27.01.2015 Views

Draft Commander 3000® A/T Mobile Fire Pump - Weis Fire & Safety ...

Draft Commander 3000® A/T Mobile Fire Pump - Weis Fire & Safety ...

Draft Commander 3000® A/T Mobile Fire Pump - Weis Fire & Safety ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T<br />

<strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing<br />

And<br />

Training Simulator Specifications<br />

MODEL NUMBER DC1911-3000 A/T


Table of Contents<br />

Introduction ................................................................................................................................................. 3<br />

Why <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T <strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator ............................. 4<br />

What is <strong>Draft</strong>ing .......................................................................................................................................... 6<br />

<strong>Draft</strong> <strong>Commander</strong> Specifications ................................................................................................................ 8<br />

DOT Rated Transporter for <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T .............................................................. 8<br />

3000 Gallons Capacity Reservoir ..................................................................................................... 9<br />

<strong>Draft</strong>ing Tubes ................................................................................................................................. 10<br />

Special Designed <strong>Draft</strong>ing Swivels ................................................................................................. 10<br />

Hard Suction Hose .......................................................................................................................... 10<br />

Extra Hard Suction Trays ................................................................................................................ 10<br />

<strong>Mobile</strong> <strong>Pump</strong> Testing & Training Simulator Equipped With .......................................................... 10<br />

Powder Coated Aluminum Inlet Manifolds ..................................................................................... 11<br />

<strong>Mobile</strong> <strong>Pump</strong> Testing & Training Simulator Monitor Station ........................................................ 11<br />

Side Compartments .......................................................................................................................... 11<br />

Hose Storage Compartment and Misc. Equipment ......................................................................... 12<br />

Additional Supplied Equipment ....................................................................................................... 12<br />

Additional Requirements ................................................................................................................. 12<br />

Optional Packages ........................................................................................................................... 13<br />

<strong>Fire</strong> <strong>Pump</strong> Test Flow Chart ....................................................................................................................... 14<br />

References/Units Sold ............................................................................................................................... 15<br />

"The Daily Sifting Herald" Article ............................................................................................................ 18<br />

<strong>Fire</strong> Apparatus & Emergency Equipment Article ..................................................................................... 19<br />

Revised 7-2012<br />

Page 2


Revised 7-2012<br />

PUMPING WITH CLEAN CLEAR WATER<br />

MODEL NUMBER: DC1911-3000 A/T<br />

THE DRAFT COMMANDER <strong>3000®</strong> A/T MOBILE FIRE PUMP TESTING & TRAINING<br />

SIMULATOR DEMANDS YOUR FIRE APPARATUS HAS BEEN TESTED AND IS<br />

READY FOR ITS EMERGENCY CALL<br />

The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T is a SOLE SOURCE mobile fire pump testing and training<br />

simulator from draft laboratory and is exclusively manufactured by <strong>Weis</strong> <strong>Fire</strong> & <strong>Safety</strong> Equipment<br />

Company, Inc. in Salina, Kansas. The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T offers unmatched simplicity,<br />

accuracy and safety allowing a true fire pump test from draft with clean clear water. The <strong>Draft</strong><br />

<strong>Commander</strong> <strong>3000®</strong> A/T is a proven testing and training device since 2002 testing thousands of fire<br />

trucks by municipalities, government agencies, commercial and industrial fire apparatus service<br />

agencies utilizing the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T. This unit performs pump service tests up to<br />

3,000 plus GPM as per NFPA-1911 and ISO Guidelines.<br />

Conventional testing of a pumper has involved the grueling task of finding a standing water source<br />

such as swimming pools, lakes or streams. Suitable water sources are becoming more difficult to<br />

access and water levels are unpredictable. Water cleanliness can vary causing abrasive premature<br />

pump wear. Test pits often contain dirty run off water and sediment and require transport to and<br />

from. The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T comes with all hoses, a complete set of testing discharge<br />

tips, and a portable testing <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T telescoping monitor simulator station.<br />

<strong>Pump</strong> testing can be done at the firehouse or a desired location with no apparatus or personnel<br />

downtime in the event of an emergency fire call.<br />

The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T allows you to perform a true pump test from draft creating a<br />

suction lift requiring the use of a primer as per NFPA 1911-2012 Edition, Section 18.7.5.1. This<br />

makes sure the engine and fire pump are performing with the correct horsepower and the fire pump<br />

is pumping the correct GPM. This service test is done by working from a suction lift throughout the<br />

test with flowing clean clear water as per NFPA-1911 up to 3000 GPM. This service also allows you<br />

to test your fire truck at your desired location, at any time, and during various seasons of the year.<br />

