Proposed Construction Schedule<br />
Contracts would be advertised in early 2011.<br />
Construction would complete by June 1, 2011.<br />
All restoration / reinforcement construction would<br />
occur entirely within the existing levee / floodwall<br />
Right of Way.<br />