E. SCADA System Construction and Programming Fees<br />

Electronic technology continues to develop rapidly with prices continually falling as the<br />

technology becomes widely adopted. In the 2008 estimate there was no allowance for a SCADA<br />

System. By the time the project reached the detailed design stage it was deemed that a SCADA<br />

System should be incorporated into the system.<br />

The cost justification was that there would be a significant savings in staff time and costs, for<br />

operation <strong>of</strong> the system and responding to alarms.<br />

The SCADA System allows the key functions and alarms <strong>of</strong> the water system to be monitored<br />

in the <strong>Village</strong> Hall and also remotely on smart phones. Apart from providing operational flexibility,<br />

it is anticipated that there will be significant staff time saved in driving to the reservoir, pump station<br />

and the Midden Building to confirm that the system is operating correctly and that there is chlorine<br />

in the system.<br />

When alarms are triggered (say a low reservoir alarm), staff will be able to identify the<br />

problem and decide if they need to respond immediately, especially outside normal working hours.<br />

This will save costs over the lifetime <strong>of</strong> the system.<br />

The system may be custom programmed to display information deemed necessary to confirm<br />

the system is operating correctly.<br />

The cost <strong>of</strong> the SCADA System is estimated at $73,485 for the hardware, underground wiring<br />

and s<strong>of</strong>tware. Programming is part <strong>of</strong> the Opus DaytonKnight engineering fees. Of the $73,485,<br />

$54,265 was the cost <strong>of</strong> installing a fibre optic communication cable between the Midden Building,<br />

the <strong>Village</strong> Hall and the Tatlow Pump Station. The remaining $ 19,222 is the estimated cost <strong>of</strong> the<br />

supply and installation <strong>of</strong> electronic equipment. There was no allowance for these costs in the 2008<br />

estimate.<br />

F. Water Meters<br />

A technology situation similar to that <strong>of</strong> the SCADA arose during selection <strong>of</strong> the water<br />

meters. In 2010, Sensus Meters developed and had approved by the regulatory authorities a new<br />

water meter for use in North America.(IPERL)<br />

The meter is a sealed unit, contains no moving parts or obstructions to flow and can be read<br />

in a couple <strong>of</strong> hours by radio from a mobile base station in a truck while driving through the <strong>Village</strong>.<br />

The water meter also contains a leak detection alarm. The unit contains a replaceable battery which<br />

is guaranteed for 20 years.<br />

S<strong>of</strong>tware purchased with the system allows for computerised billing and monitoring <strong>of</strong> leaks<br />

or unusually high consumption. The staff time savings over a number <strong>of</strong> years are obvious as are the<br />

operational advantages. Leaks typically constitute a significant portion <strong>of</strong> the consumption in a water<br />

system.<br />