QA REQUIREMENTS<br />

CONTRACT IMPLEMENTATION<br />

‘<strong>Fusion</strong> for <strong>Energy</strong>’<br />

MAY 2009 QA ON PROJECT IMPLEMENTATION 1


Origin - <strong>Quality</strong> Requirements<br />

French<br />

Authority<br />

Regul<strong>at</strong>ions<br />

ITER QA PROGRAM<br />

Compliant with<br />

French Authority Regul<strong>at</strong>ions<br />

<strong>F4E</strong> QA PROGRAM<br />

Compliant with<br />

French Authority Regul<strong>at</strong>ions<br />

and ITER QA Program<br />

ITER has been classified as an<br />

“Install<strong>at</strong>ion Nucléaire de Base” (INB),<br />

and within this larger class recognising<br />

the objective limit of the risks, in the<br />

subclass of Labs and Fuel Plants<br />

ITER must comply, <strong>Quality</strong> wise, with:<br />

• ARRETE QUALITE DU 10 AOUT<br />

1984<br />

• IAEA Safety Requirements GS-R-3<br />

(2006) – “The Management System for<br />

Facilities and Activities”.<br />

Associ<strong>at</strong>e<br />

or<br />

Industry<br />

QUALITY PLAN<br />

Compliant with<br />

<strong>F4E</strong> QA Program<br />

MAY 2009 QA ON PROJECT IMPLEMENTATION 2


Management Specific<strong>at</strong>ion - Requests<br />

<strong>Quality</strong> and Management requirements are addressed in Annex A<br />

Annex A is the Management Specific<strong>at</strong>ion and requests a <strong>Quality</strong> Plan<br />

AT TENDER LEVEL<br />

The Bidder shall provide, in its offer a meaningful outline of a dedic<strong>at</strong>ed <strong>Quality</strong> Plan where the plans,<br />

schedules and explan<strong>at</strong>ion of the provisions to comply with the following requirements will be assembled.<br />

The Bidder will be evalu<strong>at</strong>ed, inter alia, on the basis of its <strong>Quality</strong> Plan according to the Tender<br />

Specific<strong>at</strong>ions.<br />

During offer, due to the n<strong>at</strong>ure of the process, the Bidder might not have all the inform<strong>at</strong>ion th<strong>at</strong> he will have<br />

as a successful Bidder. As result of this limit<strong>at</strong>ion, <strong>at</strong> this stage the <strong>Quality</strong> Plan cannot be a “complete”<br />

version and is referenced as an “outline’ version where:<br />

– Some sections will be addressed as a description of the previewed system (proposed system).<br />

– The remaining sections shall have the description of the Bidder current system.<br />

AT CONTRACT LEVEL<br />

After the Contract sign<strong>at</strong>ure, the <strong>Quality</strong> Plan shall encompass the following sequential stages (in<br />

accordance with §5):<br />

1. <strong>at</strong> the kick-off meeting the Supplier shall provide the proposed <strong>Quality</strong> Plan;<br />

2. the Supplier shall not begin any work without the <strong>Quality</strong> Plan being released in writing by <strong>F4E</strong>;<br />

3. during Contract implement<strong>at</strong>ion, the Supplier shall upd<strong>at</strong>e the <strong>Quality</strong> Plan (or parts of it) as/if<br />