The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T offers fire departments a cost effective means of complying with<br />

their annual pump test requirements as defined by ISO and the National <strong>Fire</strong> Protection<br />

Page 3


Association(NFPA-11 2012 Edition). By doing these tests it helps your community to receive<br />

maximum credit points to help maintain the lowest insurance rates possible and that your<br />

apparatus is performing as intended for the safety of your firefighters and protection of your<br />

community.<br />

Note: Sole source letter is available upon request.<br />

Why <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T <strong>Mobile</strong><br />

<strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator<br />

The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T <strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing and Training Simulator allows you to pump test<br />

your fire apparatus on site from draft assuring your unit is up to par performing service tests which is required<br />

by ISO and by the Guide Lines of NFPA 1911-2012. While testing your <strong>Fire</strong> Apparatus to make sure it is<br />

ready to protect property and save lives in your community, testing also assures the protection for your<br />

<strong>Fire</strong>fighters.<br />

What about Training for Your <strong>Fire</strong>fighters and not wasting water<br />

and recycling the water back into<br />

The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T <strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing &<br />

Training Simulator<br />

1. Learn to perform a <strong>Fire</strong> Service <strong>Pump</strong> Test as per NFPA 1911-2012 Guidelines.<br />

2. Learn to flow water and to set the relief valve discharging large volumes of water and why setting the<br />

relief valve is of importance for safety of the <strong>Fire</strong>fighters.<br />

3. <strong>Fire</strong> <strong>Pump</strong> Operator/Engineers learn the importance of observing all gauges on the pump panel, such as<br />

the Master Pressure Gauge, Vacuum Gauge, Individual Discharge Gauges, oil pressure, temperature,<br />

volts, tech, relief valve, etc. while discharging water back into the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong>.<br />

4. Learn the importance of when drafting to make sure of NO air leaks which causes to loose prime.<br />

5. See the difference in water flow and pressure when changing a two stage pump from pressure to<br />

volume.<br />

6. Learn the importance of time when hooking up suction hose to discharge water to fight fire and learn<br />

what happens before your apparatus is ready to receive water.<br />

7. Learn the sounds of <strong>Fire</strong> Apparatus Engine and <strong>Fire</strong> Apparatus <strong>Fire</strong> <strong>Pump</strong>s when flowing high volumes<br />

of water.<br />

8. Learn engagement of pump in gear and out of gear at an idle.<br />

9. Learn the importance of not running your <strong>Fire</strong> <strong>Pump</strong> Dry and not moving water for a long period of<br />

time.<br />

10. Learn the importance of Setting Brake and use of Wheel Chocs.<br />

11. Learn to disconnect the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> suction tubes and putting the <strong>Fire</strong> Apparatus back<br />

into service – making sure the <strong>Fire</strong> Apparatus is ready to be put back into the <strong>Fire</strong> House and ready for<br />

the next emergency call.<br />

12. Learn to flow water with different sizes of fire hoses and learn the differences of water flow using<br />

different pressures.<br />

GPM Flow GPM Flow Increase In Flow<br />

1 ½” <strong>Fire</strong> Hose: _______________ 1 ¾” <strong>Fire</strong> Hose: _______________ _______________<br />

Revised 7-2012<br />

Page 4


1 ¾” <strong>Fire</strong> Hose: _______________ 2” <strong>Fire</strong> Hose: _________________ _______________<br />

2 ½” <strong>Fire</strong> Hose: _______________ 3” <strong>Fire</strong> Hose: _________________ _______________<br />

3” <strong>Fire</strong> Hose: _________________ 4” <strong>Fire</strong> Hose: _________________ _______________<br />

4” <strong>Fire</strong> Hose: _________________ 5” <strong>Fire</strong> Hose: __________________ _______________<br />

5” <strong>Fire</strong> Hose: _________________ 6” <strong>Fire</strong> Hose: __________________ _______________<br />

Testing <strong>Fire</strong> Hose<br />

<strong>Fire</strong> Hose Testing – Utilizing the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T <strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing &<br />

Training Simulator up to 250-300 PSI utilizing your <strong>Fire</strong> Apparatus <strong>Fire</strong> <strong>Pump</strong>.<br />

Example: using 2 ½” discharge to pressure the fire hose you’re testing up to 250 PSI and using<br />

another 2 ½” discharge attached to the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> and discharging low volumes of<br />

water back into the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> keeping your <strong>Fire</strong> <strong>Pump</strong> from overheating. Set your<br />

relief valve at 250 PSI or pressure desired.<br />

Note: All <strong>Fire</strong> Hose should be tested according to NFPA Standards.<br />

Revised 7-2012<br />

Page 5


<strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T<br />

<strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator<br />

NFPA – 1911 2012<br />

18.7.5 Priming System Tests<br />

NFPA – 1911 2012 Section 18.5.1.1.1, Lift for <strong>Fire</strong> <strong>Pump</strong>s<br />

