01.02.2015 Views

Monthly Progress Report of MPLAD for Lok Sabha ... - Jodhpur District

Monthly Progress Report of MPLAD for Lok Sabha ... - Jodhpur District

Monthly Progress Report of MPLAD for Lok Sabha ... - Jodhpur District

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> <strong>Lok</strong> <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE CONSTITUENCY :<br />

NAME OF THE MP :<br />

10th LS :<br />

11th LS :<br />

12tH LS :<br />

13tH LS :<br />

NAME OF THE NODAL DISTRICT :<br />

PHONE No. WITH S.T.D. CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the constituency:<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

<strong>Jodhpur</strong><br />

Sh. Ashok Gehlot, Sh. Jaswant Singh<br />

Sh. Ashok Gehlot<br />

Sh. Ashok Gehlot<br />

Sh. Ashok Gehlot<br />

Sh. Jaswant Singh<br />

<strong>Jodhpur</strong><br />

0291-650322<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

2002-2003<br />

TOTAL<br />

No.<strong>of</strong> work<br />

(a) By the 10th LS MP 137<br />

(b) By the 11th LS MP 158<br />

(c) By the 12th LS MP 75<br />

(d) By the 13th LS MP 681<br />

(e) TOTAL (a+b+c+d) 1051<br />

3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong>: No.<strong>of</strong> work<br />

(a) The 10th LS MP 134<br />

(b) The 11th LS MP 145<br />

(c) The 12th LS MP 60<br />

(d) The 13th LS MP 495<br />

(e) TOTAL (a+b+c+d) 834<br />

4. Total unsanctioned balance available with the constituency 1(c )-3(e)<br />

5. Total No. <strong>of</strong> works completed in the constituency<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

5.000<br />

100.000<br />

100.000<br />

100.000<br />

0.000<br />

150.000<br />

150.000<br />

350.000<br />

250.000<br />

200.000<br />

1405.000<br />

-<br />

1405.000<br />

Estimated cost<br />

197.280<br />

248.286<br />

112.060<br />

1011.037<br />

1568.663<br />

Amount sanctioned<br />

191.280<br />

224.036<br />

94.360<br />

778.120<br />

1287.796<br />

117.204<br />

743<br />

91<br />

1087.860<br />

60.815<br />

1148.675<br />

256.325<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-Jaipur 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE RS MP :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH S.T.D. CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the RS MP :<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

**Note : Amt. Recd. In the year 2001-2002 from other distt. Rs. 18.48<br />

Lacs due to retirement <strong>of</strong> other district's MP (Rajya <strong>Sabha</strong>)<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Sh. M.G.K. Menon, Dr. L.M. Singhvi<br />

<strong>Jodhpur</strong><br />

<strong>District</strong> Collector, <strong>Jodhpur</strong><br />

0291-650322<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

2002-2003<br />

TOTAL<br />

No.<strong>of</strong> work<br />

1993-94<br />

1994-95 15<br />

1995-96 74<br />

1996-97 5<br />

1997-98 3<br />

1998-99 1<br />

1999-00 20<br />

2000-01 48<br />

2001-02 82<br />

2002-03 36<br />

Total 284<br />

3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />

1993-94<br />

1994-95 14<br />

1995-96 74<br />

1996-97 5<br />

1997-98 3<br />

1998-99 1<br />

1999-00 20<br />

2000-01 45<br />

2001-02 72<br />

2002-03 31<br />

Total 265<br />

4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

0.000<br />

0.000<br />

200.000<br />

0.000<br />

0.000<br />

50.000<br />

0.000<br />

200.000<br />

268.480<br />

100.000<br />

818.480<br />

-<br />

818.480<br />

Estimated cost<br />

75.750<br />

126.130<br />

3.000<br />

3.920<br />

10.000<br />

87.250<br />

186.195<br />

259.350<br />

151.834<br />

903.429<br />

Amount sanctioned<br />

74.290<br />

126.130<br />

3.000<br />

3.920<br />

10.000<br />

86.966<br />

172.080<br />

219.684<br />

106.750<br />

802.820<br />

15.660<br />

168<br />

97<br />

488.924<br />

93.215<br />

582.139<br />

236.341<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-Jaipur 10/2/02


Appendix-4<br />

FORMAT FOR THE PURPOSE OF RELEASE OF FUNDS UNDER<br />

MEMBER OF PARLIAMENT LOCAL AREA DEVELOPMENT SCHEME (<strong>MPLAD</strong>S)<br />

