Government of Rajasthan<br />

<strong>State</strong> <strong>Project</strong> <strong>Management</strong> <strong>Unit</strong><br />

<strong>District</strong> <strong>Poverty</strong> <strong>Initiatives</strong> <strong>Project</strong><br />

3 rd Floor, Yojna Bhawan, Tilak Marg, Jaipur, Phone: 2384895, Fax 5104014<br />

No. F-1 (66) RD/DPIP/PA/2003 Dated 28.01.2005<br />

Collector<br />

Baran/Churu/Dausa/Dholpur/<br />

Jhalawar/Rajasamand/Tonk.<br />

Circular<br />

Sub: Dovetailing of relief work with DPIP.<br />

The following relaxation is hereby accorded in respect of sanction of sub-projects<br />

under DPIP pertaining to community infrastructure works:<br />

The sub-projects under DPIP may be dovetailed with relief works, subject to the<br />

following conditions:<br />

1. The project will be implemented in sub-project mode in which stake of poor<br />

will be protected by way of providing short term wage employment and long<br />

term livelihood support for the poor.<br />

2. Only one community infrastructure work in one village would be taken up with<br />

maximum allocation of Rs. 1.50 lacs.<br />

3. Fund will be transferred in a separate bank account opened for this purpose.<br />

4. Funding pattern will be as follows:<br />

Material component (Fixed assets) 100% DPIP<br />

Labour component<br />

100% Department of relief<br />

5. Beneficiary's contribution shall not be required since SGRY special component<br />

(wheat) will be treated as contribution.<br />

6. No dovetailing will be allowed in the villages where community infrastructure has<br />

already done under DPIP.<br />

7. The work would only be allowed in notified villages of districts (list attached).<br />

8. The work proposed would be as per the works permitted under DPIP and should<br />

benefit the poor in particular. A demand from the poor persons in the village for the<br />

said work is a pre-requisite.<br />

9. For such works, and its implementation, the Village Development Association<br />

(VDA), under the chairmanship of the Sarpanch, could be the CIG for the sub-project.<br />

Panchayat and CIGs could also take up these works.<br />

10. The estimates for the work be prepared by technical official designated by the<br />

Collector. NGO and DPMU staff will assist them in preparation of the sub-project<br />

proposal as per the formats etc. prescribed.<br />

11. Adherence to DPIP guidelines on procurement would be ensured by such agency.<br />

Moreover, the CIG (or VDA as CIG or GP) would need to sign the prescribed sub-


project agreement with such agency. The component of financing under relief and<br />

under DPIP needs to clearly spelt out.<br />

12. Dovetailing work would be taken up with the facilitation of NGOs. NGO will also<br />

look after community mobilization work and need assessment.<br />

13. Work will be selected in an open meeting (Gram Sabha), in which presence of at least<br />

70 % BPL will be ensured, proof of which will be submitted with the proposal.<br />

14. To ensure sustainability and better use of assets/infrastructure created during relief<br />

work dovetailing with DPIP formal training will be required for implementing agency<br />

(CIG/VDA/GP).<br />

15. Only need based and limited sub- projects shall be dovetailed with famine relief work<br />

as given below:<br />

Table showing maximum limit of Infrastructure works may be dovetailed per district.<br />

Name of <strong>District</strong><br />

(Rs.in lacs)<br />

Community Infrastructure works may be dovetailed with<br />

famine relief works<br />

No.<br />

Amount<br />

Baran 150 225<br />

Churu 100 150<br />

Dausa 75 112.5<br />

Rajsamand 100 150<br />

The community infrastructure work proposed in famine must be completed up to<br />

30 th September 2005.<br />

(P.S. Somashekar)<br />

<strong>State</strong> <strong>Project</strong> Director<br />

Copy to the following for information & necessary action:<br />

1. PS to Pr. Secy., RD & PR, Govt. of Rajasthan, Jaipur<br />

2. Secretary to Government, Relief Department, Rajasthan, Jaipur.<br />

3. Addl. Collector- Baran, Churu, Dausa, Dholpur, Jhalawar,<br />

Rajsamand, Tonk.<br />

4. DPM- Baran, Churu, Dausa, Dholpur, Jhalawar, Rajsamand, Tonk.<br />

5. <strong>District</strong> <strong>Project</strong> Coordinator, NGO, Baran, Churu, Dausa, Dholpur,<br />

Jhalawar, Rajsamand, Tonk.<br />

(V.K. Sharma)<br />

GM <strong>Project</strong> Appraisal