NFPA – 1911 2012 standards.<br />

Revised 7-2012<br />

Page 6


Revised 7-2012<br />

Page 7


<strong>Draft</strong>ing Water With<br />

The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T<br />

<strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator<br />

As Per NFPA – 1911 2012 Standards<br />

Revised 7-2012<br />

Page 8


<strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T<br />

<strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator Specifications<br />

MODEL NUMBER DC1911-3000 A/T<br />

Purpose Specific Engineered Aluminum Heavy Duty DOT Rated Transporter:<br />

‣ The Aluminum <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T transporter is specially designed and<br />

manufactured only for the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T to maintain a low profile for<br />

minimal wind resistance, weight distribution, and safety.<br />

‣ The front of the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T transporter is equipped with an<br />

aluminum tread plate shield 46 ¾” high by 78” wide to protect and reduce wind drag<br />

when transporting.<br />

‣ There is to be a minimum of 18” between the front shield and the front of the <strong>Draft</strong><br />

<strong>Commander</strong> <strong>3000®</strong> reservoir. This space is for extra storage for equipment and to gain<br />

access to the front ventilator.<br />

‣ Two (2) 6,000 lbs. Torflex 22 ½” up axles with 12,000 GVWR equipped with electric<br />

brakes.<br />

‣ Aluminum transporter designed and engineered for distribution of weight of the <strong>Draft</strong><br />

<strong>Commander</strong> <strong>3000®</strong> A/T and its components.<br />

‣ Two (2) sets of mud flaps to be installed on transporter.<br />

‣ Equipped with four (4) 7000 lb. capacity screw type jacks to support transporter when<br />

the reservoir is filled with water. Jacks are located: two (2) on left side and two (2) on<br />

right side.<br />

‣ One (1) 10,000 lb. tongue jack.<br />

‣ Equipped with load transporter tires, ICC Lights, work lights, stop, and turn signal<br />

lights.<br />

‣ Equipped with a crossbar at rear 15” high above the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T with<br />

stop, tail, and turn signal lights.<br />

‣ 3M reflective tape on front, rear, and sides of unit.<br />

‣ Floor of transporter to be extruded aluminum.<br />

Note: Wood or steel flooring is not acceptable<br />

‣ Folding rear step and work area of transporter is 16” deep X 77” wide.<br />

‣ Fenders of transporter to be aluminum tread plate and equipped with two hold brackets<br />

for mounting the entrance steps for entering the pitot nozzle changing compartment.<br />

‣ OAW (less water) not to exceed 6,500 lbs.<br />

‣ Over all height not to exceed 70 inches (low profile).<br />

‣ Over all length not to exceed 27 feet.<br />

‣ Standard RV 7 pin electrical connector.<br />

Revised 7-2012<br />

Page 9


Revised 7-2012<br />

3000 Gallons Capacity <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T Reservoir:<br />

‣ Reservoir is manufactured of heavy duty poly throughout the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong><br />

A/T externally and internal which includes bottom, sides, top, and suction and discharge<br />

compartments.<br />

‣ Reservoir is “T” shaped and attached to the transporter and mounted so it can not shift<br />

and will flex with the transporter.<br />

‣ The drafting pit section of the reservoir to have four (4) anti-swirl plates and a water<br />

temperature gauge to monitor water temperature.<br />

‣ The top and rear of the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T reservoir to be painted with two<br />

(2) coats of white polyurethane, UV rated, to enhance the cooling system.<br />

‣ The mobile drafting water reservoir to have a section which is an independent suction<br />

drafting pit in the reservoir, and receives water flow through a special designed<br />

integrated section of the reservoir that removes cavitations/disturbance and air from the<br />

water so when water is entering the reservoir from high volume and pressure of water<br />

being pumped out of the drafting pit section from the apparatus being tested. Thus when<br />

the water reaches the draft pit section it will maintain the correct water depth preventing<br />

water disturbance and air swirls causing the apparatus to loose prime.<br />

‣ The right and left of the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T to be laminated oraject 3951 RA<br />

2-mil gloss white injet vinyl UV rated premium cast PIC gloss cold over laminate highest<br />

level of conformability which offers superior level of UV protection. Pointed in the<br />

laminate is the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T logo and manufacturing identification<br />

number. Note: Lettering and logos of municipalities or service agencies can be added upon<br />

request and can be added to each side.<br />

‣ Ventilators located at the front and rear center of the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T<br />

reservoir 27” long x 14” wide x 17” high and manufactured of .125 aluminum tread plate.<br />

