HEALTH & SAFETY MEETING 14 JANUARY <strong>2003</strong><br />
PRESENT:<br />
MARTIN CARR<br />
JOANNE MILLS<br />
JIM STOREY<br />
ALAN HOPKINSON<br />
ACTION TO BE TAKEN<br />
These actions refer to the attached numbered Task-list.<br />
Holbrook<br />
8 Storage over main toilet block – all items have now been removed. This is no<br />
longer a storage area. Task completed.<br />
14 Trich cleaning in rolling mill – all equipment <strong>and</strong> materials have been removed.<br />
Task completed.<br />
38 Casting department – investigation into the fitting <strong>of</strong> a guard to the in-line<br />
guillotine is still continuing. Action JS.<br />
42 Cutlery department – guard improvement on the Pronging machine still<br />
under investigation. Action JS.<br />
45 Potential safety issue with the automatic gates in the works yard. Awaiting<br />
opportunity to paint warning markings on ground. Action JS.<br />
48 Rolling mill Tea Bar – new facility has now been installed. Task completed.<br />
52 Polishing shops Main Extraction ducting:<br />
1) The ducting was opened at various stages along its length <strong>and</strong> inspections<br />
Made. No build-up <strong>of</strong> polishing compound deposits were evident. Grills at<br />
Polishing-heads were re-installed with instruction given to make sure they<br />
were in-place before any polishing commenced.<br />
2) A mains-water inlet system is now to be fitted within the next 4 weeks.<br />
When this system is installed, MC will issue will issue a Procedure for<br />
tackling any further “fires”. Action JS/MC.<br />
54 Silverware department Goods-lift – all faults rectified. Task completed.
56 From Insurance Inspection report – 3 items <strong>of</strong> equipment still require attention.<br />
Action JS.<br />
71 Press department – attention to power presses as detailed in Inspection reports.<br />
Action JS.<br />
72 Additional Tea Bar facility requested. Action AGH.<br />
Unit 2<br />
6 Material rack safety stoppers to be fitted before next meeting. Action JS.<br />
51 Denibbing shop – replacement dust collector to be installed. Action JS.<br />
59 Spraybooths – blockage in the system was found (old surgical gloves) <strong>and</strong><br />
replacement pump fitted. Task completed.<br />
63 Old hardboard sheets at rear <strong>of</strong> building to be removed. Action JS.<br />
Unit 4<br />
13 Asbestos bearing ro<strong>of</strong> lining has been completely removed. Task completed.<br />
50 Extraction report by Insurance inspectors – investigation still on-going. This<br />
report also involves points raised at Unit 3. Action JS.<br />
62 Boundary fences to be re-erected. Action JS.<br />
70 Attention required to power presses guarding as detailed in inspection report.<br />
Action JS.<br />
Century House<br />
55 Attention to Goods lift. Task completed.<br />
Other Tasks<br />
3 Report now on-h<strong>and</strong> on Air sampling for wood dust at units 2/3/4/5. Investigation<br />
to take place on issues raised. Action JS.<br />
61 Cowens Insurance Brokers report has been discussed <strong>and</strong> points noted. Task<br />
completed.
Special Topics<br />
34 Noise level survey – details <strong>of</strong> new legislation received. Consultation with certain<br />
departments must now take place. Action MC/AGH.<br />
65 First Aid situation at Orgreave – MC reported that we have only one First Aider<br />
to cover all the sites. A new recruit needs to be found. Action JM.<br />
66 MC raised the issue <strong>of</strong> Hot Work Permits – JS confirmed that this system was<br />
operational within the Maintenance dept. Checks will be made to ensure that all<br />
requirements are being meet. Action MC.<br />
67 MC also raised the general issue <strong>of</strong> Permits to Work in Hazardous Situations. It<br />
was agreed to review the situation in 3 months time<br />
68 MC informed the meeting that our Induction <strong>and</strong> Training procedures were not up<br />
to current requirements. A review is required. MC to discuss this review with JW.<br />
69 Fork lift truck regulations – new Code <strong>of</strong> Practice received. MC to process.<br />
73 Accident Reporting book – new procedures to be introduced. All First Aiders will<br />
return an Incident report directly to MC. No report books will be issued in the<br />
future. This should improve the present poor reporting system from certain areas.<br />
NEXT MEETING 18/2/03 – 9.30 AM<br />
A.G.HOPKINSON<br />
17/1/03<br />
Copies to: Mr J Wood<br />
Mr S Donson<br />
Mr S Fish