required and shall submit it to <strong>F4E</strong> for release.<br />

MAY 2009 QA ON PROJECT IMPLEMENTATION 3


QUALITY PLAN<br />

The dedic<strong>at</strong>ed <strong>Quality</strong> plan describes the<br />

oper<strong>at</strong>ional quality system implemented<br />

by the bidder/supplier to ensure th<strong>at</strong>:<br />

• Contract requirements will be met,<br />

• Evidence of such compliance will be<br />

maintained.<br />

The compliance with the <strong>Quality</strong> Plan shall<br />

replace any need for QA certific<strong>at</strong>ion.<br />

Certific<strong>at</strong>ion is not mand<strong>at</strong>ory, but<br />

recommended.<br />

MAY 2009 QA ON PROJECT IMPLEMENTATION 4


PROCESSES FLOWCHARTS<br />

FLOW OF DOCUMENTATION<br />

RESPONSIBLE<br />

FUSION FOR ENERGY ACTIVITIES<br />

CUSTOMER ACTIVITIES<br />

DOCUMENT<br />

On going Process<br />

RESPONSIBLE<br />

FUSION FOR ENERGY<br />

ACTIVITIES<br />

IO ACTIVITIES<br />

(Inspection, Test, Design, …)<br />

AUTHOR<br />

(ORIGINATOR)<br />

REVIEWER<br />

START OF DOCUMENT FLOW<br />

PROCEDURE<br />

1.Draft Document<br />

Prepar<strong>at</strong>ion or<br />

Review Change<br />

2.Document REVIEW<br />

3.Review<br />

CHANGE &<br />

DEVIATION<br />

HANDLING<br />

All Personel<br />

WPM<br />

QA Officer<br />

START OF PROCEDURE<br />

2. HOLD PROCESS<br />

Activity can be initi<strong>at</strong>ed<br />

by Customer or <strong>F4E</strong><br />

1. Detect/Identify NC<br />

(Requirement not fulfilled)<br />

YES<br />

COMMENTS<br />

NO<br />

RESPONSIBLE<br />

FUSION FOR ENERGY ACTIVITIES<br />

IO ACTIVITIES<br />

DOCUMENT<br />

YES<br />

3.Process<br />

involves<br />

AUTHOR<br />

(ORIGINATOR)<br />

4. EXTERNAL<br />

REVIEW<br />

REQUIRED<br />

YES<br />

Document COMMENT<br />

by IO<br />

Frozen Specific<strong>at</strong>ion<br />

Requirements<br />

WPM<br />

QA Officer<br />

4.Segreg<strong>at</strong>e item NC<br />

and Identify<br />

Product<br />

NO<br />

Indentific<strong>at</strong>ion<br />

Tag<br />

APPROVER<br />

NO<br />

5. Document<br />

APPROVAL<br />

IO<br />

COMMENTS<br />

NO<br />

YES<br />

Competent Person<br />

1.Identify<br />

Problem/Improvement<br />

Request<br />

START OF CHANGE MANAGEMENT<br />

IO CHANGE NOTICE<br />

Change<br />

Notice<br />

WPM<br />

5.Issue NC<br />

REPORT<br />

Nonconformity<br />

opened<br />

Nonconformity<br />

Report<br />

PROCEDURE<br />

Nonconformity stays<br />

NO<br />

6.APPROVAL<br />

WPM<br />

2.DRAFT CHANGE<br />

REQUEST<br />

Draft CR<br />

PM +<br />

Affected WPM<br />

6.MAJOR<br />

NC<br />

YES<br />

7.Send to CUSTOMER<br />

RO<br />

open<br />

Major NC<br />

LIST<br />

YES<br />

AUTHOR<br />

(ORIGINATOR)<br />

7.EXTERNAL<br />

APPROVAL<br />

REQUIRED<br />

YES<br />

Final ACCEPTANCE<br />

by IO<br />

WPM<br />

+ Integr<strong>at</strong>ion<br />

3.IMPACT ANALYSIS<br />

4.IMPACT ANALYSIS<br />

No Change<br />

Impact Report<br />

PM + WPM<br />

NO<br />

8.Decision on Corrective/<br />

Preventive Actions<br />

Corrective/<br />

Preventive<br />

Action<br />

NO<br />

NO<br />

C<br />

AUTHOR<br />

(ORIGINATOR)<br />

ADMINISTRATION<br />

8. FINAL RELEASE<br />

TO CUSTOMER<br />

9.ARCHIVE<br />

ORIGINAL & UPDATE<br />

DOC PLAN<br />

IO<br />

APPROVAL<br />

YES<br />

NO<br />

PM/WPM<br />

WPM<br />

NO<br />

6.Issue Internal<br />

CHANGE<br />

REQUEST<br />

5.Change of<br />

CUSTOMER<br />

requirement<br />

YES<br />

9.Issue<br />

CHANGE<br />

REQUEST<br />

8.Change<br />

Beneficial<br />

(Conference<br />

CUSTOMER)<br />

YES<br />

Change<br />

Request<br />

WPM<br />

WPM<br />

9.Record NC in NC-LIST<br />

Nonconformity<br />

stays open<br />

10.Implement<br />

CORRECTIVE/<br />

PREVENTIVE ACTION<br />

<strong>F4E</strong> Minor NC-<br />

LIST<br />

C<br />

<strong>F4E</strong> Minor NC-<br />

LIST<br />

Customer copy<br />