‣ The ventilators are to be equipped with full length aluminum tread plate doors equipped<br />

with stainless steel hinges and devices to hold doors open for ventilation.<br />

‣ Ventilator doors to be equipped with a close fastener for when transporting.<br />

‣ Integrated water cooling system to help maintain a stable water temperature with two (2)<br />

2 ½” inlets and one (1) 4” discharge in order to discharge warm water from reservoir.<br />

‣ The 4” discharge is discharged at front right side of reservoir and controlled with<br />

quarter turn ball valve 2 ½” NST male and capped.<br />

‣ All internal anti-water flow cavitation compartment sections to be made of ½” or larger<br />

heavy duty poly and supported and welded to withstand large volumes of water that flow<br />

to the suction drafting pit compartment.<br />

‣ Reservoir clean out sump drain equipped with 2½” drain and controlled with a 2½”<br />

quarter turn valve and to discharge at right rear of transporter.<br />

‣ Located at the front of the test reservoir are two (2) aluminum 1/8” tread plate stone<br />

shield (14” wide by 30¾” long) one (1) located on the right, and one (1) located on the<br />

left side.<br />

‣ The mobile fire pump testing and training simulator is designed to test fire pumps up to<br />

Page 10


3,000 GPM plus.<br />

‣ One (1) liquid site water gauge installed at rear of reservoir drafting pit and one (1) at<br />

front of discharge receiving area.<br />

‣ Lifetime warranty on tank reservoir.<br />

<strong>Draft</strong>ing Tubes:<br />

‣ Two (2) 6” drafting tubes located in draft pit section of draft commander reservoir and<br />

equipped with special designed aluminum powder coated heavy duty 45° 6” 360° elbow<br />

swivels. Note: Swivel and dry hydrant elbows manufactured of PVC will not be accepted.<br />

‣ The swivels are designed so you can position the apparatus at the rear, left, or right side.<br />

‣ Swivels are equipped with a grease zerk to lubricate swivels.<br />

Special Designed 45° Heavy Duty Powered Coated <strong>Draft</strong>ing Swivels:<br />

‣ On top of 360° elbow swivels a suction vacuum breaker to be installed and to be<br />

controlled at the rear of the transporter on each elbow.<br />

Hard Suction Hose:<br />

‣ Two (2) 17 ft of 6” flexible hard suction hose preconnected to the drafting tubes and<br />

stored on top of the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong>. One end attached to the 360° elbow swivel<br />

and the other end equipped with 6” long handle swivel NFT female.<br />

‣ Two (2) hard suction trays to have hold down straps to secure the hard suction hose.<br />

‣ The trays to be made of 1/8” aluminum plate 46” length by 8 ½” wide by 4 ½” depth.<br />

‣ Hard suction hose is clear which allows greater visibility of the water and making sure<br />

there is no air in the suction tubes.<br />

‣ Hard suction hose supports are installed from the left pitot gauge compartment area and<br />

wrap around the rear of the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> reservoir to the right side pitot<br />

gauge compartment area. The hose support is 15” in height and is manufactured of 1 ¼”<br />

aluminum tubular. This is to support the hard suction hose when fire pump testing from<br />

the right, left, and rear of the transporter.<br />

Extra Hard Suction Trays:<br />

‣ Two (2) 10 ft. of 6” flexible hard suction hose. The hose is clear which allows greater<br />

visibility of the water.<br />

‣ Couplings on the hard suction hose: one (1) 6” swivel female L.H. N.S.T. thread at one<br />

end and (1) 6” male L.H. N.S.T. threads on the other end.<br />

‣ The hard suction hoses shall be stored one on each side of the tank between the fender<br />

wells and the tank body.<br />

Revised 7-2012<br />

<strong>Mobile</strong> <strong>Pump</strong> Testing& Training Simulator Equipped With:<br />

‣ Equipped with a hand held monitor that monitors the following: Air Temperature,<br />

Atmospheric Pressure, and Altimeter.<br />

‣ One (1) 3” water temperature gauge showing 0 – 200 degrees installed in the suction<br />

Page 11


drafting pit compartment of the reservoir of the mobile test unit left rear.<br />

Two Stainless Steel or Powder Coated Aluminum Inlet Manifolds for Flowing Water and Pitot<br />

GPM Readings:<br />

‣ Two (2) 4” manifolds: one on each side at rear of <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> attached to<br />

the tubes that feed the pitot compartment of the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong>.<br />

‣ Each manifold equipped with 5” storz male and caped, three (3) 45º NST 2½” swivels<br />

NST with 2½” male plugs.<br />

‣ Each inlet manifold to be equipped with quarter turn ball valve to drain the manifold.<br />

‣ Two (2) large pitot compartments with hinged poly door for changing various nozzles.<br />

