.50 %<br />

NW-513-107-12-3<br />

NW-513-107-12-4<br />

92.78 %<br />

92.78 NW-513-5-G-Indoor<br />

%<br />

92.78 %<br />

0.22 MVA<br />

4.50 %<br />

0.22 MVA<br />

4.50 %<br />

0.22 MVA<br />

34.41 %<br />

NW-513-79-10<br />

95.81 %<br />

NW-513-79-11<br />

95.81 %<br />

NW-513-Qalai Nazer<br />

95.80 %<br />

0.22 MVA<br />

34.38 %<br />

0.22 MVA<br />

4.35 %<br />

0.22 MVA<br />

4.35 %<br />

NW-513-79-7<br />

95.83 %<br />

NW-513-Qalai Wazir Khoshhalkhan<br />

96.28 %<br />

0.00 MVA<br />

0.00 %<br />

NW-513-74-10 NW-513-74-11<br />

96.28 % 96.27 %<br />

0.49 MVA<br />

9.84 %<br />

0.49 MVA<br />

9.84 %<br />

NW-513-No-8 Khoshalkhan<br />

96.19 % NW-513-74-20<br />

96.19 %<br />

NW-513-74-19<br />

96.20 %<br />

0.28 MVA<br />

5.51 %<br />

0.28 MVA<br />

5.51 %<br />

0.22 MVA<br />

34.38 %<br />

0.28 MVA<br />

34.41 %<br />

8.90 MVA<br />

72.14 %<br />

NW-5_6-67<br />

99.81<br />

NW-517-67<br />

%<br />

100.91 %<br />

NW-517-75<br />

NW-517-74 100.43 %<br />

100.47 %<br />

NW-5_6-74<br />

99.90 %<br />

NW-5_6-2<br />

99.89 %<br />

NW-518-104.16<br />

NW-518-No-2 Khoshhalkhan 93.98 % 1&2<br />

93.98 %<br />

NW-518-104.10<br />

93.98 %<br />

0.38 MVA<br />

7.83 %<br />

0.38 MVA<br />

7.06 %<br />

0.38 MVA<br />

7.83 %<br />

N-529_JS5_B_2_5-No_1_Zamini N-529_JS5_B_2_5-1<br />

Karte Ariana<br />

96.63 %<br />

96.63 %<br />

N-529_JS5_B_2_5-6<br />

96.61 % N-529_JS5_B_2_5-5<br />

96.62 %<br />

N-529_JS5_B_2_5-No_2_ Karte Ariana<br />

96.60<br />

N-529_JS5_B_2_5-7<br />

96.61 %<br />

BK-JS-1-A-1,2-5<br />

102.04 %<br />

N-518_JS2_A_1_2-Moqabel Wezarat Dakhela<br />

97.54 %<br />

N-518_JS2_E_1_2-Jamhoriat Hospital<br />

97.97 %<br />

N-518_JS2_E_1_2-Borj_2_Sedarat<br />

98.07 %<br />

N-518_JS2_B_1_2-Sedarat<br />

98.07 %<br />

N-518_JS2_B_1_2-Wezarat Khareja<br />

98.07 %<br />

N-518_JS2_E_1_2-Borj_1_Sedarat<br />

98.04 %<br />

N-515_JS2_531<br />

100.49 %<br />

12 MVA<br />

42 %<br />

NW-513-107-27<br />

92.23 %<br />

NW-513-107-27-3<br />

NW-513-No-1 Abrasani 92.20 % Fazel beek<br />

92.20 %<br />

NW-513-107-27-8<br />

92.15 %<br />

0.38 MVA<br />

8.03 %<br />

0.52 MVA<br />

10.91 %<br />

0.14 MVA 0.14 MVA<br />

34.45 % 2.88 %<br />

0.38 MVA<br />

8.04 %<br />

NW-513-107-27-11<br />

92.12 %<br />

0.38 MVA<br />

8.04 %<br />

NW-513-107-27-15<br />

92.09 %<br />

0.38 MVA<br />

8.04 %<br />

1.65 MVA<br />

34.33 %<br />

NW-513-107-27-19<br />

92.05 NW-513-No-2 %<br />

Abrasani<br />

92.04 %<br />

0.38 MVA<br />

8.04 %<br />

0.14 MVA<br />

34.45 %<br />

NW-513-107-20<br />

92.48 %<br />

0.25 MVA<br />

5.16 %<br />

NW-513-No-3 Abrasani<br />

NW-513-107-27-26<br />

92.00 %<br />

92.00 %<br />

0.11 MVA<br />

2.28 %<br />

0.14 MVA<br />

34.45 %<br />

0.25 MVA<br />

5.16 %<br />

0.22 MVA<br />

4.51 %<br />

NW-513-107-20-3<br />

92.47 %<br />

NW-513-107-20-6<br />

92.45 %<br />

0.22 MVA<br />

4.51 %<br />

0.22 MVA<br />

4.51 %<br />

NW-513-107-20-11<br />

92.43 %<br />

NW-513-Fazel beek<br />

92.42 %<br />

0.22 MVA<br />

4.51 %<br />

0.22 MVA<br />

34.41 %<br />

NW-4_7-Niazbeek<br />

99.41 %<br />

NW-4_7-39<br />

99.42 %<br />

NW-518-82<br />

95.95 %<br />

NW-4_7-22<br />

99.58 %<br />

NW-4_7-4.11<br />

99.63 %<br />

NW-4_7-4.10<br />

99.65 %<br />

NW-4_7-18<br />

99.64 %<br />

8.81 MVA<br />

72.14 %<br />

NW-4_7-No-7 Khushhal Khan<br />

99.63 %<br />

NW-4_7-12-4<br />

99.68 %<br />

NW-4_7-12-7<br />

99.66 %<br />

NW-4_7-12-8<br />

99.65 %<br />

NW-4_7-12-9<br />

99.64 %<br />

NW-4_7-12-14<br />

99.62 %<br />

NW-4_7-12<br />

99.70 %<br />

NW-4_7-11<br />

99.72 %<br />

NW-4_7-12-16<br />

99.61 %<br />

8.72 MVA<br />

72.14 %<br />

NW-4_7-6.2<br />

99.75 %<br />

NW-4_7-No-4 Khushhal Khan<br />

99.75 %<br />

NW-517-80<br />

100.14 %<br />

NW-5_6-80<br />

100.00 %<br />

NW-518-No-3 Dakhel J No-8<br />

100.04 %<br />

NW-518-94<br />

94.94 % NW-518-95<br />

94.86 %<br />

NW-4_7-1<br />

99.98 %<br />

P-C3-6- change cable to 240 sqmm<br />

XLPE<br />

NW-4_7-12-A3<br />

99.69 %<br />

8.71 MVA<br />

72.14 %<br />

NW-4_7-4<br />

99.82 %<br />

NW-4_7-6<br />

99.76 %<br />

JS#8-NW-517<br />

100.04 %<br />

8.69 MVA<br />

72.14 %<br />

NW-518-100<br />

94.38 % NW-518-101<br />

94.32 %<br />

NW-4_7-Paghmanehaee-Qali Wahid<br />

99.59 %<br />

8.67 MVA<br />

72.14 %<br />

NW-4_7-Water Pump hae-e-Politekhnik<br />

99.69 %<br />

8.66 MVA<br />

72.14 %<br />

NW-518-104<br />

94.07 %<br />

8.26 MVA<br />

68.95 %<br />

NW-518-Hotal <strong>Kabul</strong> Ariana<br />

93.37 %<br />

0.30 MVA<br />

4.10 %<br />

2.46 MVA<br />

0.38 MVA<br />

7.83 %<br />

NW-518-No-1 Khoshalkhan<br />

93.39 %<br />

NW-518-116<br />

93.39 %<br />

NW-F-Bus hai barqi-Bus Hai Barqi<br />

100.01 %<br />

NW-518-115<br />

93.40 %<br />

NW-518-108<br />

93.80 %<br />

0.42 MVA<br />

3.54 %<br />

0.12 MVA<br />

2.47 %<br />

NW-518-Belal NW-518-116.2 Market<br />

93.39 93.39 % %<br />

0.12 MVA<br />

1.98 %<br />

0.38 MVA<br />

6.28 % 8.23 MVA<br />

68.95 %<br />

2.46<br />

20.77 %<br />

%<br />

MVA21.11<br />

NW-518-104.6<br />

94.02 %<br />

7.40 MVA<br />

68.49 %<br />

NW-518-121<br />

93.01 %<br />

N-529_JS5_4_5-Borj Siloy Markaz<br />

96.27 %<br />

NW-518-118<br />

93.29 %<br />

7.39 MVA<br />

62.21 %<br />

BK-Denow-Denow1<br />

99.79 %<br />

NW-518-124<br />

92.84 %<br />

7.37 MVA<br />

62.21 %<br />

NW-4_6-1<br />

91.45 % NW-4_6-Kote Sangi<br />

91.46 %<br />

BK-Denow-Tangkash<br />

99.74 %<br />

0.98 MVA<br />

11.40 %<br />

7.35 MVA<br />

62.21 %<br />

BK-Denow-Children s garden<br />

99.84 %<br />

2.94 MVA<br />

24.76 %<br />

NW-518-129<br />

92.53 %<br />

BK-Ataturk-15<br />

99.53 %<br />

7.33 MVA<br />

62.21 %<br />

JS#4-NW-518<br />

91.70 %<br />

BK-Debori-Debori TS<br />

99.81 %<br />

7.31 MVA<br />

62.22 %<br />

NW-Pohantoon-Lailia Pesaran 1&2<br />

91.45 %<br />

7.27 MVA<br />

53.67 %<br />

3.16 MVA<br />

36.81 %<br />

NW-518-134<br />

92.23 %<br />

NW-518-143<br />

91.74 %<br />

BK-Ataturk-1<br />

99.93 %<br />

BK-Jamal maina-Red Cross Hospital<br />

99.91 %<br />

2.55 MVA<br />

29.79 %<br />

NW-Pohantoon-Jamnaziom Pohantoon<br />

91.31 %<br />

1.95 MVA<br />

32.79 %<br />

NW-Pohantoon-Lailia Dokhtaran 1&2<br />

91.57 %<br />

JS#4-BK-519<br />

99.93 %<br />

BK-Ataturk-26<br />

99.34 %<br />

BK-Ataturk-Emergency Medical Hospital<br />

99.17 %<br />

NW-Pohantoon-Pohanzai Kemia<br />

91.29 %<br />

BK-Ataturk-32<br />

99.25 %<br />

BK-Ataturk-Ataturk hospital<br />

99.23 %<br />

BK-Ataturk-32.2<br />

99.21 %<br />

BK-Ataturk-32.3<br />

99.19 %<br />

1.57 MVA<br />

26.41 %<br />

NW-Pohantoon-Aditoriam Pohantoon<br />

91.11 %<br />

BK-Habibia HSch-Darulmalmeen<br />

100.61 %<br />

BK-Ataturk-34<br />

99.24 %<br />

BK-Ataturk-Tifl-e-Mo<strong>the</strong>r Hospital<br />

99.20 %<br />

NW-Pohantoon-Ketabkhana Pohantoon<br />

91.15 %<br />

0.19 MVA<br />

3.20 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Aqab Wez.Zeraat<br />

100.43 %<br />

BK-Ataturk-36<br />

99.23 %<br />

BK-Ataturk-Family Hospital Transformer Station<br />

99.16 %<br />

NW-Pohantoon-Pohanzai Aqtesad<br />

91.13 %<br />

0.38 MVA<br />

6.41 %<br />

1.00 MVA<br />

16.83 %<br />

BK-Rabiya Balkhi-Karte 4 Mukhaberaat<br />

100.60 %<br />

BK-Ataturk-Ministry Agricultural<br />

99.22 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-26<br />

100.46 %<br />

0.76 MVA<br />

12.80 %<br />

NW-Pohantoon-Pohanzai Engineery 1&2<br />

91.03 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Kenar Maktab-19<br />

100.47 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-22<br />

100.50 %<br />

NW-Pohantoon-Pohanzai Zerahat<br />

91.10 %<br />

NW-Pohantoon-Takhnic Sanawee No-1<br />

91.01 %<br />

0.38 MVA<br />

6.44 %<br />

<strong>of</strong> cable to 95 sq mm<br />

NW-Pohantoon-Takhnic Sanawee No-2<br />

91.01 %<br />

P-C3-4 New cable 95 sq mm<br />

BK-Rabiya Balkhi-Karte 4<br />

100.91 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-24<br />

100.47 %<br />

BK-Jamal mina-Karte 5<br />

101.03 %<br />

0.19 MVA<br />

3.22 %<br />

BK-Jamal maina-Jamal Mina<br />

101.09 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Zeiarat Sakhi<br />

100.58 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-15<br />

100.61 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-7<br />

100.72 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-5<br />

100.75 %<br />

BK-Rabiya Balkhi-Rabiya-e-Balkhi<br />

101.03 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-1<br />

100.82 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Tape Salam<br />

100.83 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Aqabe Barq <strong>Kabul</strong><br />

101.05 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Kolali Jadid<br />

100.80 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-6.1<br />

100.80 %<br />

BK-Nawabad Dehmazang-Kulali Dahmazang<br />

101.40 %<br />

BK-Nawabad Dehmazang-4<br />

101.44 %<br />

BK-Nawabad Dehmazang-5<br />

101.43 %<br />

BK-Nawabad Dehmazang-2<br />

101.47 %<br />

BK-Nawabad Dehmazang-1<br />

101.49 %<br />

JS#3-BK-519<br />

101.25 %<br />

BK-Nawabad Dehmazang-Police Sarhadi<br />

101.46 %<br />

BK-Nawabad Dehmazang-Nawabad Dehmazang<br />

101.58 %<br />

BK-518-15<br />

BK-519-15 101.68 %<br />

101.32 %<br />

BK-JS-1-A-1,2-Mukhaberat Amniat<br />

101.93 %<br />

BK-JS-1-A-1,2-22<br />

101.93 %<br />

BK-JS-1-A-1,2-21_4<br />

101.92 %<br />

JS#3-BK-518<br />

101.65 %<br />

BK-JS-1-A-1,2-Qolabchakkan 2<br />

102.00 %<br />

BK-JS-1-A-1,2-15<br />

101.98 %<br />

BK-JS-1-A-1,2-21<br />

101.93 %<br />

BK-JS-1-A-1,2-21_9<br />

101.89 %<br />

BK-JS-1-A-1,2-National Television<br />

101.89 %<br />

BK-JS-1-A-1,2-BBC<br />

101.89 %<br />

BK-514-11<br />

BK-515-11 103.70 %<br />

103.61 %<br />

BK-JS-1-A-1,2-1<br />

102.06 %<br />

JS#1-BK-514<br />

103.43 %<br />

BK-514-12<br />

103.60 BK-515-12 %<br />

103.52 %<br />

BK-JS-1-A-1,2-Qolabchakkan 1<br />

102.07 %<br />

BK-Ibn Sina-Dakhel J.S<br />

103.42 %<br />

BK-514-13<br />

103.46 BK-515-13 %<br />

103.37 %<br />

JS#1-BK-515<br />

103.36 %<br />

BK-JS-1-A-1,2-Welaayat<br />

102.28 %<br />

BK-JS-1-A-1,2-Mechanical High School<br />

102.81 %<br />

BK-Matba-e-Maref-Matba-e-Maref-Matba-e-Maref<br />

103.39 %<br />

BK-Ibn Sina-1<br />

103.42 %<br />

BK-Ibn Sina-Ibn Sina Hospital<br />

103.42 %<br />

BK-JS-1-D-1,7-Qala-e-Hazaraha<br />

103.21 %<br />

BK-Charda Manzela JS_1-Central Poly Clinic<br />

103.21 %<br />

BK-Charda Manzela JS_1-Charda Manzila<br />

103.22 %<br />

97.87 %<br />

BK-JS-1-A-1,2-Mashal Market<br />

102.51 %<br />

BK-JS-1-A-1,2-Mohammad Jan Khan<br />

102.52 %<br />

N-518_JS2_E_1_2-Wezarat Eqtesad<br />

98.18 %<br />

BK-JS-1-A-1,2-Shaadoshamshera<br />

102.83 %<br />

N-518_JS2_B_1_2-Khetabkhana Aama<br />

N-518_JS2_E_1_2-Esteqlal High School<br />

98.38 %<br />

BK-JS-1-A-1,2-Ministry <strong>of</strong> Education<br />

N-518_JS2_B_1_2-Gurd Melye<br />

102.51 %<br />

97.77 %<br />

N-518_JS2_E_1_2-Wezarat Mokhaberat # 21<br />

98.24 %<br />

N-518_JS2_B_1_2-Wezarat Etlaat wa Caltor<br />

97.80 %<br />

N-518_JS2_E_1_2-Rabeha Balkhy Hospital<br />

98.26 % N-518_JS2_E_1_2-Stomatology<br />

N-518_JS2_B_1_2-Pashtani Tojarati Bank<br />

98.26 %<br />

97.80 % N-518_JS2_B_1_2-Spinzar Hotel<br />

97.80 %<br />

BK-Rangrazi-Malawi Sahib<br />

103.10 %<br />

BK-JS-1-E 1,2-Mestorat Hospital 1&2<br />

103.06 %<br />

N-518_JS2_B_1_2-Bank Melye<br />

97.77 %<br />

BK-JS-1-E 1,2-Old Radio<br />

102.97 %<br />

BK-Rangrazi-Rangrazi<br />

103.15 %<br />

BK-JS-1-D-1,7-Bagh-e-Nawab<br />

102.84 %<br />

BK-JS-1-D-1,7-1<br />

102.83 %<br />

BK-JS-1-D-1,7-4<br />

102.81 %<br />

BK-JS-1-D-1,7-Aashoqan-e-Aarefaan<br />

102.81 %<br />

N-518_JS2_B_1_2-Aarg Jumh<br />

97.79 %<br />

N-518_JS2_E_1_2-De <strong>Afghan</strong>is<br />

98.39 %<br />

N-5<br />

97.7<br />

N-518_JS2_E_1_2-Post Telephon<br />

98.44 %<br />

BK-JS-1-E 1,2-Pul-e-Khe<br />

102.98 %<br />

BK-JS-1-E 1,2-Pakhta Fe<br />

103.01 %<br />

BK-JS-1-E 1,2-Chindawol<br />

103.07 %<br />

NW-513-No-5 Abrasani<br />

91.97 %<br />

0.05 MVA<br />

1.14 %<br />

0.05 MVA<br />

34.19 %<br />

0.05 MVA<br />

1.14 %<br />

NW-513-107-27-39<br />

91.97 %<br />

0.11 MVA<br />

2.28 %<br />

NW-513-107-27-33<br />

91.98 %<br />

NW-513-107-27-30<br />

91.99 %<br />

0.11 MVA<br />

2.28 %<br />

NW-Dashte e Barchee-Pule sokhte Jadeed<br />

91.49 %<br />

NW-Dashte e Barchee-1<br />

91.49 %<br />

0.68 MVA<br />

7.99 %<br />

0.68 MVA<br />

6.77 %<br />

NW-4_6-12<br />

91.20 %<br />

NW-4_6-Pule Sokhte Sabeqa<br />

91.20 %<br />

0.48 MVA<br />

7.49 %<br />

BK-514-9<br />

103.90 BK-515-9 %<br />

103.83 %<br />

BK-JS-1-D-1,7-7_3<br />

102.77 %<br />

BK-JS-1-D-1,7-Khwaja Safa<br />

102.77 %<br />

BK-JS-1-D-1,7-7<br />

102.78 %<br />

NW-Dashte e Barchee-Amam hasan Mojtaba<br />

91.41 %<br />

NW-Dashte e Barchee-12<br />

NW-Dashte e Barchee-17<br />

91.43 %<br />

91.41 %<br />

NW-Dashte e Barchee-12.6<br />

91.40 % NW-Dashte e Barchee-12.1<br />

91.43 %<br />

NW-Dashte e Barchee-Harbi Shoonazi<br />

91.39 %<br />

0.38 MVA<br />

9.78 %<br />

0.30 MVA<br />

5.07 %<br />

0.38 MVA<br />

3.79 %<br />

0.30 MVA<br />

7.68 %<br />

0.30 MVA<br />

7.68 %<br />

NW-Dashte e Barchee-8<br />

91.460.68 % MVA<br />

6.77 %<br />

NW-4_6-14<br />

91.16 %<br />

NW-4_6-15<br />

91.15 %<br />

1.97 MVA<br />

16.99 %<br />

1.97 MVA<br />

16.99 %<br />

BK-Debori-Old Bangashidar 1<br />

99.60 %<br />

BK-Debori-Old Bangashidar 2<br />

99.60 %<br />

BK-Rabiya Balkhi-Umar jan<br />

100.63 %<br />

BK-Rabiya Balkhi-Behind Police Station<br />

100.71 %<br />

BK-Rabiya Balkhi-Chamcha Mast<br />

100.79 %<br />

BK-Behind Madrasa-Behind Madrasa<br />

101.00 %<br />

BK-Khatamunabein-Khatamunabein 1&2<br />

101.15 %<br />

BK-Habibia High School-Habibia High School 1&2<br />

101.16 %<br />

BK-Guzarga-1<br />

101.31 %<br />

BK-Guzarga-6<br />

101.20 %<br />

BK-Guzarga-Borj_1_Guzarga<br />

101.19 %<br />

BK-518-12<br />

102.18 BK-519-12 % BK-518-10<br />

102.02 % 102.63 BK-519-10 %<br />

102.49 %<br />

BK-516-Aqab Bagh e Babur #1<br />

104.43 %<br />

BK-516-2B25<br />

104.43 %<br />

BK-516-Aqab Bagh Babur 2<br />

104.42 %<br />

BK-518-9<br />

102.93 BK-519-9 %<br />

102.82 %<br />

BK-JS-1-<br />

102.77 %<br />

1.97 MVA<br />

16.99 %<br />

BK-Debori-1<br />

99.30 %<br />

BK-Debori-2<br />

99.29 %<br />

BK-518-8<br />

BK-519-8 103.11 %<br />

103.02 %<br />

BK-516-Bagh Babur<br />

104.46 %<br />

BK-516-2B20<br />

104.44 %<br />

NW-4_6-27_6_6<br />

90.80 % NW-4_6-27_6_2<br />

90.83 %<br />

NW-4_6-Monary Gulkhana<br />

90.79 %<br />

0.36 MVA<br />

7.63 %<br />

0.36 MVA<br />

7.62 %<br />

NW-4_6-22<br />

91.01 %<br />

0.48 MVA<br />

4.14 %<br />

NW-4_6-22-1<br />

91.01 %<br />

0.48 MVA<br />

7.51 %<br />

NW-4_6-22-4<br />

90.99 %<br />

NW-4_6-22-5<br />

90.98 %<br />

0.48 MVA<br />

7.51 %<br />

0.48 MVA<br />

7.51 %<br />

NW-4_6-22-12<br />

90.93 %<br />

0.48 MVA<br />

7.51 %<br />

NW-4_6-Sare-e- Kariz Qalahe shada<br />

90.91 %<br />

BK-Behind Madrasa-Mustaghni<br />

100.59 %<br />

BK-3_6-Khwaja Mullah<br />

101.10 %<br />

BK-516-2B17<br />

BK-516-2B16<br />

104.46 %<br />

104.46 %<br />

BK-516-2B15<br />

104.47 %<br />

BK-516-Khushal Khan<br />

104.47 %<br />

0.36 MVA<br />

7.62 %<br />

1.49 MVA<br />

12.86 %<br />

BK-Debori-New Bangashidar 1&2<br />

99.09 %<br />

BK-Behind Madrasa-Alibad 1<br />

100.46 %<br />

BK-Behind Madrasa-Rukhshana<br />

100.70 %<br />

BK-518-5<br />

103.89 BK-519-5 %<br />

103.84 %<br />

NW-4_6-27.9<br />

90.85 %<br />

NW-4_6-Foundation-e- zamini Gulkhana<br />

90.85 %<br />

0.30 MVA<br />

4.73 %<br />

NW-4_6-27-6<br />

90.86 %<br />

0.30 MVA<br />

4.73 %<br />

0.66 MVA<br />

16.98 %<br />

NW-4_6-27<br />

90.94 %<br />

NW-4_6-27.1<br />

90.92 %<br />

NW-4_6-Howza No-6 Police<br />

90.92 %<br />

0.06 MVA<br />

0.76 MVA<br />

11.88 %<br />

0.10 MVA<br />

2.46 %<br />

0.06 MVA<br />

0.52 %<br />

0.67 MVA<br />

5.79 %<br />

0.67 MVA<br />

5.79 %<br />

NW-4_6-Fabrika-e- Yakh Saze Hamza<br />

90.94 %<br />

0.94 %<br />

NW-4_6-27.A1<br />

90.94 %<br />

NW-4_6-28<br />

90.94 %<br />

BK-Behind Madrasa-Alibad 2<br />

100.47 %<br />

BK-Behind Madrasa-Mawade Mukhadir<br />

100.69 %<br />

BK-Behind Madrasa-Ministry <strong>of</strong> commerce<br />

100.68 %<br />

BK-Guzarga-19<br />

100.92 %<br />

BK-Guzarga-Borj_2_Guzarga<br />

100.92 %<br />

BK-516-2B9<br />

104.55 %<br />

BK-518-4<br />

104.15 BK-519-4 %<br />

104.10 %<br />

BK-514-4<br />

104.63 BK-515-4 %<br />

104.61 %<br />

BK-513-17<br />

104.36 %<br />

BK-5<br />

104.2<br />

BK-4_6-Doshhoy Gulam Hasan<br />

91.27 %<br />

NW-4_6-32.2<br />

90.91 %<br />

NW-4_6-Babai Wali<br />

90.91 %<br />

0.19 MVA<br />

4.92 %<br />

BK-4_6-56<br />

91.29 %<br />

BK-4_6-55<br />

91.29 %<br />

BK-4_6-54<br />

91.29 %<br />

NW-4_6-31<br />

90.92 %<br />

NW-4_6-32<br />

90.92 %<br />

0.19 MVA<br />

4.92 %<br />

0.00 MVA<br />

0.00 %<br />

0.19 MVA<br />

1.65 %<br />

NW-4_6-Qalahe Shada<br />

90.89 %<br />

0.48 MVA<br />

7.51 %<br />

NW-4_6-31_3<br />

90.90 %<br />

0.48 MVA<br />

4.14 %<br />

BK-4_6-Masjidi Safed<br />

91.20 %<br />

BK-Debori-Imam Zaman<br />

99.04 %<br />

BK-3_6-Moqabili Sifarat Russia<br />

100.67 %<br />

BK-Behind Madrasa-Shora-e-Milli<br />

100.68 %<br />

BK-3_6-Pump hawz<br />

100.63 %<br />

BK-Guzarga-Ayub Khan 1<br />

100.45 %<br />

BK-Guzarga-41-b20<br />

100.46 %<br />

BK-Guzarga-water pump 2<br />

100.48 %<br />

BK-Guzarga-41-b15<br />

100.47 %<br />

BK-Guzarga-41-b13<br />

100.48 %<br />

BK-Guzarga-Ayub Khan 2<br />

100.47 %<br />

BK-Guzarga-34<br />

100.70 %<br />

BK-Guzarga-Khwaja parsa<br />

100.69 %<br />

BK-Guzarga-25<br />

100.83 %<br />

BK-516-12A2<br />

104.58 %<br />

BK-516-Jangalak<br />

104.57 %<br />

BK-516-Constructional Water Pump<br />

104.65 %<br />

BK-516-2B7<br />

104.57 %<br />

BK-516-Immigration repatriation<br />

104.59 %<br />

BK-516-2B2<br />

104.63 %<br />

BK-516-2A2<br />

104.66 %<br />

BK-516-4B2<br />

104.60 %<br />

BK-516-p2-9<br />

104.71 %<br />

BK-516-p2-10<br />

104.68 %<br />

BK-512-3<br />

104.99 %<br />

BK-516-Chini Saazi<br />

104.66 %<br />

BK-518<br />

BK-519 104.90 %<br />

104.91 %<br />

BK-514<br />

104.95 BK-515%<br />

104.95 %<br />

BK-516-p2-3<br />

104.84 %<br />

BK-513<br />

104.97 %<br />

BK-516<br />

104.99 %<br />

BK-516-2<br />

104.91 %<br />

BK-512<br />

105.00 %<br />

BK-512-Sakhtomani omoor Barq<br />

104.98 %<br />

BK-512-5<br />

104.98 %<br />

S/S Breshna Kot<br />

105.00 %<br />

BK-517<br />

104.89 %<br />

BK-516-5<br />

104.80 %<br />

BK-4_6-47<br />

91.31 %<br />

BK-4_6-47.7<br />

91.27 %<br />

BK-4_6-47.11<br />

91.25 %<br />

BK-4_6-47.9<br />

91.26 %<br />

BK-4_6-47.13<br />

91.24 %<br />

BK-4_6-47.15<br />

91.23 %<br />

BK-6_3-Alouddin<br />

100.48 %<br />

BK-6_3-B4.6<br />

100.48 %<br />

BK-6_3-B4.3<br />

100.50 %<br />

BK-Russian Emb-Russian Emb 1&2<br />

101.25 %<br />

BK-Guzarga-41-b3<br />

100.58 %<br />

BK-Guzarga-41-b6<br />

100.54 %<br />

BK-4_6-Chaar qala 2<br />

91.29 %<br />

BK-4_6-45<br />

BK-4_6-45.1 91.32 %<br />

91.31 %<br />

BK-4_6-45.3<br />

91.29 %<br />

BK-6_3-B4<br />

100.51 %<br />

BK-6_3-1<br />

100.54 %<br />

BK-6_3-Esteqlal Hospital<br />

100.54 %<br />

BK-3_6-Sahati Oma<br />

100.54 %<br />

BK-Guzarga-Water pump 1<br />

100.56 %<br />

BK-Guzarga-41<br />

100.60 %<br />

BK-516-79<br />

103.67 %<br />

BK-Guzarga-Musahi<br />

100.57 %<br />

BK-516-Waisal Abad<br />

104.51 %<br />

BK-516-12<br />

104.52 %<br />

BK-4_6-Chaar Qala 1<br />

91.22 %<br />

BK-6_3-B7<br />

100.50 %<br />

BK-6_3-B9<br />

100.49 %<br />

BK-4_6-39<br />

BK-4_6-39.1<br />

91.43 %<br />

91.43 %<br />

BK-6_3-Khalifa Saheb<br />

100.47 %<br />

BK-6_3-B15<br />

100.48 %<br />

BK-516-Aqa Ali Shams 2<br />

103.79 %<br />

BK-4_6-Mullah Akram<br />

91.40 %<br />

BK-516-Waisal Abad 2<br />

104.17 %<br />

BK-6_3-Joye Raeis<br />

92.06 %<br />

BK-516-De Murad Khan<br />

103.67 %<br />

BK-516-25<br />

104.17 %<br />

BK-517-18<br />

102.54 %<br />

BK-516-68<br />

103.67 %<br />

BK-516-63<br />

103.69 %<br />

BK-516-Mosa "1"<br />

103.72 %<br />

BK-516-58<br />

103.72 %<br />

BK-516-51<br />

103.78 %<br />

BK-516-49<br />

103.80 %<br />

BK-516-46-2<br />

103.81 %<br />

BK-516-Aqa Ali Shams 1<br />

103.81 %<br />

BK-516-30<br />

104.09 %<br />

BK-516-20<br />

104.30 %<br />

BK-4_6-Qalai Ali Mardaan<br />

91.62 %<br />

BK-4_6-30<br />

91.62 %<br />

BK-516-46<br />

103.83 %<br />

BK-517-47<br />

BK-517-48<br />

99.90 %<br />

99.82 %<br />

BK-4_6-Qalai Jafar<br />

91.68 %<br />

BK-517-40<br />

100.50 %<br />

BK-517-Street New <strong>of</strong> <strong>the</strong> Takhnikum<br />

100.50 %<br />

BK-516-36<br />

103.98 %<br />

BK-517-26<br />

BK-517-Mullah 101.71 buzurg %<br />

101.71 %<br />

BK-517-30<br />

101.31 %<br />

BK-4_6-18.12.4<br />

91.70 %<br />

BK-6_3-Moqabel Wezarat Energy wa Aob<br />

92.13 %<br />

BK-517-30.2<br />

101.31 %<br />

BK-517-Takhnikum<br />

101.29 %<br />

BK-4_6-18.19<br />

91.72 %<br />

BK-4_6-Tubercluses<br />

91.81 %<br />

BK-4_6-18.12<br />

91.72 %<br />

BK-4_6-18.22<br />

91.72 %<br />

BK-4_6-18<br />

91.92 %<br />

BK-4_6-17<br />

BK-4_6-17.1 91.94 %<br />

91.94 %<br />

BK-4_6-18.7<br />

91.82 %<br />

BK-4_6-Veterenary<br />

91.69 %<br />

BK-6_3-Pidagoghi<br />

92.17 %<br />

BK-6_3-4<br />

92.14 %<br />

BK-6_3-Khwaja Aman<br />

92.04 %<br />

BK-6_3-11<br />

92.06 %<br />

BK-6_3-Wezarat energy Aob<br />

92.05 %<br />

BK-6_3-12<br />

92.05 %<br />

BK-4_6-17.9<br />

91.88 %<br />

BK-4_6-Qalai Bakhtiar<br />

91.88 %<br />

BK-6_3-Cure Hospital<br />

92.21 %<br />

BK-517-102.7<br />

95.32 %<br />

BK-517-Rega<br />

95.32 %<br />

BK-517-Regration<br />

96.69 %<br />

BK-517-85.9<br />

96.69 %<br />

BK-517-64<br />

98.41 %<br />

BK-517-Dahan e Bagh <strong>of</strong> Chilstoon<br />

98.41 %<br />

BK-4_6-11.8<br />

92.10 %<br />

BK-4_6-11<br />

92.17 %<br />

BK-4_6-7<br />

92.38 %<br />

BK-4_6-Ministry <strong>of</strong> Rural and Rehablitation<br />

92.08 %<br />

BK-4_6-Directorate <strong>of</strong> learning<br />

92.38 %<br />

BK-6_3-Stera Mahkama<br />

92.35 %<br />

BK-517-111<br />

94.69 %<br />

BK-517-Dedana First<br />

95.11 %<br />

BK-517-106<br />

95.12 %<br />

BK-517-102<br />

95.36 %<br />

BK-517-99<br />

95.63 %<br />

BK-517-96<br />

95.85 %<br />

BK-517-85<br />

96.70 %<br />

BK-517-76<br />

97.60 %<br />

BK-517-75<br />

97.66 %<br />

BK-517-71<br />

97.96 %<br />

BK-517-116<br />

94.27 %<br />

BK-4_6-1<br />

92.67 %<br />

BK-517-136<br />

92.79 %<br />

BK-517-National Meuseum<br />

93.12 %<br />

BK-517-131<br />

93.12 %<br />

BK-517-127<br />

93.37 %<br />

BK-517-126<br />

93.48 %<br />

BK-517-Dedana Second<br />

94.22 %<br />

BK-517-Sare kotal <strong>of</strong> Chilstoon<br />

97.93 %<br />

BK-517-Afshaar Darulaman<br />

92.73 %<br />

BK-517-137<br />

92.73 %<br />

JS#6-BK-517<br />

92.71 %<br />

BK-517-116.7<br />

94.24 %<br />

BK-517-126.4<br />

93.46 %<br />

BK-517-126.9<br />

BK-517-Examination Form <strong>of</strong> 93.45 Agriculture %<br />

93.45 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


N-515_JS2_D_2_7-Edara Computer<br />

100.43 %<br />

N-516-Shash Darak<br />

92.68 %<br />

E-541-145-1<br />

93.35 %<br />

E-541-143<br />

93.42 %<br />

E-541-No-6 Macrorayan Awal<br />

93.35 %<br />

P-C4-7 New Section 185 sqm<br />

E-531-60<br />

102.41 %<br />

E-531-37-3<br />

103.12 %<br />

1-Qasr Delkosha # 1&2<br />

N-515_JS2_D_2_7-Ehsaya Markazi ( CSO ) # 1&2<br />

100.44 %<br />

N-515_JS2_531-Ariana Hotel<br />

100.43 %<br />

E-541-148<br />

93.31 %<br />

E-541-145<br />

93.37 %<br />

E-541-143-3<br />

93.38 %<br />

E-541-No-1 Macrorayan Awal<br />

93.36 %<br />

E-541-No_3_ Macrorayan Awal<br />

93.31 %<br />

E-541-No_4_Macrorayan Awal<br />

93.28 %<br />

E-531-70<br />

102.35 %<br />

E-531-71<br />

102.35 %<br />

E-531-66<br />

102.37 %<br />

E-531-67<br />

102.36 %<br />

E-531-Mardan Ghaib<br />

102.41 %<br />

E-531-55<br />

102.54 %<br />

E-531-Mardan Ghaib-1_1&2<br />

102.54 %<br />

E-531-49<br />

102.70 %<br />

E-531-Mardan Ghaib-2<br />

102.88 %<br />

E-531-37<br />

103.13 %<br />

E-531-25<br />

103.78 %<br />

E-536-36<br />

105.00 %<br />

N-515_JS2_531-Matbah Urdo<br />

100.43 %<br />

E-541-154<br />

93.20 %<br />

E-541-No-2 Macrorayan Awal<br />

93.32 %<br />

E-541-157-8<br />

93.10 %<br />

E-541-157-5<br />

93.10 %<br />

E-541-Wezarat Omor Ejtimaey<br />

93.08 %<br />

E-541-157-12<br />

93.09 %<br />

E-531-Sement khana<br />

102.33 %<br />

E-536-48<br />

105.00 %<br />

E-541-Andimark<br />

93.30 %<br />

E-541-Riasat E-541-154-4 Mili bus<br />

93.20 % 93.20 %<br />

E-541-156-5<br />

93.15 %<br />

E-541-156<br />

93.16 %<br />

hoori<br />

N-518_JS2_E_1_2-Adare Omor<br />

98.82 %<br />

N-518_JS2_E_1_2-Wezarat Defah<br />

98.80 %<br />

E-541-Water Pump Macrorayan Awal<br />

93.15 %<br />

E-541-157<br />

93.11 %<br />

E-536-54<br />

105.00 %<br />

N-518_JS2_E_1_2-Kartografi<br />

98.50 %<br />

E-536-60<br />

105.00 %<br />

N-518_JS2_E_1_2-Wezarat Mahdan<br />

98.47 %<br />

stan Bank<br />

P-C4-12- Reconductor to 120 sqm<br />

E-541-MDC<br />

92.97 % E-541-164<br />

92.97 %<br />

518_JS2_B_1_2-Wezarat Malya<br />

74 %<br />

E-541-166<br />

92.93 %<br />

E-541-164-1<br />

92.97 %<br />

E-515-35<br />

104.63 %<br />

ne Telegram<br />

N-518_JS2_E_1_2-Pashtoonistan Wath<br />

98.44 %<br />

E-541-Muziam Omar<br />

92.85 % E-541-170<br />

E-541-171 92.85 %<br />

E-541-183 92.84 %<br />

E-541-Olampic 92.83 %<br />

92.83 %<br />

E-541-164-4<br />

92.96 %<br />

P-C4-12- Reconductor to 120 sqm<br />

E-541-Tr-Junction-7<br />

92.96 %<br />

BK-C-1,2-Eidga Mosque<br />

102.12 %<br />

eshtee<br />

E-531-60-25<br />

102.10 %<br />

BK-C-1,2-Tanor Saazi<br />

102.24 %<br />

P-C4-11- Reconductor to 120 sqm<br />

E-531-Sarak awal karte naw<br />

102.07 %<br />

E-531-60-27<br />

102.07 %<br />

eroshi<br />

BK-C-1,2-Darwazai Lawri<br />

102.15 %<br />

E-541-Salimi Hospital<br />

92.67 %<br />

E-523-58<br />

104.31 %<br />

BK-C-1,2-1<br />

102.44 %<br />

BK-C-1,2-Guzar e Azrat<br />

102.44 %<br />

BK-C-1,2-Takhta Pul<br />

102.34 %<br />

E-541-Bala Hesar<br />

92.61 %<br />

E-541-189-3<br />

92.67 %<br />

E-541-188<br />

92.68 %<br />

E-541-189<br />

92.68 %<br />

E-541-192<br />

92.66 %<br />

BK-513-Chaman Hozory<br />

103.15 %<br />

E-541-Kenar Chaman<br />

92.72 %<br />

BK-513-44_49<br />

103.15 %<br />

BK-513-44_46<br />

103.15 %<br />

P-C4-11- Reconductor to 120 sqm<br />

E-531-Sia sang<br />

101.95 %<br />

E-531-60-44<br />

101.95 %<br />

E-531-Qir Factory<br />

102.00 %<br />

E-531-60-37<br />

102.00 %<br />

E-531-60-33<br />

102.03 %<br />

P-C4-13- New O/H Section 120 sqm &<br />

switches<br />

BK-513-44_40<br />

103.16 %<br />

BK-513-Tape Balkh<br />

103.16 %<br />

BK-513-44_33<br />

103.16 %<br />

D-1,7-Sangkashaha<br />

%<br />

BK-C-1,2-Furmulia<br />

102.28 %<br />

BK-513-44_25<br />

103.20 %<br />

BK-513-Shah Shahid<br />

103.19 %<br />

BK-513-44_21A7<br />

103.24 %<br />

BK-513-Etefaq<br />

103.22 %<br />

E-515-108<br />

104.36 %<br />

E-515-58<br />

104.39 %<br />

E-515-62-34-6<br />

104.22 %<br />

BK-513-44_17<br />

103.27 %<br />

E-515-62-41<br />

104.20 %<br />

E-515-62-34-2<br />

104.22 %<br />

E-515-Tape Qawala No 2<br />

104.20 %<br />

E-515-62-9<br />

104.35 %<br />

E-515-62<br />

104.36 %<br />

BK-513-Qalhacha<br />

103.34 %<br />

E-515-62-39<br />

104.20 %<br />

E-515-62-38<br />

104.21 %<br />

E-516-Tape Qawala No 1<br />

104.22 %<br />

E-515-62-31<br />

104.23 %<br />

E-515-Family hae Nasajee<br />

104.27 %<br />

E-515-76<br />

104.36 %<br />

E-523-81<br />

103.99 %<br />

BK-513-44_9<br />

103.34 %<br />

E-515-62-26<br />

104.25 %<br />

E-515-62-14<br />

104.31 %<br />

BK-513-Shohadai Saleheen<br />

103.99 %<br />

E-523-86<br />

103.93 %<br />

BK-513-25<br />

104.08 %<br />

BK-513-27<br />

104.02 %<br />

BK-513-44<br />

103.48 %<br />

E-515-94<br />

104.36 %<br />

513-18<br />

28 %<br />

BK-513-24<br />

104.12 %<br />

E-523-91<br />

103.87 %<br />

E-523-100<br />

103.78 %<br />

E-523-103<br />

103.77 %<br />

E-523-94<br />

103.83 %<br />

E-523-zakhira-Ab-Bagrami<br />

103.77 %<br />

E-523-106<br />

103.76 %<br />

BK-513-70_21<br />

103.20 %<br />

E-523-107<br />

103.76 %<br />

E-523-108<br />

103.75 %<br />

BK-513-Borj_2_Qalhacha<br />

103.27 %<br />

E-523-109<br />

103.75 %<br />

BK-513-61<br />

103.27 %<br />

E-523-112<br />

103.74 %<br />

E-523-115<br />

103.73 %<br />

BK-513-70_3<br />

103.20 %<br />

BK-513-70_4<br />

103.19 %<br />

E-523-117<br />

103.72 %<br />

BK-513-69<br />

103.21 %<br />

BK-513-Pull Safeed<br />

103.18 %<br />

BK-513-70_33<br />

103.20 %<br />

E-523-120<br />

103.72 %<br />

E-523-121<br />

103.72 %<br />

E-523-Chaha-e-hamiq-1<br />

103.72 %<br />

BK-513-78<br />

103.18 %<br />

BK-513-80<br />

103.18 %<br />

BK-513-Beni Hesar<br />

103.16 %<br />

E-523-131<br />

103.70 %<br />

E-523-Chaha-e-hamiq-2<br />

103.70 %<br />

E-523-Chaha-e-hamiq-3<br />

103.69 %<br />

E-523-133<br />

103.69 %<br />

E-523-137<br />

103.69 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-536-70<br />

105.00 %<br />

E-536-71<br />

105.00 %<br />

E-536-89<br />

105.00 %<br />

E-536-90<br />

105.00 %<br />

E-536-95<br />

105.00 %<br />

E-536-103<br />

105.00 %<br />

E-536-110<br />

105.00 %<br />

E-536-116<br />

105.00 %<br />

E-536-122<br />

105.00 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


Appendix<br />

B<br />

Load Flow results for Case_07_B2<br />

Reduced Loading Conditions in Existing Network<br />

Please see file Case_07_B2.pdf or use hyper-link below.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International B-1


1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8


22.43 %<br />

P-B2-1 Reconductor to 70 sqm<br />

P-B2-1 Reconductor to 70 sqm<br />

P-B2-1 Reconductor to 70 sqm<br />

P-B2-1 Reconductor to 70 sqm<br />

2.38 MVA<br />

106.64 %<br />

P-B2-1 Reconductor to 70 sqm<br />

2.44 MVA<br />

106.63 %<br />

P-B2-1 Reconductor to 120 sqm<br />

3.03 MVA<br />

129.05 %<br />

0.51 MVA<br />

22.42 %<br />

P-B2-1 Reconductor to 120 sqm<br />

3.08 MVA<br />

129.05 %<br />

0.31 MVA<br />

12.90 %<br />

P-B2-1 Reconductor to 120 sqm<br />

P-B2-1 Reconductor to 120 sqm<br />

0.32 MVA<br />

79.96 %<br />

0.50 MVA<br />

79.80 %<br />

0.16 MVA<br />

79.79 %<br />

0.32 MVA<br />

79.69 %<br />

0.27 MVA<br />

79.47 %<br />

0.32 MVA<br />

79.73 %<br />

0.16 MVA<br />

79.52 %<br />

0.20 MVA<br />

78.06 %<br />

0.31 MVA 0.51 MVA<br />

77.80 %<br />

0.08 MVA<br />

78.97 %<br />

0.08 MVA<br />

78.28 %<br />

1 MVA<br />

04 %<br />

0.49 MVA<br />

77.07 %<br />

0.48 MVA<br />

76.65 %<br />

0.31 MVA<br />

76.89 %<br />

3.42 MVA<br />

70.97 %<br />

4.01 MVA<br />

80.98 %<br />

0.49 MVA<br />

13.96 %<br />

0.49 MVA<br />

13.95 %<br />

0.31 MVA<br />

8.81 %<br />

2.27 MVA<br />

103.09 %<br />

2.24 MVA<br />

103.09 %<br />

2.25 MVA<br />

103.09 %<br />

0.51 MVA<br />

2.21 MVA<br />

103.09 %<br />

2.12 MVA<br />

49.69 %<br />

0.51 MVA<br />

22.43 %<br />

22.44 %<br />

0.20 MVA<br />

8.65 %<br />

0.20 MVA<br />

8.65 %<br />

0.20 MVA<br />

8.65 %<br />

2.11 MVA<br />

49.69 %<br />

2.09 MVA<br />

49.70 %<br />

2.08 MVA<br />

49.70 %<br />

1.13 MVA<br />

27.12 %<br />

0.32 MVA<br />

7.73 %<br />

0.78 MVA<br />

18.76 %<br />

0.80 MVA<br />

19.40 %<br />

0.51 MVA<br />

12.24 %<br />

0.78 MVA<br />

18.76 %<br />

0.32 MVA<br />

7.72 %<br />

0.48 MVA<br />

11.68 %<br />

0.48 MVA<br />

11.69 %<br />

0.51 MVA<br />

12.24 %<br />

0.48 MVA<br />

11.69 %<br />

0.51 MVA<br />

12.24 %<br />

0.48 MVA<br />

11.69 %<br />

0.32 MVA<br />

7.81 %<br />

0.51 MVA<br />

12.24 %<br />

0.32 MVA<br />

7.81 %<br />

0.32 MVA<br />

7.81 %<br />

0.50 MVA<br />

12.25 %<br />

0.32 MVA<br />

7.82 %<br />

NW-513-Qaria Tolad<br />

58.51 %<br />

0.50 MVA<br />

12.25 %<br />

0.32 MVA<br />

7.82 %<br />

NW-513-Qaria Borjak<br />

58.29 NW-513-289 %<br />

NW-513-288 58.30 %<br />

0.32 MVA<br />

7.82 %<br />

0.32 MVA<br />

7.82 %<br />

58.31 %<br />

NW-513-286<br />

58.32 %<br />

0.32 MVA<br />

7.82 %<br />

NW-513-283<br />

58.34 %<br />

0.32 MVA<br />

7.82 %<br />

.<br />

NW-513-282<br />

58.48 %<br />

NW-513-212-48<br />

58.60 %<br />

NW-513-212-47<br />

58.62 %<br />

NW-513-275<br />

58.52 %<br />

NW-513-250<br />

58.55 %<br />

NW-513-244<br />

58.66 %<br />

NW-513-212-26<br />

58.94 %<br />

NW-513-212-25<br />

58.96 %<br />

NW-513-238<br />

58.72 %<br />

NW-513-Qaria Dalil<br />

58.68 %<br />

NW-513-212-16<br />

NW-513-Doda Mast<br />

59.08 59.07 % %<br />

NW-513-212-14<br />

59.10 %<br />

NW-513-Qalai Amir Mohammad<br />

NW-513-225<br />

58.90 %<br />

58.90 %<br />

NW-513-228<br />

58.87 %<br />

NW-513-229<br />

58.85 %<br />

NW-513-222<br />

58.96 %<br />

NW-513-Deh Arbab<br />

59.32 %<br />

NW-514-Qalai mirdad<br />

58.82 %<br />

NW-513-209<br />

59.55 %<br />

NW-513-203<br />

59.91 %<br />

NW-513-195<br />

60.44 %<br />

NW-513-159-40-2<br />

64.33 %<br />

NW-513-159-40-3<br />

64.32 %<br />

NW-513-Koshkak<br />

NW-513-159-40<br />

64.35<br />

64.36<br />

%<br />

%<br />

NW-513-Kamangar<br />

64.28 %<br />

NW-513-187<br />

61.08 %<br />

NW-513-Deh Ponba<br />

60.73 %<br />

NW-513-159-27<br />

64.66 %<br />

NW-513-182<br />

62.00 %<br />

NW-513-181<br />

62.18 %<br />

Branch Element<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


13.72 MVA<br />

248.25 %<br />

NW-526-No_18_Projhe Jadeed # 1&2<br />

98.18 %<br />

NW-526-No_24_Projhe Jadeed # 1&2<br />

98.13 %<br />

NW-526-No_19_Panjsad Family<br />

97.59 %<br />

NW-526-Hazare Baghal<br />

99.89 %<br />

NW-526-No_15_Maktab Sangi # 1&2<br />

96.88 %<br />

NW-526-33_15<br />

99.89 %<br />

NW-526-51_17<br />

96.89 %<br />

NW-526-51_16<br />

96.91 %<br />

NW-526-51_15<br />

96.94 %<br />

NW-526-No_17_Projhe Jadeed # 1&2<br />

98.29 %<br />

NW-526-No_14_Panjsad Family # 1&2<br />

96.93 %<br />

NW-526-No_16_Panjsad Family # 1&2<br />

97.66 %<br />

NW-526-54<br />

97.66 %<br />

NW-526-42_3<br />

98.38 %<br />

N-513-Garud Milli # 2<br />

99.42 %<br />

NW-526-42_2<br />

98.47 %<br />

NW-516-Mawad Nafti<br />

104.58 %<br />

NW-516-50<br />

104.58 %<br />

NW-526-33_2<br />

99.95 %<br />

NW-527-33<br />

97.46<br />

NW-526-33<br />

99.96 %<br />

NW-526-36<br />

99.57 %<br />

NW-527-36<br />

97.12 %<br />

NW-527-TR-61Taqweatee<br />

97.44 %<br />

NW-526-40<br />

98.96 %<br />

NW-527-40<br />

97.03 %<br />

NW-526-42<br />

NW-527-Tr-No-6- 98.71 % 1&2<br />

96.94 %<br />

NW-526-No_21_Projhe Jadeed<br />

98.47 %<br />

NW-526-48<br />

98.15 %<br />

NW-526-Nan Pazi Watan<br />

98.15 %<br />

NW-526-51<br />

97.83 %<br />

NW-526-49<br />

98.07 %<br />

NW-526-51_3<br />

97.61 %<br />

NW-526-51_4<br />

97.54 %<br />

NW-526-51_2<br />

97.70 %<br />

NW-526-No_20_Panjsad Family # 1&2<br />

97.54 %<br />

NW-526-51_7<br />

97.38 %<br />

NW-526-51_8<br />

97.33 %<br />

N-513-53<br />

101.59 %<br />

N-513-71<br />

100.49 %<br />

N-513-79<br />

99.94 %<br />

N-513-Reasat-e-Logiestic<br />

99.51 %<br />

N-513-Technic wa Asleh<br />

99.16 % N-513-99-J<br />

99.16 %<br />

NW-516-52<br />

104.58 %<br />

NW-527-30<br />

NW-526-30<br />

97.71 %<br />

100.44 %<br />

N-513-43-C15<br />

101.97 %<br />

N-513-43-C14<br />

101.98 %<br />

N-513-No-59 Taqweatee Khuja Bughra<br />

100.44 %<br />

N-513-No-59 Khuja Bughra-B<br />

101.95 %<br />

N-513-84<br />

99.61 %<br />

NW-527-44<br />

94.98 %<br />

NW-527-44.5<br />

94.39 %<br />

NW-527-44.15<br />

NW-527-44.13<br />

94.34 %<br />

94.35 %<br />

NW-527-Tr.No-8 Hawaee<br />

94.25 %<br />

N-513-47<br />

101.95 %<br />

N-513-43-C11<br />

102.03 %<br />

N-513-99-J2<br />

99.22 %<br />

NW-526-Lewai Babajan<br />

101.79 %<br />

NW-527-45 NW-527-Tr.No-6 Hawaee-1&2<br />

94.50 % 94.17 %<br />

NW-527-46<br />

94.27 %<br />

NW-527-Tr. No 6-ariana-1&2<br />

94.31 %<br />

N-520-51<br />

N-520-Borj Sera mina<br />

N-520-48<br />

# 1&2<br />

102.71<br />

102.73 %<br />

102.73 %<br />

N-520-43<br />

102.85 %<br />

N-513-46<br />

102.03 %<br />

N-513-No-62 Hawaee Khuja Bughra<br />

99.91 %<br />

N-513-99<br />

99.23 %<br />

NW-527-24<br />

NW-526-24<br />

99.68 %<br />

101.44 %<br />

N-513-43-C6<br />

102.10 %<br />

N-513-No-059 Khuja Bughra-A<br />

102.10 %<br />

NW-527-21 NW-526-21<br />

99.76 101.82 % %<br />

NW-524-Borj_4_Zamini # 1&2<br />

102.54 %<br />

NW-524-56<br />

102.55 %<br />

NW-524-52<br />

102.69 %<br />

NW-527-Tr.No 5-Hesa Awal -1&2<br />

93.34 %<br />

NW-527-52.12<br />

93.62 %<br />

NW-527-52.13<br />

93.40 %<br />

NW-527-52.8<br />

93.65 % NW-527-52<br />

94.11 %<br />

NW-527-Tr.Shafa Khane Khairkhana<br />

93.94 %<br />

NW-527-52.a.3<br />

94.03 %<br />

N-520-41<br />

102.90 % N-520-No-13 Zamini N-520-38 # 1&2<br />

102.97 % 102.97 %<br />

N-513-43-C1<br />

N-513-43 102.20 %<br />

102.21 %<br />

N-513-43-C4<br />

102.14 %<br />

NW-527-52.8.2<br />

93.54 %<br />

NW-527-TR-no-5 Khest hokhtif-1&2<br />

93.53 %<br />

NW-527-52.a.2<br />

94.04 %<br />

NW-516-40<br />

104.63 %<br />

NW-516-33<br />

104.67 %<br />

NW-527-18 NW-526-18<br />

101.42 102.24 %%<br />

NW-527-18.1<br />

101.40 %<br />

NW-527-18.2<br />

101.39<br />

NW-527-Tr-no-4<br />

%<br />

101.11 %<br />

N-520-Borj 8 Jeem N-520-57 # 1&2<br />

102.60 % 102.60 %<br />

N-513-39<br />

102.50 %<br />

N-513-35<br />

102.75 %<br />

NW-527-TR No-7 hesaee Dohm-1&2<br />

93.57 %<br />

NW-527-60<br />

93.95 %<br />

NW-516-20<br />

104.73 %<br />

NW-524-Borj_3_Markazi Hasee Awal # 1&2<br />

103.52 %<br />

NW-524-32_2<br />

103.53 % NW-524-32<br />

103.56 %<br />

NW-524-Mokhaberat Khairkhana<br />

103.03 % NW-524-41<br />

103.03 %<br />

NW-524-Jawar Mokhaberat Khairkhana<br />

103.02 %<br />

NW-524-38<br />

103.13 %<br />

NW-524-37<br />

103.24 %<br />

NW-524-38_3<br />

103.12 %<br />

NW-524-38_4<br />

103.12 %<br />

NW-524-Khedamat Takhniki Wezarat Mahdan<br />

103.11 %<br />

NW-524-38_5<br />

103.11 %<br />

NW-524-Stak Markazi Sehat Aama<br />

103.24 %<br />

N-527-43<br />

102.09 %<br />

N-527-No-9 Zamini<br />

N-527-48<br />

Tr 1&2<br />

101.99 %<br />

102.00 %<br />

N-520-29<br />

103.28 N-520-No-12 % Zamini N-520-27 # 1&2<br />

103.36 % 103.36 % N-520-25<br />

103.48 %<br />

N-513-27-B2<br />

103.13 %<br />

N-513-27-B1<br />

N-513-27 103.14 %<br />

103.14 %<br />

N-513-No-60 khuja Bughra<br />

103.13 %<br />

N-513-No-3 Zameni khuja Bughra<br />

102.85 %<br />

N-513-19-A25<br />

N-513-19-A27 102.87 %<br />

102.85 %<br />

N-513-19-A22<br />

102.90 %<br />

N-513-No-2 Hawaee Khuja Bughra<br />

N-513-19-A-19<br />

102.90 %<br />

102.95 %<br />

NW-516-12_5<br />

104.71 %<br />

NW-516-Borj_1_Hawaee<br />

104.71 %<br />

N-527-Qalhae Najara<br />

102.10 % N-527-38-C-10<br />

102.10 %<br />

N-527-No-22 Zamini<br />

102.15 % N-527-39-2<br />

102.15 % N-527-39<br />

102.17 N-527-38-A1 %<br />

102.18 %<br />

N-527-38<br />

102.19 %<br />

N-527-38-A11<br />

102.07 %<br />

N-527-Sarwar Kaynat<br />

102.06 %<br />

N-520-No-12 Taqweatee<br />

103.81 %<br />

N-520-20<br />

103.83 %<br />

N-513-19<br />

103.53 %<br />

N-513-19-A8<br />

N-513-No-1 Khuja Bughra<br />

103.15<br />

#<br />

%<br />

1<br />

103.16 %<br />

N-513-No-1 Taqweatee khuja Bughra<br />

103.13 %<br />

N-513-19-A-17<br />

102.99 %<br />

NW-516-12<br />

104.76 %<br />

NW-516-11<br />

104.78 %<br />

NW-516-11_1<br />

104.78 %<br />

NW-516-Borj_2_Hawaee<br />

104.78 %<br />

NW-524-Borj_1_Hesa Awal Khirkhana<br />

103.77 %<br />

NW-524-21_5<br />

103.77 %<br />

NW-524-23<br />

103.74 %<br />

NW-524-21_3<br />

103.80 %<br />

NW-524-23_5<br />

103.61 %<br />

NW-524-Borj_2_Zamini # 1&2<br />

103.57 %<br />

N-512-Leway Amniat<br />

102.58 %<br />

NW-516-6<br />

104.91 %<br />

NW-516<br />

104.97 %<br />

NW-518<br />

104.70 %<br />

17.81 MVA<br />

133.65 %<br />

NW-517<br />

104.94 %<br />

17.86 MVA<br />

131.48 %<br />

NW-527<br />

104.97 %<br />

20.40 MVA<br />

246.83 %<br />

NW-513<br />

104.45 %<br />

NW-527-3<br />

NW-525 104.81 %<br />

104.88 %<br />

NW-526<br />

104.74 %<br />

NW-526-3<br />

104.58 %<br />

NW-527-4<br />

104.68 NW-525-3 %<br />

NW-524-5<br />

104.69 % NW-524-4<br />

104.78 %<br />

NW-514-3<br />

104.83 %<br />

104.73 %<br />

NW-524<br />

NW-514<br />

NW-515-4<br />

104.92 %<br />

104.86 %<br />

104.68 %<br />

P-B2-1 Upgraded to 240 sqm<br />

NW-515<br />

104.89 %<br />

NW-527-7<br />

104.41<br />

NW-526-7<br />

%<br />

104.17 %<br />

S/S North West<br />

105.00 %<br />

NW-514-7<br />

NW-514-6 104.31 %<br />

104.45 %<br />

NW-524-6<br />

104.74 %<br />

NW-524-7<br />

104.60 %<br />

NW-525-9<br />

104.06 %<br />

NW-515-9<br />

104.24 %<br />

NW-515-Gaz Mayee<br />

104.24 %<br />

NW-524-21_2<br />

103.81 %<br />

NW-514-10<br />

103.73 % NW-524-12<br />

NW-524-10<br />

104.34 % NW-524-14<br />

104.42 %<br />

104.19 %<br />

NW-524-13<br />

NW-514-12<br />

104.27 %<br />

103.50 %<br />

NW-514-14<br />

103.32 %<br />

NW-525-15<br />

103.45 %<br />

NW-515-15<br />

103.68 %<br />

NW-524-21<br />

103.83 %<br />

NW-524-Borj_2_Dakhel Haweeli # 1&2<br />

104.10 %<br />

NW-524-14_4<br />

104.12 %<br />

NW-524-14_4_2<br />

104.10 %<br />

NW-524-14_12<br />

104.04 %<br />

NW-524-Borj_2_Hawee Qalah Najara<br />

104.04 %<br />

N-527-32-D4<br />

N-527-No-10 Zamini Tr 1&2<br />

102.39 %<br />

102.42 %<br />

N-527-32<br />

102.43 %<br />

N-527-32-D6 N-527-32-D7<br />

N-527-10-E1<br />

N-527-10-E6<br />

N-527-No-25 Hawaee 102.35 102.34 % %<br />

102.39 %<br />

102.26 %<br />

102.33 %<br />

N-527-10-E7<br />

102.23 %<br />

N-527-10-E8<br />

N-527-10-E9<br />

102.20<br />

102.19<br />

%<br />

N-527-No-23 N-527-10-E-10-1<br />

Hawaee Tr 1&2<br />

102.11 % 102.11 %<br />

N-527-10-E10<br />

102.13 %<br />

N-527-No-10 Hawaee<br />

103.17 % N-527-24<br />

103.17 %<br />

JS#10-N<br />

103.44 %<br />

N-519-22<br />

103.49 %<br />

N-JS10-Bland Manzel Mastora 1&2<br />

103.41 %<br />

N-520-15-A5 N-520-15-A4<br />

N-520-No-11 104.10 104.10 Zamini# % % 1&2<br />

N-520-15<br />

104.10 %<br />

104.16 % N-520-11<br />

104.37 %<br />

N-520-No-11 N-520-15-A10<br />

Hawaee<br />

104.06 % 104.07 %<br />

N-520-9<br />

104.48 % N-520-4<br />

104.75 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-513-2<br />

N-513-7 N-519-6<br />

104.86 %<br />

N-519-7<br />

104.43 %N-513-6 104.58 %<br />

N-519-8 104.52 %<br />

N-519-2<br />

N-516-3<br />

104.51 %<br />

104.84 %<br />

104.75 N-515-2%<br />

104.46 %<br />

104.87 %<br />

N-517-3<br />

N-514-3 104.82 %<br />

N-529-8<br />

N-514-8<br />

104.79 %<br />

104.26 %<br />

104.55 N-529-9<br />

N-514-9 104.19 %<br />

104.51 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-529-3<br />

104.83<br />

N-520<br />

%<br />

104.94 %<br />

S/S North<br />

105.00 %<br />

N-515-7<br />

104.64 N-518-7 %<br />

104.41 %<br />

N-512-2<br />

104.91 %<br />

N-528-2<br />

104.85 %<br />

N-518-4<br />

104.77 %<br />

N-516-19<br />

103.07<br />

N-516-40 Metra Wazir<br />

N-517-19<br />

%<br />

Abad<br />

103.07 %<br />

103.67 %<br />

N-512-21<br />

102.61 %<br />

N-528-32<br />

102.61 %<br />

N-528-528-1<br />

102.42 %<br />

N-528-9N-528-10<br />

102.00 % 101.94 %<br />

N-528-10A2<br />

101.87 %<br />

N<br />

1<br />

NW-518-7<br />

103.97 NW-517-5 %<br />

104.70 %<br />

20.30 MVA<br />

277.02 %<br />

NW-513-5<br />

103.63 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-16<br />

103.06 %<br />

NW-515-18<br />

103.42 %<br />

NW-514-18<br />

NW-514-18_4<br />

NW-514-Borj Wakseensazi 102.82 %<br />

102.81 %<br />

102.81 %<br />

NW-525-18<br />

103.15 %<br />

N-527-10-E 15<br />

102.06 %<br />

N-514-No-1 Proja Wazir Abad 1<br />

104.02 %<br />

N-514-No-6 Proja Wazir Abad 2<br />

103.74 N-514-19-C11 % N-514-19-C12<br />

103.74 %<br />

103.77 %<br />

N-528-12<br />

101.75 %<br />

N-514-19-A5<br />

104.03 %<br />

N-515-13<br />

104.30 N-518-13 %<br />

103.82 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-Spin Ghar CC<br />

102.36 %<br />

NW-514-22<br />

102.37 %<br />

N-514-19<br />

104.09 %<br />

N-529-19<br />

103.28 %<br />

N-514-19-C5<br />

103.91 %<br />

N-514-19-C4<br />

103.93 %<br />

N-514-19-C6<br />

103.88 %<br />

17.69 MVA<br />

133.65 %<br />

20.14 MVA<br />

277.02 %<br />

NW-514-28_2<br />

NW-514-Mechaniza Zrahaty<br />

102.10 %<br />

102.10 %<br />

NW-514-24_7<br />

102.10 %<br />

NW-514-Reiasat Anasor Felezy<br />

102.24 %<br />

NW-514-23<br />

102.25 NW-515-24 %<br />

102.89 %<br />

NW-525-24<br />

102.57 %<br />

N-527-Shahrak Police<br />

101.87 %<br />

N-527-10-E 29<br />

101.88 %<br />

N-527-10-E 25<br />

102.05 %<br />

N-514-19-C2<br />

103.98 %<br />

N-514-19-C1<br />

N-514-19-B3<br />

103.99 %<br />

104.00 %<br />

N-514-19-C-15<br />

103.73 %<br />

N-514-19-C-16<br />

103.73 %<br />

NW-514-24<br />

102.11 %<br />

N-527-10-E 28<br />

101.92 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-528-Mohamadya No-1<br />

100.76 %<br />

N-528-25-B7<br />

100.76 %<br />

N-528-21<br />

101.02 %<br />

NW-518-18<br />

102.29 %<br />

NW-517-13<br />

104.13 %<br />

NW-513-13<br />

100.59 %<br />

NW-514-Farm Morghdary<br />

101.61 %<br />

NW-514-28<br />

101.67 %<br />

N-527-Hotel Shame Paris<br />

101.99 N-527-10-E-25-7<br />

101.99<br />

%<br />

%<br />

N-514-29-B6<br />

N-514-No-7 Proja Wazir Abad 1<br />

103.83 %<br />

103.80 %<br />

N-514-29-B9<br />

103.81 N-514-29-B8 %<br />

103.82 %<br />

N-514-28 N-529-28<br />

N-514-29-B2103.89 102.36 %%<br />

103.87 %<br />

N-514-29-B1<br />

103.88 N-514-29 % N-514-28-A1<br />

103.88 103.88 % %<br />

N-514-No-3 Proja Wazir Abad 21<br />

103.85 %<br />

N-514-Salim Carwan<br />

103.70 %<br />

N-515-24<br />

103.15 N-518-24 %<br />

101.88 %<br />

N-528-25<br />

N-528-Mohamadya<br />

100.80 %<br />

No-2<br />

100.80 %<br />

N-528-25-B3<br />

100.80 %<br />

N-528-28<br />

100.61 %<br />

NW-518-26<br />

101.06 %<br />

17.40 MVA<br />

133.65 %<br />

NW-514-30<br />

101.42 %<br />

NW-514-Borj_1_Tahia Maskan<br />

101.37 %<br />

NW-514-Borj_2_Tahia Maskan<br />

101.35 %<br />

NW-514-Borj_3_Tahia Maskan 1&2<br />

101.34 %<br />

NW-525-37<br />

NW-515-37 101.19 %<br />

101.62 %<br />

NW-525-38<br />

101.06 %<br />

NW-515-38<br />

101.50 %<br />

NW-525-39<br />

NW-515-39<br />

100.89 %<br />

101.34 %<br />

NW-525-43<br />

100.62 %<br />

NW-515-43<br />

101.09 %<br />

NW-515-43_1<br />

101.09 %<br />

NW-515-45<br />

100.91 %<br />

NW-515-Azamatullah<br />

NW-515-43_4<br />

101.07 % 101.07 %<br />

NW-515-Haji Wazir<br />

NW-515-45_3<br />

Gul<br />

100.89 %<br />

100.89 %<br />

NW-525-45<br />

100.40 %<br />

NW-525-Market Mewa<br />

100.17 %<br />

NW-515-47 NW-525-47<br />

100.72 %<br />

100.17 %<br />

NW-515-Kochi Market<br />

100.46 % NW-515-50_8<br />

100.46 %<br />

NW-525-68.5<br />

97.83 %<br />

NW-525-Hakim Naser Khesro<br />

97.82 %<br />

NW-525-68<br />

97.85 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-514-No-4 Proja Wazir Abad<br />

N-514-36 103.85 %<br />

103.85<br />

N-529-36<br />

101.44 %<br />

NW-525-72<br />

97.43 %<br />

NW-525-Qabre Shahoon<br />

95.62 %<br />

N-528-Taqweyate<br />

N-528-50-E<br />

Wazir abad<br />

1<br />

99.64 %<br />

99.64 %<br />

N-528-Wazir Abad<br />

99.64 %<br />

N-528-50<br />

99.67 %<br />

N-528-Borje N-528-47 Tahire<br />

99.89 % 99.89 %<br />

N-528-32<br />

100.40 %<br />

N-528-38 N-528-36<br />

100.09 % 100.20 %<br />

N-528-Char Qala Wazir Abad # 21<br />

100.08 % N-528-37<br />

100.14 %<br />

N-528-42<br />

100.00 %<br />

N-528-37-c1<br />

100.11 %<br />

17.19 MVA<br />

133.65 %<br />

NW-517-23<br />

103.49 %<br />

19.55 MVA<br />

277.03 %<br />

NW-515-Proses Roda<br />

101.06 NW-515-Flezkary % Kargar<br />

101.06 %<br />

NW-515-43_6<br />

101.06 %<br />

NW-515-45_4<br />

100.89 %<br />

NW-515-45_5<br />

100.88 %<br />

NW-515-45_6<br />

100.88 %<br />

NW-515-Agha Shereen<br />

100.88 %<br />

NW-515-50<br />

100.48 %<br />

NW-525-Chaman Babrak No-8<br />

98.49 %<br />

NW-525-63<br />

98.50 %<br />

NW-525-76<br />

97.06 %<br />

NW-525-Taimani No-3<br />

97.06 %<br />

N-528-37-c4<br />

100.05 %<br />

NW-514-Zakhira Teel NW-514-40_5<br />

Badambagh<br />

100.60 %<br />

100.60 %<br />

NW-514-40_1<br />

100.61 %<br />

NW-514-40<br />

100.62 %<br />

NW-514-41<br />

100.58 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-518-32<br />

99.79 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-42<br />

100.50 %<br />

NW-514-42_1<br />

100.47 %<br />

NW-525-55<br />

99.40 %<br />

NW-515-55<br />

NW-515-Market 100.08 % mily<br />

100.08 %<br />

NW-525-58<br />

99.06 %<br />

NW-515-60<br />

99.80 %<br />

NW-515-Chaman Babrak<br />

99.52 %<br />

N-529-49<br />

100.35 %<br />

NW-525-Qasemi Vin House<br />

96.60 %<br />

NW-525-82<br />

96.67 %<br />

NW-525-kabul Paris<br />

96.66 %<br />

NW-525-82.1<br />

96.66 %<br />

N-515-31<br />

102.04 %<br />

N-518-31<br />

99.97 %<br />

N-518-Abrasani Wazir abad<br />

99.97 %<br />

N-528-Now Abad Qala Mosa<br />

99.94 %<br />

16.98 MVA<br />

133.65 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-Borj Deh Kepak 1&2<br />

100.38 %<br />

NW-514-Borj_2_Parwan NW-514-49 she<br />

100.05 % 100.05 %<br />

NW-514-Sarai Kantinery_1&2<br />

99.71 %<br />

NW-514-55<br />

99.71 %<br />

NW-515-Haji Aadam khan<br />

99.35 %<br />

NW-515-Borj_1_Parwan She<br />

99.36 %<br />

NW-515-74<br />

99.37 %<br />

P-B3-13-Reconductored to 150 sqm<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-515-62<br />

99.54 %<br />

N-529-49A6<br />

NW-515-63<br />

100.29 %<br />

99.47 NW-515-63_1<br />

%<br />

99.39 %<br />

N-529-Borj 5 Chamni Babrak<br />

100.28 %<br />

P-B3-13-Reconductored to 150 sqm<br />

NW-515-63_4<br />

99.00 %<br />

NW-525-82.4<br />

96.63 %<br />

NW-525-92<br />

95.91 %<br />

NW-525-Taimani No-2-1&2<br />

95.91 %<br />

NW-525-Nasajy Maqsody<br />

95.56 %<br />

NW-525-109<br />

95.35 %<br />

NW-525-108<br />

95.37 %<br />

NW-525-112<br />

95.23 %<br />

NW-525-111<br />

95.25 %<br />

NW-525-117<br />

95.05 %<br />

NW-525-Qalah Mosa No-1<br />

95.05 %<br />

NW-525-Qalah Mosa No-2<br />

94.98 %<br />

N-528-37-c15<br />

99.91 %<br />

N-528-37-C17<br />

99.87 %<br />

NW-518-47<br />

97.43 %<br />

NW-518-40<br />

98.38<br />

NW-517-32<br />

%<br />

102.79 %<br />

16.74 MVA<br />

133.66 %<br />

18.14 MVA<br />

277.04 %<br />

NW-513-32<br />

93.35 %<br />

P-B2-1 Reconductor to 185 sqm<br />

0<br />

NW-514-58<br />

99.56 %<br />

NW-514-Borj_3_Parwan she<br />

99.46 % NW-514-60<br />

99.46 %<br />

NW-515-67<br />

NW-515-Etebar khan<br />

99.41 %<br />

98.99 %<br />

NW-515-67_1<br />

NW-515-Hotel Sultan Qalbha<br />

99.40 %<br />

99.00 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-515-63_6<br />

98.66 %<br />

NW-515-67_3<br />

99.38 %<br />

NW-515-Maiwand Market<br />

98.66 %<br />

NW-515-67_4<br />

99.36 %<br />

NW-514-65<br />

99.28 %<br />

N-529-64<br />

NW-514-66<br />

99.00 %N-529-63<br />

99.23 %<br />

NW-515-Borj_4_Parwan NW-515-67_8<br />

99.06 %<br />

She<br />

99.31 % 99.31 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-514-69<br />

99.16 %<br />

NW-514-71<br />

99.09 %<br />

N-529-66<br />

NW-514-Chamandy Karte NW-514-71_1 Parwan_1&2<br />

98.67 %<br />

99.07 %<br />

99.07 %<br />

P-B3-13-Reconductored to 150 sqm<br />

NW-515-Hawaee Ansary<br />

97.71 %<br />

NW-515-63_16<br />

97.71 %<br />

NW-525-101<br />

95.62 %<br />

NW-525-102<br />

95.60 %<br />

NW-525-102.2<br />

95.57 %<br />

NW-525-Taimani No-1<br />

95.57 %<br />

N-515-35<br />

101.44 N-518-35 %<br />

99.00 %<br />

N-515-36<br />

101.35 N-518-36 %<br />

98.84 %<br />

NW-525-Charahy Shaheed<br />

94.95 %<br />

N-528-No-3 Qala Mosa<br />

N-528-37-C19<br />

99.83 %<br />

99.84 %<br />

N-518_JS2_A_1_2-Qalai Fatullah # 1<br />

97.21 %<br />

P-B3-18-Reconductored to 185 sqm<br />

16.58 MVA<br />

133.66 %<br />

NW-515-Blaak haee NW-515-63_16_2<br />

Shahraara<br />

97.56 % 97.56 %<br />

NW-518-51 NW-517-43 NW-513-43<br />

96.9102.31 90.76 % %<br />

16.49 MVA<br />

133.66 %<br />

NW-518-52<br />

96.75 %<br />

NW-514-77<br />

98.95 %<br />

NW-514-80<br />

98.89 %<br />

N-529-77<br />

98.03 %<br />

N-529-71<br />

98.31 %<br />

NW-515-63_16_3<br />

97.53 %<br />

NW-515-63_16_4<br />

97.48 %<br />

NW-515-Borj_2_Ansary<br />

NW-515-63_23<br />

97.48 NW-515-63_22 % 97.48 %<br />

97.50 %<br />

NW-513-Deh Araban hawahe<br />

70.63 %<br />

0.48 MVA<br />

76.28 %<br />

P-B2-1 Reconductor to 120 sqm<br />

4.56 MVA<br />

90.67 %<br />

NW-513-107-5<br />

71.07 %<br />

NW-513-5-G-OH<br />

70.98 %<br />

5.15 MVA<br />

139.40 %<br />

0.31 MVA<br />

76.27 %<br />

NW-513-107-2<br />

71.47 %<br />

5.18 MVA<br />

139.40 %<br />

NW-513-107<br />

71.66 %<br />

5.19 MVA<br />

139.40 %<br />

P-B2-1 Added a voltage regulator<br />

P-B2-1 Reconductor to 185 sqm<br />

9.95 MVA<br />

193.93 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-101<br />

73.17 %<br />

10.12 MVA<br />

193.92 %<br />

1.21 MVA<br />

28.25 %<br />

NW-513-95-2<br />

74.67 %<br />

NW-513-95<br />

74.69 %<br />

11.38 MVA<br />

217.15 %<br />

1.21 MVA<br />

23.23 %<br />

0.30 MVA<br />

7.77 %<br />

11.77 MVA<br />

222.90 %<br />

NW-513-96<br />

NW-513-93<br />

74.38 % NW-513-Family Rahmat 75.27 abad %<br />

NW-513-96-1 75.27 % NW-513-92<br />

74.36 %<br />

75.41 %<br />

NW-513-Aqeb tapa Rahmat abad<br />

74.65 %<br />

0.60 MVA<br />

15.46 %<br />

12.40 MVA<br />

234.34 %<br />

0.60 MVA<br />

75.56 %<br />

0.30 MVA<br />

7.00 %<br />

0.30 MVA<br />

75.65 %<br />

P-B2-1 Reconductor to 185 sqm<br />

12.67 MVA<br />

234.34 %<br />

NW-513-Wakseen Sazee<br />

77.01 %<br />

0.75 MVA<br />

16.93 %<br />

0.75 MVA<br />

75.31 %<br />

NW-513-86-1<br />

0.75 MVA<br />

77.06 77.06 % % 13.92 %<br />

NW-513-84<br />

77.66 %<br />

13.52 MVA<br />

248.25 %<br />

NW-513-80<br />

78.78 %<br />

P-B2-1 Reconductor to 185 sqm<br />

13.78 MVA<br />

248.25 %<br />

NW-513-79<br />

79.11 %<br />

14.51 MVA<br />

256.77 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-74<br />

80.55 %<br />

1.08 MVA<br />

25.72 %<br />

NW-513-74-1<br />

80.53 %<br />

15.69 NW-513-72<br />

MVA<br />

275.81 81.10 % %<br />

16.15 MVA<br />

275.81 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-518-Markaz-e-talimi<br />

NW-513-64<br />

94.82 % 83.50 %<br />

NW-518-Sara Miasht<br />

95.40 %<br />

NW-518-E-e-Adari Zamini 1&2<br />

94.85 % NW-518-65.3<br />

94.85 %<br />

16.35 MVA<br />

275.81 %<br />

0.49 MVA<br />

9.87 %<br />

0.49 MVA<br />

4.43 %<br />

0.49 MVA<br />

9.86 %<br />

0.38 MVA<br />

6.94 %<br />

NW-518-59.5<br />

95.41 %<br />

NW-513-61<br />

84.50 %<br />

NW-518-61<br />

94.92 %<br />

16.54 MVA<br />

275.81 %<br />

NW-518-70<br />

94.50 %<br />

P-B2-1 Reconductor to 185 sqm<br />

0.97 MVA<br />

14.61 %<br />

0.38 MVA<br />

5.71 %<br />

0.07 MVA<br />

1.24 %<br />

0.07 MVA<br />

74.37 %<br />

11.73 MVA<br />

97.07 %<br />

NW-518-59A<br />

95.44 %<br />

NW-518-61.1<br />

NW-518-M-e-H <strong>Afghan</strong> Korea 1&2 95.06 %<br />

95.05 %<br />

NW-513-W.P.Sara Miasht<br />

85.51 % NW-513-58<br />

85.51 %<br />

16.73 MVA<br />

277.05 %<br />

0.49 MVA<br />

6.49 %<br />

NW-518-66<br />

94.89 %<br />

15.30 MVA<br />

126.51 %<br />

11.74 MVA<br />

97.07 %<br />

15.86 MVA<br />

130.52 %<br />

NW-513-56<br />

86.17 %<br />

NW-518-65<br />

94.98 %<br />

16.46 MVA<br />

133.66 %<br />

16.75 MVA<br />

277.05 %<br />

17.64 MVA<br />

277.04 %<br />

2.59 MVA<br />

38.86 %<br />

NW-518-57<br />

94.92 NW-517-56 %<br />

101.44 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-518-59<br />

94.66 %<br />

NW-517-59<br />

101.26 %<br />

2.59 MVA<br />

38.86 %<br />

NW-518-59.3<br />

94.26 %<br />

NW-518-W.P Khoshhal khan<br />

94.26 %<br />

2.58 MVA<br />

38.86 %<br />

0.06 MVA<br />

0.92 %<br />

NW-518-59.22 NW-518-Afshar NW-518-59.21 Seelo<br />

93.76 % 93.75 % 93.78 %<br />

2.51 MVA<br />

37.95 %<br />

0.49 MVA<br />

9.99 %<br />

0.49 MVA<br />

9.99 %<br />

0.49 MVA<br />

9.99 %<br />

0.49 MVA<br />

9.99 %<br />

0.49 MVA<br />

9.99 %<br />

NW-518-59.19 NW-518-Academy Police<br />

93.79 93.78 % %<br />

NW-518-59.18<br />

93.80 %<br />

NW-518-59.17<br />

93.81 % NW-518-59.15<br />

93.82 %<br />

0.49 MVA<br />

9.99 %<br />

0.76 MVA<br />

15.62 %<br />

NW-518-59.10<br />

NW-518-P.Talim wa 93.96 Tarbeia %<br />

93.96 %<br />

0.38 MVA<br />

5.82 %<br />

2.50 MVA<br />

37.95 %<br />

NW-518-59.8<br />

94.05 %<br />

1.25 MVA<br />

25.60 %<br />

NW-518-59.13<br />

93.87 %<br />

2.12 MVA<br />

32.13 %<br />

0.87 MVA<br />

16.01 %<br />

NW-518-Lailia Polytechnic 1&2<br />

93.81 %<br />

N-529_JS5_4_5-Borj Intercontinental # 1&2<br />

96.55 %<br />

N-529_JS5_4_5-Borj Politechnice # 1&2<br />

96.25 %<br />

0.00 MVA<br />

0.06 %<br />

N-529_JS5_4_5-Borj Awal Karte Mamoreen<br />

96.28 %<br />

N-529_JS5_4_5-Mohamad Omar Khan # 1&2<br />

97.62 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-514-83<br />

98.78 %<br />

N-529_JS5_B_2_5-UK emb<br />

97.67 %<br />

JS#5-NW-514<br />

N-JS5-Milli Bus<br />

98.73 % JS#5-N-529<br />

98.73 %<br />

N-529-79-B1<br />

97.69 97.72 % %<br />

N-529_JS5_4_5-7<br />

97.54 %<br />

N-529_JS5_4_5-12<br />

97.47 %<br />

N-529-79-B14<br />

97.71 %<br />

N-529_JS5_4_5-34<br />

N-529_JS5_B_2_5-Noor TV station<br />

96.94 % N-529_JS5_4_5-13 97.45 %<br />

97.40 %<br />

N-529_JS5_4_5-Borj Baghe Bala # 1&2<br />

96.88 %<br />

NW-3_5-Omer Shaheed<br />

98.56 %<br />

N-529-Bland manzel Gulzad<br />

N-529-79-B16<br />

97.69 %<br />

97.69 %<br />

N-529_JS5_B_2_5-Hesa Awal Karteparwan<br />

97.28 %<br />

NW-515-63_16_9<br />

97.32 %<br />

NW-515-63_16_10<br />

97.30 %<br />

NW-515-Baraki Shahraara<br />

97.29 %<br />

N-529_JS5_B_2_5-Sarak Awal Baharestan<br />

97.10 %<br />

NW-515-63_16_7<br />

97.41 %<br />

NW-515-63_16_8<br />

97.37 %<br />

NW-515-Shahraara<br />

97.14 %<br />

N-529_JS5_B_2_5-Market Najeeb Zarab<br />

96.61 %<br />

N-529_JS5_B_2_5-Borj Zamini Market Kona<br />

96.62 %<br />

NW-515-Borj_1_Ansary<br />

97.42 %<br />

NW-515-Kolola Poshta<br />

97.34 %<br />

NW-515-63_26<br />

97.36 %<br />

NW-515-63_25<br />

NW-515-63_28<br />

97.37 %<br />

97.34 %<br />

NW-515-63_24<br />

97.38 %<br />

NW-515-63_25_3<br />

97.36 %<br />

NW-515-Blaasam Hospital # 1&2<br />

97.36 %<br />

NW-515-Moqabel Zaeeshghah<br />

97.09 %<br />

N-529_JS5_B_2_5-Technic wa Asleha Amneiat<br />

96.51 %<br />

N-529_JS5_B_2_5-Malalay Hospital<br />

96.51 %<br />

N-518_JS2_A_1_2-Bland manzel Omarzai<br />

96.83 %<br />

N-518_JS2_B_2_5-Konj Park shahrnow<br />

96.66 %<br />

N-518_JS2_A_1_2-Haji Yahqoob # 1<br />

96.83 %<br />

N-518_JS2_A_1_2-Bland manzel Asrar<br />

96.83 %<br />

N-518_JS2_B_2_5-Tank Teel Shahr now<br />

97.04 %<br />

N-518_JS2_B_2_5-Gulkhana Park shahrnow<br />

96.87 %<br />

19635126.814399999<br />

JS#2-N-518<br />

97.77 %<br />

N-515_JS2_D_2_7-Emergency Hospital<br />

100.65 %<br />

N-518_JS2_517-Sefarat Turkia<br />

97.49 %<br />

N-518_JS2_A_1_2-Naqlia Sheerpoor<br />

97.61 %<br />

JS#2-N-515<br />

100.65 %<br />

N-518_JS2_517-Sefarat Alman<br />

97.50 %<br />

N-518_JS2_517-Moqabel Sefarat Alm<br />

97.50 %<br />

4.84 MVA<br />

131.13 %<br />

NW-513-B. h-e-Cha Qumber 1&2<br />

74.24 %<br />

0.61 MVA<br />

75.71 %<br />

0.61 MVA<br />

75.71 %<br />

0.47 MVA<br />

11.51 %<br />

1.08 MVA<br />

25.72 %<br />

NW-5_6-No-6 Khoshalkhan<br />

99.66 %<br />

NW-5_6-15<br />

99.67 %<br />

NW-5_6-No-5 Khoshalkhan<br />

99.72 %<br />

NW-5_6-10<br />

99.72 %<br />

N-529_JS5_4_5-Borj Dwom Karte Mamoreen<br />

96.27 %<br />

NW-3_5-Hawahy Damane Koh<br />

98.41 %<br />

NW-3_5-Foundation-e-Zamini Damane Koh<br />

98.42 %<br />

N-529_JS5_B_2_5-Amneiat Hospital<br />

96.57 %<br />

N-529_JS5_B_2_5-Zamini Qowae Markaz<br />

96.52 %<br />

N-518_JS2_A_1_2-Wezarat Dakhela<br />

96.58 %<br />

N-518_JS2_A_1_2-Mokhaberat Shahre now<br />

96.58 %<br />

N-518_JS2_B_2_5-Markaz Lesan(American Center)<br />

97.27 N-518_JS2_B_2_5-Moqabel %<br />

Markaz Lesan<br />

97.26 %<br />

N-518_JS2_B_2_5-Sefarat Iran<br />

97.26 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


N-513-Mamr-e-Wuzarat Transport<br />

98.60 %<br />

a<br />

11<br />

N-513-Taharokat Transport<br />

99.07 %<br />

N-513-132<br />

98.78 %<br />

N-513-154<br />

98.67 %<br />

N-513-101-H4<br />

99.12 %<br />

E-513-No_3 Qasaba<br />

100.22 %<br />

N-513-Tasadee Kamaz<br />

98.82 %<br />

E-513-No_2 Qasaba<br />

100.24 %<br />

N-513-101<br />

99.17 %<br />

N-513-125<br />

98.82 %<br />

E-513-No_1 Qasaba<br />

100.25 %<br />

N-513-124<br />

98.85 %<br />

E-513-127<br />

100.29 %<br />

N-513-121<br />

98.90 %<br />

N-513-Regration<br />

98.82 %<br />

N-513-121-i10<br />

98.83 %<br />

E-513-No_2_KhanaSazee<br />

100.57 %<br />

E-513-109<br />

100.58 %<br />

E-513-108<br />

100.68 %<br />

E-513-106<br />

100.74 %<br />

E-513-No_1_KhanaSazee<br />

100.90 %<br />

E-513-101<br />

100.87 %<br />

E-513-100<br />

100.90 %<br />

E-513-Fabrica Qir<br />

101.03 %<br />

E-513-97<br />

101.04 %<br />

E-513-90<br />

101.38 %<br />

E-513-89<br />

101.41 %<br />

N-512-39<br />

00.19 %<br />

N-516-41<br />

N-517-41 101.05 N-512-40 %<br />

102.19 100.06 % %<br />

E-511-43<br />

104.64 %<br />

E-511-54<br />

104.59 %<br />

E-511-58<br />

104.57 %<br />

N-528-10A5<br />

101.78 %<br />

N-512-47<br />

98.97 %<br />

N-516-63<br />

N-517-63 100.01 %<br />

101.44 %<br />

N-512-46<br />

98.98 %<br />

N-512-63<br />

96.77 %<br />

E-521-Sang Marmar Jamshed<br />

102.53 %<br />

E-521-54<br />

102.55 %<br />

N-512-66<br />

96.24 %<br />

E-513-65<br />

102.59 %<br />

N-528-Taqwiaty N-528-A13-3 Chamandy<br />

N-528-A13-1 101.46 % 101.46 %<br />

101.48 %<br />

N-512-68<br />

95.97 %<br />

N-516-No-1-Qwai Hawaye<br />

96.11 N-516-B6 %<br />

96.12 %<br />

E-513-64<br />

102.63 %<br />

N-528-10A10<br />

101.58 %<br />

N-528-10A13<br />

101.48 %<br />

N-516-85<br />

96.94 N-517-85 %<br />

N-512-72<br />

99.17<br />

95.52<br />

%<br />

%<br />

N-516-516-B4<br />

96.14 %<br />

N-516-No-2-Qwai Hawaye<br />

96.09 %<br />

E-521-48<br />

102.60 %<br />

E-511-Tr. Gas maye Anardara<br />

104.52 %<br />

N-516-Academey Nezame<br />

96.14 %<br />

E-511-58.7<br />

104.52 %<br />

N-516-66<br />

98.77 %<br />

N-517-66<br />

100.53 %<br />

N-516-76<br />

98.03 N-517-76 %<br />

99.97 %<br />

N-512-chamandi<br />

95.50 %<br />

N-516-93<br />

96.21 %<br />

N-517-93<br />

98.64 %<br />

N-512-80<br />

94.02 %<br />

N-528-10-A22<br />

101.28 %<br />

N-528-10A23<br />

101.26 %<br />

N-528-Chamandi Hawaee<br />

101.18 %<br />

N-528-10A28<br />

101.18 %<br />

N-528-Sayed Nezam # 1&2<br />

101.26 %<br />

E-511-Tr -Alokozai kefayat<br />

104.65 %<br />

E-511-Tr,sherkat Paiman<br />

104.67 %<br />

N-512-80-c1<br />

N-512-80-c6<br />

93.99 %<br />

93.99 N-512-Blak hay Hawahy<br />

93.99 %<br />

N-517-111<br />

97.42 %<br />

N-516-111<br />

94.82 %<br />

N-512-87<br />

92.75 %<br />

N-516-113 N-517-Taleem Wa Tarbia<br />

94.72<br />

N-517-113<br />

% 97.31 % N-517-517-A3 N-512-93<br />

97.34 %<br />

N-517-Do Saraka Maidan 97.3192.75 % %<br />

97.33 %<br />

N-517-Hawa Shenase<br />

97.26 %<br />

N-517-517-A10<br />

97.26 %<br />

E-F-519 - Khowaja Rawash<br />

101.58 %<br />

E-F-519 -29.23<br />

101.58 %<br />

E-521-38<br />

102.66 %<br />

E-521-Rahim Suhak<br />

102.82 %<br />

E-521-Qasemi Felez<br />

102.63 %<br />

E-521-37<br />

102.75 %<br />

E-511-28.9<br />

104.66 %<br />

E-511-28.8<br />

104.67 %<br />

E-511-28<br />

104.74 %<br />

N-517-517-A13<br />

97.25 %<br />

E-521-28_7<br />

102.83 %<br />

E-521-Tawfiq<br />

102.84 %<br />

E-521- Zaher Plastic<br />

102.84 %<br />

E-521-TGM Transformer<br />

103.52 %<br />

E-521-28_2<br />

102.84 %<br />

E-521-28<br />

102.86 %<br />

N-512-Abrasani<br />

90.34 %<br />

N-517-T/SMarkazi N-516-T/SMarkazi Bolak Hawaye # 21<br />

93.15 93.14 %<br />

N-516-133-d1<br />

93.16 %<br />

N-516-T/s Riasat Amniat <strong>Kabul</strong><br />

93.16 %<br />

N-512-Qalai Wakil<br />

92.40 %<br />

N-517-517-A24<br />

97.18 %<br />

N-517-517-A27<br />

N-517-Qala N-517-517-A28<br />

wakeel 97.17 Jadeed %<br />

97.16 % 97.16 %<br />

N-517-517-A16<br />

N-517-517-A17 97.23 %<br />

97.22 %<br />

E-F-519 -50<br />

98.93 %<br />

E-F-519 -Qala-e Mir Abass Tr 1&2<br />

98.92 %<br />

E-F-519 -43<br />

98.97 %<br />

E-521-No_1_Park ha<br />

101.12 %<br />

E-521-19_23_5<br />

101.12 %<br />

E-521-Maihan Dost Factory<br />

101.13 %<br />

E-521-Kaka Khil Traso<br />

102.82 %<br />

E-521-Bahir Printing Press<br />

102.93 %<br />

E-521-25_3<br />

102.93 %<br />

E-521-25<br />

102.94 %<br />

E-521-15_8 E-521-15_8_5<br />

103.52 % 103.51 %<br />

E-521-Tr_4_Park ha<br />

102.93 %<br />

E-521-<strong>Afghan</strong> Aard factory<br />

103.51 %<br />

E-521-15_7<br />

103.57 %<br />

E-511-20<br />

104.84 %<br />

E-511-19<br />

104.86 %<br />

E-511-16<br />

104.89 %<br />

E-511<br />

104.94 %<br />

E-511-16-35<br />

104.89 %<br />

P-B5-5-New Overhead section 185 sqm<br />

E-F-519 - Refa Constraction Company<br />

94.47 %<br />

E-F-519 -Spengahr Oil Fectory Tr 1&2<br />

94.33 %<br />

E-F-519 -78_A3<br />

94.41 %<br />

E-F-<br />

94.4<br />

E-F-519 -78_<br />

94.49 %<br />

N-512-121<br />

88.51 %<br />

N-512-129 N-512-125-H1<br />

88.04 %<br />

88.16 %<br />

N-512-Nursing<br />

88.04 N-512-128 %<br />

88.05 %<br />

N-512-Wazir akbar khan hospital<br />

88.08 %<br />

N-512-125<br />

88.17 %<br />

N-512-102-F17<br />

90.37 %<br />

N-512-Sehat Tefl<br />

87.77 %<br />

N-512-102-F7<br />

90.42 %<br />

N-512-102-F8<br />

90.41 %<br />

N-512-qalai Khater N-512-102-F10<br />

90.38 % 90.39 %<br />

N-512-106<br />

N-512-107<br />

90.13 %<br />

90.07 %<br />

N-512-108<br />

89.95 %<br />

N-512-Nowabad BiBi Mahro<br />

89.94 %<br />

N-512-400 Bester 21<br />

87.88 %<br />

N-512-102-F2<br />

90.46 %<br />

N-512-102<br />

90.48 %<br />

N-512-Bibi Mahro Muqabel<br />

91.60 %<br />

N-512-Qalai khowaja<br />

90.71 %<br />

N-512-94<br />

91.49 %<br />

N-517-No-18 Macroryan<br />

94.62 %<br />

N-512-T#3 Wazir akbar khan<br />

87.82 %<br />

N-512-99<br />

90.91 %<br />

N-512-98 N-516-141<br />

N-517-141<br />

91.02 % 92.73 %<br />

95.85 %<br />

P-B4-17 New OH section 185 sqm<br />

N-517-No-19 Macroryan<br />

94.66 % N-517-No-20 Macroryan<br />

94.71 %<br />

N-517-No-17 Macroryan<br />

94.60 %<br />

N-516-133<br />

93.25 N-517-133 %<br />

96.28 %<br />

N-517-No-23 Macroryan<br />

94.76 %<br />

N-516-147<br />

92.33 N-517-147 %<br />

95.52 %<br />

N-517-No-16 Macroryan # 21<br />

94.59 %<br />

N-517-No-22 Macroryan<br />

94.77 % N-517-No-21 Macroryan # 1&2<br />

94.78 %<br />

N-516-155<br />

N-517-155<br />

91.85 %<br />

95.13 N-517-159 N-516-159<br />

94.88 91.61 %<br />

N-517-Bukhar khana Macroryan # 1&2<br />

94.82 %<br />

N-517-No-24 Macroryan<br />

94.81 %<br />

JS#12-N-517<br />

94.82 %<br />

E-541-T.T.C<br />

71.39 %<br />

E-541-Mawj Mutawaset<br />

72.72 %<br />

E-541-106<br />

72.72 %<br />

E-F-519 -43.15<br />

98.82 %<br />

E-F-519 -Yaka Toot Tr.1&2<br />

98.70 %<br />

E-541-Nasaji Amu<br />

76.73 %<br />

E-541-94<br />

76.08 %<br />

E-541-Septic Macrorayan<br />

76.06 %<br />

E-541-94-3<br />

76.04 %<br />

E-541-94-3-3<br />

E-541-Qalai 75.99 % Wazir<br />

75.99 %<br />

E-F-519 -35.6<br />

100.06 %<br />

E-F-519 -Zan Abad<br />

100.05 %<br />

E-F-519 -35<br />

100.36 %<br />

E-F-519 -29<br />

101.66 %<br />

E-541-70<br />

79.52 %<br />

E-F-519 -23<br />

101.82 %<br />

E-F-519 -Qabil BY<br />

101.78 %<br />

E-521-19_29<br />

101.47 %<br />

E-521-Logistic Mahajereen<br />

101.47 %<br />

E-521-Ameriat Park ha<br />

101.14 %<br />

E-521-Park ha<br />

101.18 %<br />

E-521-19_22<br />

E-521-19_23_1 102.11 %<br />

101.18 %<br />

E-521-19_21<br />

102.13 %<br />

E-521-19_23<br />

E-521-19_27<br />

101.61 %<br />

101.50 %<br />

E-521-Sangi Jeke<br />

102.13 %<br />

E-521-19_28<br />

101.49 %<br />

E-521-Police Markazee<br />

101.48 %<br />

E-521-19_14<br />

102.33 %<br />

E-521-19_13<br />

102.37 %<br />

E-521-Tawlid Aard Janat<br />

102.60 %<br />

E-521-19<br />

E-521-Marmar Khalid<br />

103.11 %<br />

102.81 %<br />

E-521-19_9<br />

102.81 %<br />

E-521-19_6<br />

102.98 %<br />

E-521-19_7<br />

102.97 %<br />

E-521-Aard <strong>Kabul</strong><br />

102.97 %<br />

E-541-Fabrike Meno<br />

95.07 %<br />

E-541-69<br />

95.15 %<br />

E-F-519 -11<br />

102.94 %<br />

E-F-519 -10<br />

103.07 %<br />

E-521-15<br />

103.62 %<br />

E-513-10<br />

104.66 %<br />

E-513-9<br />

104.77 %<br />

E-F-519 -6<br />

104.27 %<br />

E-521-8<br />

104.07 %<br />

E-F-519 -21-5<br />

101.97 %<br />

E-513-19<br />

104.34 %<br />

E-513-16<br />

104.49 % E-541-20<br />

100.59 %<br />

E-F-519 -20<br />

102.07 %<br />

E-F-519 -21<br />

102.00 %<br />

E-513-2<br />

104.91 %<br />

E-F-519 -3<br />

104.79 % E-513<br />

104.96 %<br />

E-519<br />

104.98 %<br />

S/S East<br />

105.00 %<br />

E-531<br />

104.97 %<br />

E-515-3<br />

104.98 %<br />

E-521-5<br />

104.36 %<br />

E-513-17<br />

E-521 104.43 %<br />

104.74 %<br />

E-541-19<br />

E-541-37 100.82 % E-541-16<br />

101.72 %<br />

100.39 %<br />

E-541<br />

104.70 %<br />

E-541-Hodkhel-1<br />

104.70 %<br />

E-515<br />

104.99 %<br />

E-541-13<br />

102.19 %<br />

E-541-12<br />

102.63 %<br />

E-541-8<br />

103.24 %<br />

E-541-7<br />

103.72 %<br />

E-523-3<br />

104.95<br />

E-523-4<br />

%<br />

104.94 %<br />

E-F-519 -21-7<br />

101.94 %<br />

E-523<br />

104.96 %<br />

E-F-519 -HodKhel No-2<br />

101.93 %<br />

E-F-519 -35_1<br />

100.13 %<br />

E-F-519-35a<br />

100.14 %<br />

E-F-519 -<strong>Afghan</strong>i constraction Company<br />

100.10 %<br />

E-F-519 -42<br />

99.25 %<br />

E-F-519 -44<br />

E-F-519 -39<br />

E-F-519 -kabul Hend<br />

99.00 %<br />

99.59 %<br />

99.25 %<br />

E-F-519 - oxygen Product<br />

99.59 %<br />

E-F-519 -Fanta Fectory<br />

98.99 %<br />

E-F-519 - <strong>Kabul</strong> Nan Pazi<br />

98.50 %<br />

E-F-519 -48.1<br />

98.51 %<br />

E-F-519 -48<br />

98.52 %<br />

E-F-519 -<strong>Afghan</strong> Fruit Fectory<br />

98.20 %<br />

E-F-519 -51<br />

98.21 %<br />

E-F-519 -Maweneat Takhink<br />

96.60 %<br />

E-F-519 -63_12B<br />

96.60 %<br />

E-F-519 -Poste Roda Factory<br />

94.70 %<br />

E-F-519 -63_8B<br />

96.63 %<br />

E-F-519 -63_9B<br />

96.63 %<br />

E-F-519 -63_7B<br />

E-F-519 - Workshop Urdo<br />

96.64 %<br />

96.63 %<br />

E-F-519 -Bamezai<br />

96.63 %<br />

E-F-519 -Nebraska Priting Press<br />

96.65 %<br />

E-F-519 -Pashmina Bafi Fectory<br />

97.14 % E-F-519 -60_3<br />

97.14 %<br />

E-F-519 -63_2B<br />

96.68 %<br />

E-F-519 -63_5B_1<br />

96.67 %<br />

E-F-519 -63<br />

E-F-519 -60<br />

96.71 %<br />

97.16 %<br />

E-F-519 -63_13<br />

E-F-519 -Paktia Kot No,1<br />

96.54 %<br />

E-F-519 -63_1<br />

96.70 %<br />

96.70 %<br />

E-F-519 -78<br />

94.72 %<br />

E-F-519 - Gas Mahi-e Farahi<br />

95.36 %<br />

E-F-519 -72<br />

96.01 %<br />

E-F-519 - Paktia Kot No,2<br />

96.48 %<br />

N-516-No-11 Macroryan<br />

89.95 %<br />

E-541-Banaey<br />

70.93 %<br />

E-541-111<br />

71.40 %<br />

E-515-4<br />

104.97 %<br />

E-523-7<br />

104.89 %<br />

E-523-5<br />

104.93 %<br />

E-536<br />

105.00 %<br />

N-512-T#2 Wazir akbar khan<br />

87.71 %<br />

N-512-Ministry <strong>of</strong> health<br />

87.75 %<br />

N-516-Stera Mahkama<br />

89.94 N-516-Macroryan %<br />

Communication<br />

89.84 %<br />

N-516-No-9Macroryan<br />

89.84 %<br />

N-516-15 Macroryan # 1<br />

90.27 N-516-15 % Macroryan # 2<br />

90.21 %<br />

E-541-113<br />

70.94 %<br />

E-541-115<br />

70.30 %<br />

E-541-113-1<br />

70.88 %<br />

E-541-119 E-541-Mawad -e- Mukhadera<br />

69.93 % 70.29 %<br />

E-531-5<br />

104.83 %<br />

E-531-6<br />

104.81 %<br />

N-512-T#1 Wazir akbar khan_LV<br />

83.63 %<br />

N-512-T#1 Wazir akbar khan<br />

87.57 %<br />

N-516-No-10 Macroryan<br />

89.97 %<br />

N-516-No-14 Macroryan<br />

90.10 %<br />

N-516-No-13 Macroryan<br />

90.08 %<br />

E-541-120<br />

69.38 %<br />

E-541-119-1<br />

N-516-516-18 E-541-Char 69.92 Burja %<br />

90.27 % 69.90 %<br />

E-541-Septic Qalai zamankhan<br />

75.94 %<br />

N-516-No-12Macroryan<br />

89.78 %<br />

N-516-No-8 Macroryan<br />

89.94 %<br />

N-516-12_1<br />

89.77 %<br />

N-516-Matbea # 1&2<br />

89.77 %<br />

E-541-128<br />

67.83 %<br />

E-536-11<br />

105.00 %<br />

N-518_JS2_517-<strong>Afghan</strong>istan Natil TV_Tr 1&2<br />

97.10 %<br />

N-518_JS2_517-R <strong>Afghan</strong>istan Tr 1&2<br />

97.11 %<br />

E-541-129<br />

67.47 %<br />

E-541-113-13-2<br />

70.35 %<br />

N-518_JS2_517-Hawa Nawardee<br />

97.13 %<br />

N-516-Emalat khana Ordo<br />

N-516-Garnizion 89.76 %<br />

89.76 %<br />

N-516-12_8<br />

89.69 %<br />

E-541-Maslakh Tr 1&2<br />

63.16 %<br />

E-541-132<br />

66.82 %<br />

E-541-113-13<br />

70.32 %<br />

E-541-No.55 Qalai Zamnkhan Tr 1&2<br />

70.30 %<br />

E-523-19<br />

104.74 %<br />

N-518_JS2_517-Kenare Lessee Am<br />

97.33 %<br />

N-518_JS2_517-<strong>Afghan</strong> Film<br />

97.29 %<br />

N-516-Ryasat Amneyat # 16<br />

89.67 %<br />

E-541-145-9<br />

63.14 %<br />

E-541-Riasat Amneiat<br />

63.11 E-541-Survey % Madan<br />

63.23 %<br />

E-541-145-8<br />

63.21 %<br />

E-541-145-7<br />

63.25 %<br />

E-541-135<br />

65.80 %<br />

E-541-Wezarat Fawaed Ama<br />

65.79 %<br />

E-541-113-14<br />

E-541-No.44 Qalai Zamankhan Tr 70.29 1&2 %<br />

70.21 %<br />

E-541-No_7_ Macrorayan Awal<br />

66.77 % E-541-132-7<br />

66.77 %<br />

P-C4-8 Reconductor to 120 sqm<br />

E-531-Dakhudai Dad<br />

103.08 %<br />

N-518_JS2_517-Lessee Amani<br />

97.32 %<br />

E-536-21<br />

105.00 %<br />

E-541-No_5_Macrorayan Awal<br />

63.37 %<br />

E-531-Daraz kocha<br />

102.64 %<br />

E-531-49-6<br />

102.66 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-F-519 -Dahni Tangi<br />