FOR RAJYA SABHA MPs<br />

Month : Aug'2002<br />

STATEMENT OF EXPENDITURE UNDER <strong>MPLAD</strong>S<br />

NAME OF THE STATE : RAJASTHAN<br />

NAME OF THE CONSTITUENCY : JODHPUR<br />

NAME OF THE RS MP : LM Singhvi<br />

ADDRESS : DISTT. COLLECTOR, JODHPUR<br />

PHONE No. WITH S.T.D. CODE : 0291 - 650322<br />

FAX :<br />

NAME OF THE DISTRICT IN<br />

:<br />

e-mail :<br />

JODHPUR<br />

WHICH THE MP HAS<br />

1.Total Funds received <strong>for</strong> the constituency:<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

##, ** 2001-2002<br />

2002-2003<br />

TOTAL<br />

No.<strong>of</strong> work<br />

186<br />

3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong> No.<strong>of</strong> work<br />

168<br />

4. Total unsanctioned balance available with the constituency 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in the constituency 94<br />

6. Total No. <strong>of</strong> works started but not completed 74<br />

7. Total actual expenditure -<br />

## Amt. Rs. 100 Lacs transferred by GOI to Gujrat Govt. <strong>for</strong> earthquake relief is added up.<br />

** Amt. Recd. In the year 2000-2001 from other distt. Rs. 18.48 Lacs due to retirement <strong>of</strong><br />

other district's MP (Rajya <strong>Sabha</strong>)<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

--<br />

0.000<br />

0.000<br />

--<br />

--<br />

50.000<br />

0.000<br />

200.000<br />

368.480<br />

100.000<br />

718.480<br />

-<br />

718.480<br />

Estimated cost<br />

784.629<br />

Amount sanctioned<br />

692.423<br />

26.057<br />

479.283<br />

Date :<br />

<strong>District</strong> Collector<br />

<strong>Jodhpur</strong><br />

Note:(1)The next due installment <strong>of</strong> Rs.50 lacs is released only when the amount in respect <strong>of</strong> column No.4 is reported as less than<br />

Rs.50 lacs.<br />

(2)The Nodal <strong>District</strong> collector is required to furnish a consolidated report including the in<strong>for</strong>mation pertaining to other <strong>District</strong> falling<br />

in the constituency where funds were transferred on recommendation <strong>of</strong> the MP.<br />

(3) Sanctioned amount is the cost <strong>of</strong> such schemes only <strong>for</strong> which financial sanctions have already been issued. Cost <strong>of</strong> schemes<br />

which have got only administrative approval (and not financial sanction) should not be reported as sanctioned in column No.3.<br />

2002-2003 10/2/02


FORMAT FOR THE PURPOSE OF RELEASE OF FUNDS UNDER<br />

MEMBER OF PARLIAMENT LOCAL AREA DEVELOPMENT SCHEME (<strong>MPLAD</strong>S)<br />

FOR LOK SABHA MPs<br />

STATEMENT OF EXPENDITURE UNDER <strong>MPLAD</strong>S<br />

NAME OF THE STATE :<br />

NAME OF THE CONSTITUENCY :<br />

NAME OF THE MP :<br />

10th LS :<br />

11th LS :<br />

12tH LS :<br />

13tH LS :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH S.T.D. CODE :<br />

FAX :<br />

1.Total Funds received <strong>for</strong> the constituency:<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

RAJASTHAN<br />

JODHPUR<br />

SH. ASHOK GEHLOT<br />

SH. ASHOK GEHLOT<br />

SH. ASHOK GEHLOT<br />

SH. JASWANT SINGH VISHNOI<br />

JODHPUR<br />

DISTT. COLLECTOR, JODHPUR<br />

0291 - 650322<br />

e-mail :<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

2002-2003<br />

TOTAL<br />

No.<strong>of</strong> work<br />

(a) By the 10th LS MP 137<br />

(b) By the 11th LS MP 158<br />

(c) By the 12th LS MP 75<br />

(d) By the 13th LS MP 681<br />

(e) TOTAL (a+b+c+d) 1051<br />

3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong> No.<strong>of</strong> work<br />