‣ Pitot compartment to be equipped with splash guard and defuser tip.<br />

‣ Each pitot compartment to have chrome grab handle.<br />

‣ Pitot compartments to be equipped with quick disconnects so the pitot tube can be<br />

attached to monitoring station.<br />

‣ Pitot tubes to be installed in the flow station compartments, one each on left and right<br />

side of reservoir.<br />

‣ Two sets of flow tips: 1”, 1 ¼” 1 ½”, 1 ¾”, 2”, 2 ¼” and 2 ½” mounted inside a storage<br />

compartment.<br />

Revised 7-2012<br />

<strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator Monitor Station:<br />

‣ Monitor station dimension to be 20” wide by 18” tall by 6” depth.<br />

‣ One (1) aluminum telescoping tri-pod attached to the aluminum monitoring station<br />

equipped with two (2) 3 ½” pitot gauges 0-160 PSI to be glycerin filled and “Kem-X” freeze<br />

and clog proof, one (1) 3 ½” vacuum apparatus gauge 0-30 inches, and one (1) 3 ½”<br />

apparatus pressure gauge 0-400 PSI to be glycerin filled and “Kem-X” freeze and clog<br />

proof.<br />

‣ Each gauge is equipped with quick disconnects.<br />

‣ All gauges to be calibrated. All pressure gauges to be glycerin filled and “Kem-X” freeze<br />

and clog proof.<br />

‣ The pitot gauge is equipped with two (2) 30 ft. high pressure BLUE hoses - one (1) for each<br />

pitot with quick disconnects.<br />

‣ Two (2) 10 ft high pressure hoses for the UL vacuum (BLACK) and pressure (BLUE)<br />

plugs on the apparatus. One (1) end equipped with quick disconnects and the other end<br />

threaded swivel male to attach to the UL ports on the apparatus.<br />

‣ All gauges are mounted in the monitoring station and labeled. A large 5 ½” wide by 13” tall<br />

smooth board converter chart shall be etched on the face of the pump test station showing<br />

size of tips, flow gallons per minute, and PSI reading for each tip used.<br />

Page 12


‣ One (1) etched fire pump test flow chart 20” wide by 18” high. Chart is to illustrate and<br />

give instructions for pressure settings, pitot readings, and equipment needed to perform a<br />

service test on 500-2,500 GPM from draft. Located on front of monitor station.<br />

See example on page 14.<br />

Side Compartments:<br />

‣ Two (2) heavy duty side compartments 40” wide by 6 ½” tall by 7” depth (one (1) each<br />

side) in front of fenders shall hold all flow tips.<br />

‣ Each nozzle tip to have individual compartments labeled with the size of tips.<br />

‣ Doors to be made of diamond plate aluminum with quick release hold downs.<br />

Hose Storage Compartment and Misc. Equipment:<br />

‣ One (1) large compartment 65” wide by 24” tall by 28” depth with “V” type bottom to<br />

store fire hose used for testing the fire apparatus. Large enough to store six (6) sections of<br />

3” fire hose in 50 ft sections of coiled hose, spanner wrench, mallet, tools, and etc.<br />

‣ Compartment to be ventilated and equipped with aluminum tread plate door with<br />

pneumatic openers, stainless steel hinges, and stainless handles.<br />

‣ Compartment to be made of ⅛” aluminum treaded plate.<br />

‣ Each door to be equipped with chrome lift handles.<br />

Additional Supplied Equipment:<br />

‣ Five (5) 50 ft. sections of 3” fire hose with 2 ½” couplings. Hose is 600# test and is double<br />

jacket.<br />

‣ One (1) 6” male by 5” female NST thread light weight adapter.<br />

‣ One (1) 6” male by 4 ½” ” female NST thread light weight adapter.<br />

‣ One (1) 6” male by 4” female NST thread light weight adapter.<br />

‣ One (1) 2 ½” male NST by 3” male NST thread light weight adapters.<br />

‣ One (1) 6” male by 2 ½” female NST thread light weight adapters.<br />

‣ One (1) 2 ½” double female adapter NST.<br />

‣ One (1) 2 ½” double male adapter NST.<br />

‣ One (1) heavy duty rubber mallet.<br />

‣ One (1) UV rated vinyl net cover for top of open area of reservoir tank to keep reservoir<br />

clean. Cover to be white and to be net type material to remove air and heat from<br />

reservoir with twist disconnects to hold down net and for ease of removal.<br />

‣ Two (2) spanner wrenches and hydrant wrench with holder.<br />

Revised 7-2012<br />

Page 13


Additional Requirements:<br />

‣ A list of 35 or more mobile pump testing unit users must be provided as per the <strong>Draft</strong><br />