86.88 %<br />

E-F-519 -256<br />

86.88 %<br />

E-F-519 -234<br />

86.98 %<br />

-519 -78_A2<br />

45 %<br />

_A<br />

E-F-519 - Family Akadmi Takhnic<br />

92.58 %<br />

E-F-519 -105<br />

90.23 %<br />

E-F-519 - Lakan Khial<br />

87.95 %<br />

E-F-519 -166<br />

87.82 %<br />

E-F-519 -167<br />

87.81 %<br />

E-F-519 -57 Talime<br />

92.87 %<br />

E-F-519 -103<br />

92.58 %<br />

E-F-519 -147<br />

88.29 %<br />

E-F-519 -146<br />

88.32 %<br />

E-F-521-Keshmeshpaki Babak<br />

94.49 %<br />

E-F-519 -85<br />

93.88 %<br />

E-F-519 -<strong>Kabul</strong> plastic<br />

93.85 %<br />

E-F-519 -88<br />

93.04 %<br />

E-F-519 -Sange Marmar<br />

93.04 %<br />

E-F-519 -89<br />

93.03 %<br />

E-F-519 -129<br />

88.93 %<br />

E-F-519 -172<br />

87.65 %<br />

E-F-519 -173<br />

87.61 %<br />

E-F-519 -178<br />

87.49 %<br />

E-F-519 -178.3<br />

87.46 %<br />

E-F-519 - Pul-e Charkhi Tr 1&2<br />

87.46 %<br />

E-F-519 - Qaria-e Mulah Mohammad Sahib<br />

86.80 %<br />

E-F-519 -74<br />

95.38 %<br />

E-F-519 -Qala-e Gulbaz Tr.1&2<br />

88.93 %<br />

E-F-519 -141<br />

88.51 %<br />

E-F-519 -140<br />

88.57 %<br />

E-F-519 -178.5<br />

87.45 %<br />

E-F-519 - Paktia Kot No,3<br />

96.45 %<br />

E-F-519 -178.11<br />

87.38 %<br />

E-F-519 -Qali Jabar Khan<br />

87.34 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.31<br />

77.0<br />

0.98 MVA<br />

27.91 %<br />

0.31 MVA<br />

8.81 %<br />

0.62 MVA<br />

17.52 %<br />

0.62 MVA<br />

17.52 %<br />

NW-513-Qalai NW-513-107-37-7 Kashef<br />

67.64 67.64 % %<br />

NW-513-107-37-5<br />

67.67 %<br />

0.62 MVA<br />

76.96 %<br />

0.49 MVA<br />

13.96 %<br />

NW-513-107-48-1<br />

67.34 %<br />

0.31 MVA<br />

8.81 %<br />

NW-513-107-48<br />

67.35 %<br />

1.29 MVA<br />

36.71 %<br />

0.62 MVA<br />

17.52 %<br />

NW-513-A Godam hay Kampani<br />

66.94 %<br />

0.49 MVA<br />

77.07 %<br />

NW-513-107-44<br />

67.50 %<br />

NW-513-107-43<br />

67.54 %<br />

1.29 MVA<br />

36.71 %<br />

1.29 MVA<br />

36.71 %<br />

NW-513-107-37-A1<br />

67.73 %<br />

NW-513-107-37<br />

67.75 %<br />

0.48 MVA<br />

13.78 %<br />

2.40 MVA<br />

68.00 %<br />

NW-513-107-34<br />

68.04 %<br />

0.12 MVA<br />

3.49 %<br />

2.5<br />

71.4<br />

0.48 MVA<br />

13.78 %<br />

NW-513-Market Haji Sher<br />

68.03 %<br />

0.12 MVA<br />

77.17 %<br />

NW-513-107-37-A4<br />

NW-513-Sare 67.69 % kariz Kampani Hawahe<br />

67.67 %<br />

0.48 MVA<br />

13.78 %<br />

0.48 MVA<br />

76.90 %<br />

NW-513-No-4 Abrasani<br />

67.77 %<br />

0.12 MVA<br />

77.23 %<br />

0.12 MVA<br />

3.51 %<br />

N<br />

6<br />

NW-513-107-27-44<br />

67.79 %<br />

0<br />

3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.47 MVA<br />

11.51 %<br />

0.24 MVA<br />

4.31 %<br />

P-C3-4- Upgraded cross section<br />

NW-513-107-12<br />

70.30 %<br />

4.31 MVA<br />

117.95 %<br />

0.48 MVA<br />

13.18 %<br />

NW-513-107-12-3<br />

NW-513-107-12-4<br />

70.26 %<br />

70.26 NW-513-5-G-Indoor<br />

%<br />

70.25 %<br />

0.48 MVA<br />

13.18 %<br />

0.48 MVA<br />

13.18 %<br />

0.48 MVA<br />

76.35 %<br />

NW-513-79-10<br />

79.01 %<br />

NW-513-79-11<br />

79.00 %<br />

NW-513-Qalai Nazer<br />

78.98 %<br />

0.47 MVA<br />

75.00 %<br />

0.47 MVA<br />

11.51 %<br />

0.47 MVA<br />

11.51 %<br />

NW-513-79-7<br />

79.04 %<br />

NW-513-Qalai Wazir Khoshhalkhan<br />

80.34 %<br />

0.00 MVA<br />

0.00 %<br />

NW-513-74-10 NW-513-74-11<br />

80.34 % 80.31 %<br />

1.07 MVA<br />

25.72 %<br />

1.07 MVA<br />

25.72 %<br />

NW-513-No-8 Khoshalkhan<br />

80.12 % NW-513-74-20<br />

80.13 %<br />

NW-513-74-19<br />

80.14 %<br />

0.60 MVA<br />

14.40 %<br />

0.60 MVA<br />

14.40 %<br />

0.47 MVA<br />

74.87 %<br />

0.60 MVA<br />

74.92 %<br />

11.68 MVA<br />

97.07 %<br />

NW-5_6-67<br />

99.71<br />

NW-517-67<br />

%<br />

100.83 %<br />

NW-517-75<br />

NW-517-74 100.35 %<br />

100.39 %<br />

NW-5_6-74<br />

99.80 %<br />

NW-5_6-2<br />

99.79 %<br />

NW-518-104.16<br />

NW-518-No-2 Khoshhalkhan 90.42 % 1&2<br />

90.42 %<br />

NW-518-104.10<br />

90.43 %<br />

0.49 MVA<br />

10.38 %<br />

0.49 MVA<br />

9.36 %<br />

0.49 MVA<br />

10.38 %<br />

N-529_JS5_B_2_5-No_1_Zamini N-529_JS5_B_2_5-1<br />

Karte Ariana<br />

96.50 %<br />

96.50 %<br />

N-529_JS5_B_2_5-6<br />

96.48 % N-529_JS5_B_2_5-5<br />

96.48 %<br />

N-529_JS5_B_2_5-No_2_ Karte Ariana<br />

96.46<br />

N-529_JS5_B_2_5-7<br />

96.47 %<br />

BK-JS-1-A-1,2-5<br />

101.99 %<br />

N-518_JS2_A_1_2-Moqabel Wezarat Dakhela<br />

96.60 %<br />

N-518_JS2_E_1_2-Jamhoriat Hospital<br />

97.89 %<br />

N-518_JS2_E_1_2-Borj_2_Sedarat<br />

97.99 %<br />

N-518_JS2_B_1_2-Sedarat<br />

97.16 %<br />

N-518_JS2_B_1_2-Wezarat Khareja<br />

97.15 %<br />

N-518_JS2_E_1_2-Borj_1_Sedarat<br />

97.96 %<br />

N-515_JS2_531<br />

100.41 %<br />

55 MVA<br />

49 %<br />

NW-513-107-27<br />

68.58 %<br />

NW-513-107-27-3<br />

NW-513-No-1 Abrasani 68.49 % Fazel beek<br />

68.49 %<br />

NW-513-107-27-8<br />

68.35 %<br />

0.87 MVA<br />

24.42 %<br />

1.18 MVA<br />

33.05 %<br />

0.31 MVA 0.31 MVA<br />

76.77 % 8.63 %<br />

0.87 MVA<br />

24.42 %<br />

NW-513-107-27-11<br />

68.26 %<br />

0.87 MVA<br />

24.42 %<br />

NW-513-107-27-15<br />

68.17 %<br />

0.87 MVA<br />

24.42 %<br />

3.77 MVA<br />

104.54 %<br />

NW-513-107-27-19<br />

68.04 NW-513-No-2 %<br />

Abrasani<br />

68.02 %<br />

0.86 MVA<br />

24.43 %<br />

0.31 MVA<br />

76.88 %<br />

NW-513-107-20<br />

69.34 %<br />

0.56 MVA<br />

15.73 %<br />

NW-513-No-3 Abrasani<br />

NW-513-107-27-26<br />

67.89 %<br />

67.90 %<br />

0.25 MVA<br />

7.01 %<br />

0.31 MVA<br />

76.90 %<br />

0.55 MVA<br />

15.73 %<br />

0.48 MVA<br />

13.42 %<br />

NW-513-107-20-3<br />

69.31 %<br />

NW-513-107-20-6<br />

69.26 %<br />

0.48 MVA<br />

13.42 %<br />

0.48 MVA<br />

13.42 %<br />

NW-513-107-20-11<br />

69.19 %<br />

NW-513-Fazel beek<br />

69.17 %<br />

0.48 MVA<br />

13.42 %<br />

0.48 MVA<br />

76.57 %<br />

NW-4_7-Niazbeek<br />

99.31 %<br />

NW-4_7-39<br />

99.31 %<br />

NW-518-82<br />

93.12 %<br />

NW-4_7-22<br />

99.48 %<br />

NW-4_7-4.11<br />

99.53 %<br />

NW-4_7-4.10<br />

99.54 %<br />

NW-4_7-18<br />

99.54 %<br />

11.51 MVA<br />

97.07 %<br />

NW-4_7-No-7 Khushhal Khan<br />

99.52 %<br />

NW-4_7-12-4<br />

99.58 %<br />

NW-4_7-12-7<br />

99.56 %<br />

NW-4_7-12-8<br />

99.54 %<br />

NW-4_7-12-9<br />

99.54 %<br />

NW-4_7-12-14<br />

99.51 %<br />

NW-4_7-12<br />

99.60 %<br />

NW-4_7-11<br />

99.62 %<br />

NW-4_7-12-16<br />

99.50 %<br />

11.34 MVA<br />

97.07 %<br />

NW-4_7-6.2<br />

99.64 %<br />

NW-4_7-No-4 Khushhal Khan<br />

99.64 %<br />

NW-517-80<br />

100.04 %<br />

NW-5_6-80<br />

99.90 %<br />

NW-518-No-3 Dakhel J No-8<br />

99.94 %<br />

NW-518-94<br />

91.74 % NW-518-95<br />

91.63 %<br />

NW-4_7-1<br />

99.88 %<br />

P-C3-6- change cable to 240 sqmm<br />

XLPE<br />

NW-4_7-12-A3<br />

99.59 %<br />

11.32 MVA<br />

97.08 %<br />

NW-4_7-4<br />

99.72 %<br />

NW-4_7-6<br />

99.66 %<br />

JS#8-NW-517<br />

99.94 %<br />

11.28 MVA<br />

97.08 %<br />

NW-518-100<br />

90.96 % NW-518-101<br />

90.89 %<br />

NW-4_7-Paghmanehaee-Qali Wahid<br />

99.49 %<br />

11.24 MVA<br />

97.08 %<br />

NW-4_7-Water Pump hae-e-Politekhnik<br />

99.59 %<br />

11.23 MVA<br />

97.08 %<br />

NW-518-104<br />

90.54 %<br />

10.70 MVA<br />

92.84 %<br />

NW-518-Hotal <strong>Kabul</strong> Ariana<br />

89.59 %<br />

0.38 MVA<br />

5.45 %<br />

3.15 MVA<br />

0.49 MVA<br />

10.38 %<br />

NW-518-No-1 Khoshalkhan<br />

89.61 %<br />

NW-518-116<br />

89.61 %<br />

NW-F-Bus hai barqi-Bus Hai Barqi<br />

99.91 %<br />

NW-518-115<br />

89.62 %<br />

NW-518-108<br />

90.18 %<br />

0.54 MVA<br />

4.71 %<br />

0.15 MVA<br />

3.29 %<br />

NW-518-Belal NW-518-116.2 Market<br />

89.61 89.61 % %<br />

0.15 MVA<br />

2.63 %<br />

0.49 MVA<br />

8.36 % 10.66 MVA<br />

92.84 %<br />

3.15<br />

28.00 %<br />

%<br />

MVA28.46<br />

NW-518-104.6<br />

90.48 %<br />

9.57 MVA<br />

92.34 %<br />

NW-518-121<br />

89.08 %<br />

N-529_JS5_4_5-Borj Siloy Markaz<br />

96.20 %<br />

NW-518-118<br />

89.47 %<br />

9.55 MVA<br />

83.87 %<br />

BK-Denow-Denow1<br />

99.76 %<br />

NW-518-124<br />

88.86 %<br />

9.51 MVA<br />

83.88 %<br />

NW-4_6-1<br />

86.95 % NW-4_6-Kote Sangi<br />

86.97 %<br />

BK-Denow-Tangkash<br />

99.70 %<br />

1.26 MVA<br />

15.38 %<br />

9.49 MVA<br />

83.88 %<br />

BK-Denow-Children s garden<br />

99.80 %<br />

3.77 MVA<br />

33.38 %<br />

NW-518-129<br />

88.43 %<br />

BK-Ataturk-15<br />

99.49 %<br />

9.44 MVA<br />

83.88 %<br />

JS#4-NW-518<br />

87.28 %<br />

BK-Debori-Debori TS<br />

99.77 %<br />

9.40 MVA<br />

83.88 %<br />

NW-Pohantoon-Lailia Pesaran 1&2<br />

86.96 %<br />

9.33 MVA<br />

72.36 %<br />

4.05 MVA<br />

49.63 %<br />

NW-518-134<br />

88.02 %<br />

NW-518-143<br />

87.34 %<br />

BK-Ataturk-1<br />

99.89 %<br />

BK-Jamal maina-Red Cross Hospital<br />

99.87 %<br />

3.27 MVA<br />

40.19 %<br />

NW-Pohantoon-Jamnaziom Pohantoon<br />

86.76 %<br />

2.50 MVA<br />

44.25 %<br />

NW-Pohantoon-Lailia Dokhtaran 1&2<br />

87.12 %<br />

JS#4-BK-519<br />

99.90 %<br />

BK-Ataturk-26<br />

99.30 %<br />

BK-Ataturk-Emergency Medical Hospital<br />

99.12 %<br />

NW-Pohantoon-Pohanzai Kemia<br />

86.74 %<br />

BK-Ataturk-32<br />

99.21 %<br />

BK-Ataturk-Ataturk hospital<br />

99.19 %<br />

BK-Ataturk-32.2<br />

99.17 %<br />

BK-Ataturk-32.3<br />

99.15 %<br />

2.01 MVA<br />

35.65 %<br />

NW-Pohantoon-Aditoriam Pohantoon<br />

86.50 %<br />

BK-Habibia HSch-Darulmalmeen<br />

100.59 %<br />

BK-Ataturk-34<br />

99.19 %<br />

BK-Ataturk-Tifl-e-Mo<strong>the</strong>r Hospital<br />

99.16 %<br />

NW-Pohantoon-Ketabkhana Pohantoon<br />

86.55 %<br />

0.24 MVA<br />

4.32 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Aqab Wez.Zeraat<br />

100.41 %<br />

BK-Ataturk-36<br />

99.19 %<br />

BK-Ataturk-Family Hospital Transformer Station<br />

99.12 %<br />

NW-Pohantoon-Pohanzai Aqtesad<br />

86.52 %<br />

0.49 MVA<br />

8.66 %<br />

1.28 MVA<br />

22.70 %<br />

BK-Rabiya Balkhi-Karte 4 Mukhaberaat<br />

100.58 %<br />

BK-Ataturk-Ministry Agricultural<br />

99.18 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-26<br />

100.44 %<br />

0.97 MVA<br />

17.27 %<br />

NW-Pohantoon-Pohanzai Engineery 1&2<br />

86.39 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Kenar Maktab-19<br />

100.45 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-22<br />

100.48 %<br />

NW-Pohantoon-Pohanzai Zerahat<br />

86.48 %<br />

NW-Pohantoon-Takhnic Sanawee No-1<br />

86.37 %<br />

0.49 MVA<br />

8.69 %<br />

<strong>of</strong> cable to 95 sq mm<br />

NW-Pohantoon-Takhnic Sanawee No-2<br />

86.36 %<br />

P-C3-4 New cable 95 sq mm<br />

BK-Rabiya Balkhi-Karte 4<br />

100.89 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-24<br />

100.45 %<br />

BK-Jamal mina-Karte 5<br />

101.01 %<br />

0.24 MVA<br />

4.35 %<br />

BK-Jamal maina-Jamal Mina<br />

101.07 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Zeiarat Sakhi<br />

100.56 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-15<br />

100.59 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-7<br />

100.71 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-5<br />

100.73 %<br />

BK-Rabiya Balkhi-Rabiya-e-Balkhi<br />

101.02 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-1<br />

100.80 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Tape Salam<br />

100.81 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Aqabe Barq <strong>Kabul</strong><br />

101.03 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Kolali Jadid<br />

100.78 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-6.1<br />

100.78 %<br />

BK-Nawabad Dehmazang-Kulali Dahmazang<br />

101.12 %<br />

BK-Nawabad Dehmazang-4<br />

101.16 %<br />

BK-Nawabad Dehmazang-5<br />

101.15 %<br />

BK-Nawabad Dehmazang-2<br />

101.19 %<br />

BK-Nawabad Dehmazang-1<br />

101.21 %<br />

JS#3-BK-519<br />

101.23 %<br />

BK-Nawabad Dehmazang-Police Sarhadi<br />

101.18 %<br />

BK-Nawabad Dehmazang-Nawabad Dehmazang<br />

101.30 %<br />

BK-518-15<br />

BK-519-15 101.44 %<br />

101.26 %<br />

BK-JS-1-A-1,2-Mukhaberat Amniat<br />

101.88 %<br />

BK-JS-1-A-1,2-22<br />

101.88 %<br />

BK-JS-1-A-1,2-21_4<br />

101.87 %<br />

JS#3-BK-518<br />

101.38 %<br />

BK-JS-1-A-1,2-Qolabchakkan 2<br />

101.96 %<br />

BK-JS-1-A-1,2-15<br />

101.93 %<br />

BK-JS-1-A-1,2-21<br />

101.89 %<br />

BK-JS-1-A-1,2-21_9<br />

101.85 %<br />

BK-JS-1-A-1,2-National Television<br />

101.80 %<br />

BK-JS-1-A-1,2-BBC<br />

101.82 %<br />

BK-514-11<br />

BK-515-11 103.66 %<br />

103.60 %<br />

BK-JS-1-A-1,2-1<br />

102.02 %<br />

JS#1-BK-514<br />

103.40 %<br />

BK-514-12<br />

103.57 BK-515-12 %<br />

103.50 %<br />

BK-JS-1-A-1,2-Qolabchakkan 1<br />

102.02 %<br />

BK-Ibn Sina-Dakhel J.S<br />

103.38 %<br />

BK-514-13<br />

103.43 BK-515-13 %<br />

103.35 %<br />

JS#1-BK-515<br />

103.34 %<br />

BK-JS-1-A-1,2-Welaayat<br />

102.24 %<br />

BK-JS-1-A-1,2-Mechanical High School<br />

102.77 %<br />

BK-Matba-e-Maref-Matba-e-Maref-Matba-e-Maref<br />

103.35 %<br />

BK-Ibn Sina-1<br />

103.39 %<br />

BK-Ibn Sina-Ibn Sina Hospital<br />

103.35 %<br />

BK-JS-1-D-1,7-Qala-e-Hazaraha<br />

103.18 %<br />

BK-Charda Manzela JS_1-Central Poly Clinic<br />

103.19 %<br />

BK-Charda Manzela JS_1-Charda Manzila<br />

103.20 %<br />

96.93 %<br />

BK-JS-1-A-1,2-Mashal Market<br />

102.47 %<br />

BK-JS-1-A-1,2-Mohammad Jan Khan<br />

102.47 %<br />

N-518_JS2_E_1_2-Wezarat Eqtesad<br />

98.10 %<br />

BK-JS-1-A-1,2-Shaadoshamshera<br />

102.78 %<br />

N-518_JS2_B_1_2-Khetabkhana Aama<br />

N-518_JS2_E_1_2-Esteqlal High School<br />

98.30 %<br />

BK-JS-1-A-1,2-Ministry <strong>of</strong> Education<br />

N-518_JS2_B_1_2-Gurd Melye<br />

102.47 %<br />

96.81 %<br />

N-518_JS2_E_1_2-Wezarat Mokhaberat # 21<br />

98.16 %<br />

N-518_JS2_B_1_2-Wezarat Etlaat wa Caltor<br />

96.85 %<br />

N-518_JS2_E_1_2-Rabeha Balkhy Hospital<br />

98.18 % N-518_JS2_E_1_2-Stomatology<br />

N-518_JS2_B_1_2-Pashtani Tojarati Bank<br />

98.18 %<br />

96.86 % N-518_JS2_B_1_2-Spinzar Hotel<br />

96.86 %<br />

BK-Rangrazi-Malawi Sahib<br />

103.06 %<br />

BK-JS-1-E 1,2-Mestorat Hospital 1&2<br />

103.04 %<br />

N-518_JS2_B_1_2-Bank Melye<br />

96.82 %<br />

BK-JS-1-E 1,2-Old Radio<br />

102.95 %<br />

BK-Rangrazi-Rangrazi<br />

103.11 %<br />

BK-JS-1-D-1,7-Bagh-e-Nawab<br />

102.81 %<br />

BK-JS-1-D-1,7-1<br />

102.80 %<br />

BK-JS-1-D-1,7-4<br />

102.79 %<br />

BK-JS-1-D-1,7-Aashoqan-e-Aarefaan<br />

102.79 %<br />

N-518_JS2_B_1_2-Aarg Jumh<br />

96.84 %<br />

N-518_JS2_E_1_2-De <strong>Afghan</strong>is<br />

98.31 %<br />

N-5<br />

96.7<br />

N-518_JS2_E_1_2-Post Telephon<br />

98.36 %<br />

BK-JS-1-E 1,2-Pul-e-Khe<br />

102.96 %<br />

BK-JS-1-E 1,2-Pakhta Fe<br />

102.99 %<br />

BK-JS-1-E 1,2-Chindawol<br />

103.05 %<br />

NW-513-No-5 Abrasani<br />

67.80 %<br />

0.12 MVA<br />

3.51 %<br />

0.12 MVA<br />

77.22 %<br />

0.12 MVA<br />

3.51 %<br />

NW-513-107-27-39<br />

67.80 %<br />

0.25 MVA<br />

7.01 %<br />

NW-513-107-27-33<br />

67.85 %<br />

NW-513-107-27-30<br />

67.86 %<br />

0.25 MVA<br />

7.01 %<br />

NW-Dashte e Barchee-Pule sokhte Jadeed<br />

87.01 %<br />

NW-Dashte e Barchee-1<br />

87.01 %<br />

0.88 MVA<br />

10.76 %<br />

0.88 MVA<br />

9.11 %<br />

NW-4_6-12<br />

86.61 %<br />

NW-4_6-Pule Sokhte Sabeqa<br />

86.61 %<br />

0.61 MVA<br />

10.07 %<br />

BK-514-9<br />

103.87 BK-515-9 %<br />

103.82 %<br />

BK-JS-1-D-1,7-7_3<br />

102.75 %<br />

BK-JS-1-D-1,7-Khwaja Safa<br />

102.75 %<br />

BK-JS-1-D-1,7-7<br />

102.76 %<br />

NW-Dashte e Barchee-Amam hasan Mojtaba<br />

86.90 %<br />

NW-Dashte e Barchee-12<br />

NW-Dashte e Barchee-17<br />

86.93 %<br />

86.90 %<br />

NW-Dashte e Barchee-12.6<br />

86.88 % NW-Dashte e Barchee-12.1<br />

86.92 %<br />

NW-Dashte e Barchee-Harbi Shoonazi<br />

86.86 %<br />

0.49 MVA<br />

13.14 %<br />

0.39 MVA<br />

6.82 %<br />

0.49 MVA<br />

5.10 %<br />

0.39 MVA<br />

10.34 %<br />

0.39 MVA<br />

10.34 %<br />

NW-Dashte e Barchee-8<br />

86.960.88 % MVA<br />

9.11 %<br />

NW-4_6-14<br />

86.56 %<br />

NW-4_6-15<br />

86.53 %<br />

2.52 MVA<br />

22.91 %<br />

2.53 MVA<br />

22.91 %<br />

BK-Debori-Old Bangashidar 1<br />

99.56 %<br />

BK-Debori-Old Bangashidar 2<br />

99.56 %<br />

BK-Rabiya Balkhi-Umar jan<br />

100.61 %<br />

BK-Rabiya Balkhi-Behind Police Station<br />

100.69 %<br />

BK-Rabiya Balkhi-Chamcha Mast<br />

100.77 %<br />

BK-Behind Madrasa-Behind Madrasa<br />

100.70 %<br />

BK-Khatamunabein-Khatamunabein 1&2<br />

101.14 %<br />

BK-Habibia High School-Habibia High School 1&2<br />

101.15 %<br />

BK-Guzarga-1<br />

101.03 %<br />

BK-Guzarga-6<br />

100.91 %<br />

BK-Guzarga-Borj_1_Guzarga<br />

100.91 %<br />

BK-518-12<br />

101.96 BK-519-12 % BK-518-10<br />

101.98 % 102.44 BK-519-10 %<br />

102.45 %<br />

BK-516-Aqab Bagh e Babur #1<br />

104.42 %<br />

BK-516-2B25<br />

104.42 %<br />

BK-516-Aqab Bagh Babur 2<br />

104.42 %<br />

BK-518-9<br />

102.75 BK-519-9 %<br />

102.79 %<br />

BK-JS-1-<br />

102.75 %<br />

2.52 MVA<br />

22.91 %<br />

BK-Debori-1<br />

99.26 %<br />

BK-Debori-2<br />

99.25 %<br />

BK-518-8<br />

BK-519-8 102.94 %<br />

102.99 %<br />

BK-516-Bagh Babur<br />

104.45 %<br />

BK-516-2B20<br />

104.44 %<br />

NW-4_6-27_6_6<br />

86.06 % NW-4_6-27_6_2<br />

86.11 %<br />

NW-4_6-Monary Gulkhana<br />

86.05 %<br />

0.46 MVA<br />

10.28 %<br />

0.46 MVA<br />

10.28 %<br />

NW-4_6-22<br />

86.35 %<br />

0.61 MVA<br />

5.58 %<br />

NW-4_6-22-1<br />

86.34 %<br />

0.61 MVA<br />

10.12 %<br />

NW-4_6-22-4<br />

86.31 %<br />

NW-4_6-22-5<br />

86.30 %<br />

0.61 MVA<br />

10.12 %<br />

0.61 MVA<br />

10.12 %<br />

NW-4_6-22-12<br />

86.24 %<br />

0.61 MVA<br />

10.12 %<br />

NW-4_6-Sare-e- Kariz Qalahe shada<br />

86.21 %<br />

BK-Behind Madrasa-Mustaghni<br />

100.27 %<br />

BK-3_6-Khwaja Mullah<br />

100.81 %<br />

BK-516-2B17<br />

BK-516-2B16<br />

104.45 %<br />

104.46 %<br />

BK-516-2B15<br />

104.46 %<br />

BK-516-Khushal Khan<br />

104.46 %<br />

0.46 MVA<br />

10.28 %<br />

1.91 MVA<br />

17.34 %<br />

BK-Debori-New Bangashidar 1&2<br />

99.05 %<br />

BK-Behind Madrasa-Alibad 1<br />

100.14 %<br />

BK-Behind Madrasa-Rukhshana<br />

100.39 %<br />

BK-518-5<br />

103.76 BK-519-5 %<br />

103.82 %<br />

NW-4_6-27.9<br />

86.13 %<br />

NW-4_6-Foundation-e- zamini Gulkhana<br />

86.13 %<br />

0.39 MVA<br />

6.39 %<br />

NW-4_6-27-6<br />

86.14 %<br />

0.39 MVA<br />

6.39 %<br />

0.85 MVA<br />

22.91 %<br />

NW-4_6-27<br />

86.26 %<br />

NW-4_6-27.1<br />

86.22 %<br />

NW-4_6-Howza No-6 Police<br />

86.22 %<br />

0.08 MVA<br />

0.97 MVA<br />

16.03 %<br />

0.12 MVA<br />

3.31 %<br />

0.08 MVA<br />

0.70 %<br />

0.86 MVA<br />

7.81 %<br />

0.86 MVA<br />

7.81 %<br />

NW-4_6-Fabrika-e- Yakh Saze Hamza<br />

86.26 %<br />

1.27 %<br />

NW-4_6-27.A1<br />

86.26 %<br />

NW-4_6-28<br />

86.25 %<br />

BK-Behind Madrasa-Alibad 2<br />

100.15 %<br />

BK-Behind Madrasa-Mawade Mukhadir<br />

100.38 %<br />

BK-Behind Madrasa-Ministry <strong>of</strong> commerce<br />

100.37 %<br />

BK-Guzarga-19<br />

100.62 %<br />

BK-Guzarga-Borj_2_Guzarga<br />

100.62 %<br />

BK-516-2B9<br />

104.54 %<br />

BK-518-4<br />

104.03 BK-519-4 %<br />

104.09 %<br />

BK-514-4<br />

104.61 BK-515-4 %<br />

104.60 %<br />

BK-513-17<br />

104.35 %<br />

BK-5<br />

104.2<br />

BK-4_6-Doshhoy Gulam Hasan<br />

87.89 %<br />

NW-4_6-32.2<br />

86.22 %<br />

NW-4_6-Babai Wali<br />

86.21 %<br />

0.24 MVA<br />

6.63 %<br />

BK-4_6-56<br />

87.91 %<br />

BK-4_6-55<br />

87.91 %<br />

BK-4_6-54<br />

87.91 %<br />

NW-4_6-31<br />

86.23 %<br />

NW-4_6-32<br />

86.22 %<br />

0.24 MVA<br />

6.63 %<br />

0.00 MVA<br />

0.00 %<br />

0.24 MVA<br />

2.23 %<br />

NW-4_6-Qalahe Shada<br />

86.19 %<br />

0.61 MVA<br />

10.13 %<br />

NW-4_6-31_3<br />

86.19 %<br />

0.61 MVA<br />

5.58 %<br />

BK-4_6-Masjidi Safed<br />

87.79 %<br />

BK-Debori-Imam Zaman<br />

99.00 %<br />

BK-3_6-Moqabili Sifarat Russia<br />

100.36 %<br />

BK-Behind Madrasa-Shora-e-Milli<br />

100.37 %<br />

BK-3_6-Pump hawz<br />

100.32 %<br />

BK-Guzarga-Ayub Khan 1<br />

100.12 %<br />

BK-Guzarga-41-b20<br />

100.14 %<br />

BK-Guzarga-water pump 2<br />

100.16 %<br />

BK-Guzarga-41-b15<br />

100.15 %<br />

BK-Guzarga-41-b13<br />

100.16 %<br />

BK-Guzarga-Ayub Khan 2<br />

100.15 %<br />

BK-Guzarga-34<br />

100.38 %<br />

BK-Guzarga-Khwaja parsa<br />

100.38 %<br />

BK-Guzarga-25<br />

100.52 %<br />

BK-516-12A2<br />

104.58 %<br />

BK-516-Jangalak<br />

104.56 %<br />

BK-516-Constructional Water Pump<br />

104.64 %<br />

BK-516-2B7<br />

104.56 %<br />

BK-516-Immigration repatriation<br />

104.59 %<br />

BK-516-2B2<br />

104.63 %<br />

BK-516-2A2<br />

104.66 %<br />

BK-516-4B2<br />

104.59 %<br />

BK-516-p2-9<br />

104.70 %<br />

BK-516-p2-10<br />

104.68 %<br />

BK-512-3<br />

104.99 %<br />

BK-516-Chini Saazi<br />

104.66 %<br />

BK-518<br />

BK-519 104.90 %<br />

104.91 %<br />

BK-514<br />

104.95 BK-515%<br />

104.95 %<br />

BK-516-p2-3<br />

104.84 %<br />

BK-513<br />

104.97 %<br />

BK-516<br />

104.99 %<br />

BK-516-2<br />

104.91 %<br />

BK-512<br />

105.00 %<br />

BK-512-Sakhtomani omoor Barq<br />

104.99 %<br />

BK-512-5<br />

104.99 %<br />

S/S Breshna Kot<br />

105.00 %<br />

BK-517<br />

104.86 %<br />

BK-516-5<br />

104.80 %<br />

BK-4_6-47<br />

87.93 %<br />

BK-4_6-47.7<br />

87.89 %<br />

BK-4_6-47.11<br />

87.86 %<br />

BK-4_6-47.9<br />

87.88 %<br />

BK-4_6-47.13<br />

87.84 %<br />

BK-4_6-47.15<br />

87.83 %<br />

BK-6_3-Alouddin<br />

100.14 %<br />

BK-6_3-B4.6<br />

100.15 %<br />

BK-6_3-B4.3<br />

100.16 %<br />

BK-Russian Emb-Russian Emb 1&2<br />

100.96 %<br />

BK-Guzarga-41-b3<br />

100.26 %<br />

BK-Guzarga-41-b6<br />

100.22 %<br />

BK-4_6-Chaar qala 2<br />

87.91 %<br />

BK-4_6-45<br />

BK-4_6-45.1 87.95 %<br />

87.94 %<br />

BK-4_6-45.3<br />

87.91 %<br />

BK-6_3-B4<br />

100.17 %<br />

BK-6_3-1<br />

100.20 %<br />

BK-6_3-Esteqlal Hospital<br />

100.20 %<br />

BK-3_6-Sahati Oma<br />

100.21 %<br />

BK-Guzarga-Water pump 1<br />

100.24 %<br />

BK-Guzarga-41<br />

100.29 %<br />

BK-516-79<br />

103.64 %<br />

BK-Guzarga-Musahi<br />

100.25 %<br />

BK-516-Waisal Abad<br />

104.50 %<br />

BK-516-12<br />

104.52 %<br />

BK-4_6-Chaar Qala 1<br />

87.82 %<br />

BK-6_3-B7<br />

100.16 %<br />

BK-6_3-B9<br />

99.93 %<br />

BK-4_6-39<br />

BK-4_6-39.1<br />

88.08 %<br />

88.08 %<br />

BK-6_3-Khalifa Saheb<br />

99.71 %<br />

BK-6_3-B15<br />

99.72 %<br />

BK-516-Aqa Ali Shams 2<br />

103.77 %<br />

BK-4_6-Mullah Akram<br />

88.05 %<br />

BK-516-Waisal Abad 2<br />

104.15 %<br />

BK-6_3-Joye Raeis<br />

88.88 %<br />

BK-516-De Murad Khan<br />

103.64 %<br />

BK-516-25<br />

104.15 %<br />

BK-517-18<br />

101.93 %<br />

BK-516-68<br />

103.65 %<br />

BK-516-63<br />

103.67 %<br />

BK-516-Mosa "1"<br />

103.70 %<br />

BK-516-58<br />

103.70 %<br />

BK-516-51<br />

103.76 %<br />

BK-516-49<br />

103.78 %<br />

BK-516-46-2<br />

103.79 %<br />

BK-516-Aqa Ali Shams 1<br />

103.79 %<br />

BK-516-30<br />

104.07 %<br />

BK-516-20<br />

104.29 %<br />

BK-4_6-Qalai Ali Mardaan<br />

88.32 %<br />

BK-4_6-30<br />

88.32 %<br />

BK-516-46<br />

103.81 %<br />

BK-517-47<br />

BK-517-48<br />

98.64 %<br />

98.54 %<br />

BK-4_6-Qalai Jafar<br />

88.41 %<br />

BK-517-40<br />

99.39 %<br />

BK-517-Street New <strong>of</strong> <strong>the</strong> Takhnikum<br />

99.38 %<br />

BK-516-36<br />

103.97 %<br />

BK-517-26<br />

BK-517-Mullah 100.90 buzurg %<br />

100.90 %<br />

BK-517-30<br />

100.40 %<br />

BK-4_6-18.12.4<br />

88.43 %<br />

BK-6_3-Moqabel Wezarat Energy wa Aob<br />

88.97 %<br />

BK-517-30.2<br />

100.39 %<br />

BK-517-Takhnikum<br />

100.37 %<br />

BK-4_6-18.19<br />

88.45 %<br />

BK-4_6-Tubercluses<br />

88.56 %<br />

BK-4_6-18.12<br />

88.45 %<br />

BK-4_6-18.22<br />

88.45 %<br />

BK-4_6-18<br />

88.70 %<br />

BK-4_6-17<br />

BK-4_6-17.1 88.73 %<br />

88.72 %<br />

BK-4_6-18.7<br />

88.57 %<br />

BK-4_6-Veterenary<br />

88.42 %<br />

BK-6_3-Pidagoghi<br />

89.01 %<br />

BK-6_3-4<br />

88.98 %<br />

BK-6_3-Khwaja Aman<br />

88.85 %<br />

BK-6_3-11<br />

88.88 %<br />

BK-6_3-Wezarat energy Aob<br />

88.70 %<br />

BK-6_3-12<br />

88.87 %<br />

BK-4_6-17.9<br />

88.65 %<br />

BK-4_6-Qalai Bakhtiar<br />

88.65 %<br />

BK-6_3-Cure Hospital<br />

89.07 %<br />

BK-517-102.7<br />

92.95 %<br />

BK-517-Rega<br />

92.95 %<br />

BK-517-Regration<br />

95.75 %<br />

BK-517-85.9<br />

95.75 %<br />

BK-517-64<br />

96.78 %<br />

BK-517-Dahan e Bagh <strong>of</strong> Chilstoon<br />

96.78 %<br />

BK-4_6-11.8<br />

88.92 %<br />

BK-4_6-11<br />

89.01 %<br />

BK-4_6-7<br />

89.27 %<br />

BK-4_6-Ministry <strong>of</strong> Rural and Rehablitation<br />

88.90 %<br />

BK-4_6-Directorate <strong>of</strong> learning<br />

89.27 %<br />

BK-6_3-Stera Mahkama<br />

89.24 %<br />

BK-517-111<br />

92.16 %<br />

BK-517-Dedana First<br />

92.54 %<br />

BK-517-106<br />

92.69 %<br />

BK-517-102<br />

93.00 %<br />

BK-517-99<br />

93.34 %<br />

BK-517-96<br />

93.61 %<br />

BK-517-85<br />

95.77 %<br />

BK-517-76<br />

95.77 %<br />

BK-517-75<br />

95.84 %<br />

BK-517-71<br />

96.22 %<br />

BK-517-116<br />

91.63 %<br />

BK-4_6-1<br />

89.63 %<br />

BK-517-136<br />

89.78 %<br />

BK-517-National Meuseum<br />

90.20 %<br />

BK-517-131<br />

90.20 %<br />

BK-517-127<br />

90.51 %<br />

BK-517-126<br />

90.64 %<br />

BK-517-Dedana Second<br />

91.57 %<br />

BK-517-Sare kotal <strong>of</strong> Chilstoon<br />

96.17 %<br />

BK-517-Afshaar Darulaman<br />

89.71 %<br />

BK-517-137<br />

89.70 %<br />

JS#6-BK-517<br />

89.68 %<br />

BK-517-116.7<br />

91.60 %<br />

BK-517-126.4<br />

90.62 %<br />

BK-517-126.9<br />

BK-517-Examination Form <strong>of</strong> 90.60 Agriculture %<br />

90.60 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


N-515_JS2_D_2_7-Edara Computer<br />

100.35 %<br />

N-516-Shash Darak<br />

89.65 %<br />

E-541-145-1<br />

63.63 %<br />

E-541-143<br />

63.89 %<br />

E-541-No-6 Macrorayan Awal<br />

63.62 %<br />

P-C4-7 New Section 185 sqm<br />

E-531-60<br />

102.29 %<br />

E-531-37-3<br />

103.09 %<br />

1-Qasr Delkosha # 1&2<br />

N-515_JS2_D_2_7-Ehsaya Markazi ( CSO ) # 1&2<br />

100.36 %<br />

N-515_JS2_531-Ariana Hotel<br />

100.35 %<br />

E-541-148<br />

63.52 %<br />

E-541-145<br />

63.72 %<br />

E-541-143-3<br />

63.73 %<br />

E-541-No-1 Macrorayan Awal<br />

63.66 %<br />

E-541-No_3_ Macrorayan Awal<br />

63.47 %<br />

E-541-No_4_Macrorayan Awal<br />

63.39 %<br />

E-531-70<br />

102.23 %<br />

E-531-71<br />

102.22 %<br />

E-531-66<br />

102.25 %<br />

E-531-67<br />

102.24 %<br />

E-531-Mardan Ghaib<br />

102.29 %<br />

E-531-55<br />

102.56 %<br />

E-531-Mardan Ghaib-1_1&2<br />

102.52 %<br />

E-531-49<br />

102.66 %<br />

E-531-Mardan Ghaib-2<br />

102.84 %<br />

E-531-37<br />

103.10 %<br />

E-531-25<br />

103.76 %<br />

E-536-36<br />

105.00 %<br />

N-515_JS2_531-Matbah Urdo<br />

100.34 %<br />

E-541-154<br />

63.17 %<br />

E-541-No-2 Macrorayan Awal<br />

63.51 %<br />

E-541-157-8<br />

59.68 %<br />

E-541-157-5<br />

59.68 %<br />

E-541-Wezarat Omor Ejtimaey<br />

59.41 %<br />

E-541-157-12<br />

59.61 %<br />

E-531-Sement khana<br />

102.20 %<br />

E-536-48<br />

105.00 %<br />

E-541-Andimark<br />

63.49 %<br />

E-541-Riasat E-541-154-4 Mili bus<br />

63.14 % 63.14 %<br />

E-541-156-5<br />

61.48 %<br />

E-541-156<br />

61.50 %<br />

hoori<br />

N-518_JS2_E_1_2-Adare Omor<br />

98.74 %<br />

N-518_JS2_E_1_2-Wezarat Defah<br />

98.72 %<br />

E-541-Water Pump Macrorayan Awal<br />

61.38 %<br />

E-541-157<br />

59.94 %<br />

E-536-54<br />

105.00 %<br />

N-518_JS2_E_1_2-Kartografi<br />

98.43 %<br />

E-536-60<br />

105.00 %<br />

N-518_JS2_E_1_2-Wezarat Mahdan<br />

98.39 %<br />

stan Bank<br />

P-C4-12- Reconductor to 120 sqm<br />

E-541-MDC<br />

59.52 % E-541-164<br />

59.52 %<br />

518_JS2_B_1_2-Wezarat Malya<br />

79 %<br />

E-541-166<br />

59.42 %<br />

E-541-164-1<br />

59.50 %<br />

E-515-35<br />

104.63 %<br />

ne Telegram<br />

N-518_JS2_E_1_2-Pashtoonistan Wath<br />

98.36 %<br />

E-541-Muziam Omar<br />

59.20 % E-541-170<br />

E-541-171 59.20 %<br />

E-541-183 59.17 %<br />

E-541-Olampic 59.15 %<br />

59.14 %<br />

E-541-164-4<br />

59.48 %<br />

P-C4-12- Reconductor to 120 sqm<br />

E-541-Tr-Junction-7<br />

59.37 %<br />

BK-C-1,2-Eidga Mosque<br />

102.10 %<br />

eshtee<br />

E-531-60-25<br />

101.97 %<br />

BK-C-1,2-Tanor Saazi<br />

102.22 %<br />

P-C4-11- Reconductor to 120 sqm<br />

E-531-Sarak awal karte naw<br />

101.94 %<br />

E-531-60-27<br />

101.94 %<br />

eroshi<br />

BK-C-1,2-Darwazai Lawri<br />

102.12 %<br />

E-541-Salimi Hospital<br />

58.83 %<br />

E-523-58<br />

104.30 %<br />

BK-C-1,2-1<br />

102.41 %<br />

BK-C-1,2-Takhta Pul<br />

102.31 %<br />

E-541-189-3<br />

58.84 %<br />

E-541-188<br />

58.86 %<br />

E-541-189<br />

58.85 %<br />

BK-513-Chaman Hozory<br />

103.13 %<br />

E-541-Kenar Chaman<br />

58.94 %<br />

BK-513-44_49<br />

103.13 %<br />

BK-513-44_46<br />

103.13 %<br />

P-C4-11- Reconductor to 120 sqm<br />

E-531-Sia sang<br />

101.66 %<br />

E-531-60-44<br />

101.81 %<br />

E-531-Qir Factory<br />

101.88 %<br />

E-531-60-37<br />

101.89 %<br />

E-531-60-33<br />

101.90 %<br />

BK-C-1,2-Guzar e Azrat<br />

102.42 %<br />

P-C4-13- New O/H Section 120 sqm &<br />

switches<br />

BK-513-44_40<br />

103.14 %<br />

BK-513-Tape Balkh<br />

103.14 %<br />

BK-513-44_33<br />

103.15 %<br />

D-1,7-Sangkashaha<br />

%<br />

BK-C-1,2-Furmulia<br />

102.26 %<br />

BK-513-44_25<br />

103.18 %<br />

BK-513-Shah Shahid<br />

103.18 %<br />

BK-513-44_21A7<br />

103.22 %<br />

BK-513-Etefaq<br />

103.19 %<br />

E-515-108<br />

104.35 %<br />

E-515-58<br />

104.38 %<br />

E-515-62-34-6<br />

104.20 %<br />

BK-513-44_17<br />

103.25 %<br />

E-515-62-41<br />

104.19 %<br />

E-515-62-34-2<br />

104.20 %<br />

E-515-Tape Qawala No 2<br />

104.19 %<br />

E-515-62-9<br />

104.34 %<br />

E-515-62<br />

104.35 %<br />

BK-513-Qalhacha<br />

103.32 %<br />

E-515-62-39<br />

104.19 %<br />

E-515-62-38<br />

104.19 %<br />

E-516-Tape Qawala No 1<br />

104.20 %<br />

E-515-62-31<br />

104.22 %<br />

E-515-Family hae Nasajee<br />

104.25 %<br />

E-515-76<br />

104.35 %<br />

E-523-81<br />

103.98 %<br />

BK-513-44_9<br />

103.32 %<br />

E-515-62-26<br />

104.24 %<br />

E-515-62-14<br />

104.29 %<br />

BK-513-Shohadai Saleheen<br />

103.98 %<br />

E-523-86<br />

103.92 %<br />

BK-513-25<br />

104.07 %<br />

BK-513-27<br />

104.01 %<br />

BK-513-44<br />

103.46 %<br />

E-515-94<br />

104.35 %<br />

513-18<br />

27 %<br />

BK-513-24<br />

104.11 %<br />

E-523-91<br />

103.86 %<br />

E-523-100<br />

103.76 %<br />

E-523-103<br />

103.76 %<br />

E-523-94<br />

103.82 %<br />

E-523-zakhira-Ab-Bagrami<br />

103.76 %<br />

E-523-106<br />

103.75 %<br />

BK-513-70_21<br />

103.17 %<br />

E-523-107<br />

103.74 %<br />

E-523-108<br />

103.74 %<br />

BK-513-Borj_2_Qalhacha<br />

103.24 %<br />

E-523-109<br />

103.74 %<br />

BK-513-61<br />

103.25 %<br />

E-523-112<br />

103.73 %<br />

E-523-115<br />

103.72 %<br />

BK-513-70_3<br />

103.17 %<br />

BK-513-70_4<br />

103.16 %<br />

E-523-117<br />

103.71 %<br />

BK-513-69<br />

103.19 %<br />

BK-513-Pull Safeed<br />

103.16 %<br />

BK-513-70_33<br />

103.17 %<br />

E-523-120<br />

103.70 %<br />

E-523-121<br />

103.70 %<br />

E-523-Chaha-e-hamiq-1<br />

103.70 %<br />

BK-513-78<br />

103.16 %<br />

BK-513-80<br />

103.15 %<br />

BK-513-Beni Hesar<br />

103.13 %<br />

E-523-131<br />

103.68 %<br />

E-523-Chaha-e-hamiq-2<br />

103.68 %<br />

E-523-Chaha-e-hamiq-3<br />

103.68 %<br />

E-523-133<br />

103.68 %<br />

E-523-137<br />

103.68 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-536-70<br />

105.00 %<br />

E-536-71<br />

105.00 %<br />

E-536-89<br />

105.00 %<br />

E-536-90<br />

105.00 %<br />

E-536-95<br />

105.00 %<br />

E-536-103<br />

105.00 %<br />

E-536-110<br />

105.00 %<br />

E-536-116<br />

105.00 %<br />

E-536-122<br />

105.00 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


Appendix<br />

C<br />

Load Flow Results & Investments for <strong>the</strong><br />

Short Term<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International C-1


A-1<br />

A-2<br />

A-3<br />

A-4<br />

A-5<br />

A-7<br />

B-1<br />

B-2<br />

B-3<br />

B-4<br />

B-5<br />

B-6<br />

B-7<br />

C-2<br />

C-3<br />

C-4<br />

C-5<br />

C-6<br />

D-2<br />

D-3<br />

D-4<br />

D-5<br />

E-3


NW-513-Qaria Tolad<br />

98.95 %<br />

0.46 MVA<br />

72.41 %<br />

0.46 MVA<br />

6.57 %<br />

NW-513-212-48<br />

98.99 %<br />

NW-513-212-47<br />

99.00 %<br />

0.46 MVA<br />

6.57 %<br />

0.46 MVA<br />

6.56 %<br />

NW-513-212-26<br />

99.17 %<br />

0.46 MVA<br />

6.56 %<br />

NW-513-212-25<br />

99.18 %<br />

0.46 MVA<br />

6.56 %<br />

NW-513-Doda NW-513-212-16 Mast<br />

99.24 % 99.24 %<br />

0.70 MVA<br />

10.09 %<br />

0.25 MVA<br />

72.33 %<br />

NW-513-212-14<br />

99.25 %<br />

NW-513-209<br />

99.54 %<br />

0.70 MVA<br />

10.09 %<br />

NW-513-187<br />

100.57 %<br />

2.71 MVA<br />

38.78 %<br />

2.71 MVA<br />

38.78 %<br />

P-B2-1 Reconductor to 70 sqm<br />

2.81 MVA<br />

42.14 %<br />

P-B2-1 Reconductor to 70 sqm<br />

NW-513-Deh Arbab<br />

99.37 %<br />

0.14 MVA<br />

72.45 %<br />

NW-513-203<br />

99.81 %<br />

NW-513-Deh Ponba<br />

100.43 %<br />

0.07 MVA<br />

72.41 %<br />

2.82 MVA<br />

42.14 %<br />

2.73 MVA<br />

38.77 %<br />

2.73 MVA<br />

38.77 %<br />

NW-513-Qaria Borjak<br />

NW-513-289<br />

98.23 %<br />

NW-513-288<br />

98.23 %<br />

98.23 %<br />

0.29 MVA<br />

4.21 %<br />

0.29 MVA<br />

4.21 %<br />

0.29 MVA<br />

72.48 %<br />

NW-513-195<br />

100.22 %<br />

NW-513-286<br />

98.24 %<br />

NW-513-182<br />

100.91 %<br />

A-1<br />

0.29 MVA<br />

4.21 %<br />

2.82 MVA<br />

42.14 %<br />

MVA<br />

%<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


NW-516-Mawad Nafti<br />

104.59 %<br />

NW-516-50<br />

104.60 %<br />

NW-516-52<br />

104.60 %<br />

NW-516-40<br />

104.64 %<br />

NW-516-33<br />

104.68 %<br />

NW-516-20<br />

104.74 %<br />

NW-516-12_5<br />

104.72 %<br />

NW-516-Borj_1_Hawaee<br />

104.71 %<br />

NW-516-12<br />

104.77 %<br />

NW-516-11_1<br />

104.78 %<br />

NW-516-11<br />

104.79 %<br />

NW-516-Borj_2_Hawaee<br />

104.78 %<br />

NW-516-6<br />

104.91 %<br />

A-2<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


NW-526-No_24_Projhe Jadeed # 1&2<br />

98.54 %<br />

NW-526-No_18_Projhe Jadeed # 1&2<br />

98.59 %<br />

NW-526-No_19_Panjsad Family<br />

98.04 %<br />

NW-526-Hazare Baghal<br />

100.21 %<br />

NW-526-No_15_Maktab Sangi # 1&2<br />

97.35 %<br />

NW-526-33_15<br />

100.21 %<br />

NW-526-51_17<br />

97.35 %<br />

NW-526-51_16<br />

97.37 %<br />

NW-526-51_15<br />

97.40 %<br />

NW-526-No_17_Projhe Jadeed # 1&2<br />

98.69 %<br />

NW-526-No_14_Panjsad Family # 1&2<br />

97.39 %<br />

NW-526-No_16_Panjsad Family # 1&2<br />

98.11 %<br />

NW-526-54<br />

98.11 %<br />

NW-526-42_3<br />

98.78 %<br />

N-513-Garud Milli # 2<br />

99.71 %<br />

NW-526-42_2<br />

98.88 %<br />

NW-526-33_2<br />

100.27 %<br />

NW-527-33<br />

101.82 NW-526-33 %<br />

100.28 %<br />

NW-526-36<br />

99.91 %<br />

NW-527-36<br />

101.58 %<br />

NW-526-40<br />

99.34 %<br />

NW-527-40<br />

101.18 %<br />

NW-526-42<br />

99.12 %<br />

NW-527-Tr-No-6- 1&2<br />

101.18 %<br />

NW-526-No_21_Projhe Jadeed<br />

98.87 %<br />

NW-526-48<br />

98.59 %<br />

NW-526-51<br />

98.28 %<br />

NW-526-51_2<br />

98.16 %<br />

NW-526-51_3<br />

98.06 %<br />

NW-526-No_20_Panjsad Family # 1&2<br />

97.99 %<br />

NW-526-51_4<br />

98.00 %<br />

NW-526-51_7<br />

97.84 %<br />

NW-526-51_8<br />

97.79 %<br />

N-513-53<br />

101.80 %<br />

N-513-71<br />

100.74 %<br />

N-513-Reasat-e-Logiestic<br />

99.80 %<br />

NW-527-TR-61Taqweatee<br />

101.81 %<br />

NW-526-Nan Pazi Watan<br />

98.59 %<br />

NW-526-49<br />

98.52 %<br />

P-A3-11-Reconductor to 185 sqm (if existing<br />

conductor is smaller than 70 sqmm)<br />

N-513-79<br />

100.21 %<br />

NW-527-30<br />

NW-526-30 102.11 %<br />

100.73 %<br />

N-513-43-C15<br />

102.16 %<br />

N-513-43-C14<br />

102.17 %<br />

N-513-No-59 Taqweatee Khuja Bughra<br />

100.69 %<br />

N-513-No-59 Khuja Bughra-B<br />

102.14 %<br />

N-513-84<br />

99.89 %<br />

NW-527-44<br />

100.95 %<br />

NW-527-44.5<br />

100.87 %<br />

NW-527-44.15<br />

100.83 %<br />

NW-527-44.13<br />

100.84 %<br />

NW-527-Tr.No-8 Hawaee<br />

100.83 %<br />

N-513-47<br />

102.14 %<br />

N-513-43-C11<br />

102.22 %<br />

NW-526-Lewai Babajan<br />

101.99 %<br />

NW-527-45<br />

100.90 %<br />

NW-527-46<br />

100.87 %<br />

NW-527-Tr.No-6 Hawaee-1&2<br />

100.87 %<br />

NW-527-Tr. No 6-ariana-1&2<br />

100.86 %<br />

N-520-Borj Sera mina # 1&2<br />

N-520-51<br />

N-520-48<br />

102.90 %<br />

102.88 %<br />

102.90 %<br />

N-520-43<br />

103.01 %<br />

N-513-46<br />

102.22 %<br />

N-513-No-62 Hawaee Khuja Bughra<br />

100.18 %<br />

NW-527-24<br />

102.74 NW-526-24 %<br />

101.67 %<br />

N-513-43-C6<br />

102.29 %<br />

N-513-No-059 Khuja Bughra-A<br />

102.29 %<br />

NW-527-21<br />

NW-526-21<br />

102.97<br />

102.02<br />

%<br />

%<br />

NW-524-Borj_4_Zamini # 1&2<br />

102.62 %<br />

NW-524-56<br />

102.63 %<br />

NW-524-52<br />

102.77 %<br />

NW-527-Tr.No 5-Hesa Awal -1&2<br />

100.44 %<br />

NW-527-52.12<br />

100.48 %<br />

NW-527-52.13<br />

100.46 %<br />

NW-527-52.8<br />

100.52 % NW-527-52<br />

100.78 %<br />

NW-527-52.a.3<br />

100.76 %<br />

NW-527-Tr.Shafa Khane Khairkhana<br />

100.74 %<br />

N-520-41<br />

103.06 % N-520-No-13 Zamini N-520-38 # 1&2<br />

103.12 % 103.12 %<br />

N-513-43-C1<br />

N-513-43 102.39 %<br />

102.40 %<br />

N-513-43-C4<br />

102.33 %<br />

NW-527-52.8.2<br />

100.50 %<br />

NW-527-TR-no-5 Khest hokhtif-1&2<br />

100.49 %<br />

NW-527-52.a.2<br />

100.76 %<br />

NW-527-18.1<br />

103.21 %<br />

N-520-Borj 8 Jeem N-520-57 # 1&2<br />

102.78 % 102.78 %<br />

N-513-39<br />

102.68 %<br />

N-513-35<br />

102.91 %<br />

NW-527-18 NW-526-18<br />

103.22 102.41 %%<br />

NW-527-18.2<br />

103.19 %<br />

NW-527-Tr-no-4<br />

103.19 %<br />

NW-527-TR No-7 hesaee Dohm-1&2<br />

100.59 %<br />

NW-527-60<br />

100.61 %<br />

N-520-29<br />

NW-524-Borj_3_Markazi Hasee Awal # 1&2<br />

103.61 %<br />

NW-524-32_2<br />

103.62 %<br />

NW-524-Mokhaberat Khairkhana<br />

103.11 % NW-524-41<br />

103.11 %<br />

NW-524-Jawar Mokhaberat Khairkhana<br />

103.11 %<br />

NW-524-38_3<br />

NW-524-38<br />

103.21 %<br />

103.22 %<br />

NW-524-38_4<br />

103.20 %<br />

NW-524-38_5<br />

103.20 %<br />

NW-524-32<br />

103.65 %<br />

NW-524-37<br />

103.33 %<br />

NW-524-Khedamat Takhniki Wezarat Mahdan<br />

103.20 %<br />

NW-524-Stak Markazi Sehat Aama<br />

103.33 %<br />

N-527-43<br />

102.26 %<br />

N-527-No-9 Zamini Tr 1&2<br />

N-527-48<br />

102.16 %<br />

102.16 %<br />

103.41 N-520-No-12 % Zamini N-520-27 # 1&2<br />

103.48 % 103.48 % N-520-25<br />

103.59 %<br />

N-513-27-B1<br />

N-513-27<br />

103.28 %<br />

103.28 %<br />

N-513-No-60 khuja Bughra<br />

103.27 %<br />

N-513-27-B2<br />

103.27 %<br />

N-513-No-3 Zameni khuja Bughra<br />

102.97 %<br />

N-513-19-A27<br />

102.97 %<br />

N-513-19-A25<br />

102.99 %<br />

N-513-19-A22<br />

103.01 %<br />

N-513-No-2 Hawaee Khuja Bughra<br />

103.02 %<br />

N-513-19-A-19<br />

103.07 %<br />

N-527-Qalhae Najara<br />

102.26 % N-527-38-C-10<br />

102.26 %<br />

N-527-No-22 Zamini<br />

102.32 % N-527-39-2<br />

102.32 %<br />

N-527-39<br />

102.33 N-527-38-A1 %<br />

102.34 %<br />

N-527-38<br />

102.35 %<br />

N-520-20<br />

103.92 %<br />

N-513-19-A8<br />

103.27 %<br />

N-513-No-1 Khuja Bughra # 1<br />

103.27 %<br />

N-513-No-1 Taqweatee khuja Bughra<br />

103.25 %<br />

N-513-19-A-17<br />

103.11 %<br />

N-527-38-A11<br />

102.23 %<br />

N-527-Sarwar Kaynat<br />

102.22 %<br />

N-520-No-12 Taqweatee<br />

103.90 %<br />

N-513-19<br />

103.64 %<br />

NW-524-23<br />

103.82 %<br />

NW-524-23_5<br />

103.69 %<br />

NW-524-Borj_1_Hesa Awal Khirkhana<br />

103.85 %<br />

NW-524-21_5<br />

103.85 %<br />

NW-524-21_3<br />

103.88 %<br />

NW-524-Borj_2_Zamini # 1&2<br />

103.65 %<br />

N-512-Leway Amniat<br />

103.59 %<br />

-6<br />

%<br />

NW-516<br />

104.97 %<br />

NW-518<br />

104.83 %<br />

11.02 MVA<br />

82.60 %<br />

NW-517<br />

104.93 %<br />

11.04 MVA<br />

81.26 %<br />

NW-527<br />

104.97 %<br />

10.69 MVA<br />

73.63 %<br />

NW-513<br />

104.90 %<br />

NW-527-3<br />

104.84 %<br />

NW-525<br />

104.88 %<br />

NW-526<br />

104.76 %<br />

NW-526-3<br />

104.61 %<br />

P-B2-1 Upgraded to 240 sqm<br />

NW-527-4<br />

104.72 NW-525-3 %<br />

NW-524-5<br />

104.71 %<br />

104.80 %<br />

NW-524-4<br />

104.84 %<br />

NW-514-3<br />

104.76 %<br />

NW-524<br />

NW-514<br />

104.93 %<br />

104.88 %<br />

NW-515<br />

104.90 %<br />

NW-515-4<br />

104.70 %<br />

NW-527-7<br />

104.49 NW-526-7 %<br />

104.23 %<br />

NW-514-6<br />

104.52 %<br />

NW-524-6<br />

104.76 %<br />

S/S North West<br />

105.00 %<br />

NW-514-7<br />

104.40 %<br />

NW-524-7<br />

104.63 %<br />

NW-515-9<br />

104.29 %<br />

NW-515-Gaz Mayee<br />

104.29 %<br />

NW-525-9<br />

104.12 %<br />

NW-524-10<br />

104.46 %<br />

NW-514-10<br />

103.90 %<br />

NW-524-21_2<br />

103.89 %<br />

NW-524-12<br />

104.39 %<br />

NW-524-14<br />

104.24 %<br />

NW-524-13<br />

NW-514-12<br />

104.32 %<br />

103.70 %<br />

NW-514-14<br />

103.54 %<br />

NW-525-15<br />

103.55 %<br />

NW-515-15<br />

103.77 %<br />

NW-524-21<br />

103.90 %<br />

NW-524-Borj_2_Dakhel Haweeli # 1&2<br />

104.16 %<br />

NW-524-14_4<br />

104.17 %<br />

NW-524-14_4_2<br />

104.16 %<br />

NW-524-14_12<br />

104.10 %<br />

NW-524-Borj_2_Hawee Qalah Najara<br />

104.10 %<br />

N-527-32-D4<br />

102.54 %<br />

N-527-32-D6 N-527-32-D7<br />

N-527-No-25 Hawaee 102.50 102.49 % %<br />

102.48 %<br />

N-527-No-10 Zamini Tr 1&2<br />

102.57 %<br />

N-527-32<br />

102.58 %<br />

N-527-10-E1<br />

102.54 %<br />

N-527-No-23 Hawaee Tr 1&2<br />

102.27 % N-527-10-E-10-1<br />

102.27 %<br />

N-527-10-E6<br />

102.41 %<br />

N-527-10-E7<br />

102.39 %<br />

N-527-10-E9<br />

N-527-10-E8<br />

102.35 102.35 %<br />

N-527-10-E10<br />

102.29 %<br />

N-527-No-10 Hawaee<br />

103.30 % N-527-24<br />

103.30 %<br />

JS#10-N<br />

103.55 %<br />

N-519-22<br />

103.60 %<br />

N-JS10-Bland Manzel Mastora 1&2<br />

103.53 %<br />

N-520-15-A5 N-520-15-A4<br />

N-520-No-11 104.17 Zamini# 104.17 % % 1&2<br />

104.17 %<br />

N-520-No-11 N-520-15-A10<br />

Hawaee<br />

104.13 % 104.14 %<br />

N-520-15<br />

104.22 % N-520-11<br />

104.42 %<br />

N-520-9<br />

104.52 % N-520-4<br />

104.77 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-513-7<br />

N-519-6<br />

N-519-7<br />

104.47 104.61 %<br />

104.55 % N-513-6<br />

N-519-8<br />

104.54 %<br />

104.49 %<br />

N-529-8<br />

104.39 N-514-8%<br />

104.57 %<br />

N-529-9<br />

N-514-9 104.34 %<br />

104.54 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-529-3<br />

N-513-2<br />

N-519-2<br />

S/S North<br />

105.00 %<br />

N-520<br />

N-514-3<br />

N-516-3<br />

N-515-2<br />

N-517-3<br />

N-518-4<br />

N-515-7<br />

104.58 N-518-7 %<br />

104.58 %<br />

N-512-2<br />

N-528-2<br />

Reconductored <strong>the</strong> line between N-512-2 and<br />

N-512-21 to 120 sq. mm OH.<br />

N-516-19<br />

103.86 %<br />

N-517-19<br />

N-516-40 Metra Wazir Abad<br />

103.75 %<br />

103.86 %<br />

N-512-21<br />

103.61 %<br />

Reconductored <strong>the</strong> line between N-512-21 and<br />

N-512-39 to 120 sq. mm OH.<br />

NW-518-7<br />

104.39 NW-517-5 %<br />

104.65 %<br />

10.68 MVA<br />

79.96 %<br />

NW-513-5<br />

104.65 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW 514 18 4<br />

NW-514-16<br />

103.31 %<br />

NW-515-18<br />

103.53 %<br />

NW-514-18<br />

103 11 %<br />

NW-525-18<br />

103.27 %<br />

N-527-10-E 15<br />

102.23 %<br />

N-514-No-6 Proja Wazir Abad 2<br />

103.80 % N-514-19-C12<br />

N-514-19-C11 103.81 %<br />

103.83 %<br />

A-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


N-513-Mamr-e-Wuzarat Transport<br />

98.92 %<br />

N-513-Technic wa Asleha<br />

99.46 % N-513-99-J11<br />

99.46 %<br />

N-513-Taharokat Transport<br />

99.38 %<br />

N-513-132<br />

99.10 %<br />

N-513-154<br />

98.98 %<br />

N-513-101-H4<br />

99.42 %<br />

E-513-No_3 Qasaba<br />

100.46 %<br />

N-513-Tasadee Kamaz<br />

99.13 %<br />

E-513-No_2 Qasaba<br />

100.47 %<br />

N-513-99-J2<br />

99.52 %<br />

N-513-99<br />

99.53 %<br />

N-513-125<br />

99.13 %<br />

E-513-No_1 Qasaba<br />

100.48 %<br />

N-513-101<br />

99.47 %<br />

N-513-124<br />

99.16 %<br />

E-513-127<br />

100.52 %<br />

N-513-121<br />

99.21 %<br />

N-513-Regration<br />

99.13 %<br />

N-513-121-i10<br />

99.14 %<br />

E-513-No_2_KhanaSazee<br />

100.79 %<br />

E-513-109<br />

100.79 %<br />

E-513-108<br />

100.84 %<br />

E-513-106<br />

100.90 %<br />

E-513-No_1_KhanaSazee<br />

101.05 %<br />

E-513-101<br />

101.02 %<br />

E-513-100<br />

101.05 %<br />

E-513-Fabrica Qir<br />

101.18 %<br />

E-513-97<br />

101.19 %<br />

E-513-90<br />

101.51 %<br />

E-513-89<br />

101.54 %<br />

Reconductored <strong>the</strong> line between N-512-39 and<br />

N-512-40 to 120 sq. mm OH.<br />

N-528-32<br />

102.79 %<br />

N-512-39<br />

102.25 %<br />

N-516-41<br />

102.68 %<br />

N-517-41 N-512-40<br />

102.34102.17 % %<br />

Reconductored <strong>the</strong> line between N-512-40 and<br />

N-512-46 to 120 sq. mm OH.<br />

N-528-528-1<br />

102.62 %<br />

Reconductored <strong>the</strong> line between N-512-47 and<br />

N-512-61 to 120 sq. mm OH.<br />

N-528-9 N-528-10<br />

102.23 % 102.17 %<br />

N-528-10A2<br />

102.11 %<br />

N-528-10A5<br />

102.03 %<br />

N-512-47<br />

101.55 %<br />

N-512-46<br />

101.56 %<br />

N-512-61<br />

100.33 %<br />

N-512-62<br />

100.32 %<br />

N-512-63<br />

100.31 %<br />

Reconductored <strong>the</strong> line between N-512-63 and<br />

N-512-66 to 120 sq. mm OH.<br />

E-521-Sang Marmar Jamshed<br />

102.50 %<br />

E-521-54<br />

102.51 %<br />

N-516-63<br />

N-517-63 102.04 %<br />

101.60 %<br />

N-528-12<br />

101.99 %<br />

N-528-Taqwiaty N-528-A13-3<br />

Chamandy<br />

N-528-A13-1 101.73 % 101.73 %<br />

N-512-66<br />

100.02 %<br />

N-512-68<br />

99.86 %<br />

Reconductored <strong>the</strong> line between N-512-66 and<br />

N-512-68 to 120 sq. mm OH.<br />

Reconductored <strong>the</strong> line between N-512-68 and<br />

N-512-72 to 120 sq. mm OH.<br />

N-516-No-1-Qwai Hawaye<br />

99.67 %<br />

N-516-B6<br />

99.68 %<br />

A-4<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-511-43<br />

102.37 %<br />

E-511-54<br />

102.32 %<br />

E-511-58<br />

102.30 %<br />

E-513-65<br />

102.68 %<br />

E-513-64<br />

102.72 %<br />

A-5<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-F-519 -Dahni Tangi<br />

96.72 %<br />

E-F-519 -256<br />

96.73 %<br />

E-F-519 -234<br />

96.81 %<br />

A-7<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


MVA<br />

14 %<br />

NW-513-181<br />

100.98 %<br />

P-B2-1 Reconductor to 70 sqm<br />

2.82 MVA<br />

42.13 %<br />

P-B2-1 Reconductor to 70 sqm<br />

NW-513-Bande Qargha<br />

101.20 %<br />

0.07 MVA<br />

72.39 %<br />

2.91 MVA<br />

43.21 %<br />

NW-513-172<br />

101.51 %<br />

P-B2-1 Reconductor to 70 sqm<br />

2.92 MVA<br />

43.21 %<br />

1.27 MVA<br />

18.27 %<br />

NW-513-159<br />

102.16 %<br />

0.47 MVA<br />

13.20 %<br />

0.47 MVA<br />

13.21 %<br />

0.47 MVA<br />

13.22 %<br />

0.18 MVA<br />

5.09 %<br />

0.18 MVA<br />

5.09 %<br />

0.29 MVA<br />

72.38 %<br />

0.18 MVA<br />

5.10 %<br />

B-1<br />

0.14 MVA<br />

72.47 %<br />

0.25 MVA<br />

72.36 %<br />

0.18 MVA<br />

72.59 %<br />

0.29 MVA<br />

72.46 %<br />

0.29 MVA<br />

72.46 %<br />

1.85 MVA<br />

26.61 %<br />

0.29 MVA<br />

4.17 %<br />

1.56 MVA<br />

22.44 %<br />

1.27 MVA<br />

18.27 %<br />

1.27 MVA<br />

18.27 %<br />

1.26 MVA<br />

18.27 %<br />

0.25 MVA<br />

3.57 %<br />

1.12 MVA<br />

16.18 %<br />

0.25 MVA<br />

3.57 %<br />

1.12 MVA<br />

16.18 %<br />

0.25 MVA<br />

3.57 %<br />

0.29 MVA<br />

4.20 %<br />

0.83 MVA<br />

11.98 %<br />

0.83 MVA<br />

11.98 %<br />

0.83 MVA<br />

11.98 %<br />

0.83 MVA<br />

11.98 %<br />

0.58 MVA<br />

8.42 %<br />

0.58 MVA<br />

8.42 %<br />

0.29 MVA<br />

4.20 %<br />

0.58 MVA<br />

8.42 %<br />

0.29 MVA<br />

4.20 %<br />

A<br />

NW-513-283<br />

98.25 %<br />

NW-513-282<br />

98.32 %<br />

NW-513-275<br />

98.34 %<br />

0.58 MVA<br />

8.42 %<br />

0.29 MVA<br />

72.49 %<br />

0.29 MVA<br />

4.21 %<br />

0.29 MVA<br />

4.21 %<br />

0.29 MVA<br />

4.21 %<br />

0.29 MVA<br />

4.21 %<br />

0.29 MVA<br />

4.22 %<br />

0.29 MVA<br />

72.49 %<br />

NW-513-Khal Dari<br />

98.05 %<br />

0.29 MVA<br />

4.22 %<br />

.<br />

NW-513-250-6-41<br />

98.05 %<br />

NW-513-250-6-38<br />

98.06 %<br />

NW-513-250-6-33<br />

98.08 %<br />

NW-513-250-6-31<br />

98.09 %<br />

NW-513-Qalai Yos<strong>of</strong> Khaldari<br />

NW-513-250-6-20<br />

98.13 %<br />

98.13 %<br />

NW-513-250-6-16<br />

98.17 %<br />

NW-513-250-6-11<br />

98.22 %<br />

NW-513-250<br />

98.36 %<br />

NW-513-250-1<br />

98.34 %<br />

NW-513-250-2<br />

98.33 %<br />

NW-513-250-3<br />

98.30 %<br />

NW-513-250-6<br />

98.27 %<br />

NW-513-159-11<br />

101.83 %<br />

NW-513-159-27<br />

101.74 %<br />

NW-513-250-6-8<br />

98.25 %<br />

NW-513-250-12<br />

98.22 %<br />

NW-513-Qaria Dalil<br />

98.61 %<br />

NW-513-159-40-2<br />

101.54 %<br />

NW-513-159-40-3<br />

101.53 %<br />

NW-513-244<br />

98.58 %<br />

NW-513-250-15<br />

98.21 %<br />

NW-513-238<br />

98.68 %<br />

NW-513-Shamel Zaee<br />

98.20 %<br />

NW-513-225<br />

NW-513-Qalai Amir Mohammad<br />

98.96 %<br />

98.96 %<br />

NW-513-159-40<br />

NW-513-Koshkak<br />

101.55 %<br />

101.55 %<br />

NW-513-228<br />

98.90 %<br />

NW-513-229<br />

98.88 %<br />

NW-513-222<br />

99.03 %<br />

NW-514-Qalai mirdad<br />

98.95 %<br />

NW-513-Kamangar<br />

101.50 %<br />

NW-513-<br />

95 90 %<br />

Appendix C<br />

Node Element<br />

Node<br />

P [MW]<br />

Q [MVAr]<br />

Name<br />

U/Un [%]<br />

Date: 08.01.2008 <strong>Kabul</strong> <strong>Distribution</strong> Project<br />

Short Term Investments (2008)<br />

and Load Flow Results<br />

Branch Element<br />

<strong>Kabul</strong>_2008<br />

File:<br />

Filter U/Un [%]:<br />

U/Un


3.42 MVA<br />

35.07 %<br />

3.72 MVA<br />

38.03 %<br />

8.34 MVA<br />

67.36 %<br />

N<br />

1<br />

159<br />

%<br />

P-B2-1 Reconductor to 120 sqm<br />

3.41 MVA<br />

35.07 %<br />

NW-518-32<br />

102.02 %<br />

NW-513-149<br />

102.55 %<br />

P-B2-1 Reconductor to 120 sqm<br />

10.73 MVA<br />

82.61 %<br />

P-B2-1 Rec<br />

NW-513-143<br />

NW-513-Qaria Ali Khan<br />

102.80 %<br />

102.79 %<br />

0.29 MVA<br />

72.34 %<br />

P-B2-1 Reconductor to 120 sqm<br />

NW-518-40<br />

101.22 %<br />

NW-517-32<br />

102.52 %<br />

NW-513-32<br />

101.54 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-Deh Araban Monari<br />

103.21 %<br />

0.46 MVA<br />

72.28 %<br />

10.64 MVA<br />

82.61 %<br />

10.34 MVA<br />

79.96 %<br />

NW-518-47<br />

100.72 %<br />

P-B2-1 Reconductor to 120 sqm<br />

10.59 MVA<br />

82.61 %<br />

NW-518-51 NW-517-43 NW-513-43<br />

100.43101.99 % 100.76 %%<br />

10.56 MVA<br />

82.61 %<br />

4.22 MVA<br />

42.68 %<br />

NW-518-52<br />

100.34 %<br />

NW-513-Aqeb tapa Rahmat abad<br />

96.09 %<br />

0.29 MVA<br />

72.56 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-Deh Araban hawahe<br />

104.15 %<br />

0.46 MVA<br />

72.26 %<br />

P-B2-1 Reconductor to 120 sqm<br />

NW-513-95-2<br />

96.11 %<br />

NW-513-95<br />

96.12 %<br />

0.29 MVA<br />

5.78 %<br />

0.29 MVA<br />

5.21 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-Wakseen Sazee<br />

96.71 %<br />

0.72 MVA<br />

12.98 %<br />

0.73 MVA<br />

72.53 %<br />

NW-518-Sara Miasht<br />

99.57 %<br />

0.38 MVA<br />

6.57 %<br />

NW-518-59.5<br />

99.59 %<br />

0.38 MVA<br />

5.40 %<br />

NW-518-59A<br />

99.62 %<br />

10.55 MVA<br />

82.61 %<br />

10.26 MVA<br />

79.97 %<br />

4.69 MVA<br />

47.29 %<br />

P-B2-1 Reconductor to 185 sqm<br />

6.66 MVA<br />

54.39 %<br />

6.95 MVA<br />

56.75 %<br />

10.10 MVA<br />

79.64 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-107a<br />

104.67 %<br />

P-B2-1 Added a voltage regulator<br />

NW-513-96<br />

96.04 %<br />

NW-513-96-1<br />

96.03 %<br />

NW-513-93<br />

96.27 %<br />

NW-513-Family Rahmat abad<br />

96.27 %<br />

NW-513-92<br />

96.31 %<br />

0.58 MVA<br />

72.55 %<br />

7.57 MVA<br />

61.48 %<br />

NW-513-86-1<br />

96.75 96.75 % % NW-513-84<br />

96.92 %<br />

8.31 MVA<br />

67.36 %<br />

NW-518-M-e-H <strong>Afghan</strong> Korea 1&2<br />

99.41 %<br />

NW-518-61.1<br />

99.42 %<br />

0.48 MVA<br />

6.13 %<br />

9.56 MVA<br />

75.85 %<br />

P-B2-1 Reconductor to 185 sqm<br />

513-107-64<br />

0%<br />

NW-513-107-5<br />

95.33 %<br />

NW-513-107-2<br />

95.38 %<br />

0.75 MVA<br />

15.09 %<br />

0.75 MVA<br />

15.09 %<br />

NW-513-107<br />

95.40 %<br />

P-B2-1 Reconductor to 185 sqm<br />

5.47 MVA<br />

44.90 %<br />

NW-513-101<br />

95.75 %<br />

5.49 MVA<br />

44.90 %<br />

1.16 MVA<br />

20.94 %<br />

NW-513-80<br />

97.23 %<br />

P-B2-1 Reconductor to 185 sqm<br />

8.34 MVA<br />

67.36 %<br />

NW-513-79<br />

97.32 %<br />

8.84 MVA<br />

71.04 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-74<br />

97.73 %<br />

1.04 MVA<br />

20.48 %<br />

9.89 MVA NW-513-72<br />

79.4097.89 % %<br />

9.97 MVA<br />

79.40 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-518-Markaz-e-talimi<br />

NW-513-64<br />

98 95 % 98 60 %<br />

NW-518-E-e-Adari Zamini 1&2<br />

98.96 % NW-518-65.3<br />

98.96 %<br />

10.00 MVA<br />

79.40 %<br />

0.48 MVA<br />

9 33 %<br />

0.48 MVA<br />

9.33 %<br />

NW-513-61<br />

98.89 %<br />

NW-518-61<br />

10.03 MVA<br />

79.40 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-W.P.Sara Miasht<br />

99.19 %<br />

NW-513-58<br />

99.19 %<br />

0.96 MVA<br />

13.82 %<br />

0.07 MVA<br />

72.45 %<br />

10.12 MVA<br />

79.97 %<br />

2.54 MVA<br />

36.58 %<br />

NW-513-56<br />

NW-518-57<br />

99 00 NW % 517 56<br />

2.54 MVA<br />

36.58 %<br />

NW-518-59<br />

98.91 %<br />

NW-517-59<br />

100.85 %<br />

B-2<br />

2.54 MVA<br />

36.58 %<br />

NW<br />

98.<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


104.65 %<br />

104.65 %<br />

NW-514-18_4<br />

NW-514-Borj Wakseensazi<br />

103.10 %<br />

103.10 %<br />

NW-514-18<br />

103.11 %<br />

N-514-No-1 Proja Wazir Abad 1<br />

104.08 %<br />

N-514-19-A5<br />

104.09 %<br />

N-515-13<br />

104.18 N-518-13 %<br />

104.16 %<br />

P-B2-1 Reconductor to 185 sqm<br />

N-514-19-C5<br />

103.97 %<br />

NW-514-Spin Ghar CC<br />

102.71 %<br />

NW-514-22<br />

102.71 %<br />

N-514-19<br />

104.14 %<br />

N-529-19<br />

103.57 %<br />

N-514-19-C4<br />

103.99 %<br />

N-514-19-C6<br />

103.94 %<br />

10.98 MVA<br />

82.60 %<br />

10.65 MVA<br />

79.96 %<br />

NW-514-28_2<br />

NW-514-Mechaniza 102.48 Zrahaty %<br />

102.48 %<br />

NW-514-24_7<br />

102.48 %<br />

NW-514-Reiasat Anasor Felezy<br />

102.60 %<br />

NW-514-23<br />

102.61 NW-515-24 %<br />

103.03 %<br />

NW-525-24<br />

102.73 %<br />

N-527-Shahrak Police<br />

102.04 %<br />

N-527-10-E 29<br />

102.05 %<br />

N-527-10-E 25<br />

102.13 %<br />

N-514-19-C2<br />

104.04 %<br />

N-514-19-C1<br />

N-514-19-B3 104.05 %<br />

104.06 %<br />

N-514-19-C-15<br />

103.80 %<br />

N-514-19-C-16<br />

103.79 %<br />

NW-514-24<br />

102.49 %<br />

N-527-10-E 28<br />

102.09 %<br />

N-514-No-2 Proja Wazir Abad 1&2<br />

104.05 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-518-18<br />

103.45 %<br />

NW-517-13<br />

104.02 %<br />

NW-513-13<br />

103.73 %<br />

NW-514-Farm Morghdary<br />

102.05 %<br />

NW-514-28<br />

102.11 %<br />

N-527-Hotel Shame Paris<br />

102.09 N-527-10-E-25-7<br />

%<br />

102.09 %<br />

N-514-No-7 Proja Wazir Abad 1<br />

103.88 %<br />

N-514-29-B6<br />

103.91 %<br />

N-514-29-B9<br />

103.89 N-514-29-B8 %<br />

103.89 %<br />

N-514-28 N-529-28<br />

N-514-29-B2 103.96 102.80 % %<br />

103.95 %<br />

N-514-29-B1<br />

103.95 N-514-29 % N-514-28-A1<br />

103.95<br />

103.95<br />

%<br />

%<br />

N-514-No-3 Proja Wazir Abad 21<br />

103.93 %<br />

N-514-Salim Carwan<br />

103.77 %<br />

N-515-24<br />

102.83 N-518-24 %<br />

102.77 %<br />

P-B2-1 Reconductor to 185 sqm<br />

10.88 MVA<br />

82.60 %<br />

NW-514-30<br />

101.90 %<br />

NW-514-Borj_1_Tahia Maskan<br />

101.84 %<br />

NW-515-37<br />

101.84 %<br />

NW-525-37<br />

101.44 %<br />

NW-515-38<br />

101.73 %<br />

NW-525-38<br />

101.32 %<br />

NW-525-68.5<br />

98.30 %<br />

NW-525-Hakim Naser Khesro<br />

98.30 %<br />

N-528-Taqweyate Wazir abad<br />

N-528-50-E 1<br />

99.96 %<br />

99.96 %<br />

NW-514-Borj_2_Tahia Maskan<br />

101.83 %<br />

NW-515-39<br />

101.59 %<br />

NW-525-39<br />

101.16 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-528-50<br />

100.00 %<br />

W-518-26<br />

02.75 %<br />

NW-514-Borj_3_Tahia Maskan 1&2<br />

101.82 %<br />

NW-515-43<br />

101.35 %<br />

NW-515-43_1<br />

101.35 %<br />

NW-525-43<br />

100.91 %<br />

NW-515-45<br />

101.18 %<br />

NW-525-45<br />

100.71 %<br />

NW-525-Market Mewa<br />

100.49 %<br />

NW-515-Kochi Market<br />

100.76 % NW-515-50_8<br />

100.77 %<br />

NW-525-68<br />

98.32 %<br />

N-514-36<br />

103.93 N-529-36 %<br />

102.02 %<br />

N-514-No-4 Proja Wazir Abad<br />

103.92 %<br />

NW-525-Qabre Shahoon<br />

96.23 %<br />

N-528-Wazir Abad<br />

99.96 %<br />

NW-515-Azamatullah NW-515-43_4<br />

101.33 % 101.33 %<br />

NW-515-45_3<br />

NW-515-Haji Wazir Gul<br />

101.16 %<br />

101.16 %<br />

NW-515-47<br />

101.01 %<br />

NW-525-47<br />

100.49 %<br />

NW-525-72<br />

97.94 %<br />

N-528-Borje N-528-47 Tahire<br />

100.21 % 100.21 %<br />

10.80 MVA<br />

82.60 %<br />

NW-517-23<br />

103.30 %<br />

10.56 MVA<br />

79.96 %<br />

NW-515-Proses Roda<br />

101.32 NW-515-Flezkary %<br />

Kargar<br />

101.32 %<br />

NW-515-43_6<br />

101.32 %<br />

NW-515-45_4<br />

101.16 %<br />

NW-515-45_5<br />

101.16 %<br />

NW-515-45_6<br />

101.16 %<br />

NW-515-Agha Shereen<br />

101.15 %<br />

NW-515-50<br />

100.78 %<br />

NW-525-Chaman Babrak No-8<br />

98.93 %<br />

NW-525-63<br />

98.93 %<br />

NW-525-76<br />

97.59 %<br />

NW-525-Taimani No-3<br />

97.59 %<br />

NW-514-Zakhira Teel NW-514-40_5<br />

Badambagh<br />

101.21 %<br />

101.21 %<br />

NW-514-40_1<br />

101.22 %<br />

NW-514-40<br />

101.22 %<br />

NW-514-41<br />

101.19 %<br />

P-B3-18-Reconductored to 185 sqm<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-514-42<br />

101.13 %<br />

NW-514-42_1<br />

101.10 %<br />

NW-515-55<br />

NW-515-Market 100.41 mily %<br />

100.41 %<br />

NW-525-55<br />

99.77 %<br />

NW-525-58<br />

99.46 %<br />

NW-515-60<br />

100.15 %<br />

NW-515-Chaman Babrak<br />

99.89 %<br />

N-529-49<br />

101.11 %<br />

NW-525-Qasemi Vin House<br />

97.16 %<br />

NW-525-82<br />

97.22 %<br />

NW-525-kabul Paris<br />

97.22 %<br />

NW-525-82.1<br />

97.22 %<br />

N-515-31<br />

101.53 %<br />

N-518-31<br />

101.42 %<br />

N-518-Abrasani Wazir abad<br />

101.41 %<br />

NW-514-Borj Deh Kepak 1&2<br />

101.01 %<br />

NW-514-Borj_2_Parwan NW-514-49 she<br />

100.76 % 100.76 %<br />

NW-514-Sarai Kantinery_1&2<br />

100.49 %<br />

NW-515-Borj_1_Parwan She<br />

99.74 %<br />

NW-515-Haji Aadam khan<br />

99.73 %<br />

P-B3-13-Reconductored to 150 sqm<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-515-62<br />

99.91 %<br />

P-B3-19-New Switches<br />

NW-515-63_1<br />

NW-515-63<br />

99.82 %<br />

99.84 %<br />

N-529-63a<br />

100.68 %<br />

N-529-49A6<br />

101.05 %<br />

N-529-Borj 5 Chamni Babrak<br />

101.04 %<br />

NW-525-82.4<br />

97.19 %<br />

NW-525-112<br />

95.88 %<br />

NW-525-111<br />

95.89 %<br />

NW-525-117<br />

95.70 %<br />

NW-525-Qalah Mosa No-1<br />

95.70 %<br />

NW-525-Qalah Mosa No-2<br />

95.64 %<br />

onductor to 185 sqm<br />

NW-514-55<br />

100.49 %<br />

NW-515-74<br />

99.75 %<br />

NW-515-63_4<br />

99.67 %<br />

P-B3-13-Reconductored to 150 sqm<br />

NW-525-92<br />

96.52 %<br />

NW-525-Taimani No-2-1&2<br />

96.52 %<br />

NW-525-Nasajy Maqsody<br />

96.19 %<br />

NW-525-109<br />

95.99 %<br />

NW-525-108<br />

96.01 %<br />

NW-514-58<br />

100.38 %<br />

NW-515-67<br />

99.79 %<br />

NW-515-Etebar khan<br />

99.67 %<br />

m<br />

0<br />

NW-514-Borj_3_Parwan she<br />

100.29 % NW-514-60<br />

100.29 %<br />

NW-514-65<br />

100.16 %<br />

NW-514-66<br />

100.12 %<br />

NW-515-67_1<br />

99.78 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-529-64<br />

99.98 % N-529-63<br />

100.03 %<br />

NW-515-67_3<br />

99.75 %<br />

NW-515-67_4<br />

99.74 %<br />

NW-515-Hotel Sultan Qalbha<br />

99.67 %<br />

NW-515-Borj_4_Parwan NW-515-67_8 She<br />

99.69 % 99.69 %<br />

NW-515-63_6<br />

99.55 %<br />

NW-515-Maiwand Market<br />

99.55 %<br />

P-B3-13-Reconductored to 150 sqm<br />

NW-525-101<br />

96.25 %<br />

NW-525-102<br />

96.24 %<br />

N-515-35<br />

100.83 N-518-35 %<br />

100.72 %<br />

N-515-36<br />

100.73 N-518-36 %<br />

100.61 %<br />

NW-514-69<br />

100.07 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-515-Hawaee Ansary<br />

99.20 %<br />

NW-525-102.2<br />

96.21 %<br />

NW-525-Taimani No-1<br />

96.21 %<br />

NW-514-71<br />

100.02 %<br />

NW-514-Chamandy Karte NW-514-71_1<br />

Parwan_1&2<br />

100.00 %<br />

100.00 %<br />

N-529-66<br />

99.71 %<br />

NW-515-63_16<br />

99.20 %<br />

NW-525-Charahy S<br />

95.60 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-515-Blaak haee NW-515-63_16_2<br />