(a) The 10th LS MP 134<br />

(b) The 11th LS MP 145<br />

(c) The 12th LS MP 60<br />

(d) The 13th LS MP 495<br />

(e) TOTAL (a+b+c+d) 834<br />

4. Total unsanctioned balance available with the constituency 1(c )-3(e)<br />

5. Total No. <strong>of</strong> works completed in the constituency 743<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell 91<br />

7. Total actual expenditure -<br />

APPENDIX - 3<br />

Month : Aug'2002<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

5.000<br />

100.000<br />

100.000<br />

100.000<br />

0.000<br />

150.000<br />

150.000<br />

350.000<br />

250.000<br />

200.000<br />

1405.000<br />

-<br />

1405.000<br />

Estimated cost<br />

197.280<br />

248.286<br />

112.060<br />

1011.037<br />

1568.663<br />

Amount sanctioned<br />

191.280<br />

224.036<br />

94.360<br />

778.120<br />

1287.796<br />

117.204<br />

-<br />

-<br />

1148.675<br />

Date :<br />

<strong>District</strong> Collector,<br />

<strong>Jodhpur</strong><br />

Note:(1)The next due installment <strong>of</strong> Rs.50 lacs is released only when the amount in respect <strong>of</strong> column No.4 is reported as less than<br />

Rs.50 lacs.<br />

(2)The Nodal <strong>District</strong> collector is required to furnish a consolidated report including the in<strong>for</strong>mation pertaining to other <strong>District</strong> falling<br />

in the constituency where funds were transferred on recommendation <strong>of</strong> the MP.<br />

(3) Sanctioned amount is the cost <strong>of</strong> such schemes only <strong>for</strong> which financial sanctions have already been issued. Cost <strong>of</strong> schemes<br />

which have got only administrative approval (and not financial sanction) should not be reported as sanctioned in column No.3.<br />

2002-2003 10/2/02


STATEMENT OF EXPENDITURE UNDER <strong>MPLAD</strong>S<br />

NAME OF THE STATE :<br />

NAME OF THE CONSTITUENCY :<br />

NAME OF THE RS MP :<br />

ADDRESS :<br />

PHONE No. WITH S.T.D. CODE :<br />

FAX :<br />

NAME OF THE DISTRICT IN<br />

:<br />

WHICH THE MP HAS<br />

RECOMMENDED WORKS<br />

1.Total Funds received <strong>for</strong> the constituency:<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

TOTAL<br />

No.<strong>of</strong> work<br />

98<br />

3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong> No.<strong>of</strong> work<br />

97<br />

4. Total unsanctioned balance available with the constituency 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in the constituency 88<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell 9<br />

7. Total actual expenditure -<br />

Appendix - 4<br />

FORMAT FOR THE PURPOSE OF RELEASE OF FUNDS UNDER<br />

MEMBER OF PARLIAMENT LOCAL AREA DEVELOPMENT SCHEME (<strong>MPLAD</strong>S)<br />

FOR RAJYA SABHA MPs<br />

RAJASTHAN<br />

JODHPUR<br />

Sh. MGK Menon<br />

DISTT. COLLECTOR, JODHPUR<br />

0291 - 650322<br />

e-mail :<br />

JODHPUR<br />

Month : Aug'2002<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

--<br />

--<br />

200.000<br />

--<br />

--<br />

--<br />

--<br />

--<br />

200.000<br />

0.000<br />

200.000<br />

Estimated cost<br />

218.80<br />

Amount sanctioned<br />

210.397<br />

-10.397<br />

-<br />

-<br />

202.856<br />

Date :<br />

<strong>District</strong> Collector,<br />

<strong>Jodhpur</strong><br />

Note:(1)The next due installment <strong>of</strong> Rs.50 lacs is released only when the amount in respect <strong>of</strong> column No.4 is reported as less than<br />

Rs.50 lacs.<br />

(2)The Nodal <strong>District</strong> collector is required to furnish a consolidated report including the in<strong>for</strong>mation pertaining to other <strong>District</strong> falling<br />

in the constituency where funds were transferred on recommendation <strong>of</strong> the MP.<br />