<strong>Commander</strong> <strong>3000®</strong> A/T <strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator Specifications.<br />

‣ Operation and Training Manual, along with a video, will be provided upon delivery of<br />

the mobile pump testing unit.<br />

‣ The mobile pump testing and training simulator has been in service and field tested for<br />

over ten (10) years.<br />

‣ Descriptive information such as literature/brochures of these specifications to be<br />

furnished with bid.<br />

‣ Hands on personnel training and operations to be included.<br />

Optional Packages<br />

Option 1 Package Needed To Perform <strong>Pump</strong> Testing Simultaneously On Two <strong>Fire</strong> Apparatus:<br />

‣ Two (2) 50 ft sections of 3” double jacket 600# test fire hose coupled with 2 ½” couplings<br />

with NST threads.<br />

‣ One (1) <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> <strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator<br />

Monitor Station, model number DC1911-3000, or One (1) Mini <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong><br />

<strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator Monitor Station, model number<br />

MW1911-3000.<br />

Option 2 Package Needed To Perform <strong>Pump</strong> Testing On A 3000 – 4000 GPM <strong>Fire</strong> Apparatus:<br />

‣ Portable 6” drafting tube with 90˚ elbow equipped with 6” swivel female NST threads.<br />

The portable drafting tube can be premantaly mounted to the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong><br />

or mounted on the <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> transport and used only when needed.<br />

Optional <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T <strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator<br />

Equipment:<br />

‣ Aluminum Rims<br />

‣ Albert 2.99 X 8 TPI on all 2 ½” threads on manifolds. Special threads in place of<br />

standard NST threads on manifold adaptors and fire hose.<br />

‣ Custom wrap<br />

‣ Gauges on test monitor to be PSI/KPA in place of standard PSI<br />

Revised 7-2012<br />

Page 14


FIRE PUMP TEST FLOW CHART<br />

DRAFT COMMANDER <strong>3000®</strong> A/T<br />

MOBILE FIRE PUMP TESTING & TRAINING SIMULATOR<br />

No. D.C.-GLW 1911 USA Gallons Per Minute<br />

Rated <strong>Pump</strong> For <strong>Fire</strong> Trucks<br />

Revised 7-2012<br />

Page 15


The Exclusive Manufacturer<br />

of The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong><br />

<strong>Weis</strong> <strong>Fire</strong> & <strong>Safety</strong> Equipment Co., Inc.<br />

111 E. Pacific * P.O. Box 3467 * Salina, Kansas 67402-3467<br />

785-825-9527 * 1-888-689-9347 * 785-825-9538 Fax<br />

www.draftcommander.com<br />

“It’s a WEIS Choice”<br />

References for<br />

The <strong>Draft</strong> <strong>Commander</strong> <strong>3000®</strong> A/T<br />

<strong>Mobile</strong> <strong>Fire</strong> <strong>Pump</strong> Testing & Training Simulator<br />

Frontline Apparatus Services Hall-Mark <strong>Fire</strong> Apparatus Inc. Jefferson Parish <strong>Fire</strong> Training Center<br />

Kevin Webber Bill Alm Scott Berthelot<br />

Blue Springs, MO Ocala, FL Bridge City, LA<br />

Phone: 816-985-0549 Phone: 352-629-6305 Phone: 504-436-9150<br />

Otero County LTM <strong>Fire</strong> Equipment Louisiana <strong>Fire</strong>fighter Services<br />

John Badger Tim Marriott Curtis Roller<br />

Alamogordo, NM Pontiac, MI Jonesboro, LA<br />

Phone: 575-430-2070 Phone: 248-333-3772 Phone: 318-245-1557<br />

Banner <strong>Fire</strong> Equipment Hall-Mark <strong>Fire</strong> Apparatus of Texas City of Sierra Vista<br />

Michael J. Benker Troy Williams Denver C. Horine<br />

Roxana, IL Houston, TX Sierra Vista, AZ<br />

Phone: 618-751-6020 Phone: 713-416-6160 Phone: 520-458-5775<br />

Polk County <strong>Fire</strong> Rescue City of Winnipeg Ohio Cat<br />

Mike Linkins Steve Mortlock Tom Abel<br />

Bartow, FL Winnipeg, Canada Broadview Heights, OH<br />

Phone: 863-519-7358 Phone: 204-803-0698 Phone: 440-526-6200<br />

Emergency Vehicle Service Inc. Quay County <strong>Fire</strong> Marshal’s Office County of Socorro<br />