Shahraara<br />

99.06 % 99.06 %<br />

NW-514-77<br />

99.92 %<br />

N-529-71<br />

99.40 %<br />

NW-515-63_16_3<br />

99.02 %<br />

NW-515-Borj_2_Ansary<br />

NW-515-63_23<br />

98.97 NW-515-63_22 % 98.97 %<br />

98.99 %<br />

NW-515-63_16_4<br />

98.98 %<br />

NW-514-80<br />

99.88 %<br />

N-529-77<br />

99.18 %<br />

N-529_JS5_4_5-Borj Intercontinental # 1&2<br />

97.80 %<br />

N-529_JS5_4_5-Mohamad Omar Khan # 1&2<br />

99.70 %<br />

P-B3-18-Reconductored to 185 sqm<br />

JS#5-NW-514<br />

99.76 %<br />

N-JS5-Milli Bus<br />

NW-514-83<br />

99.80 %<br />

N14990<br />

98.94 %<br />

N-529-79-B1<br />

P-B3-18 Change Cable to 240 sqm<br />

JS#5-N-529<br />

98.94 %<br />

N-529_JS5_B_2_5-UK emb<br />

N-529-Bland manzel Gulzad<br />

98.93 %<br />

N-529-79-B16<br />

98.93 %<br />

NW-515-63_16_7<br />

98.90 %<br />

NW-515-63_16_8<br />

98.86 %<br />

NW-515-63_16_9<br />

98.81 %<br />

NW-515-63_16_10<br />

98.80 %<br />

NW-515-Baraki Shahraara<br />

98.79 %<br />

NW-515-Borj_1_Ansary<br />

98.92 %<br />

NW-515-Kolola Poshta<br />

98.84 %<br />

NW-515-63_26<br />

98.86 %<br />

NW-515-63_25<br />

NW-515-63_28<br />

98.87 %<br />

98.84 %<br />

NW-515-63_24<br />

98.88 %<br />

NW-515-63_25_3<br />

98.86 %<br />

NW-515-Blaasam Hospital # 1&2<br />

98.86 %<br />

N-518_JS2_A_1_2-Haji Yahqoob # 1<br />

98.88 %<br />

NW-518-59.22 NW-518-Afshar NW-518-59.21 Seelo<br />

98.29 % 98.27 % 98.30 %<br />

0.48 MVA<br />

9.40 %<br />

0.48 MVA<br />

9.40 %<br />

N-529_JS5_4_5-2<br />

N-518_JS2_A_1_2-Bland manzel Omarzai<br />

98.87 %<br />

0.48 MVA<br />

9.40 %<br />

NW-518-59.19 NW-518-Academy Police<br />

98.31 % 98.31 %<br />

N-529_JS5_4_5-7<br />

98.80 %<br />

N-518_JS2_A_1_2-Bland manzel Asrar<br />

98.88 %<br />

NW-518-59.18<br />

98.32 %<br />

0.48 MVA<br />

9.40 %<br />

NW-518-59.17<br />

98.33 % NW-518-59.15<br />

98.34 %<br />

0.75 MVA<br />

14.69 %<br />

1.23 MVA<br />

24.09 %<br />

NW-518-59.13<br />

98.39 %<br />

0.86 MVA<br />

15.07 %<br />

NW-518-Lailia Polytechnic 1&2<br />

98.33 %<br />

N-529_JS5_4_5-Borj Politechnice # 1&2<br />

97.51 %<br />

0.00 MVA<br />

0.06 %<br />

N-529_JS5_4_5-34<br />

98.26 %<br />

N-529_JS5_4_5-Borj Baghe Bala # 1&2<br />

98.19 %<br />

N-529_JS5_4_5-12<br />

98.74 %<br />

N-529-79-B14<br />

98.94 %<br />

N-529_JS5_B_2_5-Noor TV station<br />

N-529_JS5_4_5-13<br />

98.71 %<br />

98.68 %<br />

N-529_JS5_B_2_5-Hesa Awal Karteparwan<br />

98.54 %<br />

N-518_JS2_B_2_5-Gulkhana Park shahrnow<br />

98.96 %<br />

JS#2-N-518<br />

99.83 %<br />

N-518_<br />

N-<br />

N-515_<br />

N-518_<br />

2.09 MVA<br />

30.24 %<br />

NW-3_5-Omer Shaheed<br />

98.77 %<br />

NW-515-Shahraara<br />

98.64 %<br />

N-529_JS5_B_2_5-Market Najeeb Zarab<br />

97.88 %<br />

N-515_JS2_D_2_7-Emergency Hos<br />

99.90 %<br />

NW-515-Moqabel Zaeeshghah<br />

98.59 %<br />

N-518_JS2_B_2_5-Konj Park shahrnow<br />

98.75 %<br />

NW-518-59.10<br />

NW-518-P.Talim wa Tarbeia 98.47 %<br />

98.47 %<br />

N-518_JS2_B_2_5-<strong>Kabul</strong> City Center # 1&2<br />

98.73 %<br />

19635126.814399999<br />

2.47 MVA<br />

35.71 %<br />

N-529_JS5_4_5-Borj Awal Karte Mamoreen<br />

97.55 %<br />

NW-518-59.3<br />

98.74 %<br />

518-W.P Khoshhal khan<br />

4 %<br />

2.47 MVA<br />

35.71 %<br />

NW-518-59.8<br />

98.55 %<br />

N-529_JS5_B_2_5-Sarak Awal Baharestan<br />

98.37 %<br />

N-529_JS5_B_2_5-Technic wa Asleha Amneiat<br />

97.79 %<br />

N-518_JS2_B_2_5-Tank Teel Shahr now<br />

99.12 %<br />

B-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


q y y<br />

N-528-A13-1 101.73 % 101.73 %<br />

101.74 %<br />

99.86 %<br />

N-528-10A10<br />

101.84 %<br />

N-528-10A13<br />

101.75 %<br />

N-516-85<br />

100.18 %<br />

N-517-85 N-512-72<br />

99.39 99.61 % %<br />

Reconductored <strong>the</strong> line between N-512-72 and<br />

N-512-80 to 120 sq. mm OH.<br />

N-516-516-B4<br />

99.70 %<br />

N-516-No-2-Qwai Hawaye<br />

99.65 %<br />

N-516-Academey Nezame<br />

99.69 %<br />

N-516-66<br />

101.29 %<br />

N-517-66<br />

100.71 %<br />

N-516-76<br />

100.84<br />

N-517-76<br />

%<br />

100.17 %<br />

N-512-chamandi<br />

99.59 %<br />

N-516-93<br />

99.76 %<br />

N-517-93<br />

98.88 %<br />

N-528-Mohamadya No-1<br />

101.04 %<br />

N-528-25-B7<br />

101.05 %<br />

N-528-21<br />

101.30 %<br />

Reconductored <strong>the</strong> line between N-512-80 and<br />

N-512-87 to 120 sq. mm OH.<br />

N-512-80<br />

98.77 %<br />

N-528-25<br />

N-528-Mohamadya 101.09 % No-2<br />

101.08 %<br />

N-528-25-B3<br />

101.08 %<br />

N-528-10-A22<br />

101.55 % N-528-10A23<br />

101.53 %<br />

N-528-Sayed Nezam # 1&2<br />

101.54 %<br />

N-528-Chamandi Hawaee<br />

101.45 %<br />

N-528-10A28<br />

101.46 %<br />

N-517-111<br />

97.70 %<br />

E-F-519 - Khowaja Rawash<br />

102.95 % E-F-519 -29.23<br />

102.95 %<br />

N-528-28<br />

100.90 %<br />

N-512-80-c1<br />

N-512-80-c6<br />

98.75 %<br />

98.75 %<br />

N-512-Blak hay Hawahy<br />

98.74 %<br />

N-516-111<br />

99.00 %<br />

N-512-87<br />

98.07 %<br />

N-516-113<br />

98.94 N-517-113 %<br />

97.63 %<br />

N-517-Do Saraka Maidan<br />

97.62 %<br />

N-517-Taleem Wa Tarbia<br />

97.60 % N-517-517-A3<br />

N-512-93<br />

97.60<br />

98.07<br />

%<br />

%<br />

N-517-Hawa Shenase<br />

97.55 %<br />

N-517-517-A10<br />

97.55 %<br />

N-517-517-A13<br />

97.53 %<br />

N-528-32<br />

100.70 %<br />

N-517-517-A16<br />

N-517-517-A17 97.52 %<br />

97.51 %<br />

N-512-Qalai Wakil<br />

97.80 %<br />

N-528-38<br />

100.40 %<br />

N-528-36<br />

100.50 %<br />

N-512-Abrasani<br />

94.77 %<br />

N-528-Char Qala Wazir Abad # 21<br />

100.39 % N-528-37<br />

100.45 %<br />

N-528-42<br />

100.31 %<br />

N-528-37-c1<br />

100.42 %<br />

N-517-T/SMarkazi N-516-T/SMarkazi Bolak Hawaye # 21<br />

98.11 98.10 %<br />

N-517-517-A24<br />

97.47 %<br />

E-F-519 -50<br />

102.65 %<br />

N-528-37-c4<br />

100.36 %<br />

N-516-133-d1<br />

98.12 %<br />

N-517-517-A27<br />

N-517-Qala N-517-517-A28<br />

wakeel Jadeed 97.46 %<br />

97.45 % 97.45 %<br />

E-F-519 -Qala-e Mir Abass Tr 1&2<br />

102.63 %<br />

E-F-519 -43<br />

102.68 %<br />

N-516-T/s Riasat Amniat <strong>Kabul</strong><br />

98.12 %<br />

E-F-519 -35<br />

102.81 %<br />

N-528-Now Abad Qala Mosa<br />

100.26 %<br />

N-512-102-F7<br />

94.84 %<br />

N-516-133<br />

98.20<br />

N-517-133<br />

%<br />

96.62 %<br />

N-512-102-F8<br />

94.83 %<br />

o-2<br />

N-512-qalai Khater N-512-102-F10<br />

94.81 % 94.81 %<br />

N-512-102-F2<br />

94.88 %<br />

E-F-519 -35.6<br />

102.79 %<br />

E-F-519 -29<br />

103.03 %<br />

N-528-37-c15<br />

100.22 %<br />

N-512-102-F17<br />

94.80 %<br />

N-512-102<br />

94.90 %<br />

N-512-Qalai khowaja<br />

94.92 %<br />

E-F-519 -Zan Abad<br />

102.79 %<br />

N-512-99<br />

94.95 %<br />

N-528-37-C17<br />

100.19 %<br />

N-512-106<br />

N-512-107<br />

94.90 %<br />

94.90 %<br />

N-512-98<br />

N-516-141<br />

94.96 %<br />

97.96 N-517-141 %<br />

96.22 %<br />

N-517-No-23 Macroryan<br />

95.15 %<br />

N-512-108<br />

96.83 %<br />

E-541-70<br />

99.70 %<br />

N-528-No-3 Qala Mosa<br />

100.15 %<br />

N-528-37-C19<br />

100.16 %<br />

P-B4-15 New OH section 185 sqm<br />

P-B4-17 New OH section 185 sqm<br />

N-516-147<br />

97.78 %<br />

N-517-147<br />

95.91 %<br />

E-F-519 -43.15<br />

102.54 %<br />

E-F-519 -Yaka Toot Tr.1&2<br />

102.54 %<br />

E-F-519 -23<br />

103.17 %<br />

N-512-94<br />

94.96 %<br />

N-517-No-24 Macroryan<br />

95.20 %<br />

N-518_JS2_A_1_2-Qalai Fatullah # 1<br />

99.28 %<br />

N-512-121<br />

95.55 %<br />

N-512-Nowabad BiBi Mahro<br />

96.82 %<br />

N-512-Bibi Mahro Muqabel<br />

97.21 %<br />

N-517-No-19 Macroryan<br />

95.00 %<br />

N-517-No-20 Macroryan<br />

95.05 %<br />

N-517-No-22 Macroryan<br />

95.16 %<br />

N-517-No-21 Macroryan # 1&2<br />

95.16 %<br />

N-516-159<br />

N-517-159<br />

97.46 %<br />

95.26 %<br />

y Shaheed<br />

N-512-129<br />

95.11 %<br />

N-512-Nursing<br />

95.12 N-512-128 %<br />

95.13 %<br />

N-512-125-H1<br />

95.25 %<br />

N-512-125<br />

95.25 %<br />

N-512-400 Bester 21<br />

95.01 %<br />

N-517-No-18 Macroryan<br />

94.97 %<br />

N-516-155<br />

N-517-155 97.56 %<br />

95.55 %<br />

N-517-Bukhar khana Macroryan # 1&2<br />

95.20 %<br />

JS#12-N-517<br />

95.21 %<br />

P-ST-B4-1 New 1200 kVr Switched<br />

Capacitor<br />

E-541-94<br />

97.63 %<br />

E-541-Septic Macrorayan<br />

97.61 %<br />

E-541-Nasaji Amu<br />

97.78 %<br />

E-541-94-3-3<br />

E-541-Qalai 97.55 % Wazir<br />

97.55 %<br />

E-F-519 -Qabil BY<br />

103.14 %<br />

N-512-Wazir akbar khan hospital<br />

95.20 %<br />

N-517-No-17 Macroryan<br />

94.95 %<br />

N-517-No-16 Macroryan # 21<br />

94.94 %<br />

E-541-Mawj Mutawaset<br />

96.91 %<br />

E-541-94-3<br />

97.60 %<br />

E-541-106<br />

96.92 %<br />

N-512-Sehat Tefl<br />

94.81 %<br />

N-512-T#3 Wazir akbar khan<br />

94.72 %<br />

E-541-T.T.C<br />

96.64 %<br />

N-516-No-11 Macroryan<br />

96.51 %<br />

P-ST-B4-2 New 900 kVr Switched<br />

Capacitor<br />

E-541-Banaey<br />

96.56 %<br />

E-541-111<br />

96.65 %<br />

N-516-Stera Mahkama<br />

P-ST-B4-2 New 900 kVr Switched<br />

Capacitor<br />

E-541-113<br />

96.56 %<br />

N-518_JS2_A_1_2-Naqlia Sheerpoor<br />

99.68 %<br />

N-512-T#2 Wazir akbar khan<br />

94.75 %<br />

N-512-Ministry <strong>of</strong> health<br />

94.79 %<br />

96.51 % N-516-Macroryan Communication<br />

96.43 %<br />

N-516-No-9Macroryan<br />

96.43 %<br />

P-ST-B4-2 New 900 kVr Switched<br />

Capacitor<br />

N-516-15 Macroryan # 1&2<br />

96.66 %<br />

E-541-119<br />

96.49 %<br />

E-541-115<br />

96.53 %<br />

E-541-113-1<br />

96.52 %<br />

E-541-Mawad -e- Mukhadera<br />

96.52 %<br />

N-512-T#1 Wazir akbar khan_LV<br />

96.58 %<br />

N-516-No-10 Macroryan<br />

96.52 %<br />

N-516-No-14 Macroryan<br />

96.60 %<br />

E-541-119-1<br />

N-516-516-18<br />

E-541-Char 96.49 Burja %<br />

96.70 %<br />

96.49 %<br />

E-541-Septic Qalai zamankhan<br />

97.50 %<br />

N-512-T#1 Wazir akbar khan<br />

94.61 %<br />

N-516-No-13 Macroryan<br />

96.59 %<br />

E-541-120<br />

96.44 %<br />

NW-525<br />

N-518_JS2_A_1_2<br />

N-516-No-12Macroryan<br />

96.40 %<br />

N-516-No-8 Macroryan<br />

96.50 %<br />

N-518<br />

N-515<br />

518_JS2_B_2_5<br />

N-512<br />

JS#2-N-515<br />

99.90 %<br />

N-516-12_1<br />

96.28 %<br />

N-518_JS2_517<br />

515_JS2_D_2_7<br />

518_JS2_B_1_2<br />

N-515_JS2_D_2_7<br />

N-518_JS2_E_1_2<br />

N-515_JS2_531<br />

N-516-Matbea # 1&2<br />

96.39 %<br />

E-541-128<br />

96.37 %<br />

Hospital<br />

E-541-129<br />

96.37 %<br />

N-518_JS2_517-<strong>Afghan</strong>istan Natil TV_Tr 1&2<br />

99.18 %<br />

N-518_JS2_517-R <strong>Afghan</strong>istan Tr 1&2<br />

99.19 %<br />

E-541-113-13-2<br />

96.19 %<br />

N-518_JS2_517-Sefarat Turkia<br />

99.57 %<br />

N-518_JS2_517-Sefarat Alman<br />

99.58 %<br />

N-518_JS2_517-Moqabel Sefarat Alm<br />

99.58 %<br />

N-518_JS2_517-Hawa Nawardee<br />

99.21 %<br />

N-516-Garnizion<br />

96.38 %<br />

N-516-Emalat khana Ordo<br />

96.38 %<br />

N-516-12_8<br />

96.20 %<br />

E-541-Maslakh Tr 1&2<br />

98.79 %<br />

E-541-132<br />

99.48 %<br />

E-541-113-13<br />

96.16 %<br />

E-541-No.55 Qalai Zamnkhan Tr 1&2<br />

96.12 %<br />

N-518_JS2_517-Kenare Lessee Am<br />

99.40 %<br />

N-518_JS2_517-<strong>Afghan</strong> Film<br />

99.37 %<br />

N-516-Ryasat Amneyat # 16<br />

96.19 %<br />

E-541-145-9<br />

98.80 %<br />

E-541-Riasat Amneiat<br />

E-541-145-8<br />

98.82 %<br />

E-541-135<br />

99.41 %<br />

E-541-Wezarat Fawaed Ama<br />

P-C4-8 Reconductor to 120 sqm<br />

E-541-113-14<br />

B-4<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-521-48<br />

102.53 %<br />

E-511-Tr. Gas maye Anardara<br />

102.26 %<br />

E-511-58.7<br />

102.26 %<br />

E-511-Tr -Alokozai kefayat<br />

102.41 %<br />

E-511-Tr,sherkat Paiman<br />

102.43 %<br />

E-521-38<br />

102.59 %<br />

E-521-Qasemi Felez<br />

102.59 %<br />

E-511-28.9<br />

102.42 %<br />

E-511-28.8<br />

102.43 %<br />

E-511-28<br />

102.46 %<br />

E-521-37<br />

102.64 %<br />

E-521-Rahim Suhak<br />

102.64 %<br />

E-521-28_7<br />

102.65 %<br />

E-521-Tawfiq<br />

102.66 % E-521- Zaher Plastic<br />

102.66 %<br />

E-521-TGM Transformer<br />

103.48 %<br />

E-521-28_2<br />

102.66 %<br />

E-521-28<br />

102.67 %<br />

E-521-Kaka Khil Traso<br />

102.64 %<br />

E-521-15_8<br />

103.49 %<br />

E-521-15_8_5<br />

103.48 %<br />

E-521-<strong>Afghan</strong> Aard factory<br />

103.47 %<br />

E-511-20<br />

102.55 %<br />

E-511-19<br />

102.57 %<br />

E-F-519 -Spengahr Oil Fectory Tr 1&2<br />

100.59 %<br />

E-F-519 -78_A2<br />

100.63 %<br />

E-521-Bahir Printing Press<br />

102.75 %<br />

E-521-25_3<br />

102.75 %<br />

E-521-25<br />

102.75 %<br />

E-521-Tr_4_Park ha<br />

102.75 %<br />

E-521-15_7<br />

103.53 %<br />

E-511-16<br />

102.61 %<br />

E-511-16-35<br />

101.82 %<br />

P-B5-5-New Overhead section 185 sqm<br />

E-F-519 - Refa Constraction Company<br />

101.09 %<br />

E-F-519 -78_A3<br />

100.60 %<br />

E-F-519 -78_A<br />

100.67 %<br />

E-521-No_1_Park ha<br />

101.91 %<br />

E-521-19_23_5<br />

101.92 %<br />

E-521-Maihan Dost Factory<br />

101.93 %<br />

E-511-2<br />

102.87 %<br />

E-521-Ameriat Park ha<br />

101.94 %<br />

E-F-519 -Maweneat Takhink<br />

102.38 %<br />

E-521-19_29<br />

101.94 %<br />

E-521-Logistic Mahajereen<br />

101.94 %<br />

E-521-Park ha<br />

101.97 %<br />

E-521-19_22<br />

E-521-19_23_1<br />

102.00 %<br />

101.97 %<br />

E-521-19_21<br />

102.02 %<br />

E-521-19_23<br />

E-521-19_27<br />

101.98 %<br />

101.96 %<br />

E-521-Sangi Jeke<br />

102.02 %<br />

E-521-19_28<br />

101.95 %<br />

E-521-Police Markazee<br />

101.95 %<br />

E-521-19_14<br />

102.22 %<br />

E-521-19_13<br />

102.25 %<br />

E-521-Marmar Khalid<br />

102.77 %<br />

E-521-19_9<br />

102.77 %<br />

E-521-19_6<br />

102.80 %<br />

E-521-19<br />

102.93 %<br />

E-521-19_7<br />

102.80 %<br />

E-521-Aard <strong>Kabul</strong><br />

102.79 %<br />

E-521-15<br />

103.58 %<br />

E-521-8<br />

103.86 %<br />

E-F-519 -21-5<br />

104.15 %<br />

E-521-5<br />

104.15 %<br />

E-F-519 -21-7<br />

104.12 %<br />

E-F-519 -HodKhel No-2<br />

104.12 %<br />

E-F-519 -<strong>Afghan</strong>i constraction Company<br />

103.57 %<br />

E-F-519 - <strong>Kabul</strong> Nan Pazi<br />

103.23 %<br />

E-F-519 - Workshop Urdo<br />

102.41 %<br />

E-F-519 -63_8B<br />

102.41 %<br />

E-F-519 -63_12B<br />

102.39 %<br />

E-F-519 -Poste Roda Factory<br />

100.23 %<br />

E-F-519 -63_9B<br />

102.41 %<br />

E-F-519 -63_7B<br />

102.42 %<br />

E-F-519 -Bamezai<br />

102.41 %<br />

E-F-519 -78<br />

100.25 %<br />

E-F-521-Keshmeshpaki Babak<br />

100.04 %<br />

E-F-519 -85<br />

99.95 %<br />

E-F-519 -57 Talime<br />

99.67 %<br />

E-F-519 -88<br />

99.82 %<br />

E-F-519 -89<br />

99.81 %<br />

E-F-519 - Family Akadmi Takhn<br />

99.42 %<br />

E-F-51<br />

99.42<br />

E-521-Tawlid Aard Janat<br />

102.48 %<br />

E-541-Fabrike Meno<br />

102.35 %<br />

E-513-19<br />

104.37 %<br />

E-F-519 -<strong>Afghan</strong> Fruit Fectory<br />

103.23 %<br />

E-F-519 -Nebraska Priting Press<br />

102.43 %<br />

E-F-519 -Pashmina Bafi Fectory<br />

102.60 %<br />

E-F-519 -60_3<br />

102.60 %<br />

E-F-519 -<strong>Kabul</strong> plastic<br />

99.95 %<br />

E-F-519 -Sange Marmar<br />

99.82 %<br />

E-541-69<br />

102.36 %<br />

E-F-519 -11<br />

104.50 %<br />

E-F-519 -10-2<br />

104.31 %<br />

E-F-519 -10<br />

104.54 %<br />

P-B5-15: Add switches<br />

E-521-2<br />

104.36 %<br />

P-B5-15: New 95 sqm cable section<br />

E-513-10<br />

104.68 %<br />

E-513-16<br />

E-513-17<br />

104.52 %<br />

104.46 %<br />

E-541-20 E-521<br />

103.80 % 104.52 E-541-19 %<br />

103.86 % E-541-16<br />

E-F-519 -20<br />

E-541-37<br />

104.10 %<br />

104.21 %<br />

103.74 %<br />

E-F-519 -21<br />

104.18 %<br />

E-541-13<br />

104.22 %<br />

E-541-12<br />

104.34 %<br />

E-F-519 -35_1<br />

103.60 %<br />

P-B5-14: Added switch<br />

E-F-519 -42<br />

E-F-519-35a<br />

103.29 %<br />

103.60 %<br />

E-F-519 -44<br />

E-F-519 -39<br />

103.27 %<br />

E-F-519 -kabul Hend<br />

103.32 %<br />

E-511<br />

103.29 %<br />

103.34 %<br />

E-F-519 - oxygen Product<br />

103.32 %<br />

P-B5-16: New cable 95 sq. mm<br />

E-F-519 -Fanta Fectory<br />

103.25 %<br />

P-B5-14: new 185 sq. mm OH<br />

E-F-519 -48.1<br />

103.24 %<br />

E-F-519 -48<br />

103.24 %<br />

E-F-519 -51<br />

103.24 %<br />

E-F-519 -60<br />

102.61 %<br />

E-F-519 -63_5B_1<br />

102.44 %<br />

E-F-519 -63<br />

102.48 %<br />

E-F-519 -Paktia Kot No,1<br />

102.47 %<br />

E-F-519 -63_2B<br />

102.46 %<br />

E-F-519 -63_13<br />

102.45 %<br />

E-F-519 -63_1<br />

102.47 %<br />

E-F-519 - Gas Mahi-e Farahi<br />

102.46 %<br />

E-F-519 -72<br />

102.47 %<br />

E-F-519 - Paktia Kot No,2<br />

102.38 %<br />

E-F-519 -74<br />

102.46 %<br />

E-F-519 - Paktia Kot No,3<br />

102.35 %<br />

E-513-9<br />

104.79 %<br />

E-541-8<br />

104.50 %<br />

E-541-7<br />

104.62 %<br />

E-513-2<br />

104.92 %<br />

E-F-519 -6<br />

104.85 %<br />

E-F-519 -3<br />

104.95 %<br />

E-519<br />

104.97 %<br />

S/S East<br />

105.00 %<br />

E-513<br />

104.97 %<br />

E-541<br />

104.88 %<br />

E-541-Hodkhel-1<br />

104.88 %<br />

E-531<br />

104.94 %<br />

E-515<br />

104.99 %<br />

E-523<br />

104.96 %<br />

E-515-3<br />

104.98 %<br />

E-523-3<br />

104.95 %<br />

E-523-4<br />

104.95 %<br />

E-515-4<br />

104.97 %<br />

E-523-5<br />

104.93 %<br />

E-523-7<br />

104.90 %<br />

E-536<br />

105.00 %<br />

E-531-5<br />

104.69 %<br />

E-531-6<br />

104.68 %<br />

E-536-11<br />

105.00 %<br />

E-523-19<br />

104.76 %<br />

B-5<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-F-519 - Lakan Khial<br />

97.64 %<br />

i Takhnic<br />

E-F-519 -105<br />

99.36 %<br />

E-F-519 -166<br />

97.53 %<br />

E-F-519 -167<br />

97.52 %<br />

E-F-519 -103<br />

99.42 %<br />

E-F-519 -147<br />

97.94 %<br />

E-F-519 -146<br />

97.97 %<br />

E-F-519 -178<br />

97.25 %<br />

E-F-519 -172<br />

97.39 %<br />

E-F-519 - Pul-e Charkhi Tr 1&2<br />

97.22 %<br />

E-F-519 -129<br />

98.49 %<br />

E-F-519 -173<br />

97.36 %<br />

E-F-519 -178.3<br />

97.22 %<br />

E-F-519 -Qala-e Gulbaz Tr.1&2<br />

98.49 %<br />

E-F-519 -141<br />

98.12 %<br />

E-F-519 -140<br />

98.18 %<br />

E-F-519 -178.5<br />

97.21 %<br />

E-F-519 -178.11<br />

97.16 %<br />

E-F-519 -Qali Jabar Khan<br />

97.12 %<br />

B-6<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-F-519 - Qaria-e Mulah Mohammad Sahib<br />

96.65 %<br />

B-7<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.46 MVA<br />

9.04 %<br />

W-513-107-64<br />

.90 %<br />

0.46 MVA<br />

72.51 %<br />

0.46 MVA<br />

9.17 %<br />

NW-513-Hawahe Khoja jam Wali<br />

95.89 %<br />

0.46 MVA<br />

9.17 %<br />

95.33 %<br />

NW-513-5-G-OH<br />

95.32 %<br />

0.29 MVA<br />

72.58 %<br />

95.75 %<br />

NW-513-B. h-e-Cha Qumber 1&2<br />

95.94 %<br />

0.58 MVA<br />

72.56 %<br />

0.58 MVA<br />

72.56 %<br />

0.46 MVA<br />

9.03 %<br />

4 MVA<br />

48 %<br />

NW-513-74-1<br />

97.71 %<br />

79.40 %<br />

10.00 MVA<br />

79.40 %<br />

0.48 MVA<br />

9.33 %<br />

79.97 %<br />

10.03 M<br />

79.40 %<br />

0.96 MVA<br />

13.82 %<br />

NW-518-Markaz-e-talimi<br />

NW-513-64<br />

98.89 %<br />

98.95 % 98.60 %<br />

NW-518-61<br />

98.98 %<br />

NW-518-65<br />

NW-518-70<br />

98.83 %<br />

6.06 MVA<br />

48.09 %<br />

NW-518-66<br />

99.01 %<br />

36.58 %<br />

NW-518-57<br />

99.00 NW-517-56<br />

%<br />

101.05 %<br />

NW 517 59<br />

100.85 %<br />

98.74 %<br />

NW-513-107-58<br />

95.97 %<br />

0.00 MW<br />

0.83 MVAr<br />

NW-513-H Taqwiaty Qalai kashef<br />

NW-513-107-48-5<br />

96.04 %<br />

96.04 %<br />

0.29 MVA<br />

72.56 %<br />

0.46 MVA<br />

9.23 %<br />

NW-513-79-10<br />

97.24 %<br />

1.04 MVA<br />

20.48 %<br />

NW-5_6-No-6 Khoshalkhan<br />

99.17 %<br />

NW-5_6-15<br />

99.17 %<br />

0.46 MVA<br />

9.17 %<br />

0.90 MVA<br />

18.00 %<br />

NW-513-107-48-1<br />

96.06 %<br />

0.29 MVA<br />

5.81 %<br />

0.29 MVA<br />

5.81 %<br />

NW-513-107-48<br />

96.06 %<br />

1.09 MVA<br />

21.90 %<br />

NW-513-107-37-5<br />

96.18 %<br />

NW-513-Qalai NW-513-107-37-7 Kashef<br />

96.16 96.16 % %<br />

0.58 MVA<br />

11.61 %<br />

0.58 MVA<br />

11.62 %<br />

0.58 MVA<br />

72.55 %<br />

NW-513-107-12<br />

95.27 %<br />

0.46 MVA<br />

9.23 %<br />

NW-513-107-12-3<br />

95.25 %<br />

NW-513-107-12-4<br />

95.25 NW-513-5-G-Indoor<br />

%<br />

95.24 %<br />

Opened SW .<br />

0.46 MVA<br />

72.54 %<br />

NW-513-79-11<br />

97.23 %<br />

NW-513-Qalai Nazer<br />

97.21 %<br />

0.46 MVA<br />

72.47 %<br />

0.46 MVA<br />

9.04 %<br />

NW-513-79-7<br />

97.27 %<br />

NW-513-Qalai Wazir Khoshhalkhan<br />

97.56 %<br />

0.00 MVA<br />

0.00 %<br />

NW-513-74-10NW-513-74-11<br />

97.56 % 97.54 %<br />

1.04 MVA<br />

20.48 %<br />

1.04 MVA<br />

20.48 %<br />

NW-513-No-8 Khoshalkhan<br />

97.39 % NW-513-74-20<br />

97.39 %<br />

NW-513-74-19<br />

97.40 %<br />

0.58 MVA<br />

11.46 %<br />

0.46 MVA<br />

72.46 %<br />

0.58 MVA<br />

72.51 %<br />

6.05 MVA<br />

48.09 %<br />

NW-5_6-67<br />

99.21 NW-517-67 %<br />

100.39 %<br />

NW-513-A Godam hay Kampani<br />

95.89 %<br />

0.46 MVA<br />

72.51 %<br />

NW-513-107-44<br />

96.13 %<br />

NW-513-107-43<br />

96.14 %<br />

1.09 MVA<br />

21.90 %<br />

1.10 MVA<br />

21.90 %<br />

NW-513-107-37-A1<br />

96.22 %<br />

NW-513-107-37<br />

96.23 %<br />

0.46 MVA<br />

9.14 %<br />

0.00 MW<br />

0.83 MVAr<br />

P-ST-C3-3 New 900 kVr Switched<br />

Capacitor<br />

2.07 MVA<br />

41.35 %<br />

NW-513-107-34<br />

96.35 %<br />

0.00 MVA<br />

0.00 %<br />

0.12 MVA<br />

2.33 %<br />

2.16 MVA<br />

43.03 %<br />

0.46 MVA<br />

9.14 %<br />

NW-513-107-37-A4<br />

96.19 %<br />

NW-513-Sare kariz Kampani Hawahe<br />

96.18 %<br />

0.46 MVA<br />

9.14 %<br />

0.46 MVA<br />

72.50 %<br />

NW-513-Market Haji Sher<br />

96.34 %<br />

0.12 MVA<br />

72.81 %<br />

NW-513-107-27<br />

96.57 %<br />

NW-513-107-27-3<br />

NW-513-No-1 Abrasani 96.53 % Fazel beek<br />

96.53 %<br />

1.03 MVA<br />

20.45 %<br />

0.29 MVA<br />

72.54 %<br />

3.19 MVA<br />

63.45 %<br />

NW-513-107-20<br />

96.88 %<br />

3.19 MVA<br />

63.45 %<br />

NW-513-107-20-3<br />

96.98 %<br />

3.20 MVA<br />

63.45 %<br />

C3-P3: Added 70 sq. mm. Overhead<br />

NW-518-82<br />

98.21 %<br />

NW-4_7-4.11<br />

99.13 %<br />

6.01 MVA<br />

48.09 %<br />

NW-4_7-No-7 Khushhal Khan<br />

99.13 %<br />

NW-5<br />

97.58<br />

P-C3<br />

XLP<br />

NW-513-107-20-6<br />

97.13 %<br />

NW-4_7-Niazbeek<br />

98.07 %<br />

NW-4_7-39<br />

98.07 %<br />

NW-4_7-4.10<br />

99.15 %<br />

0.85 MVA<br />

16.95 %<br />

3.20 MVA<br />

63.45 %<br />

P-ST-C3-1 New 900 kVr Switched<br />

Capacitor<br />

NW-513-107-20-11<br />

97.36 %<br />

0.46 MVA<br />

9.02 %<br />

-0.00 MW<br />

0.85 MVAr<br />

NW-4_7-22<br />

98.74 %<br />

NW-4_7-18<br />

98.98 %<br />

NW-4_7-No-4 Khushhal Kh<br />

99.27 %<br />

NW-513-107-27-8<br />

96.49 %<br />

NW-513-Fazel beek<br />

97.35 %<br />

0.46 MVA<br />

72.46 %<br />

NW-4_7<br />

99.25 %<br />

0.85 MVA<br />

16.95 %<br />

NW-4_7-12<br />

99.23 %<br />

NW-513-107-27-11<br />

96.46 %<br />

NW-4_7-12-4<br />

99.21 %<br />

0.85 MVA<br />

16.95 %<br />

NW-513-107-27-15<br />

96.44 %<br />

NW-4_7-12-7<br />

99.19 %<br />

0.85 MVA<br />

16.95 %<br />

NW-4_7-12-8<br />

99.18 %<br />

NW-4_7-12-9<br />

99.17 %<br />

NW-513-107-27-19<br />

96.40 % NW-513-No-2 Abrasani<br />

96.39 %<br />

0.85 MVA<br />

16.95 %<br />

0.29 MVA<br />

72.55 %<br />

NW-4_7-<br />

99.14 %<br />

NW-4_7-12-14<br />

99.15 %<br />

0.75 MVA<br />

14.96 %<br />

NW-513-No-4 Abrasani<br />

96.41 %<br />

0.12 MVA<br />

72.81 %<br />

NW-513-No-3 Abrasani<br />

96.38 %<br />

NW-513-107-27-26<br />

96.38 %<br />

0.29 MVA<br />

72.55 %<br />

0.76 MVA<br />

15.09 %<br />

0.12 MVA<br />

2.32 %<br />

NW-513-No-5 Abrasani<br />

96.43 %<br />

0.12 MVA<br />

72.81 %<br />

0.12 MVA<br />

2.32 %<br />

0.76 MVA<br />

15.08 %<br />

NW-513-107-27-33<br />

96.41 %<br />

NW-513-107-27-30<br />

96.40 %<br />

0.76 MVA<br />

15.08 %<br />

NW-513-107-27-44<br />

96.43 %<br />

0.12 MVA<br />

2.32 %<br />

NW-513-107-27-39<br />

96.44 %<br />

0.00 MW<br />

0.84 MVAr<br />

P-ST-C3-2 New 900 kVr Switched<br />

Capacitor<br />

NW-Dashte e Barchee-A<br />

100.47 %<br />

NW<br />

100<br />

NW-Dashte e Ba<br />

100.44 %<br />

NW-4_6-Monary Gulkhana<br />

94.53 %<br />

NW-4_6-27_6_6<br />

94.54 %<br />

0.45 MVA<br />

9.19 %<br />

C-2<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.24 MVA<br />

3.66 %<br />

74 %<br />

N-529_JS5_B_2_5-Borj Zamini Market Kona<br />

97.89 %<br />

N-529_JS5_B_2_5-Malalay Hospital<br />

97.79 %<br />

N-529_JS5_B_2_5-Zamini Qowae Markaz<br />

97.80 %<br />

N-518_JS2_A_1_2-Wezarat Dakhela<br />

98.63 %<br />

N-518_JS2_B_2_5-Sefar<br />

99.34 %<br />

NW-5_6-No-5 Khoshalkhan<br />

99.23 %<br />

NW-5_6-10<br />

99.23 %<br />

N-529_JS5_4_5-Borj Dwom Karte Mamoreen<br />

97.54 %<br />

NW-3_5-Foundation-e-Zamini Damane Koh<br />

NW-3_5-Hawahy 98.63 % Damane Koh<br />

98.62 %<br />

N-529_JS5_B_2_5-Amneiat Hospital<br />

97.85 %<br />

N-518_JS2_A_1_2-Mokhaberat Shahre now<br />

98.63 %<br />

N-518_JS2_B_2_5-Markaz Lesan(American Center)<br />

99.35 %<br />

N-518_JS2_B_2_5-Moqabel Markaz Lesan<br />

99.34 %<br />

N-518_JS2_E_1_2-Borj_2_Sedarat<br />

97.20 %<br />

NW-518-104.16<br />

96.92 %<br />

NW-518-No-2 Khoshhalkhan 1&2<br />

96.92 %<br />

NW-518-104.10<br />

96.93 %<br />

N-529_JS5_B_2_5-No_1_Zamini N-529_JS5_B_2_5-1<br />

Karte Ariana<br />

97.77 %<br />

97.77 %<br />

N-518_JS2_A_1_2-Moqabel Wezarat Dakhela<br />

98.65 %<br />

N-529_JS5_B_2_5-6<br />

97.75 % N-529_JS5_B_2_5-5<br />

97.76 %<br />

N-518_JS2_E_1_2-Jamhoriat Hospital<br />

97.10 %<br />

NW-517-75<br />

99.87 %<br />

NW-517-74<br />

99.91 %<br />

NW-5_6-74<br />

99.30 %<br />

NW-5_6-2<br />

99.29 %<br />

0.48 MVA<br />

9.53 %<br />

N-529_JS5_B_2_5-No_2_ Karte Ariana<br />

N-529_JS5_B_2_5-7<br />

97.74 %<br />

97.75 %<br />

BK-JS-1-A-1,2-5<br />

101.65 %<br />

N-518_JS2_E_1_2-Borj_1_Sedarat<br />

97.17 %<br />

NW-518-104.6<br />

96.97 %<br />

BK-JS-1-A-1,2-1<br />

101.67 %<br />

BK-JS-1-A-1,2-Qolabchakkan 1<br />

101.68 %<br />

BK-JS-1-A-1,2-Welaayat<br />

101.90 %<br />

NW-518-94<br />

97.58 %<br />

5.97 MVA<br />

48.09 %<br />

NW-518-95<br />

97.53 %<br />

NW-5_6-80<br />

99.40 %<br />

NW-518-No-3 Dakhel J No-8<br />

99.44 %<br />

P-C3-6- change cable to 240 sqmm<br />

XLPE<br />

5.97 MVA<br />

48.09 %<br />

NW-4_7-1<br />

99.40 %<br />

JS#8-NW-517<br />

NW-517-80<br />

99.44 %<br />

99.55 %<br />

5.96 MVA<br />

48.09 %<br />

NW-518-100<br />

97.22 % NW-518-101<br />

97.19 %<br />

5.95 MVA<br />

48.09 %<br />

NW-518-104<br />

97.03 %<br />

5.46 MVA<br />

44.20 %<br />

0.48 MVA<br />

9.53 %<br />

NW-F-Bus hai barqi-Bus Hai Barqi<br />

99.41 %<br />

NW-518-108<br />

96.87 %<br />

N-529_JS5_4_5-Borj Siloy Markaz<br />

97.47 %<br />

BK-Ataturk-26<br />

100.20 %<br />

BK-Ataturk-32<br />

100.11 %<br />

BK-Ataturk-34<br />

100.10 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Aqab Wez.Zeraat<br />

101.28 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-26<br />

101.31 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-24<br />

101.32 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Kenar Maktab-19<br />

101.32 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-22<br />

101.35 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Zeiarat Sakhi<br />

101.43 %<br />

BK-JS-1-A-1,2-Qolabchakkan 2<br />

101.62 %<br />

BK-JS-1-A-1,2-15<br />

101.59 %<br />

N-518_JS2_E_1_2-Wezarat Eqtesad<br />

97.32 %<br />

P-C3-2-Re arrange connections as<br />

shown<br />

Khetabkana_SW<br />

102.10 %<br />

BK-JS-1-A-1,2-Mashal Market<br />

102.13 %<br />

BK-J<br />

102.1<br />

BK-Ataturk-Ataturk hospital<br />

100.09 %<br />

NW-4_7-4<br />

99.32 %<br />

BK-Ataturk-32.2<br />

100.08 %<br />

BK-Ataturk-32.3<br />

100.06 %<br />

BK-Ataturk-36<br />

100.09 %<br />

BK-JS-1-A-1,2-Mohammad Jan Khan<br />

102.14 %<br />

NW-4_7-6.2<br />

C3-P1a: Reconductored to to 185 sqm<br />

99.28 %<br />

NW-4_7-6<br />

hhal Khan<br />

99.29 %<br />

C3-P5- reconductored to 185 sqmm OH<br />

NW-4_7-11<br />

9.25 %<br />

2<br />

NW-4_7-12-A3<br />

99.22 %<br />

NW-4_7-Water Pump hae-e-Politekhnik<br />

99.22 %<br />

NW-518-No-1 Khoshalkhan<br />

96.62 %<br />

NW-518-116<br />

96.62 %<br />

NW-518-Hotal <strong>Kabul</strong> Ariana<br />

96.60 %<br />

NW-518-115<br />

96.63 %<br />

0.48 MVA<br />

0.53 MVA<br />

4.30 %<br />

0.15 MVA<br />

3.00 %<br />

44.20 %<br />

NW-518-Belal<br />

NW-518-116.2<br />

Market<br />

96.62<br />

96.62<br />

%<br />

%<br />

7.63 % 5.45 MVA<br />

4.43 MVA<br />

39.65 %<br />

NW-518-121<br />

96.41 %<br />

NW-518-118<br />

96.57 %<br />

4.43 MVA<br />

36.02 %<br />

4.42 MVA<br />

36.02 %<br />

BK-Denow-Denow1<br />

100.64 %<br />

NW-518-124<br />

96.32 %<br />

4.42 MVA<br />

36.02 %<br />

BK-Denow-Tangkash<br />

100.59 %<br />

NW-518-129<br />

96.15 %<br />

4.41 MVA<br />

36.02 %<br />

BK-Ataturk-15<br />

100.38 %<br />

NW-Pohantoon-Lailia Pesaran 1&2<br />

100.04 %<br />

NW-518-134<br />

95.99 %<br />

BK-Jamal maina-Red Cross Hospital<br />

100.87 %<br />

NW-Pohantoon-Jamnaziom Pohantoon<br />

100.15 %<br />

1.51 MVA<br />

23.24 %<br />

BK-Ataturk-Emergency Medical Hospital<br />

100.03 %<br />

NW-Pohantoon-Aditoriam Pohantoon<br />

100.28 %<br />

BK-Ataturk-Tifl-e-Mo<strong>the</strong>r Hospital<br />

100.06 %<br />

BK-Ataturk-Family Hospital Transformer Station<br />

100.03 %<br />

1.99 MVA<br />

30.54 %<br />

NW-Pohantoon-Ketabkhana Pohantoon<br />

100.33 %<br />

0.24 MVA<br />

3.65 %<br />

NW-Pohantoon-Pohanzai Aqtesad<br />

100.30 %<br />

0.48 MVA<br />

7.31 %<br />

BK-Ataturk-Ministry Agricultural<br />

100.09 %<br />

2.70 MVA<br />

41.47 %<br />

3.00 MVA<br />

46.05 %<br />

NW-Pohantoon-Pohanzai Zerahat<br />

100.46 %<br />

BK-Jamal mina-Karte 5<br />

100.92 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-15<br />

101.46 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-7<br />

101.57 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-5<br />

101.59 %<br />

BK-JS-1-A-1,2-Mukhaberat Amniat<br />

101.54 %<br />

BK-JS-1-A-1,2-21<br />

101.54 %<br />

BK-JS-1-A-1,2-22<br />

101.54 %<br />

BK-JS-1-A-1,2-21_4<br />

101.53 %<br />

BK-JS-1-A-1,2-21_9<br />

101.51 %<br />

BK-JS-1-A-1,2-National Television<br />

101.50 %<br />

BK-JS-1-A-1,2-BBC<br />

101.50 %<br />

BK-JS-1-A-1,2-Shaadoshamshera<br />

102.55 %<br />

N-518_JS2_E_1_2-Wezar<br />

97.38 %<br />

N-518_JS2_B_1_2-Wezarat Etlaat wa Calt<br />

99.28 %<br />

N-518_JS2_B_1_2-Pashtan<br />

99.29 % N-518_JS2_B_<br />

99.29 %<br />

0.76 MVA<br />

8.08 %<br />

BK-Denow-Children s garden<br />

100.69 %<br />

4.40 MVA<br />

36.02 %<br />

NW-Pohantoon-Pohanzai Kemia<br />

100.13 %<br />

NW-Pohantoon-Pohanzai Engineery 1&2<br />

100.69 %<br />

NW-Pohantoon-Takhnic Sanawee No-1<br />

100.85 %<br />

3.48 MVA<br />

53.25 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-1<br />

101.66 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Tape Salam<br />

101.67 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Kolali Jadid<br />

101.63 %<br />

BK-JS-1-A-1,2-Mechanical High School<br />

102.54 %<br />

0.00 MVA<br />

0.04 %<br />

JS#4-NW-518<br />

95.70 %<br />

NW-Pohantoon-Lailia Dokhtaran 1&2<br />

100.01 %<br />

P-C3-4- Upgraded cross section<br />

<strong>of</strong> cable to 95 sq mm<br />

3.73 MVA<br />

44.04 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-6.1<br />

101.64 %<br />

BK-Nawabad Dehmazang-Kulali Dahmazang<br />

101.62 %<br />

BK-Matba-e-Maref-Matba-e-Maref-Matba-e-Maref<br />

103.28 %<br />

BK-Charda Manzela JS_1-Central Poly Clinic<br />

103.33 %<br />

NW-Pohantoon<br />

BK-Denow-Children s<br />

garden<br />

NW-4 6<br />

BK-Jamal maina<br />

NW-518-143<br />

4.39 MVA<br />

31.08 %<br />

BK-Ataturk-1<br />

NW-Pohantoon-Takhnic Sanawee No-2<br />

100.91 %<br />

P-C3-4 New cable 95 sq mm<br />

BK-Jamal maina-Jamal Mina<br />

101.00 %<br />

BK-Nawabad Dehmazang-4<br />

101.66 %<br />

BK-Charda Manzela JS_1-Charda Manzila<br />

103.34 %<br />

BK-JS-1-E 1,2-Mestorat Ho<br />

103.18 %<br />

JS#4-BK<br />

BK-Nawabad Dehmazang-5<br />

101.65 %<br />

W-4_7-12-16<br />

9.14 %<br />

NW-4_7-Paghmanehaee-Qali Wahid<br />

99.12 %<br />

NW-4_6-1<br />

95.38 %<br />

3.54 MVA<br />

3.54 MVA29.18 %<br />

28.71 %<br />

NW-4_6-Kote Sangi<br />

95.40 %<br />

1.23 MVA<br />

13.03 %<br />

4.15 MVA<br />

33.52 %<br />

BK-Debori-Debori TS<br />

100.66 %<br />

NW-Dashte e Barchee<br />

JS#4-BK-519<br />

100.78 %<br />

BK-Habibia HSch<br />

BK-Rabiya Balkhi-Karte 4<br />

101.86 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Aqabe Barq <strong>Kabul</strong><br />

101.88 %<br />

BK-Nawabad Dehmazang-2<br />

101.69 %<br />

BK-Nawabad Dehmazang-1<br />

101.70 %<br />

BK-Aqabe Barq <strong>Kabul</strong><br />

BK-519-JS#4<br />

BK-Rabiya Balkhi<br />

BK-Khatamunabein<br />

BK-Russian Emb-<br />

BK-3_6<br />

JS#3-BK-519<br />

102.18 %<br />

BK-Guzarga<br />

JS#3-BK-518<br />

102.10 %<br />

BK-511<br />

BK-519<br />

JS#3-BK-511<br />

101.85 %<br />

BK-Nawabad Dehmazang-Police Sarhadi<br />

101.68 %<br />

BK-Nawabad Dehmazang-Nawabad Dehmazang<br />

101.79 %<br />

BK-Jamal maina<br />

BK-Nawabad Dehmazang<br />

BK-Behind Madrasa<br />

BK-Habibia High School<br />

JS#1-BK-514<br />

103.32 %<br />

BK-514-12<br />

103.51 %<br />

BK-515-12<br />

103.63 %<br />

BK-514-11<br />

BK-515-11<br />

103.61 %<br />

103.72 %<br />

BK-514-13<br />

103.36 BK-515-13 %<br />

103.49 %<br />

P-C3-3-Make sure cables are at<br />

least 185sqm<br />

BK-Ibn Sina-Dakhel J.S<br />

103.31 %<br />

BK-Ibn Sina-1<br />

103.31 %<br />

BK-Ibn Sina-Ibn Sina Hospital<br />

103.31 %<br />

JS#1-BK-515<br />

103.48 %<br />

BK-JS-1-D-1,7-Qala-e-Hazaraha<br />

103.32 %<br />

BK-Rabiya Balkhi-Karte 4 Mukhaberaat<br />

101.57 %<br />

BK-Rabiya Balkhi-Rabiya-e-Balkhi<br />

101.98 %<br />

BK-518<br />

BK-Habibia HSch-Darulmalmeen<br />

101.58 %<br />

NW-Dashte e Barchee-Pule sokhte Jadeed<br />

100.55 %<br />

NW-Dashte e Barchee-1<br />

100.55 %<br />

NW-4_6-Pule Sokhte Sabeqa<br />

95.06 %<br />

BK-514-9<br />

103.82 BK-515-9 %<br />

103.92 %<br />

0.86 MVA<br />

7.72 %<br />

NW-4_6-12<br />

95.06 %<br />

rchee-Amam hasan Mojtaba<br />

NW-Dashte e Barchee-17<br />

100.47 %<br />

NW-Dashte e Barchee-12.6<br />

100.45 %<br />

te e Barchee-Harbi Shoonazi<br />

0.38 MVA<br />

5.78 %<br />

0.48 MVA<br />

4.32 %<br />

0.38 MVA<br />

8.76 %<br />

NW-Dashte e Barchee-12<br />

100.49 %<br />

NW-Dashte e Barchee-12.1<br />

100.49 %<br />

NW-Dashte e Barchee-8<br />

100.52 0.86 MVA %<br />

7.72 %<br />

NW-4_6-14<br />

95.01 %<br />

NW-4_6-15<br />

94.98 %<br />

2.93 MVA<br />

24.22 %<br />

2.93 MVA<br />

24.22 %<br />

BK-Debori-Old Bangashidar 1<br />

100.46 %<br />

BK-Debori-Old Bangashidar 2<br />

100.46 %<br />

BK-Rabiya Balkhi-Umar jan<br />

101.59 %<br />

BK-Rabiya Balkhi-Behind Police Station<br />

101.67 %<br />

BK-Rabiya Balkhi-Chamcha Mast<br />

101.75 %<br />

BK-Behind Madrasa-Behind Madrasa<br />

101.15 %<br />

BK-Khatamunabein-Khatamunabein 1&2<br />

102.09 %<br />

BK-Guzarga-1<br />

102.10 %<br />

BK-518-12<br />

102.68 % BK-518-10<br />

BK-519-12<br />

103.05 %<br />

102.78 % BK-519-10<br />

103.13 %<br />

BK-516-Aqab Bagh e Babur #1<br />

104.41 %<br />

BK-516-Aqab Bagh Babur 2<br />

104.40 %<br />

BK-Habibia High School-Habibia High School 1&2<br />

101.75 %<br />

BK-Guzarga-6<br />

101.27 %<br />

BK-Guzarga-Borj_1_Guzarga<br />

101.27 %<br />

BK-516-2B25<br />

104.41 %<br />

BK-518-9<br />

103.30 %<br />

2.93 MVA<br />

24.22 %<br />

BK-Debori-1<br />

100.15 %<br />

BK-Debori-2<br />

100.15 %<br />

BK-518-8<br />

103.45 %<br />

BK-519-8<br />

103.53 %<br />

BK-516-Bagh Babur<br />

104.44 %<br />

BK-516-2B20<br />

104.42 %<br />

BK-3_6-Khwaja Mullah<br />

100.76 %<br />

BK-516-2B17<br />

BK-516-2B16<br />

104.44 %<br />

104.44 %<br />

_6<br />

MVA<br />

9 %<br />

0.45 MVA<br />

9.19 %<br />

NW-4_6-27_6_2<br />

94.58 %<br />

NW-4_6-22<br />

94.80 %<br />

0.60 MVA<br />

4.98 %<br />

NW-4_6-22-1<br />

94.80 %<br />

0.60 MVA<br />

9.04 %<br />

NW-4_6-22-4<br />

94.78 %<br />

NW-4_6-22-5<br />

94.76 %<br />

0.60 MVA<br />

9.05 %<br />

0.60 MVA<br />

9.05 %<br />

NW-4_6-22-12<br />

94.71 %<br />

0.60 MVA<br />

9.05 %<br />

NW-4_6-Sare-e- Kariz Qalahe shada<br />

94.68 %<br />

BK-Behind Madrasa-Mustaghni<br />

100.74 %<br />

BK-516-2B15<br />

104.45 %<br />

BK-516-Khushal Khan<br />

104.45 %<br />

0.45 MVA<br />

9.18 %<br />

2.32 MVA<br />

19.24 %<br />

BK-Debori-New Bangashidar 1&2<br />

99.95 %<br />

BK-Behind Madrasa-Alibad 1<br />

100.60 %<br />

BK-Behind Madrasa-Rukhshana<br />

100.85 %<br />

BK-518-5<br />

104.09 %<br />

BK-519-5<br />

104 14 %<br />

C-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-541-Riasat Amneiat<br />

98.78 %<br />

E-541-Survey Madan<br />

98.83 %<br />

E-541-145-7<br />

98.84 %<br />

E-541-Wezarat Fawaed Ama<br />

99.41 %<br />

P-C4-8 Reconductor to 120 sqm<br />

E-541-113-14<br />

E-541-No.44 Qalai Zamankhan Tr 1&2 96.11 %<br />

96.10 %<br />

Sefarat Iran<br />

E-541-No_7_ Macrorayan Awal<br />

99.63 % E-541-132-7<br />

99.63 %<br />

P-C4-8 Reconductor to 120 sqm<br />

E-531-Dakhudai Dad<br />

101.69 %<br />

N-518_JS2_517-Lessee Amani<br />

99.40 %<br />

E-541-132-7-a<br />

99.72 %<br />

E-531-Daraz kocha<br />

100.89 %<br />

E-541-No_5_Macrorayan Awal<br />

95.22 %<br />

E-531-49-6<br />

100.90 %<br />

N-515_JS2_D_2_7-Edara Computer<br />

99.60 %<br />

N-516-Shash Darak<br />

96.17 %<br />

E-541-145-1<br />

99.07 %<br />

E-541-143<br />

99.16 %<br />

E-541-No-6 Macrorayan Awal<br />

95.20 %<br />

P-C4-7 New Section 185 sqm<br />

E-531-60<br />

100.30 %<br />

E-531-37-3<br />

101.69 %<br />

N-518_JS2_B_1_2-Sedarat<br />

99.49 %<br />

N-515_JS2_531-Qasr Delkosha # 1&2<br />

99.66 %<br />

N-515_JS2_D_2_7-Ehsaya Markazi ( CSO ) # 1&2<br />

99.61 %<br />

E-541-145<br />

99.12 %<br />

E-541-143-3<br />

99.16 %<br />

E-541-No_4_Macrorayan Awal<br />

95.23 %<br />

E-531-67<br />

100.02 %<br />

E-531-66<br />

100.06 %<br />

E-531-Mardan Ghaib<br />

100.30 %<br />

E-531-55<br />

100.59 %<br />

rat<br />

N-518_JS2_B_1_2-Wezarat Khareja<br />

99.48 %<br />

N-515_JS2_531-Ariana Hotel<br />

99.60 %<br />

E-541-148<br />

99.11 %<br />

E-541-No-1 Macrorayan Awal<br />

95.22 %<br />

E-531-70<br />

99.95 %<br />

E-531-Mardan Ghaib-1_1&2<br />

100.59 %<br />

E-531-49<br />

100.91 %<br />

E-531-Mardan Ghaib-2<br />

101.24 %<br />

E-531-37<br />

101.70 %<br />

E-541-No_3_ Macrorayan Awal<br />

95.28 %<br />

E-531-71<br />

99.94 %<br />

N-515_JS2_531-Matbah Urdo<br />

99.59 %<br />

E-541-Wezarat Omor Ejtimaey<br />

95.35 %<br />

E-541-154<br />

95.83 %<br />

E-541-No-2 Macrorayan Awal<br />

95.26 %<br />

E-541-157-8<br />

95.32 %<br />

E-541-157-5<br />

95.37 %<br />

E-541-157-12<br />

95.36 %<br />

E-531-Sement khana<br />

99.93 %<br />

E-541-Andimark<br />

99.09 %<br />

E-541-Riasat<br />

E-541-154-4<br />

Mili bus<br />

95.81 %<br />

95.81 %<br />

E-541-156-5<br />

95.82 %<br />

E-541-156<br />

95.84 %<br />

N-518_JS2_E_1_2-Adare Omor<br />

97.96 %<br />

N-518_JS2_B_1_2-Khetabkhana Aama<br />

99.36 %<br />

N-518_JS2_B_1_2-Aarg Jumhoori<br />

102.01 %<br />

N-518_JS2_E_1_2-Wezarat Defah<br />

97.95 %<br />

E-541-Water Pump Macrorayan Awal<br />

95.82 %<br />

E-541-157<br />

95.86 %<br />

N-518_JS2_E_1_2-Esteqlal High School<br />

97.52 %<br />

BK-JS-1-A-1,2-Ministry <strong>of</strong> Education<br />

102.14 %<br />

N-518_JS2_B_1_2-Gurd Melye<br />

101.99 %<br />

N-518_JS2_B_1_2-Bank Melye<br />

101.99 %<br />

N-518_JS2_E_1_2-De <strong>Afghan</strong>istan Bank<br />

97.53 %<br />

N-518_JS2_E_1_2-Kartografi<br />

97.65 %<br />

N-518_JS2_E_1_2-Wezarat Mahdan<br />

97.61 %<br />

P-C4-12- Reconductor to 120 sqm<br />

E-541-MDC<br />

96.13 %E-541-164<br />

96.14 %<br />

Wezarat Mokhaberat # 21<br />

N-518_JS2_B_1_2-Wezarat Malya<br />

101.97 %<br />

a Caltor<br />

N-518_JS2_E_1_2-Rabeha Balkhy Hospital<br />

97.39 %N-518_JS2_E_1_2-Stomatology<br />

97.40 %<br />

ashtani Tojarati Bank<br />

S2_B_1_2-Spinzar Hotel<br />

N-518_JS2_E_1_2-Post Telephone Telegram<br />

97.58 %<br />

N-518_JS2_E_1_2-Pashtoonistan Wath<br />

97.58 %<br />

E-541-Muziam Omar<br />

96.46 %<br />

E-541-171<br />

96.50 %<br />

E-541-183<br />

E-541-Olampic<br />

96.55 %<br />

96.54 %<br />

E-541-170<br />

96.46 %<br />

E-541-166<br />

96.24 %<br />

P-C4-12- Reconductor to 120 sqm<br />

E-541-164-1<br />

96.12 %<br />

E-541-164-4<br />

96.11 %<br />

E-541-Tr-Junction-7<br />

96.11 %<br />

BK-Rangrazi-Malawi Sahib<br />

102.99 %<br />

BK-JS-1-E 1,2-Old Radio<br />

103.08 %<br />

BK-C-1,2-Eidga Mosque<br />

102.21 %<br />

BK-JS-1-E 1,2-Pul-e-Kheshtee<br />

103.09 %<br />

E-531-60-25<br />

100.00 %<br />

BK-Rangrazi-Rangrazi<br />

103.03 %<br />

BK-C-1,2-Tanor Saazi<br />

102.33 %<br />

P-C4-11- Reconductor to 120 sqm<br />

E-531-Sarak awal karte naw<br />

99.97 %<br />

rat Hospital 1&2<br />

E-531-60-27<br />

99.97 %<br />

BK-JS-1-E 1,2-Pakhta Feroshi<br />

103.13 %<br />

BK-C-1,2-Darwazai Lawri<br />

102.24 %<br />

BK-JS-1-E 1,2-Chindawol<br />

103.19 %<br />

E-541-Salimi Hospital<br />

97.21 %<br />

E-541-189-3<br />

97.22 %<br />

E-541-188<br />

97.23 %<br />

E-541-Kenar Chaman<br />

97.31 %<br />

P-C4-11- Reconductor to 120 sqm<br />

E-541-189<br />

97.22 %<br />

BK-513-44_49<br />

97.48 %<br />

BK-C-1,2-1<br />

102.54 %<br />

BK-C-1,2-Takhta Pul<br />

102.44 %<br />

E-541-Bala Hesar<br />

97.08 %<br />

BK-513-Chaman Hozory<br />

97.48 %<br />

BK-513-44_46<br />

97.57 %<br />

E-531-Sia sang<br />

99.85 %<br />

E-531-60-44<br />

99.85 %<br />

E-531-Qir Factory<br />

99.90 %<br />

E-531-60-37<br />

99.90 %<br />

E-531-60-33<br />

99.92 %<br />

BK-C-1,2-Guzar e Azrat<br />

102.54 %<br />

E-541-192<br />

97.19 %<br />

BK-JS-1-D-1,7-Bagh-e-Nawab<br />

102.95 %<br />

P-C4-13- New O/H Section 120 sqm &<br />

switches<br />

BK-JS-1-D-1,7-1<br />

102.94 %<br />

BK-513-44_40<br />

97.83 %<br />

BK-513-44_33<br />

98.07 %<br />

BK-513-Tape Balkh<br />

98.06 %<br />

BK-JS-1-D-1,7-4<br />

102.92 %<br />

BK-JS-1-D-1,7-Aashoqan-e-Aarefaan<br />

102.92 %<br />

BK-JS-1-D-1,7-7<br />

102.89 %<br />

BK-JS-1-D-1,7-7_3<br />

102.88 %<br />

BK-JS-1-D-1,7-Khwaja Safa<br />

102.88 %<br />

BK-C-1,2-Furmulia<br />

102.38 %<br />

BK-513-44_25<br />

98.43 %<br />

BK-513-Shah Shahid<br />

98.43 %<br />

BK-513-44_21A7<br />

98.94 %<br />

BK-513-Etefaq<br />

98.92 %<br />

BK-JS-1-D-1,7-Sangkashaha<br />

102.88 %<br />

E-515-62-34-6<br />

104.26 %<br />

BK-513-44_17<br />

98.97 %<br />

E-515-62-34-2<br />

104.26 %<br />

E-515-62-41<br />

104.24 %<br />

E-515-Tape Qawala No 2<br />

104.24 %<br />

E-515-62-39<br />

104.25 %<br />

E-515-62-38<br />

104.25 %<br />

E-515-62-31<br />

104.27 %<br />

BK-513-Qalhacha<br />

99.37 %<br />

E-516-Tape Qawala No 1<br />

104.26 %<br />

BK-513-44_9<br />

99.38 %<br />

BK-513-Shohadai Saleheen<br />

101.90 %<br />

C-4<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-536-21<br />

105.00 %<br />

E-531-25<br />

102.85 %<br />

E-536-36<br />

105.00 %<br />

E-536-48<br />

105.00 %<br />

E-536-54<br />

105.00 %<br />

E-536-60<br />

105.00 %<br />

E-536-70<br />

105.00 %<br />

E-536-71<br />

105.00 %<br />

E-515-35<br />

104.65 %<br />

E-536-103<br />

105.00 %<br />

E-523-58<br />

104.35 %<br />

E-536-110<br />

105.00 %<br />

E-515-108<br />

104.39 %<br />

E-515-58<br />

104.42 %<br />

E-515-62-9<br />

104.38 %<br />

E-515-62<br />

104.39 %<br />

E-523-81<br />

104.05 %<br />

E-515-Family hae Nasajee<br />

104.30 %<br />

E-515-76<br />

104.39 %<br />

E-515-62-14<br />

104.34 %<br />

E-515-62-26<br />

104.29 %<br />

E-523-86<br />

103.99 %<br />

C-5<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-536-89<br />

105.00 %<br />

E-536-90<br />

105.00 %<br />

E-536-95<br />

105.00 %<br />

E-536-116<br />

105.00 %<br />

E-536-122<br />

105.00 %<br />

C-6<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


NW-4_<br />

94.59 %<br />

BK-4_6-Chaar Qala 1<br />

96.44 %<br />

BK-4_6-1<br />

97.01 %<br />

BK-4_6-Qalai Bakhtiar<br />

97.00 %<br />

D-2<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


BK-519-5<br />

104.14 %<br />

NW-4_6-27.9<br />

94.60 %<br />

NW-4_6-Foundation-e- zamini Gulkhana<br />

94.59 %<br />

NW-4_6-27-6<br />

94.60 %<br />

0.38 MVA<br />

5.71 %<br />

0.83 MVA<br />

20.47 %<br />

NW-4_6-27.1<br />

94.68 %<br />

0.95 MVA<br />

14.32 %<br />

0.12 MVA<br />

2.96 %<br />

NW-4_6-Howza No-6 Police<br />

94.68 %<br />

NW-4_6-27<br />

94.71 %<br />

1.29 MVA<br />

10.72 %<br />

NW-4_6-Fabrika-e- Yakh Saze Hamza<br />

94.71 %<br />

NW-4_6-27.A1<br />

94.71 %<br />

NW-4_6-28<br />

94.70 %<br />

BK-Behind Madrasa-Alibad 2<br />

100.62 %<br />

BK-Behind Madrasa-Mawade Mukhadir<br />

100.85 %<br />

BK-Behind Madrasa-Ministry <strong>of</strong> commerce<br />

100.83 %<br />

BK-Guzarga-19<br />

101.31 %<br />

BK-Guzarga-Borj_2_Guzarga<br />

101.31 %<br />

BK-518-4<br />

104.30 %<br />

BK-519-4<br />

104.33 %<br />

BK-514-4<br />

104.60 %<br />

BK-515-4<br />

104.64 %<br />

1.29 MVA<br />

10.72 %<br />

BK-516-2B9<br />

104.52 %<br />

NW-4_6-32.2<br />

94.66 %<br />

NW-4_6-Babai Wali<br />

94.65 %<br />

NW-4_6-31<br />

94.67 %<br />

NW-4_6-32<br />

94.67 %<br />

0.24 MVA<br />

5.92 %<br />

0.45 MVA<br />

3.74 %<br />

0.69 MVA<br />

5.74 %<br />

0.60 MVA<br />

9.05 %<br />

NW-4_6-Qalahe Shada<br />

94.64 %<br />

NW-4_6-31_3<br />

94.64 %<br />

BK-Debori-Imam Zaman<br />

99.90 %<br />

BK-Behind Madrasa-Shora-e-Milli<br />

100.83 %<br />

BK-3_6-Pump hawz<br />

99.64 %<br />

BK-Guzarga-Ayub Khan 1<br />

101.39 %<br />

BK-Guzarga-41-b20<br />

101.40 %<br />

BK-Guzarga-25<br />

101.37 %<br />

BK-516-12A2<br />

104.55 %<br />

BK-516-2B7<br />

104.54 %<br />

BK-516-Immigration repatriation<br />

104.57 %<br />

BK-516-2B2<br />

104.60 %<br />

P-B3-8: New OH 185 sqmm<br />

BK-511<br />

11.27 MVA<br />

84.28 %<br />

BK-516-4B2<br />

104.57 %<br />

BK-516-p2-9<br />

104.67 %<br />

BK-516-p2-10<br />

104.65 %<br />

BK-516-2A2<br />

104.63 %<br />

BK-518<br />

11.15 MVA<br />

83.48 %<br />

BK-519<br />

10.81 MVA<br />

80.91 %<br />

BK-515<br />

BK-514<br />

BK-512<br />

105.00 %<br />

BK-513<br />

104.90 %<br />

BK-516<br />

BK-516-2<br />

104.87 %<br />

S/S Breshna Kot<br />

BK-517<br />

104.92 %<br />

BK-3_6-Moqabili Sifarat Russia<br />

99.67 %<br />

BK-Guzarga-41-b15<br />

101.42 %<br />

BK-Guzarga-Ayub Khan 2<br />

101.41 %<br />

BK-516-Chini Saazi<br />

104.63 %<br />

BK-516-p2-3<br />

104.80 %<br />

BK-512-5<br />

104.98 %<br />

BK-516-5<br />

104.66 %<br />

BK-4_6-56<br />

94.64 %<br />

BK-4_6-Masjidi Safed<br />

96.43 %<br />

BK-Guzarga-41-b13<br />

101.43 %<br />

BK-Guzarga-water pump 2<br />

101.42 %<br />

BK-Guzarga-34<br />

101.46 %<br />

BK-516-Jangalak<br />

104.54 %<br />

BK-516-Constructional Water Pump<br />

104.61 %<br />

BK-512-3<br />

104.99 %<br />

BK-512-Sakhtomani omoor Barq<br />

104.98 %<br />

BK-4_6-Doshhoy Gulam Hasan<br />

94.61 %<br />

BK-4_6-55<br />

94.63 %<br />

BK-4_6-54<br />

94.63 %<br />

BK-Guzarga-Khwaja parsa<br />

101.46 %<br />

BK-4_6-47.15<br />

96.46 %<br />

BK-Guzarga-41-b6<br />

101.49 %<br />

BK-4_6-47.7<br />

96.51 %<br />

BK-4_6-47.9<br />

96.50 %<br />

BK-4_6-47.11<br />

96.48 %<br />

BK-4_6-47.13<br />

96.47 %<br />

BK-6_3-Alouddin<br />

99.15 %<br />

BK-Russian Emb-Russian Emb 1&2<br />

101.79 %<br />

BK-4_6-47<br />

96.54 %<br />

BK-6_3-B4.6<br />

99.15 %<br />

BK-6_3-B4.3<br />

99.17 %<br />

BK-Guzarga-41-b3<br />

101.52 %<br />

BK-4_6-Chaar qala 2<br />

96.52 %<br />

BK-4_6-45<br />

96.55 %<br />

BK-4_6-45.1<br />

96.54 %<br />

BK-4_6-45.3<br />

96.52 %<br />

BK-6_3-B4<br />

99.18 %<br />

BK-6_3-1<br />

99.21 %<br />

BK-6_3-Esteqlal Hospital<br />

99.21 %<br />

BK-3_6-Sahati Oma<br />

99.21 %<br />

BK-Guzarga-Water pump 1<br />

101.51 %<br />

BK-Guzarga-41<br />

101.54 %<br />

BK-516-79<br />

101.60 %<br />

BK-Guzarga-Musahi<br />

101.51 %<br />

BK-516-Waisal Abad<br />

104.10 %<br />

BK-516-12<br />

104.12 %<br />

BK-6_3-B7<br />

99.17 %<br />

BK-6_3-B9<br />

99.16 %<br />

BK-6_3-Khalifa Saheb<br />

99.14 %<br />

BK-4_6-39<br />

BK-4_6-39.1<br />

96.64 %<br />

96.64 %<br />

BK-6_3-B15<br />

99.15 %<br />

BK-516-Aqa Ali Shams 2<br />

102.53 %<br />

BK-4_6-Mullah Akram<br />

96.61 %<br />

BK-516-Waisal Abad 2<br />

103.37 %<br />

BK-6_3-Joye Raeis<br />

98.88 %<br />

BK-516-De Murad Khan<br />

101.83 %<br />

BK-516-25<br />

103.37 %<br />

BK-517-18<br />

103.37 %<br />

BK-516-68<br />

101.88 %<br />

BK-516-51<br />

102.40 %<br />

BK-516-20<br />

103.64 %<br />

BK-516-Mosa "1"<br />

102.21 %<br />

BK-516-58<br />

102.19 %<br />

BK-516-46-2<br />

102.55 %<br />

BK-516-Aqa Ali Shams 1<br />

102.55 %<br />

BK-516-63<br />

102.04 %<br />

BK-516-49<br />

102.47 %<br />

BK-516-30<br />

103.18 %<br />

BK-4_6-Qalai Ali Mardaan<br />

96.80 %<br />

BK-4_6-30<br />

96.80 %<br />

BK-516-46<br />

102.57 %<br />

BK-517-47<br />

101.67 %<br />

BK-517-48<br />

101.62 %<br />

BK-516-36<br />

102.94 %<br />

BK-517-26<br />

102.83 %<br />

BK-517-Mullah buzurg<br />

102.82 %<br />

BK-517-40<br />

102.05 %<br />

BK-517-Street New <strong>of</strong> <strong>the</strong> Takhnikum<br />

102.04 %<br />

BK-4_6-Qalai Jafar<br />

98.07 %<br />

BK-517-30<br />

102.57 %<br />

BK-4_6-18.12.4<br />

98.09 %<br />

BK-6_3-Moqabel Wezarat Energy wa Aob<br />

98.48 %<br />

BK-517-30.2<br />

102.56 %<br />

BK-517-Takhnikum<br />

102.54 %<br />

BK-4_6-18.19<br />

98.27 %<br />

BK-4_6-Tubercluses<br />

98.04 %<br />

BK-4_6-18.12<br />

98.11 %<br />

BK-4_6-18.22<br />

98.35 %<br />

BK-4_6-18.7<br />

98.05 %<br />

BK-4_6-Veterenary<br />

98.08 %<br />

BK-6_3-Pidagoghi<br />

98.36 %<br />

BK-6_3-4<br />

98.22 %<br />

BK-6_3-Khwaja Aman<br />

98.11 %<br />

BK-4_6-18<br />

97.06 %<br />

BK-6_3-11<br />

98.13 %<br />

BK-4_6-17<br />

97.07 %<br />

BK-4_6-17.1<br />

97.06 %<br />

BK-6_3-Wezarat energy Aob<br />

98.13 %<br />

BK-6_3-12<br />

98.12 %<br />

4_6-17.9<br />

01 %<br />

tiar<br />

BK-6_3-Cure Hospital<br />

98.30 %<br />

BK-517-102.7<br />

98.91 %<br />

BK-517-Rega<br />

98.91 %<br />

BK-517-Regration<br />

99.72 %<br />

BK-517-85.9<br />

99.72 %<br />

BK-517-64<br />

100.75 %<br />

BK-517-Dahan e Bagh <strong>of</strong> Chilstoon<br />

100.75 %<br />

BK-4_6-11.8<br />

97.14 %<br />

BK-4_6-11<br />

97.22 %<br />

BK-4_6-Ministry <strong>of</strong> Rural and Rehablitation<br />

97.12 %<br />

BK-6_3-Stera Mahkama<br />

97.57 %<br />

BK-517-Dedana First<br />

98.81 %<br />

BK-517-102<br />

98.96 %<br />

BK-517-99<br />

99.11 %<br />

BK-517-96<br />

99.24 %<br />

BK-517-71<br />

100.48 %<br />

BK-517-85<br />

99.73 %<br />

BK-4_6-Directorate <strong>of</strong> learning<br />

97.36 %<br />

BK-517-106<br />

98.82 %<br />

BK-517-76<br />

100.26 %<br />

BK-517-75<br />

100.30 %<br />

BK-4_6-7<br />

97.36 %<br />

BK-517-111<br />

98.60 %<br />

BK-517-116<br />

98.37 %<br />

D-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


C4<br />

BK-513-17<br />

102.99 %<br />

BK-513-25<br />

102.12 %<br />

BK-513-27<br />

101.93 %<br />

BK-513-44<br />

100.05 %<br />

BK-513-18<br />

102.74 %<br />

BK-513-24<br />

102.22 %<br />

BK-513-70_21<br />

99.77 %<br />

BK-513-Borj_2_Qalhacha<br />

99.84 %<br />

BK-513-61<br />

99.85 %<br />

BK-513-70_3<br />

99.77 %<br />

BK-513-70_4<br />

99.77 %<br />

BK-513-69<br />

99.79 %<br />

BK-513-Pull Safeed<br />

99.76 %<br />

BK-513-70_33<br />

99.77 %<br />

BK-513-80<br />

99.76 %<br />

BK-513-78<br />

99.76 %<br />

BK-513-Beni Hesar<br />

99.74 %<br />

D-4<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-515-94<br />

104.39 %<br />

E-523-91<br />

103.94 %<br />

E-523-100<br />

103.85 %<br />

E-523-103<br />

103.84 %<br />

E-523-94<br />

103.90 %<br />

E-523-zakhira-Ab-Bagrami<br />

103.84 %<br />

E-523-106<br />

103.83 %<br />

E-523-107<br />

103.83 %<br />

E-523-108<br />

103.83 %<br />

E-523-109<br />

103.83 %<br />

E-523-112<br />

103.82 %<br />

E-523-115<br />

103.81 %<br />

E-523-117<br />

103.80 %<br />

E-523-120<br />

103.79 %<br />

E-523-121<br />

103.79 %<br />

E-523-Chaha-e-hamiq-1<br />

103.79 %<br />

E-523-131<br />

103.77 %<br />

E-523-Chaha-e-hamiq-2<br />

103.77 %<br />

E-523-Chaha-e-hamiq-3<br />

103.77 %<br />

E-523-133<br />

103.77 %<br />

E-523-137<br />

103.77 %<br />

D-5<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


BK-517-Sare kotal <strong>of</strong> Chilstoon<br />

100.45 %<br />

BK-4_6-1<br />

97.56 %<br />

BK-517-National Meuseum<br />

97.79 %<br />

BK-517-131<br />

97.79 %<br />

BK-517-127<br />

97.91 %<br />

BK-517-126<br />

97.97 %<br />

BK-517-136<br />

97.63 %<br />

BK-517-Dedana Second<br />

98.32 %<br />

BK-517-Afshaar Darulaman<br />

97.57 %<br />

BK-517-137<br />

97.60 %<br />

JS#6-BK-517<br />

97.59 %<br />

BK-517-116.7<br />

98.34 %<br />

BK-517-126.4<br />

97.95 %<br />

BK-517-126.9<br />

97.93 %<br />

BK-517-Examination Form <strong>of</strong> Agriculture<br />

97.93 %<br />

E-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


Appendix<br />

D<br />

Load Flow Results & Investments for <strong>the</strong><br />

mid term.<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International D-1


A-1<br />

A-2<br />

A-3<br />

A-4<br />

A-5<br />

A-7<br />

B-1<br />

B-2<br />

B-3<br />

B-4<br />

B-5<br />

B-6<br />

B-7<br />

C-2<br />

C-3<br />

C-4<br />

C-5<br />

C-6<br />

D-2<br />

D-3<br />

D-4<br />

D-5<br />

E-3


VA<br />

NW-513-Qaria Tolad<br />

96.02 %<br />

-0.55 MW<br />

0.63 MVA<br />

9.36 %<br />

NW-513-212-48<br />

96.09 %<br />

0.63 MVA<br />

9.36 %<br />

NW-513-212-47<br />

96.10 %<br />

0.63 MVA<br />

9.35 %<br />

NW-513-212-26<br />

96.34 %<br />

0.63 MVA<br />

9.35 %<br />

NW-513-212-25<br />

96.35 %<br />

0.63 MVA<br />

9.35 %<br />

NW-513-Doda Mast<br />

96.44 %<br />

-0.30 MW<br />

NW-513-209<br />

96.88 %<br />

0.97 MVA<br />

14.38 %<br />

NW-513-187<br />

98.34 %<br />

3.76 MVA<br />

55.34 %<br />

3.78 MVA<br />

55.34 %<br />

P-B2-1 Reconductor to 70 sqm<br />

3.92 MVA<br />

60.13 %<br />

P-B2-1 Reconductor to 70 sqm<br />

NW-513-Deh Arbab<br />

96.62 %<br />

NW-513-203<br />

97.26 %<br />

NW-513-Deh Ponba<br />

98.15 %<br />

3.94 MVA<br />

60.13 %<br />

-0.17 MW<br />

3.80 MVA<br />

55.34 %<br />

3.81 MVA<br />

55.34 %<br />

-0.09 MW<br />

NW-513-Qaria Borjak<br />

NW-513-289<br />

94.98 %<br />

NW-513-288<br />

94.99 %<br />

94.99 %<br />

0.40 MVA<br />

6.01 %<br />

0.40 MVA<br />

6.01 %<br />

0.40 MVA<br />

6.01 %<br />

-0.35 MW<br />

NW-513-195<br />

97.84 %<br />

NW-513-286<br />

95.00 %<br />

NW-513-182<br />

98.84 %<br />

A-1<br />

0.40 MVA<br />

6.01 %<br />

3.94 MVA<br />

60.13 %<br />

Branch Element<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


1.60 MVA<br />

21.69 %<br />

NW-516-Mawad Nafti<br />

104.45 %<br />

-0.35 MW<br />

0.40 MVA<br />

5.42 %<br />

NW-516-40<br />

104.52 %<br />

0.40 MVA<br />

5.42 %<br />

NW-516-33<br />

104.57 %<br />

0.40 MVA<br />

5.42 %<br />

NW-516-20<br />

104.65 %<br />

NW-516-12_5<br />

104.62 %<br />

NW-516-Borj_1_Hawaee<br />

104.62 %<br />

0.40 MVA<br />

5.42 %<br />

-0.70 MW<br />

0.80 MVA<br />

17.76 %<br />

NW-516-12<br />

104.69 %<br />

1.20 MVA<br />

16.27 %<br />

NW-516-11<br />

104.72 %<br />

0.40 MVA<br />

4.01 %<br />

NW-516-Borj_2_Hawaee<br />

104.71 %<br />

-0.35 MW<br />

NW-516-6<br />

104.88 %<br />

A-2<br />

Branch Element<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


8.30 MVA<br />

84.48 %<br />

8.31 MVA<br />

84.48 %<br />

2.88 MVA<br />

42.29 %<br />

0.63 MVA<br />

14.41 %<br />

0.40 MVA<br />

7.32 %<br />

0.40 MVA<br />

7.57 %<br />

-0.70 MW<br />

NW-526-No_24_Projhe Jadeed # 1&2<br />

100.50 %<br />

NW-526-No_18_Projhe Jadeed # 1&2<br />

100.57 %<br />

-0.70 MW<br />

NW-526-No_19_Panjsad Family<br />

101.49 %<br />

1.20 MVA<br />

16.89 %<br />

-0.35 MW<br />

-0.55 MW<br />

-0.35 MW<br />

NW-526-No_15_Maktab Sangi # 1&2<br />

101.58 %<br />

-0.35 MW<br />

-0.55 MW<br />

NW-526-Hazare Baghal<br />

101.78 %<br />

-0.17 MW<br />

2.39 MVA<br />

33.77 %<br />

0.63 MVA<br />

14.44 %<br />

1.03 MVA<br />

23.59 %<br />

-0.30 MW<br />

-0.55 MW<br />

NW-526-No_17_Projhe Jadeed # 1&2<br />

100.69 %<br />

-0.70 MW<br />

-0.70 MW<br />

0.20 MVA<br />

3.77 %<br />

-0.55 MW<br />

NW-526-No_16_Panjsad Family # 1&2<br />

101.57 %<br />

NW-526-No_14_Panjsad Family # 1&2<br />

101.63 %<br />

3.36 MVA<br />

47.40 %<br />

-0.55 MW<br />

NW-526-42_3<br />

100.80 %<br />

2.06 MVA<br />

47.20 %<br />

2.46 MVA<br />

56.32 %<br />

N-513-Garud Milli # 2<br />

100.95 %<br />

P-A3-8 reconductor to 120<br />

P-A3-1 Reconductor from 70 to 185 sqm<br />

6.23 MVA<br />

64.44 %<br />

NW-526-33_2<br />

101.85 %<br />

5.27 MVA<br />

54.40 %<br />

0.20 MVA<br />

3.76 %<br />

NW-527-33<br />

101.66 %<br />

NW-526-33<br />

101.86 %<br />

-0.17 MW<br />

6.21 MVA<br />

64.44 %<br />

4.86 MVA<br />

50.27 %<br />

NW-527-TR-61Taqweatee<br />

101.86 %<br />

NW-526-36<br />

101.65 %<br />

NW-527-36<br />

101.39 %<br />

6.20 MVA<br />

64.44 %<br />

4.85 MVA<br />

50.27 %<br />

P-A3-1 new switch<br />

NW-527-40<br />

100.94 %<br />

NW-526-40<br />

101.32 %<br />

6.17 MVA<br />

64.44 %<br />

-0.22 MW<br />

4.18 MVA<br />

43.53 %<br />

4.18 MVA<br />

96.29 %<br />

-0.35 MW<br />

NW-527-Tr-No-6- 1&2<br />

101.32 %<br />

-0.70 MW<br />

NW-526-42<br />

101.21 %<br />

NW-526-No_21_Projhe Jadeed<br />

100.91 %<br />

0.00 MVA<br />

0.00 %<br />

-0.35 MW<br />

NW-526-Nan Pazi Watan<br />

101.75 %<br />

NW-526-51<br />

101.77 %<br />

0.40 MVA<br />

5.92 %<br />

NW-526-49<br />

101.76 %<br />

2.46 MVA<br />

25.47 %<br />

NW-526-51_2<br />

101.83 %<br />

P-A3-8 reconductor to 70<br />

NW-526-No_20_Panjsad Family # 1&2<br />

101.91 %<br />

-0.28 MW<br />

-0.55 MW<br />

3.40 MVA<br />

35.22 %<br />

NW-526-51_8<br />

102.10 %<br />

5.87 MVA<br />

45.20 %<br />

P-A3-6 new switch between N-513-53 and N-511-5<br />

0.00 MVA<br />

0.00 %<br />

P-A3-5 new 185 OH<br />

P-A3-1 Reconductor from 70 to 185 sqm<br />

6.19 MVA<br />

47.30 %<br />

6.17 MVA<br />

47.30 %<br />

N-513-71<br />

101.78 %<br />

P-A3-1 Reconductor from 70 to 185 sqm<br />

5.50 MVA<br />

42.45 %<br />

N-513-79<br />

101.40 %<br />

P-A3-1 Reconductor from 70 to 185 sqm<br />

5.08 MVA<br />

39.36 %<br />

N-513-Reasat-e-Logiestic<br />

101.06 %<br />

2.00 MVA<br />

38.03 %<br />

1.60 MVA<br />

30.43 %<br />

-0.35 MW<br />

6.27 MVA<br />

64.43 %<br />

0.00 MVA<br />

0.00 %<br />

P-A3-8a new line 70 OH<br />

P-A3-5 new 185 OH<br />

N-513-43-C15<br />

102.36 %<br />

N-513-No-59 Taqweatee Khuja Bughra<br />

101.72 %<br />

N-513-84<br />

101.18 %<br />

NW-526-Lewai Babajan<br />

102.89 %<br />

5.30 MVA<br />

54.40 %<br />

NW-527-44<br />

100.66 %<br />

NW-527-45<br />

100.60 %<br />

1.43 MVA<br />

27.32 %<br />

NW-527-Tr.No-6 Hawaee-1&2<br />

100.55 %<br />

-0.35 MW<br />

NW-527-44.5<br />

100.56 %<br />

0.63 MVA<br />

12.04 %<br />

-0.35 MW<br />

-0.35 MW<br />

NW-527-Tr. No 6-ariana-1&2<br />

100.55 %<br />

NW-527-Tr.No-8 Hawaee<br />

100.51 %<br />

-0.55 MW<br />

N-520-Borj Sera mina # 1&2<br />

102.66 %<br />

1.43 MVA<br />

12.59 %<br />

2.69 MVA<br />

23.67 %<br />

P-A3-1 Reconductor from 70 to 185 sqm<br />

P-A3-1 Reconductor from 70 to 185 sqm<br />

0.80 MVA<br />

18.18 %<br />

0.80 MVA<br />

18.18 %<br />

N-513-No-59 Khuja Bughra-B<br />

102.33 %<br />

-0.70 MW<br />

-0.55 MW<br />

N-513-No-62 Hawaee Khuja Bughra<br />

101.37 %<br />

P-A3-<br />

-0.35 MW<br />

0.40 MVA<br />

9.04 %<br />

NW-527-21<br />

102.93 %<br />

5.72 MVA<br />

58.48 %<br />

NW-526-21<br />

102.93 %<br />

6.29 MVA<br />

64.43 %<br />

5.31 MVA<br />

54.39 %<br />

NW-527-24<br />

102.67 %<br />

NW-526-24<br />

102.71 %<br />

P-A3-7 new OH 120<br />

0.00 MVA<br />

0.00 %<br />

-0.70 MW<br />

NW-524-Borj_4_Zamini # 1&2<br />

102.30 %<br />

P-A3-7 reconductor from 25 to 70<br />

-0.87 MW<br />

1.80 MVA<br />

26.47 %<br />

NW-524-52<br />

102.40 %<br />

NW-527-Tr.No 5-Hesa Awal -1&2<br />

100.02 %<br />

-0.70 MW<br />

-0.55 MW<br />

1.43 MVA<br />

27.46 %<br />

0.80 MVA<br />

15.36 %<br />

NW-527-52.8.2<br />

100.09 %<br />

NW-527-TR-no-5 Khest hokhtif-1&2<br />

100.09 %<br />

-0.35 MW<br />

2.23 MVA<br />

42.81 %<br />

NW-527-52<br />

100.44 %<br />

3.92 MVA<br />

41.10 %<br />

0.25 MVA<br />

7.08 %<br />

-0.35 MW<br />

NW-527-52.a.2<br />

100.42 %<br />

NW-527-Tr.Shafa Khane Khairkhana<br />

100.40 %<br />

-0.22 MW<br />

1.43 MVA<br />

19.82 %<br />

N-520-41<br />

102.83 %<br />

2.69 MVA<br />

23.67 %<br />

2.69 MVA<br />

23.67 %<br />

-0.70 MW<br />

6.20 MVA<br />

47.30 %<br />

6.21 MVA<br />

47.30 %<br />

1.20 MVA<br />

27.25 %<br />

P-A3-1 Reconductor from 70 to 185 sqm<br />

N-513-No-059 Khuja Bughra-A<br />

102.52 %<br />

-0.35 MW<br />

-0.35 MW<br />

-0.55 MW -0.55 MW -0.55 MW<br />

6.31 MVA<br />

64.43 %<br />

-0.35 MW<br />

1.43 MVA<br />

27.41 %<br />

N-520-Borj 8 Jeem # 1&2<br />

102.53 %<br />

-0.55 MW<br />

-0.70 MW<br />

P-A3-1 Reconductor from 70 to 185 sqm<br />

N-513-35<br />

103.27 %<br />

0.63 MVA<br />

14.20 %<br />

NW-527-18<br />

103.21 %<br />

4.13 MVA<br />

36.21 %<br />

NW-526-18<br />

103.18 %<br />

NW-527-Tr-no-4<br />

103.14 %<br />

1.80 MVA<br />

26.47 %<br />

6.24 MVA<br />

54.53 %<br />

-0.55 MW<br />

P-A3-7 reconductor from 25 to 70<br />

NW-527-TR No-7 hesaee Dohm-1&2<br />

100.21 %<br />

-0.70 MW<br />

-0.35 MW<br />

NW-524-Mokhaberat Khairkhana<br />

102.64 %<br />

-0.22 MW<br />

-0.55 MW<br />

NW-524-Jawar Mokhaberat Khairkhana<br />

102.63 %<br />

2.68 MVA<br />

39.36 %<br />

-0.55 MW<br />

N-527-43<br />

102.26 %<br />

1.43 MVA<br />

19.90 %<br />

-0.70 MW<br />

N-527-No-9 Zamini Tr 1&2<br />

102.15 %<br />

N-520-29<br />

103.21 %<br />

4.13 MVA<br />

36.21 %<br />

N-520-No-12 Zamini # 1&2<br />

103.28 %<br />

-0.70 MW<br />

-0.55 MW<br />

5.56 MVA<br />

48.70 %<br />

N-520-25<br />

103.40 %<br />

P-A3-5 new 185 OH<br />

0.40 MVA<br />

5.48 %<br />

-0.35 MW<br />

N-513-No-60 khuja Bughra<br />

103.64 %<br />

-0.70 MW<br />

N-513-No-3 Zameni khuja Bughra<br />

102.91 %<br />

0.80 MVA<br />

14.91 %<br />

6.38 MVA<br />

64.43 %<br />

6.43 MVA<br />

64.89 %<br />

NW-524-Borj_3_Markazi Hasee Awal # 1&2<br />

102.94 %<br />

-0.70 MW<br />

1.20 MVA<br />

27.09 %<br />

NW-524-38<br />

102.71 %<br />

P-A3-7 reconductor from 25mm to 70mm<br />

NW-524-32<br />

103.00 %<br />

3.08 MVA<br />

45.19 %<br />

NW-524-37<br />

102.78 %<br />

0.20 MVA<br />

7.47 %<br />

NW-524-Khedamat Takhniki Wezarat Mahdan<br />

102.68 %<br />

-0.17 MW<br />

NW-524-38_5<br />

NW-524-Stak Markazi Sehat Aama<br />

102.68 %<br />

102.78 %<br />

-0.17 MW<br />

-0.35 MW<br />

N-527-No-22 Zamini<br />

102.33 %<br />

1.43 MVA<br />

19.89 %<br />

-0.55 MW<br />

P-A3-5 new 185 OH<br />

7.16 MVA<br />

54.37 %<br />

6.66 MVA<br />

58.01 %<br />

-0.55 MW<br />

N-513-19-A-19<br />

103.04 %<br />

1.60 MVA<br />

29.81 %<br />

N-513-19-A22<br />

102.97 %<br />

1.60 MVA<br />

29.81 %<br />

N-513-No-2 Hawaee Khuja Bughra<br />

102.98 %<br />

-0.70 MW<br />

4.29 MVA<br />

43.82 %<br />

N-527-Qalhae Najara<br />

102.27 %<br />

-0.55 MW<br />

0.63 MVA<br />

11.82 %<br />

0.40 MVA<br />

7.50 %<br />

N-527-38-A1<br />

102.37 %<br />

N-527-38<br />

102.37 %<br />

0.00 MVA<br />

0.04 %<br />

N-527-38-A11<br />

102.37 %<br />

0.00 MVA<br />

0.03 %<br />

N-527-Sarwar Kaynat<br />

103.66 %<br />

P-A3-10 new line 120 OH<br />

0.80 MVA<br />

8.06 %<br />

N-520-No-12 Taqweatee<br />

103.69 %<br />

1.42 MVA<br />

15.98 %<br />

N-520-20<br />

103.75 %<br />

5.58 MVA<br />

48.70 %<br />

3.67 MVA<br />

27.78 %<br />

0.00 MVA<br />

0.00 %<br />

3.67 MVA<br />

68.05 %<br />

P-A3-6 new node an switches<br />

N-513-No-1 Khuja Bughra # 1<br />

103.29 %<br />

-0.55 MW<br />

-0.70 MW<br />

1.60 MVA<br />

29.81 %<br />

N-513-No-1 Taqweatee khuja Bughra<br />

103.26 %<br />

-0.55 MW<br />

-0.70 MW<br />

-0.70 MW<br />

NW-524-23<br />

103.26 %<br />

1.26 MVA<br />

34.72 %<br />

NW-524-23_5<br />

103.06 %<br />

2.46 MVA<br />

34.18 %<br />

7.03 MVA<br />

61.11 %<br />

-0.35 MW<br />

NW-524-Borj_1_Hesa Awal Khirkhana<br />

103.29 %<br />

NW-524-21_3<br />

103.33 %<br />

5.55 MVA<br />

56.66 %<br />

NW-524-Borj_2_Zamini # 1&2<br />

103.00 %<br />

-0.55 MW<br />

N-527-No-10 Zamini Tr 1&2<br />

102.57 %<br />

-0.70 MW<br />

P-A3-5 new 185 OH<br />

N-512-Leway Amniat<br />

104.67 %<br />

NW-526-3<br />

104.72 %<br />

6.45 MVA<br />

64.89 %<br />

6.44 MVA<br />

64.89 %<br />

0.80 MVA<br />

18.00 %<br />

NW-524-21<br />

103.38 %<br />

-0.55 MW<br />

N-527-32-D4<br />

102.53 %<br />

0.80 MVA<br />

14.98 %<br />

-0.55 MW<br />

0.00 MVA<br />

0.00 %<br />

-0.35 MW<br />

N-527-No-10 Hawaee<br />

104.78 %<br />

N-520-No-11 Zamini# 1&2<br />

104.05 %<br />

-0.70 MW<br />

-0.55 MW<br />

2.05 MVA<br />

17.86 %<br />

N-520-15<br />

104.11 %<br />

9.10 MVA<br />

78.97 %<br />

N-520-11<br />

104.34 %<br />

9.11 MVA<br />

78.97 %<br />

6.70 MVA<br />

58.01 %<br />

P-B3-18-Upgraded to 240 sqm<br />

P-A3-1a Upgraded to 120 mm<br />

S/S North West<br />

105.00 %<br />

61.51 MW<br />

NW-527<br />

NW-516<br />

6.41 MVA<br />

1.60 MVA<br />

64.43 %<br />

21.69 %<br />

NW-518<br />

10.87 MVA<br />

80.00 % NW-513<br />

11.57 MVA<br />

86.66 %<br />

NW-526-2<br />

104.83 %<br />

NW-526<br />

6.46 MVA NW-524<br />

47.54 %<br />

8.06 MVA<br />

69.56 %<br />

NW-525<br />

6.68 MVA NW-514<br />

67.13 %<br />

8.41 MVA<br />

69.28 %<br />

NW-515<br />

2.18 MVA<br />

21.85 %<br />

NW-517<br />

8.17 MVA<br />

67.29 %<br />

P-B2-1 Upgraded to 240 sqm<br />

6.40 MVA<br />

64.43 %<br />

NW-524-6<br />

104.64 %<br />

NW-526-7<br />

104.46 %<br />

NW-527-7<br />

104.48 %<br />

6.66 MVA<br />

67.13 %<br />

2.17 MVA<br />

21.85 %<br />

NW-514-7<br />

104.49 %<br />

8.04 MVA<br />

69.56 %<br />

NW-524-7<br />

104.45 %<br />

NW-515-Gaz Mayee<br />

104.82 %<br />

NW-525-9<br />

104.37 %<br />

-0.22 MW<br />

8.37 MVA<br />

84.47 %<br />

8.02 MVA<br />

69.56 %<br />

NW-524-10<br />

104.20 %<br />

6.64 MVA<br />

67.13 %<br />

1.92 MVA<br />

19.35 %<br />

NW-524-12<br />

104.09 %<br />

7.99 MVA<br />

81.00 %<br />

8.32 MVA<br />

84.48 %<br />

NW-515-15<br />

104.71 %<br />

NW-524-14<br />

103.88 %<br />

NW-525-15<br />

103.95 %<br />

6.38 MVA<br />

64.79 %<br />

NW-514-14<br />

103.76 %<br />

-0.35 MW<br />

NW-524-Borj_2_Dakhel Haweeli # 1&2<br />

103.75 %<br />

-0.35 MW<br />

1.60 MVA<br />

21.91 %<br />

P-A3-3 connection / switch between<br />

NW-515-15 and NW-525-15<br />

NW-524-14_4<br />

103.78 %<br />

6.53 MVA<br />

50.02 %<br />

0.80 MVA<br />

10.96 %<br />

NW-524-Borj_2_Hawee Qalah Najara<br />

103.67 %<br />

P-A3-2 new line 185 OH<br />

NW-524-14_12<br />

103.67 %<br />

0.80 MVA<br />

10.96 %<br />

-0.70 MW<br />

N-527-No-25 Hawaee<br />

102.46 %<br />

-0.70 MW<br />

0.80 MVA<br />

14.98 %<br />

N-527-10-E1<br />

102.52 %<br />

N-527-No-23 Hawaee Tr 1&2<br />

102.21 %<br />

-0.35 MW<br />

1.85 MVA<br />

34.71 %<br />

0.80 MVA<br />

15.02 %<br />

-0.35 MW<br />

1.05 MVA<br />

19.70 %<br />

N-527-10-E6<br />

102.37 %<br />

1.85 MVA<br />

34.72 %<br />

N-527-10-E10<br />

102.23 %<br />

0.39 MVA<br />

3.13 %<br />

JS#10-N<br />

104.80 %<br />

P-A3-4a: Cable reconductered to 240 sqm<br />

1.04 MVA<br />

7.16 %<br />

0.64 MVA<br />

8.74 %<br />

N-519-22<br />

104.80 %<br />

N-JS10-Bland Manzel Mastora 1&2<br />

104.77 %<br />

N-520-No-11 Hawaee<br />

104.02 %<br />

1.04 MVA<br />

8.95 %<br />

0.63 MVA<br />

7.04 %<br />

-0.55 MW<br />

N-519-8<br />

104.93 %<br />

N-529-8<br />

P-B3-15-Reconductored to 185 sqm 104.38 %<br />

9.13 MVA<br />

78.97 %<br />

P-B3-18-Reconductored to 185 sqm<br />

N-513-7<br />

104.63 %<br />

10.46 MVA<br />

78.47 %<br />

N-520<br />

N-511 9.15 MVA<br />

10.85 MVA 67.39 %<br />

82.14 %<br />

N-514-9<br />

104.30 % P-B3-15-Reconductored to 185 sqm<br />

P-B3-18-Reconductored to 185 sqm<br />

N-529<br />

11.63 MVA<br />

75.06 %<br />

N-513<br />

6.72 MVA<br />

49.50 %<br />

N-519<br />

1.04 MVA<br />

7.64 %<br />

N-516 N-517<br />

4.77 MVA 7.02 MVA<br />

35.11 % 51.68 %<br />

N-515 N-518<br />

6.61 MVA 8.83 MVA<br />

42.66 % 64.97 %<br />

6.61 MVA<br />

57.02 %<br />

8.82 MVA<br />

76.14 %<br />

N-515-7<br />

104.72 %<br />

N-512<br />

1.82 MVA<br />

16.37 %<br />

N-514<br />

10.49 MVA<br />

67.69 %<br />

N-528<br />

7.02 MVA<br />

51.66 %<br />

N-518-7<br />

104.62 %<br />

S/S North<br />

105.00 %<br />

74.70 MW<br />

P-B3-15-Upgraded to 240 sqm<br />

1.82 MVA<br />

18.26 %<br />

7.01 MVA<br />

60.56 %<br />

4.77 MVA<br />

41.14 %<br />

P-A3-1a Upgraded to 120 mm<br />

7.01 MVA<br />

60.53 %<br />

N-516-40 Metra Wazir Abad<br />

104.31 %<br />

-0.70 MW<br />

6.95 MVA<br />

60.56 %<br />

3.94 MVA<br />

34.23 %<br />

-0.22 MW<br />

-0.35 MW<br />

NW-518-7<br />

104.42 %<br />

NW-517-5<br />

104.58 %<br />

NW-513-5<br />

104.61 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW 514 B j W k i<br />