(3) Sanctioned amount is the cost <strong>of</strong> such schemes only <strong>for</strong> which financial sanctions have already been issued. Cost <strong>of</strong> schemes<br />

which have got only administrative approval (and not financial sanction) should not be reported as sanctioned in column No.3.<br />

2002-2003 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE RS MP :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH STD CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the RS MP :<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Consolidate<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

TOTAL<br />

No.<strong>of</strong> work<br />

1993-94 0<br />

1994-95 0<br />

1995-96 0<br />

1996-97 0<br />

1997-98 0<br />

1998-99 8<br />

1999-00 3<br />

2000-01 5<br />

2001-02 10<br />

Total 26<br />

3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />

1993-94 0<br />

1994-95 0<br />

1995-96 0<br />

1996-97 0<br />

1997-98 0<br />

1998-99 8<br />

1999-00 3<br />

2000-01 6<br />

2001-02 7<br />

Total 24<br />

4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2001<br />

8. Expenditure during the year 2001-2002<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

0.000<br />

0.000<br />

0.000<br />

0.000<br />

0.000<br />

5.000<br />

6.000<br />

31.000<br />

44.000<br />

86.000<br />

0.000<br />

98.500<br />

Estimated cost<br />

0.000<br />

0.000<br />

0.000<br />

0.000<br />

0.000<br />

5.000<br />

21.000<br />

14.000<br />

47.760<br />

87.760<br />

Amount sanctioned<br />

0.000<br />

0.000<br />

0.000<br />

0.000<br />

0.000<br />

5.000<br />

21.000<br />

16.000<br />

18.845<br />

18<br />

6<br />

49.295<br />

14.622<br />

63.917<br />

34.583<br />

37.655<br />

79.655<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-other-distt 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE RS MP :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH STD CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the RS MP :<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Sh. Mahesh Chandra Sharma<br />

Churu<br />

<strong>District</strong> Collector, Churu<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

TOTAL<br />

No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99 8<br />

1999-00 1<br />

2000-01<br />

2001-02 1<br />

Total 10<br />

3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99 8<br />

1999-00 1<br />

2000-01<br />

2001-02 1<br />

Total 10<br />

4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

5.000<br />

6.000<br />

5.000<br />

16.000<br />

16.000<br />

Estimated cost<br />

5.000<br />

6.000<br />

5.000<br />

16.000<br />

Amount sanctioned<br />

0.040<br />

10<br />

0<br />

14.370<br />

0.970<br />

15.340<br />

0.660<br />

5.000<br />

6.000<br />

4.960<br />

15.960<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-other-distt 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE RS MP :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH STD CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the RS MP :<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Sh. Ramdas Agarwal<br />

<strong>District</strong> Collector, Jaipur<br />

<strong>District</strong> Collector, Jaipur<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

TOTAL<br />

No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00<br />

2000-01 1<br />

2001-02 4<br />

Total 5<br />

3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00<br />

2000-01 1<br />

2001-02 3<br />

Total 4<br />

4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

2.000<br />

18.500<br />

20.500<br />

20.500<br />

Estimated cost<br />

2.000<br />

18.500<br />

20.500<br />

Amount sanctioned<br />

3.236<br />

2<br />

2<br />

4.500<br />

10.077<br />

14.577<br />

5.923<br />

2.000<br />

15.264<br />

17.264<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-other-distt 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE RS MP :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH STD CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the RS MP :<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Sh. Onkar Singh<br />

Ajmer<br />

<strong>District</strong> Collector, Ajmer<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

TOTAL<br />

No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00 2<br />

2000-01 1<br />

2001-02<br />

Total 3<br />

3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00 2<br />

2000-01 1<br />

2001-02<br />

Total 3<br />

4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

17.000<br />

Amount sanctioned<br />

0.000<br />

2<br />

1<br />

15.550<br />

0.000<br />

15.550<br />

1.450<br />

17.000<br />

17.000<br />

17.000<br />

Estimated cost<br />

15.000<br />

2.000<br />

15.000<br />

2.000<br />

17.000<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-other-distt 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE RS MP :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH STD CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the RS MP :<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Smt. Jamuna Barupal<br />

Bikaner<br />

<strong>District</strong> Collector, Bikaner<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