Steven Garite Donald Adams Jerry Wheeler<br />

Roselle, IL Tucumcari, NM Socorro, NM<br />

Phone: 630-539-2835 Phone: 575-403-7911 Phone: 575-835-0589<br />

Cibola County <strong>Fire</strong> Apparatus Repair Co. Carrier Centers<br />

Joe DeSoto Bob Franklin Rick Scott<br />

Grant, NM Mabelvale, AR Brantford, Canada<br />

Phone: 505-290-7719 Phone: 501-993-2319 Phone: 519-720-1098<br />

Rio Arriba County H&E Equipment Services Sutphen Corp.<br />

<strong>Fire</strong> Marshall Jerome Sanchez Mark Julien John Woltman<br />

Espanola, NM Phoenix, AZ Springfield, OH<br />

Phone: 505-747-6367 Phone: 602-862-6313 Phone: 614-356-2904<br />

Gorman Enterprises <strong>Fire</strong> Truck Certification Colfax County<br />

Jamie Stoneman James McNeil Larry Osborn<br />

Revised 7-2012<br />

Page 16


Elma, NY Hayfork, CA Raton, NM<br />

Phone: 716-675-5796 Phone: 530-356-3510 Phone: 575-447-1639<br />

Matanuska-Susitna Borough San Diego Rural <strong>Fire</strong> Protection District Finley <strong>Fire</strong> Equipment<br />

Dannis Brodiganmat Akilah Harris John Finley<br />

Palmer, AK Jamul, CA McConnelsville, OH<br />

Phone: 907-373-8815 Phone: 619-669-1188 Phone: 740-962-4328<br />

W.W. Williams US <strong>Fire</strong> Equipment, LLC LA <strong>Pump</strong> & Maintenance Service, LLC<br />

Pete Borchardt Lloyd Hamilton Lee Stanley<br />

Phoenix, AZ Tacoma, WA Chaneyville, LA<br />

Phone: 800-944-7375 Phone: 253-535-1778 Phone: 318-279-2551<br />

Lusk <strong>Fire</strong> and <strong>Safety</strong> County of Mora MCLB Barstow<br />

Lance Lusk Ed Littleton Captain Craig Posey<br />

Canton, IL Mora, NM Barstow, CA<br />

Phone: 309-333-2750 Phone: 575-387-5261 Phone: 760-577-5424<br />

Department of the Air Force Cumberland International Trucks USAG Vicenza/Livorno DOL, IMMA<br />

David Poston<br />

Lajes Fields, Azores Nashville, TN Vicenza, Italy<br />

Phone: 011-351-295573104 Phone: 615-829-7940 Phone: 0444716887<br />

Andrews AFB <strong>Fire</strong> & Emergency McConnell AFB USA ACC MICC Fort Drum<br />

Asst. <strong>Fire</strong> Chief Joseph Thompson Chief Hudson<br />

Andrews AFB, MD McConnell AFB, KS Fort Drum, NY<br />

Phone: 301-981-4986 Phone: 316-759-4533 Phone: 315-772-2897<br />

Cornerstone Specialty Equipment Village of Melrose Dona Ana VFD<br />

Steve Bailey <strong>Fire</strong> Chief Kenny Jacobs Chief Dennis Pacheco<br />

Clemmons, NC Melrose, NM Dona Ana, NM<br />

Phone: 336-971-6543 Phone: 575-799-5548 Phone: 575-525-5998<br />

Safe Industries Hansen’s <strong>Fire</strong> Equip Services City of Las Cruces<br />

Al Willimon Donn Hansen Rusty Smith<br />

Piedmont, SC Esko, MN Las Cruces, NM<br />

Phone: 864-313-1657 Phone: 218-879-3232 Phone: 575-642-5069<br />

Director of Emergency Services Finley <strong>Fire</strong> Equipment Accurate Equipment Service<br />

Raymond Harrington John Finley Chris Williams<br />

Fort Benning, GA McConnelsville, OH Ramona, CA<br />

Phone: 706-545-4935 Phone: 800-545-3280 Phone: 760-803-9035<br />

Emergency Equipment Service Union County <strong>Fire</strong> District First Due Apparatus Testing<br />

Mike Johnson Jim O’Brien Richard Stone<br />

Laurel, MS Clayton, NM Quinton, VA<br />

Phone: 601-498-3716 Phone: 575-207-7233 Phone: 757-342-4193<br />

Sunbelt <strong>Fire</strong> <strong>Fire</strong> Force Apparatus Ohio Cat<br />