0.40 MVA<br />

8 99 %<br />

P-A3-3 connection / switch between<br />

NW-515-18 and NW-514-18<br />

NW-525-18<br />

103.95 %<br />

N-527-10-E 15<br />

102.16 %<br />

P-B3-15-Reconductored to 185 sqm<br />

10.42 MVA<br />

78.47 %<br />

11.56 MVA<br />

87.01 %<br />

6.46<br />

56.0<br />

N-514-No-6 Proja Wazir Abad 1&2<br />

104.42 %<br />

-0.63 MW<br />

-0.50 MW<br />

A-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


1.00 MVA<br />

12.09 %<br />

3.54 MVA<br />

50.75 %<br />

4.19 MVA<br />

59.76 %<br />

4.26 MVA<br />

59.75 %<br />

N-513-Mamr-e-Wuzarat Transport<br />

100.14 %<br />

-0.35 MW<br />

0.40 MVA<br />

5.68 %<br />

-0.70 MW<br />

-0.87 MW<br />

-0.70 MW<br />

-0.55 MW<br />

N-513-Technic wa Asleha<br />

100.76 %<br />

N-513-Taharokat Transport<br />

100.69 %<br />

0.63 MVA<br />

12.00 %<br />

N-513-132<br />

100.36 %<br />

1.00 MVA<br />

11.56 %<br />

0.40 MVA<br />

5.67 %<br />

N-513-154<br />

100.22 %<br />

-0.87 MW<br />

E-513-No_3 Qasaba<br />

98.46 %<br />

N-513-101-H4<br />

100.75 %<br />

0.40 MVA<br />

7.65 %<br />

-0.55 MW<br />

-0.55 MW<br />

N-513-Tasadee Kamaz<br />

100.40 %<br />

0.00 MVA<br />

0.00 %<br />

E-513-No_2 Qasaba<br />

98.48 %<br />

-1 Reconductor from 70 to 120 sqm<br />

3.07 MVA<br />

32.00 %<br />

N-513-99-J2<br />

100.84 %<br />

1.00 MVA<br />

19.07 %<br />

-0.55 MW<br />

E-513-No_1 Qasaba<br />

98.50 %<br />

1.63 MVA<br />

19.69 %<br />

N-513-99<br />

100.85 %<br />

N-513-101<br />

2.43 MVA<br />

25.43 %<br />

N-513-101<br />

100.81 %<br />

P-A3-1 Reconductor from 70 to 120 sqm<br />

1.03 MVA<br />

15.44 %<br />

P-A3-1 Reconductor from 50 to 70 sqm<br />

E-513-127<br />

98.55 %<br />

2.26 MVA<br />

34.58 %<br />

P-A3-1 Reconductor from 50 to 70 sqm<br />

1.43 MVA<br />

20.25 %<br />

N-513-121<br />

100.48 %<br />

-0.35 MW<br />

N-513-Regration<br />

100.39 %<br />

2.27 MVA<br />

24.16 %<br />

-0.55 MW<br />

0.40 MVA<br />

5.67 %<br />

0.40 MVA<br />

5.67 %<br />

E-513-No_2_KhanaSazee<br />

98.94 %<br />

N-513-121-i10<br />

100.40 %<br />

0.63 MVA<br />

5.76 %<br />

E-513-109<br />

98.95 %<br />

2.90 MVA<br />

41.73 %<br />

E-513-106<br />

99.10 %<br />

-0.55 MW<br />

2.91 MVA<br />

41.72 %<br />

E-513-No_1_KhanaSazee<br />

99.32 %<br />

E-513-101<br />

99.27 %<br />

E-513-100<br />

99.33 %<br />

-0.55 MW<br />

E-513-Fabrica Qir<br />

99.51 %<br />

E-513-97<br />

99.52 %<br />

E-513-90<br />

99.99 %<br />

4.19 MVA<br />

59.76 %<br />

P-A3-1a Upgraded to 120 mm<br />

1.42 MVA<br />

14.26 %<br />

A<br />

P-A3-1a Upgraded to 120 mm<br />

6.91 MVA<br />

60.54 %<br />

N-528-528-1<br />

103.20 %<br />

1.41 MVA<br />

14.26 %<br />

6.88 MVA<br />

70.52 %<br />

3.92 MVA<br />

39.86 %<br />

6.90 MVA<br />

60.54 %<br />

P-A3-1a Upgraded to 120 mm<br />

-0.35 MW<br />

N-528-9<br />

102.90 %<br />

2.90 MVA<br />

32.87 %<br />

N-528-10A5<br />

102.71 %<br />

1.41 MVA<br />

14.26 %<br />

P-A3-1a Upgraded to 120 mm<br />

E-521-Sang Marmar Jamshed<br />

102.99 %<br />

N-516-63<br />

103.32 %<br />

1.41 MVA<br />

14.26 %<br />

3.98 MVA<br />

55.13 %<br />

N-517-63<br />

102.21 %<br />

N-528-12<br />

102.74 %<br />

2.89 MVA<br />

32.87 %<br />

N-528-Taqwiaty Chamandy<br />

102.42 %<br />

-0.55 MW<br />

N-512-66<br />

104.10 %<br />

1.41 MVA<br />

14.26 %<br />

P-A3-1a Upgraded to 120 mm<br />

P-A3-1a Upgraded to 120 mm<br />

N-516-No-1-Qwai Hawaye<br />

101.94 %<br />

0.63 MVA<br />

7.19 %<br />

A-4<br />

1 4<br />

%<br />

6 MVA<br />

-0.55 MW<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


4.26 MVA<br />

59.75 %<br />

MVA<br />

%<br />

E-511-43<br />

103.47 %<br />

0.63 MVA<br />

8.66 %<br />

E-511-54<br />

103.37 %<br />

0.63 MVA<br />

8.66 %<br />

E-511-58<br />

103.33 %<br />

0.63 MVA<br />

8.66 %<br />

E-513-65<br />

101.68 %<br />

A-5<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-F-519 -Dahni Tangi<br />

95.47 %<br />

-0.35 MW<br />

0.40 MVA<br />

5.97 %<br />

E-F-519 -234<br />

95.62 %<br />

A-7<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


A<br />

0.34 MVA<br />

5.11 %<br />

0.34 MVA<br />

5.11 %<br />

2.58 MVA<br />

38.02 %<br />

MVA<br />

3 %<br />

NW-513-181<br />

98.94 %<br />

P-B2-1 Reconductor to 70 sqm<br />

NW-513-283<br />

95.02 %<br />

3.95 MVA<br />

60.13 %<br />

P-B2-1 Reconductor to 70 sqm<br />

NW-513-Bande Qargha<br />

99.25 %<br />

-0.09 MW<br />

4.07 MVA<br />

61.64 %<br />

NW-513-222<br />

96.13 %<br />

NW-513-172<br />

99.69 %<br />

2.16 MVA<br />

32.08 %<br />

NW-513-Qalai Amir Mohammad<br />

96.03 %<br />

P-B2-1 Reconductor to 70 sqm<br />

-0.35 MW<br />

1.76 MVA<br />

26.14 %<br />

NW-513-229<br />

95.93 %<br />

4.11 MVA<br />

61.64 %<br />

0.40 MVA<br />

5.94 %<br />

1.76 MVA<br />

26.14 %<br />

0.40 MVA<br />

6.01 %<br />

NW-513-282<br />

95.12 %<br />

-0.35 MW<br />

NW-513-159<br />

100.62 %<br />

NW-513-Khal Dari<br />

94.72 %<br />

NW-513-238<br />

95.64 %<br />

0.40 MVA<br />

6.01 %<br />

NW-513-250-6-41<br />

94.73 %<br />

NW-513-250<br />

95.17 %<br />

0.40 MVA<br />

6.03 %<br />

NW-513-250-6-38<br />

94.74 %<br />

0.40 MVA<br />

6.03 %<br />

NW-513-275<br />

95.15 %<br />

0.40 MVA<br />

6.01 %<br />

NW-513-250-1<br />

95.15 %<br />

1.14 MVA<br />

17.15 %<br />

1.55 MVA<br />

23.15 %<br />

NW-513-Qaria Dalil<br />

95.54 %<br />

1.75 MVA<br />

26.14 %<br />

NW-514-Qalai mirdad<br />

96.02 %<br />

NW-513-250-6-33<br />

94.77 %<br />

1.55 MVA<br />

23.15 %<br />

-0.17 MW<br />

-0.35 MW<br />

0.40 MVA<br />

6.03 %<br />

NW-513-250-6-31<br />

94.78 %<br />

1.14 MVA<br />

17.15 %<br />

NW-513-244<br />

95.49 %<br />

0.40 MVA<br />

6.03 %<br />

-0.35 MW<br />

NW-513-250-3<br />

95.09 %<br />

NW-513-Qalai Yos<strong>of</strong> Khaldari<br />

94.84 %<br />

NW-513-250-6-20<br />

94.85 %<br />

0.40 MVA<br />

6.02 %<br />

NW-513-250-6<br />

95.05 %<br />

1.14 MVA<br />

17.15 %<br />

0.65 MVA<br />

18.53 %<br />

0.80 MVA<br />

12.05 %<br />

NW-513-250-6-16<br />

94.90 %<br />

0.80 MVA<br />

12.05 %<br />

0.80 MVA<br />

12.05 %<br />

0.80 MVA<br />

12.05 %<br />

NW-513-250-6-11<br />

94.97 % NW-513-250-6-8<br />

95.01 %<br />

NW-513-159-27<br />

100.03 %<br />

0.65 MVA<br />

18.54 %<br />

NW-513-159-11<br />

100.16 %<br />

NW-513-250-12<br />

94.97 %<br />

0.34 MVA<br />

5.11 %<br />

NW-513-250-15<br />

94.96 %<br />

NW-513-Shamel Zaee<br />

94.94 %<br />

0.65 MVA<br />

18.54 %<br />

-0.30 MW<br />

NW-513-159-40-2<br />

99.75 %<br />

NW-513-159-40-3<br />

99.74 %<br />

0.25 MVA<br />

7.14 %<br />

0.25 MVA<br />

7.13 %<br />

NW-513-159-40<br />

NW-513-Koshkak<br />

99.77 %<br />

99.77 %<br />

0.65 MVA<br />

18.55 %<br />

-0.35 MW<br />

0.25 MVA<br />

7.14 %<br />

NW-513-Kamangar<br />

99.71 %<br />

-0.22 MW<br />

B-1<br />

NW-513<br />

97.88 %<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


4.81 MVA<br />

49.91 %<br />

5.94 MVA<br />

60.53 %<br />

10.74 MVA<br />

86.68 %<br />

NW<br />

102<br />

59<br />

P-B2-1 Reconductor to 120 sqm<br />

4.79 MVA<br />

49.91 %<br />

NW-518-32<br />

102.08 %<br />

NW-513-149<br />

101.19 %<br />

P-B2-1 Reconductor to 120 sqm<br />

8.01 MVA<br />

70.46 %<br />

10.57 MVA<br />

81.33 %<br />

P-B2-1 Recon<br />

NW-513-Qaria Ali Khan<br />

101.54 %<br />

P-B2-1 Reconductor to 120 sqm<br />

-0.35 MW<br />

NW-518-40<br />

101.29 %<br />

5.24 MVA<br />

54.05 %<br />

NW-517-32<br />

101.96 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-Deh Araban Monari<br />

102.13 %<br />

10.49 MVA<br />

81.33 %<br />

-0.55 MW<br />

11.21 MVA<br />

86.67 %<br />

7.93 MVA<br />

70.46 %<br />

NW-518-47<br />

100.79 %<br />

P-B2-1 Reconductor to 120 sqm<br />

10.44 MVA<br />

81.33 %<br />

NW-518-51<br />

100.51 %<br />

NW-513-43<br />

100.83 %<br />

NW-513-Aqeb tapa Rahmat abad<br />

96.05 %<br />

P-B2-1 Reconductor to 185 sqm<br />

-0.87 MW<br />

0.40 MVA<br />

7.20 %<br />

-0.35 MW<br />

NW-513-Wakseen Sazee<br />

96.75 %<br />

NW-518-Sara Miasht<br />

99.64 %<br />

513-107-64<br />

8 %<br />

A<br />

NW-513-Deh Araban hawahe<br />

103.48 %<br />

-0.55 MW<br />

P-B2-1 Reconductor to 120 sqm<br />

6.61 MVA<br />

66.92 %<br />

NW-513-107a<br />

104.17 %<br />

NW-513-107-2<br />

95.03 %<br />

1.03 MVA<br />

20.93 %<br />

1.03 MVA<br />

20.92 %<br />

P-B2-1a Added a voltage regulator<br />

NW-513-107<br />

95.05 %<br />

P-B2-1 Reconductor to 185 sqm<br />

7.71 MVA<br />

63.37 %<br />

P-B2-1a new 1200 kVAr switched capacitor<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-101<br />

95.56 %<br />

7.74 MVA<br />

63.37 %<br />

NW-513-96<br />

95.97 %<br />

1.60 MVA<br />

28.94 %<br />

NW-513-95-2<br />

96.07 %<br />

NW-513-95<br />

96.09 %<br />

9.36 MVA<br />

76.48 %<br />

0.40 MVA<br />

7.99 %<br />

9.26 MVA<br />

75.56 %<br />

NW-513-92<br />

96.33 %<br />

P-B2-1 Reconductor to 185 sqm<br />

NW-513-Family Rahmat abad<br />

96.28 %<br />

-0.70 MW<br />

9.70 MVA<br />

78.68 %<br />

P-B2-1a new 1200 kVAr switched capacitor<br />

NW-513-86-1<br />

96.81 %<br />

1.00 MVA<br />

17.90 %<br />

10.70 MVA<br />

86.68 %<br />

NW-513-84<br />

97.00 %<br />

NW-513-80<br />

97.35 %<br />

P-B3-1 Reconductor to 185 sqm<br />

10.75 MVA<br />

86.68 %<br />

NW-513-79<br />

97.46 %<br />

10.80 MVA<br />

86.68 %<br />

P-B3-1 Reconductor to 185 sqm<br />

0.63 MVA<br />

6.72 %<br />

NW-513-74<br />

97.89 %<br />

NW 513 74 1<br />

NW-513-72<br />

98.05 %<br />

10.82 MVA<br />

86.68 %<br />

10.89 MVA<br />

86.68 %<br />

P-B3-1 Reconductor to 185 sqm<br />

NW-513-64<br />

98.73 %<br />

-0.35 MW<br />

NW-518-65.3<br />

99.06 %<br />

0.80 MVA<br />

15.52 %<br />

-0.55 MW<br />

0.63 MVA<br />

10.93 %<br />

NW-518-59.5a<br />

99.66 %<br />

NW-518-E-e-Adari Zamini 1&2<br />

99.05 %<br />

-0.35 MW<br />

-0.35 MW<br />

P-B3-1 Reconductor to 185 sqm<br />

10.96 MVA<br />

86.68 %<br />

0.80 MVA<br />

11.50 %<br />

-0.09 MW<br />

0.63 MVA<br />

8.98 %<br />

NW-518-M-e-H <strong>Afghan</strong> Korea 1&2<br />

99.50 %<br />

NW-513-W.P.Sara Miasht<br />

99.06 %<br />

NW-518-59b<br />

99.70 %<br />

NW-518-59A<br />

99.70 %<br />

NW-518-61.1<br />

99.51 %<br />

-0.35 MW<br />

8.85 MVA<br />

70.08 %<br />

NW-513-57<br />

99.48 %<br />

NW-518-65<br />

99.16 %<br />

9.69 MVA<br />

76.39 %<br />

10.40 MVA<br />

81.33 %<br />

11.12 MVA<br />

86.67 %<br />

7.83 MVA<br />

70.47 %<br />

7.82 MVA<br />

70.47 %<br />

7.88 MVA<br />

70.47 %<br />

NW-517-56a<br />

100.63 %<br />

NW-517-56a<br />

100.45 %<br />

P-B2-2 insert nodes and switches<br />

P-B2-2 insert nodes and switches<br />

P-B2-2 insert switch<br />

NW 517 56 1<br />

5.07 MVA<br />

72.96 %<br />

7.79 MVA<br />

70.47 %<br />

NW-518-59<br />

98.88 %<br />

NW-517-59<br />

99.90 %<br />

B-2<br />

5.06 MVA<br />

72.96 %<br />

NW-518-<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


NW-514-Borj Wakseensazi<br />

103.38 %<br />

-0.35 MW<br />

0.40 MVA<br />

8.99 %<br />

1.05 MVA<br />

19.70 %<br />

N-514-No-1 Proja Wazir Abad 1&2<br />

103.52 %<br />

-0.63 MW<br />

-0.50 MW<br />

0.69 MVA<br />

12.72 %<br />

.46 MVA<br />

56.01 %<br />

N-515-13<br />

104.44 %<br />

0.00 MVA<br />

0.00 %<br />

P-B3-13-Switch added<br />

7.88 MVA<br />

80.41 %<br />

P-B2-1 Reconductor to 185 sqm<br />

0.00 MVA<br />

0.02 %<br />

1.28 MVA<br />

17.60 %<br />

N-514-19-C5<br />

104.38 %<br />

0.69 MVA<br />

12.72 %<br />

0.69 MVA<br />

12.72 %<br />

N-518-13<br />

104.30 %<br />

10.81 MVA<br />

81.33 %<br />

11.54 MVA<br />

86.66 %<br />

8.14 MVA<br />

70.46 %<br />

-0.17 MW<br />

NW-514-Mechaniza Zrahaty<br />

102.87 %<br />

NW-514-Spin Ghar CC<br />

103.06 %<br />

-0.11 MW<br />

NW-514-Reiasat Anasor Felezy<br />

102.97 %<br />

0.20 MVA<br />

2.76 %<br />

-0.55 MW<br />

0.12 MVA<br />

2.92 %<br />

0.63 MVA<br />

8.65 %<br />

NW-514-24<br />

102.88 %<br />

7.10 MVA<br />

72.72 %<br />

NW-525-24<br />

103.95 %<br />

N-527-Shahrak Police<br />

101.94 %<br />

-0.70 MW<br />

0.79 MVA<br />

6.51 %<br />

N-527-10-E 29<br />

101.95 %<br />

0.80 MVA<br />

15.00 %<br />

N-527-10-E 28<br />

102.00 %<br />

N-527-10-E 25<br />

102.04 %<br />

0.80 MVA<br />

15.00 %<br />

0.25 MVA<br />

4.70 %<br />

P-B3-15-Reconductored to 185 sqm<br />

9.07 MVA<br />

68.77 %<br />

11.47 MVA<br />

87.02 %<br />

N-514-19<br />

103.60 %<br />

N-529-19<br />

103.53 %<br />

0.00 MVA<br />

0.00 %<br />

N-514-19-B3<br />

104.33 %<br />

P-B3-18-Reconductored to 185 sqm<br />

0.69 MVA<br />

10.13 %<br />

0.69 MVA<br />

12.72 %<br />

N-514-No-2 Proja Wazir Abad 1&2<br />

104.32 %<br />

-0.24 MW<br />

-0.37 MW<br />

N-514-19-C-15<br />

104.41 %<br />

0.36 MVA<br />

6.59 %<br />

6.58 MVA<br />

57.03 %<br />

6.45 MVA<br />

56.01 %<br />

6.90 MVA<br />

70.68 %<br />

-0.22 MW<br />

NW-518-18<br />

103.49 %<br />

NW-517-13<br />

103.81 %<br />

NW-514-Farm Morghdary<br />

102.50 %<br />

-0.35 MW<br />

0.40 MVA<br />

5.54 %<br />

NW-514-28<br />

102.58 %<br />

1.92 MVA<br />

19.35 %<br />

0.00 MVA<br />

0.01 %<br />

N-527-Hotel Shame Paris<br />

102.00 %<br />

N-514-No-7 Proja Wazir Abad 1<br />

102.84 %<br />

-0.50 MW<br />

-0.50 MW<br />

N-514-29-B6<br />

102.88 %<br />

1.13 MVA<br />

15.61 %<br />

1.13 MVA<br />

15.61 %<br />

N-514-No-3 Proja Wazir Abad 1&2<br />

102.91 %<br />

1.43 MVA<br />

19.82 %<br />

N-514-Salim Carwan<br />

104.37 %<br />

-0.31 MW<br />

N-515-24<br />

103.49 %<br />

N-518-24<br />

103.38 %<br />

-0.63 MW<br />

-0.63 MW<br />

6.48 MVA<br />

66.58 %<br />

P-B2-1 Reconductor to 185 sqm<br />

W-518-26<br />

02.80 %<br />

10.64 MVA<br />

81.33 %<br />

10.71 MVA<br />

81.33 %<br />

11.44 MVA<br />

86.66 %<br />

8.08 MVA<br />

70.46 %<br />

NW-517-23<br />

102.93 %<br />

NW-514-Zakhira Teel Badambagh<br />

101.98 %<br />

0.25 MVA<br />

4.70 %<br />

NW-514-30<br />

102.41 %<br />

3.85 MVA<br />

39.59 %<br />

NW-514-40_1<br />

101.99 % NW-514-40<br />

102.00 %<br />

2.62 MVA<br />

30.50 %<br />

NW-514-Borj_2_Tahia Maskan<br />

102.32 %<br />

-0.70 MW<br />

NW-514-Borj_3_Tahia Maskan 1&2<br />

102.32 %<br />

1.82 MVA<br />

21.23 %<br />

-0.35 MW<br />

-0.55 MW<br />

NW-514-Borj_1_Tahia Maskan<br />

102.35 %<br />

-0.70 MW<br />

NW-525-37<br />

103.95 %<br />

NW-515-37<br />

104.27 %<br />

NW-515-39<br />

104.21 %<br />

-0.35 MW<br />

NW-515-Azamatullah<br />

104.12 %<br />

-0.14 MW<br />

NW-515-Flezkary Kargar<br />

104.11 %<br />

NW-515-Proses Roda -0.14 MW<br />

104.11 %<br />

NW-525-39<br />

103.95 %<br />

0.32 MVA<br />

5.89 %<br />

NW-515-43<br />

104.16 %<br />

NW-515-43_1<br />

104.15 %<br />

0.72 MVA<br />

13.25 %<br />

1.19 MVA<br />

12.10 %<br />

NW-515-Haji Wazir Gul<br />

104.11 %<br />

-0.35 MW<br />

NW-515-Agha Shereen<br />

104.10 %<br />

NW-525-43<br />

103.95 %<br />

-0.17 MW<br />

0.60 MVA<br />

11.04 %<br />

NW-525-45<br />

103.95 %<br />

NW-515-47<br />

104.12 %<br />

NW-525-Market Mewa<br />

104.12 %<br />

0.20 MVA<br />

2.02 %<br />

-0.35 MW<br />

NW-515-50<br />

104.11 %<br />

0.00 MVA<br />

0.00 %<br />

0.20 MVA<br />

4.46 %<br />

0.00 MVA<br />

0.00 %<br />

-0.17 MW<br />

NW-515-Kochi Market<br />

104.09 %<br />

-0.35 MW<br />

-0.55 MW<br />

NW-525-Chaman Babrak No-8<br />

102.30 %<br />

NW-525-Hakim Naser Khesro<br />

102.32 %<br />

0.40 MVA<br />

4.54 %<br />

0.63 MVA<br />

7.16 %<br />

NW-525-68<br />

102.35 %<br />

P-B3-15-New OH section <strong>of</strong> 185<br />

P-B3-15-New OH section <strong>of</strong> 185<br />

N-514-36<br />

1.03 MVA<br />

10.58 %<br />

11.29 MVA<br />

87.02 %<br />

P-B3-15-Reconductored to 185 sqm<br />

5.87 MVA<br />

44.93 %<br />

NW-525-72<br />

102.40 %<br />

-0.50 MW<br />

0.80 MVA<br />

8.21 %<br />

6.45 MVA<br />

49.25 %<br />

N-514-No-4 Proja Wazir Abad<br />

102.55 %<br />

NW-525-Taimani No-3<br />

102.36 %<br />

11.38 MVA<br />

87.02 %<br />

P-B3-18-Reconductored to 185 sqm<br />

-0.70 MW<br />

0.00 MVA<br />

0.00 %<br />

NW-525-Qabre Shahoon<br />

101.25 %<br />

-0.87 MW<br />

N-528-Taqweyate Wazir abad<br />

103.09 %<br />

N-528-Wazir Abad<br />

103.09 %<br />

-0.55 MW<br />

-0.70 MW<br />

0.63 MVA<br />

11.72 %<br />

N-518-24a<br />

103.14 %<br />

2.05 MVA<br />

18.03 %<br />

6.52 MVA<br />

57.03 %<br />

N-528-50<br />

103.12 %<br />

4.33 MVA<br />

37.98 %<br />

P-B3-13-Switch added<br />

0.63 MVA<br />

6.42 %<br />

P-B3-1a-reconductor to 120<br />

N-528-Borje Tahire<br />

103.07 %<br />

P<br />

-0.55<br />

P-B2-1 Reconductor to 185 sqm<br />

-0.22 MW<br />

3.58 MVA<br />

31.79 %<br />

NW-514-42<br />

101.94 %<br />

0.00 MVA<br />

0.00 %<br />

-0.70 MW<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-525-82<br />

101.43 %<br />

onductor to 185 sqm<br />

NW-514-42_1<br />

101.90 %<br />

1.03 MVA<br />

28.77 %<br />

NW-514-Borj Deh Kepak 1&2<br />

101.78 %<br />

-0.35 MW<br />

-0.55 MW<br />

2.55 MVA<br />

22.65 %<br />

0.63 MVA<br />

7.36 %<br />

NW-514-Borj_2_Parwan she<br />

101.76 %<br />

-0.55 MW<br />

1.92 MVA<br />

17.06 %<br />

NW-514-Sarai Kantinery_1&2<br />

101.64 %<br />

NW-514-55<br />

101.65 %<br />

0.32 MVA<br />

3.73 %<br />

-0.14 MW<br />

-0.14 MW<br />

NW-515-Market mily<br />

101.96 %<br />

NW-515-Borj_1_Parwan She<br />

101.86 %<br />

-0.35 MW<br />

1.03 MVA<br />

14.30 %<br />

NW-515-74<br />

-0.55 MW<br />

101.87 %<br />

0.40 MVA<br />

6.77 %<br />

0.00 MVA<br />

0.00 %<br />

0.40 MVA<br />

4.12 %<br />

NW-515-Haji Aadam khan<br />

101.85 %<br />

NW-515-60<br />

101.97 %<br />

-0.35 MW<br />

0.40 MVA<br />

4.12 %<br />

NW-515-62<br />

101.99 %<br />

P-B3-15-Reconductored to 185 sqm<br />

1.83 MVA<br />

18.88 %<br />

1.20 MVA<br />

12.36 %<br />

NW-515-Chaman Babrak<br />

101.96 %<br />

0.80 MVA<br />

11.09 %<br />

0.00 MVA<br />

0.00 %<br />

NW-515-63_1a<br />

101.99 %<br />

N-529-63a<br />

100.62 %<br />

10.39 MVA<br />

80.81 %<br />

N-529-63a<br />

1.00 MVA<br />

7.67 %<br />

N-529-49<br />

101.00 %<br />

P-B3-18-Reconductored to 185 sqm<br />

P-B3-19-New switch<br />

NW-515-63_4<br />

101.97 %<br />

0.80 MVA<br />

15.21 %<br />

N-529-49A6<br />

100.91 %<br />

P-B3-15-Reconductored to 185 sqm<br />

0.80 MVA<br />

9.42 %<br />

N-529-Borj 5 Chamni Babrak<br />

100.90 %<br />

-0.55 MW<br />

NW-525-Qasemi Vin House<br />

101.37 %<br />

-0.70 MW<br />

0.63 MVA<br />

10.72 %<br />

NW-525-kabul Paris<br />

101.43 %<br />

NW-525-82.4<br />

101.40 %<br />

-0.35 MW<br />

0.63 MVA<br />

6.52 %<br />

1.03 MVA<br />

10.67 %<br />

NW-525-82.1<br />

101.43 %<br />

-0.70 MW<br />

-0.55 MW<br />

NW-525-Taimani No-2-1&2<br />

101.55 %<br />

0.99 MVA<br />

19.93 %<br />

-0.35 MW<br />

4.86 MVA<br />

43.13 %<br />

4.86 MVA<br />

43.13 %<br />

4.87 MVA<br />

43.13 %<br />

-0.70 MW<br />

P-B3-13-Reconductored to 150 sqm<br />

-0.14 MW<br />

6.46 MVA<br />

42.77 %<br />

0.80 MVA<br />

13.46 %<br />

P-B3-12-New cable section <strong>of</strong> 240<br />

0.00 MVA<br />

0.00 %<br />

P-B3-13-Switch added<br />

-0.70 MW<br />

1.60 MVA<br />

14.23 %<br />

-0.70 MW<br />

-0.70 MW<br />

NW-514-Borj_3_Parwan she<br />

101.57 %<br />

0.00 MVA<br />

0.00 %<br />

1.03 MVA<br />

14.35 %<br />

P-B3-18-Reconductored to 185 sqm<br />

10.28 MVA<br />

80.81 %<br />

0.80 MVA<br />

18.28 %<br />

-0.35 MW<br />

-0.17 MW<br />

0.40 MVA<br />

3.07 %<br />

3.45 MVA<br />

35.80 %<br />

3.45 MVA<br />

35.79 %<br />

NW-525-Nasajy Maqsody<br />

101.79 %<br />

NW-525-109<br />

102.12 %<br />

NW-525-112<br />

102.24 %<br />

NW-525-Qalah Mosa No-1<br />

102.43 %<br />

N-518-Abrasani Wazir abad<br />

102.68 %<br />

N-515-31<br />

102.58 %<br />

0.16 MVA<br />

1.41 %<br />

N-518-31<br />

102.68 %<br />

0.02 MVA<br />

0.20 %<br />

4.15 MVA<br />

36.57 %<br />

NW-525-Qalah Mosa No-2<br />

102.37 %<br />

NW-514-58<br />

101.60 %<br />

NW-515-67<br />

101.92 %<br />

NW-515-67_4<br />

101.87 %<br />

NW-515-Etebar khan<br />

101.96 %<br />

NW-515-Hotel Sultan Qalbha<br />

101.97 %<br />

NW-515-Maiwand Market<br />

101.96 %<br />

NW-515-63_6<br />

101.96 %<br />

N14892<br />

101.73 %<br />

0.40 MVA<br />

4.07 %<br />

4.85 MVA<br />

43.13 %<br />

P-B3-13-Reconductored to 150 sqm<br />

P-B3-13-Reconductored to 150 sqm<br />

0.01 MVA<br />

0.20 %<br />

P-B3-11-New OH section <strong>of</strong> 150<br />

N-515-35<br />

102.58 %<br />

N-518-35<br />

102.38 %<br />

m<br />

0<br />

NW-514-65<br />

98.63 %<br />

0.00 MVA<br />

0.00 %<br />

N-529-64<br />

99.85 %<br />

P-B3-20- new OH 120 sqm<br />

0.80 MVA<br />

18.28 %<br />

NW-515-Borj_4_Parwan She<br />

101.79 %<br />

-0.35 MW<br />

0.00 MVA<br />

0.00 %<br />

P-B3-13-Reconductored to 185 sqm<br />

P-B3-14-New OH section <strong>of</strong> 150<br />

NW-525-101<br />

101.83 %<br />

1.39 MVA<br />

14.42 %<br />

P-B3-11-New OH section <strong>of</strong> 150<br />

0.00 MVA<br />

0.00 %<br />

NW-514-69<br />

98.63 %<br />

0.00 MVA<br />

0.00 %<br />

NW-514-Chamandy Karte Parwan_1&2<br />

98.61 %<br />

10.27 MVA<br />

80.81 %<br />

N-529-66<br />

99.57 %<br />

P-B3-18-Reconductored to 185 sqm<br />

-0.70 MW<br />

-0.35 MW<br />

NW-515-63_16<br />

100.97 %<br />

NW-515-Hawaee Ansary<br />

100.97 %<br />

P-B3-13-Reconductored to 150 sqm<br />

NW-525-Taimani No-1<br />

101.81 %<br />

-0.87 MW<br />

4.14 MVA<br />

36.67 %<br />

NW-525-Charahy Shaheed<br />

99.95 %<br />

-0.55 MW<br />

1.26 MVA<br />

11.56 %<br />

-0.55 MW<br />

-0.55 MW<br />

10.24 MVA<br />

80.82 %<br />

P-B3-18-Reconductored to 185 sqm<br />

NW-515-Blaak haee Shahraara<br />

100.87 %<br />

1.42 MVA<br />

32.88 %<br />

1.82 MVA<br />

16.35 %<br />

P-B3-13-Reconductored to 150 sqm<br />

-0.70 MW<br />

-0.70 MW<br />

0.00 MVA<br />

0.00 %<br />

NW-514-77<br />

98.69 %<br />

1.26 MVA<br />

11.56 %<br />

10.21 MVA<br />

80.82 %<br />

N-529-71<br />

99.26 %<br />

NW-515-63_16_4<br />

100.84 %<br />

0.62 MVA<br />

14.43 %<br />

NW-515-Borj_2_Ansary<br />

101.09 %<br />

P-B3-11-New OH section <strong>of</strong> 150<br />

0.78 MVA<br />

13.53 %<br />

NW-514-80<br />

98.72 %<br />

P-B3-18-Reconductored to 185 sqm<br />

1.26 MVA<br />

18.20 %<br />

N-529-77<br />

99.04 %<br />

NW-515-63_16_7<br />

100.81 %<br />

0.62 MVA<br />

14.43 %<br />

2.62 MVA<br />

24.53 %<br />

P-B3-10-Cable upgraded to 120<br />

-0.55 MW<br />

NW-515-Kolola Poshta<br />

101.34 %<br />

-0.70 MW<br />

N-529_JS5_4_5-Borj Intercontinental # 1&2<br />

97.15 %<br />

P-B3-18-Reconductored to 240 sqm<br />

N-529_JS5_B_2_5-UK emb<br />

98.78 %<br />

-0.35 MW<br />

-0.55 MW<br />

N-529_JS5_4_5-Auxiliary JS5<br />

98.78 %<br />

0.62 MVA<br />

14.43 %<br />

NW-515-Borj_1_Ansary<br />

101.22 %<br />

0.22 MVA<br />

5.16 %<br />

0.63 MVA<br />

11.93 %<br />

NW-518-59.22<br />

97.65 %<br />

-0.70 MW<br />

NW-518-Afshar Seelo<br />

97.63 %<br />

0.80 MVA<br />

15.77 %<br />

NW-518-Academy Police<br />

97.69 %<br />

N-529_JS5_4_5-Borj Politechnice # 1&2<br />

97.62 %<br />

-0.70 MW<br />

N-529_JS5_4_5-Mohamad Omar Khan # 1&2<br />

98.69 %<br />

-0.55 MW<br />

1.26 MVA<br />

22.08 %<br />

N-JS5-Milli Bus<br />

98.78 %<br />

-1.29 MW<br />

JS#5-N-529<br />

98.79 %<br />

1.66 MVA<br />

20.08 %<br />

0.16 MVA<br />

3.10 %<br />

N-529-79-B16<br />

98.77 %<br />

N-529-Bland manzel Gulzad<br />

98.77 %<br />

0.16 MVA<br />

1.92 %<br />

-0.14 MW<br />

NW-515-63_16_9<br />

100.77 %<br />

NW-515-Baraki Shahraara<br />

100.75 %<br />

-0.55 MW<br />

-0.55 MW<br />

3.25 MVA<br />

30.37 %<br />

NW-515-Blaasam Hospital # 1&2<br />

101.36 %<br />

P-B3-10-Cable upgraded to 120<br />

-0.11 MW<br />

-0.09 MW<br />

N-518_JS2_A_1_2-Haji Yahqoob # 1&2<br />

99.66 %<br />

-0.55 MW<br />

N-518_JS2_A_1_2-Bland manzel Asrar<br />

99.69 %<br />

-0.17 MW<br />

-0.87 MW<br />

N-518_JS2_A_1_2-Bland manzel Omarzai<br />

99.65 %<br />

P-B3-8-New cable to 240 sqm<br />

-0.35 MW<br />

-0.22 MW<br />

NW-518-59.18<br />

97.71 %<br />

0.80 MVA<br />

15.77 %<br />

NW-518-59.17<br />

97.73 %<br />

1.25 MVA<br />

24.62 %<br />

2.05 MVA<br />

40.39 %<br />

-1.09 MW<br />

NW-518-59.13<br />

97.82 %<br />

2.23 MVA<br />

39.46 %<br />

NW-518-Lailia Polytechnic 1&2<br />

97.67 %<br />

-0.70 MW<br />

-0.55 MW<br />

0.79 MVA<br />

14.11 %<br />

-0.35 MW<br />

1.59 MVA<br />

19.54 %<br />

0.00 MVA<br />

0.00 %<br />

N-529_JS5_4_5-Borj Baghe Bala # 1&2<br />

98.57 %<br />

N-529_JS5_4_5-34<br />

98.59 %<br />

1.26 MVA<br />

11.57 %<br />

1.26 MVA<br />

11.57 %<br />

2.06 MVA<br />

36.13 %<br />

-0.55 MW<br />

1.26 MVA<br />

11.57 %<br />

N-529_JS5_B_2_5-Noor TV station<br />

98.68 %<br />

-0.22 MW<br />

1.42 MVA<br />

17.11 %<br />

N-529_JS5_B_2_5-Hesa Awal Karteparwan<br />

98.62 %<br />

0.01 MVA<br />

0.19 %<br />

-0.55 MW<br />

P-B3-7-New cable to 120 sqm<br />

3.52 MVA<br />

37.04 %<br />

0.63 MVA<br />

10.93 %<br />

0.01 MVA<br />

0.16 %<br />

N-518_JS2_B_2_5-Gulkhana Park shahrnow<br />

99.46 %<br />

-0.55 MW<br />

P-B3-9-New cable to 240 sqm<br />

Central S/<br />

100.00 %<br />

69.03 MW<br />

5.60 MVA<br />

40.57 %<br />

C-5<br />

5.85 M<br />

42.36<br />

4.29 MVA<br />

62.36 %<br />

0.00 MVA<br />

0.00 %<br />

-0.55 MW<br />

-0.55 MW<br />

NW-3_5-Omer Shaheed<br />

98.58 %<br />

-0.70 MW<br />

NW-515-Shahraara<br />

98.55 %<br />

-0.55 MW<br />

N-515_JS2_D_2_7-Emergency Hospita<br />

99.94 %<br />

NW-518-P.Talim wa Tarbeia<br />

97.99 %<br />

0.62 MVA<br />

7.49 %<br />

-0.14 MW<br />

N-529_JS5_B_2_5-Market Najeeb Zarab<br />

98.60 %<br />

0.63 MVA<br />

11.08 %<br />

NW-515-Moqabel Zaeeshghah<br />

98.61 %<br />

N-518_JS2_B_2_5-<strong>Kabul</strong> City Center # 1&2<br />

99.54 %<br />

1.02 MVA<br />

12.25 %<br />

-0.35 MW<br />

N-518_JS2_B_2_5-Konj Park shahrnow<br />

99.53 %<br />

0.00 MVA<br />

0.00 %<br />

19635126.814399999<br />

4.92 MVA<br />

71.52 %<br />

-0.55 MW<br />

0.16 MVA<br />

3.26 %<br />

-1.09 MW<br />

-1.09 MW<br />

P-B3-1-Open Cable Haji Yahqoob to Tank Teel<br />

Shahr reconnect at this point and install Switches<br />

NW-518-59.3<br />

98.54 %<br />

4.94 MVA<br />

71.52 %<br />

-0.70 MW<br />

N-529_JS5_4_5-Borj Awal Karte Mamoreen<br />

97.33 %<br />

1.43 MVA<br />

25.11 %<br />

N-529_JS5_B_2_5-Sarak Awal Baharestan<br />

98.58 %<br />

-0.17 MW<br />

N-529_JS5_B_2_5-Technic wa Asleha Amneiat<br />

98.66 %<br />

N-518_JS2_B_2_5-Tank Teel Shahr now<br />

99.59 %<br />

B-3<br />

1.25 MVA<br />

15.14 %<br />

0.20 MVA<br />

2.40 %<br />

-0.35 MW<br />

18 W P Kh hh l kh<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.40 MVA<br />

5.47 %<br />

0.00 MVA<br />

0.00 %<br />

0.31 MVA<br />

4.93 %<br />

4.95 MVA<br />

38.68 %<br />

1.00 MVA<br />

10.49 %<br />

N-528-10A10<br />

102.53 %<br />

2.89 MVA<br />

32.87 %<br />

0.63 MVA<br />

7.15 %<br />

1.41 MVA<br />

14.27 %<br />

N-516-85<br />

102.31 %<br />

Reconductored <strong>the</strong> line between N-512-72 and<br />

N-512-80 to 120 sq. mm OH.<br />

N-516-516-B4<br />

101.99 %<br />

1.00 MVA<br />

11.64 %<br />

1.26 MVA<br />

13.00 %<br />

-0.55 MW<br />

0.63 MVA<br />

7.19 %<br />

N-516-No-2-Qwai Hawaye<br />

101.91 %<br />

-0.55 MW<br />

3.97 MVA<br />

55.13 %<br />

N-516-66<br />

102.91 %<br />

3.88 MVA<br />

39.86 %<br />

6.76 MVA<br />

70.53 %<br />

0.40 MVA<br />

7.37 %<br />

6.72 MVA<br />

60.57 %<br />

3.87 MVA<br />

34.24 %<br />

2.26 MVA<br />

23.30 %<br />

-0.87 MW<br />

N-516-Academey Nezame<br />

101.97 %<br />

N-517-66<br />

101.48 %<br />

N-512-chamandi<br />

104.00 %<br />

N-516-93<br />

102.07 %<br />

2.26 MVA<br />

25.72 %<br />

-0.55 MW<br />

N-517-93<br />

99.98 %<br />

-0.35 MW<br />

N-528-Mohamadya No-1<br />

102.12 %<br />

N-528-25-B7<br />

102.12 %<br />

N-528-21<br />

102.29 %<br />

N-528-10A28<br />

102.15 %<br />

P-A3-1a Upgraded to 120 mm<br />

N-512-80<br />

103.92 %<br />

0.63 MVA<br />

8.77 %<br />

3.96 MVA<br />

55.13 %<br />

N-528-25-B3<br />

102.15 %<br />

N-528-25<br />

102.16 %<br />

N-528-Mohamadya No-2<br />

102.15 %<br />

N-528-10-A22<br />

102.24 %<br />

N-528-Sayed Nezam # 1&2<br />

102.23 %<br />

1.00 MVA<br />

18.78 %<br />

-0.55 MW<br />

1.00 MVA<br />

18.79 %<br />

N-528-Chamandi Hawaee<br />

102.15 %<br />

-0.87 MW<br />

1.60 MVA<br />

6.69 MVA<br />

70.53 %<br />

16.56 %<br />

0.61 MVA<br />

6.19 %<br />

2.52 MVA<br />

35.23 %<br />

-0.70 MW<br />

-0.55 MW<br />

E-F-519 - Khowaja Rawash<br />

100.05 %<br />

N-516-111<br />

101.85 %<br />

N-528-28<br />

102.06 %<br />

N-512-87<br />

103.86 %<br />

N-517-111<br />

99.01 %<br />

-0.09 MW<br />

N-517-Taleem Wa Tarbia<br />

98.91 %<br />

N-517-Hawa Shenase<br />

98.84 %<br />

-0.55 MW<br />

1.03 MVA<br />

12.15 %<br />

-0.35 MW<br />

2.52 MVA<br />

35.23 %<br />

N-512-Blak hay Hawahy<br />

103.88 %<br />

-0.35 MW<br />

0.61 MVA<br />

7.02 %<br />

N-517-Do Saraka Maidan<br />

98.94 %<br />

-0.55 MW<br />

0.63 MVA<br />

9.09 %<br />

N-528-32<br />

101.95 %<br />

0.63 MVA<br />

9.09 %<br />

N-512-Abrasani<br />

97.10 %<br />

N-517-517-A17<br />

98.79 %<br />

2.52 MVA<br />

35.23 %<br />

-0.14 MW<br />

N-512-Qalai Wakil<br />

103.84 %<br />

P-B4-1a-reconductor to 120<br />

-0.55 MW<br />

0.00 MVA<br />

0.00 %<br />

N-528-Char Qala Wazir Abad # 1&2<br />

101.79 %<br />

0.00 MVA<br />

0.00 %<br />

-0.55 MW -0.55 MW<br />

1.26 MVA<br />

23.81 %<br />

1.26 MVA<br />

23.81 %<br />

N-528-37-c4<br />

101.73 %<br />

N-528-36<br />

101.84 %<br />

N-516-133-d1<br />

101.49 %<br />

0.40 MVA<br />

4.68 %<br />

N-517-T/SMarkazi N-516-T/SMarkazi Bolak Hawaye # 21<br />

101.48 101.46 %<br />

0.40 0.80 MVA<br />

3.56 7.12 %<br />

-0.35 -0.70 MW<br />

1.60 MVA<br />

14.23 %<br />

-0.55 MW<br />

4.86 MVA<br />

44.47 %<br />

N-517-Qala wakeel Jadeed<br />

98.71 %<br />

-0.55 MW<br />

N-517-517-A24<br />

98.74 %<br />

0.63 MVA<br />

9.09 %<br />

0.63 MVA<br />

9.09 %<br />

E-F-519 -Qala-e Mir Abass Tr 1&2<br />

99.52 %<br />

E-F-519 -50<br />

99.55 %<br />

1.26 MVA<br />

18.02 %<br />

-0.55 MW<br />

1.26 MVA<br />

18.02 %<br />

E-F-519 -43<br />

99.60 %<br />

0.63 MVA<br />

6.62 %<br />

N-516-T/s Riasat Amniat <strong>Kabul</strong><br />

101.49 %<br />

0.16 MVA<br />

3.17 %<br />

-0.55 MW<br />

2.67 MVA<br />

28.17 %<br />

1.26 MVA<br />

23.81 %<br />

-0.35 MW<br />

1.60 MVA<br />

14.24 %<br />

E-F-519 -35<br />

99.82 %<br />

dded<br />

No-2<br />

N-528-Now Abad Qala Mosa<br />

101.62 %<br />

N-528-37-c15<br />

101.59 %<br />

0.63 MVA<br />

11.91 %<br />

-0.55 MW<br />

N-512-102-F17<br />

97.13 %<br />

0.16 MVA<br />

3.17 %<br />

N-512-qalai Khater<br />

97.15 %<br />

-0.70 MW<br />

N-512-102-F8<br />

97.18 %<br />

0.96 MVA<br />

11.53 %<br />

N-512-102-F7<br />

97.19 %<br />

0.96 MVA<br />

11.53 %<br />

0.96 MVA<br />

11.52 %<br />

N-512-102-F2<br />

97.24 %<br />

0.96 MVA<br />

11.52 %<br />

0.63 MVA<br />

7.56 %<br />

0.03 MVA<br />

0.22 %<br />

N-516-133<br />

101.60 %<br />

N-517-133<br />

98.21 %<br />

1.40 MVA<br />

14.84 %<br />

E-F-519 -35.6<br />

99.79 %<br />

E-F-519 -Zan Abad<br />

99.78 %<br />

0.63 MVA<br />

6.65 %<br />

0.63 MVA<br />

6.65 %<br />

3.31 MVA<br />

34.81 %<br />

E-F-519 -29<br />

100.18 %<br />

0.63 MVA<br />

11.91 %<br />

1.59 MVA<br />

19.08 %<br />

N-512-Qalai khowaja<br />

97.25 %<br />

-0.55 MW<br />

0.00 MVA<br />

0.00 %<br />

N-512-99<br />

97.25 %<br />

-0.55 MW<br />

-0.55 MW<br />

3.95 MVA<br />

41.44 %<br />

P-D5-1 New 185 sqm OH section and switch<br />

N-528-37-C17<br />

101.56 %<br />

0.63 MVA<br />

11.91 %<br />

N-512-108<br />

97.38 %<br />

1.59 MVA<br />

19.08 %<br />

1.59 MVA<br />

19.08 %<br />

0.00 MVA<br />

0.00 %<br />

N-512-98<br />

96.80 %<br />

N-517-No-23 Macroryan<br />

97.11 %<br />

E-541-70<br />

100.54 %<br />

6.70 MVA<br />

92.38 %<br />

N-528-No-3 Qala Mosa<br />

101.52 %<br />

N-518_JS2_A_1_2-Qalai Fatullah # 1<br />

99.82 %<br />

-0.55 MW<br />

-0.14 MW<br />

-0.55 MW<br />

N-512-121<br />

98.36 %<br />

P-B4-14 Reconductor to 185 sqm<br />

7.62 MVA<br />

61.43 %<br />

0.63 MVA<br />

7.69 %<br />

N-512-Nowabad BiBi Mahro<br />

97.36 %<br />

-0.55 MW<br />

P-B4-15 New OH section 185 sqm<br />

5.38 MVA<br />

43.51 %<br />

N-512-Bibi Mahro Muqabel<br />

97.05 %<br />

N-512-94<br />

97.00 %<br />

4.98 MVA<br />

40.27 %<br />

-0.35 MW<br />

4.97 MVA<br />

40.27 %<br />

P-B4-17 New OH section 185 sqm<br />

P-B4-16 Reconductor to 185 sqm<br />

N-517-No-19 Macroryan<br />

96.38 %<br />

-0.70 MW<br />

4.32 MVA<br />

37.39 %<br />

4.95 MVA<br />

40.27 %<br />

N-517-No-20 Macroryan<br />

96.46 %<br />

-0.55 MW<br />

0.63 MVA<br />

5.39 %<br />

N-517-No-22 Macroryan<br />

97.12 %<br />

-0.55 MW<br />

-0.55 MW<br />

2.89 MVA<br />

24.80 %<br />

N-517-No-21 Macroryan # 1&2<br />

97.13 %<br />

-0.55 MW<br />

N-517-No-24 Macroryan<br />

97.18 %<br />

0.63 MVA<br />

5.39 %<br />

E-F-519 -Yaka Toot Tr.1&2<br />

99.36 %<br />

-0.87 MW<br />

-0.35 MW<br />

E-541-70-2<br />

100.47 %<br />

E-F-519 -23<br />

100.43 %<br />

ed<br />

0.63 MVA<br />

9.13 %<br />

0.00 MVA<br />

0.00 %<br />

-0.87 MW<br />

N-512-400 Bester 1&2<br />

98.62 %<br />

-0.87 MW<br />

1.99 MVA<br />

35.07 %<br />

3.52 MVA<br />

30.48 %<br />

-0.87 MW<br />

4.78 MVA<br />

57.28 %<br />

0.00 MVA<br />

0.00 %<br />

JS#12-N-517<br />

97.19 %<br />

1.57 MVA<br />

22.20 %<br />

E-F-519 -Qabil BY<br />

100.37 %<br />

P-B4-13 New OH section 185 sqm<br />

-0.55 MW<br />

N-512-Nursing<br />

99.20 %<br />

0.00 MVA<br />

0.00 %<br />

0.63 MVA<br />

9.13 %<br />

0.63 MVA<br />

9.13 %<br />

N-512-125<br />

98.33 %<br />

N-517-No-18 Macroryan<br />

96.31 %<br />

-0.55 MW<br />

2.89 MVA<br />

25.03 %<br />

-0.55 MW<br />

N-517-Bukhar khana Macroryan # 1&2<br />

97.19 %<br />

-0.55 MW<br />

-0.28 MW<br />

E-541-Mawj Mutawaset<br />

98.18 %<br />

0.00 MVA<br />

0.00 %<br />

E-541-Septic Macrorayan<br />

99.99 %<br />

-0.35 MW<br />

1.16 MVA<br />

16.52 %<br />

-0.35 MW<br />

0.76 MVA<br />

14.61 %<br />

E-541-Nasaji Amu<br />

100.04 %<br />

E-541-Qalai Wazir<br />

99.91 %<br />

-0.35 MW<br />

-0.87 MW<br />

N-512-Wazir akbar khan hospital<br />

98.31 %<br />

-0.55 MW<br />

N-517-No-17 Macroryan<br />

96.27 %<br />

N-517-No-16 Macroryan # 1&2<br />

96.25 %<br />

1.26 MVA<br />

10.92 %<br />

-0.35 MW<br />

N-518_JS2_A_1_2-Naqlia Sheerpoor<br />

99.93 %<br />

0.63 MVA<br />

10.93 %<br />

1.62 MVA<br />

28.35 %<br />

-0.87 MW<br />

N-512-Sehat Tefl<br />

99.28 %<br />

0.99 MVA<br />

17.31 %<br />

0.00 MVA<br />

0.00 %<br />

N-516-Stera Mahkama<br />

99.09 %<br />

8.53 MVA<br />

72.04 %<br />

N-516-Macroryan Communication<br />

99.07 %<br />

N-512-T#3 Wazir akbar khan<br />

99.11 %<br />

-0.70 MW<br />

-0.87 MW<br />

N-516-No-11-Macroy-SW<br />

98.88 %<br />

1.00 MVA<br />

7.52 %<br />

N-516-No-11 Macroryan<br />

96.26 %<br />

-0.87 MW<br />

-0.55 MW<br />

P-B4-19-New Switches<br />

P-B4-19-New Cable 240 sqm<br />

-0.55 MW<br />

-0.55 MW<br />

-0.70 MW<br />

-0.30 MW<br />

E-541-Banaey<br />

98.21 %<br />

3.59 MVA<br />

52.05 %<br />

0.34 MVA<br />

5.99 %<br />

E-541-T.T.C<br />

98.20 %<br />

2.53 MVA<br />

36.76 %<br />

0.40 MVA<br />

6.26 %<br />

0.71 MVA<br />

10.36 %<br />

0.31 MVA<br />

4.56 %<br />

0.36 MVA<br />

6.92 %<br />

S/S<br />

%<br />

W<br />

C-516<br />

5.85 MVA<br />

42.36 %<br />

N-518<br />

0.02 MVA<br />

0.19 %<br />

C-520<br />

0.63 MVA<br />

7.50 %<br />

C-517<br />

6.71 MVA<br />

48.57 %<br />

C-518<br />

7.39 MVA<br />

53.47 %<br />

C-519<br />

3.82 MVA<br />

66.20 %<br />

-0.55 MW<br />

N-515<br />

0.02 MVA<br />

0.21 %<br />

C-521<br />

1.41 MVA<br />

24.41 %<br />

C-514<br />

8.46 MVA<br />

66.45 %<br />

C-515<br />

9.01 MVA<br />

65.19 %<br />

8.27 MVA<br />

60.23 %<br />

C-511 C-512<br />

9.19 MVA 8.66 MVA<br />

66.47 % 62.63 %<br />

C-510<br />

9.39 MVA<br />

67.91 %<br />

P-B4-18-New Cable 240 sqm<br />

P-B4-1-Change Cable to 240 sqm<br />

C-513<br />

N-512-T#2 Wazir akbar khan<br />

99.35 %<br />

-0.87 MW<br />

0.25 MVA<br />

4.33 %<br />

4.66 MVA<br />

34.03 %<br />

N-512-Ministry <strong>of</strong> health<br />

98.91 %<br />

-0.22 MW<br />

P-B4-2-Change Cable to 240 sqm<br />

and reconnect to #12 Macoryan<br />

-0.35 MW<br />

P-B4-2- Remove 50 sqm cable between T#1<br />

and T#2 Wazir Akabar Khan<br />

-0.22 MW<br />

P-B4-2-New Cable 50 sqm<br />

-0.87 MW<br />

P-B4-3- 2 New Risers and Reconnect<br />

Cables to Trf<br />

0.99 MVA<br />

8.37 %<br />

N-516-No-9Macroryan<br />

99.07 %<br />

-0.55 MW<br />

N-516-12_1<br />

98.53 %<br />

-0.55 MW<br />

0.00 MVA<br />

0.00 %<br />

N-516-No-12Macroryan<br />

99.09 %<br />

P-B4-7-Change<br />

cable to 240 sqm<br />

-0.55 MW<br />

8.52 MVA<br />

72.06 %<br />

N-516-No-10 Macroryan<br />

98.75 %<br />

N-516-Matbea # 1&2<br />

98.53 %<br />

0.63 MVA<br />

5.31 %<br />

-0.55 MW<br />

-0.70 MW<br />

N-516-No-8 Macroryan<br />

98.74 %<br />

P-B4-10 New OH section 185 sqm<br />

3.38 MVA<br />

26.92 %<br />

7.09 MVA<br />

60.01 %<br />

N-516-No-13 Macroryan<br />

98.62 %<br />

6.46 MVA<br />

54.68 %<br />

-0.55 MW<br />

-0.55 MW<br />

0.00 MVA<br />

0.00 %<br />

N-516-15 Macroryan # 1&2<br />

98.50 %<br />

5.82 MVA<br />

49.37 %<br />

N-516-No-14 Macroryan<br />

98.60 %<br />

4.40 MVA<br />

37.27 %<br />

0.00 MVA<br />

0.00 %<br />

P-B4-12 New switches and connections<br />

P-B4-11 Reconductor to 120 sqm<br />

4.40 MVA<br />

35.06 %<br />

3.99 MVA<br />

57.84 %<br />

0.40 MVA<br />

5.79 %<br />

E-541-Char Burja<br />

98.41 %<br />

-0.35 MW<br />

-0.35 MW<br />

E-541-Mawad -e- Mukhadera<br />

98.29 %<br />

2.53 MVA<br />

36.76 %<br />

E-541-Septic Qalai zamankhan<br />

99.86 %<br />

-0.31 MW<br />

0.25 MVA<br />

2.10 %<br />

Hospital<br />

-0.22 MW<br />

-0.22 MW<br />

N-518_JS2_517-Sefarat Turkia<br />

99.57 %<br />

P-B4-19-Change Cable to 240 sqm<br />

P B4 9 Change Cable to 240 sqm<br />

0.25 MVA<br />

5.08 %<br />

P-B4-8-Change Cable to 240 sqm<br />

0.20 MVA<br />

4.08 %<br />

N-518_JS2_517-Sefarat Alman<br />

99.58 %<br />

-0.17 MW<br />

3.36 MVA<br />

58.46 %<br />

P-B4-5-Change Cable to 240 sqm<br />

N-518_JS2_517-Kenare Lessee Am<br />

99.30 %<br />

2.56 MVA<br />

44.62 %<br />

0.40 MVA<br />

8.14 %<br />

N-518_JS2_517-<strong>Afghan</strong>istan Natil TV_Tr 1&2<br />

98.93 %<br />

-0.55 MW<br />

-0.35 MW<br />

1.27 MVA<br />

22.30 %<br />

-0.35 MW<br />

-0.35 MW<br />

-0.55 MW<br />

N-518_JS2_517-Hawa Nawardee<br />

98.98 %<br />

-0.22 MW<br />

N-518_JS2_517-<strong>Afghan</strong> Film<br />

99.25 %<br />

N-518_JS2_517-R <strong>Afghan</strong>istan Tr 1&2<br />

98.95 %<br />

P-B4-3 Change Cable to 240 sqm<br />

N-516-Garnizion<br />

98.51 %<br />

N-516-Ryasat Amneyat # 16<br />

98.85 %<br />

N-516-Emalat khana Ordo<br />

98.51 %<br />

-0.35 MW<br />

5.45 MVA<br />

39.88 %<br />

0.40 MVA<br />

4.82 %<br />

N-516-12_8<br />

98.80 %<br />

-0.35 MW<br />

5.43 MVA<br />

43.29 %<br />

P-B4-3 Reconductor to 185 sqm<br />

E-541-Maslakh Tr 1&2<br />

97.60 %<br />

E-541-Riasat Amneiat<br />

97 59 %<br />

E-541-145-9<br />

97.61 % -0.55 MW<br />

-0.55 MW<br />

0.80 MVA<br />

15.77 %<br />

1.26 MVA<br />

22.37 %<br />

P-B4-11 Reconductor to 120 sqm<br />

0.80 MVA<br />

15.77 %<br />

E-541-145-8<br />

97.64 %<br />

2.06 MVA<br />

40.60 %<br />

E 541 145 7<br />

E-541-129<br />

98.28 %<br />

3.37 MVA<br />

36.14 %<br />

P-C4-6 Reconductor to 120sqm<br />

3.37 MVA<br />

36.14 %<br />

E-541-135<br />

97.93 %<br />

0.40 MVA<br />

4.36 %<br />

E-541-Wezarat Fawaed Ama<br />

97 93 %<br />

E-541-132<br />

98.18 %<br />

0.00 MVA<br />

0.00 %<br />

3.36 MVA<br />

36.14 %<br />

P-C4-8 Reconductor to 120 sqm<br />

P C4 8 Reconductor to 120 sqm<br />

E-541-113-13<br />

97.75 %<br />

E-541-113-13-2<br />

97.78 %<br />

1.26 MVA<br />

18.39 %<br />

1.26 MVA<br />

18.39 %<br />

E-541-No.55 Qalai Zamnkhan Tr 2_LV<br />

99.14 %<br />

1.26 MVA<br />

18.38 %<br />

E-541-No.55 Qalai Zamnkhan Tr 1&2<br />

97.70 %<br />

-0.55 MW<br />

-0.55 MW<br />

B-4<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.40 MVA<br />

7.43 %<br />

0.40 MVA<br />

5.49 %<br />

1.03 MVA<br />

7.81 %<br />

4.91 MVA<br />

37.03 %<br />

3.73 MVA<br />

53.29 %<br />

0.40 MVA<br />

7.44 %<br />

E-521-48<br />

103.04 %<br />

E-511-58.7<br />

103.24 %<br />

0.63 MVA<br />

9.36 %<br />

E-511-Tr. Gas maye Anardara<br />

103.24 %<br />

-0.55 MW<br />

0.63 MVA<br />

8.65 %<br />

4.29 MVA<br />

32.92 %<br />

-0.87 MW -0.55 MW<br />

-0.55 MW<br />

E-511-Tr -Alokozai kefayat<br />

103.56 %<br />

E-511-Tr,sherkat Paiman<br />

103.58 %<br />

E-521-Qasemi Felez<br />

103.16 %<br />

1.00 MVA<br />

13.71 %<br />

1.62 MVA<br />

22.34 %<br />

E-511-28<br />

103.65 %<br />

E-521-38<br />

103.17 %<br />

1.03 MVA<br />

19.14 %<br />

E-521-37<br />

103.28 %<br />

P-B5-10 Added a switch<br />

-0.35 MW<br />

E-521-Rahim Suhak<br />

102.41 %<br />

E-521-28_7<br />

102.41 %<br />

-0.17 MW<br />

E-521-Tawfiq<br />

102.44 %<br />

0.45 MVA<br />

8.41 %<br />

E-521- Zaher Plastic<br />

102.44 %<br />

-0.17 MW<br />

1.03 MVA<br />

19.14 %<br />

4.29 MVA<br />

32.92 %<br />

-0.22 MW<br />

E-521-TGM Transformer<br />

103.81 %<br />

2.26 MVA<br />

30.99 %<br />

0.25 MVA<br />

4.39 %<br />

E-521-28_2<br />

102.44 %<br />

1.05 MVA<br />

19.63 %<br />

0.25 MVA<br />

2.85 %<br />

-0.55 MW<br />

5.41 MVA<br />

74.28 %<br />

E-521-Kaka Khil Traso<br />

102.40 %<br />

P-B5-9 Reconductor to 185 sqm<br />

E-521-<strong>Afghan</strong> Aard factory<br />

103.78 %<br />

E-511-20<br />

103.84 %<br />

-0.87 MW<br />

E-F-519 -Spengahr Oil Fectory Tr 1&2<br />

103.09 %<br />

2.26 MVA<br />

30.99 %<br />

-0.22 MW<br />

-0.87 MW<br />

-0.35 MW<br />

0.88 MVA<br />

16.23 %<br />

E-511-19<br />

103.88 %<br />

E-521-No_1_Park ha<br />

101.88 %<br />

-0.87 MW<br />

E-521-Bahir Printing Press<br />

103.36 %<br />

0.40 MVA<br />

7.42 %<br />

E-521-Tr_4_Park ha<br />

103.37 %<br />

-0.87 MW<br />

E-521-15_7<br />

103.91 %<br />

E-511-16<br />

103.95 %<br />

P-B5-4 Reconductored to 185 sqm<br />

2.26 MVA<br />

30.99 %<br />

P-B5-4 Reconductored to 185 sqm<br />

2.64 MVA<br />

19.95 %<br />

E-511-16-35<br />

103.71 %<br />

P-B5-5-New OH 240 sqm<br />

2.63 MVA<br />

19.95 %<br />

E-F-519 - Refa Constraction Company<br />

103.33 %<br />

-0.55 MW<br />

2.00 MVA<br />

15.18 %<br />

1.99 MVA<br />

27.56 %<br />

E-F-519 -78_A<br />

103.22 %<br />

2.42 MVA<br />

18.41 %<br />

0.88 MVA<br />

16.23 %<br />

E-521-Maihan Dost Factory<br />

101.91 %<br />

-0.35 MW<br />

-0.87 MW<br />

-0.17 MW<br />

P-B5-9 Reconductor to 185 sqm<br />

E-511-2<br />

104.08 %<br />

Added 70 sq mm OH section E-511-2-2.<br />

E-F-519 -Maweneat Takhink<br />

100.66 %<br />

-0.<br />

E-521-Logistic Mahajereen<br />

101.95 %<br />

-0.35 MW<br />

E-521-19_27<br />

101.98 %<br />

0.80 MVA<br />

15.05 %<br />

-0.35 MW<br />

-0.87 MW<br />

E-521-Police Markazee<br />

101.95 %<br />

E-521-Park ha<br />

101.99 %<br />

E-521-Ameriat Park ha<br />

101.93 %<br />

E-521-Sangi Jeke<br />

102.10 %<br />

-0.35 MW<br />

0.00 MVA<br />

0.02 %<br />

4.61 MVA<br />

86.56 %<br />

4.63 MVA<br />

86.56 %<br />

E-521-Tawlid Aard Janat<br />

103.04 %<br />

-0.35 MW<br />

5.05 MVA<br />

38.37 %<br />

0.00 MVA<br />

0.00 %<br />

E-521-Marmar Khalid<br />

103.30 %<br />

E-521-19_6<br />

103.37 %<br />

-0.35 MW<br />

P-B5-7-New OH 185 sq mm section<br />

E-541-Fabrike Meno<br />

103.42 %<br />

E-541-69<br />

103.43 %<br />

-0.35 MW<br />

5.65 MVA<br />

42.91 %<br />

E-521-19<br />

103.48 %<br />

E-521-Aard <strong>Kabul</strong><br />

103.36 %<br />

P-B5-12 Reconductor to 185 sqm<br />

8.12 MVA<br />

61.32 %<br />

P-B5-2 Reconductor to 185 sqm<br />

7.16 MVA<br />

53.93 %<br />

P-B5-15:Switches added<br />

E-F-519 -11<br />

104.11 %<br />

P-B5-2 Reconductor to 185 sqm<br />

0.01 MVA<br />

0.09 %<br />

E-521-15<br />

104.00 %<br />

P-B5-15: New 95 sqmm cable section<br />

E-513-10<br />

104.43 %<br />

9.01 MVA<br />

67.94 %<br />

P-B5-12 Reconductor to 185 sqm<br />

5.44 MVA<br />

74.28 %<br />

E-513-16<br />

104.13 %<br />

E-521-8<br />

104.23 %<br />

9.03 MVA<br />

67.94 %<br />

E-F-519 -21-5<br />

103.50 %<br />

E-513-19<br />

103.89 %<br />

E-F-519 -21<br />

103.56 %<br />

P-B5-8- Upgraded cable to 240 sq. mm.<br />

9.06 MVA<br />

67.94 %<br />

P-B5-9 Reconductor to 185 sqm<br />

E-521-5<br />

104.46 %<br />

E-521-1<br />

104.76 %<br />

P-B5-9 Reconductor to 185 sqm<br />

7.17 MVA<br />

53.93 %<br />

0.80 MVA<br />

10.98 %<br />

0.80 MVA<br />

10.98 %<br />

P-B5-2 Reconductor to 185 sqm<br />

E-541-16<br />

104.45 %<br />

E-F-519 -21-7<br />

103.46 %<br />

-0.70 MW<br />

P-B5-3- Upgraded cable to 240 sq. mm.<br />

E-F-519 -HodKhel No-2<br />

103.45 %<br />

P-B5-3- Upgraded cable to 240 sq. mm.<br />

E-F-519-35a<br />

102.67 %<br />

0.00 MVA<br />

0.00 %<br />

5.53 MVA<br />

36.03 %<br />

0.63 MVA<br />

9.10 %<br />

0.00 MVA<br />

0.00 %<br />

8.94 MVA<br />

68.43 %<br />

P-B5-2: New cable 95 sq. mm<br />

-0.55 MW<br />

P-B5-2 Reconductor to 185 sqm<br />

E-F-519 - oxygen Product<br />

104.30 %<br />

E-F-519 -<strong>Afghan</strong>i constraction Company<br />

104.04 %<br />

P-B5-2: Added switch<br />

-0.35 MW<br />

1.59 MVA<br />

21.73 %<br />

E-F-519 -kabul Hend<br />

104.25 %<br />

-0.22 MW<br />

8.92 MVA<br />

68.43 %<br />

0.63 MVA<br />

11.59 %<br />

P-B5-14: new 185 sq. mm OH<br />

0.71 MVA<br />

9.74 %<br />

-0.35 MW<br />

E-F-519 - <strong>Kabul</strong> Nan Pazi<br />

104.15 %<br />

E-F-519 -48.1<br />

104.17 %<br />

E-F-519 -48<br />

104.18 %<br />

0.40 MVA<br />

5.45 %<br />

0.31 MVA<br />

4.29 %<br />

-0.28 MW<br />

E-F-519 -<strong>Afghan</strong> Fruit Fectory<br />

104.15 %<br />

0.31 MVA<br />

4.29 %<br />

P-B5-2: Switch<br />

8.85 MVA<br />

68.43 %<br />

0.63 MVA<br />

8.87 %<br />

-0.55 MW<br />

E-F-519 -Nebraska Priting Press<br />

100.74 %<br />

E-F-519 -Pashmina Bafi Fectory<br />

101.04 %<br />

E-F-519 -60<br />

101.07 %<br />

-0.55 MW<br />

0.63 MVA<br />

8.90 %<br />

E-F-519 - Workshop Urdo<br />

100.70 %<br />

8.18 MVA<br />

63.56 %<br />

0.63 MVA<br />

8.90 %<br />

-0.35 MW<br />

E-F-519 -Paktia Kot No,1<br />

100.81 %<br />

E-F-519 -63_8B<br />

100.71 %<br />

E-F-519 -63<br />

100.83 %<br />

1.86 MVA<br />

26.27 %<br />

1.23 MVA<br />

17.38 %<br />

-0.55 MW<br />

0.63 MVA<br />

8.90 %<br />

0.20 MVA<br />

2.82 %<br />

E-F-519 -63_2B<br />

100.79 %<br />

0.63 MVA<br />

8.90 %<br />

E-F-519 -63_12B<br />

100.67 %<br />

E-F-519 -Poste Roda Factory<br />

100.28 %<br />

E-F-519 -Bamezai<br />

100.71 %<br />

-0.17 MW<br />

5.06 MVA<br />

39.42 %<br />

-0.35 MW<br />

0.40 MVA<br />

5.67 %<br />

-0.17 MW<br />

E-F-519 -78<br />

100.32 %<br />

E-F-519 - Gas Mahi-e Farahi<br />

100.44 %<br />

0.63 MVA<br />

8.90 %<br />

0.00 MVA<br />

0.00 %<br />

4.84 MVA<br />

37.87 %<br />

Opened Switch<br />

4.44 MVA<br />

63.12 %<br />

E-F-521-Keshmeshpaki Babak<br />

100.03 %<br />

E-F-519 -74<br />

100.44 %<br />

0.63 MVA<br />

8.90 %<br />

-0.09 MW<br />

4.33 MVA<br />

61.72 %<br />

E-F-519 -85<br />

99.89 %<br />

0.20 MVA<br />

2.85 %<br />

E-F-519 -<strong>Kabul</strong> plastic<br />

99.89 %<br />

-0.17 MW<br />

4.13 MVA<br />

58.91 %<br />

0.40 MVA<br />

5.71 %<br />

-0.55 MW<br />

E-F-519 -57 Talime<br />

99.49 %<br />

E-F-519 -Sange Marmar<br />

99.72 %<br />

-0.35 MW<br />

E-F-519 -89<br />

99.68 %<br />

3.10 MVA<br />

44.47 %<br />

E-F-519 - Family Akadmi Ta<br />

99.14 %<br />

E-<br />

99<br />

5.45 MVA<br />

74.28 %<br />

E-F-519 - Paktia Kot No,2<br />

100.74 %<br />

E-F-519 - Paktia Kot No,3<br />

100.70 %<br />

E-513-9<br />

104.61 %<br />

7.19 MVA<br />

53.93 %<br />

P-B5-12 Reconductor to 185 sqm<br />

E-F-519 -Fanta Fectory<br />

104.19 %<br />

-0.55 MW<br />

-0.55 MW<br />

9.93 MVA<br />

74.47 %<br />

-0.55 MW<br />

P-B5-2 Reconductor to 185 sqm<br />

S/S East<br />

105.00 %<br />

41.88 MW<br />

E-521<br />

P-B5-1- Upgraded cable to 240 sq. mm.<br />

E-519<br />

9.95 MVA<br />

64.24 %<br />

E-513<br />

5.46 MVA<br />

74.28 %<br />

E-531<br />

3.99 MVA<br />

29.88 %<br />

9.07 MVA<br />

62.50 %<br />

E-511<br />

7.56 MVA<br />

48.81 %<br />

E-541<br />

7.20 MVA<br />

E-536<br />

53.93 %<br />

0.01 MVA<br />

E-515 0.10 %<br />

0.95 MVA<br />

-0.70 MW<br />

9.50 %<br />

E-541-Hodkhel-1<br />

104.94 %<br />

E-523<br />

2.80 MVA<br />

28.53 %<br />

P-B5-11- Upgraded cable to 240 sq. mm.<br />

2.80 MVA<br />

24.18 %<br />

E-523-7<br />

104.81 %<br />

E-531-5<br />

104.84 %<br />

E-531-6<br />

104.83 %<br />

3.99 MVA<br />

29.88 %<br />

0.01 MVA<br />

0.06 %<br />

2.80 MVA<br />

24.18 %<br />

E-536-11<br />

105.00 %<br />

3.99 MVA<br />

29.88 %<br />

E-523-19<br />

104.52 %<br />

0.01 MVA<br />

0.06 %<br />

B-5<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.81 MVA<br />

11.94 %<br />

.35 MW<br />

E-F-519 - Lakan Khial<br />

96.82 %<br />

1.98 MVA<br />

29.18 %<br />

E-F-519 -167<br />

96.67 %<br />

akhnic<br />

-0.35 MW<br />

F-519 -103<br />

9.14 %<br />

2.37 MVA<br />

34.73 %<br />

1.98 MVA<br />

29.18 %<br />

E-F-519 -146<br />

97.23 %<br />

P-B5-6-900 kVAr capacitor bank<br />

E-F-519 -178<br />

96.34 %<br />

2.37 MVA<br />

34.72 %<br />

1.97 MVA<br />

29.18 %<br />

1.43 MVA<br />

21.19 %<br />

-0.55 MW<br />

E-F-519 - Pul-e Charkhi Tr 1&2<br />

96.29 %<br />

2.70 MVA<br />

38.90 %<br />

E-F-519 -173<br />

96.47 %<br />

E-F-519 -178.3<br />

96.30 %<br />

-0.35 MW<br />

E-F-519 -Qala-e Gulbaz Tr.1&2<br />

97.91 %<br />

-0.17 MW<br />

2.38 MVA<br />

34.72 %<br />

E-F-519 -141<br />

97.44 %<br />

2.38 MVA<br />

34.72 %<br />

0.40 MVA<br />

5.93 %<br />

-0.09 MW<br />

E-F-519 -140<br />

97.51 %<br />

E-F-519 -178.5<br />

96.27 %<br />

0.40 MVA<br />

5.93 %<br />

E-F-519 -178.11<br />

96.18 %<br />

0.40 MVA<br />

5.94 %<br />

E-F-519 -Qali Jabar Khan<br />

96.13 %<br />

-0.35 MW<br />

B-6<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.40 MVA<br />

5.98 %<br />

0.81 MVA<br />

11.94 %<br />

E-F-519 - Qaria-e Mulah Mohammad Sahib<br />

95.36 %<br />

-0.35 MW<br />

B-7<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.63 MVA<br />

12.27 %<br />

6.62 MVA<br />

49.88 %<br />

6.63 MVA<br />

49.88 %<br />

97.88 %<br />

0.63 MVA<br />

12.38 %<br />

NW-513-Hawahe Khoja jam Wali<br />

97.87 %<br />

-0.55 MW<br />

0.63 MVA<br />

12.38 %<br />

NW-513-107-58<br />

97.97 %<br />

-0.35 MW<br />

NW-513-5-G-OH<br />

94.95 %<br />

-0.35 MW<br />

0.63 MVA<br />

12.80 %<br />

NW-513-B. h-e-Cha Qumber 1&2<br />

95.84 %<br />

-0.70 MW<br />

-0.70 MW<br />

6.72 %<br />

NW-513-74-1<br />

98.85 %<br />

P-B3-1 change connection from NW-513-79 to NW-517-56.5<br />

P-B3-1 change connection from NW-513-74 to NW-517-56.4<br />

0.63 MVA<br />

12.27 %<br />

NW-518-Markaz-e-talimi<br />

98.89 %<br />

-0.70 MW<br />

P-B3-1 new line OH 120<br />

P-B3-1 new line OH 120<br />

P-B3-1 change connection from NW-518-Markaz-e-talimi to N14787<br />

NW-518-70<br />

99.14 %<br />

0 8<br />

11.50 %<br />

2.87 MVA<br />

30.55 %<br />

P-B3-1 change connection from NW-518-61 to NW-517-56.3<br />

NW-517-56.2<br />

99.06 %<br />

0.00 MVA<br />

0.01 %<br />

NW-517-56.1<br />

99.10 %<br />

NW-518-66<br />

99.14 %<br />

P-B3-1 insert switch<br />

P-B3-1 new line OH 120<br />

P-B3-1 change connection from NW-513-58 to NW-517-56.2<br />

70<br />

99.90 %<br />

NW-5_6-No-6 Khoshalkhan<br />

97.81 %<br />

NW-518-<br />

98.54 %<br />

NW-513-H Taqwiaty Qalai kashef<br />

98.19 %<br />

1.44 MVA<br />

27.94 %<br />

NW-5_6-15<br />

97.81 %<br />

-0.70 MW<br />

1.26 MVA<br />

24.76 %<br />

0.40 MVA<br />

7.84 %<br />

0.80 MVA<br />

15.62 %<br />

NW-513-107-12<br />

94.88 %<br />

0.63 MVA<br />

12.81 %<br />

NW-513-79-11<br />

98.72 %<br />

0.63 MVA<br />

12.27 %<br />

NW-513-79-7<br />

98.76 %<br />

0.80 MVA<br />

11.65 %<br />

NW-513-107-37-5<br />

98.51 %<br />

-0.70 MW<br />

0.63 MVA<br />

12.38 %<br />

0.40 MVA<br />

7.83 %<br />

NW-513-107-48<br />

98.23 %<br />

1.67 MVA<br />

32.59 %<br />

0.80 MVA<br />

15.62 %<br />

NW-513-5-G-Indoor<br />

94.84 %<br />

Opened SW .<br />

-0.55 MW<br />

NW-513-Qalai Nazer<br />

98.69 %<br />

-0.55 MW<br />

NW-513-Qalai Wazir Khoshhalkhan<br />

98.65 %<br />

0.00 MVA<br />

0.00 %<br />

NW-513-74-10<br />

98.65 %<br />

1.43 MVA<br />

27.94 %<br />

NW-513-74-19<br />

98.43 %<br />

NW-513-No-8 Khoshalkhan<br />

98.41 %<br />

-0.70 MW<br />

0.00 MVA<br />

0.01 %<br />

0.00 MVA<br />

0.00 %<br />

-0.55 MW<br />

NW-513-A Godam hay Kampani<br />

97.86 %<br />

NW-513-107-43<br />

98.39 %<br />

1.67 MVA<br />

32.59 %<br />

NW-513-107-37-A1<br />

98.57 %<br />

NW-513-107-37<br />

98.58 %<br />

0.63 MVA<br />

12.30 %<br />

3.11 MVA<br />

60.51 %<br />

NW-513-107-34<br />

98.84 %<br />

-0.55 MW<br />

0.16 MVA<br />

3.11 %<br />

3.28 MVA<br />

63.62 %<br />

NW-513-107-27<br />

99.32 %<br />

NW-513-Market Haji Sher<br />

98.84 %<br />

NW-518-82<br />

99.14 %<br />

NW-513-107-37-A4<br />

98.53 %<br />

0.63 MVA<br />

12.30 %<br />

0.63 MVA<br />

12.30 %<br />

NW-513-Sare kariz Kampani Hawahe<br />

98.51 %<br />

-0.55 MW<br />

-0.14 MW<br />

NW-513-107-27-3<br />

103.71 %<br />

0.00 MVA<br />

0.00 %<br />

-0.35 MW<br />

NW-513-No-1 Abrasani Fazel beek<br />

103.71 %<br />

3.30 MVA<br />

63.62 %<br />

NW-513-107-20<br />

99.79 %<br />

3.30 MVA<br />

63.61 %<br />

3.30 MVA<br />

63.61 %<br />

NW-513-107-20-3<br />

99.95 %<br />

C3-P3: Added 70 sq. mm. Overhead<br />

-0.55 MW<br />

0.00 MVA<br />

0.01 %<br />

-0.87 MW<br />

NW-4_7-No-7 Khushhal Khan<br />

103.65 %<br />

NW<br />

99<br />

P-<br />

NW-513-107-20-6<br />

100.16 %<br />

4.01 MVA<br />

59.33 %<br />

NW-4_7-Niazbeek<br />

102.01 %<br />

0.63 MVA<br />

9.48 %<br />

NW-4_7-4.10<br />

103.67 %<br />

1.00 MVA<br />

18.49 %<br />

0.40 MVA<br />

7.39 %<br />

3.31 MVA<br />

63.61 %<br />

4.69 MVA<br />

64.80 %<br />

NW-513-Fazel beek<br />

100.49 %<br />

0.63 MVA<br />

12.04 %<br />

NW-513-107-20-11<br />

100.50 %<br />

NW-4_7-22<br />

103.18 % NW-4_7-18<br />

103.50 %<br />

4.70 MVA<br />

64.80 %<br />

NW-4_7-No-4 Khushhal<br />

103.85 %<br />

NW-513-107-27-8<br />

103.76 %<br />

-0.55 MW<br />

4.72 MVA<br />

64.80 %<br />

NW-4<br />

103.9<br />

0.40 MVA<br />

7.39 %<br />

NW-4_7-12<br />

103.93 %<br />

NW-513-107-27-11<br />

103.78 %<br />

6.60 MVA<br />

49.88 %<br />

NW-4_7-12-4<br />

104.10 %<br />

0.40 MVA<br />

7.39 %<br />

NW-513-107-27-15<br />

103.81 %<br />

0.40 MVA<br />

7.39 %<br />

NW-4_7-12-8<br />

104.34 %<br />

C2-P2- reconductored to 185 sqmm OH<br />

NW-513-No-2 Abrasani<br />

103.86 %<br />

C3-P<br />

cable<br />

-0.35 MW<br />

NW-4_7-12-14<br />

104.63 %<br />

0.80 MVA<br />

14.77 %<br />

NW-513-No-4 Abrasani<br />

103.87 %<br />

-0.35 MW<br />

NW-513-No-3 Abrasani<br />

103.97 %<br />

P-C2-1 new OH line 120<br />

-0.14 MW<br />

0.32 MVA<br />

5.90 %<br />

0.16 MVA<br />

2.95 %<br />

-0.14 MW<br />

NW-513-No-5 Abrasani<br />

103.89 %<br />

NW-513-107-27-33<br />

103.93 %<br />

0.32 MVA<br />

5.90 %<br />

NW-513-107-27-30<br />

103.95 %<br />

0.16 MVA<br />

2.95 %<br />

0.32 MVA<br />

5.90 %<br />

NW-513-107-27-44<br />

103.88 %<br />

0.16 MVA<br />

2.95 %<br />

NW-513-107-27-39<br />

103.90 %<br />

NW-Dashte e Barche<br />

103.92 %<br />

NW-Dashte e<br />

103.87 %<br />

NW-4_6-Monary Gulkhana<br />

103.13 %<br />

0.75 MVA<br />

13.95 %<br />

C-2<br />

-0.66 MW<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.40 MVA<br />

5.88 %<br />

0.00 MVA<br />

0.00 %<br />

1.00 MVA<br />

13.83 %<br />

1.60 MVA<br />

18.94 %<br />

4.77 MVA<br />

74.23 %<br />

518-W.P Khoshhal khan<br />

%<br />

-0.09 MW<br />

0.40 MVA<br />

4.87 %<br />

-0.55 MW<br />

0.01 MVA<br />

0.22 %<br />

N-529_JS5_B_2_5-Borj Zamini Market Kona<br />

98.61 %<br />

N-529_JS5_B_2_5-Malalay Hospital<br />

98.66 %<br />

-0.55 MW<br />

%<br />

P-C3-1a-Change cable to 240 sqm<br />

5.20 MVA<br />

37.69 %<br />

0.83 MVA<br />

9.99 %<br />

NW-5_6-No-5 Khoshalkhan<br />

97.87 %<br />

NW-5_6-10<br />

97.87 %<br />

0.80 MVA<br />

12.58 %<br />

-0.70 MW<br />

N-529_JS5_4_5-Borj Dwom Karte Mamoreen<br />

97.31 %<br />

-0.35 MW<br />

NW-3_5-Foundation-e-Zamini Damane Koh<br />

NW-3_5-Hawahy Damane Koh 98.40 %<br />

98.39 %<br />

-0.70 MW -0.55 MW<br />

0.01 MVA<br />

0.15 %<br />

-0.30 MW<br />

0.49 MVA<br />

5.97 %<br />

N-529_JS5_B_2_5-Amneiat Hospital<br />

98.63 %<br />

-0.35 MW<br />

0.89 MVA<br />

10.77 %<br />

N-529_JS5_B_2_5-Zamini Qowae Markaz<br />

98.67 %<br />

-0.35 MW<br />

P-C3-2a- New Cable Section 50 sqm<br />

N-518_JS2_A_1_2-Wezarat Dakhela<br />

98.87 %<br />

-0.35 MW<br />

3.37 MVA<br />

59.16 %<br />

0.40 MVA<br />

6.99 %<br />

N-518_JS2_A_1_2-Mokhaberat Shahre now<br />

98.88 %<br />

N-518_JS2_B_2_5-Moqabel Markaz Lesan<br />

99.72 %<br />

0.63 MVA<br />

12.84 %<br />

0.25 MVA<br />

5.08 %<br />

N-518_JS2_B<br />

99.72 %<br />

N-518_JS2_B_2_5-Markaz Lesan(A<br />

99.73 %<br />

-0.55 MW<br />

P-C3-2a- New Cable Section 50 sqm<br />

-0.17 MW<br />

3.98 MVA<br />

69.64 %<br />

-0.55 MW<br />

N-518_JS2_E_1_2<br />

99.06 %<br />

0.80 MVA<br />

11.65 %<br />

NW-518-No-2 Khoshhalkhan 1&2<br />

97.64 %<br />

-0.35 MW<br />

2.79 MVA<br />

34.12 %<br />

N-529_JS5_B_2_5-No_1_Zamini Karte Ariana<br />

98.35 %<br />

0.00 MVA<br />

0.00 %<br />

N-518_JS2_A_1_2-Moqabel Wezarat Dakhela<br />

99.03 %<br />

-0.70 MW<br />

-0.35 MW<br />

-0.70 MW<br />

0.80 MVA<br />

11.59 %<br />

P-C3-4a- New Section cable 50 sqm<br />

0.00 MVA<br />

0.00 %<br />

1.63 MVA<br />

28.44 %<br />

-0.35 MW<br />

7.73 MVA<br />

70.47 %<br />

0.80 MVA<br />

11.65 %<br />

NW-5_6-2<br />

97.94 %<br />

0.80 MVA<br />

15.76 %<br />

0.80 MVA<br />

11.59 %<br />

N-529_JS5_B_2_5-No_2_ Karte Ariana<br />

98.44 %<br />

0.80 MVA<br />

11.59 %<br />

1.20 MVA<br />

18.40 %<br />

P-C3-6a- New O/H Section t0 sqm<br />

BK-JS-1-A-1,2-5<br />

98.64 %<br />

N-518_JS2_E_1_2-Jamhoriat Hospital<br />

98.89 %<br />

-0.87 MW<br />

0.00 MVA<br />

0.00 %<br />

1.00 MVA<br />

17.44 %<br />

N-518_JS2_E_1_2-Borj_1_Sedarat<br />

99.00 %<br />

-0.55 MW<br />

-0.35 MW<br />

1.60 MVA<br />

23.30 %<br />

7.68 MVA<br />

70.47 %<br />

NW-518-104.6<br />

97.73 %<br />

BK-JS-1-A-1,2-Qolabchakkan 2<br />

98.62 %<br />

0.40 MVA<br />

4.72 %<br />

BK-JS-1-A-1,2-1<br />

98.70 %<br />

1.60 MVA<br />

33.06 %<br />

-0.55 MW<br />

BK-JS-1-A-1,2-Qolabchakkan 1<br />

98.70 %<br />

2.23 MVA<br />

39.05 %<br />

BK-JS-1-A-1,2-Welaayat<br />

99.05 %<br />

-0.55 MW<br />

N-518_JS2_E_1_2-Wezarat Eqtesad<br />

99.27 %<br />

P-C3-4a- Change cable to 50 sqm<br />

NW-518-94<br />

99.14 %<br />

P-C3-6- Change cable to 240 sqm<br />

NW-518-No-3 Dakhel J No-8<br />

98.11 %<br />

-0.55 MW<br />

0.00 MVA<br />

0.00 %<br />

NW-4_7-1<br />

98.11 %<br />

JS#8-NW-517<br />

98.11 %<br />

4.60 MVA<br />

36.90 %<br />

NW-518-104<br />

97.82 %<br />

3.79 MVA<br />

30.46 %<br />

0.80 MVA<br />

15.76 %<br />

N-529_JS5_4_5-Borj Siloy Markaz<br />

97.62 %<br />

P-C2-1 new OH 70 sqm<br />

3.79 MVA<br />

40.67 %<br />

-0.87 MW<br />

BK-Aqabe Barq <strong>Kabul</strong>-Aqab Wez.Zeraat<br />

102.46 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-26<br />

102.40 %<br />

1.26 MVA<br />

17.50 %<br />

1.26 MVA<br />

17.50 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Kenar Maktab-19<br />

102.37 %<br />

-0.55 MW<br />

-0.55 MW<br />

0.00 MVA<br />

0.01 %<br />

-0.35 MW<br />

P-C3-4a- Change cable to 95 sqm<br />

2.86 MVA<br />

34.36 %<br />

P-C3-2-Re arrange connections as<br />

shown<br />

BK-JS-1-A-1,2-Mashal Market<br />

99.24 %<br />

-0.35 MW<br />

Khetabkana_SW<br />

99.37 %<br />

-0.35 MW<br />

2.43 MVA<br />

42.33 %<br />

0.00 MVA<br />

0.00 %<br />

-0<br />

N-518_JS2_B<br />

98.48 %<br />

hal Khan<br />

NW-4_7-6.2<br />

103.86 %<br />

0.63 MVA<br />

11.62 %<br />

NW-4_7-4<br />

103.86 %<br />

1.00 MVA<br />

7.55 %<br />

NW-4_7-6<br />

103.87 %<br />

C3-P1a: Reconductored to to 185 sqm<br />

0.80 MVA<br />

8.51 %<br />

NW-F-Bus hai barqi-Bus Hai Barqi<br />

98.08 %<br />

-0.70 MW<br />

0.00 MVA<br />

0.00 %<br />

-0.87 MW<br />

4.52 MVA<br />

50.90 %<br />

BK-Ataturk-26<br />

103.06 %<br />

4.50 MVA<br />

50.90 %<br />

1.03 MVA<br />

23.32 %<br />

BK-Ataturk-32<br />

102.81 %<br />

BK-Ataturk-Ataturk hospital<br />

102.79 %<br />

-0.70 MW<br />

2.46 MVA<br />

46.08 %<br />

-0.17 MW<br />

BK-Ataturk-Tifl-e-Mo<strong>the</strong>r Hospital<br />

102.75 %<br />

BK-Ataturk-34<br />

102.72 %<br />

BK-Ataturk-36<br />

102.66 %<br />

PC3-1: New Section 70 sqm OH<br />

-0.35 MW<br />

2.06 MVA<br />

30.28 %<br />

-0.70 MW<br />

BK-Ataturk-Ministry Agricultural<br />

102.58 %<br />

0.63 MVA<br />

8.76 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Zeiarat Sakhi<br />

102.24 %<br />

0.63 MVA<br />

8.76 %<br />

-0.09 MW<br />

0.00 MVA<br />

0.00 %<br />

P-C3-5a- Change<br />

cable to 95 sqm<br />

BK-JS-1-A-1,2-Mohammad Jan Khan<br />

99.25 %<br />

-0.55 MW<br />

0.20 MVA<br />

3.47 %<br />

4.08 MVA<br />

49.03 %<br />

-0.17 MW<br />

BK-JS-1-A-1,2-Minis<br />

99.24 %<br />

0.85 MVA<br />

17.35 %<br />

W-4_7-11<br />

03.91 %<br />

2<br />

1.63 MVA<br />

12.29 %<br />

-0.55 MW<br />

0.25 MVA<br />

2.53 %<br />

1.63 MVA<br />

12.29 %<br />

-0.35 MW<br />

3-P7 added a feeder with a new<br />

able section <strong>of</strong> 240 sq. mm. XLPE.<br />

0.40 MVA<br />

5.43 %<br />

C3-P5- reconductored to 185 sqmm OH<br />

-0.22 MW<br />

NW-4_7-Paghmanehaee-Qali Wahid<br />

104.60 %<br />

NW-4_7-Water Pump hae-e-Politekhnik<br />

103.92 %<br />

S/S South West<br />

105.00 %<br />

C3-P8 added a feeder with a new<br />

cable section <strong>of</strong> 240 sq. mm.<br />

SW-514<br />

7.04 MVA<br />

45.61 %<br />

SW-510<br />

1.53 MVA<br />

15.35 %<br />

SW-511<br />

9.12 MVA<br />

68.29 %<br />

NW-518-No-1 Khoshalkhan<br />

103.60 %<br />

-0.55 MW<br />

NW-518-Hotal <strong>Kabul</strong> Ariana<br />

103.57 %<br />

SW-512<br />

8.50 MVA<br />

54.92 %<br />

38.13 MW<br />

-0.70 MW<br />

-0.22 MW<br />

C3-P9 added a feeder with a new<br />

cable section <strong>of</strong> 240 sq. mm.<br />

SW-515<br />

8.27 MVA<br />

61.20 %<br />

NW-518-115<br />

103.61 %<br />

0.88 MVA<br />

6.64 %<br />

SW-513<br />

9.00 MVA<br />

58.11 %<br />

1.67 MVA<br />

13.96 %<br />

NW-518-Belal Market<br />

103.59 %<br />

1.67 MVA<br />

12.67 %<br />

NW-518-118<br />

103.63 %<br />

-0.35 MW<br />

1.67 MVA<br />

12.66 %<br />

NW-518-124<br />

103.72 %<br />

2.07 MVA<br />

15.68 %<br />

C3-P12- Upgraded cross section<br />

<strong>of</strong> cable to 240 sq mm<br />

C3-P4- Connected <strong>the</strong> cable<br />

sections at this node.<br />

C3-P10 Extended <strong>the</strong> section <strong>of</strong> 240 sq. mm.<br />

XLPE . from JS#3 to erstwhile JS #4 to SS SW<br />

C3-P11 added a feeder with a new cable<br />

section <strong>of</strong> 240 sq. mm.<br />

NW-4_6-Kote Sangi_SW512<br />

104.89 %<br />

BK-Denow-Tangkash<br />

103.75 %<br />

0.99 MVA<br />

10.24 %<br />

0.63 MVA<br />

6.47 %<br />

BK-Denow-Children s garden<br />

103.78 %<br />

C3-P4- New cable section <strong>of</strong> 120<br />

sq mm<br />

NW-518-129<br />

103.79 %<br />

-0.55 MW<br />

3.69 MVA<br />

27.93 %<br />

BK-Ataturk-15<br />

103.52 %<br />

4.53 MVA<br />

83.98 %<br />

0.00 MVA<br />

0.00 %<br />

8.50 MVA<br />

54.92 %<br />

1.37 MVA<br />

14.05 %<br />

-0.35 MW<br />

-0.55 MW<br />

C3-P4- Connected Section to<br />

BK-Ataturk-15 from JS 4 to this<br />

node and upgraded to 95 sq mm<br />

6.60 MVA<br />

67.61 %<br />

SW511-2<br />

104.48 %<br />

-0.55 MW<br />

5.34 MVA<br />

54.76 %<br />

NW-Pohantoon_exit<br />

104.44 %<br />

-0.55 MW<br />

NW-Pohantoon-Lailia Pesaran 1&2<br />

104.07 %<br />

NW-518-134<br />

103.92 %<br />

BK-Jamal maina-Red Cross Hospital<br />

104.35 %<br />

4.08 MVA<br />

60.33 %<br />

-0.55 MW<br />

NW-Pohantoon-Lailia Dokhtaran 1&2<br />

104.28 %<br />

NW-Pohantoon-Jamnaziom Pohantoon<br />

103.80 %<br />

BK-Ataturk-Emergency Medical Hospital<br />

102.70 %<br />

-0.35 MW<br />

NW-Pohantoon-Pohanzai Kemia<br />

103.77 %<br />

-0.55 MW -0.35 MW<br />

-0.35 MW<br />

0.00 MVA<br />

0.05 %<br />

NW-Pohantoon-Aditoriam Pohantoon<br />

103.44 %<br />

BK-Ataturk-Family Hospital Transformer Station<br />

102.70 %<br />

3.28 MVA<br />

48.59 %<br />

-0.35 MW<br />

NW-Pohantoon-Ketabkhana Pohantoon<br />

103.51 %<br />

0.00 MVA<br />

0.00 %<br />

0.40 MVA<br />

5.90 %<br />

NW-Pohantoon-Pohanzai Aqtesad<br />

103.47 %<br />

-0.35 MW<br />

0.79 MVA<br />

11.80 %<br />

-0.35 MW<br />

2.08 MVA<br />

30.92 %<br />

1.58 MVA<br />

23.53 %<br />

-0.44 MW<br />

NW-Pohantoon-Pohanzai Engineery<br />

-0.55 MW<br />

1&2<br />

103.29 %<br />

NW-Pohantoon-Pohanzai Zerahat<br />

103.41 %<br />

-0.14 MW<br />

0.98 MVA<br />

10.05 %<br />

0.79 MVA<br />

11.83 %<br />

P-C3-4b- Upgraded cross section<br />

<strong>of</strong> cable to 95 sq mm<br />

NW-Pohantoon-Takhnic Sanawee No-2<br />

103.24 %<br />

C3-4b- Upgraded cross section <strong>of</strong><br />

cable to 95 sq mm<br />

BK-Jamal mina-Karte 5<br />

104.17 %<br />

0.40 MVA<br />

5.90 %<br />

0.08 MVA<br />

0.55 %<br />

-0.87 MW<br />

0.00 MVA<br />

0.00 %<br />

NW-Pohantoon-Takhnic Sanawee No-1<br />

103.26 %<br />

-0.35 MW<br />

0.00 MVA<br />

0.03 %<br />

-0.35 MW<br />

-0.55 MW<br />

BK-Aqabe Barq <strong>Kabul</strong>-15<br />

102.29 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-7<br />

102.31 %<br />

BK-Jamal maina-Jamal Mina<br />

102.53 %<br />

0.00 MVA<br />

0.01 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Tape Salam<br />

102.31 %<br />

-0.87 MW<br />

0.40 MVA<br />

5.56 %<br />

1.39 MVA<br />

17.28 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Aqabe Barq <strong>Kabul</strong><br />