TOTAL<br />

No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00<br />

2000-01<br />

2001-02 1<br />

Total 1<br />

3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00<br />

2000-01 1<br />

2001-02<br />

Total 1<br />

4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

2.000<br />

2.000<br />

2.000<br />

Estimated cost<br />

2.000<br />

2.000<br />

Amount sanctioned<br />

0.000<br />

1<br />

0<br />

1.500<br />

1.500<br />

0.500<br />

2.000<br />

2.000<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-other-distt 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE RS MP :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH STD CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the RS MP :<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Sh. Santosh Bagoria<br />

Bhilwara<br />

<strong>District</strong> Collector, Bhilwara<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

TOTAL<br />

No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00<br />

2000-01<br />

2001-02 1<br />

Total 1<br />

3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00<br />

2000-01<br />

2001-02 1<br />

Total 1<br />

4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

10.000<br />

10.000<br />

10.000<br />

Estimated cost<br />

10.000<br />

10.000<br />

Amount sanctioned<br />

0.000<br />

1<br />

0.000<br />

10.000<br />

10.000<br />

10.000<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-other-distt 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> <strong>Lok</strong> <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE CONSTITUENCY :<br />

NAME OF THE MP :<br />

10th LS :<br />

11th LS :<br />

12tH LS :<br />

13tH LS :<br />

NAME OF THE NODAL DISTRICT :<br />

PHONE No. WITH S.T.D. CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the constituency:<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Barmer<br />

Sh. Ram Niwas Mirdha/Col. Sona Ram<br />

Sh. Ram Niwas Mirdha<br />

Col. Sona Ram Choudhary<br />

Col. Sona Ram Choudhary<br />

Barmer<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

2002-2003<br />

TOTAL<br />

No.<strong>of</strong> work<br />

(a) By the 10th LS MP 0<br />

(b) By the 11th LS MP 16<br />

(c) By the 12th LS MP 0<br />

(d) By the 13th LS MP 98<br />

(e) TOTAL (a+b+c+d) 114<br />

3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong>: No.<strong>of</strong> work<br />

(a) The 10th LS MP 0<br />

(b) The 11th LS MP 16<br />

(c) The 12th LS MP 0<br />

(d) The 13th LS MP 85<br />

(e) TOTAL (a+b+c+d) 101<br />

4. Total unsanctioned balance available with the constituency 1(c )-3(e)<br />

5. Total No. <strong>of</strong> works completed in the constituency<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