Slade McLenden Tony Jumeau Jeff Whaley<br />

Fairhope, AL Vancouver, BC Canada Columbus, OH<br />

Phone: 251-586-8371 Phone: 888-802-0848 Phone: 614-851-3503<br />

Revised 7-2012<br />

Page 17


Camp Lejeune W.W. Williams Carrier Centers<br />

Chris Parker Jim Pompos Scott Colby<br />

MCB Camp Lejeune, NC Grand Rapids, MI Toronto, Canada<br />

Phone: 910-451-3314 Phone: 800-338-1989 Phone: 519-720-1098<br />

US Army ACC MICC Fort Belvoir NAS Fort Worth JRB Kirtland Air Force Base<br />

Charles Spencer Allen Almodovar Eric W. Nagel<br />

Fort Belvoir, VA Fort Worth, TX Albuquerque, NM<br />

Phone: 703-805-2495 Phone: 817-782-6332 Phone: 505-846-4502<br />

US Army Lewis-McChord Underwriters Laboratories Inc. Profire<br />

Richard Samson Johnathan Simpson Mike Rogers<br />

Fort Lewis, WA Northbrook, IL Abbotsford, BC Canada<br />

Phone: 253-967-7580 Phone: 847-664-1514 Phone: 604-852-3687<br />

KME Kovatch Fail Safe Testing, Inc. Pasco County Florida<br />

John Kovatch IV Tim Somers Stephen McNaughton<br />

Nesquehoning, PA Monmouth Beach, NJ New Port Richey, FL<br />

Phone: 570-233-1447 Phone: 732-245-7501 Phone: 727-861-3089<br />

<strong>Mobile</strong> <strong>Fire</strong> Apparatus South Adams County FPD San Miguel County<br />

Charles LaCross Ron LaPenna Russel Pacheco<br />

South Dennis, MA Commerce City, CO Las Vegas, NM<br />

Phone: 508-962-8063 Phone: 303-288-0835 Phone: 505-425-2855<br />

The City of Red Deer Hansen’s Welding Cumberland Equipment, LLC<br />

James Johnson Don Hansen David Poston<br />

Red Deer, Canada Esko, MN Nashville, TN<br />

Phone: 403-346-5511 Phone: 218-879-3232 Phone: 615-829-7940<br />

Revised 7-2012<br />

Page 18


Revised 7-2012<br />

Page 19


By Joe Phelps<br />

The Daily Siftings Herald<br />

Wed Sep 30, 2009<br />

Arkadelphia, Ark.<br />

All six of Arkadelphia <strong>Fire</strong> Department’s fire trucks passed a pump inspection Tuesday.<br />

Each truck was tested by a specialized mobile fire pump testing trailer, which brings a water<br />

source to the fire department. In years past, firefighters had to shuffle trucks around and<br />

shut off a city street while water was pumped from Nowlin Pond to test the pumps on each<br />

truck. For the first time, though, retired firefighter Bob Franklin, who visits 200 fire<br />

departments each year, brought the <strong>Draft</strong> <strong>Commander</strong> testing system — one of only a few<br />

which have been manufactured. Franklin and his son-in-law checked each fire pump for<br />

needed maintenance, including oil, seals and valves, as well as each truck’s transmission<br />

and coolant system. The inspections took one hour for each truck, running a series of tests<br />

for water capacity, water pressure and excess pump power. The inspection, said <strong>Fire</strong> Chief<br />

Ricky Arnold, saves AFD time at no additional cost to the city. Franklin said the trucks<br />

“passed with flying colors.”<br />

http://www.siftingsherald.com/news/police_and_fire/x1699606507/<strong>Pump</strong>-it-up<br />

Revised 7-2012<br />

Page 20


Revised 7-2012<br />

Page 21


Revised 7-2012<br />

Page 22


Revised 7-2012<br />

Page 23


Revised 7-2012<br />

Page 24


Revised 7-2012<br />

Page 25


John Badger<br />

Otero County, Alamogordo, New Mexico<br />

“This was the first unit in the state of New Mexico<br />

and is the greatest thing we could have purchased,”<br />

Badger said. “One big benefit of the <strong>Draft</strong><br />

<strong>Commander</strong>”, he said, “is that instead of taking<br />

pumpers to a central location where they’re out of<br />

service, we take the tester to the department.”<br />

James McNeill<br />

<strong>Fire</strong> Truck Certification, Hayfork, CA<br />

“The fact that the unit is portable is the ticket because<br />

it’s self contained, has no gimmicks, and is a<br />

professional topnotch unit,” stated McNeill. “The<br />

best thing about it is how simple it is to set up and<br />

use, and besides, the truck doesn’t have to be out of<br />

service because we bring the pump tester to the<br />

department. It’s been a massive success for us,” he<br />

said.<br />

Chief Tom Garcia, Shawnee Heights <strong>Fire</strong> District<br />

Revised 7-2012<br />

Page 26


“Having our apparatus pump tested annually on-site with the <strong>Draft</strong> <strong>Commander</strong> saves us time, money and<br />

is convenient because the trucks never have to leave the fire district.”<br />

Revised 7-2012<br />

Page 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!