102.44 %<br />

BK-Aqabe Barq <strong>Kabul</strong>-Kolali Jadid<br />

102.27 %<br />

0.40 MVA<br />

5.56 %<br />

-0.55 MW<br />

-0.35 MW<br />

1.00 MVA<br />

13.83 %<br />

0.40 MVA<br />

4.92 %<br />

-0.87 MW<br />

BK-Nawabad Dehmazang-Kulali Dahmazang<br />

102.63 %<br />

BK-Nawabad Dehmazang-4<br />

102.69 %<br />

BK-Nawabad Dehmazang-2<br />

102.72 %<br />

1.00 MVA<br />

14.94 %<br />

BK-Nawabad Dehmazang-5<br />

102.67 %<br />

BK-JS-1-A-1,2-Mukhaberat Amniat<br />

102.34 %<br />

BK-JS-1-A-1,2-22<br />

102.34 %<br />

BK-Nawabad Dehmazang-Police Sarhadi<br />

102.71 %<br />

-0.35 MW -0.55 MW<br />

0.10 MVA<br />

1.87 %<br />

BK-JS-1-A-1,2-21_4<br />

102.35 %<br />

BK-JS-1-A-1,2-21<br />

102.34 %<br />

0.10 MVA<br />

1.87 %<br />

BK-JS-1-A-1,2-21_9<br />

102.35 %<br />

BK-JS-1-A-1,2-National Television<br />

102.35 %<br />

BK-JS-1-A-1,2-BBC<br />

102.36 %<br />

-0.22 MW<br />

-0.22 MW<br />

-0.87 MW<br />

BK-Ibn Sina-1<br />

102.82 %<br />

P-C3-1 New O/H Section 70 sqm<br />

BK-Ibn Sina-Dakhel J.S<br />

102.82 %<br />

0.60 MVA<br />

8.82 %<br />

BK-JS-1-A-1,2-Mechanical High School<br />

102.48 %<br />

BK-Matba-e-Maref-Matba-e-Maref-Matba-e-Maref<br />

102.77 %<br />

1.79 MVA<br />

30.22 %<br />

-0.35 MW<br />

0.99 MVA<br />

19.68 %<br />

P-C3-1 New Riser<br />

-0.35 MW<br />

BK-JS-1-D-1,7-Qala-e-Hazaraha<br />

102.42 % P-C4-15-Change Cable to 120 sqm<br />

-0.70 MW<br />

0.40 MVA<br />

6.72 %<br />

-0.35 MW<br />

-0.70 MW<br />

0.00 MVA<br />

0.00 %<br />

BK-Charda Manzela JS_1-Central Poly Clinic<br />

102.12 %<br />

BK-Charda Manzela JS_1-Charda Manzila<br />

102.53 %<br />

BK-JS-1-A-1,2-Shaadoshamshera<br />

102.50 %<br />

0.00 MVA<br />

0.04 %<br />

P-C3-3-New Cable to 50 sqm<br />

-0.87 MW<br />

-0.35 MW<br />

N-518_JS2_B_1_2-Wezarat Etlaa<br />

99.26 %<br />

N-518_JS2_B_1_2-Pashtani T<br />

99.27 %<br />

0.40 MVA<br />

6.77 %<br />

N-518_JS2_B_1_2-<br />

99.27 %<br />

BK-JS-1-E 1,2-Mestorat Ho<br />

102.15 %<br />

-0.87 MW<br />

BK-Debori-Debori TS<br />

104.34 %<br />

-0.87 MW<br />

0.62 MVA<br />

6.45 %<br />

Aqabe Barq <strong>Kabul</strong><br />

Jamal Mina<br />

JS#3-BK-518<br />

102.95 %<br />

Nawabad Dehmazang<br />

1.39 MVA<br />

17.19 %<br />

BK-Nawabad Dehmazang-Nawabad Dehmazang<br />

102.86 %<br />

JS#1-BK-514<br />

102.84 %<br />

-0.22 MW<br />

BK-Ibn Sina-Ibn Sina Hospital<br />

102.82 %<br />

C3-P13- Upgraded cross section<br />

<strong>of</strong> cable to 240 sq mm<br />

Khatamunabein<br />

Russian Embassy<br />

Guzarga<br />

JS#3-BK-519<br />

103.21 %<br />

JS#3-BK-511<br />

102.62 %<br />

Rabiya-e-Balkhi<br />

Khwaja Mullah<br />

0.00 MVA<br />

0.01 %<br />

P-C3-4-New O/H feeder185sqm<br />

JS#1-BK-515<br />

102.74 %<br />

P-C3-3-Make sure cables are at<br />

least 185sqm<br />

-0.35 MW<br />

Habibia High School<br />

-0.55 MW<br />

BK-Rabiya Balkhi-Karte 4 Mukhaberaat<br />

103.46 %<br />

BK-Rabiya Balkhi-Karte 4<br />

102.34 %<br />

1.18 MVA<br />

12.36 %<br />

BK-Rabiya Balkhi-Rabiya-e-Balkhi<br />

102.42 %<br />

-0.35 MW<br />

Behind Madrasa<br />

BK-518<br />

7.73 MVA<br />

57.81 %<br />

BK-519<br />

6.72 MVA<br />

50.10 %<br />

BK-511<br />

BK-514-11<br />

103.19 %<br />

BK-515-11<br />

103.09 %<br />

-0.55 MW<br />

NW-Dashte e Barchee-Pule sokhte Jadeed<br />

103.97 %<br />

7.47 MVA<br />

48.52 %<br />

BK-Habibia HSch-Darulmalmeen<br />

103.47 %<br />

0.20 MVA<br />

2.03 %<br />

-0.17 MW<br />

8.05 MVA<br />

61.13 %<br />

8.50 MVA<br />

64.61 %<br />

0.82 MVA<br />

8.49 %<br />

0.71 MVA<br />

10.63 %<br />

3.92 MVA<br />

40.86 %<br />

P-B3-8: New OH 185 sqmm<br />

BK-514-9<br />

103.48 %<br />

BK-515-9<br />

103.39 %<br />

0.63 MVA<br />

5.47 %<br />

-0.70 MW<br />

chee-Amam hasan Mojtaba<br />

0.80 MVA<br />

6.94 %<br />

0.63 MVA<br />

14.07 %<br />

NW-Dashte e Barchee-12<br />

103.96 %<br />

NW-Dashte e Barchee-12.1<br />

103.95 %<br />

1.42 MVA<br />

12.41 %<br />

2.05 MVA<br />

17.87 %<br />

NW-4_6-15<br />

103.98 %<br />

NW-4_6-12<br />

104.16 %<br />

8.06 MVA<br />

60.78 %<br />

NW-4_6-14<br />

104.02 %<br />

NW-4_6-Pule Sokhte Sabeqa<br />

104.15 %<br />

-0.87 MW<br />

C3-P18 added a cable section <strong>of</strong> 240<br />

sq. mm. XLPE.<br />

BK-Debori-Old Bangashidar 1<br />

103.93 %<br />

-0.55 MW<br />

BK-Debori-Old Bangashidar 2<br />

103.93 %<br />

-0.44 MW<br />

C3-P13- Upgraded cross section<br />

<strong>of</strong> cable to 240 sq mm<br />

BK-Rabiya Balkhi-Umar jan<br />

103.50 %<br />

-0.35 MW<br />

-0.35 MW<br />

BK-Rabiya Balkhi-Behind Police Station<br />

102.24 %<br />

0.39 MVA<br />

4.12 %<br />

0.79 MVA<br />

8.24 %<br />

-0.35 MW<br />

BK-Rabiya Balkhi-Chamcha Mast<br />

102.27 %<br />

-0.35 MW<br />

BK-Khatamunabein-Khatamunabein 1&2<br />

103.07 %<br />

-0.31 MW<br />

BK-Guzarga-1<br />

102.74 %<br />

BK-518-12<br />

103.37 %<br />

BK-519-12<br />

103.59 %<br />

7.75 MVA<br />

58.76 %<br />

BK-519-10<br />

103.81 %<br />

BK-518-10<br />

103.63 %<br />

7.76 MVA<br />

58.76 %<br />

1.22 MVA<br />

12.59 %<br />

6.74 MVA<br />

50.92 %<br />

te e Barchee-Harbi Shoonazi<br />

6.32 MVA<br />

41.23 %<br />

BK-Behind Madrasa-Behind Madrasa<br />

102.02 %<br />

-0.31 MW<br />

-0.31 MW<br />

4.77 MVA<br />

42.01 %<br />

BK-516-Aqab Bagh e Babur #1<br />

104.34 %<br />

-0.35 MW<br />

BK-516-Aqab Bagh Babur 2<br />

104.34 %<br />

-0.55 MW<br />

0.01 MVA<br />

0.08 %<br />

C3-P14- Connected this section to<br />

SW512<br />

-0.31 MW<br />

BK-Habibia High School-Habibia High School 1&2<br />

102.82 %<br />

BK-Guzarga-Borj_1_Guzarga<br />

102.56 %<br />

P-C3-5-New Switch<br />

-0.35 MW<br />

-0.55 MW<br />

5.99 MVA<br />

45.28 %<br />

C3-P15- reconductored to 185<br />

sqmm OH<br />

0.40 MVA<br />

4.03 %<br />

BK-516-Bagh Babur<br />

104.38 %<br />

VA<br />

95 %<br />

0.75 MVA<br />

13.95 %<br />

NW-4_6-27_6_2<br />

103.21 %<br />

NW-4_6-22<br />

103.64 %<br />

C3-P17- reconductored to 120 sqmm OH<br />

NW-4_6-22-5<br />

103.64 %<br />

0.00 MVA<br />

0.01 %<br />

C3-P17- reconductored to 120 sqmm OH<br />

0.00 MVA<br />

0.00 %<br />

NW-4_6-22-12<br />

103.64 %<br />

C3-P17- reconductored to 120 sqmm OH<br />

NW-4_6-Sare-e- Kariz Qalahe shada<br />

103.14 %<br />

-0.87 MW<br />

C3-P16 added a 120 sq. mm. OH<br />

section .<br />

1.00 MVA<br />

10.19 %<br />

C3-P15 Upgraded cross section <strong>of</strong><br />

cable to 185 sq mm .<br />

5.09 MVA<br />

38.03 %<br />

-0.55 MW<br />

-0.55 MW<br />

BK-Behind Madrasa-Mustaghni<br />

101.55 %<br />

4.54 MVA<br />

47.62 %<br />

-0.55 MW<br />

BK-3_6-Khwaja Mullah<br />

101.97 %<br />

1.24 MVA<br />

15.31 %<br />

4.13 MVA<br />

36.47 %<br />

-0.17 MW<br />

0.20 MVA<br />

1.99 %<br />

BK-516-2B17<br />

104.38 %<br />

BK-516-Khushal Khan<br />

104.39 %<br />

BK-516-2B20<br />

104.36 %<br />

0.80 MVA<br />

8.05 %<br />

-0.35 MW<br />

6.77 MVA<br />

50.92 %<br />

6 MW<br />

0.75 MVA<br />

13.94 %<br />

5.97 MVA<br />

45.28 %<br />

-0.70 MW<br />

BK-Debori-New Bangashidar 1&2<br />

103.30 %<br />

BK-Behind Madrasa-Alibad 1<br />

103.21 %<br />

5 MVA<br />

%<br />

BK-Behind Madrasa-Rukhshana<br />

101.60 %<br />

-0.55 MW -0.35 MW<br />

1.39 MVA<br />

14.07 %<br />

C-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


3.54 MVA<br />

31.87 %<br />

0.00 MVA<br />

0.00 %<br />

2_B_2_5-Sefarat Iran<br />

P-B4-9-Change Cable to 240 sqm<br />

-0.22 MW<br />

N-518_JS2_517-Kenare Lessee Am<br />

99.30 %<br />

0.40 MVA<br />

6.96 %<br />

N-518_JS2_517-Lessee Amani<br />

99.29 %<br />

P-B4-5-Change Cable to 240 sqm<br />

-0.35 MW<br />

-0.35 MW<br />

N-515_JS2_D_2_7-Edara Computer<br />

99.22 %<br />

6.08 MVA<br />

44.47 %<br />

-0.55 MW<br />

E-541-Riasat Amneiat<br />

97.59 % -0.70 MW<br />

E-541-Survey Madan<br />

97.65 %<br />

0.<br />

15.<br />

-0.55 MW<br />

0.63 MVA<br />

11.17 %<br />

P-C4-6 Reconductor to 120sqm<br />

2.70 MVA<br />

53.00 %<br />

06 MVA<br />

0.60 %<br />

E-541-145-7<br />

97.67 %<br />

0.40 MVA<br />

4.30 %<br />

VA<br />

%<br />

E-541-Wezarat Fawaed Ama<br />

97.93 %<br />

-0.35 MW<br />

0.63 MVA<br />

9.11 %<br />

A<br />

%<br />

E-541-132-7<br />

98.00 %<br />

P-C4-8 Reconductor to 120 sqm<br />

E-541-No_7_ Macrorayan Awal<br />

98.00 %<br />

2.23 MVA<br />

24.00 %<br />

E-541-132-7-a<br />

97.95 %<br />

-0.44 MW<br />

P-C4-8 Reconductor to 120 sqm<br />

E-541-No.44 Qalai Zamankhan Tr 1&2<br />

97.67 %<br />

-0.55 MW<br />

-0.55 MW<br />

-0.35 MW<br />

-0.35 MW<br />

E-531-Daraz kocha<br />

102.80 %<br />

-0.28 MW<br />

E-531-Dakhudai Dad<br />

103.20 %<br />

0.31 MVA<br />

2.75 %<br />

1 63 MVA<br />

n(American Center)<br />

_2-Borj_2_Sedarat<br />

-0.70 MW<br />

N-518_JS2_B_1_2-Sedarat<br />

99.60 %<br />

2.03 MVA<br />

35.38 %<br />

N14964<br />

99.48 %<br />

-0.35 MW<br />

P-B4-9-Change Cable to 240 sqm<br />

N-518_JS2_B_1_2-Wezarat Khareja<br />

99.47 %<br />

8.13 MVA<br />

59.31 %<br />

P-B4-9-insert new node and<br />

N-515_JS2_531-Qasr Delkosha # 1&2<br />

99.22 %<br />

-0.35 MW<br />

P-B4-8-Change Cable to 240 sqm<br />

-0.35 MW<br />

P-C4-4-Change Cable to 240 sqm<br />

7.33 MVA<br />

53.49 %<br />

-0.55 MW<br />

N-515_JS2_531-Ariana Hotel<br />

98.90 %<br />

0.40 MVA<br />

7.00 %<br />

-0.55 MW<br />

0.63 MVA<br />

12.91 %<br />

-0.55 MW<br />

-0.35 MW<br />

6.72 MVA<br />

48.98 %<br />

N-516-Shash Darak<br />

99.11 %<br />

P-C4-1-New Cable 240 sqm<br />

N-515_JS2_D_2_7-Ehsaya Markazi ( CSO ) # 1&2<br />

99.23 %<br />

-0.55 MW<br />

P-C4-2-Change Cable to 240 sqm<br />

P-C4-6 Reconductor to 185 sqm<br />

P-C4-6 Reconductor to 120sqm<br />

E-541-148<br />

98.16 %<br />

E-541-145-1<br />

97.94 %<br />

5.55 MVA<br />

59.77 %<br />

2.70 MVA<br />

53.00 %<br />

E-541-145<br />

98.01 %<br />

E-541-143<br />

97.96 %<br />

2.85 MVA<br />

30.73 %<br />

2.46 MVA<br />

35.73 %<br />

E-541-143-3<br />

97.90 %<br />

E-541-No-1 Macrorayan Awal<br />

97.87 %<br />

2.45 MVA<br />

26.80 %<br />

-0.55 MW<br />

E-541-No-6 Macrorayan Awal<br />

97.97 %<br />

0.00 MVA<br />

0.06 %<br />

1.83 MVA<br />

26.49 %<br />

-0.55 MW<br />

E-541-No_3_ Macrorayan Awal<br />

97.78 %<br />

E-541-No_5_Macrorayan Awal<br />

97.93 %<br />

E-541-No_4_Macrorayan Awal<br />

97.91 %<br />

0.00 MVA<br />

0.06 %<br />

0.80 MVA<br />

11.60 %<br />

-0.55 MW<br />

-0.70 MW<br />

P-C4-7 New Section 120 sqm<br />

0.80 MVA<br />

8.62 %<br />

E-531-70<br />

97.87 %<br />

E-531-71<br />

97.87 %<br />

0.00 MVA<br />

0.00 %<br />

E-531-66<br />

102.57 %<br />

0.00 MVA<br />

0.00 %<br />

E-531-Mardan Ghaib<br />

102.57 %<br />

E-531-55<br />

102.67 %<br />

E-531-Mardan Ghaib-1_1&2<br />

102.67 %<br />

2.00 MVA<br />

15.32 %<br />

0.80 MVA<br />

6.10 %<br />

-0.35 MW -0.35 MW<br />

2.80 MVA<br />

21.42 %<br />

E-531-49<br />

102.82 %<br />

3.21 MVA<br />

24.47 %<br />

E-531-Mardan Ghaib-2<br />

102.98 %<br />

-0.35 MW<br />

3.61 MVA<br />

27.50 %<br />

E-531-37<br />

103.22 %<br />

E-531-37-3<br />

103.21 %<br />

0.31 MVA<br />

2.75 %<br />

3.95 MVA<br />

34.46 %<br />

-0.55 MW<br />

7.37 MVA<br />

53.54 %<br />

2_B_1_2-Khetabkhana Aama<br />

P-C4-10-Change Cable to 240 sqm<br />

N-518_JS2_E_1_2-Esteqlal High School<br />

98.68 %<br />

-0.35 MW<br />

0.63 MVA<br />

11.08 %<br />

0.40 MVA<br />

7.02 %<br />

0.97 MVA<br />

17.00 %<br />

-0.30 MW<br />

N-518_JS2_B_1_2-Aarg Jumhoori<br />

98.56 %<br />

N-518_JS2_B_1_2-Gurd Melye<br />

98.59 %<br />

-0.17 MW<br />

8.09 MVA<br />

59.11 %<br />

-0.17 MW<br />

N-518_JS2_E_1_2-Kartografi<br />

98.83 %<br />

-0.35 MW<br />

N-518_JS2_E_1_2-Adare Omor<br />

98.99 %<br />

0.63 MVA<br />

11.00 %<br />

N-518_JS2_E_1_2-Wezarat Defah<br />

98.96 %<br />

P-C4-3-Change Cable to 240 sqm<br />

N-515_JS2_531-Matbah Urdo<br />

98.89 %<br />

-0.55 MW<br />

-0.35 MW<br />

6.52 MVA<br />

47.70 %<br />

P-C4-5-New Cable 240 sqm<br />

E-541-Andimark<br />

98.54 %<br />

-0.17 MW<br />

6.28 MVA<br />

50.28 %<br />

E-541-Riasat Mili bus<br />

98.11 %<br />

-0.31 MW<br />

E-541-Water Pump Macrorayan Awal<br />

98.10 %<br />

0.72 MVA<br />

7.72 %<br />

E-541-154<br />

98.13 %<br />

0.36 MVA<br />

7.06 %<br />

E-541-156-5<br />

98.11 %<br />

0.36 MVA<br />

6.35 %<br />

-0.31 MW<br />

0.36 MVA<br />

3.86 %<br />

0.36 MVA<br />

8.54 %<br />

E-541-157<br />

98.12 %<br />

0.00 MVA<br />

0.00 %<br />

E-541-No-2 Macrorayan Awal<br />

97.80 %<br />

-0.70 MW<br />

P-C4-12- Reconductor to 120 sqm<br />

0.00 MVA<br />

0.00 %<br />

1.03 MVA<br />

14.90 %<br />

0.40 MVA<br />

4.37 %<br />

-0.55 MW<br />

0.40 MVA<br />

7.86 %<br />

0.40 MVA<br />

7.86 %<br />

E-541-Wezarat Omor Ejtimaey<br />

97.74 %<br />

0.40 MVA<br />

6.29 %<br />

-0.35 MW<br />

E-531-Sement khana<br />

97.85 %<br />

-0.70 MW<br />

0.80 MVA<br />

6.42 %<br />

nistry <strong>of</strong> Education<br />

N-518_JS2_B_1_2-Bank Melye<br />

98.59 %<br />

-0.22 MW<br />

N-518_JS2_E_1_2-De <strong>Afghan</strong>istan Bank<br />

98.70 %<br />

3.01 MVA<br />

52.85 %<br />

P-C4-3 new node and switch<br />

N-518_JS2_E_1_2-Wezarat Mahdan<br />

98.81 %<br />

0.00 MVA<br />

0.00 %<br />

P-C4-12- Reconductor to 120 sqm<br />

1.60 MVA<br />

14.15 %<br />

-0.70 MW<br />

0.83 MVA<br />

14.52 %<br />

-0.55 MW<br />

-0.14 MW<br />

laat wa Caltor<br />

ni Tojarati Bank<br />

-0.17 MW<br />

N-518_JS2_E_1_2-Wezarat Mokhaberat # 1&2<br />

98.37 %<br />

-0.87 MW<br />

-0.22 MW<br />

_2-Spinzar Hotel<br />

-0.87 MW<br />

2.00 MVA<br />

35.21 %<br />

N-518_JS2_E_1_2-Stomatology<br />

98.43 %<br />

-0.35 MW<br />

P-C4-9-Reconnect to Bank Melye<br />

add new cable sections as<br />

necessary 50 sqm<br />

-0.87 MW<br />

0.40 MVA<br />

8.21 %<br />

N-518_JS2_E_1_2-Rabeha Balkhy Hospital<br />

98.42 %<br />

-0.17 MW<br />

3.41 MVA<br />

59.80 %<br />

0.20 MVA<br />

3.51 %<br />

N-518_JS2_E_1_2-Post Telephone Telegram<br />

98.75 %<br />

N-518_JS2_B_1_2-Wezarat Malya<br />

98.55 %<br />

-0.35 MW<br />

-0.55 MW<br />

N-518_JS2_E_1_2-Pashtoonistan Wath<br />

98.75 %<br />

P-C4-10-Change Cable to 50 sqm<br />

E-541-Olampic<br />

99.88 %<br />

E-541-Muziam Omar<br />

99.87 %<br />

-0.17 MW<br />

0.56 MVA<br />

5.90 %<br />

E-541-166<br />

99.85 %<br />

P-C4-12- Reconductor to 120 sqm<br />

E-541-MDC<br />

99.83 %<br />

0.56 MVA<br />

5.90 %<br />

0.40 MVA<br />

4.27 %<br />

0.40 MVA<br />

9.32 %<br />

E-541-164-1<br />

99.82 %<br />

0.40 MVA<br />

9.32 %<br />

E-541-164-4<br />

99.81 %<br />

-0.55 MW<br />

E-541-Tr-Junction-7<br />

99.80 %<br />

0.01 MVA<br />

0.13 %<br />

-0.55 MW<br />

BK-JS-1-E 1,2-Old Radio<br />

102.02 %<br />

-0.17 MW<br />

-0.55 MW<br />

-0.35 MW<br />

BK-Rangrazi-Malawi Sahib<br />

102.35 %<br />

0.20 MVA<br />

3.94 %<br />

BK-C-1,2-Eidga Mosque<br />

101.21 %<br />

P-C4-16-New Cable 50 sqm<br />

0.01 MVA<br />

0.10 %<br />

m<br />

BK-JS-1-E 1,2-Pul-e-Kheshtee<br />

102.04 %<br />

1.39 MVA<br />

14.64 %<br />

0.82 MVA<br />

13.92 %<br />

P-C4-10-Change Cable to 50 sqm<br />

0.62 MVA<br />

12.39 %<br />

0.63 MVA<br />

12.60 %<br />

-0.55 MW<br />

-0.70 MW<br />

E-531-60-25<br />

102.21 %<br />

1.60 MVA<br />

14.15 %<br />

-0.55 MW<br />

BK-Rangrazi-Rangrazi<br />

102.42 %<br />

-0.66 MW<br />

BK-C-1,2-Tanor Saazi<br />

101.46 %<br />

1.25 MVA<br />

25.17 %<br />

P-C4-11- Reconductor to 120 sqm<br />

E-531-Sarak awal karte naw<br />

102.17 %<br />

Hospital 1&2<br />

-0.17 MW<br />

E-531-60-27<br />

102.18 %<br />

-0.35 MW<br />

3.95 MVA<br />

36.40 %<br />

-0.66 MW<br />

1.22 MVA<br />

20.65 %<br />

BK-JS-1-E 1,2-Chindawol<br />

-0.35 MW<br />

102.19 %<br />

P-C4-10-Change Cable to 50 sqm<br />

BK-JS-1-E 1,2-Pakhta Feroshi<br />

102.09 %<br />

BK-C-1,2-Darwazai Lawri<br />

101.27 %<br />

E-541-Salimi Hospital<br />

100.00 %<br />

-0.55 MW<br />

-0.22 MW<br />

0.25 MVA<br />

3.83 %<br />

E-541-189-3<br />

100.01 %<br />

P-C4-13- Reconductor to 120 sqm<br />

E-541-188<br />

100.02 %<br />

0.88 MVA<br />

9.26 %<br />

E-541-Kenar Chaman<br />

100.07 %<br />

P-C4-11- Reconductor to 120 sqm<br />

1.20 MVA<br />

10.62 %<br />

2.58 MVA<br />

27.21 %<br />

2.06 MVA<br />

41.09 %0.62 MVA<br />

E-541-189<br />

100.01 %<br />

BK-513-44_49<br />

100.14 %<br />

-0.28 MW<br />

-0.35 MW<br />

P-C4-14- Reconductor to 120 sqm<br />

-0.55 MW<br />

BK-C-1,2-Takhta Pul<br />

101.76 %<br />

E-541-Bala Hesar<br />

99.92 %<br />

P-C4-13- Reconductor to 120 sqm<br />

0.63 MVA<br />

6.64 %<br />

BK-513-Chaman Hozory<br />

100.14 %<br />

-0.28 MW<br />

E-531-Sia sang<br />

102.04 %<br />

0.80 MVA<br />

7.08 %<br />

E-531-Qir Factory<br />

102.09 %<br />

E-531-60-33<br />

102.12 %<br />

0.63 MVA<br />

6.64 %<br />

-0.70 MW<br />

BK-C-1,2-Guzar e Azrat<br />

101.88 %<br />

-0.55 MW<br />

P-C4-13- Reconductor to 120 sqm<br />

E-541-192<br />

99.99 %<br />

2.90 MVA<br />

26.20 %<br />

BK-JS-1-D-1,7-Bagh-e-Nawab<br />

101.66 %<br />

-0.70 MW<br />

-0.55 MW<br />

P-C4-13- New O/H Section 120 sqm &<br />

switches<br />

1.89 MVA<br />

26.46 %<br />

BK-513-44_40<br />

100.28 %<br />

2.90 MVA<br />

26.20 %<br />

BK-513-Tape Balkh<br />

100.37 %<br />

-0.55 MW<br />

BK-JS-1-D-1,7-Aashoqan-e-Aarefaan<br />

101.60 %<br />

12.50 %<br />

1.26 MVA<br />

17.65 %<br />

-0.55 MW<br />

BK-JS-1-D-1,7-7<br />

101.55 %<br />

0.63 MVA<br />

8.82 %<br />

BK-JS-1-D-1,7-Khwaja Safa<br />

101.53 %<br />

-0.55 MW<br />

0.63 MVA<br />

5.61 %<br />

BK-C-1,2-Furmulia<br />

101.65 %<br />

BK-513-44_25<br />

100.55 %<br />

BK-513-Shah Shahid<br />

100.55 %<br />

-0.55 MW<br />

BK-513-44_21A7<br />

100.79 %<br />

0.63 MVA<br />

7.28 %<br />

BK-513-Etefaq<br />

100.76 %<br />

BK-JS-1-D-1,7-Sangkashaha<br />

101.52 %<br />

-0.55 MW<br />

-0.55 MW<br />

-0.55 MW<br />

4.18 MVA<br />

37.52 %<br />

0.63 MVA<br />

7.28 %<br />

E-515-62-34-6<br />

104.17 %<br />

0.00 MVA<br />

0.00 %<br />

BK-513-44_17<br />

100.84 %<br />

E-515-Tape Qawala No 2<br />

104.15 %<br />

-0.28 MW<br />

E-515-62-34-2<br />

104.17 %<br />

E-515-62-41<br />

104.15 %<br />

4.82 MVA<br />

43.17 %<br />

0.31 MVA<br />

3.18 %<br />

E-515-62-39<br />

104.15 %<br />

0.31 MVA<br />

3.18 %<br />

0.63 MVA<br />

4.73 %<br />

E-515-<br />

104.18<br />

BK-513-Qalhacha<br />

101.06 %<br />

-0.28 MW<br />

E-516-Tape Qawala No 1<br />

104.17 %<br />

-0.28 MW<br />

BK-513-44_9<br />

101.07 %<br />

BK-513-Shohadai Saleheen<br />

102.73 %<br />

5.15 MVA<br />

45.99 %<br />

C-4<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.94 MVA<br />

7.09 %<br />

0.01 MVA<br />

0.05 %<br />

0.00 MVA<br />

0.04 %<br />

0.00 MVA<br />

0.04 %<br />

E-536-21<br />

105.00 %<br />

0.95 MVA<br />

9.50 %<br />

E-531-25<br />

103.84 %<br />

E-536-36<br />

105.00 %<br />

0.00 MVA<br />

0.04 %<br />

E-536-48<br />

105.00 %<br />

E-536-54<br />

105.00 %<br />

2.79 MVA<br />

24.18 %<br />

E-536-60<br />

105.00 %<br />

0.00 MVA<br />

0.03 %<br />

E-536-70<br />

105.00 %<br />

E-515-35<br />

104.61 %<br />

0.00 MVA<br />

0.03 %<br />

E-536-103<br />

105.00 %<br />

E-523-58<br />

103.64 %<br />

0.00 MVA<br />

0.01 %<br />

0.94 MVA<br />

9.51 %<br />

E-536-110<br />

105.00 %<br />

0<br />

0.<br />

2.77 MVA<br />

24.19 %<br />

E-515-108<br />

102.69 %<br />

E-515-58<br />

104.35 %<br />

0.94 MVA<br />

9.52 %<br />

E-515-62-9<br />

104.30 %<br />

0.94 MVA<br />

7.09 %<br />

E-515-62<br />

104.31 %<br />

515-62-31<br />

4.18 %<br />

-0.28 MW<br />

0.94 MVA<br />

7.09 %<br />

0.00 MVA<br />

0.00 %<br />

0.00 MVA<br />

0.01 %<br />

E-523-81<br />

103.00 %<br />

0.63 MVA<br />

4.73 %<br />

E-515-76<br />

102.69 %<br />

0.63 MVA<br />

4.73 %<br />

E-515-Family hae Nasajee<br />

104.22 %<br />

E-515-62-26<br />

104.20 %<br />

E-515-62-14<br />

104.26 %<br />

2.75 MVA<br />

24.19 %<br />

0.00 MVA<br />

0.00 %<br />

E-523-86<br />

102.89 %<br />

C-5<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


E-536-89<br />

105.00 %<br />

0.00 MVA<br />

0.02 %<br />

E-536-95<br />

105.00 %<br />

0.00 MVA<br />

0.02 %<br />

0.00 MVA<br />

0.01 %<br />

E-536-116<br />

105.00 %<br />

0.00 MVA<br />

0.00 %<br />

E-536-122<br />

105.00 %<br />

C-6<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


NW-4<br />

103.2<br />

BK-4_6-Chaar Qala 1<br />

102.84 %<br />

-0.70 MW<br />

BK-4_6-<br />

97.94 %<br />

BK-4_6-Qalai Bakhtiar<br />

97.93 %<br />

D-2<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


0.40 MVA<br />

3.47 %<br />

NW-4_6-Foundation-e- zamini Gulkhana<br />

103.24 %<br />

-0.55 MW<br />

NW-4_6-27-6<br />

103.25 %<br />

0.63 MVA<br />

8.67 %<br />

1.38 MVA<br />

31.09 %<br />

NW-4_6-Babai Wali<br />

103.25 %<br />

NW-4_6-Howza No-6 Police<br />

103.36 %<br />

-0.35 MW<br />

NW-4_6-27<br />

103.41 %<br />

NW-4_6-31<br />

103.29 %<br />

NW-4_6-32<br />

103.27 %<br />

0.40 MVA<br />

9.00 %<br />

2.86 MVA<br />

21.74 %<br />

-0.17 MW<br />

3.26 MVA<br />

24.78 %<br />

4.26 MVA<br />

32.36 %<br />

NW-4_6-Fabrika-e- Yakh Saze Hamza<br />

103.41 %<br />

-0.11 MW<br />

NW-4_6-Qalahe Shada<br />

103.24 %<br />

1.00 MVA<br />

13.76 %<br />

-0.87 MW<br />

BK-4_6-Masjidi Safed<br />

103.20 %<br />

D3-P7 added a 120 sq. mm. OH<br />

section .<br />

0.80 MVA<br />

5.97 %<br />

-0.55 MW<br />

BK-Debori-Imam Zaman<br />

103.23 %<br />

103.30 %<br />

D3-P4 Upgraded cross section <strong>of</strong><br />

cable to 185 sq mm .<br />

-0.55 MW<br />

1.42 MVA<br />

10.59 %<br />

1.25 MVA<br />

20.97 %<br />

BK-Behind Madrasa-Alibad 2<br />

103.19 %<br />

0.62 MVA<br />

9.31 %<br />

-0.55 MW<br />

0.00 MVA<br />

0.00 %<br />

0.63 MVA<br />

9.49 %<br />

BK-Behind Madrasa-Mawade Mukhadir<br />

101.59 %<br />

P-D3-1-New Cable 95 sqm<br />

BK-3_6-Moqabili Sifarat Russia<br />

101.44 %<br />

-0.55 MW<br />

1.62 MVA<br />

19.06 %<br />

0.63 MVA<br />

6.62 %<br />

-0.87 MW<br />

-0.55 MW<br />

BK-3_6-Pump hawz<br />

101.47 %<br />

P-D3-2-New Switches<br />

BK-Behind Madrasa-Ministry <strong>of</strong> commerce<br />

101.57 %<br />

-0.55 MW<br />

BK-Behind Madrasa-Shora-e-Milli<br />

101.50 %<br />

3.28 MVA<br />

34.38 %<br />

BK-Guzarga-41-b20<br />

101.46 %<br />

BK-Guzarga-Ayub Khan 1<br />

101.45 %<br />

0.40 MVA<br />

4.59 %<br />

0.40 MVA<br />

4.59 %<br />

BK-Guzarga-41-b13<br />

101.50 %<br />

0.40 MVA<br />

5.60 %<br />

-0.35 MW<br />

BK-Guzarga-41-b15<br />

101.48 %<br />

0.80 MVA<br />

9.17 %<br />

BK-Guzarga-Ayub Khan 2<br />

101.48 %<br />

-0.35 MW<br />

3.11 MVA<br />

27.63 %<br />

BK-Guzarga-19<br />

102.16 %<br />

BK-Guzarga-25<br />

102.01 %<br />

3.12 MVA<br />

27.63 %<br />

BK-Guzarga-Borj_2_Guzarga<br />

102.16 %<br />

-0.87 MW<br />

P-D3-3-New Feeder O/H 185 sqm<br />

BK-510-2<br />

103.92 %<br />

0.00 MVA<br />

0.00 %<br />

0.63 MVA<br />

9.23 %<br />

-0.55 MW<br />

BK-516-12A2<br />

104.52 %<br />

BK-516-Jangalak<br />

104.50 %<br />

-0.17 MW<br />

0.63 MVA<br />

11.53 %<br />

9 MVA<br />

07 %<br />

BK-516-2B9<br />

104.48 %<br />

1.39 MVA<br />

14.07 %<br />

0.20 MVA<br />

3.66 %<br />

BK-516-Constructional Water Pump<br />

104.60 %<br />

BK-516-2B7<br />

104.51 %<br />

BK-516-Immigration repatriation<br />

104.54 %<br />

BK-516-2B2<br />

104.58 %<br />

6.78 MVA<br />

50.92 %<br />

1.39 MVA<br />

14.07 %<br />

-0.55 MW<br />

2.02 MVA<br />

20.40 %<br />

P-B3-8: New OH 185 sqmm<br />

2.02 MVA<br />

20.39 %<br />

BK-516-4B2<br />

104.54 %<br />

-0.55 MW<br />

BK-516-Chini Saazi<br />

104.61 %<br />

S/S Breshna Kot<br />

105.00 %<br />

60.31 MW<br />

BK-514<br />

8.17 MVA<br />

61.13 %<br />

BK-519<br />

6.80 MVA<br />

BK-515<br />

BK-513<br />

50.91 % 8.63 MVA<br />

7.60 MVA<br />

64.60 %<br />

65.58 %<br />

BK-518<br />

7.85 MVA<br />

58.75 %<br />

BK-511<br />

8.33 MVA<br />

62.29 %<br />

BK-510 BK-512 BK-516<br />

7.77 MVA<br />

0.30 MVA 6.79 MVA<br />

58.13 %<br />

3.60 %<br />

58.61 %<br />

BK-512-Sakhtomani omoor Barq<br />

104.99 %<br />

-0.26 MW<br />

BK-517<br />

7.01 MVA<br />

52.49 %<br />

BK-516-5<br />

104.80 %<br />

BK-4_6-Doshhoy Gulam Hasan<br />

103.05 %<br />

0.63 MVA<br />

8.68 %<br />

BK-4_6-56<br />

103.10 %<br />

BK-4_6-54<br />

103.08 %<br />

D3-P6- reconductored to 120 sqmm OH<br />

0.00 MVA<br />

0.00 %<br />

-0.70 MW<br />

BK-Guzarga-water pump 2<br />

101.49 %<br />

-0.35 MW<br />

1.20 MVA<br />

13.76 %<br />

BK-Guzarga-Khwaja parsa<br />

101.80 %<br />

-0.35 MW<br />

-0.55 MW<br />

2.22 MVA<br />

19.56 %<br />

D3-P6- reconductored to 120 sqmm OH<br />

D3-P6- reconductored to 120 sqmm OH<br />

0.00 MVA<br />

0.00 %<br />

BK-4_6-47.15<br />

103.00 %<br />

-0.55 MW<br />

3.27 MVA<br />

34.47 %<br />

-0.55 MW<br />

BK-Guzarga-41-b6<br />

101.57 %<br />

1.20 MVA<br />

13.75 %<br />

2.71 MVA<br />

24.08 %<br />

3.30 MVA<br />

28.52 %<br />

0.80 MVA<br />

11.05 %<br />

-0.55 MW<br />

BK-4_6-Chaar qala 2<br />

102.93 %<br />

1.43 MVA<br />

19.75 %<br />

BK-4_6-47<br />

103.00 %<br />

2.22 MVA<br />

19.56 %<br />

0.00 MVA<br />

0.01 %<br />

BK-4_6-47.7<br />

103.00 %<br />

BK-6_3-Alouddin<br />

101.16 %<br />

BK-6_3-B4.6<br />

101.17 %<br />

BK-6_3-B7<br />

101.19 %<br />

0.63 MVA<br />

8.86 %<br />

BK-6_3-B4<br />

101.20 %<br />

0.40 MVA<br />

5.62 %<br />

BK-6_3-B4.3<br />

101.19 %<br />

-0.22 MW<br />

BK-6_3-Esteqlal Hospital<br />

101.24 %<br />

BK-3_6-Sahati Oma<br />

101.24 %<br />

-0.87 MW<br />

BK-Russian Emb-Russian Emb 1&2<br />

102.70 %<br />

-0.55 MW<br />

BK-Guzarga-Water pump 1<br />

101.60 %<br />

0.25 MVA<br />

3.75 %<br />

-0.22 MW<br />

BK-Guzarga-41-b3<br />

101.61 %<br />

1.45 MVA<br />

16.59 %<br />

BK-Guzarga-41<br />

101.65 %<br />

BK-516-79<br />

101.64 %<br />

0.63 MVA<br />

5.60 %<br />

Closed switch in section L6198 .<br />

0.63 MVA<br />

8.82 %<br />

BK-Guzarga-Musahi<br />

101.60 %<br />

-0.55 MW<br />

7.69 MVA<br />

58.13 %<br />

BK-516-Waisal Abad<br />

104.50 %<br />

-0.55 MW<br />

0.63 MVA<br />

5.44 %<br />

BK-516-12<br />

104.52 %<br />

0.80 MVA<br />

7.02 %<br />

0.40 MVA<br />

5.62 %<br />

BK-6_3-B9<br />

101.18 %<br />

-0.35 MW<br />

BK-6_3-Khalifa Saheb<br />

101.16 %<br />

0.40 MVA<br />

5.62 %<br />

0.40 MVA<br />

5.62 %<br />

1.00 MVA<br />

10.54 %<br />

0.63 MVA<br />

5.60 %<br />

BK-New 2-2<br />

103.92 %<br />

BK-516-Aqa Ali Shams 2<br />

103.84 %<br />

2.66 MVA<br />

23.08 %<br />

0.40 MVA<br />

7.45 %<br />

BK-4_6-Mullah Akram<br />

102.90 %<br />

-0.35 MW<br />

P-D3-3-New Feeder O/H 185 sqm<br />

-0.35 MW<br />

-0.55 MW<br />

BK-516-Waisal Abad 2<br />

104.19 %<br />

-0.87 MW<br />

BK-6_3-Joye Raeis<br />

101.17 %<br />

BK-516-De Murad Khan<br />

101.59 %<br />

-0.55 MW<br />

2.66 MVA<br />

23.08 %<br />

BK-517-18<br />

103.75 %<br />

0.40 MVA<br />

3.51 %<br />

BK-516-68<br />

103.81 %<br />

0.00 MVA<br />

0.00 %<br />

-0.87 MW<br />

BK-516-51<br />

103.85 %<br />

7.69 MVA<br />

58.13 %<br />

2.03 MVA<br />

17.63 %<br />

BK-516-20<br />

104.31 %<br />

0.00 MVA<br />

0.00 %<br />

BK-516-Mosa "1"<br />

103.81 %<br />

1.00 MVA<br />

8.69 %<br />

BK-516-Aqa Ali Shams 1<br />

103.87 %<br />

BK-4_6-Qalai Ali Mardaan<br />

102.90 %<br />

-0.35 MW<br />

0.00 MVA<br />

0.00 %<br />

BK-4_6-Qalai Jafar<br />

97.66 %<br />

0.40 MVA<br />

7.88 %<br />

-0.35 MW<br />

0.01 MVA<br />

0.14 %<br />

7.65 MVA<br />

58.13 %<br />

BK-516-63<br />

103.81 %<br />

0.00 MVA<br />

0.00 %<br />

BK-516-58<br />

103.81 %<br />

P-D3-3-New Switches<br />

1.00 MVA<br />

8.69 %<br />

BK-New 2-3<br />

103.37 %<br />

1.03 MVA<br />

8.95 %<br />

BK-516-46<br />

103.89 %<br />

5.21 MVA<br />

39.89 %<br />

-0.55 MW<br />

2.03 MVA<br />

17.63 %<br />

5.87 MVA<br />

5.22 MVA<br />

39.89 %<br />

BK-517-40<br />

102.76 %<br />

BK-517-Street New <strong>of</strong> <strong>the</strong> Takhnikum<br />

102.76 %<br />

-0.55 MW<br />

BK-516-36<br />

104.02 %<br />

2.03 MVA<br />

17.63 %<br />

BK-516-30<br />

104.12 %<br />

44.69 %<br />

BK-517-Mullah buzurg<br />

103.32 %<br />

-0.35 MW<br />

BK-517-30<br />

103.13 %<br />

MVA<br />

%6.51<br />

0.63 MVA<br />

4.78<br />

52.50 %<br />

49.47 % 6.93 MVA<br />

BK-4_6-18.12.4<br />

97.68 %<br />

BK-6_3-Moqabel Wezarat Energy wa Aob<br />

97.94 %<br />

-0.35 MW<br />

5.20 MVA<br />

39.89 %<br />

BK-517-30.2<br />

103.12 %<br />

0.63 MVA<br />

11.72 %<br />

BK-4_6-Tubercluses<br />

97.85 %<br />

0.40 MVA<br />

7.88 %<br />

BK-4_6-18.12<br />

97.71 %<br />

0.00 MVA<br />

0.02 %<br />

BK-4_6-18.19<br />

97.71 %<br />

0.00 MVA<br />

0.01 %<br />

0.39 MVA<br />

4.28 %<br />

BK-517-Takhnikum<br />

103.09 %<br />

-0.55 MW<br />

BK-4_6-17.1<br />

98.01 %<br />

BK-4_6-18<br />

98.02 %<br />

1.83 MVA<br />

36.00 %<br />

-0.55 MW<br />

BK-4_6-18.7<br />

97.86 %<br />

0.63 MVA<br />

11.15 %<br />

1.20 MVA<br />

23.63 %<br />

0.80 MVA<br />

11.67 %<br />

BK-4_6-Veterenary<br />

97.67 %<br />

-0.70 MW<br />

-0.55 MW -0.55 MW<br />

BK-6_3-Pidagoghi<br />

BK-6_3-4<br />

97.95 %<br />

97.87 %<br />

BK-6_3-Khwaja Aman<br />

97.72 %<br />

1.02 MVA<br />

11.13 %<br />

1.26 MVA<br />

24.80 %<br />

1.26 MVA<br />

24.80 %<br />

BK-6_3-Wezarat energy Aob<br />

97.74 %<br />

P-D3-3-New Feeder O/H 185 sqm<br />

-0.35 MW<br />

-0.55 MW<br />

K-4_6-17.9<br />

7.94 %<br />

khtiar<br />

1.00 MVA<br />

9.24 %<br />

-0.87 MW<br />

BK-6_3-Cure Hospital<br />

97.99 %<br />

-0.55 MW<br />

BK-517-Rega<br />

100.79 %<br />

BK-517-Regration<br />

101.26 %<br />

BK-517-64<br />

101.89 %<br />

BK-517-Dahan e Bagh <strong>of</strong> Chilstoon<br />

101.88 %<br />

-0.87 MW<br />

-0.55 MW<br />

2.84 MVA<br />

26.18 %<br />

0.80 MVA<br />

15.70 %<br />

BK-4_6-11.8<br />

98.06 %<br />

3.29 MVA<br />

35.79 %<br />

0.63 MVA<br />

12.00 %<br />

0.40 MVA<br />

3.09 %<br />

4.55 MVA<br />

35.05 %<br />

0.80 MVA<br />

15.70 %<br />

BK-4_6-11<br />

98.17 %<br />

BK-4_6-Ministry <strong>of</strong> Rural and Rehablitation<br />

98.03 %<br />

-0.22 MW<br />

BK-517-Dedana First<br />

100.78 %<br />

3.48 MVA<br />

27.11 %<br />

BK-517-99<br />

100.94 %<br />

3.49 MVA<br />

27.11 %<br />

BK-517-96<br />

101.01 %<br />

BK-517-71<br />

101.71 %<br />

-0.70 MW<br />

BK-6_3-Stera Mahkama<br />

98.15 %<br />

-0.87 MW<br />

3.49 MVA<br />

27.11 %<br />

3.91 MVA<br />

30.20 %<br />

3.64 MVA<br />

33.57 %<br />

BK-517-85<br />

101.28 %<br />

0.63 MVA<br />

4.85 %<br />

3.91 MVA<br />

30.20 %<br />

BK-4_6-7<br />

98.32 %<br />

0.10 MVA<br />

2.37 %<br />

BK-4_6-Directorate <strong>of</strong> learning<br />

98.32 %<br />

1.85 MVA<br />

14.43 %<br />

BK-517-75<br />

101.61 %<br />

P-D3-3-New Feeder O/H 185 sqm<br />

3.75 MVA<br />

34.49 %<br />

-0.09 MW<br />

-0.35 MW<br />

3.54 MVA<br />

38.44 %<br />

BK-517-116<br />

100.63 %<br />

14.43 %<br />

MVA<br />

%1.85<br />

1.45 MVA<br />

11.32<br />

BK-517-111<br />

100.71 %<br />

BK-517-Sare kotal <strong>of</strong> Chilstoon<br />

101 67 %<br />

D-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


7.50 MVA<br />

65.58 %<br />

1.58 MVA<br />

14.07 %<br />

0.63 MVA<br />

5.63 %<br />

BK-513-17<br />

103.54 %<br />

BK-513-25<br />

102.91 %<br />

7.45 MVA<br />

65.58 %<br />

0.63 MVA<br />

11.76 %<br />

-0.55 MW<br />

6.81 MVA<br />

60.05 %<br />

BK-513-44<br />

101.47 %<br />

BK-513-18<br />

103.36 %<br />

7.49 MVA<br />

65.58 %<br />

BK-513-70_21<br />

101.07 %<br />

BK-513-Borj_2_Qalhacha<br />

101.17 %<br />

0.31 MVA<br />

2.81 %<br />

-0.28 MW<br />

BK-513-61<br />

101.17 %<br />

0.00 MVA<br />

0.01 %<br />

0.00 MVA<br />

0.00 %<br />

1.26 MVA<br />

11.26 %<br />

BK-513-70_3<br />

101.06 %<br />

0.63 MVA<br />

5.63 %<br />

BK-513-70_4<br />

101.05 %<br />

0.63 MVA<br />

5.63 %<br />

BK-513-69<br />

101.09 %<br />

BK-513-Pull Safeed<br />

101.04 %<br />

-0.55 MW<br />

BK-513-70_33<br />

101.07 %<br />

0.63 MVA<br />

5.63 %<br />

BK-513-78<br />

101.04 %<br />

0.63 MVA<br />

5.64 %<br />

BK-513-Beni Hesar<br />

101.01 %<br />

-0.55 MW<br />

D-4<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


P-D5-1 New 150 sqm OH section<br />

E-515-94<br />

102.69 %<br />

0.00 MVA<br />

0.01 %<br />

E-523-91<br />

102.77 %<br />

MVA<br />

%2.75<br />

2.75 MVA<br />

24.20<br />

24.19 %<br />

2.74 MVA<br />

24.21 %<br />

E-523-100<br />

102.58 %<br />

0.75 MVA<br />

6.60 %<br />

E-523-103<br />

102.56 %<br />

E-523-94<br />

102.69 %<br />

E-523-zakhira-Ab-Bagrami<br />

102.56 %<br />

-0.87 MW<br />

-0.87 MW<br />

E-523-106<br />

102.55 %<br />

0.75 MVA<br />

6.61 %<br />

0.75 MVA<br />

6.61 %<br />

E-523-115<br />

102.50 %<br />

0.75 MVA<br />

6.61 %<br />

E-523-120<br />

102.47 %<br />

E-523-Chaha-e-hamiq-1<br />

102.46 %<br />

-0.22 MW<br />

0.50 MVA<br />

4.41 %<br />

E-523-131<br />

102.42 %<br />

E-523-Chaha-e-hamiq-2<br />

102.42 %<br />

-0.22 MW<br />

E-523-Chaha-e-hamiq-3<br />

102.42 %<br />

-0.22 MW<br />

E-523-137<br />

102.42 %<br />

D-5<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


-0.35 MW<br />

BK-517-127<br />

100.50 %<br />

1.45 MVA<br />

11.32 %<br />

BK-517-Sare kotal <strong>of</strong> Chilstoon<br />

101.67 %<br />

BK-517-National Meuseum<br />

100.46 %<br />

-0.55 MW<br />

0.40 MVA<br />

7.64 %<br />

BK-4_6-1<br />

98.53 %<br />

BK-517-126<br />

100.51 %<br />

P-D3-3-New Feeder O/H 185 sqm<br />

BK-517-Afshaar Darulaman<br />

100.35 %<br />

0.80 MVA<br />

11.34 %<br />

BK-517-137<br />

100.44 %<br />

JS#6-BK-517<br />

98.57 %<br />

0.40 MVA<br />

3.12 %<br />

BK-517-Dedana Second<br />

100.56 %<br />

-0.35 MW<br />

0.25 MVA<br />

4.78 %<br />

-0.70 MW<br />

BK-517-116.7<br />

100.58 %<br />

BK-517-126.4<br />

100.49 %<br />

0.25 MVA<br />

4.78 %<br />

BK-517-Examination Form <strong>of</strong> Agriculture<br />

100.46 %<br />

-0.22 MW<br />

E-3<br />

Branch Element<br />

.<br />

S [MVA]<br />

I/Ib [%]<br />

Filter I/Ib [%]:<br />

I/Ib


Appendix<br />

E<br />

Turkmenistan One line Diagrams (with<br />

100 MW diesel unit in <strong>Kabul</strong>)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International E-1


8.4<br />

13.6<br />

1.6<br />

31.8<br />

0.3<br />

32.4 7.9<br />

0.3<br />

5.9<br />

0.3<br />

7.8 7.6<br />

9.4<br />

22.3<br />

10.8<br />

22.2<br />

0.0<br />

0.0<br />

10.3<br />

0.0<br />

0.0<br />

9.8<br />

0.0<br />

9.9<br />

0.0<br />

0.0<br />

0.0<br />

1.5<br />

13.6<br />

8.4<br />

13.6<br />

1.9<br />

0.1<br />

1.9<br />

0.1<br />

1.9<br />

0.1<br />

1.9<br />

0.1<br />

5.5L<br />

22.0<br />

0.8<br />

32.2 32.4<br />

14.7<br />

0.2<br />

14.0<br />

0.1<br />

3.7<br />

12.0<br />

0.0<br />

12.2<br />

3.7<br />

12.0<br />

0.0<br />

12.2<br />

1.0<br />

7.5<br />

1.7<br />

7.5<br />

2.7<br />

4.5<br />

2.8<br />

4.5<br />

0.1<br />

19.4<br />

1.5<br />

19.2<br />

2.1<br />

3.4<br />

0.9<br />

3.4<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

1.018<br />

-26.3<br />

1<br />

85.6<br />

1.042<br />

-23.3<br />

1<br />

86.6<br />

16.4<br />

1<br />

84.6<br />

27.5<br />

2010<br />

UZBEK SRCE<br />

1.030<br />

-0.5<br />

1<br />

10.0<br />

27.8<br />

10.1<br />

27.8<br />

10.1<br />

13.4<br />

2.0<br />

13.3<br />

2.4<br />

1.035<br />

-30.2<br />

10.9H<br />

1.0000<br />

10.0<br />

10.9<br />

1.036<br />

-30.1<br />

1<br />

10.6<br />

23.1<br />

11.6<br />

22.9<br />

35.7<br />

1<br />

1.027<br />

-32.0<br />

1<br />

15.5<br />

120<br />

BRESHNA KOT<br />

1.015<br />

-32.2<br />

1<br />

36.0<br />

22.3<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.043<br />

-30.9<br />

1<br />

0.0<br />

0.0<br />

1.025<br />

-32.2<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

0.7<br />

13.4<br />

3.5<br />

110<br />

SAROBI TOWN<br />

1.043<br />

-30.9<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

4.8<br />

3.0<br />

505<br />

NAGHLU HPP 1<br />

1<br />

2.5R<br />

1.0000<br />

18.0<br />

2.5<br />

1.020<br />

-29.8<br />

4<br />

25.0<br />

2.4R<br />

1.0200<br />

1.0000<br />

24.8<br />

2.9<br />

2<br />

0.0<br />

0.0<br />

1.020<br />

-29.8<br />

3<br />

0.0<br />

0.0<br />

0.0<br />

111<br />

SAROBI GEN<br />

1.038<br />

-30.8<br />

0.3<br />

5.9<br />

0.3<br />

503<br />

SAROBI HPP 1<br />

1.038<br />

-30.8<br />

1<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.029<br />

-30.8<br />

2<br />

0.0<br />

2.8L<br />

1.0000<br />

2.8 2.8<br />

0.2<br />

1.0000<br />

0.0<br />

0.0<br />

114<br />

MAHIPAR<br />

32.7<br />

7.6<br />

1.026<br />

-31.2<br />

1<br />

0.0<br />

0.0<br />

32.2<br />

0.8<br />

31.8<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-27.3<br />

22.0<br />

3.1R<br />

1.0200<br />

1.0000<br />

21.9<br />

1.2<br />

1.010<br />

-27.3<br />

3<br />

22.0<br />

3.1R<br />

1.0200<br />

1.0000<br />

21.9<br />

1.2<br />

109<br />

MEHTARLAM<br />

1.024<br />

-32.3<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

3.4<br />

2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

86.6<br />

16.4<br />

85.6<br />

20.5 9.0<br />

1<br />

87.7<br />

2.2<br />

1.071<br />

-16.9<br />

1<br />

9.9<br />

88.5<br />

1.008<br />

-5.1<br />

1<br />

13.6<br />

8.4<br />

12<br />

KUNDUZ<br />

1.011<br />

-4.8<br />

7<br />

NAIBABAD<br />

88.7<br />

16.8<br />

2.2<br />

88.8<br />

16.8<br />

13<br />

SHEKANBANDAR<br />

1.026<br />

-2.6<br />

74.6<br />

13.3<br />

75.3<br />

7.8<br />

14<br />

TALOQAN<br />

0.999<br />

-6.6<br />

62.7<br />

7.1<br />

62.3<br />

13.0<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.8<br />

4.7<br />

2.0<br />

4.6<br />

1.000<br />

-7.8<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

15.3<br />

13.6<br />

7.5<br />

301<br />

TALOQAN<br />

1.005<br />

-11.1<br />

1.0000<br />

1.0500<br />

19.9<br />

34.8<br />

16.4<br />

302<br />

RUSTAQ<br />

1.003<br />

-11.2<br />

1<br />

8.5<br />

5.3<br />

8.5<br />

4.7<br />

8.5<br />

5.3<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1<br />

12.8<br />

7.9<br />

26.3<br />

11.6<br />

25.7<br />

13.2<br />

305<br />

CHAH AB<br />

0.954<br />

-13.1<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.3<br />

12.7<br />

7.9<br />

35.0<br />

1.028<br />

-2.4<br />

37.6 37.7<br />

2.0<br />

3.9<br />

37.7<br />

2.0<br />

311<br />

SHERKHAN<br />

15.6<br />

3.8<br />

15.8<br />

0.6<br />

314<br />

IMAM SABIB<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

3011<br />

TAJIK TIE<br />

1.029<br />

-2.5<br />

3010<br />

TAJIK SRCE<br />

1.029<br />

-2.1<br />

19.6<br />

0.1<br />

75.3<br />

4.0<br />

75.4<br />

2.0<br />

3100<br />

TAJIK GEN<br />

1.030<br />

0.0<br />

1<br />

95.2<br />

1.0000<br />

95.0<br />

95.2<br />

5.5 2.0<br />

1.0000<br />

2001<br />

UZBEK TIE<br />

0.0<br />

0.0<br />

2.4<br />

2011<br />

UZBEK TIE<br />

1.029<br />

-0.9<br />

1.0000<br />

1.0000<br />

2.3<br />

21.5<br />

2.1<br />

2100<br />

UZBEK GEN<br />

1.030<br />

0.0<br />

1<br />

1.0000<br />

1.0000<br />

21.7 21.9<br />

21.7<br />

0.1<br />

201<br />

MAZAR-E-SHRF<br />

0.998<br />

-2.9<br />

1<br />

8.4<br />

21.0<br />

21.5<br />

2.1<br />

5.7<br />

204<br />

DAWLATABAD<br />

0.997<br />

-3.0<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

3.4<br />

209<br />

MAZAR NO 1<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

0.5<br />

1.002<br />

-3.0<br />

0.0<br />

4.0<br />

0.0<br />

0.0<br />

2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

10<br />

SHEBERGHAN<br />

1.052<br />

-11.2<br />

1<br />

88.8<br />

90.1<br />

45.5<br />

20.3<br />

90.1<br />

45.5<br />

202<br />

SHEBERGHAN<br />

0.988<br />

-7.1<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

4001<br />

A NDKHOY_2<br />

1.037<br />

-8.9<br />

90.1<br />

45.5<br />

90.8<br />

55.0<br />

90.1<br />

45.5<br />

90.8<br />

55.0<br />

1.016<br />

-4.2<br />

1<br />

8.5<br />

5.3<br />

28.2<br />

0.4<br />

29.1<br />

2.2<br />

0.966<br />

-7.9<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.6<br />

13.6<br />

8.4<br />

0.992<br />

-7.2<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.988<br />

-7.1<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.988<br />

-7.1<br />

3<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

3.9<br />

206<br />

SHERIM TAQAB<br />

1.000<br />

-8.0<br />

1<br />

8.5<br />

5.3<br />

10.0<br />

25.7<br />

1.040<br />

0.0<br />

17.3 15.3<br />

6.6<br />

67.0<br />

0.0<br />

4010<br />

ANDKHOY_2<br />

1<br />

207<br />

JUMABAZAR<br />

1.001<br />

-8.8<br />

1<br />

3.4<br />

17.2<br />

11.9<br />

10.7<br />

2.1<br />

208<br />

MAIMANA<br />

0.997<br />

-9.4<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

2.8<br />

13.6<br />

1.5<br />

11.6H<br />

4.5<br />

2.8<br />

2.4<br />

1.028<br />

-31.9<br />

1.033<br />

-30.6<br />

115<br />

BOT-KHAK<br />

19.9<br />

18.7<br />

19.7<br />

19.3<br />

7.5<br />

1.7<br />

7.5<br />

21.6<br />

1.0R<br />

21<br />

FAIZABAD<br />

310<br />

KUNDOZ<br />

1.0000<br />

0.0<br />

19.4<br />

1.001<br />

-4.5<br />

11<br />

BAGHLAN<br />

37.6<br />

0.1<br />

1.0000<br />

1.0000<br />

1.0000<br />

21.6<br />

21.8<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.019<br />

-32.1 2.4<br />

1.6<br />

108<br />

JALALABAD<br />

0.2<br />

17.8<br />

2.4<br />

25.0<br />

1.0200<br />

2.8<br />

0.0<br />

506<br />

NAGHLU HPP 2<br />

0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

5.5R<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

3001<br />

TAJIK TIE<br />

0.1R<br />

21.9<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

1.0000<br />

524<br />

SHEBERGHAN 4<br />

0.0<br />

10.0<br />

17.1<br />

0.5<br />

1.019<br />

-3.3<br />

1.0000<br />

4.5<br />

21.6<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-27.3<br />

1.034<br />

-30.4<br />

7.8<br />

32.8<br />

27.5<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

0.0<br />

1.020<br />

-30.1<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-30.1<br />

3.9<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.030<br />

-0.5<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8 32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.033<br />

-30.6<br />

0.3 7.9<br />

1<br />

87.6<br />

3<br />

KHENJAN<br />

12.9<br />

87.7<br />

0.0<br />

0.0<br />

1.071<br />

-16.2<br />

12.9<br />

1.068<br />

-18.7<br />

9.9<br />

6<br />

KHULM<br />

88.5<br />

18.0<br />

0.0<br />

1.0500<br />

33.2<br />

1.0500<br />

10.0<br />

27.8<br />

84.4<br />

30.5<br />

63.0<br />

10.0<br />

10.0<br />

10.1<br />

1.009<br />

-6.1<br />

27.8<br />

27.8<br />

27.8<br />

10.1<br />

26.7<br />

0.0<br />

0.0<br />

64.2<br />

26.7<br />

1.060<br />

-20.8<br />

76.5<br />

26.1<br />

84.7<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

67.0<br />

15.3R<br />

1<br />

84.4<br />

4100<br />

SERDAR<br />

20.3<br />

13.6<br />

181.5<br />

109.9<br />

181.7<br />

98.1<br />

1.0000<br />

1.0000<br />

SW<br />

88.2<br />

2<br />

CHARIKAR<br />

27.8<br />

57.6<br />

20.8<br />

4<br />

PUL-E-KHUMRI<br />

0.0<br />

0.0<br />

305.3<br />

30.4<br />

27.8<br />

502<br />

NW KABUL G2<br />

19.3<br />

4.8<br />

19.3<br />

19.3<br />

4.8<br />

19.3<br />

5.3<br />

9<br />

MAZAR<br />

1.071<br />

-16.2<br />

1.0000<br />

87.5<br />

5<br />

AIBAK<br />

10.8<br />

88.8<br />

0.0<br />

184.2<br />

272.1R<br />

182.1<br />

169.6<br />

207.2<br />

181.7<br />

169.6<br />

0.0<br />

3.5<br />

0.0<br />

0.0<br />

0.0<br />

3.5<br />

0.0<br />

0.0<br />

1.0000<br />

1.0000<br />

21.8<br />

0.0<br />

0.0<br />

88.2<br />

84.6<br />

SW<br />

33.2<br />

1.0000<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1, TURKMENISTAN SOURCE, NORMAL CONDITIONS<br />

MON, NOV 19 2007 18:02<br />

84.6<br />

1.000<br />

0.0<br />

184.2<br />

272.1<br />

182.1<br />

1.018<br />

-5.6<br />

4020<br />

BORDER_5<br />

20.6<br />

36.3<br />

13.7<br />

23.0<br />

12.1<br />

25.0<br />

8.0<br />

25.0<br />

7.8<br />

25.0<br />

8.0<br />

25.0<br />

7.8<br />

1.0<br />

105<br />

KABUL EAST<br />

36.4<br />

15.5<br />

104<br />

KABUL NORTH<br />

5.3<br />

1.028<br />

-31.9<br />

47.4<br />

10.5<br />

47.3<br />

24.7<br />

102<br />

KABUL NW<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

1.015<br />

-32.3<br />

526<br />

KABUL SW<br />

101<br />

CHIMTALAH<br />

40.5<br />

19.6<br />

1<br />

10.5<br />

34.9<br />

1<br />

72.0<br />

0.0<br />

9.9<br />

0.0<br />

1.030<br />

-31.8<br />

14.5<br />

100.0<br />

1<br />

26.5 26.7<br />

525<br />

KABUL DIESEL<br />

1.017<br />

-32.3<br />

13.1<br />

23.2<br />

1.015<br />

-32.3<br />

24.2<br />

1.021<br />

-32.0<br />

23.1<br />

0.994<br />

-28.6<br />

527<br />

KABUL CENTRL<br />

1.011<br />

-32.4<br />

24.3<br />

24.8<br />

103<br />

KABUL NO TAP<br />

41.3R


8.4<br />

13.6<br />

3.7<br />

32.8<br />

2.5<br />

33.4 8.5<br />

0.7<br />

6.6<br />

0.7<br />

6.2 6.0<br />

8.3<br />

22.3<br />

9.7<br />

22.2<br />

0.0<br />

0.0<br />

10.3<br />

0.0<br />

0.0<br />

9.8<br />

0.0<br />

9.9<br />

0.0<br />

0.0<br />

0.0<br />

1.5<br />

13.6<br />

8.4<br />

13.6<br />

1.4<br />

0.1<br />

1.4<br />

0.1<br />

1.4<br />

0.1<br />

1.4<br />

0.1<br />

5.5L<br />

22.0<br />

3.0<br />

33.1 33.4<br />

16.0<br />

1.8<br />

15.3<br />

1.9<br />

4.2<br />

11.0<br />

0.5<br />

11.2<br />

4.2<br />

11.0<br />

0.5<br />

11.2<br />

1.5<br />

6.5<br />

2.2<br />

6.5<br />

2.7<br />

4.5<br />

2.8<br />

4.5<br />

0.1<br />

19.4<br />

1.5<br />

19.2<br />

2.1<br />

3.4<br />

0.9<br />

3.4<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

1.011<br />

-26.6<br />

1<br />

85.9<br />

1.035<br />

-23.5<br />

1<br />

86.9<br />

17.1<br />

1<br />

84.9<br />

27.4<br />

2010<br />

UZBEK SRCE<br />

1.030<br />

-0.5<br />

1<br />

9.9<br />

27.9<br />

10.0<br />

27.9<br />

10.0<br />

11.8<br />

1.0<br />

11.8<br />

1.5<br />

1.027<br />

-30.5<br />

10.9H<br />

1.0000<br />

10.0<br />

10.9<br />

1.028<br />

-30.4<br />

1<br />

10.6<br />

23.1<br />

11.6<br />

22.9<br />

35.7<br />

1<br />

1.026<br />

-32.1<br />

1<br />

21.2<br />

120<br />

BRESHNA KOT<br />

1.009<br />

-32.4<br />

1<br />

36.0<br />

22.3<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.042<br />

-31.2<br />

1<br />

0.0<br />

0.0<br />

1.024<br />

-32.4<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

0.7<br />

13.4<br />

3.5<br />

110<br />

SAROBI TOWN<br />

1.042<br />

-31.2<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

4.8<br />

3.0<br />

505<br />

NAGHLU HPP 1<br />

1<br />

1.3R<br />

1.0000<br />

18.0<br />

1.3<br />

1.020<br />

-30.0<br />

4<br />

25.0<br />

1.2R<br />

1.0200<br />

1.0000<br />

24.8<br />

1.7<br />

2<br />

0.0<br />

0.0<br />

1.020<br />

-30.0<br />

3<br />

0.0<br />

0.0<br />

0.0<br />

111<br />

SAROBI GEN<br />

1.036<br />

-31.0<br />

0.7<br />

6.6<br />

0.7<br />

503<br />

SAROBI HPP 1<br />

1.036<br />

-31.0<br />

1<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.027<br />

-31.0<br />

2<br />

0.0<br />

2.8L<br />

1.0000<br />

2.8 2.8<br />

0.2<br />

1.0000<br />

0.0<br />

0.0<br />

114<br />

MAHIPAR<br />

32.7<br />

6.0<br />

1.022<br />

-31.5<br />

1<br />

0.0<br />

0.0<br />

33.1<br />

3.0<br />

32.8<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-27.6<br />

22.0<br />

1.6R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.2<br />

1.010<br />

-27.6<br />

3<br />

22.0<br />

1.6R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.2<br />

109<br />

MEHTARLAM<br />

1.023<br />

-32.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

3.4<br />

2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

86.9<br />

17.1<br />

85.9<br />

20.9 9.9<br />

1<br />

88.0<br />

1.1<br />

1.066<br />

-17.0<br />

1<br />

10.7<br />

88.8<br />

1.008<br />

-5.1<br />

1<br />

13.6<br />

8.4<br />

12<br />

KUNDUZ<br />

1.011<br />

-4.8<br />

7<br />

NAIBABAD<br />

89.0<br />

15.4<br />

1.1<br />

89.1<br />

15.4<br />

13<br />

SHEKANBANDAR<br />

1.026<br />

-2.6<br />

74.6<br />

13.3<br />

75.3<br />

7.8<br />

14<br />

TALOQAN<br />

0.999<br />

-6.6<br />

62.7<br />

7.1<br />

62.3<br />

13.0<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.8<br />

4.7<br />

2.0<br />

4.6<br />

1.000<br />

-7.8<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

15.3<br />

13.6<br />

7.5<br />

301<br />

TALOQAN<br />

1.005<br />

-11.1<br />

1.0000<br />

1.0500<br />

19.9<br />

34.8<br />

16.4<br />

302<br />

RUSTAQ<br />

1.003<br />

-11.2<br />

1<br />

8.5<br />

5.3<br />

8.5<br />

4.7<br />

8.5<br />

5.3<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1<br />

12.8<br />

7.9<br />

26.3<br />

11.6<br />

25.7<br />

13.2<br />

305<br />

CHAH AB<br />

0.954<br />

-13.1<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.3<br />

12.8<br />

7.9<br />

35.0<br />

1.028<br />

-2.4<br />

37.6 37.7<br />

2.0<br />

3.9<br />

37.7<br />

2.0<br />

311<br />

SHERKHAN<br />

15.6<br />

3.8<br />

15.8<br />

0.6<br />

314<br />

IMAM SABIB<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

3011<br />

TAJIK TIE<br />

1.029<br />

-2.5<br />

3010<br />

TAJIK SRCE<br />

1.029<br />

-2.1<br />

19.6<br />

0.1<br />

75.3<br />

4.0<br />

75.4<br />

2.0<br />

3100<br />

TAJIK GEN<br />

1.030<br />

0.0<br />

1<br />

95.2<br />

1.0000<br />

95.0<br />

95.2<br />

5.5 2.0<br />

1.0000<br />

2001<br />

UZBEK TIE<br />

0.0<br />

0.0<br />

2.4<br />

2011<br />

UZBEK TIE<br />

1.029<br />

-0.9<br />

1.0000<br />

1.0000<br />

2.3<br />

21.5<br />

2.1<br />

2100<br />

UZBEK GEN<br />

1.030<br />

0.0<br />

1<br />

1.0000<br />

1.0000<br />

21.7 21.9<br />

21.7<br />

0.1<br />

201<br />

MAZAR-E-SHRF<br />

0.998<br />

-2.9<br />

1<br />

8.4<br />

21.0<br />

21.5<br />

2.1<br />

5.7<br />

204<br />

DAWLATABAD<br />

0.997<br />

-3.0<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

3.4<br />

209<br />

MAZAR NO 1<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

0.5<br />

1.002<br />

-3.0<br />

0.0<br />

4.0<br />

0.0<br />

0.0<br />

2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

10<br />

SHEBERGHAN<br />

1.049<br />

-11.2<br />

1<br />

89.1<br />

90.4<br />

43.8<br />

18.9<br />

90.4<br />

43.8<br />

202<br />

SHEBERGHAN<br />

0.988<br />

-7.1<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

4001<br />

A NDKHOY_2<br />

1.034<br />

-8.9<br />

90.4<br />

43.8<br />

91.1<br />

53.2<br />

90.4<br />

43.8<br />

91.1<br />

53.2<br />

1.016<br />

-4.2<br />

1<br />

8.5<br />

5.3<br />

28.2<br />

0.4<br />

29.1<br />

2.2<br />

0.966<br />

-7.9<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.6<br />

13.6<br />

8.4<br />

0.992<br />

-7.2<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.988<br />

-7.1<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.988<br />

-7.1<br />

3<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

3.9<br />

206<br />

SHERIM TAQAB<br />

1.000<br />

-8.0<br />

1<br />

8.5<br />

5.3<br />

10.0<br />

25.7<br />

1.040<br />

0.0<br />

17.3 15.3<br />

6.6<br />

67.0<br />

0.0<br />

4010<br />

ANDKHOY_2<br />

1<br />

207<br />

JUMABAZAR<br />

1.001<br />

-8.8<br />

1<br />

3.4<br />

17.2<br />

11.9<br />

10.7<br />

2.1<br />

208<br />

MAIMANA<br />

0.997<br />

-9.4<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

2.8<br />

13.6<br />

1.5<br />

11.6H<br />

4.5<br />

2.8<br />

1.4<br />

1.028<br />

-32.0<br />

1.030<br />

-30.9<br />

115<br />

BOT-KHAK<br />

30.8<br />

23.6<br />

30.4<br />

24.0<br />

6.5<br />

2.2<br />

6.5<br />

21.7<br />

1.0R<br />

21<br />

FAIZABAD<br />

310<br />

KUNDOZ<br />

1.0000<br />

0.0<br />

19.4<br />

1.001<br />

-4.5<br />

11<br />

BAGHLAN<br />

37.6<br />

0.1<br />

1.0000<br />

1.0000<br />

1.0000<br />

21.6<br />

21.8<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.011<br />

-32.5 1.4<br />

3.7<br />

108<br />

JALALABAD<br />

0.2<br />

17.8<br />

1.2<br />

25.0<br />

1.0200<br />

1.6<br />

0.0<br />

506<br />

NAGHLU HPP 2<br />

0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

5.5R<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

3001<br />

TAJIK TIE<br />

0.1R<br />

21.9<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

1.0000<br />

524<br />

SHEBERGHAN 4<br />

0.0<br />

10.0<br />

17.1<br />

0.5<br />

1.019<br />

-3.3<br />

1.0000<br />

4.5<br />

21.7<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-27.6<br />

1.032<br />

-30.6<br />

6.2<br />

32.8<br />

27.4<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

0.0<br />

1.020<br />

-30.4<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-30.4<br />

3.9<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.030<br />

-0.5<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8 32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.030<br />

-30.9<br />

2.5 8.5<br />

1<br />

87.8<br />

3<br />

KHENJAN<br />

11.6<br />

88.0<br />

0.0<br />

0.0<br />

1.066<br />

-16.3<br />

11.6<br />

1.063<br />

-18.8<br />

10.8<br />

6<br />

KHULM<br />

88.8<br />

18.0<br />

0.0<br />

1.0500<br />

33.3<br />

1.0500<br />

9.9<br />

27.9<br />

84.6<br />

30.5<br />

63.0<br />

9.9<br />

9.9<br />

10.0<br />

1.007<br />

-6.1<br />

27.9<br />

27.9<br />

27.9<br />

10.0<br />

27.1<br />

0.0<br />

0.0<br />

64.2<br />

26.7<br />

1.054<br />

-21.0<br />

76.5<br />

26.3<br />

84.9<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

67.0<br />

15.3R<br />

1<br />

84.6<br />

4100<br />

SERDAR<br />

18.9<br />

13.6<br />

182.2<br />

106.5<br />

182.3<br />

94.7<br />

1.0000<br />

1.0000<br />

SW<br />

88.5<br />

2<br />

CHARIKAR<br />

27.9<br />

57.6<br />

20.5<br />

4<br />

PUL-E-KHUMRI<br />

0.0<br />

0.0<br />

304.2<br />

30.6<br />

27.9<br />

502<br />

NW KABUL G2<br />

20.3<br />

5.1<br />

20.2<br />

20.3<br />

5.1<br />

20.2<br />

5.6<br />

9<br />

MAZAR<br />

1.066<br />

-16.3<br />

1.0000<br />

87.8<br />

5<br />

AIBAK<br />

11.7<br />

89.1<br />

0.0<br />

184.8<br />

268.9R<br />

182.7<br />

172.0<br />

209.4<br />

182.3<br />

172.0<br />

0.0<br />

3.4<br />

0.0<br />

0.0<br />

0.0<br />

3.4<br />

0.0<br />

0.0<br />

1.0000<br />

1.0000<br />

21.8<br />

0.0<br />

0.0<br />

88.5<br />

84.8<br />

SW<br />

33.3<br />

1.0000<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1, TURKMENISTAN SOURCE, CONTIGENCY NORTH DIESEL<br />

MON, NOV 19 2007 18:07<br />

84.9<br />

1.000<br />

0.0<br />

184.8<br />

268.9<br />

182.7<br />

1.017<br />

-5.7<br />

4020<br />

BORDER_5<br />

20.3<br />

48.3<br />

36.5<br />

19.4<br />

31.4<br />

10.0<br />

31.5<br />

9.8<br />

31.4<br />

10.0<br />

31.5<br />

9.8<br />

1.5<br />

105<br />

KABUL EAST<br />

48.3<br />

21.2<br />

104<br />

KABUL NORTH<br />

5.6<br />

1.027<br />

-32.0<br />

60.0<br />

19.3<br />

59.8<br />

12.2<br />

102<br />

KABUL NW<br />

20.3<br />

9.5<br />

20.3<br />

9.8<br />

20.3<br />

9.5<br />

20.3<br />

9.8<br />

1.007<br />

-32.6<br />

526<br />

KABUL SW<br />

101<br />

CHIMTALAH<br />

40.5<br />

19.6<br />

1<br />

19.1<br />

34.9<br />

1<br />

72.0<br />

0.0<br />

9.7<br />

0.0<br />

1.030<br />

-31.9<br />

100.0<br />

1<br />

525<br />

KABUL DIESEL<br />

1.009<br />

-32.6<br />

19.8<br />

37.1<br />

1.006<br />

-32.7<br />

15.6<br />

1.013<br />

-32.4<br />

23.1<br />

0.986<br />

-28.9<br />

527<br />

KABUL CENTRL<br />

1.004<br />

-32.7<br />

15.8<br />

12.2<br />

103<br />

KABUL NO TAP<br />

38.9R


8.4<br />

13.6<br />

2.2<br />

31.5<br />

0.9<br />

32.1 8.1<br />

0.6<br />

6.1<br />

0.6<br />

7.3 7.1<br />

9.1<br />

22.3<br />

10.5<br />

22.2<br />

0.0<br />

0.0<br />

10.3<br />

0.0<br />

0.0<br />

9.8<br />

0.0<br />

9.9<br />

0.0<br />

0.0<br />

0.0<br />

1.5<br />

13.6<br />

8.4<br />

13.6<br />

1.8<br />

0.1<br />

1.8<br />

0.1<br />

1.8<br />

0.1<br />

1.8<br />

0.1<br />

5.5L<br />

22.0<br />

1.5<br />

31.9 32.1<br />

15.0<br />

0.8<br />

14.3<br />

0.7<br />

4.4<br />

12.3<br />

0.7<br />

12.5<br />

4.4<br />

12.3<br />

0.7<br />

12.5<br />

1.7<br />

7.8<br />

2.4<br />

7.8<br />

2.7<br />

4.5<br />

2.8<br />

4.5<br />

0.1<br />

19.4<br />

1.5<br />

19.2<br />

2.1<br />

3.4<br />

0.9<br />

3.4<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

1.017<br />

-26.4<br />

1<br />

85.7<br />

1.041<br />

-23.3<br />

1<br />

86.7<br />

16.4<br />

1<br />

84.7<br />

27.4<br />

2010<br />

UZBEK SRCE<br />

1.030<br />

-0.5<br />

1<br />

10.0<br />

27.8<br />

10.1<br />

27.8<br />

10.1<br />

13.2<br />

1.9<br />

13.1<br />

2.4<br />

1.034<br />

-30.3<br />

10.9H<br />

1.0000<br />

10.0<br />

10.9<br />

1.035<br />

-30.1<br />

1<br />

10.6<br />

23.1<br />

11.6<br />

22.9<br />

35.7<br />

1<br />

1.024<br />

-32.1<br />

1<br />

15.7<br />

120<br />

BRESHNA KOT<br />

1.014<br />

-32.3<br />

1<br />

36.0<br />

22.3<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.042<br />

-31.1<br />

1<br />

0.0<br />

0.0<br />

1.025<br />

-32.3<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

0.7<br />

13.4<br />

3.5<br />

110<br />

SAROBI TOWN<br />

1.042<br />

-31.1<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

4.8<br />

2.9<br />

505<br />

NAGHLU HPP 1<br />

1<br />

1.5R<br />

1.0000<br />

18.0<br />

1.5<br />

1.020<br />

-30.0<br />

4<br />

25.0<br />

1.4R<br />

1.0200<br />

1.0000<br />

24.8<br />

1.9<br />

2<br />

0.0<br />

0.0<br />

1.020<br />

-30.0<br />

3<br />

0.0<br />

0.0<br />

0.0<br />

111<br />

SAROBI GEN<br />

1.037<br />

-30.9<br />

0.6<br />

6.1<br />

0.6<br />

503<br />

SAROBI HPP 1<br />

1.037<br />

-30.9<br />

1<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.028<br />

-30.9<br />

2<br />

0.0<br />

2.8L<br />

1.0000<br />

2.8 2.8<br />

0.2<br />

1.0000<br />

0.0<br />

0.0<br />

114<br />

MAHIPAR<br />

32.7<br />

7.1<br />

1.025<br />

-31.3<br />

1<br />

0.0<br />

0.0<br />

31.9<br />

1.5<br />

31.5<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-27.4<br />

22.0<br />

2.7R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.9<br />

1.010<br />

-27.4<br />

3<br />

22.0<br />

2.7R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.9<br />

109<br />

MEHTARLAM<br />

1.023<br />

-32.4<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

3.4<br />

2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

86.7<br />

16.4<br />

85.7<br />

20.5 9.0<br />

1<br />

87.7<br />

2.1<br />

1.070<br />

-16.9<br />

1<br />

9.9<br />

88.5<br />

1.008<br />

-5.1<br />

1<br />

13.6<br />

8.4<br />

12<br />

KUNDUZ<br />

1.011<br />

-4.8<br />

7<br />

NAIBABAD<br />

88.7<br />

16.7<br />

2.1<br />

88.9<br />

16.6<br />

13<br />

SHEKANBANDAR<br />

1.026<br />

-2.6<br />

74.6<br />

13.3<br />

75.3<br />

7.8<br />

14<br />

TALOQAN<br />

0.999<br />

-6.6<br />

62.7<br />

7.1<br />

62.3<br />

13.0<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.8<br />

4.7<br />

2.0<br />

4.6<br />

1.000<br />

-7.8<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

15.3<br />

13.6<br />

7.5<br />

301<br />

TALOQAN<br />

1.005<br />

-11.1<br />

1.0000<br />

1.0500<br />

19.9<br />

34.8<br />

16.4<br />

302<br />

RUSTAQ<br />

1.003<br />

-11.2<br />

1<br />

8.5<br />

5.3<br />

8.5<br />

4.7<br />

8.5<br />

5.3<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1<br />

12.8<br />

7.9<br />

26.3<br />

11.6<br />

25.7<br />

13.2<br />

305<br />

CHAH AB<br />

0.954<br />

-13.1<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.3<br />

12.8<br />

7.9<br />

35.0<br />

1.028<br />

-2.4<br />

37.6 37.7<br />

2.0<br />

3.9<br />

37.7<br />

2.0<br />

311<br />

SHERKHAN<br />

15.6<br />

3.8<br />

15.8<br />

0.6<br />

314<br />

IMAM SABIB<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

3011<br />

TAJIK TIE<br />

1.029<br />

-2.5<br />

3010<br />

TAJIK SRCE<br />

1.029<br />

-2.1<br />

19.6<br />

0.1<br />

75.3<br />

4.0<br />

75.4<br />

2.0<br />

3100<br />

TAJIK GEN<br />

1.030<br />

0.0<br />

1<br />

95.2<br />

1.0000<br />

95.0<br />

95.2<br />

5.5 2.0<br />

1.0000<br />

2001<br />

UZBEK TIE<br />

0.0<br />

0.0<br />

2.4<br />

2011<br />

UZBEK TIE<br />

1.029<br />

-0.9<br />

1.0000<br />

1.0000<br />

2.3<br />

21.5<br />

2.1<br />

2100<br />

UZBEK GEN<br />

1.030<br />

0.0<br />

1<br />

1.0000<br />

1.0000<br />

21.7 21.9<br />

21.7<br />

0.1<br />

201<br />

MAZAR-E-SHRF<br />

0.998<br />

-2.9<br />

1<br />

8.4<br />

21.0<br />

21.5<br />

2.1<br />

5.7<br />

204<br />

DAWLATABAD<br />

0.997<br />

-3.0<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

3.4<br />

209<br />

MAZAR NO 1<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

0.5<br />

1.002<br />

-3.0<br />

0.0<br />

4.0<br />

0.0<br />

0.0<br />

2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

10<br />

SHEBERGHAN<br />

1.052<br />

-11.2<br />

1<br />

88.8<br />

90.1<br />

45.3<br />

20.1<br />

90.1<br />

45.3<br />

202<br />

SHEBERGHAN<br />

0.988<br />

-7.1<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

4001<br />

A NDKHOY_2<br />

1.037<br />

-8.9<br />

90.1<br />

45.3<br />

90.8<br />

54.8<br />

90.1<br />

45.3<br />

90.8<br />

54.8<br />

1.016<br />

-4.2<br />

1<br />

8.5<br />

5.3<br />

28.2<br />

0.4<br />

29.1<br />

2.2<br />

0.966<br />

-7.9<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.6<br />

13.6<br />

8.4<br />

0.992<br />

-7.2<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.988<br />

-7.1<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.988<br />

-7.1<br />

3<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

3.9<br />

206<br />

SHERIM TAQAB<br />

1.000<br />

-8.0<br />

1<br />

8.5<br />

5.3<br />

10.0<br />

25.7<br />

1.040<br />

0.0<br />

17.3 15.3<br />

6.6<br />

67.0<br />

0.0<br />

4010<br />

ANDKHOY_2<br />

1<br />

207<br />

JUMABAZAR<br />

1.001<br />

-8.8<br />

1<br />

3.4<br />

17.2<br />

11.9<br />

10.7<br />

2.1<br />

208<br />

MAIMANA<br />

0.997<br />

-9.4<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

2.8<br />

13.6<br />

1.5<br />

11.6H<br />

4.5<br />

2.8<br />

2.1<br />

1.026<br />

-32.0<br />

1.032<br />

-30.7<br />

115<br />

BOT-KHAK<br />

16.6<br />

17.1<br />

16.4<br />

17.8<br />

7.8<br />

2.4<br />

7.8<br />

21.7<br />

1.0R<br />

21<br />

FAIZABAD<br />

310<br />

KUNDOZ<br />

1.0000<br />

0.0<br />

19.4<br />

1.001<br />

-4.5<br />

11<br />

BAGHLAN<br />

37.6<br />

0.1<br />

1.0000<br />

1.0000<br />

1.0000<br />

21.6<br />

21.8<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.018<br />

-32.2 2.1<br />

2.3<br />

108<br />

JALALABAD<br />

0.2<br />

17.8<br />

1.4<br />

25.0<br />

1.0200<br />

1.8<br />

0.0<br />

506<br />

NAGHLU HPP 2<br />

0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

5.5R<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

3001<br />

TAJIK TIE<br />

0.1R<br />

21.9<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

1.0000<br />

524<br />

SHEBERGHAN 4<br />

0.0<br />

10.0<br />

17.1<br />

0.5<br />

1.019<br />

-3.3<br />

1.0000<br />

4.5<br />

21.7<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-27.4<br />

1.034<br />

-30.5<br />

7.3<br />

32.8<br />

27.4<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

0.0<br />

1.020<br />

-30.3<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-30.3<br />

3.9<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.030<br />

-0.5<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8 32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.032<br />

-30.7<br />

0.9 8.1<br />

1<br />

87.6<br />

3<br />

KHENJAN<br />

12.8<br />

87.7<br />

0.0<br />

0.0<br />

1.070<br />

-16.2<br />

12.8<br />

1.068<br />

-18.7<br />

10.0<br />

6<br />

KHULM<br />

88.5<br />

18.0<br />

0.0<br />

1.0500<br />

33.2<br />

1.0500<br />

10.0<br />

27.8<br />

84.4<br />

30.5<br />

63.0<br />

10.0<br />

10.0<br />

10.1<br />

1.009<br />

-6.1<br />

27.8<br />

27.8<br />

27.8<br />

10.1<br />

26.7<br />

0.0<br />

0.0<br />

64.2<br />

26.7<br />

1.060<br />

-20.8<br />

76.5<br />

26.1<br />

84.7<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

67.0<br />

15.3R<br />

1<br />

84.4<br />

4100<br />

SERDAR<br />

20.1<br />

13.6<br />

181.6<br />

109.6<br />

181.8<br />

97.8<br />

1.0000<br />

1.0000<br />

SW<br />

88.3<br />

2<br />

CHARIKAR<br />

27.8<br />

57.6<br />

20.8<br />

4<br />

PUL-E-KHUMRI<br />

0.0<br />

0.0<br />

305.2<br />

30.4<br />

27.8<br />

502<br />

NW KABUL G2<br />

19.4<br />

4.8<br />

19.4<br />

19.4<br />

4.8<br />

19.4<br />

5.3<br />

9<br />

MAZAR<br />

1.070<br />

-16.2<br />

1.0000<br />

87.6<br />

5<br />

AIBAK<br />

10.9<br />

88.8<br />

0.0<br />

184.3<br />

271.8R<br />

182.2<br />

169.8<br />

207.4<br />

181.8<br />

169.8<br />

0.0<br />

3.5<br />

0.0<br />

0.0<br />

0.0<br />

3.5<br />

0.0<br />

0.0<br />

1.0000<br />

1.0000<br />

21.8<br />

0.0<br />

0.0<br />

88.3<br />

84.6<br />

SW<br />

33.2<br />

1.0000<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1, TURKMENISTAN SOURCE, CONTINGENCY EAST DIESEL<br />

MON, NOV 19 2007 18:09<br />

84.7<br />

1.000<br />

0.0<br />

184.3<br />

271.8<br />

182.2<br />

1.018<br />

-5.6<br />

4020<br />

BORDER_5<br />

20.6<br />

37.9<br />

13.9<br />

24.8<br />

12.4<br />

46.0<br />

13.0<br />

46.2<br />

13.0<br />

1.7<br />

105<br />

KABUL EAST<br />

38.0<br />

15.6<br />

104<br />

KABUL NORTH<br />

5.3<br />

1.026<br />

-32.0<br />

43.6<br />

10.3<br />

43.4<br />

28.6<br />

102<br />

KABUL NW<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

1.014<br />

-32.3<br />

526<br />

KABUL SW<br />

101<br />

CHIMTALAH<br />

40.5<br />

19.6<br />

1<br />

10.3<br />

34.9<br />

1<br />

72.0<br />

0.0<br />

9.9<br />

0.0<br />

1.030<br />

-31.8<br />

14.7<br />

100.0<br />

1<br />

28.4<br />

525<br />

KABUL DIESEL<br />

1.016<br />

-32.3<br />

13.2<br />

25.1<br />

1.014<br />

-32.4<br />

24.5<br />

1.020<br />

-32.1<br />

23.1<br />

0.993<br />

-28.6<br />

527<br />

KABUL CENTRL<br />

1.010<br />

-32.5<br />

24.6<br />

28.6<br />

103<br />

KABUL NO TAP<br />

39.3R<br />

28.7


8.4<br />

13.6<br />

5.7<br />

33.7<br />

4.6<br />

34.4 9.4<br />

1.7<br />

7.5<br />

1.7<br />

5.0 4.9<br />

7.5<br />

22.3<br />

8.9<br />

22.2<br />

0.0<br />

0.0<br />

10.3<br />

0.0<br />

0.0<br />

9.8<br />

0.0<br />

9.9<br />

0.0<br />

0.0<br />

0.0<br />

1.5<br />

13.6<br />

8.4<br />

13.6<br />

1.0<br />

0.1<br />

1.0<br />

0.1<br />

1.0<br />

0.1<br />

1.0<br />

0.1<br />

5.5L<br />

22.0<br />

5.0<br />

34.1 34.4<br />

17.8<br />

3.8<br />

17.1<br />

3.9<br />

3.3<br />

10.1<br />

0.5<br />

10.2<br />

3.3<br />

10.1<br />

0.5<br />

10.2<br />

0.6<br />

5.5<br />

1.3<br />

5.5<br />

2.7<br />

4.5<br />

2.8<br />

4.5<br />

0.1<br />

19.4<br />

1.5<br />

19.2<br />

2.1<br />

3.4<br />

0.9<br />

3.4<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

1.013<br />

-26.5<br />

1<br />

85.7<br />

1.037<br />

-23.4<br />

1<br />

86.7<br />

16.9<br />

1<br />

84.7<br />

27.5<br />

2010<br />

UZBEK SRCE<br />

1.030<br />

-0.5<br />

1<br />

10.0<br />

27.8<br />

10.1<br />

27.9<br />

10.1<br />

12.5<br />

1.2<br />

12.5<br />

1.7<br />

1.030<br />

-30.4<br />

10.9H<br />

1.0000<br />

10.0<br />

10.9<br />

1.031<br />

-30.3<br />

1<br />

10.6<br />

23.1<br />

11.6<br />

22.9<br />

35.7<br />

1<br />

1.029<br />

-32.0<br />

1<br />

20.4<br />

120<br />

BRESHNA KOT<br />

1.005<br />

-32.5<br />

1<br />

36.0<br />

22.3<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.042<br />

-31.2<br />

1<br />

0.0<br />

0.0<br />

1.024<br />

-32.4<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

0.7<br />

13.4<br />

3.5<br />

110<br />

SAROBI TOWN<br />

1.042<br />

-31.2<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

4.8<br />

2.9<br />

505<br />

NAGHLU HPP 1<br />

1<br />

1.4R<br />

1.0000<br />

18.0<br />

1.4<br />

1.020<br />

-30.0<br />

4<br />

25.0<br />

1.2R<br />

1.0200<br />

1.0000<br />

24.8<br />

1.7<br />

2<br />

0.0<br />

0.0<br />

1.020<br />

-30.0<br />

3<br />

0.0<br />

0.0<br />

0.0<br />

111<br />

SAROBI GEN<br />

1.036<br />

-31.1<br />

1.7<br />

7.5<br />

1.7<br />

503<br />

SAROBI HPP 1<br />

1.036<br />

-31.1<br />

1<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.026<br />

-31.1<br />

2<br />

0.0<br />

2.8L<br />

1.0000<br />

2.8 2.8<br />

0.2<br />

1.0000<br />

0.0<br />

0.0<br />

114<br />

MAHIPAR<br />

32.7<br />

4.9<br />

1.019<br />

-31.5<br />

1<br />

0.0<br />

0.0<br />

34.1<br />

5.0<br />

33.7<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-27.6<br />

22.0<br />

0.4R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.6<br />

1.010<br />

-27.6<br />

3<br />

22.0<br />

0.4R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.6<br />

109<br />

MEHTARLAM<br />

1.023<br />

-32.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

3.4<br />

2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

86.7<br />

16.9<br />

85.7<br />

20.8 9.6<br />

1<br />

87.8<br />

1.5<br />

1.067<br />

-16.9<br />

1<br />

10.5<br />

88.6<br />

1.008<br />

-5.1<br />

1<br />

13.6<br />

8.4<br />

12<br />

KUNDUZ<br />

1.011<br />

-4.8<br />

7<br />

NAIBABAD<br />

88.8<br />

15.9<br />

1.5<br />

89.0<br />

15.8<br />

13<br />

SHEKANBANDAR<br />

1.026<br />

-2.6<br />

74.6<br />

13.3<br />

75.3<br />

7.8<br />

14<br />

TALOQAN<br />

0.999<br />

-6.6<br />

62.7<br />

7.1<br />

62.3<br />

13.0<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.8<br />

4.7<br />

2.0<br />

4.6<br />

1.000<br />

-7.8<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

15.3<br />

13.6<br />

7.5<br />

301<br />

TALOQAN<br />

1.005<br />

-11.1<br />

1.0000<br />

1.0500<br />

19.9<br />

34.8<br />

16.4<br />

302<br />

RUSTAQ<br />

1.003<br />

-11.2<br />

1<br />

8.5<br />

5.3<br />

8.5<br />

4.7<br />

8.5<br />

5.3<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1<br />

12.8<br />

7.9<br />

26.3<br />

11.6<br />

25.7<br />

13.2<br />

305<br />

CHAH AB<br />

0.954<br />

-13.1<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.3<br />

12.8<br />

7.9<br />

35.0<br />

1.028<br />

-2.4<br />

37.6 37.7<br />

2.0<br />

3.9<br />

37.7<br />

2.0<br />

311<br />

SHERKHAN<br />

15.6<br />

3.8<br />

15.8<br />

0.6<br />

314<br />

IMAM SABIB<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

3011<br />

TAJIK TIE<br />

1.029<br />

-2.5<br />

3010<br />

TAJIK SRCE<br />

1.029<br />

-2.1<br />

19.6<br />

0.1<br />

75.3<br />

4.0<br />

75.4<br />

2.0<br />

3100<br />

TAJIK GEN<br />

1.030<br />

0.0<br />

1<br />

95.2<br />

1.0000<br />

95.0<br />

95.2<br />

5.5 2.0<br />

1.0000<br />

2001<br />

UZBEK TIE<br />

0.0<br />

0.0<br />

2.4<br />

2011<br />

UZBEK TIE<br />

1.029<br />

-0.9<br />

1.0000<br />

1.0000<br />

2.3<br />

21.5<br />

2.1<br />

2100<br />

UZBEK GEN<br />

1.030<br />

0.0<br />

1<br />

1.0000<br />

1.0000<br />

21.7 21.9<br />

21.7<br />

0.1<br />

201<br />

MAZAR-E-SHRF<br />

0.998<br />

-2.9<br />

1<br />

8.4<br />

21.0<br />

21.5<br />

2.1<br />

5.7<br />

204<br />

DAWLATABAD<br />

0.997<br />

-3.0<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

3.4<br />

209<br />

MAZAR NO 1<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

0.5<br />

1.002<br />

-3.0<br />

0.0<br />

4.0<br />

0.0<br />

0.0<br />

2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

10<br />

SHEBERGHAN<br />

1.050<br />

-11.2<br />

1<br />

88.9<br />

90.2<br />

44.4<br />

19.3<br />

90.2<br />

44.4<br />

202<br />

SHEBERGHAN<br />

0.988<br />

-7.1<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

4001<br />

A NDKHOY_2<br />

1.035<br />

-8.9<br />

90.2<br />

44.4<br />

90.9<br />

53.8<br />

90.2<br />

44.4<br />

90.9<br />

53.8<br />

1.016<br />

-4.2<br />

1<br />

8.5<br />

5.3<br />

28.2<br />

0.4<br />

29.1<br />

2.2<br />

0.966<br />

-7.9<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.6<br />

13.6<br />

8.4<br />

0.992<br />

-7.2<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.988<br />

-7.1<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.988<br />

-7.1<br />

3<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

3.9<br />

206<br />

SHERIM TAQAB<br />

1.000<br />

-8.0<br />

1<br />

8.5<br />

5.3<br />

10.0<br />

25.7<br />

1.040<br />

0.0<br />

17.3 15.3<br />

6.6<br />

67.0<br />

0.0<br />

4010<br />

ANDKHOY_2<br />

1<br />

207<br />

JUMABAZAR<br />

1.001<br />

-8.8<br />

1<br />

3.4<br />

17.2<br />

11.9<br />

10.7<br />

2.1<br />

208<br />

MAIMANA<br />

0.997<br />

-9.4<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

2.8<br />

13.6<br />

1.5<br />

11.6H<br />

4.5<br />

2.8<br />

0.6<br />

1.030<br />

-32.0<br />

1.028<br />

-30.9<br />

115<br />

BOT-KHAK<br />

5.5<br />

1.3<br />

5.5<br />

21.7<br />

1.0R<br />

21<br />

FAIZABAD<br />

310<br />

KUNDOZ<br />

1.0000<br />

0.0<br />

19.4<br />

1.001<br />

-4.5<br />

11<br />

BAGHLAN<br />

37.6<br />

0.1<br />

1.0000<br />

1.0000<br />

1.0000<br />

21.6<br />

21.8<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.013<br />

-32.3 0.6<br />

5.7<br />

108<br />

JALALABAD<br />

0.2<br />

17.8<br />

1.2<br />

25.0<br />

1.0200<br />

1.6<br />

0.0<br />

506<br />

NAGHLU HPP 2<br />

0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

5.5R<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

3001<br />

TAJIK TIE<br />

0.1R<br />

21.9<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

1.0000<br />

524<br />

SHEBERGHAN 4<br />

0.0<br />

10.0<br />

17.1<br />

0.5<br />

1.019<br />

-3.3<br />

1.0000<br />

4.5<br />

21.7<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-27.6<br />

1.030<br />

-30.7<br />

5.0<br />

32.8<br />

27.5<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

0.0<br />

1.020<br />

-30.4<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-30.4<br />

3.9<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.030<br />

-0.5<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8 32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.028<br />

-30.9<br />

4.6 9.4<br />

1<br />

87.7<br />

3<br />

KHENJAN<br />

12.0<br />

87.8<br />

0.0<br />

0.0<br />

1.067<br />

-16.2<br />

12.0<br />

1.064<br />

-18.8<br />

10.5<br />

6<br />

KHULM<br />

88.6<br />

18.0<br />

0.0<br />

1.0500<br />

33.3<br />

1.0500<br />

10.0<br />

27.9<br />

84.5<br />

30.5<br />

63.0<br />

10.0<br />

10.0<br />

10.1<br />

1.008<br />

-6.1<br />

27.9<br />

27.8<br />

27.8<br />

10.1<br />

27.0<br />

0.0<br />

0.0<br />

64.2<br />

26.7<br />

1.056<br />

-20.9<br />

76.5<br />

26.3<br />

84.8<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

67.0<br />

15.3R<br />

1<br />

84.5<br />

4100<br />

SERDAR<br />

19.3<br />

13.6<br />

181.8<br />

107.6<br />

182.0<br />

95.8<br />

1.0000<br />

1.0000<br />

SW<br />

88.3<br />

2<br />

CHARIKAR<br />

27.9<br />

57.6<br />

20.6<br />

4<br />

PUL-E-KHUMRI<br />

0.0<br />

0.0<br />

304.5<br />

30.6<br />

27.8<br />

502<br />

NW KABUL G2<br />

19.8<br />

5.1<br />

19.8<br />

19.8<br />

5.1<br />

19.8<br />

5.6<br />

9<br />

MAZAR<br />

1.068<br />

-16.2<br />

1.0000<br />

87.7<br />

5<br />

AIBAK<br />

11.4<br />

88.9<br />

0.0<br />

184.5<br />

270.0R<br />

182.3<br />

171.2<br />

208.7<br />

182.0<br />

171.2<br />

0.0<br />

3.5<br />

0.0<br />

0.0<br />

0.0<br />

3.5<br />

0.0<br />

0.0<br />

1.0000<br />

1.0000<br />

21.8<br />

0.0<br />

0.0<br />

88.3<br />

84.6<br />

SW<br />

33.3<br />

1.0000<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1, TURKMENISTAN SOURCE, CONTINGENCY EAST BRESHNA KOT<br />