0.620<br />

12.500<br />

12.500<br />

10.000<br />

5.000<br />

11.000<br />

5.000<br />

40.000<br />

20.000<br />

6.000<br />

122.620<br />

-<br />

122.620<br />

Estimated cost<br />

0.000<br />

25.520<br />

0.000<br />

110.457<br />

135.977<br />

Amount sanctioned<br />

0.000<br />

25.520<br />

0.000<br />

100.165<br />

125.685<br />

-3.065<br />

78<br />

23<br />

86.859<br />

28.510<br />

115.369<br />

7.251<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-other-distt 10/2/02


<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />

<strong>District</strong> : <strong>Jodhpur</strong><br />

NAME OF THE STATE :<br />

NAME OF THE RS MP :<br />

NAME OF THE NODAL DISTRICT :<br />

ADDRESS :<br />

PHONE No. WITH STD CODE :<br />

FAX : email :<br />

1.Total Funds received <strong>for</strong> the RS MP :<br />

(a) Fund received from the Govt. <strong>of</strong> India<br />

(b) Total amount <strong>of</strong> interest accrued on the funds<br />

(c) TOTAL (a+b)<br />

2.Total No. and cost <strong>of</strong> works recommended:<br />

Month : Aug'2002<br />

Rajasthan<br />

Sh. Jaswant Singh Jasol<br />

Barmer<br />

<strong>District</strong> Collector, Barmer<br />

YEAR<br />

1993-1994<br />

1994-1995<br />

1995-1996<br />

1996-1997<br />

1997-1998<br />

1998-1999<br />

1999-2000<br />

2000-2001<br />

2001-2002<br />

2002-2003<br />

TOTAL<br />

No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00<br />

2000-01 3<br />

2001-02 3<br />

2002-03 4<br />

Total 10<br />

3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />

1993-94<br />

1994-95<br />

1995-96<br />

1996-97<br />

1997-98<br />

1998-99<br />

1999-00<br />

2000-01 3<br />

2001-02 2<br />

Total 5<br />

4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />

5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />

6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />

7. Expenditure upto March'2002<br />

8. Expenditure during the year 2002-2003<br />

9. Total Expenditure upto the Month (7+8)<br />

10. Balance amount as on 01.__________[1(c)-9]<br />

FUNDS RECEIVED<br />

(Rs. In Lacs)<br />

10.000<br />

10.500<br />

12.500<br />

33.000<br />

33.000<br />

Estimated cost<br />

10.000<br />

12.260<br />

10.500<br />

32.760<br />

Amount sanctioned<br />

15.569<br />

3<br />

2<br />

13.375<br />

3.575<br />

16.950<br />

16.050<br />

10.000<br />

7.431<br />

17.431<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003 mp-other-distt 10/2/02


ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % QykSnh ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />

Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />

;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />

;kstuk izkjEHk ls<br />

lanfHkZr =Sekl esa<br />

Ø-la- lsDVj @ dk;Z<br />

lanfHkZr =Sekl rd fujLr lanfHkZr =Sekl esa<br />

fo'ks"k<br />

lanfHkZr =Sekl rd<br />

fooj.k<br />

Lohd`r dk;ksZa dh Lohd`r dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh<br />

jkf'k<br />

jkf'k la[;k jkf'k la[;k la[;k ykxr la[;k ykxr la[;k<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 is;ty<br />

v- gs.MiEi<br />

c- is;ty ;kstuk 4.25 2 3.00 1 3.00 1<br />

l- ikjEifjd tyL=ksr ds fodkl dk;Z 0.15 1 0.15 1 0.15 1<br />

;ksx 0.00 0 4.40 3 0 0.00 3.15 2 3.15 2<br />

2 f'k{kk<br />

v- Hkou 1.50 1 59.42 44 5.66 4 39.22 30<br />

c- Hkou foLrkj 3.96 5 2.36 2 3.56 4<br />

l- dEI;wVj<br />

n- vU; lkexzh<br />

;ksx 1.50 1 63.38 49 0 0.00 8.02 6 42.78 34<br />

3 ifjogu<br />

v- lM+d<br />

1- xzsoy 2.49 2 5.49 4 3.00 2<br />

2- MCyw ch ,e<br />

3- ch-Vh-<br />

4- vU; izdkj<br />

;ksx ¼1&4½ 2.49 2 5.49 4 0 0.00 0.00 0 3.00 2<br />

c- iqfy;k@jiV 2.00 1 2.00 1<br />

dqy ;ksx ¼v$c½ 4.49 3 7.49 5 0 0.00 0.00 0 3.00 2<br />

4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />

v- Hkou<br />

c- Hkou foLrkj<br />

l- fpfdRlk midj.k<br />

n- vkaxuokM+h Hkou<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

5 flapkbZ<br />

v- ykq flapkbZ dk;Z<br />

c- rkykcksa dh lQkbZ@MhflfYVax 2.00 1 2.00 1<br />

l- lkeq-tyks-flapkbZ ;kstuk<br />

;ksx 0.00 0 2.00 1 0 0.00 0.00 0 2.00 1<br />

6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />

2002-2003 QPR-mlalad


v- vkcknh {ks= esa lM+d@[kjatk@ukyh 1.00 1 1.00 1<br />

c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh 4.00 2 30.75 17 2.25 2 23.75 13<br />

Hkou<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 1.50 2<br />

n- cl LVs.M<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 2.00 2 2.00 2<br />

;ksx 4.00 2 35.25 22 0 0.00 2.25 2 26.75 16<br />

7 fo|qfrdj.k ds dk;Z<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou 1.50 1 1.50 1<br />

c- iapk;rh jkt laLFkkvksa ds Hkou<br />

;ksx 0.00 0 1.50 1 0 0.00 0.00 0 1.50 1<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

9.99 6 114.02 81 0 0.00 13.42 10 79.18 56<br />

2002-2003 QPR-mlalad


ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % 'ksjx


v- vkcknh {ks= esa lM+d@[kjatk@ukyh 2.90 2 0.90 1 2.90 2<br />

c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh 2.00 1 23.95 15 9.57 5 15.20 10<br />

Hkou<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk<br />

n- cl LVs.M 3.00 2 3.00 2<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 9.00 6 7.00 3<br />