APPROVED<br />

Corrective/<br />

Preventive Action<br />

Minor NC<br />

LIST<br />

Corrective/<br />

Preventive<br />

Action<br />

YES<br />

10.DOCUMENT<br />

NEEDS<br />

CHANGES<br />

NO<br />

Review Group<br />

(in Man. Plan)<br />

7.Technical Review of<br />

Proposed Change<br />

10.Send to CUSTOMER<br />

RO<br />

Disposition of<br />

CHANGE<br />

Disposition<br />

Disposition<br />

QA Officer<br />

11.Completition and<br />

Control of the Correction<br />

Actions<br />

Nonconformity<br />

closed<br />

END OF NONCONFORMITY<br />

Closed<br />

NCR<br />

END OF DOCUMENT FLOW<br />

PROCEDURE<br />

FUSION FOR ENERGY<br />

IO<br />

Project/Contract<br />

Management<br />

11.CHANGE<br />

REQUEST<br />

APPROVED<br />

NO<br />

No Change<br />

PROCEDURE<br />

FUSION FOR ENERGY ACTIVITIES<br />

C<br />

Reject (Scrap), Repair,<br />

Rework, Use-As Is<br />

CUSTOMER ACTIVITIES<br />

YES<br />

Customer<br />

No Change<br />

NO<br />

IMPACT<br />

REPORT<br />

DOCUMENTATION<br />

FLOW<br />

Project/Contract<br />

Management<br />

WPM<br />

12.Establish Work<br />

Plan with resources<br />

and schedule<br />

13.CHANGES<br />

IMPLEMENTATION<br />

14. UPDATE<br />

Specific<strong>at</strong>ion<br />

Requirements<br />

Acceptance<br />

YES<br />

UPDATE Specific<strong>at</strong>ion<br />

Requirements<br />

Work Plan<br />

Upd<strong>at</strong>ed<br />

Specific<strong>at</strong>ion<br />

NONCONFORMITY<br />

HANDLING<br />

END OF CHANGE MANAGEMENT<br />

PROCEDURE<br />

Change Request<br />

Closed<br />

FUSION FOR ENERGY ACTIVITIES<br />

IO ACTIVITIES<br />

MAY 2009 QA ON PROJECT IMPLEMENTATION 5


French Regul<strong>at</strong>ion for Nuclear Safety <strong>Quality</strong><br />

Order (resume)<br />

QUALITY ORDER OF AUGUST 10, 1984 FRENCH REGULATION FOR NUCLEAR SAFETY<br />

The required quality is obtained and maintained on one hand by activities performed and on the other hand by<br />

organized and appropri<strong>at</strong>e verific<strong>at</strong>ion.<br />

Art 1. Graded quality management system according to safety importance of components and activities (SIC). Set up <strong>at</strong><br />

the design stage and extended throughout all the subsequent stages of existence of the Install<strong>at</strong>ion.<br />

Art 2. Definition of safety relevant activities.<br />

Art 3. Definition of Oper<strong>at</strong>or and contractors.<br />

Art 4. Oper<strong>at</strong>or is responsible for safety and responsible of applic<strong>at</strong>ion by contractors of adequ<strong>at</strong>e QA system.<br />

Art 5. QA manual + QA compliance report + contractors assessment.<br />

Art 6. Safety requirement are defined and monitored.<br />

Art 7. Appropri<strong>at</strong>e human and technical resources in agreement to<br />

safety objectives.<br />

Art 8. Independent verific<strong>at</strong>ion of safety relevant activities.<br />

Art 9. QA management team + Evalu<strong>at</strong>ion and correction<br />

monitoring.<br />

Art 10. Records and reporting + frequency.<br />

Art 11. Correctly storage records and hardcopies.<br />

Art 12. & 13. Devi<strong>at</strong>ions definition, devi<strong>at</strong>ion records, declare to<br />

NSA, feedback.<br />

Art 14. Safety relevant studies are concerned by QA (apply QA<br />

during design).<br />

KO DA<br />

RU DA<br />

JP DA<br />

USA DA<br />

IN DA<br />

ITA<br />

French Authority<br />

Requirements<br />

ITER<br />

QMS<br />

CN DA<br />

<strong>F4E</strong><br />

PP<br />

QP<br />

PP<br />

PP<br />

PP<br />

EU<br />

SUPPLIER<br />

EU<br />

SUPPLIER<br />

QP<br />

<strong>F4E</strong><br />

QA PROGRAM<br />

PP<br />

QP<br />

QP<br />

EU<br />

SUPPLIER<br />

EU<br />

SUPPLIER<br />

PP = Comercial Contract +<br />

Technical Specific<strong>at</strong>ion +<br />

Management Specific<strong>at</strong>ion<br />

MAY 2009 QA ON PROJECT IMPLEMENTATION 6