MON, NOV 19 2007 18:20<br />

84.7<br />

1.000<br />

0.0<br />

184.5<br />

270.0<br />

182.3<br />

1.017<br />

-5.6<br />

4020<br />

BORDER_5<br />

20.4<br />

42.9<br />

20.1<br />

30.5<br />

18.1<br />

17.0<br />

1.0<br />

17.0<br />

1.3<br />

17.0<br />

1.0<br />

17.0<br />

1.3<br />

0.6<br />

105<br />

KABUL EAST<br />

43.0<br />

20.4<br />

104<br />

KABUL NORTH<br />

5.6<br />

1.030<br />

-32.0<br />

31.7<br />

0.7<br />

31.7<br />

40.4<br />

102<br />

KABUL NW<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

1.010<br />

-32.5<br />

526<br />

KABUL SW<br />

101<br />

CHIMTALAH<br />

40.5<br />

19.6<br />

1<br />

0.5<br />

34.9<br />

1<br />

72.0<br />

0.0<br />

9.8<br />

0.0<br />

1.030<br />

-31.9<br />

20.5<br />

100.0<br />

1<br />

34.6<br />

525<br />

KABUL DIESEL<br />

1.011<br />

-32.5<br />

18.7<br />

30.9<br />

1.009<br />

-32.5<br />

35.5<br />

1.015<br />

-32.2<br />

23.1<br />

0.989<br />

-28.7<br />

527<br />

KABUL CENTRL<br />

1.003<br />

-32.7<br />

35.4<br />

40.5<br />

103<br />

KABUL NO TAP<br />

35.5R<br />

35.1


8.4<br />

13.6<br />

0.4<br />

28.2<br />

2.0<br />

28.6 7.6<br />

4.1<br />

5.7<br />

4.0<br />

9.8 9.6<br />

10.7<br />

22.3<br />

12.2<br />

22.2<br />

0.0<br />

0.0<br />

10.3<br />

0.0<br />

0.0<br />

9.8<br />

0.0<br />

9.9<br />

0.0<br />

0.0<br />

0.0<br />

1.5<br />

13.6<br />

8.4<br />

13.6<br />

2.6<br />

0.1<br />

2.6<br />

0.1<br />

2.6<br />

0.1<br />

2.6<br />

0.1<br />

5.5L<br />

22.0<br />

1.3<br />

28.5 28.6<br />

14.2<br />

7.6<br />

13.5<br />

7.6<br />

3.8<br />

15.7<br />

0.2<br />

15.9<br />

3.8<br />

15.7<br />

0.2<br />

15.9<br />

1.0<br />

11.1<br />

1.7<br />

11.1<br />

2.7<br />

4.5<br />

2.8<br />

4.5<br />

0.1<br />

19.4<br />

1.5<br />

19.2<br />

2.1<br />

3.4<br />

0.9<br />

3.4<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

1.002<br />

-26.9<br />

1<br />

86.3<br />

1.027<br />

-23.8<br />

1<br />

87.4<br />

17.8<br />

1<br />

85.3<br />

27.2<br />

2010<br />

UZBEK SRCE<br />

1.030<br />

-0.5<br />

1<br />

9.7<br />

28.1<br />

9.8<br />

28.1<br />

9.8<br />

11.0<br />

0.7<br />

11.0<br />

1.2<br />

1.017<br />

-31.0<br />

10.9H<br />

1.0000<br />

10.0<br />

10.9<br />

1.018<br />

-30.9<br />

1<br />

10.6<br />

23.1<br />

11.6<br />

22.9<br />

35.7<br />

1<br />

1.022<br />

-32.1<br />

1<br />

20.7<br />

120<br />

BRESHNA KOT<br />

1.022<br />

-31.5<br />

1<br />

36.0<br />

22.3<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.043<br />

-30.7<br />

1<br />

0.0<br />

0.0<br />

1.025<br />

-31.9<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

0.7<br />

13.4<br />

3.5<br />

110<br />

SAROBI TOWN<br />

1.043<br />

-30.7<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

4.8<br />

3.0<br />

505<br />

NAGHLU HPP 1<br />

1<br />

2.5R<br />

1.0000<br />

18.0<br />

2.5<br />

1.020<br />

-29.6<br />

4<br />

25.0<br />

2.4R<br />

1.0200<br />

1.0000<br />

24.8<br />

2.9<br />

2<br />

0.0<br />

0.0<br />

1.020<br />

-29.6<br />

3<br />

0.0<br />

0.0<br />

0.0<br />

111<br />

SAROBI GEN<br />

1.040<br />

-30.4<br />

4.0<br />

5.7<br />

4.1<br />

503<br />

SAROBI HPP 1<br />

1.040<br />

-30.4<br />

1<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.030<br />

-30.4<br />

2<br />

0.0<br />

2.8L<br />

1.0000<br />

2.8 2.8<br />

0.2<br />

1.0000<br />

0.0<br />

0.0<br />

114<br />

MAHIPAR<br />

32.7<br />

9.6<br />

1.031<br />

-30.7<br />

1<br />

0.0<br />

0.0<br />

28.5<br />

1.3<br />

28.2<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-26.8<br />

22.0<br />

5.1R<br />

1.0200<br />

1.0000<br />

21.9<br />

2.5<br />

1.010<br />

-26.8<br />

3<br />

22.0<br />

5.1R<br />

1.0200<br />

1.0000<br />

21.9<br />

2.5<br />

109<br />

MEHTARLAM<br />

1.024<br />

-32.0<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

3.4<br />

2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

87.4<br />

17.8<br />

86.3<br />

21.3 10.9<br />

1<br />

88.5<br />

0.2<br />

1.059<br />

-17.2<br />

1<br />

11.7<br />

89.4<br />

1.008<br />

-5.1<br />

1<br />

13.6<br />

8.4<br />

12<br />

KUNDUZ<br />

1.011<br />

-4.8<br />

7<br />

NAIBABAD<br />

89.5<br />

13.8<br />

0.2<br />

89.7<br />

13.8<br />

13<br />

SHEKANBANDAR<br />

1.026<br />

-2.6<br />

74.6<br />

13.3<br />

75.3<br />

7.8<br />

14<br />

TALOQAN<br />

0.999<br />

-6.6<br />

62.7<br />

7.1<br />

62.3<br />

13.0<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.8<br />

4.7<br />

2.0<br />

4.6<br />

1.000<br />

-7.8<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

15.3<br />

13.6<br />

7.5<br />

301<br />

TALOQAN<br />

1.005<br />

-11.1<br />

1.0000<br />

1.0500<br />

19.9<br />

34.8<br />

16.4<br />

302<br />

RUSTAQ<br />

1.003<br />

-11.2<br />

1<br />

8.5<br />

5.3<br />

8.5<br />

4.7<br />

8.5<br />

5.3<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1<br />

12.8<br />

7.9<br />

26.3<br />

11.6<br />

25.7<br />

13.2<br />

305<br />

CHAH AB<br />

0.954<br />

-13.1<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.3<br />

12.8<br />

7.9<br />

35.0<br />

1.028<br />

-2.4<br />

37.6 37.7<br />

2.0<br />

3.9<br />

37.7<br />

2.0<br />

311<br />

SHERKHAN<br />

15.6<br />

3.8<br />

15.8<br />

0.6<br />

314<br />

IMAM SABIB<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

3011<br />

TAJIK TIE<br />

1.029<br />

-2.5<br />

3010<br />

TAJIK SRCE<br />

1.029<br />

-2.1<br />

19.6<br />

0.1<br />

75.3<br />

4.0<br />

75.4<br />

2.0<br />

3100<br />

TAJIK GEN<br />

1.030<br />

0.0<br />

1<br />

95.2<br />

1.0000<br />

95.0<br />

95.2<br />

5.5 2.0<br />

1.0000<br />

2001<br />

UZBEK TIE<br />

0.0<br />

0.0<br />

2.4<br />

2011<br />

UZBEK TIE<br />

1.029<br />

-0.9<br />

1.0000<br />

1.0000<br />

2.3<br />

21.5<br />

2.1<br />

2100<br />

UZBEK GEN<br />

1.030<br />

0.0<br />

1<br />

1.0000<br />

1.0000<br />

21.7 21.9<br />

21.7<br />

0.1<br />

201<br />

MAZAR-E-SHRF<br />

0.998<br />

-2.9<br />

1<br />

8.4<br />

21.0<br />

21.5<br />

2.1<br />

5.7<br />

204<br />

DAWLATABAD<br />

0.997<br />

-3.0<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

3.4<br />

209<br />

MAZAR NO 1<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

0.5<br />

1.002<br />

-3.0<br />

0.0<br />

4.0<br />

0.0<br />

0.0<br />

2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

10<br />

SHEBERGHAN<br />

1.044<br />

-11.3<br />

1<br />

89.6<br />

91.0<br />

41.8<br />

17.2<br />

91.0<br />

41.8<br />

202<br />

SHEBERGHAN<br />

0.988<br />

-7.1<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

4001<br />

A NDKHOY_2<br />

1.031<br />

-9.0<br />

91.0<br />

41.8<br />

91.7<br />

51.1<br />

91.0<br />

41.8<br />

91.7<br />

51.1<br />

1.016<br />

-4.2<br />

1<br />

8.5<br />

5.3<br />

28.2<br />

0.4<br />

29.1<br />

2.2<br />

0.966<br />

-7.9<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.6<br />

13.6<br />

8.4<br />

0.992<br />

-7.2<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.988<br />

-7.1<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.988<br />

-7.1<br />

3<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

3.9<br />

206<br />

SHERIM TAQAB<br />

1.000<br />

-8.0<br />

1<br />

8.5<br />

5.3<br />

10.0<br />

25.7<br />

1.040<br />

0.0<br />

17.3 15.3<br />

6.6<br />

67.0<br />

0.0<br />

4010<br />

ANDKHOY_2<br />

1<br />

207<br />

JUMABAZAR<br />

1.001<br />

-8.8<br />

1<br />

3.4<br />

17.2<br />

11.9<br />

10.7<br />

2.1<br />

208<br />

MAIMANA<br />

0.997<br />

-9.4<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

2.8<br />

13.6<br />

1.5<br />

11.6H<br />

4.5<br />

2.8<br />

3.7<br />

1.025<br />

-31.9<br />

1.036<br />

-30.1<br />

115<br />

BOT-KHAK<br />

20.3<br />

12.0<br />

20.4<br />

12.7<br />

11.1<br />

1.7<br />

11.1<br />

21.6<br />

1.0R<br />

21<br />

FAIZABAD<br />

310<br />

KUNDOZ<br />

1.0000<br />

0.0<br />

19.4<br />

1.001<br />

-4.5<br />

11<br />

BAGHLAN<br />

37.6<br />

0.1<br />

1.0000<br />

1.0000<br />

1.0000<br />

21.6<br />

21.8<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.001<br />

-33.0 3.7<br />

0.4<br />

108<br />

JALALABAD<br />

0.2<br />

17.8<br />

2.4<br />

25.0<br />

1.0200<br />

2.8<br />

0.0<br />

506<br />

NAGHLU HPP 2<br />

0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

5.5R<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

3001<br />

TAJIK TIE<br />

0.1R<br />

21.9<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

1.0000<br />

524<br />

SHEBERGHAN 4<br />

0.0<br />

10.0<br />

17.1<br />

0.5<br />

1.019<br />

-3.3<br />

1.0000<br />

4.5<br />

21.6<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-26.8<br />

1.038<br />

-29.8<br />

9.8<br />

32.8<br />

27.2<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

0.0<br />

1.020<br />

-29.9<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-29.9<br />

3.9<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.030<br />

-0.5<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8 32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.036<br />

-30.1<br />

2.0 7.6<br />

1<br />

88.4<br />

3<br />

KHENJAN<br />

10.1<br />

88.5<br />

0.0<br />

0.0<br />

1.059<br />

-16.4<br />

10.1<br />

1.056<br />

-19.0<br />

11.8<br />

6<br />

KHULM<br />

89.4<br />

18.0<br />

0.0<br />

1.0500<br />

33.3<br />

1.0500<br />

9.7<br />

28.1<br />

85.1<br />

30.5<br />

63.0<br />

9.7<br />

9.7<br />

9.8<br />

1.005<br />

-6.1<br />

28.1<br />

28.1<br />

28.1<br />

9.8<br />

27.3<br />

0.0<br />

0.0<br />

64.2<br />

26.7<br />

1.046<br />

-21.2<br />

76.5<br />

26.4<br />

85.4<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

67.0<br />

15.3R<br />

1<br />

85.1<br />

4100<br />

SERDAR<br />

17.2<br />

13.6<br />

183.3<br />

102.2<br />

183.5<br />

90.5<br />

1.0000<br />

1.0000<br />

SW<br />

89.1<br />

2<br />

CHARIKAR<br />

28.1<br />

57.6<br />

20.1<br />

4<br />

PUL-E-KHUMRI<br />

0.0<br />

0.0<br />

302.7<br />

30.6<br />

28.1<br />

502<br />

NW KABUL G2<br />

21.2<br />

4.8<br />

21.1<br />

21.2<br />

4.8<br />

21.1<br />

5.2<br />

9<br />

MAZAR<br />

1.060<br />

-16.5<br />

1.0000<br />

88.4<br />

5<br />

AIBAK<br />

12.6<br />

89.6<br />

0.0<br />

186.0<br />

264.8R<br />

183.8<br />

175.1<br />

212.3<br />

183.5<br />

175.1<br />

0.0<br />

3.4<br />

0.0<br />

0.0<br />

0.0<br />

3.4<br />

0.0<br />

0.0<br />

1.0000<br />

1.0000<br />

21.8<br />

0.0<br />

0.0<br />

89.1<br />

85.2<br />

SW<br />

33.3<br />

1.0000<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1, TURKMENISTAN SOURCE, CONTINGENCY BRESHNA CENTRAL<br />

MON, NOV 19 2007 18:25<br />

85.3<br />

1.000<br />

0.0<br />

186.0<br />

264.8<br />

183.8<br />

1.014<br />

-5.7<br />

4020<br />

BORDER_5<br />

19.8<br />

56.2<br />

21.7<br />

45.3<br />

19.6<br />

1.2<br />

4.7<br />

1.2<br />

4.4<br />

1.2<br />

4.7<br />

1.2<br />

4.4<br />

1.0<br />

105<br />

KABUL EAST<br />

56.3<br />

20.7<br />

104<br />

KABUL NORTH<br />

5.2<br />

1.024<br />

-31.9<br />

72.0<br />

102<br />

KABUL NW<br />

20.3<br />

9.5<br />

20.3<br />

9.8<br />

20.3<br />

9.5<br />

20.3<br />

9.8<br />

0.997<br />

-33.1<br />

526<br />

KABUL SW<br />

101<br />

CHIMTALAH<br />

40.5<br />

19.6<br />

1<br />

34.9<br />

1<br />

72.0<br />

0.0<br />

9.5<br />

0.0<br />

1.023<br />

-32.1<br />

21.3<br />

100.0<br />

1<br />

50.6<br />

525<br />

KABUL DIESEL<br />

0.999<br />

-33.1<br />

19.5<br />

46.0<br />

0.996<br />

-33.2<br />

35.3<br />

1.003<br />

-32.9<br />

23.1<br />

0.977<br />

-29.3<br />

527<br />

KABUL CENTRL<br />

0.988<br />

-33.5<br />

34.9<br />

72.4<br />

103<br />

KABUL NO TAP<br />

50.0H<br />

51.5


8.4<br />

13.6<br />

7.0<br />

33.7<br />

5.9<br />

34.3 9.7<br />

1.6<br />

7.8<br />

1.7<br />

4.0 3.8<br />

6.8<br />

22.3<br />

8.2<br />

22.2<br />

0.0<br />

0.0<br />

10.3<br />

0.0<br />

0.0<br />

9.8<br />

0.0<br />

9.9<br />

0.0<br />

0.0<br />

0.0<br />

1.5<br />

13.6<br />

8.4<br />

13.6<br />

0.7<br />

0.1<br />

0.7<br />

0.1<br />

0.7<br />

0.1<br />

0.7<br />

0.1<br />

5.5L<br />

22.0<br />

6.4<br />

34.1 34.4<br />

18.4<br />

3.8<br />

17.7<br />

3.9<br />

4.7<br />

10.1<br />

0.9<br />

10.2<br />

4.7<br />

10.1<br />

0.9<br />

10.2<br />

2.0<br />

5.5<br />

2.7<br />

5.5<br />

2.7<br />

4.5<br />

2.8<br />

4.5<br />

0.1<br />

19.4<br />

1.5<br />

19.2<br />

2.1<br />

3.4<br />

0.9<br />

3.4<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

1.027<br />

-26.3<br />

1<br />

85.9<br />

1.050<br />

-23.3<br />

1<br />

86.9<br />

15.3<br />

1<br />

84.9<br />

27.0<br />

2010<br />

UZBEK SRCE<br />

1.030<br />

-0.5<br />

1<br />

9.9<br />

27.9<br />

10.0<br />

28.0<br />

10.0<br />

15.1<br />

3.3<br />

15.0<br />

3.8<br />

1.045<br />

-30.1<br />

10.9H<br />

1.0000<br />

10.0<br />

10.9<br />

1.046<br />

-30.0<br />

1<br />

10.6<br />

23.1<br />

11.6<br />

22.9<br />

35.7<br />

1<br />

1.025<br />

-32.1<br />

1<br />

5.2<br />

120<br />

BRESHNA KOT<br />

1.002<br />

-32.5<br />

1<br />

36.0<br />

22.3<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.040<br />

-31.3<br />

1<br />

0.0<br />

0.0<br />

1.023<br />

-32.5<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

0.7<br />

13.4<br />

3.5<br />

110<br />

SAROBI TOWN<br />

1.040<br />

-31.3<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

4.8<br />

2.9<br />

505<br />

NAGHLU HPP 1<br />

1<br />

0.4R<br />

1.0000<br />

18.0<br />

0.4<br />

1.020<br />

-30.1<br />

4<br />

25.0<br />

0.5R<br />

1.0200<br />

1.0000<br />

24.8<br />

0.0<br />

2<br />

0.0<br />

0.0<br />

1.020<br />

-30.1<br />

3<br />

0.0<br />

0.0<br />

0.0<br />

111<br />

SAROBI GEN<br />

1.034<br />

-31.2<br />

1.7<br />

7.8<br />

1.7<br />

503<br />

SAROBI HPP 1<br />

1.034<br />

-31.2<br />

1<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.024<br />

-31.2<br />

2<br />

0.0<br />

2.8L<br />

1.0000<br />

2.8 2.8<br />

0.2<br />

1.0000<br />

0.0<br />

0.0<br />

114<br />

MAHIPAR<br />

32.7<br />

3.8<br />

1.016<br />

-31.6<br />

1<br />

0.0<br />

0.0<br />

34.1<br />

6.4<br />

33.7<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-27.7<br />

22.0<br />

0.6R<br />

1.0200<br />

1.0000<br />

21.9<br />

1.3<br />

1.010<br />

-27.7<br />

3<br />

22.0<br />

0.6R<br />

1.0200<br />

1.0000<br />

21.9<br />

1.3<br />

109<br />

MEHTARLAM<br />

1.021<br />

-32.6<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

3.4<br />

2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

86.9<br />

15.3<br />

85.9<br />

19.6 7.6<br />

1<br />

88.0<br />

3.8<br />

1.076<br />

-16.9<br />

1<br />

8.5<br />

88.7<br />

1.008<br />

-5.1<br />

1<br />

13.6<br />

8.4<br />

12<br />

KUNDUZ<br />

1.011<br />

-4.8<br />

7<br />

NAIBABAD<br />

88.9<br />

18.5<br />

3.8<br />

89.1<br />

18.5<br />

13<br />

SHEKANBANDAR<br />

1.026<br />

-2.6<br />

74.6<br />

13.3<br />

75.3<br />

7.8<br />

14<br />

TALOQAN<br />

0.999<br />

-6.6<br />

62.7<br />

7.1<br />

62.3<br />

13.0<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.8<br />

4.7<br />

2.0<br />

4.6<br />

1.000<br />

-7.8<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

15.3<br />

13.6<br />

7.5<br />

301<br />

TALOQAN<br />

1.005<br />

-11.1<br />

1.0000<br />

1.0500<br />

19.9<br />

34.8<br />

16.4<br />

302<br />

RUSTAQ<br />

1.003<br />

-11.2<br />

1<br />

8.5<br />

5.3<br />

8.5<br />

4.7<br />

8.5<br />

5.3<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1<br />

12.8<br />

7.9<br />

26.3<br />

11.6<br />

25.7<br />

13.2<br />

305<br />

CHAH AB<br />

0.954<br />

-13.1<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.3<br />

12.8<br />

7.9<br />

35.0<br />

1.028<br />

-2.4<br />

37.6 37.7<br />

2.0<br />

3.9<br />

37.7<br />

2.0<br />

311<br />

SHERKHAN<br />

15.6<br />

3.8<br />

15.8<br />

0.6<br />

314<br />

IMAM SABIB<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

3011<br />

TAJIK TIE<br />

1.029<br />

-2.5<br />

3010<br />

TAJIK SRCE<br />

1.029<br />

-2.1<br />

19.6<br />

0.1<br />

75.3<br />

4.0<br />

75.4<br />

2.0<br />

3100<br />

TAJIK GEN<br />

1.030<br />

0.0<br />

1<br />

95.2<br />

1.0000<br />

95.0<br />

95.2<br />

5.5 2.0<br />

1.0000<br />

2001<br />

UZBEK TIE<br />

0.0<br />

0.0<br />

2.4<br />

2011<br />

UZBEK TIE<br />

1.029<br />

-0.9<br />

1.0000<br />

1.0000<br />

2.3<br />

21.5<br />

2.1<br />

2100<br />

UZBEK GEN<br />

1.030<br />

0.0<br />

1<br />

1.0000<br />

1.0000<br />

21.7 21.9<br />

21.7<br />

0.1<br />

201<br />

MAZAR-E-SHRF<br />

0.998<br />

-2.9<br />

1<br />

8.4<br />

21.0<br />

21.5<br />

2.1<br />

5.7<br />

204<br />

DAWLATABAD<br />

0.997<br />

-3.0<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

3.4<br />

209<br />

MAZAR NO 1<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

0.0<br />

2.0<br />

0.5<br />

1.002<br />

-3.0<br />

0.0<br />

4.0<br />

0.0<br />

0.0<br />

2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.998<br />

-2.9<br />

1<br />

2.0<br />

10<br />

SHEBERGHAN<br />

1.056<br />

-11.2<br />

1<br />

89.0<br />

90.4<br />

47.5<br />

22.0<br />

90.4<br />

47.5<br />

202<br />

SHEBERGHAN<br />

0.988<br />

-7.1<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

4001<br />

A NDKHOY_2<br />

1.040<br />

-8.9<br />

90.4<br />

47.5<br />

91.0<br />

57.0<br />

90.4<br />

47.5<br />

91.0<br />

57.0<br />

1.016<br />

-4.2<br />

1<br />

8.5<br />

5.3<br />

28.2<br />

0.4<br />

29.1<br />

2.2<br />

0.966<br />

-7.9<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.6<br />

13.6<br />

8.4<br />

0.992<br />

-7.2<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.988<br />

-7.1<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.988<br />

-7.1<br />

3<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

3.9<br />

206<br />

SHERIM TAQAB<br />

1.000<br />

-8.0<br />

1<br />

8.5<br />

5.3<br />

10.0<br />

25.7<br />

1.040<br />

0.0<br />

17.3 15.3<br />

6.6<br />

67.0<br />

0.0<br />

4010<br />

ANDKHOY_2<br />

1<br />

207<br />

JUMABAZAR<br />

1.001<br />

-8.8<br />

1<br />

3.4<br />

17.2<br />

11.9<br />

10.7<br />

2.1<br />

208<br />

MAIMANA<br />

0.997<br />

-9.4<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

2.8<br />

13.6<br />

1.5<br />

11.6H<br />

4.5<br />

2.8<br />

0.1<br />

1.026<br />

-32.0<br />

1.026<br />

-31.0<br />

115<br />

BOT-KHAK<br />

41.6<br />

33.7<br />

40.9<br />

33.5<br />

5.5<br />

2.7<br />

5.5<br />

21.7<br />

1.0R<br />

21<br />

FAIZABAD<br />

310<br />

KUNDOZ<br />

1.0000<br />

0.0<br />

19.4<br />

1.001<br />

-4.5<br />

11<br />

BAGHLAN<br />

37.6<br />

0.1<br />

1.0000<br />

1.0000<br />

1.0000<br />

21.6<br />

21.8<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.029<br />

-32.0 0.1<br />

7.0<br />

108<br />

JALALABAD<br />

0.2<br />

17.8<br />

0.5<br />

25.0<br />

1.0200<br />

0.2<br />

0.0<br />

506<br />

NAGHLU HPP 2<br />

0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

5.5R<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

3001<br />

TAJIK TIE<br />

0.1R<br />

21.9<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

1.0000<br />

524<br />

SHEBERGHAN 4<br />

0.0<br />

10.0<br />

17.1<br />

0.5<br />

1.019<br />

-3.3<br />

1.0000<br />

4.5<br />

21.7<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-27.7<br />

1.028<br />

-30.8<br />

4.0<br />

32.8<br />

27.0<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

0.0<br />

1.020<br />

-30.5<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-30.5<br />

3.9<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.030<br />

-0.5<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8 32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.026<br />

-31.0<br />

5.9 9.7<br />

1<br />

87.8<br />

3<br />

KHENJAN<br />

14.6<br />

88.0<br />

0.0<br />

0.0<br />

1.076<br />

-16.2<br />

14.6<br />

1.075<br />

-18.7<br />

8.6<br />

6<br />

KHULM<br />

88.7<br />

18.0<br />

0.0<br />

1.0500<br />

32.6<br />

1.0500<br />

9.9<br />

28.0<br />

84.7<br />

30.5<br />

63.0<br />

9.9<br />

9.9<br />

10.0<br />

1.011<br />

-6.1<br />

28.0<br />

27.9<br />

27.9<br />

10.0<br />

25.9<br />

0.0<br />

0.0<br />

64.2<br />

26.7<br />

1.067<br />

-20.8<br />

76.5<br />

25.4<br />

85.0<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

67.0<br />

15.3R<br />

1<br />

84.7<br />

4100<br />

SERDAR<br />

22.0<br />

13.6<br />

182.1<br />

114.0<br />

182.3<br />

101.9<br />

1.0000<br />

1.0000<br />

SW<br />

88.5<br />

2<br />

CHARIKAR<br />

28.0<br />

57.6<br />

21.3<br />

4<br />

PUL-E-KHUMRI<br />

0.0<br />

0.0<br />

306.4<br />

29.8<br />

27.9<br />

502<br />

NW KABUL G2<br />

18.7<br />

4.0<br />

18.7<br />

18.7<br />

4.0<br />

18.7<br />

4.5<br />

9<br />

MAZAR<br />

1.076<br />

-16.2<br />

1.0000<br />

87.8<br />

5<br />

AIBAK<br />

9.5<br />

89.0<br />

0.0<br />

184.8<br />

275.5R<br />

182.6<br />

166.7<br />

204.5<br />

182.3<br />

166.7<br />

0.0<br />

3.5<br />

0.0<br />

0.0<br />

0.0<br />

3.5<br />

0.0<br />

0.0<br />

1.0000<br />

1.0000<br />

21.8<br />

0.0<br />

0.0<br />

88.5<br />

84.9<br />

SW<br />

32.6<br />

1.0000<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1, TURKMENISTAN SOURCE, CONTINGENCY NORTH CENTRAL<br />

MON, NOV 19 2007 18:28<br />

84.9<br />

1.000<br />

0.0<br />

184.8<br />

275.5<br />

182.6<br />

1.020<br />

-5.7<br />

4020<br />

BORDER_5<br />

21.0<br />

25.8<br />

0.7<br />

10.8<br />

0.2<br />

37.8<br />

14.6<br />

37.9<br />

14.4<br />

37.8<br />

14.6<br />

37.9<br />

14.4<br />

2.0<br />

105<br />

KABUL EAST<br />

25.9<br />

5.1<br />

104<br />

KABUL NORTH<br />

4.5<br />

1.026<br />

-32.0<br />

72.4<br />

35.3<br />

72.0<br />

102<br />

KABUL NW<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

1.025<br />

-32.1<br />

526<br />

KABUL SW<br />

101<br />

CHIMTALAH<br />

40.5<br />

19.6<br />

1<br />

34.9<br />

34.9<br />

1<br />

72.0<br />

0.0<br />

10.1<br />

0.0<br />

1.030<br />

-31.8<br />

1.8<br />

100.0<br />

1<br />

13.3<br />

525<br />

KABUL DIESEL<br />

1.026<br />

-32.1<br />

1.4<br />

10.9<br />

1.025<br />

-32.2<br />

1.031<br />

-31.9<br />

23.1<br />

1.003<br />

-28.5<br />

527<br />

KABUL CENTRL<br />

0.994<br />

-32.8<br />

103<br />

KABUL NO TAP<br />

29.7R<br />

13.3


1<br />

1<br />

1<br />

3<br />

0.0<br />

2<br />

2<br />

1<br />

1<br />

1<br />

3<br />

2<br />

1<br />

4<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1.000<br />

0.0<br />

212.7<br />

1<br />

248.0R<br />

4100<br />

SERDAR<br />

4001<br />

A NDKHOY_2<br />

206<br />

SHERIM TAQAB<br />

8.5 25.7<br />

5.3 6.6<br />

17.2<br />

0.0<br />

11.9<br />

0.0<br />

1.000<br />

-8.0<br />

207<br />

JUMABAZAR<br />

0.0<br />

10.0<br />

3.4<br />

2.1<br />

1<br />

208<br />

MAIMANA<br />

13.6<br />

8.4<br />

1<br />

17.1<br />

10.7<br />

13.7<br />

2.8<br />

13.6<br />

1.5<br />

9.9<br />

1.001<br />

-8.8<br />

0.997<br />

-9.4<br />

0.995<br />

-7.0<br />

104.7<br />

46.4<br />

1.005<br />

-6.5<br />

209.6<br />

78.5<br />

1.0000<br />

1.0000<br />

209.4<br />

92.9<br />

104.7<br />

46.4<br />

212.7<br />

248.0<br />

210.0<br />

182.7<br />

210.0<br />

182.7<br />

209.6<br />

218.4<br />

0.0<br />

297.0<br />

1<br />

1.018<br />

-10.4<br />

1.040<br />

0.0<br />

0.0<br />

10.3<br />

64.2<br />

67.0<br />

17.3 15.3<br />

8.5<br />

5.3<br />

1.016<br />

-4.2<br />

4020<br />

BORDER_5<br />

67.0<br />

15.3R<br />

26.7<br />

10.0<br />

0.988<br />

-7.1<br />

205<br />

SAREPUL<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

10<br />

SHEBERGHAN<br />

1<br />

4010<br />

ANDKHOY_2<br />

4011<br />

BORDER_1<br />

1<br />

29.1<br />

2.2<br />

28.2<br />

0.4<br />

13.8<br />

5.6<br />

13.6<br />

8.4<br />

203<br />

ANDKHOI<br />

0.966<br />

-7.9<br />

103.8<br />

38.5<br />

9.8<br />

13.6<br />

8.4<br />

1<br />

103.8<br />

38.5<br />

0.0<br />

3.9<br />

103.8<br />

1.0000<br />

1.0000<br />

103.8 38.5<br />

38.5<br />

204<br />

3.4 DAWLATABAD<br />

2.1<br />

3.4<br />

251<br />

1<br />

1.0000<br />

1.0000<br />

0.997<br />

-3.0<br />

1.029<br />

-13.0<br />

2.0<br />

210<br />

MAZAR NO 2<br />

2.0<br />

0.5<br />

0.998<br />

-2.9<br />

209<br />

2.0 MAZAR NO 1<br />

0.5<br />

2.0<br />

0.5<br />

0.998<br />

-2.9<br />

2.1 250<br />

MAZAR TIE W MAZAR TIE E<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.992<br />

-7.2<br />

1.002<br />

-3.0<br />

201<br />

MAZAR-E-SHRF<br />

521<br />

SHEBERGHAN 1 522<br />

SHEBERGHAN 2<br />

0.988<br />

-7.1<br />

0.988<br />

-7.1<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

2<br />

0.2<br />

0.0<br />

0.0 0.0<br />

1.0000<br />

523<br />

SHEBERGHAN 3<br />

0.988<br />

-7.1<br />

3<br />

0.2<br />

0.0<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.5<br />

0.2<br />

0.0<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.988<br />

-7.1<br />

4<br />

202<br />

SHEBERGHAN<br />

524<br />

SHEBERGHAN 4<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1, TURKMENISTAN SOURCE, LOSS ONE UNIT IN NORTWEST<br />

MON, NOV 19 2007 18:31<br />

1.0000<br />

0.0<br />

4.0<br />

3.4<br />

1.3<br />

2.0<br />

0.0<br />

1.0000<br />

1.0000<br />

9<br />

MAZAR<br />

13.6<br />

8.4<br />

1<br />

2.0<br />

0.0<br />

21.0<br />

5.7<br />

7<br />

NAIBABAD<br />

0.0<br />

0.0<br />

3.3<br />

3.3<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

526<br />

KABUL SW<br />

0.991<br />

-38.7<br />

1.042<br />

-19.0<br />

0.997<br />

-38.4<br />

21.5<br />

2.1<br />

0.0<br />

0.0<br />

0.998<br />

-2.9<br />

2011<br />

UZBEK TIE<br />

21.5<br />

2.1<br />

1.029<br />

-0.9<br />

102.1<br />

17.5<br />

102.1<br />

1.0000<br />

17.5<br />

1<br />

CHIMTALAH<br />

102<br />

KABUL NW<br />

20.3<br />

9.5<br />

501<br />

NW KABUL G1<br />

20.2<br />

9.8<br />

101<br />

CHIMTALAH<br />

40.5<br />

19.6<br />

1<br />

20.3<br />

9.5<br />

20.2<br />

9.8<br />

63.0<br />

1<br />

1.0000<br />

0.0<br />

21.6<br />

10.0<br />

1.0000<br />

21.8<br />

10.9H<br />

21.7<br />

10.9<br />

2.3<br />

1<br />

1.0000<br />

21.8<br />

1.028<br />

-24.6<br />

0.0<br />

30.5<br />

SW<br />

0.0<br />

5<br />

AIBAK<br />

2010<br />

UZBEK SRCE<br />

21.7 21.9<br />

0.1<br />

0.1<br />

1.030<br />

-0.5<br />

2001<br />

UZBEK TIE<br />

1<br />

1<br />

1.011<br />

-36.6<br />

0.0<br />

2.4<br />

102.2<br />

14.2<br />

2.3<br />

101.3<br />

2.3<br />

100.6<br />

7.7<br />

3<br />

KHENJAN<br />

0.0<br />

19.9<br />

33.7<br />

0.0<br />

4.5<br />

33.7<br />

4.6<br />

0.0<br />

101.3<br />

SW<br />

9.3<br />

96.4<br />

1.0000<br />

0.0<br />

0.0<br />

99.1<br />

12.0<br />

99.1<br />

12.0<br />

33.7<br />

4.5<br />

33.7<br />

33.7<br />

4.6<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

0.995<br />

-38.6<br />

1.0000<br />

1.041<br />

-19.9<br />

1.037<br />

-22.1<br />

100.4<br />

8.5<br />

17.6<br />

96.5<br />

1.010<br />

-27.7<br />

0.987<br />

-31.5<br />

1.0500<br />

96.2<br />

24.3<br />

1.0000<br />

17.0<br />

33.7<br />

4.6<br />

33.7<br />

1.0000<br />

1.0000<br />

4.5<br />

33.7<br />

102.0<br />

14.3<br />

101.7<br />

11.0<br />

96.5<br />

97.8<br />

13.6<br />

9.3<br />

0.0<br />

0.0<br />

101.7<br />

11.0<br />

100.4<br />

7.7<br />

97.8<br />

100.6<br />

13.8 6.8<br />

1.0500<br />

96.2<br />

96.6<br />

4.5<br />

4.6<br />

24.3<br />

17.0<br />

19.6<br />

21.7<br />

1.0000<br />

19.5<br />

5.9<br />

19.5<br />

5.9<br />

2100<br />

UZBEK GEN<br />

21.9<br />

0.1R<br />

1.030<br />

0.0<br />

1.030<br />

-0.5<br />

1.041<br />

-19.0<br />

1<br />

1<br />

0.964<br />

-34.3<br />

57.6<br />

6<br />

KHULM<br />

1<br />

35.7<br />

502<br />

NW KABUL G2<br />

0.0<br />

0.0<br />

1<br />

13.6<br />

8.4<br />

1.008<br />

-5.1<br />

2<br />

CHARIKAR<br />

1.026<br />

-2.6<br />

13.6<br />

36.0<br />

22.3<br />

37.6 37.7<br />

3.9<br />

2.0<br />

75.3<br />

7.8<br />

8.4<br />

1<br />

13.6<br />

1.5<br />

0.0<br />

19.7<br />

19.4<br />

5.4<br />

19.4<br />

5.4<br />

36.3<br />

12.2<br />

31.8<br />

0.997<br />

-38.9<br />

95.2<br />

5.5R<br />

3001<br />

TAJIK TIE<br />

37.7<br />

2.0<br />

37.6<br />

3100<br />

TAJIK GEN<br />

1.030<br />

0.0<br />

75.3<br />

4.0<br />

3.9<br />

11<br />

BAGHLAN<br />

4<br />

PUL-E-KHUMRI<br />

9.7<br />

76.5<br />

37.1<br />

95.2<br />

95.0<br />

5.5 2.0<br />

0.0<br />

0.0<br />

13<br />

SHEKANBANDAR<br />

311<br />

SHERKHAN<br />

74.6<br />

13.3<br />

13.5<br />

1.0000<br />

1.0000<br />

1.028<br />

-2.4<br />

12<br />

KUNDUZ<br />

0.0<br />

0.0<br />

1.8<br />

4.7<br />

62.7<br />

7.1<br />

1.011<br />

-4.8<br />

75.4<br />

2.0<br />

1.0000<br />

1.029<br />

-2.1<br />

0.0<br />

3010<br />

TAJIK SRCE<br />

1.0000<br />

19.6<br />

1.0000<br />

1.0000<br />

19.2<br />

4.5<br />

1.5<br />

15.8<br />

0.6<br />

1.001<br />

-4.5 15.6<br />

3.8<br />

13.6<br />

8.4<br />

2.0<br />

4.6 310<br />

KUNDOZ<br />

1.029<br />

19.4 -2.5<br />

0.1<br />

19.4<br />

2.8<br />

0.1<br />

32.1<br />

9.0<br />

0.0<br />

0.0<br />

3.4<br />

3011<br />

TAJIK TIE<br />

0.9<br />

4.5<br />

2.8<br />

1<br />

9.1<br />

5.6<br />

13.6<br />

8.4<br />

3.4<br />

2.1<br />

18.0<br />

5.7R<br />

0.0<br />

0.0<br />

0.0<br />

505<br />

NAGHLU HPP 1<br />

18.0<br />

5.7<br />

107<br />

NAGHLU<br />

0.0<br />

0.0<br />

32.1 32.4 0.4<br />

9.0<br />

8.6 10.4<br />

1.012<br />

-38.1<br />

1.019<br />

-3.3<br />

62.3<br />

13.0<br />

0.0<br />

0.0<br />

14<br />

TALOQAN<br />

35.0<br />

19.9<br />

13.7<br />

15.3<br />

0.999<br />

-6.6<br />

1.0000<br />

1.0500<br />

106<br />

PULI CHARKHI<br />

1.013<br />

-38.7<br />

1.0000<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

314<br />

IMAM SABIB<br />

34.8<br />

16.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

7.9<br />

301<br />

TALOQAN<br />

26.3 25.7<br />

11.6 13.2<br />

8.5<br />

4.7<br />

1.005<br />

-11.1<br />

0.0<br />

1.0200<br />

1.0200<br />

12.8<br />

1.0000<br />

1.0000<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1.0200<br />

1.0200<br />

12.9<br />

5.3<br />

1.020<br />

-37.2<br />

506<br />

NAGHLU HPP 2<br />

1.020<br />

-37.2<br />

507<br />

NAGHLU HPP 3<br />

22.1 21.5 25.1<br />

122<br />

0.0<br />

1.020<br />

4.1<br />

P CHARK TP N<br />

508<br />

-36.8<br />

36.4 22.8 23.1<br />

4.5<br />

0.0 NAGHLU HPP 4<br />

12.2 21.0 20.3 4.1<br />

2.7<br />

13.6<br />

0.0 25.0<br />

24.8<br />

4.5<br />

0.6<br />

527<br />

8.8<br />

0.995<br />

25.0 5.8<br />

5.3<br />

1<br />

25.0<br />

2.7<br />

KABUL CENTRL<br />

103<br />

-38.8<br />

5.8R<br />

4.4<br />

1.020<br />

0.991<br />

25.0<br />

KABUL NO TAP<br />

12.0<br />

-36.8<br />

-39.0<br />

12.2<br />

4.4<br />

7.4<br />

7.4 9.0<br />

5.4<br />

6.9<br />

6.2 12.0<br />

12.2<br />

7.4<br />

7.4<br />

9.0<br />

511<br />

5.4 4.8<br />

6.9<br />

6.2<br />

MAHIPAR HPP1<br />

1.013<br />

114<br />

2.9<br />

22.0<br />

-38.6<br />

MAHIPAR 0.1<br />

512 2.6R<br />

21.9<br />

19.1<br />

0.995<br />

MAHIPAR HPP2<br />

21.7<br />

0.1 0.1 2.6<br />

1.036<br />

-38.6 1.4<br />

-38.0<br />

45.0<br />

0.0 0.0<br />

22.0<br />

1.010<br />

21.8<br />

22.3<br />

-34.2 22.2<br />

5.5L<br />

32.8<br />

5.5<br />

6.8<br />

513<br />

2.0<br />

105<br />

0.1 0.1 MAHIPAR HPP3<br />

KABUL EAST<br />

20.0<br />

1.010<br />

0.0 0.0 21.9 21.7 32.8 32.7<br />

120<br />

BRESHNA KOT<br />

21.1<br />

-34.2 22.0 2.6<br />

1.4 2.0 1.8<br />

1.010<br />

2.6R<br />

1.025<br />

19.8<br />

-37.3<br />

-38.7<br />

21.7<br />

1.010<br />

0.4<br />

-34.2<br />

31.7<br />

32.3 10.4<br />

9.7<br />

115<br />

8.6<br />

BOT-KHAK<br />

1.023<br />

-37.5<br />

72.0<br />

34.9<br />

24.9<br />

6.1<br />

24.9<br />

6.3<br />

47.1<br />

28.6<br />

47.3<br />

28.7<br />

0.993<br />

-38.9<br />

104<br />

KABUL NORTH<br />

525<br />

KABUL DIESEL<br />

1.013<br />

-38.5<br />

26.3<br />

26.7<br />

100.0<br />

50.0H<br />

25.1<br />

1<br />

0.0<br />

17.8<br />

5.4<br />

0.954<br />

-13.1<br />

8.5<br />

5.3<br />

1<br />

12.8<br />

7.9<br />

12.8<br />

7.9<br />

1.003<br />

-11.2<br />

8.5<br />

5.3<br />

302<br />

RUSTAQ<br />

113<br />

MAHIPAR TP N<br />

32.7<br />

1.8<br />

305<br />

CHAH AB<br />

1.023<br />

-37.5<br />

13.6<br />

7.5<br />

10.0<br />

2.4<br />

13.4<br />

3.5<br />

1.000<br />

-7.8<br />

13.6 0.0<br />

8.4 1.0R<br />

21<br />

FAIZABAD<br />

108<br />

JALALABAD<br />

3.4<br />

1.1<br />

1.019<br />

-39.2<br />

110<br />

SAROBI TOWN<br />

4.8 4.8<br />

3.0 3.0<br />

1.036<br />

-38.0<br />

0.2<br />

19.7<br />

0.3<br />

8.5<br />

0.3<br />

8.5<br />

112<br />

MAHIPAR TP S<br />

111<br />

SAROBI GEN<br />

1.020<br />

0.2<br />

0.0 -37.8<br />

0.0<br />

2.8 2.8<br />

2.8L<br />

504<br />

SAROBI HPP 2<br />

0.2<br />

0.0<br />

1.0000<br />

1.030<br />

-37.8<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

3.4<br />

2.1<br />

3.4<br />

2.1<br />

1.000<br />

0.0<br />

1.017<br />

-39.3<br />

109<br />

MEHTARLAM<br />

509<br />

DARUNTA DPP<br />

1.030<br />

0.0 -37.8<br />

0.0<br />

503<br />

SAROBI HPP 1


Appendix<br />

F<br />

Uzbekistan One line Diagrams (with 100<br />

MW diesel unit in <strong>Kabul</strong>)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International F-1


8.4<br />

13.6<br />

31.1<br />

31.8<br />

31.1<br />

32.3 7.7<br />

8.0<br />

5.8<br />

6.1<br />

32.2 32.1<br />

91.8<br />

24.1<br />

91.8<br />

24.7<br />

0.0<br />

0.0<br />

-10.1<br />

0.0<br />

0.0<br />

-9.5<br />

0.0<br />

-9.7<br />

0.0<br />

0.0<br />

0.0<br />

13.7<br />

16.0<br />

0.0<br />

1.9<br />

0.0<br />

1.9<br />

0.0<br />

1.9<br />

0.0<br />

1.9<br />

-5.5L<br />

22.0<br />

32.1 32.3<br />

14.9<br />

14.2<br />

12.1<br />

12.6<br />

11.6<br />

12.2<br />

12.1<br />

12.6<br />

11.6<br />

12.2<br />

7.3<br />

7.6<br />

7.4<br />

7.7<br />

5.1<br />

5.3<br />

5.1<br />

5.3<br />

19.4<br />

19.3<br />

4.0<br />

3.5<br />

2.1<br />

2.0<br />

1.014<br />

-19.7<br />

1<br />

89.1<br />

1.037<br />

-16.6<br />

1<br />

87.8<br />

21.2<br />

1.020<br />

-25.4<br />

1<br />

90.1<br />

54.0<br />

2010<br />

AMU<br />

1.055<br />

-4.3<br />

1<br />

28.4<br />

29.2<br />

28.5<br />

29.2<br />

28.5<br />

1.016<br />

-25.6<br />

13.4<br />

13.1<br />

13.4<br />

13.1<br />

1.034<br />

-23.6<br />

1<br />

10.9H<br />

1.0000<br />

78.0<br />

78.6<br />

1.035<br />

-23.5<br />

1<br />

23.1 82.6<br />

25.9<br />

83.3<br />

25.2<br />

35.7<br />

1.014<br />

-25.7<br />

1<br />

39.4 39.4<br />

1.027<br />

-25.4<br />

1<br />

38.6<br />

120<br />

BRESHNA KOT<br />

1.014<br />

-25.6<br />

1<br />

36.0<br />

22.3<br />

1.028<br />

-25.3<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.042<br />

-24.3<br />

1<br />

0.0<br />

0.0<br />

1.025<br />

-25.6<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

12.9<br />

13.8<br />

13.4<br />

110<br />

SAROBI TOWN<br />

1<br />

4.8<br />

3.0<br />

5.6<br />

5.3<br />

5.6<br />

5.3<br />

505<br />

NAGHLU HPP 1<br />

1<br />

-2.4R<br />

1.0000<br />

18.2<br />

28.3<br />

1.020<br />

-23.2<br />

4<br />

25.0<br />

-2.3R<br />

1.0200<br />

1.0000<br />

24.9<br />

38.0<br />

2<br />

0.0<br />

0.0<br />

1.020<br />

-23.2<br />

3<br />

0.0<br />

0.0<br />

0.0<br />

111<br />

SAROBI GEN<br />

1.038<br />

-24.2<br />

6.1<br />

5.8<br />

8.0<br />

503<br />

SAROBI HPP 1<br />

1.038<br />

-24.2<br />

1<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.029<br />

-24.2<br />

2<br />

0.0<br />

-2.8L<br />

1.0000<br />

18.2 18.1<br />

2.8<br />

1.0000<br />

2.8<br />

1.4<br />

114<br />

MAHIPAR<br />

33.5<br />

32.1<br />

1.025<br />

-24.6<br />

1<br />

0.0<br />

0.0<br />

32.2<br />

31.1<br />

31.9<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-20.7<br />

22.0<br />

-3.0R<br />

1.0200<br />

1.0000<br />

21.9<br />

83.4<br />

1.010<br />

-20.7<br />

3<br />

22.0<br />

-3.0R<br />

1.0200<br />

1.0000<br />

21.9<br />

83.4<br />

109<br />

MEHTARLAM<br />

1.024<br />

-25.6<br />

1<br />

3.4<br />

2.1<br />

3.6<br />

3.5<br />

4.0<br />

3.9<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

87.8<br />

21.2<br />

87.6<br />

21.6 20.9<br />

1<br />

87.8<br />

1.058<br />

-10.0<br />

1<br />

14.6<br />

90.7<br />

1.008<br />

-5.1<br />

1<br />

13.6<br />

8.4<br />

12<br />

KUNDUZ<br />

1.011<br />

-4.8<br />

7<br />

NAIBABAD<br />

91.8<br />

15.3<br />

14.8<br />

92.0<br />

15.3<br />

13<br />

SHEKANBANDAR<br />

1.026<br />

-2.6<br />

75.8<br />

18.7<br />

75.7<br />

18.4<br />

14<br />

TALOQAN<br />

0.999<br />

-6.6<br />

63.1<br />

15.6<br />

63.6<br />

15.9<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

5.0<br />

9.9<br />

5.0<br />

10.1<br />

1.000<br />

-7.8<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

20.5<br />

5.1<br />

15.5<br />

3.9<br />

301<br />

TALOQAN<br />

1.005<br />

-11.1<br />

1.0000<br />

1.0500<br />

80.6<br />

38.4<br />

76.4<br />

302<br />

RUSTAQ<br />

1.003<br />

-11.2<br />

1<br />

8.5<br />

5.3<br />

9.7<br />

9.6<br />

10.0<br />

9.9<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1<br />

12.8<br />

7.9<br />

28.7<br />

28.3<br />

28.9<br />

29.4<br />

305<br />

CHAH AB<br />

0.954<br />

-13.1<br />

1<br />

12.8<br />

7.9<br />

14.0<br />

14.2<br />

15.0<br />

15.6<br />

40.3<br />

1.028<br />

-2.4<br />

37.8<br />

9.2<br />

9.2<br />

37.7<br />

9.2<br />

311<br />

SHERKHAN<br />

16.0<br />

15.9<br />

15.8<br />

15.4<br />

314<br />

IMAM SABIB<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

3011<br />

TAJIK TIE<br />

1.029<br />

-2.5<br />

3010<br />

TAJIK SRCE<br />

1.029<br />

-2.1<br />

19.6<br />

7.5<br />

75.4<br />

18.4<br />

75.4<br />

18.3<br />

1.030<br />

0.0<br />

1<br />

95.2<br />

1.0000<br />

95.0<br />

95.4<br />

37.0 36.9<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0<br />

0.4<br />

2100<br />

SURKHAN<br />

1.030<br />

0.0<br />

1<br />

1.0000<br />

201<br />

MAZAR-E-SHRF<br />

1.045<br />

-11.8<br />

1<br />

8.4<br />

204<br />

DAWLATABAD<br />

1.043<br />

-11.8<br />

1<br />

3.4<br />

2.1<br />

3.6<br />

3.4<br />

4.0<br />

209<br />

MAZAR NO 1<br />

1.044<br />

-11.8<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

1.9<br />

2.1<br />

2.0<br />

1.048<br />

-11.9<br />

4.4<br />

4.2<br />

0.0<br />

0.0<br />

3.8 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

1.044<br />

-11.8<br />

1<br />

2.0<br />

202<br />

SHEBERGHAN<br />

0.975<br />

-7.2<br />

1<br />

13.6<br />

8.4<br />

1.004<br />

-4.3<br />

1<br />

8.5<br />

5.3<br />

28.2<br />

28.7<br />

29.1<br />

28.7<br />

0.952<br />

-8.0<br />

1<br />

13.6<br />

8.4<br />

15.0<br />

15.2<br />

16.0<br />

16.7<br />

0.978<br />

-7.3<br />

3.8<br />

0.0<br />

0.975<br />

-7.2<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.975<br />

-7.2<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.6 0.0<br />

523<br />

SHEBERGHAN 3<br />

3<br />

1.0000<br />

0.2<br />

0.6<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

0.0<br />

3.9<br />

206<br />

SHERIM TAQAB<br />

0.987<br />

-8.1<br />

1<br />

8.5<br />

5.3<br />

26.4<br />

1.030<br />

0.0<br />

65.3 65.8<br />

68.3<br />

0.0<br />

207<br />

JUMABAZAR<br />

0.987<br />

-8.9<br />

1<br />

3.4<br />

20.6<br />

20.7<br />

20.0<br />

2.1<br />

208<br />

MAIMANA<br />

0.983<br />

-9.5<br />

1<br />

13.6<br />

8.4<br />

13.9<br />

13.7<br />

11.6H<br />

5.3<br />

5.1<br />

81.0<br />

1.028<br />

-25.3<br />

1.033<br />

-24.0<br />

115<br />

BOT-KHAK<br />

28.0<br />

27.0<br />

28.3<br />

27.7<br />

7.7<br />

7.4<br />

7.6<br />

7.3<br />

21.8<br />

1.0R<br />

21<br />

FAIZABAD<br />

310<br />

KUNDOZ<br />

1.0000<br />

7.6<br />

19.4<br />

1.001<br />

-4.5<br />

11<br />

BAGHLAN<br />

37.8<br />

1.0000<br />

1.0000<br />

1.0000<br />

23.8<br />

24.4<br />

501<br />

NW KABUL G1<br />

1.0000<br />

5.1<br />

21.8<br />

45.0<br />

1.018<br />

-25.5 81.0<br />

31.2<br />

108<br />

JALALABAD<br />

0.2<br />

18.0<br />

39.1<br />

25.1<br />

1.0200<br />

27.4<br />

0.0<br />

506<br />

NAGHLU HPP 2<br />

0.6<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

5.5R<br />

0.0<br />

0.0<br />

3001<br />

TAJIK TIE<br />

-53.9R<br />

0.0<br />

0.0<br />

1.0000<br />

524<br />

SHEBERGHAN 4<br />

0.0<br />

-9.7<br />

19.9<br />

0.5<br />

103<br />

KABUL NO TAP<br />

1.019<br />

-3.3<br />

1.0000<br />

5.3<br />

21.8<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-20.7<br />

1.034<br />

-23.7<br />

32.2<br />

33.6<br />

54.0<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

0.0<br />

1.020<br />

-23.5<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-23.5<br />

9.2<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

33.6 33.5<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.033<br />

-24.0<br />

7.7<br />

1<br />

88.0<br />

3<br />

KHENJAN<br />

15.1<br />

88.0<br />

0.0<br />

1.057<br />

-9.3<br />

15.1<br />

1.059<br />

-11.9<br />

14.7<br />

6<br />

KHULM<br />

0.991<br />

-21.9<br />

90.7<br />

18.0<br />

0.0<br />

1.0500<br />

56.8<br />

1.0500<br />

28.4<br />

29.2<br />

88.1<br />

30.5<br />

63.0<br />

28.4<br />

28.4<br />

28.5<br />

29.2<br />

29.2<br />

29.2<br />

28.5<br />

22.0<br />

0.0<br />

66.1<br />

28.3<br />

1.054<br />

-14.0<br />

76.5<br />

22.2<br />

89.3<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

67.0<br />

-13.6R<br />

1<br />

88.1<br />

13.6<br />

88.8<br />

29.2<br />

57.6<br />

-20.8<br />

4<br />

PUL-E-KHUMRI<br />

0.6<br />

22.5<br />

29.2<br />

502<br />

NW KABUL G2<br />

19.6<br />

19.1<br />

19.7<br />

19.2<br />

19.6<br />

19.1<br />

19.7<br />

19.2<br />

9<br />

MAZAR<br />

1.057<br />

-9.4<br />

1.0000<br />

87.6<br />

5<br />

AIBAK<br />

20.9<br />

0.0<br />

10.6<br />

2.5<br />

11.0<br />

2.6<br />

10.6<br />

2.6<br />

102<br />

KABUL NW<br />

22.1<br />

41.8<br />

21.6<br />

41.4<br />

1.0000<br />

21.8<br />

0.0<br />

88.8<br />

101<br />

CHIMTALAH<br />

87.9<br />

0.0<br />

-9.8<br />

0.0<br />

56.8<br />

1.0000<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

-20.6<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 2, UZBEKISTAN SOURCE. NORMAL CONDITIONS<br />

MON, NOV 19 2007 18:14<br />

90.1<br />

3100<br />

TAJIK GEN<br />

1.055<br />

-4.3<br />

0.0<br />

1.0<br />

1.055<br />

-4.3<br />

0.0<br />

1.0<br />

2011<br />

AMU<br />

0.5<br />

0.1<br />

4.9<br />

1.2<br />

2012<br />

SURHAN<br />

203.4<br />

0.5<br />

0.1<br />

4.9<br />

1.2<br />

37.7<br />

1.056<br />

-6.6<br />

25.1<br />

102.3 104.2<br />

24.7<br />

40.8<br />

1.0000<br />

-11.1<br />

104.2<br />

8<br />

HAIRATAN<br />

1.0000<br />

102.3<br />

24.2<br />

104.2<br />

24.7<br />

105.9<br />

1.054<br />

-4.3<br />

24.7<br />

104.2<br />

0.0<br />

2.5<br />

SW<br />

14.8<br />

11.0<br />

2014<br />

BORDER<br />

24.7<br />

24.2<br />

25.1<br />

105.9<br />

215.0<br />

1.042<br />

-24.3<br />

SW<br />

0.975<br />

-7.2<br />

2<br />

CHARIKAR<br />

48.9<br />

47.8<br />

48.8<br />

47.9<br />

1.010<br />

-25.8<br />

22.4<br />

21.8<br />

22.5<br />

22.0<br />

21.8<br />

22.5<br />

22.0<br />

40.5<br />

19.6<br />

1<br />

526<br />

KABUL SW<br />

1.014<br />

-25.6<br />

22.4<br />

1.030<br />

-25.2<br />

26.3<br />

25.4<br />

26.3<br />

25.3<br />

26.3<br />

25.4<br />

26.3<br />

33.6<br />

32.8<br />

33.6<br />

33.0<br />

38.5<br />

105<br />

KABUL EAST<br />

45.5R<br />

1<br />

100.0<br />

104<br />

KABUL NORTH<br />

525<br />

KABUL DIESEL<br />

25.3<br />

527<br />

KABUL CENTRL<br />

30.8<br />

30.2<br />

30.7<br />

29.5<br />

27.2<br />

26.5<br />

26.9<br />

25.9<br />

72.0<br />

34.9


1<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

3<br />

0.0<br />

2<br />

2<br />

1<br />

4<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

206<br />

SHERIM TAQAB<br />

8.5 26.4<br />

5.3<br />

20.6<br />

0.0<br />

20.7<br />

0.0<br />

0.987<br />

-8.1<br />

207<br />

JUMABAZAR<br />

0.0<br />

-9.7<br />

3.4<br />

1<br />

1<br />

2.1<br />

1<br />

208<br />

MAIMANA<br />

13.6<br />

8.4<br />

1<br />

19.9<br />

20.0<br />

13.9<br />

13.7<br />

-9.7<br />

0.987<br />

-8.9<br />

0.983<br />

-9.5<br />

1.030<br />

0.0<br />

0.0<br />

-10.1<br />

66.1<br />

68.3<br />

65.3 65.8<br />

8.5<br />

5.3<br />

1.004<br />

-4.3<br />

28.3<br />

0.975<br />

-7.2<br />

13.6<br />

8.4<br />

1<br />

1<br />

67.0<br />

-13.6R<br />

205<br />

SAREPUL<br />

4011<br />

BORDER_1<br />

1<br />

29.1<br />

28.7<br />

28.2<br />

28.7<br />

15.0<br />

15.2<br />

16.0<br />

16.7<br />

203<br />

ANDKHOI<br />

0.0<br />

0.952<br />

-8.0<br />

-9.5<br />

13.6<br />

8.4<br />

1<br />

3.8<br />

3.9<br />

204<br />

3.4 DAWLATABAD<br />

2.1<br />

4.0<br />

1<br />

2.0<br />

210<br />

MAZAR NO 2<br />

2.1<br />

1.041<br />

-11.8<br />

209<br />

2.0 MAZAR NO 1<br />

0.5<br />

2.1<br />

2.0<br />

1.041<br />

-11.8<br />

3.8 251<br />

250<br />

1.040<br />

-11.9<br />

MAZAR TIE W MAZAR TIE E<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.978<br />

1.045<br />

-7.3<br />

-11.9<br />

521<br />

SHEBERGHAN 1<br />

0.975<br />

-7.2<br />

0.975<br />

-7.2<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

1.0000<br />

0.2<br />

0.6<br />

3<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

2<br />

0.2<br />

0.0<br />

0.6 0.0<br />

1.0000<br />

523<br />

SHEBERGHAN 3<br />

0.0<br />

0.0<br />

0.5<br />

201<br />

MAZAR-E-SHRF<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

9<br />

MAZAR<br />

202<br />

SHEBERGHAN<br />

524<br />

SHEBERGHAN 4<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 2, UZBEKISTAN SOURCE. CONTINGENCY NORTH - DIESEL<br />

MON, NOV 19 2007 18:21<br />

0.975<br />

-7.2<br />

4.4<br />

4.2<br />

3.6<br />

3.5<br />

2.0<br />

1.9<br />

21.6<br />

41.6<br />

1.0000<br />

1.0000<br />

22.1<br />

42.0<br />

13.6<br />

8.4<br />

1<br />

2.0<br />

7<br />

NAIBABAD<br />

10.6<br />

2.5<br />

11.1<br />

2.6<br />

0.0<br />

0.0<br />

1.054<br />

-4.3<br />

10.6<br />

11.1<br />

2.6<br />

526<br />

KABUL SW<br />

2.5<br />

22.4<br />

22.0<br />

1.041<br />

-11.8<br />

1.0<br />

0.4<br />

1.0000<br />

501<br />

NW KABUL G1<br />

22.5<br />

22.2<br />

1.0<br />

1.0<br />

1.054<br />

-9.4<br />

2011<br />

AMU<br />

1.054<br />

-4.3<br />

8<br />

HAIRATAN<br />

0.0<br />

1<br />

CHIMTALAH<br />

102<br />

KABUL NW<br />

40.5<br />

19.6<br />

1<br />

SW<br />

22.4<br />

22.0<br />

22.5<br />

22.2<br />

63.0<br />

1<br />

1.0000<br />

1<br />

23.8<br />

78.6<br />

1.0000<br />

21.8<br />

10.9H<br />

79.2<br />

1<br />

1.0000<br />

24.4<br />

1<br />

0.0<br />

1.049<br />

-14.1<br />

0.0<br />

5<br />

AIBAK<br />

30.5<br />

1<br />

1.026<br />

-23.8<br />

2010<br />

AMU<br />

1.053<br />

-4.3<br />

1<br />

91.8<br />

15.3<br />

14.8<br />

88.1<br />

14.8<br />

3<br />

KHENJAN<br />

0.0<br />

29.4<br />

0.0<br />

28.8<br />

29.4<br />

28.9<br />

0.5<br />

0.1<br />

0.5<br />

0.1<br />

88.9<br />

88.9<br />

101<br />

CHIMTALAH<br />

1.006<br />

-25.8<br />

104.0<br />

24.7<br />

104.0<br />

24.7<br />

104.0<br />

24.7<br />

102.1<br />

24.2<br />

14.8<br />

SW<br />

-9.7<br />

88.3<br />

102.1 104.0<br />

24.2<br />

24.7<br />

88.3<br />

21.4<br />

88.3<br />

21.4<br />

29.4<br />

28.8<br />

29.4<br />

1.031<br />

-16.7<br />

1.008<br />

-19.8<br />

54.7<br />

29.4<br />

28.9<br />

29.4<br />

28.9<br />

29.4<br />

25.9<br />

25.2<br />

23.1 83.9<br />

83.3<br />

11.6H<br />

1.027<br />

-23.7<br />

1.055<br />

-10.0<br />

1.055<br />

-11.9<br />

88.4<br />

21.1<br />

22.4<br />

90.6<br />

1.0500<br />

88.5<br />

57.5<br />

1.0000<br />

1.0000<br />

1.0000<br />

1<br />

4.9<br />

1.2<br />

4.9<br />

1.2<br />

105.7<br />

28.8<br />

29.4<br />

91.6<br />

15.3<br />

90.7<br />

15.1<br />

90.7<br />

15.1<br />

87.9<br />

90.6<br />

89.6<br />

11.9<br />

11.6<br />

14.8<br />

88.0<br />

88.4<br />

21.8 21.1<br />

1.0500<br />

88.5<br />

89.7<br />

28.8<br />

28.9<br />

57.5<br />

54.7<br />

20.7<br />

20.4<br />

2012<br />

SURHAN<br />

40.7<br />

1.0000<br />

25.1<br />

105.7<br />

25.1<br />

1.052<br />

-4.3<br />

22.2<br />

22.8<br />

1.0000<br />

214.4<br />

20.7<br />

20.4<br />

1.054<br />

-9.3<br />

1<br />

1<br />

0.984<br />

-22.1<br />

6<br />

KHULM<br />

1<br />

57.6<br />

35.7<br />

0.0<br />

502<br />

NW KABUL G2<br />

1.0000<br />

2014<br />

1.054BORDER<br />

-6.6<br />

0.0<br />

-11.0<br />

2100<br />

SURKHAN<br />

204.0<br />

-50.1R<br />

1.030<br />

0.0<br />

1<br />

13.6<br />

8.4<br />

1.008<br />

-5.1<br />

2<br />

CHARIKAR<br />

1.026<br />

-2.6<br />

16.0<br />

36.0<br />

22.3<br />

37.7<br />

9.2<br />

37.8<br />

9.2<br />

75.7<br />

18.4<br />

33.0<br />

1.009<br />

-25.7<br />

95.2<br />

5.5R<br />

3001<br />

TAJIK TIE<br />

37.7<br />

9.2<br />

0.0<br />

0.0<br />

37.8<br />

1<br />

1.030<br />

0.0<br />

75.4<br />

18.4<br />

9.2<br />

11<br />

BAGHLAN<br />

32.5<br />

76.5<br />

37.1<br />

95.4<br />

95.0<br />

37.0 36.9<br />

13<br />

SHEKANBANDAR<br />

311<br />

SHERKHAN<br />

75.8<br />

18.7<br />

13.7<br />

0.0<br />

1.0000<br />

52.9 52.8<br />

52.1 52.1<br />

11.8<br />

11.6<br />

1.0000<br />

1.028<br />

-2.4<br />

12<br />

KUNDUZ<br />

0.0<br />

0.0<br />

5.0<br />

9.9<br />

63.1<br />

15.6<br />

1.011<br />

-4.8<br />

75.4<br />

18.3<br />

1.0000<br />

1.029<br />

-2.1<br />

7.6<br />

3010<br />

TAJIK SRCE<br />

1.0000<br />

19.6<br />

1.0000<br />

1.0000<br />

19.3<br />

1.001<br />

-4.5 16.0<br />

15.9<br />

13.6<br />

8.4<br />

5.0<br />

10.1 310<br />

KUNDOZ<br />

1.027<br />

-25.3<br />

15.8<br />

15.4<br />

5.3<br />

1.029<br />

19.4 -2.5<br />

7.5<br />

19.4<br />

5.2<br />

33.3<br />

32.3<br />

0.0<br />

0.0<br />

3.5<br />

1<br />

9.1<br />

5.6<br />

5.3<br />

5.2<br />

3011<br />

TAJIK TIE<br />

13.6<br />

8.4<br />

4.0<br />

18.0<br />

-1.2R<br />

0.0<br />

0.0<br />

0.0<br />

505<br />

NAGHLU HPP 1<br />

18.0<br />

28.1<br />

107<br />

NAGHLU<br />

0.0<br />

0.0<br />

33.2 33.4<br />

1.022<br />

-24.8<br />

1.019<br />

-3.3<br />

63.6<br />

15.9<br />

0.0<br />

0.0<br />

14<br />

TALOQAN<br />

40.3<br />

80.6<br />

20.5<br />

5.1<br />

0.999<br />

-6.6<br />

1.0000<br />

106<br />

PULI CHARKHI<br />

1.0500<br />

1.0000<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

314<br />

IMAM SABIB<br />

38.4<br />

76.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

7.9<br />

301<br />

TALOQAN<br />

28.7 28.9<br />

28.3 29.4<br />

9.7<br />

9.6<br />

1.005<br />

-11.1<br />

0.0<br />

1.0200<br />

1.0200<br />

12.8<br />

1.0000<br />

1.0000<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1.0200<br />

1.0200<br />

14.0<br />

14.2<br />

1.020<br />

-23.7<br />

506<br />

NAGHLU HPP 2<br />

1.020<br />

-23.7<br />

507<br />

NAGHLU HPP 3<br />

1.005<br />

122<br />

0.0<br />

1.020<br />

-26.0<br />

525<br />

527<br />

KABUL DIESEL<br />

P CHARK TP N<br />

-23.3<br />

KABUL CENTRL<br />

5.3<br />

508<br />

103<br />

0.0 NAGHLU HPP 4<br />

1.003<br />

KABUL NO TAP<br />

100.0<br />

5.1<br />

13.6<br />

-26.0<br />

42.3<br />

42.6<br />

0.0 25.0<br />

24.8<br />

41.9R<br />

5.3<br />

12.9<br />

41.6<br />

41.0<br />

25.0 38.9<br />

37.8<br />

1.008 105<br />

5.1<br />

-25.9 KABUL EAST<br />

-1.1R<br />

1.020<br />

33.0 33.0<br />

11.8<br />

-23.3<br />

11.2<br />

31.9 31.8<br />

33.0 33.0<br />

1.011<br />

11.4<br />

10.6<br />

-25.6<br />

6.9<br />

31.9 31.8<br />

6.7<br />

1.030<br />

-25.2<br />

11.8<br />

11.2<br />

6.9 6.6<br />

6.7 6.5<br />

11.4<br />

511<br />

10.6 5.6<br />

6.6<br />

6.5<br />

MAHIPAR HPP1<br />

1.027<br />

114<br />

5.3<br />

22.0<br />

-25.3<br />

MAHIPAR 15.7<br />

512 -1.4R<br />

21.9 21.7<br />

1.009<br />

MAHIPAR HPP2<br />

1.4 1.4 83.3<br />

1.041<br />

-25.7 80.9<br />

-24.5<br />

45.0<br />

0.0 0.0<br />

22.0<br />

1.010<br />

21.8<br />

23.7<br />

-20.8 24.2<br />

-5.5L<br />

33.2<br />

90.4<br />

90.4<br />

513<br />

32.0<br />

1.4 1.4 MAHIPAR HPP3<br />

39.4<br />

0.0 0.0 21.9 21.7 33.2 33.1<br />

1.010<br />

120<br />

22.0<br />

BRESHNA KOT<br />

38.1<br />

-20.8<br />

1.026<br />

83.3 80.9 32.0 31.9<br />

-25.4<br />

-1.4R<br />

1.032<br />

39.4<br />

-23.9<br />

38.7<br />

1.010<br />

8.7<br />

-20.8<br />

33.0<br />

33.4 8.4<br />

32.4<br />

115<br />

32.2<br />

BOT-KHAK<br />

1.030<br />

-24.2<br />

-20.5<br />

4<br />

PUL-E-KHUMRI<br />

63.5<br />

62.5<br />

18.5<br />

18.2<br />

18.6<br />

18.4<br />

63.3<br />

62.6<br />

72.0<br />

34.9<br />

3100<br />

TAJIK GEN<br />

20.8<br />

20.8<br />

20.5<br />

20.5<br />

-20.2<br />

104<br />

KABUL NORTH<br />

0.0<br />

17.8<br />

27.2<br />

0.954<br />

-13.1<br />

10.0<br />

9.9<br />

1<br />

12.8<br />

7.9<br />

15.0<br />

15.6<br />

1.003<br />

-11.2<br />

8.5<br />

5.3<br />

302<br />

RUSTAQ<br />

113<br />

MAHIPAR TP N<br />

33.1<br />

31.9<br />

305<br />

CHAH AB<br />

1.030<br />

-24.2<br />

15.5<br />

3.9<br />

10.0<br />

2.4<br />

13.8<br />

13.4<br />

1.000<br />

-7.8<br />

13.6 0.0<br />

8.4 1.0R<br />

21<br />

FAIZABAD<br />

108<br />

JALALABAD<br />

3.6<br />

3.5<br />

1.024<br />

-25.7<br />

110<br />

SAROBI TOWN<br />

5.6 4.8<br />

5.3 3.0<br />

1.041<br />

-24.5<br />

16.4<br />

6.7<br />

6.5<br />

8.7 6.7<br />

8.4 6.5<br />

112<br />

MAHIPAR TP S<br />

111<br />

SAROBI GEN<br />

1.027<br />

2.8<br />

2.8 -24.3<br />

0.0<br />

18.2 18.2<br />

-2.8L<br />

504<br />

SAROBI HPP 2<br />

0.2<br />

1.4<br />

1.0000<br />

1.036<br />

-24.3<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

3.4<br />

2.1<br />

4.0<br />

3.9<br />

1.000<br />

0.0<br />

1.023<br />

-25.8<br />

109<br />

MEHTARLAM<br />

509<br />

DARUNTA DPP<br />

1.036<br />

0.0 -24.3<br />

0.0<br />

503<br />

SAROBI HPP 1


1<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

3<br />

0.0<br />

2<br />

2<br />

1<br />

4<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

206<br />

SHERIM TAQAB<br />

8.5 26.4<br />

5.3<br />

20.6<br />

0.0<br />

20.7<br />

0.0<br />

0.987<br />

-8.1<br />

207<br />

JUMABAZAR<br />

0.0<br />

-9.7<br />

3.4<br />

1<br />

1<br />

2.1<br />

1<br />

208<br />

MAIMANA<br />

13.6<br />

8.4<br />

1<br />

19.8<br />

19.9<br />

13.9<br />

13.7<br />

-9.7<br />

0.987<br />

-8.9<br />

0.983<br />

-9.5<br />

1.030<br />

0.0<br />

0.0<br />

-10.1<br />

66.1<br />

68.4<br />

65.3 65.9<br />

8.5<br />

5.3<br />

1.004<br />

-4.3<br />

28.3<br />

0.975<br />

-7.2<br />

13.6<br />

8.4<br />

1<br />

1<br />

67.0<br />

-13.6R<br />

205<br />

SAREPUL<br />

4011<br />

BORDER_1<br />

1<br />

29.1<br />

28.7<br />

28.2<br />

28.7<br />

15.0<br />

15.2<br />

16.0<br />

16.7<br />

203<br />

ANDKHOI<br />

0.0<br />

0.952<br />

-8.0<br />

-9.5<br />

13.6<br />

8.4<br />

1<br />

3.8<br />

3.9<br />

204<br />

3.4 DAWLATABAD<br />

2.1<br />

4.0<br />

1<br />

2.0<br />

210<br />

MAZAR NO 2<br />

2.1<br />

1.044<br />

-11.8<br />

209<br />

2.0 MAZAR NO 1<br />

0.5<br />

2.1<br />

2.0<br />

1.044<br />

-11.8<br />

3.8 251<br />

250<br />

1.043<br />

-11.8<br />

MAZAR TIE W MAZAR TIE E<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.978<br />

1.048<br />

-7.3<br />

-11.9<br />

521<br />

SHEBERGHAN 1<br />

0.975<br />

-7.2<br />

0.975<br />

-7.2<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

1.0000<br />

0.2<br />

0.6<br />

3<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

2<br />

0.2<br />

0.0<br />

0.6 0.0<br />

1.0000<br />

523<br />

SHEBERGHAN 3<br />

0.0<br />

0.0<br />

0.5<br />

201<br />

MAZAR-E-SHRF<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

9<br />

MAZAR<br />

202<br />

SHEBERGHAN<br />

524<br />

SHEBERGHAN 4<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 2, UZBEKISTAN SOURCE. CONTINGENCY DIESEL - EAST<br />

MON, NOV 19 2007 18:30<br />

0.975<br />

-7.2<br />

4.4<br />

4.2<br />

3.6<br />

3.4<br />

2.0<br />

1.9<br />

21.6<br />

41.4<br />

1.0000<br />

1.0000<br />

22.1<br />

41.8<br />

13.6<br />

8.4<br />

1<br />

2.0<br />

7<br />

NAIBABAD<br />

10.6<br />

2.5<br />

11.0<br />

2.6<br />

0.0<br />

0.0<br />

1.055<br />

-4.3<br />

10.6<br />

11.0<br />

2.6<br />

526<br />

KABUL SW<br />

2.5<br />

22.4<br />

21.9<br />

1.044<br />

-11.8<br />

1.0<br />

0.4<br />

1.0000<br />

501<br />

NW KABUL G1<br />

22.5<br />

22.0<br />

1.0<br />

1.0<br />

1.056<br />

-9.4<br />

2011<br />

AMU<br />

1.055<br />

-4.3<br />

8<br />

HAIRATAN<br />

0.0<br />

1<br />

CHIMTALAH<br />

102<br />

KABUL NW<br />

40.5<br />

19.6<br />

1<br />

SW<br />

22.4<br />

21.9<br />

22.5<br />

22.0<br />

63.0<br />

1<br />

1.0000<br />

1<br />

23.8<br />

78.0<br />

1.0000<br />

21.8<br />

10.9H<br />

78.6<br />

1<br />

1.0000<br />

24.4<br />

1<br />

0.0<br />

1.054<br />

-14.0<br />

0.0<br />

5<br />

AIBAK<br />

30.5<br />

1<br />

1.033<br />

-23.6<br />

2010<br />

AMU<br />

1.054<br />

-4.3<br />

1<br />

92.0<br />

15.3<br />

14.8<br />

87.8<br />

14.7<br />

3<br />

KHENJAN<br />

0.0<br />

29.2<br />

0.0<br />

28.5<br />

29.2<br />

28.5<br />

0.5<br />

0.1<br />

0.5<br />

0.1<br />

88.8<br />

88.8<br />

101<br />

CHIMTALAH<br />

1.013<br />

-25.6<br />

104.2<br />

24.7<br />

104.2<br />

24.7<br />

104.2<br />

24.7<br />

102.3<br />

24.2<br />

14.8<br />

SW<br />

-9.8<br />

87.9<br />

102.3 104.2<br />

24.2<br />

24.7<br />

87.9<br />

21.2<br />

87.9<br />

21.2<br />

29.2<br />

28.5<br />

29.2<br />

1.036<br />

-16.6<br />

1.014<br />

-19.7<br />

54.1<br />

29.2<br />

28.5<br />

29.2<br />

28.5<br />

29.2<br />

25.8<br />

25.2<br />

23.1 83.3<br />

82.7<br />

11.6H<br />

1.034<br />

-23.5<br />

1.058<br />

-10.0<br />

1.058<br />

-11.9<br />

88.1<br />

20.9<br />

22.2<br />

90.2<br />

1.0500<br />

88.2<br />

56.9<br />

1.0000<br />

1.0000<br />

1.0000<br />

1<br />

4.9<br />

1.2<br />

4.9<br />

1.2<br />

105.9<br />

28.5<br />

29.2<br />

91.8<br />

15.3<br />

90.8<br />

15.1<br />

90.8<br />

15.1<br />

87.7<br />

90.2<br />

89.1<br />

13.2<br />

12.9<br />

14.6<br />

87.6<br />

88.1<br />

21.6 20.9<br />

1.0500<br />

88.2<br />

89.3<br />

28.5<br />

28.5<br />

56.9<br />

54.1<br />

19.8<br />

19.3<br />

2012<br />

SURHAN<br />

40.8<br />

1.0000<br />

25.1<br />

105.9<br />

25.1<br />

1.054<br />

-4.3<br />

22.0<br />

22.5<br />

1.0000<br />

215.0<br />

19.8<br />

19.3<br />

1.057<br />

-9.3<br />

1<br />

1<br />

0.990<br />

-22.0<br />

6<br />

KHULM<br />

1<br />

57.6<br />

35.7<br />

0.0<br />

502<br />

NW KABUL G2<br />

1.0000<br />

2014<br />

1.056BORDER<br />

-6.6<br />

0.0<br />

-11.1<br />

2100<br />

SURKHAN<br />

203.5<br />

-53.5R<br />

1.030<br />

0.0<br />

1<br />

13.6<br />

8.4<br />

1.008<br />

-5.1<br />

2<br />

CHARIKAR<br />

1.026<br />

-2.6<br />

16.0<br />

36.0<br />

22.3<br />

37.7<br />

9.2<br />

37.8<br />

9.2<br />

75.7<br />

18.4<br />

31.6<br />

1.013<br />

-25.6<br />

95.2<br />

5.5R<br />

3001<br />

TAJIK TIE<br />

37.7<br />

9.2<br />

0.0<br />

0.0<br />

37.8<br />

1<br />

1.030<br />

0.0<br />

75.4<br />

18.4<br />

9.2<br />

11<br />

BAGHLAN<br />

31.0<br />

76.5<br />

37.1<br />

95.4<br />

95.0<br />

37.0 36.9<br />

13<br />

SHEKANBANDAR<br />

311<br />

SHERKHAN<br />

75.8<br />

18.7<br />

13.7<br />

0.0<br />

1.0000<br />

41.1 41.0<br />

40.1 40.2<br />

13.2<br />

12.9<br />

1.0000<br />

1.028<br />

-2.4<br />

12<br />

KUNDUZ<br />

0.0<br />

0.0<br />

5.0<br />

9.9<br />

63.1<br />

15.6<br />

1.011<br />

-4.8<br />

75.4<br />

18.3<br />

1.0000<br />

1.029<br />

-2.1<br />

7.6<br />

3010<br />

TAJIK SRCE<br />

1.0000<br />

19.6<br />

1.0000<br />

1.0000<br />

19.3<br />

1.001<br />

-4.5 16.0<br />

15.9<br />

13.6<br />

8.4<br />

5.0<br />

10.1 310<br />

KUNDOZ<br />

1.026<br />

-25.4<br />

15.8<br />

15.4<br />

5.3<br />

1.029<br />

19.4 -2.5<br />

7.5<br />

19.4<br />

5.2<br />

31.9<br />

30.9<br />

0.0<br />

0.0<br />

3.5<br />

1<br />

9.1<br />

5.6<br />

5.3<br />

5.2<br />

3011<br />

TAJIK TIE<br />

13.6<br />

8.4<br />

4.0<br />

18.0<br />

-1.4R<br />

0.0<br />

0.0<br />

0.0<br />

505<br />

NAGHLU HPP 1<br />

18.1<br />

28.1<br />

107<br />

NAGHLU<br />

0.0<br />

0.0<br />

31.9 32.1<br />

1.024<br />

-24.7<br />

1.019<br />

-3.3<br />

63.6<br />

15.9<br />

0.0<br />

0.0<br />

14<br />

TALOQAN<br />

40.3<br />

80.6<br />

20.5<br />

5.1<br />

0.999<br />

-6.6<br />

1.0000<br />

106<br />

PULI CHARKHI<br />

1.0500<br />

1.0000<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

314<br />

IMAM SABIB<br />

38.4<br />

76.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

7.9<br />

301<br />

TALOQAN<br />

28.7 28.9<br />

28.3 29.4<br />

9.7<br />

9.6<br />

1.005<br />

-11.1<br />

0.0<br />

1.0200<br />

1.0200<br />

12.8<br />

1.0000<br />

1.0000<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1.0200<br />

1.0200<br />

14.0<br />

14.2<br />

1.020<br />

-23.7<br />

506<br />

NAGHLU HPP 2<br />

1.020<br />

-23.7<br />

507<br />

NAGHLU HPP 3<br />

1.013<br />

122<br />

0.0<br />

1.020<br />

-25.7<br />

525<br />

527<br />

KABUL DIESEL<br />

P CHARK TP N<br />

-23.3<br />

KABUL CENTRL<br />

5.3<br />

508<br />

103<br />

32.6<br />

0.0 NAGHLU HPP 4<br />

1.009<br />

KABUL NO TAP31.4<br />

100.0<br />

5.1<br />

13.6<br />

-25.8<br />

28.9<br />

28.7<br />

0.0 25.0<br />

24.8<br />

43.3R<br />

5.3<br />

13.0<br />

28.2<br />

27.6<br />

25.0 39.0<br />

37.9<br />

1.015 105<br />

5.1<br />

-25.7 KABUL EAST<br />

-1.3R<br />

1.020<br />

13.1<br />

-23.3<br />

12.5<br />

48.1 48.3<br />

1.019<br />

12.7<br />

11.9<br />

-25.4<br />

8.2<br />

46.6 46.5<br />

8.0<br />

1.030<br />

-25.2<br />

13.1<br />

12.5<br />

8.2 7.9<br />

8.0 7.7<br />

12.7<br />

511<br />

11.9 5.6<br />

7.9<br />

7.7<br />

MAHIPAR HPP1<br />

1.026<br />

114<br />

5.3<br />

22.0<br />

-25.4<br />

MAHIPAR 14.6<br />

512 -2.5R<br />

21.9 21.7<br />

1.017<br />

MAHIPAR HPP2<br />

1.7 1.7 83.3<br />

1.042<br />

-25.5 80.9<br />

-24.5<br />

45.0<br />

0.0 0.0<br />

22.0<br />

1.010<br />

21.8<br />

24.0<br />

-20.8 24.5<br />

-5.5L<br />

33.5<br />

91.4<br />

91.4<br />

513<br />

32.2<br />

1.7 1.7 MAHIPAR HPP3<br />

24.5<br />

0.0 0.0 21.9 21.7 33.5 33.4<br />

1.010<br />

120<br />

22.0<br />

BRESHNA KOT<br />

23.7<br />

-20.8<br />

1.024<br />

83.3 80.9 32.2 32.1<br />

-25.5<br />

-2.5R<br />

1.033<br />

24.9<br />

-23.8<br />

24.4<br />

1.010<br />

8.2<br />

-20.8<br />

31.6<br />

32.1 7.9<br />

31.0<br />

115<br />

30.9<br />

BOT-KHAK<br />

1.032<br />

-24.1<br />

-20.8<br />

4<br />

PUL-E-KHUMRI<br />

45.1<br />

44.1<br />

36.8<br />

36.0<br />

36.8<br />

36.2<br />

45.0<br />

44.2<br />

72.0<br />

34.9<br />

3100<br />

TAJIK GEN<br />

19.8<br />

19.8<br />

19.4<br />

19.4<br />

-20.5<br />

32.7<br />

32.0<br />

104<br />

KABUL NORTH<br />

0.0<br />

17.9<br />

27.2<br />

0.954<br />

-13.1<br />

10.0<br />

9.9<br />

1<br />

12.8<br />

7.9<br />

15.0<br />

15.6<br />

1.003<br />

-11.2<br />

8.5<br />

5.3<br />

302<br />

RUSTAQ<br />

113<br />

MAHIPAR TP N<br />

33.4<br />

32.1<br />

305<br />

CHAH AB<br />

1.032<br />

-24.1<br />

15.5<br />

3.9<br />

10.0<br />

2.4<br />

13.9<br />

13.4<br />

1.000<br />

-7.8<br />

13.6 0.0<br />

8.4 1.0R<br />

21<br />

FAIZABAD<br />

108<br />

JALALABAD<br />

3.6<br />

3.5<br />

1.024<br />

-25.7<br />

110<br />

SAROBI TOWN<br />

5.6 4.8<br />

5.3 3.0<br />

1.042<br />

-24.5<br />

15.3<br />

6.3<br />

6.0<br />

8.2 6.3<br />

7.9 6.0<br />

112<br />

MAHIPAR TP S<br />

111<br />

SAROBI GEN<br />

1.028<br />

2.8<br />

2.8 -24.3<br />

0.0<br />

18.2 18.2<br />

-2.8L<br />

504<br />

SAROBI HPP 2<br />

0.2<br />

1.4<br />

1.0000<br />

1.037<br />

-24.3<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

3.4<br />

2.1<br />

4.0<br />

3.9<br />

1.000<br />

0.0<br />

1.023<br />

-25.8<br />

109<br />

MEHTARLAM<br />

509<br />

DARUNTA DPP<br />

1.037<br />

0.0 -24.3<br />

0.0<br />

503<br />

SAROBI HPP 1


1<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

3<br />

0.0<br />

2<br />

2<br />

1<br />

4<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

206<br />

SHERIM TAQAB<br />

8.5 26.4<br />

5.3<br />

20.6<br />

0.0<br />

20.7<br />

0.0<br />

0.987<br />

-8.1<br />

207<br />

JUMABAZAR<br />

0.0<br />

-9.7<br />

3.4<br />

1<br />

1<br />

2.1<br />

1<br />

208<br />

MAIMANA<br />

13.6<br />

8.4<br />

1<br />

19.8<br />

19.9<br />

13.9<br />

13.7<br />

-9.7<br />

0.987<br />

-8.9<br />

0.983<br />

-9.5<br />

1.030<br />

0.0<br />

0.0<br />

-10.1<br />

66.1<br />

68.4<br />

65.3 65.9<br />

8.5<br />

5.3<br />

1.004<br />

-4.3<br />

28.3<br />

0.975<br />

-7.2<br />

13.6<br />

8.4<br />

1<br />

1<br />

67.0<br />

-13.6R<br />

205<br />

SAREPUL<br />

4011<br />

BORDER_1<br />

1<br />

29.1<br />

28.7<br />

28.2<br />

28.7<br />

15.0<br />

15.2<br />

16.0<br />

16.7<br />

203<br />

ANDKHOI<br />

0.0<br />

0.952<br />

-8.0<br />

-9.5<br />

13.6<br />

8.4<br />

1<br />

3.8<br />

3.9<br />

204<br />

3.4 DAWLATABAD<br />

2.1<br />

4.0<br />

1<br />

2.0<br />

210<br />

MAZAR NO 2<br />

2.1<br />

1.042<br />

-11.8<br />

209<br />

2.0 MAZAR NO 1<br />

0.5<br />

2.1<br />

2.0<br />

1.042<br />

-11.8<br />

3.8 251<br />

250<br />

1.041<br />

-11.8<br />

MAZAR TIE W MAZAR TIE E<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.978<br />

1.046<br />

-7.3<br />

-11.9<br />

521<br />

SHEBERGHAN 1<br />

0.975<br />

-7.2<br />

0.975<br />

-7.2<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

1.0000<br />

0.2<br />

0.6<br />

3<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

2<br />

0.2<br />

0.0<br />

0.6 0.0<br />

1.0000<br />

523<br />

SHEBERGHAN 3<br />

0.0<br />

0.0<br />

0.5<br />

201<br />

MAZAR-E-SHRF<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

9<br />

MAZAR<br />

202<br />

SHEBERGHAN<br />

524<br />

SHEBERGHAN 4<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 2, UZBEKISTAN SOURCE. KABUL EAST - BRESHNA KOT<br />

MON, NOV 19 2007 18:33<br />

0.975<br />

-7.2<br />

4.4<br />

4.2<br />

3.6<br />

3.5<br />

2.0<br />

1.9<br />

21.6<br />

41.5<br />

1.0000<br />

1.0000<br />

22.1<br />

41.9<br />

13.6<br />

8.4<br />

1<br />

2.0<br />

7<br />

NAIBABAD<br />

10.6<br />

2.5<br />

11.0<br />

2.6<br />

0.0<br />

0.0<br />

1.054<br />

-4.3<br />

10.6<br />

11.0<br />

2.6<br />

526<br />

KABUL SW<br />

2.5<br />

22.4<br />

22.0<br />

1.042<br />

-11.8<br />

1.0<br />

0.4<br />

1.0000<br />

501<br />

NW KABUL G1<br />

22.5<br />

22.1<br />

1.0<br />

1.0<br />

1.055<br />

-9.4<br />

2011<br />

AMU<br />

1.054<br />

-4.3<br />

8<br />

HAIRATAN<br />

0.0<br />

1<br />

CHIMTALAH<br />

102<br />

KABUL NW<br />

40.5<br />

19.6<br />

1<br />

SW<br />

22.4<br />

22.0<br />

22.5<br />

22.1<br />

63.0<br />

1<br />

1.0000<br />

1<br />

23.8<br />

78.4<br />

1.0000<br />

21.8<br />

10.9H<br />

79.0<br />

1<br />

1.0000<br />

24.4<br />

1<br />

0.0<br />

1.051<br />

-14.1<br />

0.0<br />

5<br />

AIBAK<br />

30.5<br />

1<br />

1.028<br />

-23.7<br />

2010<br />

AMU<br />

1.054<br />

-4.3<br />

1<br />

91.9<br />

15.3<br />

14.8<br />

88.0<br />

14.7<br />

3<br />

KHENJAN<br />

0.0<br />

29.3<br />

0.0<br />

28.7<br />

29.3<br />

28.7<br />

0.5<br />

0.1<br />

0.5<br />

0.1<br />

88.9<br />

88.9<br />

101<br />

CHIMTALAH<br />

1.008<br />

-25.8<br />

104.1<br />

24.7<br />

104.1<br />

24.7<br />

104.1<br />

24.7<br />

102.2<br />

24.2<br />

14.8<br />

SW<br />

-9.7<br />

88.2<br />

102.2 104.1<br />

24.2<br />

24.7<br />

88.1<br />

21.3<br />

88.1<br />

21.3<br />

29.3<br />

28.7<br />

29.3<br />

1.033<br />

-16.6<br />

1.010<br />

-19.7<br />

54.5<br />

29.3<br />

28.7<br />

29.3<br />

28.7<br />

29.3<br />

25.8<br />

25.2<br />

23.1 83.7<br />

83.1<br />

11.6H<br />

1.029<br />

-23.6<br />

1.056<br />

-10.0<br />

1.056<br />

-11.9<br />

88.3<br />

21.0<br />

22.4<br />

90.4<br />

1.0500<br />

88.4<br />

57.3<br />

1.0000<br />

1.0000<br />

1.0000<br />

1<br />

4.9<br />

1.2<br />

4.9<br />

1.2<br />

105.7<br />

28.7<br />

29.3<br />

91.7<br />

15.3<br />

90.7<br />

15.1<br />

90.7<br />

15.1<br />

87.8<br />

90.4<br />

89.4<br />

12.6<br />

12.3<br />

14.7<br />

87.9<br />

88.3<br />

21.8 21.0<br />

57.3<br />

1.0500<br />

88.4<br />

89.6<br />

28.7<br />

28.7<br />

54.5<br />

20.3<br />

19.9<br />

2012<br />

SURHAN<br />

40.8<br />

1.0000<br />

25.1<br />

105.7<br />

25.1<br />

1.053<br />

-4.3<br />

22.1<br />

22.7<br />

1.0000<br />

214.6<br />

20.3<br />

19.9<br />

1.055<br />

-9.3<br />

1<br />

1<br />

0.986<br />

-22.0<br />

6<br />

KHULM<br />

1<br />

57.6<br />

35.7<br />

0.0<br />

502<br />

NW KABUL G2<br />

1.0000<br />

2014<br />

1.055BORDER<br />

-6.6<br />

0.0<br />

-11.0<br />

2100<br />

SURKHAN<br />

203.8<br />

-51.3R<br />

1.030<br />

0.0<br />

1<br />

13.6<br />

8.4<br />

1.008<br />

-5.1<br />

2<br />

CHARIKAR<br />

1.026<br />

-2.6<br />

16.0<br />

36.0<br />

22.3<br />

37.7<br />

9.2<br />

37.8<br />

9.2<br />

75.7<br />

18.4<br />

34.3<br />

1.004<br />

-25.8<br />

95.2<br />

5.5R<br />

3001<br />

TAJIK TIE<br />

37.7<br />

9.2<br />

0.0<br />

0.0<br />

37.8<br />

1<br />

1.030<br />

0.0<br />

75.4<br />

18.4<br />

9.2<br />

11<br />

BAGHLAN<br />

33.9<br />

76.5<br />

37.1<br />

95.4<br />

95.0<br />

37.0 36.9<br />

13<br />

SHEKANBANDAR<br />

311<br />

SHERKHAN<br />

75.8<br />

18.7<br />

13.7<br />

0.0<br />

1.0000<br />

47.8 47.7<br />

46.9 46.9<br />

12.5<br />

12.3<br />

1.0000<br />

1.028<br />

-2.4<br />

12<br />

KUNDUZ<br />

0.0<br />

0.0<br />

5.0<br />

9.9<br />

63.1<br />

15.6<br />

1.011<br />

-4.8<br />

75.4<br />

18.3<br />

1.0000<br />

1.029<br />

-2.1<br />

7.6<br />

3010<br />

TAJIK SRCE<br />

1.0000<br />

19.6<br />

1.0000<br />

1.0000<br />

19.3<br />

1.001<br />

-4.5 16.0<br />

15.9<br />

13.6<br />

8.4<br />

5.0<br />

10.1 310<br />

KUNDOZ<br />

1.030<br />

-25.3<br />

15.8<br />

15.4<br />

5.3<br />

1.029<br />

19.4 -2.5<br />

7.5<br />

19.4<br />

5.1<br />

34.6<br />

33.7<br />

0.0<br />

0.0<br />

3.5<br />

1<br />

9.1<br />

5.6<br />

5.3<br />

5.1<br />

3011<br />

TAJIK TIE<br />

13.6<br />

8.4<br />

4.0<br />

18.0<br />

-1.2R<br />

0.0<br />

0.0<br />

0.0<br />

505<br />

NAGHLU HPP 1<br />

18.0<br />

28.1<br />

107<br />

NAGHLU<br />

0.0<br />

0.0<br />

34.6 34.8<br />

1.018<br />

-24.9<br />

1.019<br />

-3.3<br />

63.6<br />

15.9<br />

0.0<br />

0.0<br />

14<br />

TALOQAN<br />

40.3<br />

80.6<br />

20.5<br />

5.1<br />

0.999<br />

-6.6<br />

1.0000<br />

106<br />

PULI CHARKHI<br />

1.0500<br />

1.0000<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

314<br />

IMAM SABIB<br />

38.4<br />

76.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

7.9<br />

301<br />

TALOQAN<br />

28.7 28.9<br />

28.3 29.4<br />

9.7<br />

9.6<br />

1.005<br />

-11.1<br />

0.0<br />

1.0200<br />

1.0200<br />

12.8<br />

1.0000<br />

1.0000<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1.0200<br />

1.0200<br />

14.0<br />

14.2<br />

1.020<br />

-23.7<br />

506<br />

NAGHLU HPP 2<br />

1.020<br />

-23.7<br />

507<br />

NAGHLU HPP 3<br />

1.008<br />

122<br />

0.0<br />

1.020<br />

-25.9<br />

525<br />

527<br />

KABUL DIESEL<br />

P CHARK TP N<br />

-23.4<br />

KABUL CENTRL<br />

5.3<br />

508<br />

103<br />

41.4<br />

0.0 NAGHLU HPP 4<br />

1.002<br />

KABUL NO TAP39.8<br />

100.0<br />

5.1<br />

13.6<br />

-26.0<br />

36.7<br />

36.7<br />

0.0 25.0<br />

24.8<br />

39.1R<br />

5.3<br />

13.0<br />

36.1<br />

35.4<br />

25.0 38.9<br />

37.8<br />

1.010 105<br />

5.1<br />

-25.8 KABUL EAST<br />

-1.1R<br />

1.020<br />

16.8 16.9<br />

10.6<br />

-23.4<br />

10.2<br />

16.2 16.3<br />

16.8 16.9<br />

1.014<br />

10.2<br />

9.7<br />

-25.5<br />

5.7<br />

16.2 16.3<br />

5.5<br />

1.030<br />

-25.3<br />

10.6<br />

10.2<br />

5.5 5.7<br />

5.3 5.5<br />

10.2<br />

511<br />

9.7 5.6<br />

5.5<br />

5.3<br />

MAHIPAR HPP1<br />

1.030<br />

114<br />

5.3<br />

22.0<br />

-25.3<br />

MAHIPAR 17.9<br />

512 -0.2R<br />

21.9 21.7<br />

1.012<br />

MAHIPAR HPP2<br />

1.0 1.0 83.3<br />

1.041<br />

-25.6 80.9<br />

-24.5<br />

45.0<br />

0.0 0.0<br />

22.0<br />

1.010<br />

21.8<br />

23.5<br />

-20.9 23.9<br />

-5.5R<br />

33.2<br />

89.3<br />

89.3<br />

513<br />

32.0<br />

1.0 1.0 MAHIPAR HPP3<br />

0.0 0.0 21.9 21.7 33.2 33.1<br />

1.010<br />

120<br />

-20.9 22.0<br />

BRESHNA KOT<br />

1.029<br />

83.3 80.9 32.0 31.9<br />

-25.4<br />

-0.2R<br />

1.029<br />

-24.0<br />

1.010<br />

9.8<br />

-20.9<br />

34.3<br />

34.8 9.4<br />

33.9<br />

115<br />

33.6<br />

BOT-KHAK<br />

1.028<br />

-24.3<br />

-20.6<br />

4<br />

PUL-E-KHUMRI<br />

31.2<br />

30.9<br />

72.0<br />

34.9<br />

31.2<br />

30.9<br />

53.7<br />

52.9<br />

53.6<br />

53.0<br />

3100<br />

TAJIK GEN<br />

20.3<br />

20.3<br />

20.0<br />

20.0<br />

-20.3<br />

41.1<br />

40.5<br />

104<br />

KABUL NORTH<br />

0.0<br />

17.8<br />

27.2<br />

0.954<br />

-13.1<br />

10.0<br />

9.9<br />

1<br />

12.8<br />

7.9<br />

15.0<br />

15.6<br />

1.003<br />

-11.2<br />

8.5<br />

5.3<br />

302<br />

RUSTAQ<br />

113<br />

MAHIPAR TP N<br />

33.1<br />

32.0<br />

305<br />

CHAH AB<br />

1.028<br />

-24.3<br />

15.5<br />

3.9<br />

10.0<br />

2.4<br />

13.9<br />

13.4<br />

1.000<br />

-7.8<br />

13.6 0.0<br />

8.4 1.0R<br />

21<br />

FAIZABAD<br />

108<br />

JALALABAD<br />

3.6<br />

3.5<br />

1.024<br />

-25.8<br />

110<br />

SAROBI TOWN<br />

5.6 4.8<br />

5.3 3.0<br />

1.041<br />

-24.5<br />

18.6<br />

7.9<br />

7.5<br />

9.8 7.9<br />

9.4 7.5<br />

112<br />

MAHIPAR TP S<br />

111<br />

SAROBI GEN<br />

1.026<br />

2.8<br />

2.8 -24.4<br />

0.0<br />

18.2 18.2<br />

-2.8L<br />

504<br />

SAROBI HPP 2<br />

0.2<br />

1.4<br />

1.0000<br />

1.035<br />

-24.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

3.4<br />

2.1<br />

4.0<br />

3.9<br />

1.000<br />

0.0<br />

1.023<br />

-25.8<br />

109<br />

MEHTARLAM<br />

509<br />

DARUNTA DPP<br />

1.035<br />

0.0 -24.4<br />

0.0<br />

503<br />

SAROBI HPP 1


1<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

3<br />

0.0<br />

2<br />

2<br />

1<br />

4<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

206<br />

SHERIM TAQAB<br />

8.5 26.4<br />

5.3<br />

20.6<br />

0.0<br />

20.7<br />

0.0<br />

0.987<br />

-8.1<br />

207<br />

JUMABAZAR<br />

0.0<br />

-9.7<br />

3.4<br />

1<br />

1<br />

2.1<br />

1<br />

208<br />

MAIMANA<br />

13.6<br />

8.4<br />

1<br />

19.8<br />

19.9<br />

13.9<br />

13.7<br />

-9.7<br />

0.987<br />

-8.9<br />

0.983<br />

-9.5<br />

1.030<br />

0.0<br />

0.0<br />

-10.1<br />

66.1<br />

68.4<br />

65.3 65.9<br />

8.5<br />

5.3<br />

1.004<br />

-4.3<br />

28.3<br />

0.975<br />

-7.2<br />

13.6<br />

8.4<br />

1<br />

1<br />

67.0<br />

-13.6R<br />

205<br />

SAREPUL<br />

4011<br />

BORDER_1<br />

1<br />

29.1<br />

28.7<br />

28.2<br />

28.7<br />

15.0<br />

15.2<br />

16.0<br />

16.7<br />

203<br />

ANDKHOI<br />

0.0<br />

0.952<br />

-8.0<br />

-9.5<br />

13.6<br />

8.4<br />

1<br />

3.8<br />

3.9<br />

204<br />

3.4 DAWLATABAD<br />

2.1<br />

4.0<br />

1<br />

2.0<br />

210<br />

MAZAR NO 2<br />

2.1<br />

1.037<br />

-11.9<br />

209<br />

2.0 MAZAR NO 1<br />

0.5<br />

2.1<br />

2.0<br />

1.037<br />

-11.9<br />

3.8 251<br />

250<br />

1.036<br />

-11.9<br />

MAZAR TIE W MAZAR TIE E<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.978<br />

