26.01.2015 Views

Link to full text - Pontchartrain Basin Clearinghouse - University of ...

Link to full text - Pontchartrain Basin Clearinghouse - University of ...

Link to full text - Pontchartrain Basin Clearinghouse - University of ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

APPROVED BUDGET<br />

Category Amount Requested Match & Source<br />

Personnel $ 71,550.00 $ 9,748.00 / UNO<br />

Travel $ 2,000.00<br />

Supplies $ 2,000.00<br />

Indirect Cost (14%) $ 10,577.00 $25,248.00 / UNO<br />

Equipment $ 3,873.00<br />

Total $ 90,000.00 $34,996.00 / UNO<br />

Justification:<br />

Personnel: (1) Michael A. Poirrier, Principle Investiga<strong>to</strong>r - 1.5 months summer salary.<br />

Funds are needed because his university appointment does not provide<br />

summer support during this period <strong>of</strong> intense research effort.<br />

(2) Elizabeth Spalding, Research Associate – 6 months support.<br />

(3) Carol Franze, Research Associate – 9 months support.<br />

Standard <strong>University</strong> fringe benefits at 21% <strong>of</strong> <strong>full</strong>-time salaries for Poirrier, Spalding and<br />

Franze.<br />

(4) Undergraduate Student Workers at $5 - $8 / hour.<br />

Travel: Funds are requested <strong>to</strong> support local field travel and participation at a national<br />

meeting. Local field travel will include vehicle mileage ($.32/mi) and boat gas and<br />

maintenance.<br />

Supplies: Funds are requested <strong>to</strong> purchase preservatives, reagents, glassware, microscope<br />

slides, waters sample bottles, computer s<strong>of</strong>tware and other item needed <strong>to</strong> conduct research.<br />

Overhead: 14% <strong>of</strong> costs excluding equipment, as established by NOAA and UNO.<br />

Equipment: Funds are requested <strong>to</strong> replace older field equipment which may cease <strong>to</strong><br />

function.<br />

Matching funds represent Principle Investiga<strong>to</strong>r release-time for research, and the difference<br />

between UNO standard Indirect/overhead Rate (42%) and the established rate by NOAA (14<br />

BUDGET STATUS<br />

All funds awarded have been encumbered.<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!