1.041<br />

-7.3<br />

-12.0<br />

521<br />

SHEBERGHAN 1<br />

0.975<br />

-7.2<br />

0.975<br />

-7.2<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

1.0000<br />

0.2<br />

0.6<br />

3<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

2<br />

0.2<br />

0.0<br />

0.6 0.0<br />

1.0000<br />

523<br />

SHEBERGHAN 3<br />

0.0<br />

0.0<br />

0.5<br />

201<br />

MAZAR-E-SHRF<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

9<br />

MAZAR<br />

202<br />

SHEBERGHAN<br />

524<br />

SHEBERGHAN 4<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 2, UZBEKISTAN SOURCE. CONTINGENCY BRESHNA K- CENTRAL<br />

MON, NOV 19 2007 18:48<br />

0.975<br />

-7.2<br />

4.3<br />

4.1<br />

3.6<br />

3.5<br />

2.0<br />

1.9<br />

21.6<br />

41.8<br />

1.0000<br />

1.0000<br />

22.1<br />

42.2<br />

13.6<br />

8.4<br />

1<br />

2.0<br />

7<br />

NAIBABAD<br />

10.6<br />

2.5<br />

11.1<br />

2.6<br />

0.0<br />

0.0<br />

1.052<br />

-4.4<br />

10.6<br />

11.1<br />

2.6<br />

526<br />

KABUL SW<br />

2.5<br />

22.4<br />

22.3<br />

1.037<br />

-11.9<br />

1.0<br />

0.4<br />

1.0000<br />

501<br />

NW KABUL G1<br />

22.5<br />

22.5<br />

1.0<br />

1.0<br />

1.049<br />

-9.5<br />

2011<br />

AMU<br />

1.051<br />

-4.4<br />

8<br />

HAIRATAN<br />

0.0<br />

1<br />

CHIMTALAH<br />

102<br />

KABUL NW<br />

40.5<br />

19.6<br />

1<br />

SW<br />

22.4<br />

22.3<br />

22.5<br />

22.5<br />

63.0<br />

1<br />

1.0000<br />

1<br />

23.8<br />

79.5<br />

1.0000<br />

21.8<br />

10.9H<br />

80.1<br />

1<br />

1.0000<br />

24.4<br />

1<br />

0.0<br />

1.043<br />

-14.2<br />

0.0<br />

5<br />

AIBAK<br />

30.5<br />

1<br />

1.015<br />

-24.1<br />

2010<br />

AMU<br />

1.051<br />

-4.4<br />

1<br />

91.8<br />

15.4<br />

15.0<br />

88.7<br />

15.0<br />

3<br />

KHENJAN<br />

0.0<br />

29.6<br />

0.0<br />

29.4<br />

29.6<br />

29.4<br />

0.5<br />

0.1<br />

0.5<br />

0.1<br />

89.3<br />

89.3<br />

101<br />

CHIMTALAH<br />

0.994<br />

-26.2<br />

103.9<br />

24.7<br />

103.9<br />

24.7<br />

103.9<br />

24.7<br />

102.2<br />

24.3<br />

15.0<br />

SW<br />

-9.5<br />

89.0<br />

102.2 103.9<br />

24.3<br />

24.7<br />

89.1<br />

21.8<br />

89.1<br />

21.8<br />

29.6<br />

29.4<br />

29.6<br />

1.023<br />

-16.8<br />

0.998<br />

-20.0<br />

55.7<br />

29.6<br />

29.4<br />

29.6<br />

29.4<br />

29.6<br />

25.9<br />

25.2<br />

23.1 84.8<br />

84.2<br />

11.6H<br />

1.016<br />

-24.0<br />

1.050<br />

-10.1<br />

1.049<br />

-12.0<br />

89.2<br />

21.4<br />

22.8<br />

91.3<br />

1.0500<br />

89.1<br />

58.6<br />

1.0000<br />

1.0000<br />

1.0000<br />

1<br />

4.9<br />

1.2<br />

4.9<br />

1.2<br />

105.5<br />

29.4<br />

29.6<br />

91.6<br />

15.4<br />

90.8<br />

15.2<br />

90.8<br />

15.2<br />

88.6<br />

91.3<br />

90.3<br />

11.0<br />

10.9<br />

15.0<br />

88.8<br />

89.1<br />

22.2 21.4<br />

1.0500<br />

89.1<br />

90.4<br />

29.4<br />

29.4<br />

58.6<br />

55.7<br />

21.6<br />

21.4<br />

2012<br />

SURHAN<br />

40.7<br />

1.0000<br />

25.1<br />

105.5<br />

25.1<br />

1.050<br />

-4.3<br />

22.6<br />

23.2<br />

1.0000<br />

213.9<br />

21.6<br />

21.4<br />

1.050<br />

-9.4<br />

1<br />

1<br />

0.974<br />

-22.4<br />

6<br />

KHULM<br />

1<br />

57.6<br />

35.7<br />

0.0<br />

502<br />

NW KABUL G2<br />

1.0000<br />

2014<br />

1.051BORDER<br />

-6.7<br />

0.0<br />

-10.9<br />

2100<br />

SURKHAN<br />

205.1<br />

-44.8R<br />

1.030<br />

0.0<br />

1<br />

13.6<br />

8.4<br />

1.008<br />

-5.1<br />

2<br />

CHARIKAR<br />

1.026<br />

-2.6<br />

16.0<br />

36.0<br />

22.3<br />

37.7<br />

9.2<br />

37.8<br />

9.2<br />

75.7<br />

18.4<br />

28.2<br />

1.021<br />

-24.7<br />

95.2<br />

5.5R<br />

3001<br />

TAJIK TIE<br />

37.7<br />

9.2<br />

0.0<br />

0.0<br />

37.8<br />

1<br />

1.030<br />

0.0<br />

75.4<br />

18.4<br />

9.2<br />

11<br />

BAGHLAN<br />

27.4<br />

76.5<br />

37.1<br />

95.4<br />

95.0<br />

37.0 36.9<br />

13<br />

SHEKANBANDAR<br />

311<br />

SHERKHAN<br />

75.8<br />

18.7<br />

13.7<br />

0.0<br />

1.0000<br />

60.0 59.9<br />

59.7 59.8<br />

11.0<br />

11.0<br />

1.0000<br />

1.028<br />

-2.4<br />

12<br />

KUNDUZ<br />

0.0<br />

0.0<br />

5.0<br />

9.9<br />

63.1<br />

15.6<br />

1.011<br />

-4.8<br />

75.4<br />

18.3<br />

1.0000<br />

1.029<br />

-2.1<br />

7.6<br />

3010<br />

TAJIK SRCE<br />

1.0000<br />

19.6<br />

1.0000<br />

1.0000<br />

19.3<br />

1.001<br />

-4.5 16.0<br />

15.9<br />

13.6<br />

8.4<br />

5.0<br />

10.1 310<br />

KUNDOZ<br />

1.023<br />

-25.1<br />

15.8<br />

15.4<br />

5.3<br />

1.029<br />

19.4 -2.5<br />

7.5<br />

19.4<br />

5.2<br />

28.5<br />

27.4<br />

0.0<br />

0.0<br />

3.5<br />

1<br />

9.1<br />

5.6<br />

5.3<br />

5.2<br />

3011<br />

TAJIK TIE<br />

13.6<br />

8.4<br />

4.0<br />

18.0<br />

-1.8R<br />

0.0<br />

0.0<br />

0.0<br />

505<br />

NAGHLU HPP 1<br />

18.1<br />

28.2<br />

107<br />

NAGHLU<br />

0.0<br />

0.0<br />

28.5 28.7<br />

1.030<br />

-23.8<br />

1.019<br />

-3.3<br />

63.6<br />

15.9<br />

0.0<br />

0.0<br />

14<br />

TALOQAN<br />

40.3<br />

80.6<br />

20.5<br />

5.1<br />

0.999<br />

-6.6<br />

1.0000<br />

106<br />

PULI CHARKHI<br />

1.0500<br />

1.0000<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

314<br />

IMAM SABIB<br />

38.4<br />

76.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

7.9<br />

301<br />

TALOQAN<br />

28.7 28.9<br />

28.3 29.4<br />

9.7<br />

9.6<br />

1.005<br />

-11.1<br />

0.0<br />

1.0200<br />

1.0200<br />

12.8<br />

1.0000<br />

1.0000<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1.0200<br />

1.0200<br />

14.0<br />

14.2<br />

1.020<br />

-23.0<br />

506<br />

NAGHLU HPP 2<br />

1.020<br />

-23.0<br />

507<br />

NAGHLU HPP 3<br />

0.994<br />

122<br />

0.0<br />

1.020<br />

-26.3<br />

525<br />

527<br />

KABUL DIESEL<br />

P CHARK TP N<br />

-22.7<br />

KABUL CENTRL<br />

5.3<br />

508<br />

56.2<br />

103<br />

0.0 NAGHLU HPP 4<br />

0.986<br />

KABUL NO TAP54.6<br />

100.0<br />

5.1<br />

13.6<br />

-26.6<br />

49.6<br />

50.3<br />

0.0 25.1<br />

24.9<br />

50.0H<br />

5.3<br />

13.0<br />

49.4<br />

48.9<br />

25.0 39.0<br />

37.9<br />

0.997 105<br />

5.1<br />

-26.2 KABUL<br />

-1.7R<br />

1.020<br />

3.9<br />

EAST<br />

3.6<br />

16.3<br />

-22.7<br />

15.9<br />

3.8 3.5<br />

3.9 3.6<br />

1.000<br />

15.8<br />

15.2<br />

3.8 3.5<br />

-26.0<br />

11.3<br />

11.2<br />

1.021<br />

-25.3<br />

16.3<br />

15.9<br />

11.3 11.0<br />

11.2 10.9<br />

15.8<br />

511<br />

15.2 5.6<br />

11.0<br />

10.9<br />

MAHIPAR HPP1<br />

1.023<br />

114<br />

5.3<br />

22.0<br />

-25.1<br />

MAHIPAR 15.6<br />

512 -4.7R<br />

22.0 21.9<br />

0.998<br />

MAHIPAR HPP2<br />

2.5 2.5 83.7<br />

1.042<br />

-26.1 81.3<br />

-23.9<br />

45.0<br />

0.0 0.0<br />

22.0<br />

1.010<br />

21.8<br />

24.6<br />

-19.9 25.2<br />

-5.5L<br />

34.1<br />

93.6<br />

93.6<br />

513<br />

32.6<br />

2.5 2.5 MAHIPAR HPP3<br />

23.0<br />

0.0 0.0 22.0 21.9 34.1 34.0<br />

1.010<br />

120<br />

-19.9 22.0<br />

BRESHNA KOT<br />

22.4 1.021<br />

83.7 81.3 32.6 32.6<br />

-25.2<br />

-4.7R<br />

1.037<br />

23.5<br />

-23.0<br />

22.8<br />

1.010<br />

8.8<br />

-19.9<br />

28.2<br />

28.7 8.4<br />

27.4<br />

115<br />

27.5<br />

BOT-KHAK<br />

1.036<br />

-23.2<br />

-20.0<br />

4<br />

PUL-E-KHUMRI<br />

80.4<br />

79.9<br />

80.4<br />

72.0<br />

34.9<br />

80.3<br />

3100<br />

TAJIK GEN<br />

21.6<br />

21.6<br />

21.6<br />

21.6<br />

-19.8<br />

55.2<br />

55.1<br />

104<br />

KABUL NORTH<br />

0.0<br />

17.9<br />

27.3<br />

0.954<br />

-13.1<br />

10.0<br />

9.9<br />

1<br />

12.8<br />

7.9<br />

15.0<br />

15.6<br />

1.003<br />

-11.2<br />

8.5<br />

5.3<br />

302<br />

RUSTAQ<br />

113<br />

MAHIPAR TP N<br />

34.0<br />

32.6<br />

305<br />

CHAH AB<br />

1.036<br />

-23.2<br />

15.5<br />

3.9<br />

10.0<br />

2.4<br />

13.9<br />

13.4<br />

1.000<br />

-7.8<br />

13.6 0.0<br />

8.4 1.0R<br />

21<br />

FAIZABAD<br />

108<br />

JALALABAD<br />

3.6<br />

3.5<br />

1.025<br />

-25.1<br />

110<br />

SAROBI TOWN<br />

5.6 4.8<br />

5.3 3.0<br />

1.042<br />

-23.9<br />

16.3<br />

7.1<br />

6.7<br />

8.8 7.1<br />

8.4 6.7<br />

112<br />

MAHIPAR TP S<br />

111<br />

SAROBI GEN<br />

1.030<br />

2.8<br />

2.8 -23.6<br />

0.0<br />

18.2 18.1<br />

-2.8L<br />

504<br />

SAROBI HPP 2<br />

0.2<br />

1.4<br />

1.0000<br />

1.039<br />

-23.6<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

3.4<br />

2.1<br />

4.0<br />

3.9<br />

1.000<br />

0.0<br />

1.023<br />

-25.2<br />

109<br />

MEHTARLAM<br />

509<br />

DARUNTA DPP<br />

1.039<br />

0.0 -23.6<br />

0.0<br />

503<br />

SAROBI HPP 1


1<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

3<br />

0.0<br />

2<br />

2<br />

1<br />

4<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

206<br />

SHERIM TAQAB<br />

8.5 26.4<br />

5.3<br />

20.6<br />

0.0<br />

20.7<br />

0.0<br />

0.987<br />

-8.1<br />

207<br />

JUMABAZAR<br />

0.0<br />

-9.7<br />

3.4<br />

1<br />

1<br />

2.1<br />

1<br />

208<br />

MAIMANA<br />

13.6<br />

8.4<br />

1<br />

19.8<br />

19.9<br />

13.9<br />

13.7<br />

-9.7<br />

0.987<br />

-8.9<br />

0.983<br />

-9.5<br />

1.030<br />

0.0<br />

0.0<br />

-10.1<br />

66.1<br />

68.4<br />

65.3 65.9<br />

8.5<br />

5.3<br />

1.004<br />

-4.3<br />

28.3<br />

0.975<br />

-7.2<br />

13.6<br />

8.4<br />

1<br />

1<br />

67.0<br />

-13.6R<br />

205<br />

SAREPUL<br />

4011<br />

BORDER_1<br />

1<br />

29.1<br />

28.7<br />

28.2<br />

28.7<br />

15.0<br />

15.2<br />

16.0<br />

16.7<br />

203<br />

ANDKHOI<br />

0.0<br />

0.952<br />

-8.0<br />

-9.5<br />

13.6<br />

8.4<br />

1<br />

3.8<br />

3.9<br />

204<br />

3.4 DAWLATABAD<br />

2.1<br />

4.0<br />

1<br />

2.0<br />

210<br />

MAZAR NO 2<br />

2.1<br />

1.048<br />

-11.8<br />

209<br />

2.0 MAZAR NO 1<br />

0.5<br />

2.1<br />

2.0<br />

1.048<br />

-11.8<br />

3.8 251<br />

250<br />

1.047<br />

-11.8<br />

MAZAR TIE W MAZAR TIE E<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.978<br />

1.052<br />

-7.3<br />

-11.9<br />

521<br />

SHEBERGHAN 1<br />

0.975<br />

-7.2<br />

0.975<br />

-7.2<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

1.0000<br />

0.2<br />

0.6<br />

3<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

2<br />

0.2<br />

0.0<br />

0.6 0.0<br />

1.0000<br />

523<br />

SHEBERGHAN 3<br />

0.0<br />

0.0<br />

0.5<br />

201<br />

MAZAR-E-SHRF<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

9<br />

MAZAR<br />

202<br />

SHEBERGHAN<br />

524<br />

SHEBERGHAN 4<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 2, UZBEKISTAN SOURCE. CONTINGENCY CENTRAL - NORTH<br />

MON, NOV 19 2007 18:44<br />

0.975<br />

-7.2<br />

4.4<br />

4.2<br />

3.6<br />

3.4<br />

2.0<br />

1.9<br />

21.6<br />

41.2<br />

1.0000<br />

1.0000<br />

22.1<br />

41.7<br />

13.6<br />

8.4<br />

1<br />

2.0<br />

7<br />

NAIBABAD<br />

10.6<br />

2.5<br />

11.0<br />

2.6<br />

0.0<br />

0.0<br />

1.057<br />

-4.3<br />

10.6<br />

11.0<br />

2.6<br />

526<br />

KABUL SW<br />

2.5<br />

22.4<br />

21.7<br />

1.048<br />

-11.8<br />

1.0<br />

0.4<br />

1.0000<br />

501<br />

NW KABUL G1<br />

22.5<br />

21.8<br />

1.0<br />

1.0<br />

1.060<br />

-9.4<br />

2011<br />

AMU<br />

1.057<br />

-4.3<br />

8<br />

HAIRATAN<br />

0.0<br />

1<br />

CHIMTALAH<br />

102<br />

KABUL NW<br />

40.5<br />

19.6<br />

1<br />

SW<br />

22.4<br />

21.7<br />

22.5<br />

21.8<br />

63.0<br />

1<br />

1.0000<br />

1<br />

23.8<br />

77.3<br />

1.0000<br />

21.8<br />

10.9H<br />

77.9<br />

1<br />

1.0000<br />

24.4<br />

1<br />

0.0<br />

1.059<br />

-14.0<br />

0.0<br />

5<br />

AIBAK<br />

30.5<br />

1<br />

1.043<br />

-23.5<br />

2010<br />

AMU<br />

1.056<br />

-4.3<br />

1<br />

92.7<br />

15.4<br />

14.8<br />

88.0<br />

14.6<br />

3<br />

KHENJAN<br />

0.0<br />

29.2<br />

0.0<br />

28.1<br />

29.2<br />

28.2<br />

0.5<br />

0.1<br />

0.5<br />

0.1<br />

89.2<br />

89.2<br />

101<br />

CHIMTALAH<br />

1.024<br />

-25.5<br />

105.0<br />

24.8<br />

105.0<br />

24.8<br />

105.0<br />

24.8<br />

103.0<br />

24.3<br />

14.8<br />

SW<br />

-10.0<br />

87.8<br />

103.0 105.0<br />

24.3<br />

24.8<br />

87.8<br />

21.0<br />

87.8<br />

21.0<br />

29.2<br />

28.1<br />

29.2<br />

1.043<br />

-16.6<br />

1.022<br />

-19.6<br />

53.5<br />

29.2<br />

28.2<br />

29.2<br />

28.2<br />

29.2<br />

25.9<br />

25.2<br />

23.1 82.5<br />

81.9<br />

11.6H<br />

1.044<br />

-23.4<br />

1.062<br />

-10.0<br />

1.063<br />

-11.9<br />

88.1<br />

20.8<br />

22.0<br />

90.0<br />

1.0500<br />

88.1<br />

56.3<br />

1.0000<br />

1.0000<br />

1.0000<br />

1<br />

4.9<br />

1.2<br />

4.9<br />

1.2<br />

106.8<br />

28.1<br />

29.2<br />

92.6<br />

15.4<br />

91.4<br />

15.2<br />

91.4<br />

15.2<br />

87.8<br />

90.0<br />

89.0<br />

15.1<br />

14.6<br />

14.6<br />

87.5<br />

88.1<br />

21.4 20.8<br />

1.0500<br />

88.1<br />

89.2<br />

28.1<br />

28.2<br />

56.3<br />

53.5<br />

18.8<br />

18.2<br />

2012<br />

SURHAN<br />

41.1<br />

1.0000<br />

25.3<br />

106.8<br />

25.3<br />

1.055<br />

-4.3<br />

21.8<br />

22.3<br />

1.0000<br />

216.9<br />

18.8<br />

18.2<br />

1.061<br />

-9.3<br />

1<br />

1<br />

0.999<br />

-21.9<br />

6<br />

KHULM<br />

1<br />

57.6<br />

35.7<br />

0.0<br />

502<br />

NW KABUL G2<br />

1.0000<br />

2014<br />

1.059BORDER<br />

-6.6<br />

0.0<br />

-11.2<br />

2100<br />

SURKHAN<br />

203.9<br />

-57.9R<br />

1.030<br />

0.0<br />

1<br />

13.6<br />

8.4<br />

1.008<br />

-5.1<br />

2<br />

CHARIKAR<br />

1.026<br />

-2.6<br />

16.0<br />

36.0<br />

22.3<br />

37.7<br />

9.2<br />

37.8<br />

9.2<br />

75.7<br />

18.4<br />

34.5<br />

1.002<br />

-26.0<br />

95.2<br />

5.5R<br />

3001<br />

TAJIK TIE<br />

37.7<br />

9.2<br />

0.0<br />

0.0<br />

37.8<br />

1<br />

1.030<br />

0.0<br />

75.4<br />

18.4<br />

9.2<br />

11<br />

BAGHLAN<br />

34.2<br />

76.5<br />

37.1<br />

95.4<br />

95.0<br />

37.0 36.9<br />

13<br />

SHEKANBANDAR<br />

311<br />

SHERKHAN<br />

75.8<br />

18.7<br />

13.7<br />

0.0<br />

1.0000<br />

26.4 26.4<br />

25.5 25.6<br />

15.1<br />

14.6<br />

1.0000<br />

1.028<br />

-2.4<br />

12<br />

KUNDUZ<br />

0.0<br />

0.0<br />

5.0<br />

9.9<br />

63.1<br />

15.6<br />

1.011<br />

-4.8<br />

75.4<br />

18.3<br />

1.0000<br />

1.029<br />

-2.1<br />

7.6<br />

3010<br />

TAJIK SRCE<br />

1.0000<br />

19.6<br />

1.0000<br />

1.0000<br />

19.3<br />

1.001<br />

-4.5 16.0<br />

15.9<br />

13.6<br />

8.4<br />

5.0<br />

10.1 310<br />

KUNDOZ<br />

1.026<br />

-25.5<br />

15.8<br />

15.4<br />

5.3<br />

1.029<br />

19.4 -2.5<br />

7.5<br />

19.4<br />

5.2<br />

34.7<br />

33.9<br />

0.0<br />

0.0<br />

3.5<br />

1<br />

9.1<br />

5.6<br />

5.3<br />

5.2<br />

3011<br />

TAJIK TIE<br />

13.6<br />

8.4<br />

4.0<br />

18.0<br />

0.4R<br />

0.0<br />

0.0<br />

0.0<br />

505<br />

NAGHLU HPP 1<br />

18.0<br />

28.0<br />

107<br />

NAGHLU<br />

0.0<br />

0.0<br />

34.8 35.0<br />

1.016<br />

-25.1<br />

1.019<br />

-3.3<br />

63.6<br />

15.9<br />

0.0<br />

0.0<br />

14<br />

TALOQAN<br />

40.3<br />

80.6<br />

20.5<br />

5.1<br />

0.999<br />

-6.6<br />

1.0000<br />

106<br />

PULI CHARKHI<br />

1.0500<br />

1.0000<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

314<br />

IMAM SABIB<br />

38.4<br />

76.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

7.9<br />

301<br />

TALOQAN<br />

28.7 28.9<br />

28.3 29.4<br />

9.7<br />

9.6<br />

1.005<br />

-11.1<br />

0.0<br />

1.0200<br />

1.0200<br />

12.8<br />

1.0000<br />

1.0000<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1.0200<br />

1.0200<br />

14.0<br />

14.2<br />

1.020<br />

-24.0<br />

506<br />

NAGHLU HPP 2<br />

1.020<br />

-24.0<br />

507<br />

NAGHLU HPP 3<br />

1.024<br />

122<br />

0.0<br />

1.020<br />

-25.6<br />

525<br />

527<br />

KABUL DIESEL<br />

P CHARK TP N<br />

-23.6<br />

KABUL CENTRL<br />

5.3<br />

508<br />

103<br />

13.7<br />

0.0 NAGHLU HPP 4<br />

0.994<br />

KABUL NO TAP13.2<br />

100.0<br />

5.1<br />

13.6<br />

-26.3<br />

11.5<br />

11.2<br />

0.0 25.0<br />

24.8<br />

35.5R<br />

5.3<br />

13.0<br />

11.1<br />

10.7<br />

25.0 38.9<br />

37.8<br />

1.025 105<br />

5.1<br />

-25.6 KABUL EAST<br />

0.5R<br />

1.020<br />

40.6 40.7<br />

11.1<br />

-23.6<br />

10.2<br />

39.3 39.2<br />

40.6 40.7<br />

1.029<br />

10.8<br />

9.8<br />

-25.3<br />

6.2<br />

39.3 39.2<br />

5.9<br />

1.030<br />

-25.3<br />

11.1<br />

10.2<br />

6.0 6.2<br />

5.7 5.9<br />

10.8<br />

511<br />

9.8 5.6<br />

6.0<br />

5.7<br />

MAHIPAR HPP1<br />

1.026<br />

114<br />

5.3<br />

22.0<br />

-25.5<br />

MAHIPAR 18.1<br />

512 0.6R<br />

21.9 21.7<br />

1.027<br />

MAHIPAR HPP2<br />

0.7 0.7 83.4<br />

1.040<br />

-25.4 81.0<br />

-24.8<br />

45.0<br />

0.0 0.0<br />

22.0<br />

1.010<br />

21.8<br />

23.3<br />

-21.2 23.7<br />

-5.5R<br />

33.1<br />

88.7<br />

88.7<br />

513<br />

32.0<br />

0.7 0.7 MAHIPAR HPP3<br />

53.7<br />

0.0 0.0 21.9 21.7 33.1 33.0<br />

1.010<br />

120<br />

-21.2 22.0<br />

BRESHNA KOT<br />

52.0 1.025<br />

83.4 81.0 32.0 31.9<br />

-25.6<br />

0.6R<br />

1.028<br />

53.1<br />

-24.3<br />

52.6<br />

1.010<br />

9.9<br />

-21.2<br />

34.5<br />

34.9 9.5<br />

34.2<br />

115<br />

33.8<br />

BOT-KHAK<br />

1.026<br />

-24.5<br />

-21.2<br />

4<br />

PUL-E-KHUMRI<br />

80.2<br />

80.1<br />

72.0<br />

34.9<br />

80.8<br />

80.0<br />

3100<br />

TAJIK GEN<br />

18.8<br />

18.8<br />

18.2<br />

18.2<br />

-21.0<br />

14.0<br />

13.5<br />

104<br />

KABUL NORTH<br />

0.0<br />

17.8<br />

27.1<br />

0.954<br />

-13.1<br />

10.0<br />

9.9<br />

1<br />

12.8<br />

7.9<br />

15.0<br />

15.6<br />

1.003<br />

-11.2<br />

8.5<br />

5.3<br />

302<br />

RUSTAQ<br />

113<br />

MAHIPAR TP N<br />

33.0<br />

31.9<br />

305<br />

CHAH AB<br />

1.026<br />

-24.5<br />

15.5<br />

3.9<br />

10.0<br />

2.4<br />

13.9<br />

13.4<br />

1.000<br />

-7.8<br />

13.6 0.0<br />

8.4 1.0R<br />

21<br />

FAIZABAD<br />

108<br />

JALALABAD<br />

3.6<br />

3.5<br />

1.023<br />

-26.0<br />

110<br />

SAROBI TOWN<br />

5.6 4.8<br />

5.3 3.0<br />

1.040<br />

-24.8<br />

18.8<br />

8.0<br />

7.7<br />

9.9 8.0<br />

9.5 7.7<br />

112<br />

MAHIPAR TP S<br />

111<br />

SAROBI GEN<br />

1.024<br />

2.8<br />

2.8 -24.6<br />

0.0<br />

18.3 18.2<br />

-2.8L<br />

504<br />

SAROBI HPP 2<br />

0.2<br />

1.4<br />

1.0000<br />

1.034<br />

-24.6<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

3.4<br />

2.1<br />

4.0<br />

3.9<br />

1.000<br />

0.0<br />

1.021<br />

-26.1<br />

109<br />

MEHTARLAM<br />

509<br />

DARUNTA DPP<br />

1.034<br />

0.0 -24.6<br />

0.0<br />

503<br />

SAROBI HPP 1


1<br />

1<br />

1<br />

3<br />

2<br />

0.0<br />

2<br />

1<br />

1<br />

1<br />

3<br />

2<br />

1<br />

4<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

206<br />

SHERIM TAQAB<br />

8.5 26.4<br />

5.3<br />

20.6<br />

0.0<br />

20.7<br />

0.0<br />

0.987<br />

-8.1<br />

207<br />

JUMABAZAR<br />

0.0<br />

-9.7<br />

3.4<br />

1<br />

2.1<br />

208<br />

MAIMANA<br />

13.6<br />

8.4<br />

1<br />

19.8<br />

19.9<br />

13.9<br />

13.7<br />

-9.7<br />

0.987<br />

-8.9<br />

0.983<br />

-9.5<br />

1.030<br />

0.0<br />

0.0<br />

-10.1<br />

66.1<br />

68.4<br />

65.3 65.9<br />

8.5<br />

5.3<br />

1.004<br />

-4.3<br />

28.3<br />

0.975<br />

-7.2<br />

13.6<br />

8.4<br />

1<br />

1<br />

67.0<br />

-13.6R<br />

205<br />

SAREPUL<br />

4011<br />

BORDER_1<br />

1<br />

29.1<br />

28.7<br />

28.2<br />

28.7<br />

15.0<br />

15.2<br />

16.0<br />

16.7<br />

203<br />

ANDKHOI<br />

0.0<br />

0.952<br />

-8.0<br />

-9.5<br />

13.6<br />

8.4<br />

1<br />

3.8<br />

3.9<br />

204<br />

3.4 DAWLATABAD<br />

2.1<br />

4.0<br />

1<br />

2.0<br />

210<br />

MAZAR NO 2<br />

2.1<br />

1.029<br />

-13.1<br />

209<br />

2.0 MAZAR NO 1<br />

0.5<br />

2.1<br />

2.0<br />

1.029<br />

-13.1<br />

3.9 251<br />

250<br />

1.028<br />

-13.2<br />

MAZAR TIE W MAZAR TIE E<br />

0.0<br />

0.0<br />

0.0<br />

0.0<br />

0.978<br />

1.033<br />

-7.3<br />

-13.2<br />

521<br />

SHEBERGHAN 1<br />

0.975<br />

-7.2<br />

0.975<br />

-7.2<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

1.0000<br />

0.2<br />

0.6<br />

3<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

2<br />

0.2<br />

0.0<br />

0.6 0.0<br />

1.0000<br />

523<br />

SHEBERGHAN 3<br />

0.0<br />

0.0<br />

0.5<br />

201<br />

MAZAR-E-SHRF<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.2<br />

0.6<br />

1.0000<br />

1.0000<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

9<br />

MAZAR<br />

202<br />

SHEBERGHAN<br />

524<br />

SHEBERGHAN 4<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 2, UZBEKISTAN SOURCE. ONE UNIT KABUL NW OUT OF SERVIC<br />

MON, NOV 19 2007 18:50<br />

0.975<br />

-7.2<br />

4.3<br />

4.1<br />

3.6<br />

3.5<br />

2.0<br />

1.9<br />

21.7<br />

42.1<br />

1.0000<br />

1.0000<br />

22.1<br />

42.5<br />

13.6<br />

8.4<br />

1<br />

2.0<br />

7<br />

NAIBABAD<br />

10.6<br />

2.5<br />

11.1<br />

2.7<br />

0.0<br />

0.0<br />

1.049<br />

-4.9<br />

10.6<br />

11.1<br />

2.7<br />

526<br />

KABUL SW<br />

2.5<br />

22.4<br />

22.3<br />

1.029<br />

-13.1<br />

1.0<br />

0.4<br />

1.0000<br />

501<br />

NW KABUL G1<br />

22.5<br />

22.4<br />

1.0<br />

1.0<br />

1.042<br />

-10.7<br />

2011<br />

AMU<br />

1.048<br />

-4.9<br />

8<br />

HAIRATAN<br />

0.0<br />

1<br />

CHIMTALAH<br />

102<br />

KABUL NW<br />

40.5<br />

19.6<br />

1<br />

SW<br />

22.4<br />

22.3<br />

22.5<br />

22.4<br />

63.0<br />

1<br />

1.0000<br />

1<br />

23.8<br />

79.5<br />

1.0000<br />

21.8<br />

10.9H<br />

1<br />

80.1<br />

1<br />

1.0000<br />

24.4<br />

0.0<br />

1.034<br />

-16.2<br />

0.0<br />

5<br />

AIBAK<br />

30.5<br />

1<br />

1.014<br />

-28.0<br />

2010<br />

AMU<br />

1.048<br />

-4.9<br />

1<br />

103.8<br />

17.5<br />

17.2<br />

100.6<br />

17.1<br />

3<br />

KHENJAN<br />

0.0<br />

34.1<br />

0.0<br />

33.9<br />

34.1<br />

33.9<br />

0.5<br />

0.1<br />

0.5<br />

0.1<br />

101.5<br />

101.5<br />

101<br />

CHIMTALAH<br />

0.994<br />

-30.1<br />

115.9<br />

27.7<br />

115.9<br />

27.7<br />

115.9<br />

27.7<br />

114.2<br />

27.4<br />

17.2<br />

SW<br />

-9.4<br />

98.2<br />

114.2 115.9<br />

27.4<br />

27.7<br />

100.0<br />

24.6<br />

100.0<br />

24.6<br />

34.1<br />

33.9<br />

34.1<br />

1.015<br />

-19.2<br />

0.991<br />

-22.9<br />

61.2<br />

34.1<br />

33.9<br />

34.1<br />

33.9<br />

34.1<br />

0.2<br />

0.998<br />

-29.9<br />

0.7<br />

0.0<br />

0.0<br />

1.043<br />

-11.4<br />

1.041<br />

-13.6<br />

100.8<br />

24.4<br />

25.4<br />

99.8<br />

1.0500<br />

98.0<br />

64.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

4.9<br />

1.2<br />

4.9<br />

1.2<br />

117.4<br />

33.9<br />

34.1<br />

103.6<br />

17.5<br />

102.9<br />

17.4<br />

102.9<br />

17.4<br />

100.4<br />

99.8<br />

100.0<br />

15.8<br />

15.8<br />

17.1<br />

98.9<br />

100.8<br />

24.9 24.4<br />

64.4<br />

1.0500<br />

98.0<br />

99.3<br />

33.9<br />

33.9<br />

61.2<br />

20.1<br />

20.0<br />

2012<br />

SURHAN<br />

45.3<br />

1.0000<br />

28.0<br />

117.4<br />

28.0<br />

1.047<br />

-4.9<br />

25.2<br />

25.6<br />

1.0000<br />

237.1<br />

20.1<br />

20.0<br />

1.043<br />

-10.5<br />

1<br />

1<br />

0.969<br />

-25.7<br />

6<br />

KHULM<br />

1<br />

57.6<br />

35.7<br />

0.0<br />

502<br />

NW KABUL G2<br />

1.0000<br />

2014<br />

1.046BORDER<br />

-7.5<br />

0.0<br />

-10.7<br />

2100<br />

SURKHAN<br />

230.8<br />

-34.8R<br />

1.030<br />

0.0<br />

1<br />

13.6<br />

8.4<br />

1.008<br />

-5.1<br />

2<br />

CHARIKAR<br />

1.026<br />

-2.6<br />

16.0<br />

36.0<br />

22.3<br />

37.7<br />

9.2<br />

37.8<br />

9.2<br />

75.7<br />

18.4<br />

32.9<br />

0.999<br />

-30.2<br />

95.2<br />

5.5R<br />

3001<br />

TAJIK TIE<br />

37.7<br />

9.2<br />

0.0<br />

0.0<br />

37.8<br />

1<br />

1.030<br />

0.0<br />

75.4<br />

18.4<br />

9.2<br />

11<br />

BAGHLAN<br />

32.7<br />

76.5<br />

37.1<br />

95.4<br />

95.0<br />

37.0 36.9<br />

13<br />

SHEKANBANDAR<br />

311<br />

SHERKHAN<br />

75.8<br />

18.7<br />

13.7<br />

0.0<br />

1.0000<br />

38.5 38.4<br />

38.2 38.3<br />

15.6<br />

15.5<br />

1.0000<br />

1.028<br />

-2.4<br />

12<br />

KUNDUZ<br />

0.0<br />

0.0<br />

5.0<br />

9.9<br />

63.1<br />

15.6<br />

1.011<br />

-4.8<br />

75.4<br />

18.3<br />

1.0000<br />

1.029<br />

-2.1<br />

7.6<br />

3010<br />

TAJIK SRCE<br />

1.0000<br />

19.6<br />

1.0000<br />

1.0000<br />

19.3<br />

1.001<br />

-4.5 16.0<br />

15.9<br />

13.6<br />

8.4<br />

5.0<br />

10.1 310<br />

KUNDOZ<br />

1.015<br />

-30.0<br />

15.8<br />

15.4<br />

5.3<br />

1.029<br />

19.4 -2.5<br />

7.5<br />

19.4<br />

5.2<br />

33.1<br />

32.4<br />

0.0<br />

0.0<br />

3.5<br />

1<br />

9.1<br />

5.6<br />

5.3<br />

5.2<br />

3011<br />

TAJIK TIE<br />

13.6<br />

8.4<br />

4.0<br />

18.0<br />

4.5R<br />

0.0<br />

0.0<br />

0.0<br />

505<br />

NAGHLU HPP 1<br />

18.6<br />

28.9<br />

107<br />

NAGHLU<br />

0.0<br />

0.0<br />

33.1 33.2<br />

1.014<br />

-29.4<br />

1.019<br />

-3.3<br />

63.6<br />

15.9<br />

0.0<br />

0.0<br />

14<br />

TALOQAN<br />

40.3<br />

80.6<br />

20.5<br />

5.1<br />

0.999<br />

-6.6<br />

1.0000<br />

106<br />

PULI CHARKHI<br />

1.0500<br />

1.0000<br />

1.017<br />

-3.4<br />

3.4<br />

2.1<br />

314<br />

IMAM SABIB<br />

38.4<br />

76.4<br />

1.0000<br />

1.0000<br />

1.0000<br />

7.9<br />

301<br />

TALOQAN<br />

28.7 28.9<br />

28.3 29.4<br />

9.7<br />

9.6<br />

1.005<br />

-11.1<br />

0.0<br />

1.0200<br />

1.0200<br />

12.8<br />

1.0000<br />

1.0000<br />

304<br />

DASHT ARCHI<br />

0.974<br />

-12.3<br />

1.0200<br />

1.0200<br />

14.0<br />

14.2<br />

1.020<br />

-28.4<br />

506<br />

NAGHLU HPP 2<br />

1.020<br />

-28.4<br />

507<br />

NAGHLU HPP 3<br />

0.996<br />

122<br />

0.0<br />

1.020<br />

-30.2<br />

525<br />

527<br />

KABUL DIESEL<br />

P CHARK TP N<br />

-28.1<br />

KABUL CENTRL<br />

5.3<br />

508<br />

103<br />

33.8<br />

0.0 NAGHLU HPP 4<br />

0.994<br />

KABUL NO TAP33.0<br />

100.0<br />

5.2<br />

13.6<br />

-30.4<br />

30.5<br />

30.3<br />

0.0 25.4<br />

25.1<br />

50.0H<br />

5.3<br />

13.0<br />

30.4<br />

29.6<br />

25.0 39.6<br />

38.5<br />

0.998 105<br />

5.2<br />

-30.2 KABUL EAST<br />

4.7R<br />

1.020<br />

25.5 25.5<br />

14.6<br />

-28.1<br />

13.0<br />

24.9 24.9<br />

25.5 25.5<br />

1.000<br />

14.2<br />

12.5<br />

-29.8<br />

9.7<br />

24.9 24.9<br />

9.3<br />

1.015<br />

-29.8<br />

14.6<br />

13.0<br />

9.7 9.5<br />

9.3 9.1<br />

14.2<br />

511<br />

12.5 5.6<br />

9.5<br />

9.1<br />

MAHIPAR HPP1<br />

1.015<br />

114<br />

5.4<br />

22.0<br />

-30.0<br />

MAHIPAR 18.4<br />

512 1.8R<br />

22.0 21.7<br />

0.998<br />

MAHIPAR HPP2<br />

0.3 0.3 83.7<br />

1.037<br />

-29.9 81.2<br />

-29.2<br />

45.0<br />

0.0 0.0<br />

22.0<br />

1.010<br />

21.8<br />

23.1<br />

-25.5 23.4<br />

-5.5R<br />

32.9<br />

87.8<br />

87.8<br />

513<br />

31.8<br />

0.3 0.3 MAHIPAR HPP3<br />

29.0<br />

0.0 0.0 22.0 21.7 32.9 32.8<br />

1.010<br />

120<br />

-25.5 22.0<br />

BRESHNA KOT<br />

28.4 1.012<br />

83.7 81.2 31.8 31.8<br />

-30.0<br />

1.8R<br />

1.026<br />

29.3<br />

-28.6<br />

29.0<br />

1.010<br />

10.0<br />

-25.5<br />

32.9<br />

33.2 9.7<br />

32.7<br />

115<br />

32.2<br />

BOT-KHAK<br />

1.024<br />

-28.8<br />

-20.0<br />

4<br />

PUL-E-KHUMRI<br />

54.2<br />

53.8<br />

26.2<br />

26.2<br />

26.2<br />

54.0<br />

54.0<br />

72.0<br />

34.9<br />

26.1<br />

3100<br />

TAJIK GEN<br />

19.9<br />

19.9<br />

19.8<br />

19.8<br />

-19.8<br />

33.9<br />

33.8<br />

104<br />

KABUL NORTH<br />

0.0<br />

18.3<br />

28.0<br />

0.954<br />

-13.1<br />

10.0<br />

9.9<br />

1<br />

12.8<br />

7.9<br />

15.0<br />

15.6<br />

1.003<br />

-11.2<br />

8.5<br />

5.3<br />

302<br />

RUSTAQ<br />

113<br />

MAHIPAR TP N<br />

32.8<br />

31.8<br />

305<br />

CHAH AB<br />

1.024<br />

-28.8<br />

15.5<br />

3.9<br />

10.0<br />

2.4<br />

13.9<br />

13.5<br />

1.000<br />

-7.8<br />

13.6 0.0<br />

8.4 1.0R<br />

21<br />

FAIZABAD<br />

108<br />

JALALABAD<br />

3.6<br />

3.5<br />

1.019<br />

-30.5<br />

110<br />

SAROBI TOWN<br />

5.6 4.8<br />

5.4 3.0<br />

1.037<br />

-29.2<br />

19.1<br />

8.1<br />

7.8<br />

10.0 8.1<br />

9.7 7.8<br />

112<br />

MAHIPAR TP S<br />

111<br />

SAROBI GEN<br />

1.022<br />

2.8<br />

2.8 -29.1<br />

0.0<br />

18.3 18.3<br />

-2.8L<br />

504<br />

SAROBI HPP 2<br />

0.2<br />

1.4<br />

1.0000<br />

1.031<br />

-29.1<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

3.4<br />

2.1<br />

4.0<br />

3.9<br />

1.000<br />

0.0<br />

1.018<br />

-30.6<br />

109<br />

MEHTARLAM<br />

509<br />

DARUNTA DPP<br />

1.031<br />

0.0 -29.1<br />

0.0<br />

503<br />

SAROBI HPP 1


Appendix<br />

G<br />

Tajikistan One line Diagrams (with 100<br />

MW diesel unit in <strong>Kabul</strong>)<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International G-1


8.4<br />

13.6<br />

-5.6<br />

-31.8<br />

4.3<br />

32.4 -9.1<br />

0.3<br />

7.2<br />

-0.3<br />

-5.0 4.8<br />

-7.5<br />

22.3<br />

8.9<br />

-22.2<br />

-10.1<br />

0.0<br />

0.0<br />

-9.5<br />

-9.7<br />

0.0<br />

0.0<br />

0.0<br />

-41.8<br />

169.8<br />

46.4<br />

-34.0<br />

130.0<br />

33.1<br />

-128.5<br />

0.0<br />

3.4<br />

0.0<br />

-3.4<br />

1.0<br />

-0.1<br />

-1.0<br />

0.1<br />

-1.0<br />

0.1<br />

1.0<br />

-0.1<br />

-5.5L<br />

22.0<br />

-4.9<br />

-32.1 32.4<br />

-17.2<br />

0.2<br />

16.5<br />

-0.1<br />

-6.1<br />

-12.0<br />

2.4<br />

12.2<br />

-6.1<br />

-12.0<br />

2.4<br />

12.2<br />

3.3<br />

7.5<br />

-4.0<br />

-7.5<br />

2.7<br />

4.5<br />

-2.8<br />

-4.5<br />

-2.1<br />

-3.4<br />

1.0<br />

3.4<br />

-0.5<br />

-2.0<br />

-0.0<br />

2.0<br />

0.993<br />

-25.7<br />

1<br />

13.6<br />

8.4<br />

81.3<br />

1.018<br />

-22.1<br />

1<br />

3.4<br />

2.1<br />

91.3<br />

11.1<br />

1.008<br />

-31.6<br />

1<br />

84.7<br />

-17.7<br />

1<br />

5.0<br />

-27.8<br />

-5.1<br />

27.9<br />

-5.1<br />

1.006<br />

-31.9<br />

13.5<br />

-5.0<br />

-13.4<br />

4.5<br />

1.023<br />

-29.8<br />

1<br />

10.9H<br />

1.0000<br />

-10.0<br />

10.9<br />

1.024<br />

-29.6<br />

1<br />

23.1 -10.6<br />

23.1<br />

11.6<br />

-22.9<br />

35.7<br />

1.004<br />

-32.0<br />

1<br />

13.9<br />

-36.3<br />

1.019<br />

-31.7<br />

1<br />

-13.9<br />

120<br />

BRESHNA KOT<br />

1.006<br />

-31.9<br />

1<br />

36.0<br />

22.3<br />

1.021<br />

-31.6<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.039<br />

-30.8<br />

1<br />

0.0<br />

0.0<br />

1.022<br />

-32.1<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

-0.7<br />

-13.4<br />

-3.5<br />

110<br />

SAROBI TOWN<br />

1.039<br />

-30.8<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

-4.8<br />

-3.0<br />

505<br />

NAGHLU HPP 1<br />

1<br />

1.4R<br />

1.0000<br />

21.4<br />

1.4<br />

1.020<br />

-29.8<br />

4<br />

25.0<br />

1.4R<br />

1.0200<br />

1.0000<br />

-21.3<br />

-1.0<br />

2<br />

-3.4<br />

0.0<br />

1.020<br />

-29.8<br />

3<br />

-3.4<br />

0.0<br />

3.4<br />

111<br />

SAROBI GEN<br />

1.034<br />

-30.6<br />

-0.3<br />

7.2<br />

0.3<br />

503<br />

SAROBI HPP 1<br />

1.034<br />

-30.6<br />

1<br />

1.0000<br />

1.0000<br />

-0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.025<br />

-30.6<br />

2<br />

0.0<br />

-2.8L<br />

1.0000<br />

2.8 -2.8<br />

0.2<br />

1.0000<br />

-0.0<br />

-0.0<br />

114<br />

MAHIPAR<br />

-32.7<br />

4.8<br />

1.019<br />

-31.0<br />

1<br />

0.0<br />

0.0<br />

32.1<br />

4.9<br />

-31.8<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-27.1<br />

22.0<br />

-0.4R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.6<br />

1.010<br />

-27.1<br />

3<br />

22.0<br />

-0.4R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.6<br />

109<br />

MEHTARLAM<br />

1.021<br />

-32.1<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

-3.4<br />

-2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

13.6<br />

-94.7<br />

-13.2<br />

-94.9<br />

8.7<br />

1<br />

13.6<br />

8.4<br />

16.3<br />

1.045<br />

-19.8<br />

1<br />

8.4<br />

-10.9<br />

1.031<br />

-16.7<br />

1<br />

8.4<br />

-41.5<br />

-120.6<br />

35.4<br />

123.2<br />

7<br />

NAIBABAD<br />

2.7<br />

1.7<br />

-15.9<br />

-2.7<br />

-1.7<br />

13<br />

SHEKANBANDAR<br />

1.027<br />

-9.2<br />

-166.6<br />

46.4<br />

169.8<br />

14<br />

TALUQAN<br />

1.013<br />

-15.6<br />

15.7<br />

-62.2<br />

-21.8<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

17.2<br />

6.5<br />

-17.0<br />

-5.8<br />

1.000<br />

-16.7<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

-6.1<br />

-13.6<br />

-16.9<br />

301<br />

TALUQAN<br />

1.022<br />

-20.0<br />

1.0000<br />

1.0500<br />

19.5<br />

-34.7<br />

-16.1<br />

302<br />

RUSTAQ<br />

1.019<br />

-20.1<br />

1<br />

5.3<br />

8.5<br />

4.7<br />

-8.5<br />

304<br />

DASHT ARCHI<br />

0.991<br />

-21.2<br />

1<br />

12.8<br />

7.9<br />

26.2<br />

11.4<br />

-25.7<br />

-13.1<br />

305<br />

CHAH AB<br />

0.971<br />

-21.9<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.2<br />

-12.8<br />

-7.9<br />

35.0<br />

311<br />

BORDER<br />

3.4<br />

-2.7<br />

-3.4<br />

-1.0<br />

314<br />

IMAM SABIB<br />

1.013<br />

-16.4<br />

3.4<br />

2.1<br />

3010<br />

SANGTUDA<br />

1<br />

1<br />

201<br />

MAZAR-E-SHRF<br />

0.993<br />

-2.4<br />

1<br />

8.4<br />

21.5<br />

204<br />

DAWLATABAD<br />

0.991<br />

-2.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

-3.4<br />

209<br />

MAZAR NO 1<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

-0.0<br />

-2.0<br />

-0.5<br />

0.996<br />

-2.6<br />

0.0<br />

-4.0<br />

-0.0<br />

-0.0<br />

-2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

202<br />

SHEBERGHAN<br />

0.975<br />

-7.2<br />

1<br />

13.6<br />

8.4<br />

1.004<br />

-4.3<br />

1<br />

8.5<br />

5.3<br />

-28.2<br />

-0.8<br />

29.1<br />

-1.6<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.7<br />

-13.6<br />

-8.4<br />

0.978<br />

-7.3<br />

0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.975<br />

-7.2<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

-0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.975<br />

-7.2<br />

3<br />

1.0000<br />

0.2<br />

-0.0<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

-0.0<br />

-3.8<br />

206<br />

SHERIM TAQAB<br />

0.987<br />

-8.1<br />

1<br />

8.5<br />

5.3<br />

-9.2<br />

-25.7<br />

1.030<br />

0.0<br />

15.7 -13.6<br />

6.0<br />

67.0<br />

0.0<br />

207<br />

JUMABAZAR<br />

0.987<br />

-8.9<br />

1<br />

3.4<br />

17.2<br />

-11.2<br />

10.1<br />

2.1<br />

208<br />

MAIMANA<br />

0.983<br />

-9.5<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

-2.5<br />

-13.6<br />

1.2<br />

11.6H<br />

-4.5<br />

-2.8<br />

0.5<br />

1.021<br />

-31.6<br />

1.028<br />

-30.4<br />

115<br />

BOT-KHAK<br />

19.9<br />

21.0<br />

-19.7<br />

-21.6<br />

-7.5<br />

-4.0<br />

7.5<br />

3.3<br />

-21.7<br />

-8.5R<br />

21<br />

FAIZABAD<br />

1.017<br />

-16.0<br />

1.0000<br />

1.0000<br />

-21.6<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.007<br />

-31.7 0.5<br />

-5.6<br />

0.2<br />

-21.2<br />

1.4<br />

21.6<br />

1.0200<br />

-1.0<br />

3.4<br />

506<br />

NAGHLU HPP 2<br />

104<br />

KABUL NORTH<br />

-0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

1.4R<br />

0.0<br />

1.0000<br />

0.0<br />

-9.7<br />

-17.1<br />

0.5<br />

1.015<br />

-16.3<br />

4.5<br />

-21.7<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-27.1<br />

1.030<br />

-30.2<br />

-5.0<br />

32.8<br />

-17.7<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

-0.0<br />

1.020<br />

-29.8<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-29.8<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8-32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.028<br />

-30.4<br />

4.3 -9.1<br />

1<br />

95.9<br />

3<br />

KHENJAN<br />

8.4<br />

97.5<br />

0.0<br />

13.6<br />

1.042<br />

-19.7<br />

-21.9<br />

0.975<br />

-28.0<br />

-2.7<br />

18.0<br />

-0.0<br />

1.0500<br />

23.3<br />

1.0500<br />

5.0<br />

27.9<br />

-84.5<br />

30.5<br />

63.0<br />

5.0<br />

5.0<br />

-5.1<br />

27.9<br />

-27.8<br />

-27.8<br />

-5.1<br />

14.2<br />

0.0<br />

-64.3<br />

26.7<br />

1.037<br />

-19.2<br />

76.5<br />

-113.7<br />

-80.5<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

1<br />

-84.5<br />

13.6<br />

-16.3<br />

2<br />

CHARIKAR<br />

27.9<br />

57.6<br />

-20.3<br />

-0.0<br />

-27.8<br />

19.4<br />

-1.7<br />

-19.3<br />

1.2<br />

19.4<br />

-1.7<br />

-19.3<br />

1.2<br />

1.0000<br />

10.9<br />

5<br />

AIBAK<br />

9.0<br />

0.0<br />

21.8<br />

0.0<br />

2.7<br />

101<br />

CHIMTALAH<br />

-89.0<br />

0.0<br />

23.3<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

-20.2<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1 ,TAJIKISTAN SOURCE, NORMAL CONDITIONS<br />

MON, NOV 19 2007 19:42<br />

1.030<br />

0.0<br />

-2.2<br />

21.6<br />

1.024<br />

-0.4<br />

2.2<br />

-21.5<br />

1.4<br />

2011<br />

AMU<br />

-5.8<br />

8<br />

HAIRATAN<br />

-21.0<br />

0.0<br />

SW<br />

7.4<br />

1.046<br />

-19.8<br />

114.9<br />

4<br />

PUL-E-KHUMRI<br />

-41.8<br />

-166.6<br />

0.0<br />

-5.3<br />

310<br />

KUNDUZ<br />

176.2<br />

-169.8<br />

-32.1<br />

-2.0 -6.4<br />

-169.8<br />

41.8<br />

-32.1<br />

1.030<br />

0.0<br />

13.6<br />

108<br />

JALALABAD<br />

8.5<br />

524<br />

SHEBERGHAN 4<br />

352.3<br />

21.6<br />

62.7<br />

0.0<br />

-42.4<br />

-16.8<br />

SW<br />

-9.5<br />

1.0000<br />

84.7<br />

-25.2<br />

1.030<br />

-13.9<br />

-53.7<br />

0.0<br />

39.3<br />

-18.1<br />

11<br />

BAGHLAN<br />

-38.5<br />

-13.6R<br />

0.952<br />

-8.0<br />

67.0<br />

41.8<br />

-64.2R<br />

176.2<br />

0.0<br />

100.0<br />

525<br />

KABUL DIESEL<br />

1.022<br />

-31.5<br />

21.8<br />

102<br />

KABUL NW<br />

1.0000<br />

20.3<br />

9.5<br />

-20.3<br />

-9.8<br />

20.3<br />

9.5<br />

-20.3<br />

-9.8<br />

40.5<br />

19.6<br />

1<br />

526<br />

KABUL SW<br />

1.003<br />

-31.8<br />

502<br />

NW KABUL G2<br />

6<br />

KHULM<br />

1<br />

50.0H<br />

36.4<br />

105<br />

KABUL EAST<br />

-25.0<br />

-7.0<br />

25.1<br />

6.7<br />

-25.0<br />

-7.0<br />

25.1<br />

6.7<br />

-22.9<br />

-18.4<br />

23.2<br />

17.6<br />

26.7<br />

19.0<br />

-18.9<br />

103<br />

KABUL NO TAP<br />

-19.7<br />

12<br />

KUNDUZ<br />

-26.4<br />

47.4<br />

20.5<br />

-47.2<br />

-20.5<br />

24.8<br />

14.3<br />

-24.8<br />

-14.4<br />

72.0<br />

34.9<br />

1<br />

527<br />

KABUL CENTRL<br />

1.001<br />

-32.1


8.4<br />

13.6<br />

-5.6<br />

-31.8<br />

4.3<br />

32.4 -9.1<br />

0.3<br />

7.2<br />

-0.3<br />

-5.0 4.8<br />

-7.5<br />

22.3<br />

8.9<br />

-22.2<br />

-10.1<br />

0.0<br />

0.0<br />

-9.5<br />

-9.7<br />

0.0<br />

0.0<br />

0.0<br />

-41.8<br />

169.8<br />

46.4<br />

-34.0<br />

130.0<br />

33.1<br />

-128.5<br />

0.0<br />

3.4<br />

0.0<br />

-3.4<br />

1.0<br />

-0.1<br />

-1.0<br />

0.1<br />

-1.0<br />

0.1<br />

1.0<br />

-0.1<br />

-5.5L<br />

22.0<br />

-4.9<br />

-32.1 32.4<br />

-17.2<br />

0.2<br />

16.5<br />

-0.1<br />

-6.1<br />

-12.0<br />

2.4<br />

12.2<br />

-6.1<br />

-12.0<br />

2.4<br />

12.2<br />

3.3<br />

7.5<br />

-4.0<br />

-7.5<br />

2.7<br />

4.5<br />

-2.8<br />

-4.5<br />

-2.1<br />

-3.4<br />

1.0<br />

3.4<br />

-0.5<br />

-2.0<br />

-0.0<br />

2.0<br />

0.993<br />

-25.7<br />

1<br />

13.6<br />

8.4<br />

81.3<br />

1.018<br />

-22.1<br />

1<br />

3.4<br />

2.1<br />

91.3<br />

11.1<br />

1.008<br />

-31.6<br />

1<br />

84.7<br />

-17.7<br />

1<br />

5.0<br />

-27.8<br />

-5.1<br />

27.9<br />

-5.1<br />

1.006<br />

-31.9<br />

13.5<br />

-5.0<br />

-13.4<br />

4.5<br />

1.023<br />

-29.8<br />

1<br />

10.9H<br />

1.0000<br />

-10.0<br />

10.9<br />

1.024<br />

-29.6<br />

1<br />

23.1 -10.6<br />

23.1<br />

11.6<br />

-22.9<br />

35.7<br />

1.004<br />

-32.0<br />

1<br />

13.9<br />

-36.3<br />

1.019<br />

-31.7<br />

1<br />

-13.9<br />

120<br />

BRESHNA KOT<br />

1.006<br />

-31.9<br />

1<br />

36.0<br />

22.3<br />

1.021<br />

-31.6<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.039<br />

-30.8<br />

1<br />

0.0<br />

0.0<br />

1.022<br />

-32.1<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

-0.7<br />

-13.4<br />

-3.5<br />

110<br />

SAROBI TOWN<br />

1.039<br />

-30.8<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

-4.8<br />

-3.0<br />

505<br />

NAGHLU HPP 1<br />

1<br />

1.4R<br />

1.0000<br />

21.4<br />

1.4<br />

1.020<br />

-29.8<br />

4<br />

25.0<br />

1.4R<br />

1.0200<br />

1.0000<br />

-21.3<br />

-1.0<br />

2<br />

-3.4<br />

0.0<br />

1.020<br />

-29.8<br />

3<br />

-3.4<br />

0.0<br />

3.4<br />

111<br />

SAROBI GEN<br />

1.034<br />

-30.6<br />

-0.3<br />

7.2<br />

0.3<br />

503<br />

SAROBI HPP 1<br />

1.034<br />

-30.6<br />

1<br />

1.0000<br />

1.0000<br />

-0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.025<br />

-30.6<br />

2<br />

0.0<br />

-2.8L<br />

1.0000<br />

2.8 -2.8<br />

0.2<br />

1.0000<br />

-0.0<br />

-0.0<br />

114<br />

MAHIPAR<br />

-32.7<br />

4.8<br />

1.019<br />

-31.0<br />

1<br />

0.0<br />

0.0<br />

32.1<br />

4.9<br />

-31.8<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-27.1<br />

22.0<br />

-0.4R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.6<br />

1.010<br />

-27.1<br />

3<br />

22.0<br />

-0.4R<br />

1.0200<br />

1.0000<br />

21.9<br />

0.6<br />

109<br />

MEHTARLAM<br />

1.021<br />

-32.1<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

-3.4<br />

-2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

13.6<br />

-94.7<br />

-13.2<br />

-94.9<br />

8.7<br />

1<br />

13.6<br />

8.4<br />

16.3<br />

1.045<br />

-19.8<br />

1<br />

8.4<br />

-10.9<br />

1.031<br />

-16.7<br />

1<br />

8.4<br />

-41.5<br />

-120.6<br />

35.4<br />

123.2<br />

7<br />

NAIBABAD<br />

2.7<br />

1.7<br />

-15.9<br />

-2.7<br />

-1.7<br />

13<br />

SHEKANBANDAR<br />

1.027<br />

-9.2<br />

-166.6<br />

46.4<br />

169.8<br />

14<br />

TALUQAN<br />

1.013<br />

-15.6<br />

15.7<br />

-62.2<br />

-21.8<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

17.2<br />

6.5<br />

-17.0<br />

-5.8<br />

1.000<br />

-16.7<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

-6.1<br />

-13.6<br />

-16.9<br />

301<br />

TALUQAN<br />

1.022<br />

-20.0<br />

1.0000<br />

1.0500<br />

19.5<br />

-34.7<br />

-16.1<br />

302<br />

RUSTAQ<br />

1.019<br />

-20.1<br />

1<br />

5.3<br />

8.5<br />

4.7<br />

-8.5<br />

304<br />

DASHT ARCHI<br />

0.991<br />

-21.2<br />

1<br />

12.8<br />

7.9<br />

26.2<br />

11.4<br />

-25.7<br />

-13.1<br />

305<br />

CHAH AB<br />

0.971<br />

-21.9<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.2<br />

-12.8<br />

-7.9<br />

35.0<br />

311<br />

BORDER<br />

3.4<br />

-2.7<br />

-3.4<br />

-1.0<br />

314<br />

IMAM SABIB<br />

1.013<br />

-16.4<br />

3.4<br />

2.1<br />

3010<br />

SANGTUDA<br />

1<br />

1<br />

201<br />

MAZAR-E-SHRF<br />

0.993<br />

-2.4<br />

1<br />

8.4<br />

21.5<br />

204<br />

DAWLATABAD<br />

0.991<br />

-2.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

-3.4<br />

209<br />

MAZAR NO 1<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

-0.0<br />

-2.0<br />

-0.5<br />

0.996<br />

-2.6<br />

0.0<br />

-4.0<br />

-0.0<br />

-0.0<br />

-2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

202<br />

SHEBERGHAN<br />

0.975<br />

-7.2<br />

1<br />

13.6<br />

8.4<br />

1.004<br />

-4.3<br />

1<br />

8.5<br />

5.3<br />

-28.2<br />

-0.8<br />

29.1<br />

-1.6<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.7<br />

-13.6<br />

-8.4<br />

0.978<br />

-7.3<br />

0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.975<br />

-7.2<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

-0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.975<br />

-7.2<br />

3<br />

1.0000<br />

0.2<br />

-0.0<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

-0.0<br />

-3.8<br />

206<br />

SHERIM TAQAB<br />

0.987<br />

-8.1<br />

1<br />

8.5<br />

5.3<br />

-9.2<br />

-25.7<br />

1.030<br />

0.0<br />

15.7 -13.6<br />

6.0<br />

67.0<br />

0.0<br />

207<br />

JUMABAZAR<br />

0.987<br />

-8.9<br />

1<br />

3.4<br />

17.2<br />

-11.2<br />

10.1<br />

2.1<br />

208<br />

MAIMANA<br />

0.983<br />

-9.5<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

-2.5<br />

-13.6<br />

1.2<br />

11.6H<br />

-4.5<br />

-2.8<br />

0.5<br />

1.021<br />

-31.6<br />

1.028<br />

-30.4<br />

115<br />

BOT-KHAK<br />

19.9<br />

21.0<br />

-19.7<br />

-21.6<br />

-7.5<br />

-4.0<br />

7.5<br />

3.3<br />

-21.7<br />

-8.5R<br />

21<br />

FAIZABAD<br />

1.017<br />

-16.0<br />

1.0000<br />

1.0000<br />

-21.6<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.007<br />

-31.7 0.5<br />

-5.6<br />

0.2<br />

-21.2<br />

1.4<br />

21.6<br />

1.0200<br />

-1.0<br />

3.4<br />

506<br />

NAGHLU HPP 2<br />

104<br />

KABUL NORTH<br />

-0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

1.4R<br />

0.0<br />

1.0000<br />

0.0<br />

-9.7<br />

-17.1<br />

0.5<br />

1.015<br />

-16.3<br />

4.5<br />

-21.7<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-27.1<br />

1.030<br />

-30.2<br />

-5.0<br />

32.8<br />

-17.7<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

-0.0<br />

1.020<br />

-29.8<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-29.8<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8-32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.028<br />

-30.4<br />

4.3 -9.1<br />

1<br />

95.9<br />

3<br />

KHENJAN<br />

8.4<br />

97.5<br />

0.0<br />

13.6<br />

1.042<br />

-19.7<br />

-21.9<br />

0.975<br />

-28.0<br />

-2.7<br />

18.0<br />

-0.0<br />

1.0500<br />

23.3<br />

1.0500<br />

5.0<br />

27.9<br />

-84.5<br />

30.5<br />

63.0<br />

5.0<br />

5.0<br />

-5.1<br />

27.9<br />

-27.8<br />

-27.8<br />

-5.1<br />

14.2<br />

0.0<br />

-64.3<br />

26.7<br />

1.037<br />

-19.2<br />

76.5<br />

-113.7<br />

-80.5<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

1<br />

-84.5<br />

13.6<br />

-16.3<br />

2<br />

CHARIKAR<br />

27.9<br />

57.6<br />

-20.3<br />

-0.0<br />

-27.8<br />

19.4<br />

-1.7<br />

-19.3<br />

1.2<br />

19.4<br />

-1.7<br />

-19.3<br />

1.2<br />

1.0000<br />

10.9<br />

5<br />

AIBAK<br />

9.0<br />

0.0<br />

21.8<br />

0.0<br />

2.7<br />

101<br />

CHIMTALAH<br />

-89.0<br />

0.0<br />

23.3<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

-20.2<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1 ,TAJIKISTAN SOURCE, CONTINGENCY NORTH - DIESEL<br />

MON, NOV 19 2007 19:44<br />

1.030<br />

0.0<br />

-2.2<br />

21.6<br />

1.024<br />

-0.4<br />

2.2<br />

-21.5<br />

1.4<br />

2011<br />

AMU<br />

-5.8<br />

8<br />

HAIRATAN<br />

-21.0<br />

0.0<br />

SW<br />

7.4<br />

1.046<br />

-19.8<br />

114.9<br />

4<br />

PUL-E-KHUMRI<br />

-41.8<br />

-166.6<br />

0.0<br />

-5.3<br />

310<br />

KUNDUZ<br />

176.2<br />

-169.8<br />

-32.1<br />

-2.0 -6.4<br />

-169.8<br />

41.8<br />

-32.1<br />

1.030<br />

0.0<br />

108<br />

JALALABAD<br />

8.5<br />

524<br />

SHEBERGHAN 4<br />

352.3<br />

21.6<br />

62.7<br />

0.0<br />

-42.4<br />

-16.8<br />

SW<br />

-9.5<br />

1.0000<br />

84.7<br />

-25.2<br />

1.030<br />

-13.9<br />

-53.7<br />

0.0<br />

39.3<br />

-18.1<br />

11<br />

BAGHLAN<br />

-38.5<br />

-13.6R<br />

0.952<br />

-8.0<br />

67.0<br />

41.8<br />

-64.2R<br />

176.2<br />

0.0<br />

100.0<br />

525<br />

KABUL DIESEL<br />

1.022<br />

-31.5<br />

21.8<br />

102<br />

KABUL NW<br />

1.0000<br />

20.3<br />

9.5<br />

-20.3<br />

-9.8<br />

20.3<br />

9.5<br />

-20.3<br />

-9.8<br />

40.5<br />

19.6<br />

1<br />

526<br />

KABUL SW<br />

1.003<br />

-31.8<br />

502<br />

NW KABUL G2<br />

6<br />

KHULM<br />

1<br />

50.0H<br />

36.4<br />

105<br />

KABUL EAST<br />

-25.0<br />

-7.0<br />

25.1<br />

6.7<br />

-25.0<br />

-7.0<br />

25.1<br />

6.7<br />

-22.9<br />

-18.4<br />

23.2<br />

17.6<br />

-18.9<br />

12<br />

KUNDUZ<br />

47.4<br />

20.5<br />

-47.2<br />

-20.5<br />

24.8<br />

14.3<br />

-24.8<br />

-14.4<br />

72.0<br />

34.9<br />

1<br />

527<br />

KABUL CENTRL<br />

1.001<br />

-32.1<br />

13.6<br />

103<br />

KABUL NO TAP


8.4<br />

13.6<br />

-2.0<br />

-31.5<br />

0.7<br />

32.1 -8.0<br />

0.6<br />

6.0<br />

-0.6<br />

-7.4 7.3<br />

-9.1<br />

22.3<br />

10.6<br />

-22.2<br />

-10.1<br />

0.0<br />

0.0<br />

-9.5<br />

-9.7<br />

0.0<br />

0.0<br />

0.0<br />

-47.0<br />

169.6<br />

51.5<br />

-40.5<br />

129.7<br />

39.4<br />

-128.3<br />

0.0<br />

3.4<br />

0.0<br />

-3.4<br />

1.8<br />

-0.1<br />

-1.8<br />

0.1<br />

-1.8<br />

0.1<br />

1.8<br />

-0.1<br />

-5.5L<br />

22.0<br />

-1.3<br />

-31.9 32.1<br />

-14.9<br />

0.8<br />

14.1<br />

-0.7<br />

-4.4<br />

-12.3<br />

0.7<br />

12.5<br />

-4.4<br />

-12.3<br />

0.7<br />

12.5<br />

1.7<br />

7.8<br />

-2.4<br />

-7.8<br />

2.7<br />

4.5<br />

-2.8<br />

-4.5<br />

-2.1<br />

-3.4<br />

0.9<br />

3.4<br />

-0.5<br />

-2.0<br />

-0.0<br />

2.0<br />

1.011<br />

-25.5<br />

1<br />

13.6<br />

8.4<br />

81.2<br />

1.033<br />

-22.0<br />

1<br />

3.4<br />

2.1<br />

91.1<br />

6.6<br />

1.021<br />

-31.2<br />

1<br />

84.7<br />

-29.2<br />

1<br />

10.9<br />

-27.8<br />

-11.0<br />

27.8<br />

-11.0<br />

1.017<br />

-31.4<br />

13.1<br />

3.2<br />

-13.1<br />

-3.7<br />

1.035<br />

-29.4<br />

1<br />

10.9H<br />

1.0000<br />

-10.0<br />

10.9<br />

1.036<br />

-29.3<br />

1<br />

23.1 -10.6<br />

23.1<br />

11.6<br />

-22.9<br />

35.7<br />

1.015<br />

-31.5<br />

1<br />

15.7<br />

-37.9<br />

1.024<br />

-31.2<br />

1<br />

-15.7<br />

120<br />

BRESHNA KOT<br />

1.014<br />

-31.4<br />

1<br />

36.0<br />

22.3<br />

1.026<br />

-31.1<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.042<br />

-30.2<br />

1<br />

0.0<br />

0.0<br />

1.025<br />

-31.5<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

-0.7<br />

-13.4<br />

-3.5<br />

110<br />

SAROBI TOWN<br />

1.042<br />

-30.2<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

-4.8<br />

-3.0<br />

505<br />

NAGHLU HPP 1<br />

1<br />

-1.6R<br />

1.0000<br />

21.4<br />

-1.6<br />

1.020<br />

-29.2<br />

4<br />

25.0<br />

-1.6R<br />

1.0200<br />

1.0000<br />

-21.3<br />

1.9<br />

2<br />

-3.4<br />

0.0<br />

1.020<br />

-29.2<br />

3<br />

-3.4<br />

0.0<br />

3.4<br />

111<br />

SAROBI GEN<br />

1.038<br />

-30.0<br />

-0.6<br />

6.0<br />

0.6<br />

503<br />

SAROBI HPP 1<br />

1.038<br />

-30.0<br />

1<br />

1.0000<br />

1.0000<br />

-0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.028<br />

-30.0<br />

2<br />

0.0<br />

-2.8L<br />

1.0000<br />

2.8 -2.8<br />

0.2<br />

1.0000<br />

0.0<br />

-0.0<br />

114<br />

MAHIPAR<br />

-32.7<br />

7.3<br />

1.025<br />

-30.5<br />

1<br />

0.0<br />

0.0<br />

31.9<br />

1.3<br />

-31.5<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-26.5<br />

22.0<br />

-2.8R<br />

1.0200<br />

1.0000<br />

21.9<br />

-1.0<br />

1.010<br />

-26.5<br />

3<br />

22.0<br />

-2.8R<br />

1.0200<br />

1.0000<br />

21.9<br />

-1.0<br />

109<br />

MEHTARLAM<br />

1.023<br />

-31.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

-3.4<br />

-2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

13.6<br />

-94.5<br />

-8.7<br />

-94.8<br />

3.7<br />

1<br />

13.6<br />

8.4<br />

16.3<br />

1.057<br />

-19.7<br />

1<br />

8.4<br />

-10.9<br />

1.041<br />

-16.7<br />

1<br />

8.4<br />

-47.9<br />

-120.3<br />

41.7<br />

123.0<br />

7<br />

NAIBABAD<br />

2.7<br />

1.7<br />

-16.3<br />

-2.7<br />

-1.7<br />

13<br />

SHEKANBANDAR<br />

1.032<br />

-9.2<br />

-166.4<br />

51.5<br />

169.6<br />

14<br />

TALUQAN<br />

1.019<br />

-15.5<br />

19.0<br />

-62.2<br />

-25.2<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

17.2<br />

6.4<br />

-17.0<br />

-5.7<br />

1.000<br />

-16.5<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

-2.6<br />

-13.6<br />

-20.6<br />

301<br />

TALUQAN<br />

1.028<br />

-19.9<br />

1.0000<br />

1.0500<br />

19.4<br />

-34.7<br />

-16.0<br />

302<br />

RUSTAQ<br />

1.026<br />

-20.0<br />

1<br />

5.3<br />

8.5<br />

4.7<br />

-8.5<br />

304<br />

DASHT ARCHI<br />

0.998<br />

-21.1<br />

1<br />

12.8<br />

7.9<br />

26.2<br />

11.3<br />

-25.7<br />

-13.0<br />

305<br />

CHAH AB<br />

0.978<br />

-21.8<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.1<br />

-12.7<br />

-7.9<br />

35.0<br />

311<br />

BORDER<br />

3.4<br />

-2.7<br />

-3.4<br />

-0.9<br />

314<br />

IMAM SABIB<br />

1.021<br />

-16.3<br />

3.4<br />

2.1<br />

3010<br />

SANGTUDA<br />

1<br />

1<br />

201<br />

MAZAR-E-SHRF<br />

0.993<br />

-2.4<br />

1<br />

8.4<br />

21.5<br />

204<br />

DAWLATABAD<br />

0.991<br />

-2.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

-3.4<br />

209<br />

MAZAR NO 1<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

-0.0<br />

-2.0<br />

-0.5<br />

0.996<br />

-2.6<br />

0.0<br />

-4.0<br />

-0.0<br />

-0.0<br />

-2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

202<br />

SHEBERGHAN<br />

0.975<br />

-7.2<br />

1<br />

13.6<br />

8.4<br />

1.004<br />

-4.3<br />

1<br />

8.5<br />

5.3<br />

-28.2<br />

-0.8<br />

29.1<br />

-1.6<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.7<br />

-13.6<br />

-8.4<br />

0.978<br />

-7.3<br />

0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.975<br />

-7.2<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

-0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.975<br />

-7.2<br />

3<br />

1.0000<br />

0.2<br />

-0.0<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

-0.0<br />

-3.8<br />

206<br />

SHERIM TAQAB<br />

0.987<br />

-8.1<br />

1<br />

8.5<br />

5.3<br />

-9.2<br />

-25.7<br />

1.030<br />

0.0<br />

15.7 -13.6<br />

6.0<br />

67.0<br />

0.0<br />

207<br />

JUMABAZAR<br />

0.987<br />

-8.9<br />

1<br />

3.4<br />

17.2<br />

-11.2<br />

10.1<br />

2.1<br />

208<br />

MAIMANA<br />

0.983<br />

-9.5<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

-2.5<br />

-13.6<br />

1.2<br />

11.6H<br />

-4.5<br />

-2.8<br />

2.1<br />

1.026<br />

-31.1<br />

1.032<br />

-29.8<br />

115<br />

BOT-KHAK<br />

16.6<br />

16.3<br />

-16.4<br />

-17.1<br />

-7.8<br />

-2.4<br />

7.8<br />

1.7<br />

-21.7<br />

-12.1R<br />

21<br />

FAIZABAD<br />

1.024<br />

-15.9<br />

1.0000<br />

1.0000<br />

-21.6<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.019<br />

-31.3 2.1<br />

-2.0<br />

0.2<br />

-21.2<br />

-1.6<br />

21.6<br />

1.0200<br />

1.9<br />

3.4<br />

506<br />

NAGHLU HPP 2<br />

104<br />

KABUL NORTH<br />

-0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

1.4R<br />

0.0<br />

1.0000<br />

0.0<br />

-9.7<br />

-17.1<br />

0.5<br />

1.022<br />

-16.3<br />

4.5<br />

-21.7<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-26.5<br />

1.034<br />

-29.6<br />

-7.4<br />

32.8<br />

-29.2<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

-0.0<br />

1.020<br />

-29.2<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-29.2<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8-32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.032<br />

-29.8<br />

0.7 -8.0<br />

1<br />

95.6<br />

3<br />

KHENJAN<br />

8.4<br />

97.3<br />

0.0<br />

13.6<br />

1.054<br />

-19.6<br />

-22.6<br />

0.995<br />

-27.8<br />

-2.7<br />

18.0<br />

-0.0<br />

1.0500<br />

35.1<br />

1.0500<br />

10.9<br />

27.8<br />

-84.4<br />

30.5<br />

63.0<br />

10.9<br />

10.9<br />

-11.0<br />

27.8<br />

-27.8<br />

-27.8<br />

-11.0<br />

10.5<br />

0.0<br />

-64.3<br />

26.7<br />

1.048<br />

-19.2<br />

76.5<br />

-113.5<br />

-80.4<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

1<br />

-84.4<br />

13.6<br />

-16.3<br />

2<br />

CHARIKAR<br />

27.8<br />

57.6<br />

-20.8<br />

-0.0<br />

-27.8<br />

19.4<br />

6.0<br />

-19.4<br />

-6.5<br />

19.4<br />

6.0<br />

-19.4<br />

-6.5<br />

1.0000<br />

10.9<br />

5<br />

AIBAK<br />

4.1<br />

0.0<br />

21.8<br />

0.0<br />

2.7<br />

101<br />

CHIMTALAH<br />

-88.9<br />

0.0<br />

35.1<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

-20.6<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1 ,TAJIKISTAN SOURCE, CONTINGENCY DIESEL - EAST<br />

MON, NOV 19 2007 19:48<br />

1.030<br />

0.0<br />

-2.2<br />

21.6<br />

1.024<br />

-0.4<br />

2.2<br />

-21.5<br />

1.4<br />

2011<br />

AMU<br />

-5.8<br />

8<br />

HAIRATAN<br />

-21.0<br />

0.0<br />

SW<br />

7.8<br />

1.058<br />

-19.7<br />

114.7<br />

4<br />

PUL-E-KHUMRI<br />

-47.0<br />

-166.4<br />

0.0<br />

-5.3<br />

310<br />

KUNDUZ<br />

176.0<br />

-169.6<br />

-37.1<br />

-1.9 -6.5<br />

-169.6<br />

47.0<br />

-37.1<br />

1.030<br />

0.0<br />

108<br />

JALALABAD<br />

8.5<br />

524<br />

SHEBERGHAN 4<br />

352.0<br />

21.6<br />

62.7<br />

0.0<br />

-43.0<br />

-12.8<br />

SW<br />

-39.6<br />

1.0000<br />

84.7<br />

-26.0<br />

1.037<br />

-13.9<br />

-55.0<br />

0.0<br />

45.6<br />

-14.9<br />

11<br />

BAGHLAN<br />

-45.0<br />

-13.6R<br />

0.952<br />

-8.0<br />

67.0<br />

47.0<br />

-74.3R<br />

176.0<br />

0.0<br />

100.0<br />

525<br />

KABUL DIESEL<br />

1.030<br />

-30.9<br />

21.8<br />

102<br />

KABUL NW<br />

1.0000<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

40.5<br />

19.6<br />

1<br />

526<br />

KABUL SW<br />

1.015<br />

-31.4<br />

502<br />

NW KABUL G2<br />

6<br />

KHULM<br />

1<br />

36.0R<br />

38.0<br />

105<br />

KABUL EAST<br />

-46.0<br />

-12.3<br />

46.1<br />

12.2<br />

-24.9<br />

-12.0<br />

25.1<br />

11.1<br />

28.7<br />

12.7<br />

-15.6<br />

-13.4<br />

12<br />

KUNDUZ<br />

-28.4<br />

43.6<br />

9.1<br />

-43.4<br />

-9.1<br />

28.6<br />

25.6<br />

-28.6<br />

-25.7<br />

72.0<br />

34.9<br />

1<br />

527<br />

KABUL CENTRL<br />

1.010<br />

-31.6<br />

13.6<br />

103<br />

KABUL NO TAP


8.4<br />

13.6<br />

-1.4<br />

-31.9<br />

0.1<br />

32.4 -7.8<br />

0.3<br />

5.8<br />

-0.3<br />

-7.9 7.7<br />

-9.4<br />

22.3<br />

10.9<br />

-22.2<br />

-10.1<br />

0.0<br />

0.0<br />

-9.5<br />

-9.7<br />

0.0<br />

0.0<br />

0.0<br />

-47.2<br />

169.5<br />

51.7<br />

-40.7<br />

129.6<br />

39.6<br />

-128.1<br />

-0.0<br />

3.4<br />

0.0<br />

-3.4<br />

2.0<br />

-0.1<br />

-2.0<br />

0.1<br />

-2.0<br />

0.1<br />

2.0<br />

-0.1<br />

-5.5L<br />

22.0<br />

-0.6<br />

-32.2 32.4<br />

-14.5<br />

0.2<br />

13.8<br />

-0.2<br />

-3.7<br />

-12.0<br />

-0.0<br />

12.2<br />

-3.7<br />

-12.0<br />

-0.0<br />

12.2<br />

1.0<br />

7.5<br />

-1.7<br />

-7.5<br />

2.7<br />

4.5<br />

-2.8<br />

-4.5<br />

-2.1<br />

-3.4<br />

0.9<br />

3.4<br />

-0.5<br />

-2.0<br />

-0.0<br />

2.0<br />

1.012<br />

-25.5<br />

1<br />

13.6<br />

8.4<br />

81.0<br />

1.033<br />

-22.0<br />

1<br />

3.4<br />

2.1<br />

91.0<br />

6.5<br />

1<br />

84.5<br />

-29.3<br />

1<br />

10.9<br />

-27.7<br />

-11.0<br />

27.8<br />

-11.0<br />

1.017<br />

-31.4<br />

13.3<br />

3.3<br />

-13.3<br />

-3.7<br />

1.036<br />

-29.4<br />

1<br />

10.9H<br />

1.0000<br />

-10.0<br />

10.9<br />

1.037<br />

-29.2<br />

1<br />

23.1 -10.6<br />

23.1<br />

11.6<br />

-22.9<br />

35.7<br />

1.015<br />

-31.5<br />

1<br />

15.6<br />

-36.3<br />

1.027<br />

-31.1<br />

1<br />

-15.6<br />

120<br />

BRESHNA KOT<br />

1.015<br />

-31.3<br />

1<br />

36.0<br />

22.3<br />

1.028<br />

-31.0<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.043<br />

-30.0<br />

1<br />

0.0<br />

0.0<br />

1.026<br />

-31.3<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

-0.7<br />

-13.4<br />

-3.5<br />

110<br />

SAROBI TOWN<br />

1.043<br />

-30.0<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

-4.8<br />

-2.9<br />

505<br />

NAGHLU HPP 1<br />

1<br />

-2.6R<br />

1.0000<br />

21.4<br />

-2.6<br />

1.020<br />

-29.1<br />

4<br />

25.0<br />

-2.6R<br />

1.0200<br />

1.0000<br />

-21.3<br />

2.9<br />

2<br />

-3.4<br />

0.0<br />

1.020<br />

-29.1<br />

3<br />

-3.4<br />

0.0<br />

3.4<br />

111<br />

SAROBI GEN<br />

1.038<br />

-29.9<br />

-0.3<br />

5.9<br />

0.3<br />

503<br />

SAROBI HPP 1<br />

1.038<br />

-29.9<br />

1<br />

1.0000<br />

1.0000<br />

-0.0<br />

-0.0<br />

504<br />

SAROBI HPP 2<br />

1.029<br />

-29.9<br />

2<br />

0.0<br />

-2.8L<br />

1.0000<br />

2.8 -2.8<br />

0.2<br />

1.0000<br />

0.0<br />

0.0<br />

114<br />

MAHIPAR<br />

-32.7<br />

7.7<br />

1.026<br />

-30.3<br />

1<br />

0.0<br />

0.0<br />

32.2<br />

0.6<br />

-31.9<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-26.4<br />

22.0<br />

-3.2R<br />

1.0200<br />

1.0000<br />

21.9<br />

-1.3<br />

1.010<br />

-26.4<br />

3<br />

22.0<br />

-3.2R<br />

1.0200<br />

1.0000<br />

21.9<br />

-1.3<br />

109<br />

MEHTARLAM<br />

1.024<br />

-31.3<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

-3.4<br />

-2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

13.6<br />

-94.4<br />

-8.6<br />

-94.6<br />

3.6<br />

1<br />

13.6<br />

8.4<br />

16.3<br />

1.058<br />

-19.7<br />

1<br />

8.4<br />

-10.9<br />

1.041<br />

-16.7<br />

1<br />

8.4<br />

-48.1<br />

-120.2<br />

41.8<br />

122.9<br />

7<br />

NAIBABAD<br />

2.7<br />

1.7<br />

-16.3<br />

-2.7<br />

-1.7<br />

13<br />

SHEKANBANDAR<br />

1.032<br />

-9.2<br />

-166.2<br />

51.7<br />

169.5<br />

14<br />

TALUQAN<br />

1.019<br />

-15.5<br />

19.2<br />

-62.2<br />

-25.4<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

17.2<br />

6.4<br />

-17.0<br />

-5.7<br />

1.000<br />

-16.5<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

-2.4<br />

-13.6<br />

-20.7<br />

301<br />

TALUQAN<br />

1.028<br />

-19.9<br />

1.0000<br />

1.0500<br />

19.4<br />

-34.7<br />

-16.0<br />

302<br />

RUSTAQ<br />

1.026<br />

-20.0<br />

1<br />

5.3<br />

8.5<br />

4.7<br />

-8.5<br />

304<br />

DASHT ARCHI<br />

0.998<br />

-21.0<br />

1<br />

12.8<br />

7.9<br />

26.2<br />

11.3<br />

-25.7<br />

-13.0<br />

305<br />

CHAH AB<br />

0.978<br />

-21.8<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.1<br />

-12.7<br />

-7.9<br />

35.0<br />

311<br />

BORDER<br />

3.4<br />

-2.7<br />

-3.4<br />

-0.9<br />

314<br />

IMAM SABIB<br />

1.021<br />

-16.3<br />

3.4<br />

2.1<br />

3010<br />

SANGTUDA<br />

1<br />

1<br />

201<br />

MAZAR-E-SHRF<br />

0.993<br />

-2.4<br />

1<br />

8.4<br />

21.5<br />

204<br />

DAWLATABAD<br />

0.991<br />

-2.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

-3.4<br />

209<br />

MAZAR NO 1<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

-0.0<br />

-2.0<br />

-0.5<br />

0.996<br />

-2.6<br />

0.0<br />

-4.0<br />

-0.0<br />

-0.0<br />

-2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

202<br />

SHEBERGHAN<br />

0.975<br />

-7.2<br />

1<br />

13.6<br />

8.4<br />

1.004<br />

-4.3<br />

1<br />

8.5<br />

5.3<br />

-28.2<br />

-0.8<br />

29.1<br />

-1.6<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.7<br />

-13.6<br />

-8.4<br />

0.978<br />

-7.3<br />

0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

1<br />

0.0<br />

0.0<br />

522<br />

SHEBERGHAN 2<br />

0.975<br />

-7.2<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

-0.0 0.0<br />

523<br />

SHEBERGHAN 3<br />

0.975<br />

-7.2<br />

3<br />

1.0000<br />

0.2<br />

-0.0<br />

0.0<br />

0.0<br />

0.975<br />

-7.2<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

-0.0<br />

-3.8<br />

206<br />

SHERIM TAQAB<br />

0.987<br />

-8.1<br />

1<br />

8.5<br />

5.3<br />

-9.2<br />

-25.7<br />

1.030<br />

0.0<br />

15.7 -13.6<br />

6.0<br />

67.0<br />

0.0<br />

207<br />

JUMABAZAR<br />

0.987<br />

-8.9<br />

1<br />

3.4<br />

17.2<br />

-11.2<br />

10.1<br />

2.1<br />

208<br />

MAIMANA<br />

0.983<br />

-9.5<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

-2.5<br />

-13.6<br />

1.2<br />

11.6H<br />

-4.5<br />

-2.8<br />

2.4<br />

1.028<br />

-31.0<br />

1.033<br />

-29.7<br />

115<br />

BOT-KHAK<br />

19.9<br />

17.8<br />

-19.7<br />

-18.5<br />

-7.5<br />

-1.7<br />

7.5<br />

1.0<br />

-21.6<br />

-12.3R<br />

21<br />

FAIZABAD<br />

1.024<br />

-15.9<br />

1.0000<br />

1.0000<br />

-21.6<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.020<br />

-31.2 2.4<br />

-1.4<br />

0.2<br />

-21.2<br />

-2.6<br />

21.5<br />

1.0200<br />

2.9<br />

3.4<br />

506<br />

NAGHLU HPP 2<br />

104<br />

KABUL NORTH<br />

-0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

1.4R<br />

0.0<br />

1.0000<br />

0.0<br />

-9.7<br />

-17.1<br />

0.5<br />

1.023<br />

-16.2<br />

4.5<br />

-21.6<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-26.4<br />

1.035<br />

-29.5<br />

-7.9<br />

32.8<br />

-29.3<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

-0.0<br />

1.020<br />

-29.1<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-29.1<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8-32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.033<br />

-29.7<br />

0.1 -7.8<br />

1<br />

95.5<br />

3<br />

KHENJAN<br />

8.4<br />

97.2<br />

0.0<br />

13.6<br />

1.055<br />

-19.6<br />

-22.7<br />

0.996<br />

-27.7<br />

-2.7<br />

18.0<br />

-0.0<br />

1.0500<br />

35.1<br />

1.0500<br />

10.9<br />

27.8<br />

-84.3<br />

30.5<br />

63.0<br />

10.9<br />

10.9<br />

-11.0<br />

27.8<br />

-27.7<br />

-27.7<br />

-11.0<br />

10.5<br />

0.0<br />

-64.3<br />

26.7<br />

1.049<br />

-19.1<br />

76.5<br />

-113.3<br />

-80.3<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

1<br />

-84.3<br />

13.6<br />

-16.3<br />

2<br />

CHARIKAR<br />

27.8<br />

57.6<br />

-20.9<br />

-0.0<br />

-27.7<br />

19.3<br />

6.0<br />

-19.2<br />

-6.5<br />

19.3<br />

6.0<br />

-19.2<br />

-6.5<br />

1.0000<br />

10.9<br />

5<br />

AIBAK<br />

4.0<br />

0.0<br />

21.8<br />

0.0<br />

2.7<br />

101<br />

CHIMTALAH<br />

-88.8<br />

0.0<br />

35.1<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

-20.6<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1 ,TAJIKISTAN SOURCE, CONTINGENCY NORTH -CENTRAL<br />

MON, NOV 19 2007 19:56<br />

1.030<br />

0.0<br />

-2.2<br />

21.6<br />

1.024<br />

-0.4<br />

2.2<br />

-21.5<br />

1.4<br />

2011<br />

AMU<br />

-5.8<br />

8<br />

HAIRATAN<br />

-21.0<br />

0.0<br />

SW<br />

7.9<br />

1.058<br />

-19.7<br />

114.5<br />

4<br />

PUL-E-KHUMRI<br />

-47.2<br />

-166.2<br />

0.0<br />

-5.3<br />

310<br />

KUNDUZ<br />

175.9<br />

-169.5<br />

-37.4<br />

-1.9 -6.5<br />

-169.5<br />

47.2<br />

-37.4<br />

1.030<br />

0.0<br />

108<br />

JALALABAD<br />

8.5<br />

524<br />

SHEBERGHAN 4<br />

351.7<br />

21.6<br />

62.7<br />

0.0<br />

-43.1<br />

-12.8<br />

SW<br />

-39.7<br />

1.0000<br />

84.5<br />

-26.0<br />

1.038<br />

-13.9<br />

-55.0<br />

0.0<br />

45.8<br />

-14.9<br />

11<br />

BAGHLAN<br />

-45.2<br />

-13.6R<br />

0.952<br />

-8.0<br />

67.0<br />

47.2<br />

-74.7R<br />

175.9<br />

0.0<br />

100.0<br />

525<br />

KABUL DIESEL<br />

1.030<br />

-30.9<br />

21.8<br />

102<br />

KABUL NW<br />

1.0000<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

40.5<br />

19.6<br />

1<br />

526<br />

KABUL SW<br />

1.016<br />

-31.4<br />

502<br />

NW KABUL G2<br />

6<br />

KHULM<br />

1<br />

38.0R<br />

36.3<br />

105<br />

KABUL EAST<br />

-24.9<br />

-7.6<br />

25.0<br />

7.3<br />

-24.9 25.0<br />

7.3<br />

-23.1<br />

-11.8<br />

23.3<br />

10.9<br />

26.8<br />

12.4<br />

-15.6<br />

-13.3<br />

12<br />

KUNDUZ<br />

-26.5<br />

47.5<br />

9.3<br />

-47.4<br />

-9.3<br />

72.0<br />

34.9<br />

1<br />

527<br />

KABUL CENTRL<br />

1.011<br />

-31.5<br />

13.6<br />

-7.6<br />

1.022<br />

-31.2<br />

103<br />

KABUL NO TAP


1<br />

1<br />

1<br />

3<br />

2<br />

2<br />

1<br />

1<br />

1<br />

3<br />

2<br />

1<br />

4<br />

1<br />

1<br />

3<br />

2<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

1<br />

206<br />

SHERIM TAQAB<br />

8.5 -25.7<br />

5.3 6.0<br />

17.2<br />

0.0<br />

-11.2<br />

0.0<br />

0.987<br />

-8.1<br />

207<br />

JUMABAZAR<br />

0.0<br />

-9.7<br />

3.4<br />

1<br />

2.1<br />

208<br />

MAIMANA<br />

13.6<br />

8.4<br />

1<br />

-17.1<br />

10.1<br />

13.7<br />

-2.5<br />

-13.6<br />

1.2<br />

0.0<br />

-9.7<br />

0.987<br />

-8.9<br />

0.983<br />

-9.5<br />

1.030<br />

0.0<br />

0.0<br />

-10.1<br />

-64.3<br />

67.0<br />

15.7 -13.6<br />

8.5<br />

5.3<br />

1.004<br />

-4.3<br />

26.7<br />

-9.2<br />

0.975<br />

-7.2<br />

13.6<br />

8.4<br />

1<br />

1<br />

67.0<br />

-13.6R<br />

205<br />

SAREPUL<br />

4011<br />

BORDER_1<br />

1<br />

29.1<br />

-1.6<br />

-28.2<br />

-0.8<br />

13.8<br />

5.7<br />

-13.6<br />

-8.4<br />

203<br />

ANDKHOI<br />

0.0<br />

0.952<br />

-8.0<br />

-9.5<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

-3.8<br />

204<br />

3.4 DAWLATABAD<br />

2.1<br />

-3.4<br />

210<br />

MAZAR NO 2<br />

-2.0<br />

-0.5<br />

0.992<br />

-2.5<br />

209<br />

2.0 MAZAR NO 1<br />

0.5<br />

-2.0<br />

-0.5<br />

0.992<br />

-2.5<br />

-2.1 251<br />

250<br />

0.991<br />

-2.5<br />

MAZAR TIE W MAZAR TIE E<br />

-0.0<br />

-0.0<br />

-0.0<br />

-0.0<br />

0.978<br />

0.996<br />

-7.3<br />

-2.6<br />

1<br />

2.0<br />

201<br />

MAZAR-E-SHRF<br />

521<br />

SHEBERGHAN 1 522<br />

SHEBERGHAN 2<br />

0.975<br />

-7.2<br />

0.975<br />

-7.2<br />

1.0000<br />

1.0000<br />

-0.0<br />

-0.0<br />

1.0000<br />

0.2<br />

0.0<br />

3<br />

0.2<br />

0.0<br />

1.0000<br />

1.0000<br />

2<br />

0.2<br />

-0.0<br />

0.0 -0.0<br />

1.0000<br />

523<br />

SHEBERGHAN 3<br />

0.975<br />

-7.2<br />

-0.0<br />

-0.0<br />

0.5<br />

0.0<br />

0.0<br />

0.2<br />

0.0<br />

1.0000<br />

1.0000<br />

-0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

4<br />

202<br />

SHEBERGHAN<br />

524<br />

SHEBERGHAN 4<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1 ,TAJIKISTAN SOURCE, CONTINGENCY BRESHNA K - EAST<br />

MON, NOV 19 2007 19:50<br />

0.0<br />

-4.0<br />

3.4<br />

1.3<br />

2.0<br />

-0.0<br />

13.6<br />

8.4<br />

1<br />

2.0<br />

-0.0<br />

-21.5<br />

-2.2<br />

1<br />

21.5<br />

2.2<br />

7<br />

NAIBABAD<br />

2011<br />

AMU<br />

21.6<br />

1.4R<br />

21.6<br />

0.993<br />

-2.4<br />

1.030<br />

0.0<br />

8<br />

HAIRATAN<br />

1.024<br />

-0.4<br />

-21.0<br />

-5.8<br />

1.4<br />

SW<br />

0.0<br />

1<br />

CHIMTALAH<br />

102<br />

KABUL NW<br />

501<br />

NW KABUL G1<br />

526<br />

KABUL SW<br />

40.5<br />

19.6<br />

1<br />

20.3<br />

9.5<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

-20.2<br />

-9.8<br />

63.0<br />

1<br />

1<br />

-21.6<br />

-10.0<br />

1.0000<br />

21.8<br />

30.5<br />

21.8<br />

10.9H<br />

1.016<br />

-31.4<br />

13.6<br />

8.4<br />

10.9<br />

0.0<br />

5<br />

AIBAK<br />

1<br />

1.049<br />

-19.2<br />

0.0<br />

0.0<br />

13.6<br />

8.4<br />

3.4<br />

2.1<br />

1<br />

1<br />

1.036<br />

-29.4<br />

-2.7<br />

-1.7<br />

3<br />

KHENJAN<br />

27.8<br />

0.0<br />

10.9<br />

-27.8<br />

-11.0<br />

2.7<br />

-16.3<br />

101<br />

CHIMTALAH<br />

1.0000<br />

-16.3<br />

16.3<br />

-22.6<br />

0.0<br />

-55.0<br />

27.8<br />

7.8<br />

-94.5<br />

-8.6<br />

91.1<br />

6.5<br />

-27.8<br />

-11.0<br />

10.9<br />

27.8<br />

1.037<br />

-29.3<br />

1.057<br />

-19.7<br />

1.054<br />

-19.6<br />

95.6<br />

4.0<br />

SW<br />

-39.7<br />

-88.9<br />

-15.5<br />

84.6<br />

1.033<br />

-22.0<br />

1.012<br />

-25.5<br />

1.0500<br />

-84.4<br />

35.0<br />

1.0000<br />

-29.2<br />

-27.8<br />

-11.0<br />

-27.8<br />

23.1<br />

-22.9<br />

23.1 11.6<br />

-10.6<br />

11.6H<br />

1.0000<br />

1.0000<br />

1<br />

10.9<br />

27.8<br />

2.7<br />

1.7<br />

-10.9 -2.7<br />

-1.9 -6.5<br />

13.6<br />

8.4<br />

10.9<br />

84.6<br />

1<br />

-94.7<br />

-12.7<br />

13.6<br />

8.4<br />

81.1<br />

13.4<br />

3.2<br />

97.3<br />

3.6<br />

1.0500<br />

-84.4<br />

10.9<br />

-11.0<br />

-26.0<br />

35.0<br />

-29.2<br />

10.5<br />

-80.4<br />

-14.8<br />

1.0000<br />

6.0<br />

19.3<br />

6.0<br />

19.3<br />

1.058<br />

-19.7<br />

1<br />

-113.4<br />

45.8<br />

0.996<br />

-27.8<br />

502<br />

NW KABUL G2<br />

6<br />

KHULM<br />

1<br />

57.6<br />

35.7<br />

0.0<br />

1<br />

13.6<br />

8.4<br />

1.041<br />

-16.7<br />

-120.3<br />

41.8<br />

2<br />

CHARIKAR<br />

-20.9<br />

1.032<br />

-9.2<br />

-128.2<br />

114.6<br />

-169.6<br />

1.015<br />

-31.5<br />

1.022<br />

-31.2<br />

36.0<br />

22.3<br />

169.6<br />

-47.2<br />

39.6<br />

-48.1<br />

47.2<br />

-31.8<br />

-1.4<br />

169.6<br />

1<br />

-47.2<br />

120<br />

BRESHNA KOT<br />

-31.8<br />

1.015<br />

-31.3<br />

13<br />

SHEKANBANDAR<br />

51.7<br />

-166.3<br />

51.7<br />

129.7<br />

-40.7<br />

123.0<br />

-45.2<br />

0.0<br />

-36.3<br />

17.2<br />

6.4<br />

19.1<br />

1.037<br />

-13.9<br />

-15.6<br />

3010<br />

SANGTUDA<br />

1.0000<br />

1.0000<br />

1.028<br />

104<br />

-31.0<br />

KABUL NORTH<br />

103<br />

12.5<br />

36.4 KABUL NO TAP<br />

-23.0<br />

23.2<br />

-13.3 15.6<br />

-11.9<br />

11.0<br />

-3.7<br />

1.017 105<br />

-31.4 KABUL EAST<br />

-7.5<br />

-1.7<br />

1.027<br />

-31.1<br />

1.024<br />

-15.9 3.4<br />

-2.7<br />

13.6<br />

8.4<br />

-17.0<br />

-5.7 310<br />

KUNDUZ<br />

-7.5<br />

-1.7<br />

311<br />

BORDER<br />

1.023<br />

-16.3<br />

-4.5<br />

32.2<br />

0.7<br />

0.0<br />

0.0<br />

3.4<br />

1<br />

0.9<br />

9.1<br />

5.6<br />

-4.5 -2.8<br />

-2.8<br />

4.5<br />

2.7<br />

7.5<br />

1.0<br />

13.6<br />

8.4<br />

-12.0<br />

-3.7<br />

-12.0<br />

-3.7<br />

-0.1<br />

1.010<br />

2.0<br />

-26.4<br />

-3.4<br />

-2.1<br />

0.1<br />

-2.0<br />

22.0<br />

-3.2R<br />

18.0<br />

-2.5R<br />

-3.4<br />

0.0<br />

-3.4<br />

0.0<br />

3.4<br />

-3.4<br />

505<br />

NAGHLU HPP 1<br />

21.4<br />

-2.5<br />

0.0<br />

-0.0<br />

1.020<br />

-29.1<br />

3.4<br />

0.0 21.6<br />

25.0 -2.5<br />

-2.5R<br />

511<br />

MAHIPAR HPP1<br />

1.028 22.0<br />

-31.0<br />

512 -3.2R<br />

21.9 -21.6<br />

1.020<br />

MAHIPAR HPP2<br />

-31.3 -0.1 0.1 -1.3<br />

2.4<br />

45.0<br />

2.0 -2.0<br />

22.0<br />

1.010<br />

21.8<br />

22.3<br />

-26.4 -22.2<br />

-5.5L<br />

-9.4<br />

10.9<br />

-1.4<br />

-169.6<br />

4<br />

PUL-E-KHUMRI<br />

-47.3<br />

-9.4<br />

47.4<br />

9.3<br />

24.8<br />

25.4<br />

527<br />

KABUL CENTRL<br />

-24.7<br />

-25.5<br />

47.2<br />

11<br />

BAGHLAN<br />

72.0<br />

34.9<br />

1<br />

76.5<br />

37.1<br />

1.011<br />

-31.5<br />

-166.3<br />

-19.2<br />

-6.5<br />

-19.2<br />

-6.5<br />

351.9<br />

-74.6R<br />

176.0<br />

-37.3<br />

176.0<br />

-37.3<br />

-20.6<br />

1.030<br />

0.0<br />

12<br />

KUNDUZ<br />

0.0<br />

-43.1<br />

62.7<br />

-26.5<br />

-13.3<br />

26.7<br />

-25.0 25.0<br />

-25.0 25.0<br />

-7.6<br />

7.3<br />

-7.6<br />

7.3<br />

-3.4<br />

-0.9<br />

525<br />

KABUL DIESEL<br />

100.0<br />

38.1R<br />

1.030<br />

-31.0<br />

1.020<br />

-29.1<br />

107<br />

NAGHLU<br />

0.0<br />

0.0<br />

13.6<br />

-0.7<br />

12.2<br />

-0.0<br />

12.2<br />

-0.0 4.8<br />

2.9<br />

13.8<br />

1.043<br />

-30.1<br />

-32.2 32.4 0.3<br />

-0.7<br />

0.1 -7.8<br />

1.026<br />

-30.4<br />

-62.2<br />

-25.3<br />

0.0<br />

0.0<br />

4.5<br />

2.7<br />

7.5<br />

1.0<br />

115<br />

BOT-KHAK<br />

14<br />

TALUQAN<br />

35.0<br />

19.4<br />

13.7<br />

-2.4<br />

1.019<br />

-15.5<br />

1.0000<br />

106<br />

PULI CHARKHI<br />

122<br />

P CHARK TP N<br />

1.0500<br />

1.0000<br />

1.021<br />

-16.3<br />

3.4<br />

2.1<br />

314<br />

IMAM SABIB<br />

-34.7<br />

-16.0<br />

1.0000<br />

21.9<br />

-1.3<br />

1.010<br />

-26.4<br />

1.0000<br />

1.0000<br />

7.9<br />

301<br />

TALUQAN<br />

26.2 -25.7<br />

11.3 -13.0<br />

8.5<br />

4.7<br />

1.028<br />

-19.9<br />

3.4<br />

-0.0<br />

1.0200<br />

513<br />

MAHIPAR HPP3<br />

1.0200<br />

12.8<br />

1.0000<br />

1.0000<br />

304<br />

DASHT ARCHI<br />

0.998<br />

-21.1<br />

1.0200<br />

1.0200<br />

12.9<br />

5.1<br />

1.020<br />

-29.1<br />

506<br />

NAGHLU HPP 2<br />

1.020<br />

-29.1<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

114<br />

MAHIPAR<br />

32.8<br />

-7.9<br />

-21.2<br />

2.9<br />

-21.3<br />

2.9<br />

0.978<br />

-21.8<br />

-21.6 32.8-32.7<br />

2.4 -7.9 7.7<br />

1.035<br />

-29.5<br />

0.3<br />

32.4 -7.8<br />

0.1<br />

1.033<br />

-29.7<br />

1.026<br />

-20.0<br />

-8.5 8.5<br />

-5.3 5.3<br />

302<br />

RUSTAQ<br />

-0.1<br />

1<br />

12.8<br />

7.9<br />

-12.8<br />

-7.9<br />

113<br />

MAHIPAR TP N<br />

-32.7<br />

7.7<br />

305<br />

CHAH AB<br />

1.033<br />

-29.7<br />

-13.6<br />

-20.7<br />

10.0<br />

2.4<br />

-13.4<br />

-3.5<br />

1.000<br />

-16.5<br />

13.6 0.0<br />

8.4 -12.3R<br />

21<br />

FAIZABAD<br />

3.4<br />

1.1<br />

1.025<br />

-31.3<br />

110<br />

SAROBI TOWN<br />

-4.8 4.8<br />

-2.9 3.0<br />

0.1<br />

-14.5<br />

1.043<br />

-30.1<br />

-0.3<br />

5.8<br />

-0.3<br />

5.8<br />

112<br />

MAHIPAR TP S<br />

108<br />

JALALABAD<br />

1.0000<br />

111<br />

SAROBI GEN<br />

1.029<br />

0.2<br />

0.0 -29.9<br />

0.0<br />

2.8 -2.8<br />

-2.8L<br />

504<br />

SAROBI HPP 2<br />

0.2<br />

-0.0<br />

1.038<br />

-29.9<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

1.0000<br />

3.4<br />

2.1<br />

-3.4<br />

-2.1<br />

1.000<br />

0.0<br />

1.024<br />

-31.4<br />

109<br />

MEHTARLAM<br />

509<br />

DARUNTA DPP<br />

1.038<br />

-0.0 -29.9<br />

0.0<br />

503<br />

SAROBI HPP 1


8.4<br />

13.6<br />

1.7<br />

-28.2<br />

-3.3<br />

28.6 -6.7<br />

4.1<br />

4.7<br />

-4.0<br />

-10.210.0<br />

-11.0<br />

22.3<br />

12.5<br />

-22.2<br />

-10.1<br />

0.0<br />

0.0<br />

-9.5<br />

-9.7<br />

0.0<br />

0.0<br />

0.0<br />

-44.7<br />

170.3<br />

49.4<br />

-37.7<br />

130.5<br />

36.7<br />

-129.0<br />

0.0<br />

3.4<br />

0.0<br />

-3.4<br />

2.7<br />

-0.1<br />

-2.7<br />

0.1<br />

-2.7<br />

0.1<br />

2.7<br />

-0.1<br />

-5.5L<br />

22.0<br />

2.7<br />

-28.5 28.6<br />

-12.3<br />

7.6<br />

11.5<br />

-7.6<br />

-1.9<br />

-15.7<br />

-1.7<br />

15.9<br />

-1.9<br />

-15.7<br />

-1.7<br />

15.9<br />

-0.8<br />

11.1<br />

0.1<br />

-11.1<br />

2.7<br />

4.5<br />

-2.8<br />

-4.5<br />

-2.1<br />

-3.4<br />

0.9<br />

3.4<br />

-0.5<br />

-2.0<br />

-0.0<br />

2.0<br />

1.003<br />

-25.8<br />

1<br />

13.6<br />

8.4<br />

81.8<br />

1.026<br />

-22.2<br />

1<br />

3.4<br />

2.1<br />

91.8<br />

8.3<br />

1<br />

85.3<br />

-29.8<br />

1<br />

11.1<br />

-28.1<br />

-11.2<br />

28.1<br />

-11.2<br />

1.007<br />

-31.8<br />

11.0<br />

2.8<br />

-10.9<br />

-3.3<br />

1.025<br />

-29.7<br />

1<br />

10.9H<br />

1.0000<br />

-10.0<br />

10.9<br />

1.026<br />

-29.6<br />

1<br />

23.1 -10.6<br />

23.1<br />

11.6<br />

-22.9<br />

35.7<br />

1.004<br />

-31.9<br />

1<br />

19.9<br />

-56.2<br />

1.028<br />

-30.7<br />

1<br />

-19.9<br />

120<br />

BRESHNA KOT<br />

1.027<br />

-30.1<br />

1<br />

36.0<br />

22.3<br />

1.030<br />

-30.5<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.045<br />

-29.2<br />

1<br />

0.0<br />

0.0<br />

1.028<br />

-30.4<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

-0.8<br />

-13.4<br />

-3.5<br />

110<br />

SAROBI TOWN<br />

1.045<br />

-29.2<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

-4.8<br />

-3.0<br />

505<br />

NAGHLU HPP 1<br />

1<br />

-5.4R<br />

1.0000<br />

21.4<br />

-5.4<br />

1.020<br />

-28.2<br />

4<br />

25.0<br />

-5.4R<br />

1.0200<br />

1.0000<br />

-21.3<br />

5.8<br />

2<br />

-3.4<br />

0.0<br />

1.020<br />

-28.2<br />

3<br />

-3.4<br />

0.0<br />

3.4<br />

111<br />

SAROBI GEN<br />

1.043<br />

-28.9<br />

-4.0<br />

4.7<br />

4.1<br />

503<br />

SAROBI HPP 1<br />

1.043<br />

-28.9<br />

1<br />

1.0000<br />

1.0000<br />

-0.0<br />

0.0<br />

504<br />

SAROBI HPP 2<br />

1.033<br />

-28.9<br />

2<br />

0.0<br />

-2.8L<br />

1.0000<br />

2.8 -2.8<br />

0.2<br />

1.0000<br />

0.0<br />

-0.0<br />

114<br />

MAHIPAR<br />

-32.7<br />

10.0<br />

1.035<br />

-29.2<br />

1<br />

0.0<br />

0.0<br />

28.5<br />

-2.7<br />

-28.2<br />

511<br />

MAHIPAR HPP1<br />

1.013<br />

-25.3<br />

22.0<br />

-5.5L<br />

1.0200<br />

1.0000<br />

21.9<br />

-2.7<br />

1.013<br />

-25.3<br />

3<br />

22.0<br />

-5.5L<br />

1.0200<br />

1.0000<br />

21.9<br />

-2.7<br />

109<br />

MEHTARLAM<br />

1.026<br />

-30.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

-3.4<br />

-2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

13.6<br />

-95.2<br />

-10.4<br />

-95.4<br />

5.7<br />

1<br />

13.6<br />

8.4<br />

16.3<br />

1.052<br />

-19.9<br />

1<br />

8.4<br />

-10.9<br />

1.036<br />

-16.8<br />

1<br />

8.4<br />

-45.2<br />

-121.0<br />

39.1<br />

123.7<br />

7<br />

NAIBABAD<br />

2.7<br />

1.7<br />

-16.1<br />

-2.7<br />

-1.7<br />

13<br />

SHEKANBANDAR<br />

1.030<br />

-9.2<br />

-167.1<br />

49.4<br />

170.3<br />

14<br />

TALUQAN<br />

1.016<br />

-15.6<br />

17.4<br />

-62.2<br />

-23.6<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

17.2<br />

6.4<br />

-17.0<br />

-5.7<br />

1.000<br />

-16.6<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

-4.3<br />

-13.6<br />

-18.8<br />

301<br />

TALUQAN<br />

1.025<br />

-20.0<br />

1.0000<br />

1.0500<br />

19.4<br />

-34.7<br />

-16.1<br />

302<br />

RUSTAQ<br />

1.023<br />

-20.1<br />

1<br />

5.3<br />

8.5<br />

4.7<br />

-8.5<br />

304<br />

DASHT ARCHI<br />

0.994<br />

-21.2<br />

1<br />

12.8<br />

7.9<br />

26.2<br />

11.4<br />

-25.7<br />

-13.1<br />

305<br />

CHAH AB<br />

0.975<br />

-21.9<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.2<br />

-12.7<br />

-7.9<br />

35.0<br />

311<br />

BORDER<br />

3.4<br />

-2.7<br />

-3.4<br />

-0.9<br />

314<br />

IMAM SABIB<br />

1.017<br />

-16.4<br />

3.4<br />

2.1<br />

3010<br />

SANGTUDA<br />

1<br />

1<br />

201<br />

MAZAR-E-SHRF<br />

0.993<br />

-2.4<br />

1<br />

8.4<br />

21.5<br />

204<br />

DAWLATABAD<br />

0.991<br />

-2.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

-3.4<br />

209<br />

MAZAR NO 1<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

-0.0<br />

-2.0<br />

-0.5<br />

0.996<br />

-2.6<br />

0.0<br />

-4.0<br />

-0.0<br />

-0.0<br />

-2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

202<br />

SHEBERGHAN<br />

0.975<br />

-7.2<br />

1<br />

13.6<br />

8.4<br />

1.004<br />

-4.3<br />

1<br />

8.5<br />

5.3<br />

-28.2<br />

-0.8<br />

29.1<br />

-1.6<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.7<br />

-13.6<br />

-8.4<br />

0.978<br />

-7.3<br />

0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

1<br />

0.0<br />

-0.0<br />

522<br />

SHEBERGHAN 2<br />

0.975<br />

-7.2<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.0 -0.0<br />

523<br />

SHEBERGHAN 3<br />

0.975<br />

-7.2<br />

3<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

-0.0<br />

-0.0<br />

-3.8<br />

206<br />

SHERIM TAQAB<br />

0.987<br />

-8.1<br />

1<br />

8.5<br />

5.3<br />

-9.2<br />

-25.7<br />

1.030<br />

0.0<br />

15.7 -13.6<br />

6.0<br />

67.0<br />

0.0<br />

207<br />

JUMABAZAR<br />

0.987<br />

-8.9<br />

1<br />

3.4<br />

17.2<br />

-11.2<br />

10.1<br />

2.1<br />

208<br />

MAIMANA<br />

0.983<br />

-9.5<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

-2.5<br />

-13.6<br />

1.2<br />

11.6H<br />

-4.5<br />

-2.8<br />

3.9<br />

1.030<br />

-30.5<br />

1.040<br />

-28.6<br />

115<br />

BOT-KHAK<br />

-20.3<br />

14.6<br />

20.5<br />

-15.3<br />

-11.1<br />

0.1<br />

11.1<br />

-0.8<br />

-21.6<br />

-10.4R<br />

21<br />

FAIZABAD<br />

1.021<br />

-16.0<br />

1.0000<br />

1.0000<br />

-21.6<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.009<br />

-31.6 3.9<br />

1.7<br />

0.2<br />

-21.2<br />

-5.4<br />

21.6<br />

1.0200<br />

5.8<br />

3.4<br />

506<br />

NAGHLU HPP 2<br />

104<br />

KABUL NORTH<br />

0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

1.4R<br />

0.0<br />

1.0000<br />

0.0<br />

-9.7<br />

-17.1<br />

0.5<br />

1.019<br />

-16.3<br />

4.5<br />

-21.6<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.013<br />

-25.3<br />

1.041<br />

-28.4<br />

-10.2<br />

32.8<br />

-29.8<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

-0.0<br />

1.020<br />

-28.2<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-28.2<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8-32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.040<br />

-28.6<br />

-3.3 -6.7<br />

1<br />

96.3<br />

3<br />

KHENJAN<br />

8.4<br />

98.0<br />

0.0<br />

13.6<br />

1.049<br />

-19.7<br />

-22.3<br />

0.986<br />

-28.0<br />

-2.7<br />

18.0<br />

-0.0<br />

1.0500<br />

35.8<br />

1.0500<br />

11.1<br />

28.1<br />

-85.0<br />

30.5<br />

63.0<br />

11.1<br />

11.1<br />

-11.2<br />

28.1<br />

-28.1<br />

-28.1<br />

-11.2<br />

11.8<br />

0.0<br />

-64.3<br />

26.7<br />

1.043<br />

-19.3<br />

76.5<br />

-114.2<br />

-81.0<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

1<br />

-85.0<br />

13.6<br />

-16.3<br />

2<br />

CHARIKAR<br />

28.1<br />

57.6<br />

-20.4<br />

0.0<br />

-28.1<br />

21.1<br />

6.5<br />

-21.1<br />

-6.9<br />

21.1<br />

6.5<br />

-21.1<br />

-6.9<br />

1.0000<br />

10.9<br />

5<br />

AIBAK<br />

6.1<br />

0.0<br />

21.8<br />

0.0<br />

2.7<br />

101<br />

CHIMTALAH<br />

-89.5<br />

0.0<br />

35.8<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

-20.2<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1 ,TAJIKISTAN SOURCE, CONTINGENCY BRESHNA K -CENTRAL<br />

MON, NOV 19 2007 19:53<br />

1.030<br />

0.0<br />

-2.2<br />

21.6<br />

1.024<br />

-0.4<br />

2.2<br />

-21.5<br />

1.4<br />

2011<br />

AMU<br />

-5.8<br />

8<br />

HAIRATAN<br />

-21.0<br />

0.0<br />

SW<br />

7.6<br />

1.052<br />

-19.8<br />

115.4<br />

4<br />

PUL-E-KHUMRI<br />

-44.7<br />

-167.1<br />

0.0<br />

-5.3<br />

310<br />

KUNDUZ<br />

176.8<br />

-170.3<br />

-34.7<br />

-2.0 -6.5<br />

-170.3<br />

44.7<br />

-34.7<br />

1.030<br />

0.0<br />

108<br />

JALALABAD<br />

8.5<br />

524<br />

SHEBERGHAN 4<br />

353.5<br />

21.6<br />

62.7<br />

0.0<br />

-42.7<br />

-14.2<br />

SW<br />

-38.9<br />

1.0000<br />

85.3<br />

-25.6<br />

1.034<br />

-14.0<br />

-54.4<br />

0.0<br />

43.0<br />

-15.9<br />

11<br />

BAGHLAN<br />

-42.2<br />

-13.6R<br />

0.952<br />

-8.0<br />

67.0<br />

44.7<br />

-69.4R<br />

176.8<br />

0.0<br />

100.0<br />

525<br />

KABUL DIESEL<br />

1.029<br />

-30.7<br />

21.8<br />

102<br />

KABUL NW<br />

1.0000<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

40.5<br />

19.6<br />

1<br />

526<br />

KABUL SW<br />

1.005<br />

-31.8<br />

502<br />

NW KABUL G2<br />

6<br />

KHULM<br />

1<br />

50.0H<br />

56.3<br />

105<br />

KABUL EAST<br />

-1.2<br />

-7.7<br />

1.2<br />

7.4<br />

-1.2 1.2<br />

7.4<br />

-45.3<br />

-16.7<br />

46.1<br />

16.6<br />

51.5<br />

18.6<br />

-16.7<br />

-18.4<br />

12<br />

KUNDUZ<br />

-50.6<br />

72.4<br />

35.3<br />

-72.0<br />

-34.9<br />

72.0<br />

34.9<br />

1<br />

527<br />

KABUL CENTRL<br />

0.997<br />

-32.2<br />

13.6<br />

103<br />

KABUL NO TAP<br />

-7.7<br />

1.011<br />

-31.6


8.4<br />

13.6<br />

-6.6<br />

-31.8<br />

5.4<br />

32.4 -9.5<br />

0.3<br />

7.5<br />

-0.3<br />

-4.2 4.0<br />

-7.0<br />

22.3<br />

8.3<br />

-22.2<br />

-10.1<br />

0.0<br />

0.0<br />

-9.5<br />

-9.7<br />

0.0<br />

0.0<br />

0.0<br />

-41.7<br />

183.5<br />

48.8<br />

-35.2<br />

143.1<br />

35.7<br />

-141.3<br />

0.0<br />

3.4<br />

0.0<br />

-3.4<br />

0.7<br />

-0.1<br />

-0.7<br />

0.1<br />

-0.7<br />

0.1<br />

0.7<br />

-0.1<br />

-5.5L<br />

22.0<br />

-5.9<br />

-32.1 32.4<br />

-17.9<br />

0.2<br />

17.2<br />

-0.1<br />

-6.8<br />

-12.0<br />

3.2<br />

12.2<br />

-6.8<br />

-12.0<br />

3.2<br />

12.2<br />

4.1<br />

7.5<br />

-4.8<br />

-7.5<br />

2.7<br />

4.5<br />

-2.8<br />

-4.5<br />

-2.1<br />

-3.4<br />

1.0<br />

3.4<br />

-0.5<br />

-2.0<br />

-0.0<br />

2.0<br />

0.991<br />

-28.5<br />

1<br />

13.6<br />

8.4<br />

93.1<br />

1.013<br />

-24.4<br />

1<br />

3.4<br />

2.1<br />

103.5<br />

4.8<br />

1<br />

96.3<br />

-21.4<br />

1<br />

6.8<br />

-33.6<br />

-6.9<br />

33.7<br />

-6.9<br />

1.003<br />

-35.6<br />

13.5<br />

-6.1<br />

-13.4<br />

5.7<br />

1.020<br />

-33.5<br />

1<br />

10.9H<br />

1.0000<br />

-10.0<br />

10.9<br />

1.004<br />

-35.4<br />

-0.0<br />

0.0<br />

0.0<br />

0.2<br />

35.7<br />

1.001<br />

-35.7<br />

1<br />

13.5<br />

-36.3<br />

1.017<br />

-35.5<br />

1<br />

-13.5<br />

120<br />

BRESHNA KOT<br />

1.004<br />

-35.6<br />

1<br />

36.0<br />

22.3<br />

1.019<br />

-35.4<br />

1<br />

9.1<br />

5.6<br />

107<br />

NAGHLU<br />

1.039<br />

-34.6<br />

1<br />

0.0<br />

0.0<br />

1.021<br />

-35.9<br />

1<br />

10.0<br />

2.4<br />

13.6<br />

-0.7<br />

-13.4<br />

-3.5<br />

110<br />

SAROBI TOWN<br />

1.038<br />

-34.6<br />

1<br />

4.8<br />

3.0<br />

4.8<br />

2.9<br />

-4.8<br />

-2.9<br />

505<br />

NAGHLU HPP 1<br />

1<br />

2.5R<br />

1.0000<br />

21.4<br />

2.5<br />

1.020<br />

-33.6<br />

4<br />

25.0<br />

2.5R<br />

1.0200<br />

1.0000<br />

-21.3<br />

-2.1<br />

2<br />

-3.4<br />

0.0<br />

1.020<br />

-33.6<br />

3<br />

-3.4<br />

0.0<br />

3.4<br />

111<br />

SAROBI GEN<br />

1.033<br />

-34.4<br />

-0.3<br />

7.5<br />

0.3<br />

503<br />

SAROBI HPP 1<br />

1.033<br />

-34.4<br />

1<br />

1.0000<br />

1.0000<br />

0.0<br />

-0.0<br />

504<br />

SAROBI HPP 2<br />

1.024<br />

-34.4<br />

2<br />

0.0<br />

-2.8L<br />

1.0000<br />

2.8 -2.8<br />

0.2<br />

1.0000<br />

-0.0<br />

0.0<br />

114<br />

MAHIPAR<br />

-32.7<br />

4.0<br />

1.017<br />

-34.8<br />

1<br />

0.0<br />

0.0<br />

32.2<br />

5.9<br />

-31.8<br />

511<br />

MAHIPAR HPP1<br />

1.010<br />

-30.9<br />

22.0<br />

0.4R<br />

1.0200<br />

1.0000<br />

21.9<br />

1.1<br />

1.010<br />

-30.9<br />

3<br />

22.0<br />

0.4R<br />

1.0200<br />

1.0000<br />

21.9<br />

1.1<br />

109<br />

MEHTARLAM<br />

1.020<br />

-35.9<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.1<br />

-3.4<br />

-2.1<br />

1.000<br />

0.0<br />

1<br />

2<br />

3<br />

1.0000<br />

509<br />

DARUNTA DPP<br />

1<br />

13.6<br />

-106.9<br />

-6.9<br />

-106.7<br />

4.0<br />

1<br />

13.6<br />

8.4<br />

16.3<br />

1.039<br />

-21.6<br />

1<br />

8.4<br />

-10.9<br />

1.025<br />

-18.2<br />

1<br />

8.4<br />

-44.1<br />

-133.1<br />

39.4<br />

136.3<br />

7<br />

NAIBABAD<br />

2.7<br />

1.7<br />

-15.6<br />

-2.7<br />

-1.7<br />

13<br />

SHEKANBANDAR<br />

1.022<br />

-9.9<br />

-179.7<br />

48.8<br />

183.5<br />

14<br />

TALUQAN<br />

1.008<br />

-16.8<br />

12.8<br />

-62.2<br />

-18.8<br />

1<br />

13.6<br />

8.4<br />

1.0000<br />

1.0000<br />

17.2<br />

6.5<br />

-17.0<br />

-5.8<br />

1.000<br />

-17.9<br />

1<br />

13.6<br />

8.4<br />

1<br />

0.0<br />

13.7<br />

-9.2<br />

-13.6<br />

-13.8<br />

301<br />

TALUQAN<br />

1.016<br />

-21.3<br />

1.0000<br />

1.0500<br />

19.6<br />

-34.7<br />

-16.2<br />

302<br />

RUSTAQ<br />

1.014<br />

-21.4<br />

1<br />

5.3<br />

8.5<br />

4.7<br />

-8.5<br />

304<br />

DASHT ARCHI<br />

0.985<br />

-22.5<br />

1<br />

12.8<br />

7.9<br />

26.2<br />

11.5<br />

-25.7<br />

-13.1<br />

305<br />

CHAH AB<br />

0.965<br />

-23.2<br />

1<br />

12.8<br />

7.9<br />

12.9<br />

5.2<br />

-12.7<br />

-7.9<br />

35.0<br />

311<br />

BORDER<br />

3.4<br />

-2.6<br />

-3.4<br />

-1.0<br />

314<br />

IMAM SABIB<br />

1.007<br />

-17.6<br />

3.4<br />

2.1<br />

3010<br />

SANGTUDA<br />

1<br />

1<br />

201<br />

MAZAR-E-SHRF<br />

0.993<br />

-2.4<br />

1<br />

8.4<br />

21.5<br />

204<br />

DAWLATABAD<br />

0.991<br />

-2.5<br />

1<br />

3.4<br />

2.1<br />

3.4<br />

1.3<br />

-3.4<br />

209<br />

MAZAR NO 1<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

0.5<br />

2.0<br />

-0.0<br />

-2.0<br />

-0.5<br />

0.996<br />

-2.6<br />

0.0<br />

-4.0<br />

-0.0<br />

-0.0<br />

-2.1 250<br />

MAZAR TIE E<br />

210<br />

MAZAR NO 2<br />

0.992<br />

-2.5<br />

1<br />

2.0<br />

202<br />

SHEBERGHAN<br />

0.975<br />

-7.2<br />

1<br />

13.6<br />

8.4<br />

1.004<br />

-4.3<br />

1<br />

8.5<br />

5.3<br />

-28.2<br />

-0.8<br />

29.1<br />

-1.6<br />

1<br />

13.6<br />

8.4<br />

13.8<br />

5.7<br />

-13.6<br />

-8.4<br />

0.978<br />

-7.3<br />

0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

1<br />

0.0<br />

-0.0<br />

522<br />

SHEBERGHAN 2<br />

0.975<br />

-7.2<br />

2<br />

1.0000<br />

1.0000<br />

0.2<br />

0.0 -0.0<br />

523<br />

SHEBERGHAN 3<br />

0.975<br />

-7.2<br />

3<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

-0.0<br />

0.975<br />

-7.2<br />

4<br />

1.0000<br />

0.2<br />

0.0<br />

-0.0<br />

-0.0<br />

-3.8<br />

206<br />

SHERIM TAQAB<br />

0.987<br />

-8.1<br />

1<br />

8.5<br />

5.3<br />

-9.2<br />

-25.7<br />

1.030<br />

0.0<br />

15.7 -13.6<br />

6.0<br />

67.0<br />

0.0<br />

207<br />

JUMABAZAR<br />

0.987<br />

-8.9<br />

1<br />

3.4<br />

17.2<br />

-11.2<br />

10.1<br />

2.1<br />

208<br />

MAIMANA<br />

0.983<br />

-9.5<br />

1<br />

13.6<br />

8.4<br />

13.7<br />

-2.5<br />

-13.6<br />

1.2<br />

-4.5<br />

-2.8<br />

0.0<br />

1.019<br />

-35.4<br />

1.027<br />

-34.2<br />

115<br />

BOT-KHAK<br />

19.9<br />

21.0<br />

-19.7<br />

-21.6<br />

-7.5<br />

-4.8<br />

7.5<br />

4.1<br />

-21.7<br />

-5.3R<br />

21<br />

FAIZABAD<br />

1.010<br />

-17.2<br />

1.0000<br />

1.0000<br />

-21.6<br />

501<br />

NW KABUL G1<br />

1.0000<br />

2.7<br />

21.8<br />

45.0<br />

1.004<br />

-35.4 0.0<br />

-6.6<br />

0.2<br />

-21.2<br />

2.5<br />

21.6<br />

1.0200<br />

-2.1<br />

3.4<br />

506<br />

NAGHLU HPP 2<br />

104<br />

KABUL NORTH<br />

0.0<br />

1.0000<br />

0.2<br />

0.0<br />

0.0<br />

1.4R<br />

0.0<br />

1.0000<br />

0.0<br />

-9.7<br />

-17.1<br />

0.5<br />

1.008<br />

-17.5<br />

4.5<br />

-21.7<br />

2<br />

512<br />

MAHIPAR HPP2<br />

1<br />

1.010<br />

-30.9<br />

1.028<br />

-34.0<br />

-4.2<br />

32.8<br />

-21.4<br />

507<br />

NAGHLU HPP 3<br />

508<br />

NAGHLU HPP 4<br />

122<br />

P CHARK TP N<br />

-0.0<br />

1.020<br />

-33.6<br />

106<br />

PULI CHARKHI<br />

1.020<br />

-33.6<br />

1.0000<br />

251<br />

MAZAR TIE W<br />

1.0000<br />

1.0000<br />

1.0000<br />

113<br />

MAHIPAR TP N<br />

32.8-32.7<br />

513<br />

MAHIPAR HPP3<br />

112<br />

MAHIPAR TP S<br />

1.027<br />

-34.2<br />

5.4 -9.5<br />

1<br />

108.4<br />

3<br />

KHENJAN<br />

8.4<br />

110.0<br />

0.0<br />

13.6<br />

1.036<br />

-21.5<br />

-21.5<br />

0.976<br />

-31.3<br />

-2.7<br />

18.0<br />

-0.0<br />

1.0500<br />

28.7<br />

1.0500<br />

6.8<br />

33.7<br />

-96.1<br />

30.5<br />

63.0<br />

6.8<br />

6.8<br />

-6.9<br />

33.7<br />

-33.6<br />

-33.6<br />

-6.9<br />

6.3<br />

0.0<br />

-64.3<br />

26.7<br />

1.030<br />

-21.0<br />

76.5<br />

-126.2<br />

-92.0<br />

521<br />

SHEBERGHAN 1<br />

4011<br />

BORDER_1<br />

203<br />

ANDKHOI<br />

1<br />

-96.1<br />

13.6<br />

-16.3<br />

2<br />

CHARIKAR<br />

33.7<br />

57.6<br />

-20.2<br />

0.0<br />

-33.6<br />

19.4<br />

-2.8<br />

-19.3<br />

2.4<br />

19.4<br />

-2.8<br />

-19.3<br />

2.4<br />

1.0000<br />

10.9<br />

5<br />

AIBAK<br />

4.3<br />

0.0<br />

21.8<br />

0.0<br />

2.7<br />

101<br />

CHIMTALAH<br />

-100.6<br />

0.0<br />

28.7<br />

1<br />

CHIMTALAH<br />

205<br />

SAREPUL<br />

37.1<br />

-20.1<br />

AFGHANISTAN NORTHEAST POWER SYSTEM, 100 MW KABUL DIESEL<br />

OPTION 1 ,TAJIKISTAN SOURCE, ONE UNIT KABUL NW OUT<br />

TUE, NOV 20 2007 8:38<br />

1.030<br />

0.0<br />

-2.2<br />

21.6<br />

1.024<br />

-0.4<br />

2.2<br />

-21.5<br />

1.4<br />

2011<br />

AMU<br />

-5.8<br />

8<br />

HAIRATAN<br />

-21.0<br />

0.0<br />

SW<br />

7.2<br />

1.039<br />

-21.6<br />

127.7<br />

4<br />

PUL-E-KHUMRI<br />

-41.7<br />

-179.7<br />

0.0<br />

-5.3<br />

310<br />

KUNDUZ<br />

190.9<br />

-183.5<br />

-27.2<br />

-2.1 -6.4<br />

-183.5<br />

41.7<br />

-27.2<br />

1.030<br />

0.0<br />

108<br />

JALALABAD<br />

8.5<br />

524<br />

SHEBERGHAN 4<br />

381.7<br />

21.6<br />

62.7<br />

0.0<br />

-41.9<br />

-8.9<br />

SW<br />

-38.1<br />

1.0000<br />

96.3<br />

-24.8<br />

1.024<br />

-15.1<br />

-53.1<br />

0.0<br />

43.3<br />

-9.2<br />

11<br />

BAGHLAN<br />

-39.7<br />

-13.6R<br />

0.952<br />

-8.0<br />

67.0<br />

41.7<br />

-54.5R<br />

190.9<br />

0.0<br />

100.0<br />

525<br />

KABUL DIESEL<br />

1.020<br />

-35.3<br />

21.8<br />

102<br />

KABUL NW<br />

1.0000<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

20.3<br />

9.5<br />

-20.2<br />

-9.8<br />

40.5<br />

19.6<br />

1<br />

526<br />

KABUL SW<br />

1.000<br />

-35.6<br />

502<br />

NW KABUL G2<br />

6<br />

KHULM<br />

1<br />

50.0H<br />

36.3<br />

105<br />

KABUL EAST<br />

-25.0<br />

-6.3<br />

25.0<br />

6.1<br />

-25.0 25.0<br />

6.1<br />

-22.9<br />

-19.1<br />

23.2<br />

18.4<br />

26.7<br />

19.7<br />

-10.0<br />

-20.3<br />

12<br />

KUNDUZ<br />

-26.3<br />

47.4<br />

22.7<br />

-47.2<br />

-22.6<br />

24.8<br />

12.1<br />

-24.8<br />

-12.3<br />

72.0<br />

34.9<br />

1<br />

527<br />

KABUL CENTRL<br />

0.999<br />

-35.8<br />

13.6<br />

-6.3<br />

1.006<br />

-35.3<br />

103<br />

KABUL NO TAP


Appendix<br />

H<br />

Cost <strong>of</strong> Medium Term Investments by<br />

Project<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International H-1


Medium Term Investments for Central Substation<br />

Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

C-510 P-B4-9 Exit <strong>of</strong> Central C- N-515_JS2_531- Cable 240 Replace<br />

510<br />

Qasr Delkosha #<br />

1&2<br />

C-510 P-C4-4 N-515_JS2_531- N-515_JS2_531- Cable 240 Replace<br />

Qasr Delkosha # Ariana Hotel<br />

1&2<br />

C-510 P-C4-5 N-515_JS2_531- E-541-Andimark Cable 240 Replace<br />

Ariana Hotel<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

Sum<br />

187,357 1.57 294,151 0 294,151<br />

187,357 0.77 144,265 0 144,265<br />

187,357 0.97 181,736 0 181,736<br />

C-510 P-C4-6 E-541-Andimark E-541-148 Overhead 185 Reconductor 15,142 0.42 6,360 0 6,360<br />

C-510 P-C4-6 E-541-148 E-541-145 Overhead 120 Reconductor 13,888 0.15 2,083 0 2,083<br />

C-510 P-C4-6 E-541-145 E-541-143 Overhead 120 Reconductor 13,888 0.08 1,111 0 1,111<br />

C-510 P-C4-6 E-541-143 E-541-135 Overhead 120 Reconductor 13,888 0.42 5,833 0 5,833<br />

C-510 P-C4-6 E-541-135 E-541-132 Overhead 120 Reconductor 13,888 0.11 1,528 0 1,528<br />

C-510 P-C4-12 E-541-148 E-541-154 Overhead 120 Reconductor 13,888 0.24 3,333 0 3,333<br />

C-510 P-C4-12 E-541-154 E-541-156 Overhead 120 Reconductor 13,888 0.11 1,528 0 1,528<br />

C-510 P-C4-12 E-541-156 E-541-157 Overhead 120 Reconductor 13,888 0.11 1,528 0 1,528<br />

C-510 P-C4-12 E-541-157 E-541-164 Overhead 120 Reconductor 13,888 0.34 4,722 0 4,722<br />

C-510 P-C4-12 E-541-164 E-541-166 Overhead 120 Reconductor 13,888 0.12 1,667 0 1,667<br />

C-510 P-C4-12 E-541-166 E-541-170 Overhead 120 Reconductor 13,888 0.25 3,472 0 3,472<br />

C-510 P-C4-12 E-541-170 E-541-171 Overhead 120 Reconductor 13,888 0.05 694 0 694<br />

C-510 P-C4-12 E-541-171 E-541-183 Overhead 120 Reconductor 13,888 0.05 694 0 694<br />

N-518_JS2_E_1_2 -Cable 240 Replace<br />

C-511 P-B4-8 Exit <strong>of</strong> Central C-<br />

511<br />

C-511 P-C4-3 N-518_JS2_E_1_2 -<br />

Adare Omor<br />

187,357 1.98 370,967 0 370,967<br />

N-518_JS2_E_1_2- Cable<br />

Adare Omor Kartografi<br />

240 Replace<br />

187,357 0.36 67,449 0 67,449<br />

C-511 P-C4-3 N-518_JS2_E_1_2- N-518_JS2_E_1_2- Cable<br />

Kartografi<br />

Wezarat Mahdan<br />

240 Replace<br />

187,357 0.04 7,494 0 7,494<br />

C-511 P-C4-3 N-518_JS2_E_1_2- N/A Switch N/A Add new<br />

Kartografi<br />

switches to<br />

separate <strong>the</strong><br />

feeder in 3<br />

sections 3,500 1.00 3,500 0 3,500<br />

C-511 P-C4-9 N-518_JS2_E_1_2- N-518_JS2_B_1_2- Cable 50 Add new cable<br />

De <strong>Afghan</strong>istan Bank Melye<br />

sections to create<br />

Bank<br />

this connection.<br />

C-512 P-B4-5 Exit <strong>of</strong> Central C- N-515_JS2_D_2_7- Cable 240 Replace<br />

512<br />

Ehsaya Markazi (<br />

CSO ) # 1&2<br />

C-512 P-C4-1 N-515_JS2_D_2_7- N-516-Shash Darak Cable 240 Replace<br />

Ehsaya Markazi (<br />

CSO ) # 1&2<br />

C-512 P-C4-2 N-516-Shash Darak N-516-Ryasat Cable 240 Replace<br />

Amneyat # 16<br />

C-512 P-B4-3 N-516-Ryasat<br />

Amneyat # 16<br />

N-516-12_8 Cable 240 Replace. Probably<br />

new riser required<br />

152,346 0.22 33,516 8,750 42,266<br />

187,357 1.59 297,898 0 297,898<br />

187,357 0.33 61,828 0 61,828<br />

187,357 0.75 140,518 0 140,518<br />

187,357 0.17 31,851 0 31,851


Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

C-512 P-B4-3 N-516-12_8 N-516-12_1 Overhead 185 Reconductor 15,142 0.17 2,574 0 2,574<br />

C-512 P-B4-3 N-516-12_1 N-516-12_8 Switch N/A New riser and<br />

reconnect cable to<br />

N-516-Emalat<br />

khana Ordo 3,500 1.00 3,500 0 3,500<br />

C-512 P-B4-10 N-516-12_8 E-541-128 Overhead 185 New section 60,619 0.40 24,248 4,250 28,498<br />

C-512 P-B4-11 E-541-128 E-541-129 Overhead 120 Reconductor 13,888 0.09 1,250 0 1,250<br />

C-512 E-541-129 E-541-132 Overhead 120 Reconductor 13,888 0.16 2,222 0 2,222<br />

C-512 P-C4-7 E-541-132-7-a E-531-70 Overhead 120 Reconductor 13,888 0.53 7,361 0 7,361<br />

C-512 P-C4-8 E-541-132 E-541-132-7 Overhead 120 Reconductor 13,888 0.30 4,166 0 4,166<br />

C-512 E-541-132-7 E-541-132-7-a Overhead 120 Reconductor 13,888 0.11 1,528 0 1,528<br />

N-512-T#2 Wazir Cable 240 Replace<br />

C-513 P-B4-1 Exit <strong>of</strong> Central C-<br />

513<br />

C-513 P-B4-2 N-512-T#2 Wazir<br />

akbar khan<br />

C-513 P-B4-2 N-512-T#1 Wazir<br />

akbar khan<br />

akbar khan<br />

N-516-No-<br />

12Macroryan<br />

N-516-No-<br />

12Macroryan<br />

Cable 240 Replace cable<br />

and reconnect to<br />

# 12 Macroryan is<br />

necessary<br />

Cable 240 New cable section<br />

Sum<br />

187,357 1.41 264,174 0 264,174<br />

187,357 1.00 187,357 0 187,357<br />

187,357 0.14 26,230 8,750 34,980<br />

C-514 P-B4-13 Exit <strong>of</strong> Central C- N-512-121<br />

514<br />

Overhead 185 New Section<br />

60,619 1.35 81,835 4,250 86,085<br />

C-514 P-B4-14 N-512-121 N-512-108 Overhead 185 Reconductor 15,142 0.89 13,476 0 13,476<br />

C-514 P-B4-15 N-512-108 N-512-Bibi Mahro Overhead<br />

Muqabel<br />

185 New Section<br />

60,619 0.43 26,066 4,250 30,316<br />

C-514 P-B4-16 N-512-94 N-512-Bibi Mahro Overhead<br />

Muqabel<br />

185 Reconductor<br />

15,142 0.06 909 0 909<br />

C-514 P-B4-16 N-512-94 N-512-98 Overhead 185 Reconductor 15,142 0.27 4,088 0 4,088<br />

C-514 P-B4-17 N-512-98 N-517-No-20<br />

Macroryan<br />

Overhead 185 New Section<br />

60,619 0.47 28,491 4,250 32,741<br />

C-514 P-B4-19 N-516-No-11<br />

Macroryan<br />

N-517-No-17<br />

Macroryan<br />

Overhead 185 New Section<br />

60,619 0.21 12,730 4,250 16,980<br />

C-515 P-B4-18 Exit <strong>of</strong> Central C- N-516-Stera<br />

515<br />

Mahkama<br />

cable 240 New Section<br />

187,357 1.80 337,243 8,750 345,993<br />

C-515 P-B4-11 E-541-120 E-541-128 Overhead 120 Reconductor 13,888 0.31 4,305 0 4,305<br />

C-515 P-B4-12 N-516-516-18 N/A Switch N/A New switches<br />

reconnect to line<br />

between E-541-<br />

119 and E-541-<br />

120. 3,500 4.00 14,000 0 14,000<br />

C-516 P-B3-9 Exit <strong>of</strong> Central C- N-515_JS2_D_2_7- Cable 240 Replace<br />

516<br />

Emergency<br />

Hospital<br />

187,357 0.19 35,598 0 35,598<br />

C-516 P-B3-8 N-518_JS2_A_1_2- N-515_JS2_D_2_7- Cable 240 New Section<br />

Bland manzel Asrar Emergency<br />

Hospital<br />

187,357 0.80 149,886 8,750 158,636<br />

C-516 P-B3-7 N-518_JS2_A_1_2- N-518_JS2_B_2_5- Cable 120 New Section<br />

Bland manzel Asrar <strong>Kabul</strong> City Center #<br />

1&2<br />

185,350 0.47 87,114 8,750 95,864


Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

C-517 P-C3-1a Exit <strong>of</strong> Central C- N-518_JS2_B_2_5- Cable 240 Replace<br />

517<br />

Markaz<br />

Lesan(American<br />

Center)<br />

C-517 P-C3-1a N-518_JS2_B_2_5-<br />

Markaz<br />

Lesan(American<br />

Center)<br />

N-518_JS2_B_2_5-<br />

Tank Teel Shahr<br />

now<br />

Cable 240 Replace<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

Sum<br />

187,357 0.73 136,771 0 136,771<br />

187,357 0.47 88,058 0 88,058<br />

C-517 P-B3-1 N-518_JS2_B_2_5- N/A Switch N/A Open Cable Haji<br />

Tank Teel Shahr<br />

Yahqoob to Tank<br />

now<br />

Teel Shahr<br />

reconnect at this<br />

point and install<br />

Switches 3,500 4.00 14,000 0 14,000<br />

C-517 P-C3-2a N-518_JS2_A_1_2- N-529_JS5_B_2_5- cable 50 New Section<br />

Mokhaberat Shahre Zamini Qowae<br />

now<br />

Markaz<br />

152,346 0.33 50,274 8,750 59,024<br />

C-518 P-B4-19 Exit <strong>of</strong> Central C- N-518_JS2_B_1_2- cable<br />

518<br />

Sedarat<br />

240 Replace<br />

187,357 0.97 181,736 0 181,736<br />

Khetabkana_SW cable 240 Replace<br />

C-518 P-C4-10 N-518_JS2_B_1_2-<br />

Sedarat<br />

(near N-<br />

518_JS2_B_1_2-<br />

Khetabkhana<br />

Aama)<br />

C-518 P-C3-2 Khetabkana_SW N/A Switch N/A Rearrange<br />

(near N-<br />

connections and<br />

518_JS2_B_1_2-<br />

install switches.<br />

Khetabkhana<br />

Aama)<br />

C-518 P-C3-5a Khetabkana_SW BK-JS-1-A-1,2- Cable 95 Replace<br />

(near N- Mohammad Jan<br />

518_JS2_B_1_2- Khan<br />

Khetabkhana<br />

Aama)<br />

C-518 P-C3-4a BK-JS-1-A-1,2- BK-JS-1-A-1,2- Cable 95 Replace<br />

Mohammad Jan Welaayat<br />

Khan<br />

C-518 P-C3-4a BK-JS-1-A-1,2- BK-JS-1-A-1,2- Cable 50 Replace<br />

Welaayat<br />

Qolabchakkan 1<br />

C-518 P-C3-3a BK-JS-1-A-1,2-<br />

Qolabchakkan 1<br />

C-518 P-C3-6a N-529_JS5_B_2_5-<br />

No_2_ Karte Ariana<br />

N-529_JS5_B_2_5-<br />

Amneiat Hospital<br />

Cable 50 New Section<br />

BK-JS-1-A-1,2-5 Overhead 70 New Section<br />

187,357 0.55 103,046 0 103,046<br />

3,500 5.00 17,500 0 17,500<br />

183,342 0.29 53,169 0 53,169<br />

183,342 0.67 122,839 0 122,839<br />

152,346 0.84 127,970 0 127,970<br />

152,346 0.66 100,548 8,750 109,298<br />

58,852 0.61 35,900 4,250 40,150


Medium Term Investments for Breshna Kot Substation<br />

Feeder Project From<br />

(node name)<br />

BK-510 P-D3-3<br />

Exit <strong>of</strong> Breshna Kot<br />

BK-510 P-D3-3<br />

BK-510<br />

To<br />

(node name)<br />

BK-510-New-2-1<br />

BK-510 P-D3-3 BK-510-2<br />

BK-516-Jangalak<br />

BK-510 P-D3-3 (near BK-516-<br />

Jangalak)<br />

BK-510 P-D3-3 BK-510-New-2-1 BK-New 2-2 (near<br />

BK-510 P-D3-3 (close to BK-516-<br />

BK-516-Aqa Ali<br />

Jangalak)<br />

Shams 2)<br />

BK-510 P-D3-3 BK-New 2-2 (near BK-New 2-3 (near<br />

to BK-516-Aqa Ali BK-516-46)<br />

Shams 2)<br />

BK-510 P-D3-3 BK-New 2-3 (near<br />

BK-516-46)<br />

Type Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Overhead 185<br />

New Section<br />

switch<br />

Overhead 185<br />

New Section<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

60,619 0.78 47,283 4,250 51,533<br />

Overhead 185 New Section<br />

60,619 0.51 30,916 4,250 35,166<br />

BK-516-46 switch N/A New<br />

Switches 3,500 1.00 3,500 0 3,500<br />

BK-510 P-D3-3 BK-New 2-3 (near BK-517-48 Switch N/A New<br />

BK-516-46)<br />

Switches 3,500 1.00 3,500 0 3,500<br />

BK-510 P-D3-3 BK-New 2-3 (near BK-New 2-4 (near Overhead<br />

BK-516-46) BK-517-102.7)<br />

185 New Section<br />

60,619 2.44 147,910 4,250 152,160<br />

BK-510 P-D3-3 BK-New 2-4 (near JS#6-BK-517<br />

BK-517-102.7) (Junction S # 6)<br />

Overhead 185 New Section<br />

60,619 2.10 127,300 4,250 131,550<br />

BK-510 P-D3-3 BK-New 2-4 (near BK-517-102.7 Switch N/A New<br />

BK-517-102.7)<br />

Switches 3,500 1.00 3,500 0 3,500<br />

BK-511 P-D3-8 Breshna Kot S/S Junction Station # 3 Overhead 185 New Section<br />

exit BK-511 exit JS#3-BK-511<br />

60,619 2.13 129,118 4,250 133,368<br />

BK-511 P-C3-4 JS#3-BK-511 JS#1-5 Overhead 185 New Section 60,619 0.95 57,588 4,250 61,838<br />

BK-511 P-D3-2 BK-3_6-Moqabili Sifarat SW Switch N/A Install switches to<br />

Sifarat Russia<br />

transformer 3,500 1.00 3,500 0 3,500<br />

BK-513 P-C4-11 BK-513-44_49 E-541-Kenar<br />

Chaman<br />

Overhead 120 Reconductor<br />

13,888 0.14 1,944 0 1,944<br />

BK-513 P-C4-11 E-541-Kenar E-541-183<br />

Chaman<br />

Overhead 120 Reconductor<br />

13,888 0.74 10,277 0 10,277<br />

BK-513 P-C4-12 E-541-148 E-541-154 Overhead 120 Reconductor 13,888 0.24 3,333 0 3,333<br />

BK-513 P-C4-12 E-541-154 E-541-156 Overhead 120 Reconductor 13,888 0.11 1,528 0 1,528<br />

BK-513 P-C4-12 E-541-156 E-541-157 Overhead 120 Reconductor 13,888 0.11 1,528 0 1,528<br />

BK-513 P-C4-12 E-541-157 E-541-164 Overhead 120 Reconductor 13,888 0.34 4,722 0 4,722<br />

BK-513 P-C4-12 E-541-164 E-541-166 Overhead 120 Reconductor 13,888 0.12 1,667 0 1,667<br />

BK-513 P-C4-12 E-541-166 E-541-170 Overhead 120 Reconductor 13,888 0.25 3,472 0 3,472<br />

BK-513 P-C4-12 E-541-170 E-541-171 Overhead 120 Reconductor 13,888 0.05 694 0 694<br />

BK-513 P-C4-12 E-541-171 E-541-183 Overhead 120 Reconductor 13,888 0.05 694 0 694<br />

BK-513 P-C4-13 E-541-Kenar E-541-188<br />

Chaman<br />

Overhead 120 Reconductor<br />

13,888 0.34 4,722 0 4,722<br />

BK-513 P-C4-13 E-541-188 E-541-189 Overhead 120 Reconductor 13,888 0.04 556 0 556<br />

BK-513 P-C4-13 E-541-189 EE-541-192 Overhead 120 Reconductor 13,888 0.17 2,361 0 2,361<br />

BK-513 P-C4-13 EE-541-192 E-541-Bala Hesar Overhead 120 Reconductor 13,888 0.66 9,166 0 9,166<br />

N/A<br />

New<br />

Switches<br />

60,619<br />

3,500<br />

1.00<br />

1.00<br />

60,619<br />

3,500<br />

Sum<br />

4,250 64,869<br />

0 3,500


Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

BK-513 P-C4-13 E-541-Bala Hesar BK-C-1,2-Takhta<br />

Pul<br />

Action Total Unit Cost<br />

Type Cross Section<br />

mm 2 (US$/unit)<br />

Overhead 120 New section,<br />

risers and<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

switches 59,365 0.05 2,968 4,250 7,218<br />

BK-514 P-C3-1 BK-JS-1-A-1,2-BBC BK-JS-1-A-1,2-<br />

Shaadoshamshera Overhead 70 New Section 58,852 0.90 52,967 4,250 57,217<br />

BK-514 P-C3-3 BK-Charda Manzela BK-JS-1-E 1,2- cable 50 New Section<br />

JS_1-Central Poly Mestorat Hospital<br />

Clinic<br />

1&2<br />

152,346 0.49 74,649 8,750 83,399<br />

BK-514 P-C4-10 BK-JS-1-E 1,2- BK-JS-1-E 1,2- cable<br />

Chindawol Pakhta Feroshi<br />

50 Replace<br />

152,346 0.43 65,509 0 65,509<br />

BK-514 P-C4-10 BK-JS-1-E 1,2- BK-JS-1-E 1,2-Pule-Kheshtee<br />

cable<br />

Pakhta Feroshi<br />

50 Replace<br />

152,346 0.38 57,891 0 57,891<br />

BK-514 P-C4-10 BK-JS-1-E 1,2-Pule-Kheshtee<br />

N-518_JS2_E_1_2- cable 50 Replace<br />

Pashtoonistan<br />

Wath<br />

152,346 0.61 92,931 0 92,931<br />

BK-515 P-C4-15 JS#1-BK-515 BK-C-1,2-Guzar e Cable 120 Replacement<br />

Azrat<br />

BK-515 P-C4-15 BK-C-1,2-Guzar e BK-C-1,2-1 Cable 120 Replacement<br />

Azrat<br />

Sum<br />

185,350 2.06 381,820 0 381,820<br />

185,350 0.05 9,267 0 9,267<br />

BK-515 P-C4-14 BK-C-1,2-1 BK-C-1,2-Takhta Overhead 120 Reconductor<br />

Pul<br />

13,888 0.50 6,972 0 6,972<br />

BK-519 P-C3-10 Close to JS # 4 S/S South West Cable 240 New Section 187,357 1.00 187,357 8,750 196,107


Medium Term Investments for South West Substation<br />

Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

SW-514 C3-P1a NW-4_7-1 NW-4_7-4 Overhead 185 Reconductor 15,142 0.18 2,726 0 2,726<br />

SW-514 C3-P1a NW-4_7-4 NW-4_7-6 Overhead 185 Reconductor 15,142 0.10 1,514 0 1,514<br />

SW-514 NW-4_7-12-14 Cable 240 New feeder<br />

SW-514 C3-P7<br />

section. 187,357 0.73 136,021 8,750 144,771<br />

SW-514 C2-P2 NW-4_7-12-14 NW-4_7-12-9 Overhead 185 Reconductor 15,142 0.27 4,088 0 4,088<br />

SW-514 C2-P2 NW-4_7-12-9 NW-4_7-12-8 Overhead 185 Reconductor 15,142 0.05 757 0 757<br />

SW-514 C2-P2 NW-4_7-12-8 NW-4_7-12-7 Overhead 185 Reconductor 15,142 0.10 1,514 0 1,514<br />

SW-514 C2-P2 NW-4_7-12-7 NW-4_7-12-4 Overhead 185 Reconductor 15,142 0.17 2,574 0 2,574<br />

SW-514 C2-P2 NW-4_7-12-4 NW-4_7-12 Overhead 185 Reconductor 15,142 0.18 2,726 0 2,726<br />

SW-514 C3-P5 NW-4_7-12 NW-4_7-11 Overhead 185 Reconductor 15,142 0.09 1,363 0 1,363<br />

SW-514 C3-P5 NW-4_7-11 NW-4_7-6 Overhead 185 Reconductor 15,142 0.18 2,726 0 2,726<br />

SW-514 C3-P3<br />

NW-4_7-39 NW-513-107-20-11 Overhead 70 New section<br />

58,852 1.46 85,924 4,250 90,174<br />

SW-513 C3-P11 SW-513 SW511 Cable 240 New section 187,357 0.11 21,359 8,750 30,109<br />

SW-513 C3-P11 SW511 SW511-2 Cable 240 New section 187,357 0.78 145,389 8,750 154,139<br />

SW-513 C 3-P 4<br />

NW-518-134 BK-Jamal maina- Cable<br />

Red Cross Hospital<br />

120 New section<br />

185,350 0.30 54,864 8,750 63,614<br />

NW-Pohantoon- NW-Pohantoon- Cable 95 Upgraded<br />

Takhnic Sanawee Takhnic Sanawee<br />

SW-513 C3-P4<br />

No-1<br />

No-2<br />

183,342 0.18 32,268 0 32,268<br />

NW-Pohantoon- BK-Jamal maina- Cable 95 Upgraded<br />

Takhnic Sanawee Jamal Mina<br />

SW-513 C3-P4<br />

No-2<br />

183,342 0.20 37,402 0 37,402<br />

SW-512 C 3-P12<br />

SW exit SW-512 NW-4_6-Kote<br />

Sangi_SW512<br />

Cable 240 Replaced<br />

187,357 0.19 34,848 0 34,848<br />

SW-512 C 3-P13<br />

NW-4_6-Kote BK-Debori-Debori<br />

Sangi_SW512 TS<br />

Cable 240 Upgraded<br />

187,357 0.90 167,872 0 167,872<br />

SW-512 C 3-P13<br />

BK-Debori-Debori BK-Debori-Old<br />

TS<br />

Bangashidar 1<br />

Cable 240 Upgraded<br />

187,357 0.74 139,394 0 139,394<br />

SW-512 C 3-P13<br />

BK-Debori-Old BK-Debori-1<br />

Bangashidar 1<br />

Cable 240 Upgraded<br />

187,357 0.83 155,694 0 155,694<br />

BK-Debori-1 N14828 Switch N/A New<br />

SW-512 C 3-P14<br />

Switches 3,500 1.00 3,500 0 3,500<br />

SW-512 C 3-P15 BK-Debori-1 BK-Debori-2 Overhead 185 Reconductor 15,142 0.03 424 0 424<br />

SW-512 C 3-P15<br />

BK-Debori-2 BK-Debori-New<br />

Bangashidar 1&2<br />

Cable 240 Upgraded<br />

187,357 0.55 102,859 0 102,859<br />

SW-512 D3-P4<br />

BK-Debori-New BK-Debori-Imam<br />

Bangashidar 1&2 Zaman<br />

Cable 120 Upgraded<br />

185,350 0.26 47,450 0 47,450<br />

BK-Debori-New<br />

Bangashidar 1&2<br />

NW-4_6-Sare-e-<br />

Kariz Qalahe shada Overhead 120 Added 59,365 0.91 53,725 4,250 57,975<br />

SW-512 C 3-P16<br />

SW-512 D 3-P 7<br />

BK-Debori-Imam BK-4_6-Masjidi<br />

Zaman<br />

Safed<br />

Overhead 120 Added<br />

59,365 0.49 29,326 4,250 33,576<br />

SW-511 C 3-P 8 SW-511 NW-4_6-1_SW513 Cable 240 Added 187,357 0.19 35,036 8,750 43,786<br />

SW-511 C 3-P 18<br />

NW-4_6-14 NW-Dashte e Cable<br />

Barchee-8<br />

240 Added<br />

187,357 0.08 14,052 8,750 22,802<br />

Sum


Feeder Project From<br />

(node name)<br />

SW-511 C 3-P 17<br />

SW-511 C 3-P 17<br />

SW-511 C 3-P 17<br />

SW-511 C 3-P 17<br />

SW-515 C 3-P 9<br />

SW-515 C 3-P 4<br />

SW-515 C 3-P 4<br />

SW-515 C 3-1<br />

SW-510 C 2-1<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

NW-4_6-22-1 NW-4_6-22-4 Overhead 120 Reconductor<br />

ed 13,888 0.16 2,153 0 2,153<br />

NW-4_6-22-4 NW-4_6-22-5 Overhead 120 Reconductor<br />

ed 13,888 0.08 1,042 0 1,042<br />

NW-4_6-22-5 NW-4_6-22-12 Overhead 120 Reconductor<br />

ed 13,888 0.32 4,458 0 4,458<br />

NW-4_6-22-12 NW-4_6-Sare-e- Overhead 120 Reconductor<br />

Kariz Qalahe shada<br />

ed 13,888 0.21 2,847 0 2,847<br />

SW-515 SW514 Cable 240 added a<br />

feeder 187,357 0.11 19,673 8,750 28,423<br />

NW-518-134 BK-Ataturk-15 Cable 95 Connected<br />

NW-518-129<br />

BK-Ataturk-Ministry<br />

Agricultural<br />

SW-510<br />

BK-Denow-<br />

Tangkash<br />

BK-Aqabe Barq<br />

<strong>Kabul</strong>-Aqab<br />

Wez.Zeraat<br />

NW-513-No-3<br />

Abrasani<br />

Section to node<br />

BK-Ataturk-15 to<br />

feeder SW515<br />

instead <strong>of</strong> JS 4 to<br />

this node and<br />

upgraded 183,342 0.29 52,619 8,750 61,369<br />

Switch N/A New junction.<br />

3,500 1.00 3,500 0 3,500<br />

Overhead 70 New Section<br />

58,852 0.23 13,418 4,250 17,668<br />

Overhead 120 New section<br />

59,365 3.92 232,592 4,250 236,842<br />

Sum


Medium Term Investments for East Substation<br />

Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

E-511 P-B5-3 E-511 E-511-2 Cable 240 Upgraded 187,357 1.22 228,201 0 228,201<br />

E-511 P-B5-3 E-511-2 E-511-2 Cable 240 Upgraded 187,357 0.63 118,222 0 118,222<br />

E-511 P-B5-16 E-511-2 E-F-519 -39 Cable 95 New section 183,342 0.12 21,634 8,750 30,384<br />

Overhead 70 Added<br />

E-511 P B5-17 E-511-2 E-F-519 -<strong>Afghan</strong>i<br />

construction<br />

Company<br />

58,852 0.25 14,419 4,250 18,669<br />

E-511 P-B5-4 E-511-16 E-511-16-35 Overhead 185 Reconductor 15,142 0.67 10,145 0 10,145<br />

E-511 E-511-2 E-511-16-35 Overhead 185 Reconductor<br />

ed 15,142 0.86 12,961 0 12,961<br />

E-511 P-B5-5 E-511-16-35 E-F-519 - Refa Overhead 185 New section<br />

Construction<br />

Company<br />

60,619 1.08 65,347 4,250 69,597<br />

E-513 P-B5-10 E-513-19-2 E-513-19-3 Switch N/A New<br />

Switches 3,500 1.00 3,500 0 3,500<br />

E-523 P-D5-1 E-523-94 E-515-94 Overhead 150 New section 0 0.99 0 4,250 4,250<br />

E-519 P-B5-1 S/S East E-519 Cable 240 Upgraded 187,357 0.07 12,519 0 12,519<br />

E-519 P-B5-2 E-519 E-F-519 -3 Overhead 185 Reconductor 15,142 0.03 469 0 469<br />

E-519 P-B5-2 E-F-519 -3 E-F-519 -6 Overhead 185 Reconductor 15,142 0.14 2,180 0 2,180<br />

E-519 P-B5-2 E-F-519 -6 E-F-519 -10 Overhead 185 Reconductor 15,142 0.47 7,147 0 7,147<br />

E-519 P-B5-2 E-F-519 -10 E-F-519 -11 Overhead 185 Reconductor 15,142 0.05 727 0 727<br />

E-519 P-B5-2 E-F-519 -11 E-F-519 -20 Overhead 185 Reconductor 15,142 0.40 6,011 0 6,011<br />

E-519 P-B5-2 E-F-519 -20 E-F-519 -21 Overhead 185 Reconductor 15,142 0.03 469 0 469<br />

E-519 P-B5-2 E-F-519 -21 E-F-519-35a Overhead 185 Reconductor 15,142 0.76 11,462 0 11,462<br />

E-519 P-B5-2 E-F-519-35a E-F-519 -39-2 Overhead 185 Reconductor 15,142 0.20 3,074 0 3,074<br />

E-519 P-B5-14 E-F-519 -39-2 E-F-519 -51-2 Overhead 185 New section 60,619 0.68 40,918 4,250 45,168<br />

E-519 P-B5-14 E-F-519 -39 E-F-519 -39-2 Switch N/A New<br />

Switches 3,500 1.00 3,500 0 3,500<br />

E-519 P-B5-6 E-F-519 -178 Capacitor<br />

900 kVar<br />

Switched<br />

N/A<br />

3,630 1.00 3,630 0 3,630<br />

E-521 P-B5-8 E-521 E-521-1 Cable 240 Upgraded 187,357 0.50 92,929 0 92,929<br />

E-521 P-B5-9 E-521-1 E-521-5 Overhead 185 Reconductor 15,142 0.24 3,649 0 3,649<br />

E-521 P-B5-9 E-521-5 E-521-8 Overhead 185 Reconductor 15,142 0.19 2,938 0 2,938<br />

E-521 P-B5-9 E-521-8 E-521-15 Overhead 185 Reconductor 15,142 0.18 2,741 0 2,741<br />

E-521 P-B5-9 E-521-15 E-521-19 Overhead 185 Reconductor 15,142 0.47 7,147 0 7,147<br />

E-521 P-B5-9 E-521-19 E-521-25 Overhead 185 Reconductor 15,142 0.33 5,027 0 5,027<br />

E-521 P-B5-9 E-521-25 E-521-28 Overhead 185 Reconductor 15,142 0.26 3,861 0 3,861<br />

E-521 P-B5-15 E-521-1 E-521-2 Cable 95 New section 183,342 0.43 78,287 8,750 87,037<br />

E-521 P-B5-15 E-F-519 -10-2 E-521-2 Switch N/A New<br />

Switches 3,500 1.00 3,500 0 3,500<br />

E-541 P-B5-11 E-541 E-541-2 Cable 240 Upgraded 187,357 0.13 23,982 0 23,982<br />

E-541 P-B5-12 E-541-Hodkhel-1 E-541-7 Overhead 185 Reconductor 15,142 0.17 2,498 0 2,498<br />

Sum


Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

E-541 P-B5-12 E-541-7 E-541-8 Overhead 185 Reconductor 15,142 0.08 1,226 0 1,226<br />

E-541 P-B5-12 E-541-8 E-541-12 Overhead 185 Reconductor 15,142 0.10 1,575 0 1,575<br />

E-541 P-B5-12 E-541-12 E-541-13 Overhead 185 Reconductor 15,142 0.07 1,105 0 1,105<br />

E-541 P-B5-12 E-541-13 E-541-16 Overhead 185 Reconductor 15,142 0.08 1,211 0 1,211<br />

E-541 P-B5-12 E-541-16 E-541-37 Overhead 185 Reconductor 15,142 0.16 2,453 0 2,453<br />

E-541 P-B5-12 E-541-37 E-541-69 Overhead 185 Reconductor 15,142 0.88 13,370 0 13,370<br />

E-541 P-B5-7 E-541-69 E-521-Tawlid Aard Overhead 185 New section<br />

Janat<br />

60,619 0.17 10,305 4,250 14,555<br />

E-541 P-D5-1 E-F-519 -23 E-541-70 Overhead 185 New section<br />

and switch 15,142 0.16 2,362 0 2,362<br />

Sum


Medium Term Investments for North West Substation<br />

Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

N/A<br />

New<br />

NW-513, NW- P-B2-1a NW-513-107 Voltage Regulator<br />

517 and NW-<br />

300 Amps<br />

minimum<br />

518<br />

32 steps + 10%<br />

NW-513, NW- P-B2-1a NW-513-95 Capacitor N/A<br />

517 and NW-<br />

1200 kVar<br />

Switched<br />

518<br />

NW-513, NW- P-B2-1a NW-513-92 Capacitor N/A<br />

517 and NW-<br />

1200 kVar<br />

Switched<br />

518<br />

NW-513, NW- P-B2-1 NW-513 NW-513-2 Cable 240 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-2 NW-513-5 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-5 NW-513-13 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-13 NW-513-32 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-32 NW-513-43 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-43 NW-513-56 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-56 NW-513-57 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-57 NW-513-58 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-58 NW-513-61 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-61 NW-513-64 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-64 NW-513-72 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-72 NW-513-74 Overhead 185 Reconductor<br />

517 and NW-<br />

518<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

Sum<br />

9,500 1.00 9,500 0 9,500<br />

3,630 1.00 3,630 0 3,630<br />

3,630 1.00 3,630 0 3,630<br />

187,357 0.18 33,350 0 33,350<br />

15,142 0.17 2,574 0 2,574<br />

15,142 0.62 9,373 0 9,373<br />

15,142 1.48 22,410 0 22,410<br />

15,142 0.53 7,980 0 7,980<br />

15,142 0.93 14,067 0 14,067<br />

15,142 0.03 394 0 394<br />

15,142 0.12 1,832 0 1,832<br />

15,142 0.21 3,149 0 3,149<br />

15,142 0.21 3,119 0 3,119<br />

15,142 0.49 7,435 0 7,435<br />

15,142 0.11 1,726 0 1,726


Feeder Project From<br />

(node name)<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

P-B2-1 NW-513-74 NW-513-79 Overhead 185 Reconductor<br />

P-B2-1 NW-513-79 NW-513-80 Overhead 185 Reconductor<br />

P-B2-1 NW-513-80 NW-513-84 Overhead 185 Reconductor<br />

P-B2-1 NW-513-84 NW-513-86 Overhead 185 Reconductor<br />

P-B2-1 NW-513-86 NW-513-92 Overhead 185 Reconductor<br />

P-B2-1 NW-513-92 NW-513-93 Overhead 185 Reconductor<br />

P-B2-1 NW-513-93 NW-513-95 Overhead 185 Reconductor<br />

P-B2-1 NW-513-95 NW-513-96 Overhead 185 Reconductor<br />

P-B2-1 NW-513-96 NW-513-101 Overhead 185 Reconductor<br />

P-B2-1 NW-513-101 NW-513-107 Overhead 185 Reconductor<br />

518<br />

NW-513, NW- P-B2-1 NW-513-107a NW-513-Deh Overhead 120 Reconductor<br />

517 and NW-<br />

Araban hawahe<br />

518<br />

NW-513, NW- P-B2-1<br />

NW-513-Deh NW-513-Deh Overhead 120 Reconductor<br />

517 and NW-<br />

Araban hawahe Araban Monari<br />

518<br />

NW-513, NW- P-B2-1<br />

NW-513-Deh NW-513-143 Overhead 120 Reconductor<br />

517 and NW-<br />

Araban Monari<br />

518<br />

NW-513, NW- P-B2-1 NW-513-143 NW-513-149 Overhead 120 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-149 NW-513-159 Overhead 120 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-159 NW-513-172 Overhead 70 Reconductor<br />

517 and NW-<br />

518<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

Sum<br />

15,142 0.32 4,815 0 4,815<br />

15,142 0.08 1,136 0 1,136<br />

15,142 0.26 3,861 0 3,861<br />

15,142 0.14 2,090 0 2,090<br />

15,142 0.40 6,042 0 6,042<br />

15,142 0.03 500 0 500<br />

15,142 0.15 2,241 0 2,241<br />

15,142 0.08 1,242 0 1,242<br />

15,142 0.35 5,360 0 5,360<br />

15,142 0.44 6,647 0 6,647<br />

13,888 0.60 8,277 0 8,277<br />

13,888 1.30 17,985 0 17,985<br />

13,888 0.63 8,791 0 8,791<br />

13,888 0.41 5,736 0 5,736<br />

13,888 0.67 9,249 0 9,249<br />

13,375 0.86 11,516 0 11,516


Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Overhead 70 Reconductor<br />

NW-513, NW- P-B2-1 NW-513-172 NW-513-Bande<br />

517 and NW-<br />

Qargha<br />

518<br />

NW-513, NW- P-B2-1<br />

NW-513-Bande NW-513-181 Overhead 70 Reconductor<br />

517 and NW-<br />

Qargha<br />

518<br />

NW-513, NW- P-B2-1 NW-513-181 NW-513-182 Overhead 70 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-182 NW-513-187 Overhead 70 Reconductor<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B2-1 NW-513-187 NW-513-Deh Overhead 70 Reconductor<br />

517 and NW-<br />

Ponba<br />

518<br />

NW-513, NW- P-B3-1 NW-517-56 NW-517-56.1 Overhead 120 new<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B3-1 NW-517-56.1 NW-517-56.2 Overhead 120 new<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B3-1 NW-517-56.2 NW-517-56.3 Overhead 120 new<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B3-1 NW-517-56.3 NW-517-56.4 Overhead 120 new<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B3-1 NW-517-56.4 NW-517-56.5 Overhead 120 new<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B3-1 NW-517-56.1 NW-518-66 Switch N/A new<br />

517 and NW-<br />

518<br />

NW-513, NW- P-B3-1 NW-513-58 NW-517-56.2 Switch N/A Reconnect to<br />

517 and NW-<br />

NW 517<br />

518<br />

NW-513, NW- P-B3-1 NW-518-61 NW-517-56.3 Switch N/A Reconnect to<br />

517 and NW-<br />

NW 517<br />

518<br />

NW-513, NW- P-B3-1 NW-518-61 NW-517-56.3 Switch N/A Reconnect to<br />

517 and NW-<br />

NW 517<br />

518<br />

NW-513, NW- P-B3-1 NW-513-74 NW-517-56.4 Switch N/A Reconnect to<br />

517 and NW-<br />

NW 517<br />

518<br />

NW-513, NW- P-B3-1 NW-517-56.5 NW-517-56.5 Switch N/A Reconnect to<br />

517 and NW-<br />

NW 517<br />

518<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

Sum<br />

13,375 0.41 5,537 0 5,537<br />

13,375 0.29 3,932 0 3,932<br />

13,375 0.09 1,244 0 1,244<br />

13,375 0.47 6,340 0 6,340<br />

13,375 0.18 2,421 0 2,421<br />

59,365 0.04 2,375 4,250 6,625<br />

59,365 0.01 653 4,250 4,903<br />

59,365 0.22 12,823 4,250 17,073<br />

59,365 0.81 47,848 4,250 52,098<br />

59,365 0.32 19,056 4,250 23,306<br />

3,500 1.00 3,500 0 3,500<br />

3,500 1.00 3,500 0 3,500<br />

3,500 1.00 3,500 0 3,500<br />

3,500 1.00 3,500 0 3,500<br />

3,500 1.00 3,500 0 3,500<br />

3,500 1.00 3,500 0 3,500


Feeder Project From<br />

(node name)<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

518<br />

NW-513, NW-<br />

517 and NW-<br />

To<br />

(node name)<br />

Type<br />

P-B2-2 NW-518-59b NW-518-59A Switch N/A new<br />

P-B2-2 NW-518-59b NW-517-56a Switch N/A new<br />

P-B2-2 NW-518-61.1a NW-518-61.1 Switch N/A new<br />

P-B2-2 NW-518-61.1a NW-517-56a Switch N/A new<br />

P-B2-2 NW-518-65 NW-513-57 Switch N/A new<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

Sum<br />

3,500 1.00 3,500 0 3,500<br />

3,500 1.00 3,500 0 3,500<br />

3,500 1.00 3,500 0 3,500<br />

3,500 1.00 3,500 0 3,500<br />

518<br />

3,500 1.00 3,500 0 3,500<br />

NW-513, NW- P-C3-1 NW-518-108 N-529_JS5_4_5- Cable 120 New<br />

517 and NW-<br />

Borj Siloy Markaz<br />

518<br />

185,350 0.27 50,415 8,750 59,165<br />

NW-514 P-A3-3 NW-514-18 NW-515-18 switch N/A new 3,500 1.00 3,500 0 3,500<br />

NW-515 P-A3-3a NW-515-15 NW-525-15 switch N/A new 3,500 1.00 3,500 0 3,500<br />

NW-524 P-A3-7 NW-524-32 NW-524-32 Overhead 70 reconductor 13,375 0.27 3,638 0 3,638<br />

NW-524 P-A3-7 NW-524-41 NW-524-52 Overhead 70 reconductor 13,375 0.50 6,741 0 6,741<br />

NW-524 P-A3-7 NW-524-52 NW-524-56 Overhead 70 reconductor 13,375 0.20 2,715 0 2,715<br />

NW-524 P-A3-7 NW-524-56 NW-526-21 Overhead 120 new 59,365 0.53 31,464 4,250 35,714<br />

NW-525 P-A3-2 NW-525-15 N-527-32 Overhead 185 new 60,619 1.53 92,686 4,250 96,936<br />

NW-526 and NWP-A3-1 NW-527-40 NW-526-40 switch N/A new 3,500 1.00 3,500 0 3,500


Medium Term Investments for North Substation<br />

Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

N-511 P-A3-5 N-511 N-511-2 Overhead 185 new 60,619 0.84 50,738 4,250 54,988<br />

N-511 P-A3-5 N-511-2 N-511-3 Overhead 185 new 60,619 0.37 22,126 4,250 26,376<br />

N-511 P-A3-5 N-511-3 N-511-4 Overhead 185 new 60,619 0.76 45,888 4,250 50,138<br />

N-511 P-A3-5 N-511-4 N-511-5 Overhead 185 new 60,619 0.50 30,552 4,250 34,802<br />

N-511 P-A3-5 N-511-5 NW-526-51_8 Overhead 185 new 60,619 0.18 10,851 4,250 15,101<br />

N-511 P-A3-6 N-511-2 N-513-19a switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-511 P-A3-6 N-513-19 N-513-19a switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-511 P-A3-6 N-511-5 N-513-53 switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-511 P-A3-8 NW-526-51_8 NW-526-51_7 overhead 120 reconductor 13,888 0.08 1,055 0 1,055<br />

N-511 P-A3-8 NW-526-51_7 NW-526-51_4 overhead 120 reconductor 13,888 0.24 3,319 0 3,319<br />

N-511 P-A3-8 NW-526-51_4 NW-526-51_3 overhead 120 reconductor 13,888 0.07 1,000 0 1,000<br />

N-511 P-A3-8 NW-526-51_3 NW-526-51_2 overhead 120 reconductor 13,888 0.10 1,430 0 1,430<br />

N-511 P-A3-8 NW-526-51_2 NW-526-51 overhead 120 reconductor 13,888 0.14 1,944 0 1,944<br />

N-511 P-A3-8 NW-526-51 NW-526-49 overhead 70 reconductor 13,375 0.16 2,153 0 2,153<br />

N-511 P-A3-8a NW-526-49 N-520-51 overhead 70 new 58,852 0.27 15,890 4,250 20,140<br />

N-512 P-A3-1a N-512-2 N-512-21 Overhead 120 reconductor 13,888 0.90 12,471 0 12,471<br />

N-512 P-A3-1a N-512-21 N-512-39 Overhead 120 reconductor 13,888 0.97 13,485 0 13,485<br />

N-512 P-A3-1a N-512-39 N-512-40 Overhead 120 reconductor 13,888 0.05 750 0 750<br />

N-512 P-A3-1a N-512-40 N-512-47 Overhead 120 reconductor 13,888 0.41 5,708 0 5,708<br />

N-512 P-A3-1a N-512-47 N-512-63 Overhead 120 reconductor 13,888 0.88 12,180 0 12,180<br />

N-512 P-A3-1a N-512-63 N-512-66 Overhead 120 reconductor 13,888 0.22 3,069 0 3,069<br />

N-512 P-A3-1a N-512-66 N-512-68 Overhead 120 reconductor 13,888 0.11 1,514 0 1,514<br />

N-512 P-A3-1a N-512-68 N-512-72 Overhead 120 reconductor 13,888 0.18 2,472 0 2,472<br />

N-512 P-A3-1a N-512-72 N-512-80 Overhead 120 reconductor 13,888 0.63 8,680 0 8,680<br />

N-512 P-A3-1a N-512-80 N-512-87 Overhead 120 reconductor 13,888 0.54 7,555 0 7,555<br />

N-513 P-A3-11 N-513-35 N-513-39 Overhead 185 upgrade 15,142 0.16 2,483 0 2,483<br />

N-513 P-A3-11 N-513-39 N-513-43 Overhead 185 upgrade 15,142 0.20 2,968 0 2,968<br />

N-513 P-A3-11 N-513-43 N-513-46 Overhead 185 upgrade 15,142 0.15 2,241 0 2,241<br />

N-513 P-A3-11 N-513-46 N-513-47 Overhead 185 upgrade 15,142 0.07 984 0 984<br />

N-513 P-A3-11 N-513-47 N-513-53 Overhead 185 upgrade 15,142 0.29 4,346 0 4,346<br />

N-513 P-A3-11 N-513-53 N-513-71 Overhead 185 upgrade 15,142 0.89 13,401 0 13,401<br />

N-513 P-A3-11 N-513-71 N-513-79 Overhead 185 upgrade 15,142 0.49 7,435 0 7,435<br />

N-513 P-A3-11 N-513-79 N-513-84 Overhead 185 upgrade 15,142 0.32 4,891 0 4,891<br />

N-513 P-A3-11 N-513-84 N-513-99 Overhead 120 upgrade 13,888 0.59 8,250 0 8,250<br />

N-513 P-A3-11 N-513-99 N-513-101 Overhead 120 upgrade 13,888 0.09 1,264 0 1,264<br />

N-513 P-A3-11 N-513-121 N-513-124 Overhead 120 upgrade 13,888 0.20 2,722 0 2,722<br />

N-513 P-A3-11 N-513-124 N-513-125 Overhead 120 upgrade 13,888 0.08 1,167 0 1,167<br />

N-514 P-B3-15 S/S North N-514 Cable 240 change 187,357 0.05 9,930 0 9,930<br />

N-514 P-B3-15 N-514 N-514-2 Overhead 185 reconductor 15,142 0.08 1,226 0 1,226<br />

N-514 P-B3-15 N-514-2 N-514-3 Overhead 185 reconductor 15,142 0.07 1,015 0 1,015<br />

Sum


Feeder Project From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

Cross Section Action Total Unit Cost<br />

mm 2 (US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

N-514 P-B3-15 N-514-3 N-514-8 Overhead 185 reconductor 15,142 0.28 4,164 0 4,164<br />

N-514 P-B3-15 N-514-8 N-514-9 Overhead 185 reconductor 15,142 0.04 651 0 651<br />

N-514 P-B3-15 N-514-9 N-514-19 Overhead 185 reconductor 15,142 0.49 7,435 0 7,435<br />

N-514 P-B3-15 N-514-19 N-514-28 Overhead 185 reconductor 15,142 0.49 7,465 0 7,465<br />

N-514 P-B3-15 N-514-28 N-514-29 Overhead 185 reconductor 15,142 0.05 772 0 772<br />

N-514 P-B3-15 N-514-29 N-514-36 Overhead 185 reconductor 15,142 0.44 6,662 0 6,662<br />

N-514 P-B3-15 N-514-36 NW-525-72 Overhead 185 new 60,619 0.19 11,396 4,250 15,646<br />

N-514 P-B3-15 NW-525-72 NW-515-63 Overhead 185 new 60,619 0.72 43,646 4,250 47,896<br />

N-514 P-B3-15 NW-515-63 NW-515-63_1 Overhead 185 reconductor 15,142 0.04 560 0 560<br />

N-514 P-B3-15 NW-515-63_1a NW-515-63_4 Overhead 185 reconductor 15,142 0.18 2,756 0 2,756<br />

N-514 P-B3-15 NW-515-63_4 NW-515-63_6 Overhead 185 reconductor 15,142 0.18 2,771 0 2,771<br />

N-514 P-B3-15 NW-515-63_6 NW-515-63_16 Overhead 185 reconductor 15,142 0.55 8,373 0 8,373<br />

N-514 P-B3-19 N-529-63a NW-515-63_1 switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-515 P-B3-13 N-515-13 N-518-13 Switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-515 P-B3-13 N-518-24a N-528-50 Switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-515 P-B3-13 N-515-31 N-518-31 Switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-518 P-B3-1a N-528-47 N-528-50 Overhead 120 reconductor 13,888 0.46 6,402 0 6,402<br />

N-519 P-A3-4a N-519-22 JS#10-N Cable 240 replace 187,357 0.08 14,239 0 14,239<br />

N-520 P-A3-10 N-527-Sarwar<br />

Kaynat<br />

N-520-No-12<br />

Taqweatee<br />

Overhead 120 new<br />

59,365 0.42 25,111 4,250 29,361<br />

N-528 P-B4-1a N-528-38 N-528-42 Overhead 120 reconductor 13,888 0.13 1,792 0 1,792<br />

N-528 P-B4-1a N-528-42 N-528-47 Overhead 120 reconductor 13,888 0.16 2,208 0 2,208<br />

N-529 P-B3-18 S/S North N-529 Cable 240 change 187,357 0.05 9,368 0 9,368<br />

N-529 P-B3-18 N-529 N-529-3 Overhead 185 reconductor 15,142 0.05 772 0 772<br />

N-529 P-B3-18 N-529-3 N-529-8 Overhead 185 reconductor 15,142 0.31 4,679 0 4,679<br />

N-529 P-B3-18 N-529-8 N-529-9 Overhead 185 reconductor 15,142 0.04 636 0 636<br />

N-529 P-B3-18 N-529-9 N-529-19 Overhead 185 reconductor 15,142 0.49 7,435 0 7,435<br />

N-529 P-B3-18 N-529-19 N-529-28 Overhead 185 reconductor 15,142 0.50 7,556 0 7,556<br />

N-529 P-B3-18 N-529-28 N-529-36 Overhead 185 reconductor 15,142 0.50 7,601 0 7,601<br />

N-529 P-B3-18 N-529-36 N-529-49 Overhead 185 reconductor 15,142 0.59 8,994 0 8,994<br />

N-529 P-B3-18 N-529-49 N-529-63a Overhead 185 reconductor 15,142 0.26 3,891 0 3,891<br />

N-529 P-B3-18 N-529-63a N-529-63 Overhead 185 reconductor 15,142 0.49 7,465 0 7,465<br />

N-529 P-B3-18 N-529-63 N-529-64 Overhead 185 reconductor 15,142 0.03 500 0 500<br />

N-529 P-B3-18 N-529-64 N-529-66 Overhead 185 reconductor 15,142 0.19 2,922 0 2,922<br />

N-529 P-B3-18 N-529-66 N-529-71 Overhead 185 reconductor 15,142 0.21 3,195 0 3,195<br />

N-529 P-B3-18 N-529-71 N-529-77 Overhead 185 reconductor 15,142 0.15 2,332 0 2,332<br />

N-529 P-B3-18 N-529-77 N-529-79 Overhead 185 reconductor 15,142 0.16 2,423 0 2,423<br />

N-529 P-B3-18 N-529-79 JS#5-N-529 Cable 240 change 187,357 0.03 5,059 0 5,059<br />

N-529 P-B3-20 NW-515-62 NW-515-62 Overhead 120 new 59,365 1.34 79,431 4,250 83,681<br />

Sum


Appendix<br />

I<br />

Cost <strong>of</strong> Short Term Investments by<br />

Project<br />

Siemens Power Transmission & <strong>Distribution</strong>, Inc.<br />

Power Technologies International I-1


Central Substation<br />

Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

Project From<br />

To<br />

Type Cross Section Action Total Unit<br />

Additional<br />

Length (Km) Base Costs<br />

(node name) (node name)<br />

mm 2 Cost<br />

Instalation<br />

or # units US$<br />

(US$/unit)<br />

Costs US$<br />

Sum<br />

P-C4-7 E-541-132-7-a E-531-70 Overhead 120 Reconductor 13,888 0.53 7,361 0 7,361<br />

P-C4-8 E-541-132 E-541-132-7 Overhead 120 Reconductor 13,888 0.3 4,166 0 4,166<br />

E-541-132-7 E-541-132-7-a Overhead 120 Reconductor 13,888 0.11 1,528 0 1,528<br />

Overhead 185 New Section<br />

P-B4-15 N-512-108 N-512-Bibi Mahro<br />

Muqabel<br />

60,619 0.43 26,066 4250 30,316<br />

P-B4-17 N-512-98 N-517-No-20<br />

Macroryan<br />

Overhead 185 New Section<br />

60,619 0.47 28,491 4250 32,741<br />

P-B4-10 N-516-12_8 E-541-128 Overhead 185 New section 60,619 0.4 24,248 4250 28,498<br />

P-C3-2<br />

Rearrange<br />

Khetabkana_SW N/A<br />

(near N-<br />

518_JS2_B_1_2-<br />

Khetabkhana Aama)<br />

P-ST-B4-1 JS#12-N-517 Capacitor<br />

1200 kVar<br />

Switched<br />

P-ST-B4-2<br />

N-516-15<br />

Macroryan # 1&2<br />

N-516-No-11<br />

Macroryan<br />

N-516-No-13<br />

Macroryan<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

900 kVar<br />

Switched<br />

Capacitor<br />

900 kVar<br />

Switched<br />

N/A<br />

N/A<br />

N/A<br />

N/A<br />

connections and<br />

install switches.<br />

0 0 0 0 0<br />

3,630 1.00 3,630 0 3,630<br />

3,630 1.00 3,630 0 3,630<br />

3,630 1.00 3,630 0 3,630<br />

3,630 1.00 3,630 0 3,630


Breshna Kot Substation<br />

Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

Project<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

P-C4-11 BK-513-44_49 E-541-Kenar<br />

Chaman<br />

E-541-Kenar<br />

Chaman<br />

Type Cross Section Action Total Unit<br />

mm 2 Cost<br />

(US$/unit)<br />

Overhead 120 Reconductor<br />

E-541-183 Overhead 120 Reconductor<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

Sum<br />

13,888 0.14 1,944 0 1,944<br />

13,888 0.74 10,277 0 10,277<br />

P-C4-12 E-541-157 E-541-164 Overhead 120 Reconductor 13,888 0.34 4,722 0 4,722<br />

E-541-164 E-541-166 Overhead 120 Reconductor 13,888 0.12 1,667 0 1,667<br />

E-541-166 E-541-170 Overhead 120 Reconductor 13,888 0.25 3,472 0 3,472<br />

E-541-170 E-541-171 Overhead 120 Reconductor 13,888 0.05 694 0 694<br />

E-541-171 E-541-183 Overhead 120 Reconductor 13,888 0.05 694 0 694<br />

P-C4-13 E-541-Bala Hesar BK-C-1,2-Takhta<br />

Pul<br />

C3-P4<br />

NW-Pohantoon- BK-Jamal maina-<br />

Takhnic Sanawee Jamal Mina<br />

No-2<br />

NW-Pohantoon- NW-Pohantoon-<br />

Takhnic Sanawee Takhnic Sanawee<br />

No-2<br />

No-1<br />

Overhead 120 New section, risers<br />

and switches<br />

Cable 95 New Section<br />

Cable 95 New Section<br />

59,365 0.05 2,968 4250 7,218<br />

183,342 0.20 36,668 8750 45,418<br />

183,342 0.18 33,002 8750 41,752


South West Substation<br />

Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

Project From<br />

To<br />

Type Cross Section Action Total Unit<br />

Additional<br />

Length (Km) Base Costs<br />

(node name) (node name)<br />

mm 2 Cost<br />

Instalation<br />

or # units US$<br />

(US$/unit)<br />

Costs US$<br />

Sum<br />

C3-P1a NW-4_7-1 NW-4_7-4 Overhead 185 Reconductor 15,142 0.18 2,726 0 2,726<br />

NW-4_7-4 NW-4_7-6 Overhead 185 Reconductor 15,142 0.10 1,514 0 1,514<br />

C3-P5 NW-4_7-12 NW-4_7-11 Overhead 185 Reconductor 15,142 0.09 1,363 0 1,363<br />

NW-4_7-11 NW-4_7-6 Overhead 185 Reconductor 15,142 0.18 2,726 0 2,726<br />

C3-P3 NW-4_7-39 NW-513-107-20-11 Overhead 70 New section<br />

58,852 1.46 85,924 4250 90,174<br />

P-ST-C3-1 NW-513-107-20-11 Capacitor<br />

1200 kVar<br />

Switched<br />

P-ST-C3-2 NW-513-107-27-39 Capacitor<br />

1200 kVar<br />

Switched<br />

P-ST-C3-3 NW-513-107-37 Capacitor<br />

1200 kVar<br />

Switched<br />

N/A<br />

N/A<br />

N/A<br />

3,630 1.00 3,630 0 3,630<br />

3,630 1.00 3,630 0 3,630<br />

3,630 1.00 3,630 0 3,630


East Substation<br />

Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

Project From<br />

To<br />

Type Cross Section Action Total Unit<br />

Additional<br />

Length (Km) Base Costs<br />

(node name) (node name)<br />

mm 2 Cost<br />

Instalation<br />

or # units US$<br />

(US$/unit)<br />

Costs US$<br />

Sum<br />

P-B5-14 E-F-519 -39-2 E-F-519 -51-2 Overhead 185 New section 60,619 0.68 40,918 4250 45,168<br />

E-F-519 -39 E-F-519 -39-2 Switch N/A New 3,500 1.00 3,500 0 3,500<br />

P-B5-16 E-511-2 E-F-519 -39 Cable 95 New section 183,342 0.12 21,634 8750 30,384<br />

P-B5-15 E-521-1 E-521-2 Cable 95 New section 183,342 0.43 78,287 8750 87,037<br />

E-F-519 -10-2 E-521-2 Switch N/A New 3,500 1.00 3,500 0 3,500<br />

Overhead 185 New section<br />

P-B5-5 E-511-16-35 E-F-519 - Refa<br />

Construction<br />

Company<br />

60,619 1.08 65,347 4250 69,597


North West Substation<br />

Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

Project<br />

From<br />

(node name)<br />

To<br />

(node name)<br />

Type<br />

P-B2-1a NW-513-107 Voltage Regulator N/A<br />

300 Amps minimum<br />

32 steps +- 10%<br />

Cross Section Action Total Unit<br />

mm 2 Cost<br />

(US$/unit)<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

9,500 1.00 9,500 0 9,500<br />

P-B2-1 NW-513 NW-513-2 Cable 240 Reconductor 187,357 0.18 33,350 0 33,350<br />

NW-513-2 NW-513-5 Overhead 185 Reconductor 15,142 0.17 2,574 0 2,574<br />

NW-513-5 NW-513-13 Overhead 185 Reconductor 15,142 0.62 9,373 0 9,373<br />

NW-513-13 NW-513-32 Overhead 185 Reconductor 15,142 1.48 22,410 0 22,410<br />

NW-513-32 NW-513-43 Overhead 185 Reconductor 15,142 0.53 7,980 0 7,980<br />

NW-513-43 NW-513-56 Overhead 185 Reconductor 15,142 0.93 14,067 0 14,067<br />

NW-513-56 NW-513-57 Overhead 185 Reconductor 15,142 0.03 394 0 394<br />

NW-513-57 NW-513-58 Overhead 185 Reconductor 15,142 0.12 1,832 0 1,832<br />

NW-513-58 NW-513-61 Overhead 185 Reconductor 15,142 0.21 3,149 0 3,149<br />

NW-513-61 NW-513-64 Overhead 185 Reconductor 15,142 0.21 3,119 0 3,119<br />

NW-513-64 NW-513-72 Overhead 185 Reconductor 15,142 0.49 7,435 0 7,435<br />

NW-513-72 NW-513-74 Overhead 185 Reconductor 15,142 0.11 1,726 0 1,726<br />

NW-513-74 NW-513-79 Overhead 185 Reconductor 15,142 0.32 4,815 0 4,815<br />

NW-513-79 NW-513-80 Overhead 185 Reconductor 15,142 0.08 1,136 0 1,136<br />

NW-513-80 NW-513-84 Overhead 185 Reconductor 15,142 0.26 3,861 0 3,861<br />

NW-513-84 NW-513-86 Overhead 185 Reconductor 15,142 0.14 2,090 0 2,090<br />

NW-513-86 NW-513-92 Overhead 185 Reconductor 15,142 0.40 6,042 0 6,042<br />

NW-513-92 NW-513-93 Overhead 185 Reconductor 15,142 0.03 500 0 500<br />

NW-513-93 NW-513-95 Overhead 185 Reconductor 15,142 0.15 2,241 0 2,241<br />

NW-513-95 NW-513-96 Overhead 185 Reconductor 15,142 0.08 1,242 0 1,242<br />

NW-513-96 NW-513-101 Overhead 185 Reconductor 15,142 0.35 5,360 0 5,360<br />

NW-513-101 NW-513-107 Overhead 185 Reconductor 15,142 0.44 6,647 0 6,647<br />

NW-513-107a NW-513-Deh Overhead 120 Reconductor<br />

NW-513-Deh<br />

Araban hawahe<br />

NW-513-Deh<br />

Araban Monari<br />

Araban hawahe<br />

NW-513-Deh<br />

Araban Monari<br />

Overhead 120 Reconductor<br />

NW-513-143 Overhead 120 Reconductor<br />

Sum<br />

13,888 0.60 8,277 0 8,277<br />

13,888 1.30 17,985 0 17,985<br />

13,888 0.63 8,791 0 8,791<br />

NW-513-143 NW-513-149 Overhead 120 Reconductor 13,888 0.41 5,736 0 5,736<br />

NW-513-149 NW-513-159 Overhead 120 Reconductor 13,888 0.67 9,249 0 9,249<br />

NW-513-159 NW-513-172 Overhead 70 Reconductor 13,375 0.86 11,516 0 11,516


Project<br />

From<br />

(node name)<br />

NW-513-172<br />

NW-513-Bande<br />

Qargha<br />

To<br />

(node name)<br />

NW-513-Bande<br />

Qargha<br />

Type Cross Section Action Total Unit<br />

mm 2 Cost<br />

(US$/unit)<br />

Overhead 70 Reconductor<br />

NW-513-181 Overhead 70 Reconductor<br />

Length (Km)<br />

or # units<br />

Base Costs<br />

US$<br />

Additional<br />

Instalation<br />

Costs US$<br />

Sum<br />

13,375 0.41 5,537 0 5,537<br />

13,375 0.29 3,932 0 3,932<br />

NW-513-181 NW-513-182 Overhead 70 Reconductor 13,375 0.09 1,244 0 1,244<br />

NW-513-182 NW-513-187 Overhead 70 Reconductor 13,375 0.47 6,340 0 6,340<br />

NW-513-187 NW-513-Deh Ponba Overhead 70 Reconductor<br />

13,375 0.18 2,421 0 2,421


North<br />

Medium Term Investments to be advanced to <strong>the</strong> Short Term<br />

Project From<br />

To<br />

Type Cross Section Action Total Unit<br />

Additional<br />

Length (Km) Base Costs<br />

(node name) (node name)<br />

mm 2 Cost<br />

Instalation<br />

or # units US$<br />

(US$/unit)<br />

Costs US$<br />

Sum<br />

P-A3-11 N-513-35 N-513-39 Overhead 185 upgrade 15,142 0.16 2,483 0 2,483<br />

N-513-39 N-513-43 Overhead 185 upgrade 15,142 0.20 2,968 0 2,968<br />

N-513-43 N-513-46 Overhead 185 upgrade 15,142 0.15 2,241 0 2,241<br />

N-513-46 N-513-47 Overhead 185 upgrade 15,142 0.07 984 0 984<br />

N-513-47 N-513-53 Overhead 185 upgrade 15,142 0.29 4,346 0 4,346<br />

P-B3-18 S/S North N-529 Cable 240 change 187,357 0.05 9,368 0 9,368<br />

N-529 N-529-3 Overhead 185 reconductor 15,142 0.05 772 0 772<br />

N-529-3 N-529-8 Overhead 185 reconductor 15,142 0.31 4,679 0 4,679<br />

N-529-8 N-529-9 Overhead 185 reconductor 15,142 0.04 636 0 636<br />

N-529-9 N-529-19 Overhead 185 reconductor 15,142 0.49 7,435 0 7,435<br />

N-529-19 N-529-28 Overhead 185 reconductor 15,142 0.50 7,556 0 7,556<br />

N-529-28 N-529-36 Overhead 185 reconductor 15,142 0.50 7,601 0 7,601<br />

N-529-36 N-529-49 Overhead 185 reconductor 15,142 0.59 8,994 0 8,994<br />

N-529-49 N-529-63a Overhead 185 reconductor 15,142 0.26 3,891 0 3,891<br />

N-529-63a N-529-63 Overhead 185 reconductor 15,142 0.49 7,465 0 7,465<br />

N-529-63 N-529-64 Overhead 185 reconductor 15,142 0.03 500 0 500<br />

N-529-64 N-529-66 Overhead 185 reconductor 15,142 0.19 2,922 0 2,922<br />

N-529-66 N-529-71 Overhead 185 reconductor 15,142 0.21 3,195 0 3,195<br />

N-529-71 N-529-77 Overhead 185 reconductor 15,142 0.15 2,332 0 2,332<br />

N-529-77 N-529-79 Overhead 185 reconductor 15,142 0.16 2,423 0 2,423<br />

N-529-79 JS#5-N-529 Cable 240 change 187,357 0.03 5,059 0 5,059<br />

P-B3-13 N-515-13 N-518-13 Switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-518-24a N-528-50 Switch N/A new 3,500 1.00 3,500 0 3,500<br />

N-515-31 N-518-31 Switch N/A new 3,500 1.00 3,500 0 3,500<br />

P-B3-19 N-529-63a NW-515-63_1 switch N/A new 3,500 1.00 3,500 0 3,500

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!