;ksx 2.00 1 38.85 25 0 0.00 10.47 6 28.10 17<br />

7 fo|qfrdj.k ds dk;Z<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou 0.50 1 0.50 1<br />

c- iapk;rh jkt laLFkkvksa ds Hkou<br />

;ksx 0.00 0 0.50 1 0 0.00 0.00 0 0.50 1<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou 2.00 1<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 2.00 1 0 0.00 0.00 0 0.00 0<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

10.27 12 93.37 75 2 6.21 21.87 15 57.80 43<br />

2002-2003 QPR-mlalad


ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % Hkksikyx


v- vkcknh {ks= esa lM+d@[kjatk@ukyh 4.50 4 3.62 3<br />

c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />

1.47 1 1.47 1<br />

Hkou<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 0.70 2 0.70 2<br />

n- cl LVs.M<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 2.05 4 2.05 4<br />

;ksx 0.00 0 8.72 11 0 0.00 0.00 0 7.84 10<br />

7 fo|qfrdj.k ds dk;Z<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou<br />

c- iapk;rh jkt laLFkkvksa ds Hkou<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

0.00 0 46.38 43 0 0.00 13.06 9 39.79 35<br />

2002-2003 QPR-mlalad


ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % vkSfl;ka ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />

Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />

;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />

;kstuk izkjEHk ls<br />

Ø-la- lsDVj @ dk;Z<br />

lanfHkZr =Sekl esa<br />

fujLr<br />

lanfHkZr =Sekl esa<br />

fo'ks"k<br />

lanfHkZr =Sekl rd<br />

lanfHkZr =Sekl rd<br />

fooj.k<br />

Lohd`r dk;ksZa dh Lohd`r dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh<br />

jkf'k<br />

jkf'k la[;k jkf'k la[;k la[;k ykxr la[;k ykxr la[;k<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 is;ty<br />

v- gs.MiEi<br />

c- is;ty ;kstuk<br />

l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

2 f'k{kk<br />

v- Hkou 28.14 19 5.85 4 22.14 16<br />

c- Hkou foLrkj<br />

l- dEI;wVj<br />

n- vU; lkexzh<br />

;ksx 0.00 0 28.14 19 0 0.00 5.85 4 22.14 16<br />

3 ifjogu<br />

v- lM+d<br />

1- xzsoy<br />

2- MCyw ch ,e<br />

3- ch-Vh-<br />

4- vU; izdkj<br />

;ksx ¼1&4½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

c- iqfy;k@jiV<br />

dqy ;ksx ¼v$c½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />

v- Hkou 1.40 1 1.40 1 1.40 1<br />

c- Hkou foLrkj<br />

l- fpfdRlk midj.k<br />

n- vkaxuokM+h Hkou<br />

;ksx 0.00 0 1.40 1 0 0.00 1.40 1 1.40 1<br />

5 flapkbZ<br />

v- ykq flapkbZ dk;Z<br />

c- rkykcksa dh lQkbZ@MhflfYVax<br />

l- lkeq-tyks-flapkbZ ;kstuk<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />

v- vkcknh {ks= esa lM+d@[kjatk@ukyh 2.00 1<br />

2002-2003 QPR-mlalad


c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />

Hkou<br />

13.38 9 1.50 1 10.38 7<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk<br />

n- cl LVs.M<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 1.50 2 1.50 2<br />

;ksx 0.00 0 16.88 12 0 0.00 1.50 1 11.88 9<br />

7 fo|qfrdj.k ds dk;Z<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou<br />

c- iapk;rh jkt laLFkkvksa ds Hkou 1.00 1 1.00 1<br />

;ksx 0.00 0 1.00 1 0 0.00 0.00 0 1.00 1<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

0.00 0 47.42 33 0 0.00 8.75 6 36.42 27<br />

2002-2003 QPR-mlalad


ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % lwjlkxj ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />

Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />

;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />

;kstuk izkjEHk ls<br />

lanfHkZr =Sekl esa<br />

lanfHkZr =Sekl esa<br />

Ø-la- lsDVj @ dk;Z<br />

lanfHkZr =Sekl rd fujLr<br />

lanfHkZr =Sekl rd<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

la[;k<br />

jkf'k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 is;ty<br />

v- gs.MiEi<br />

c- is;ty ;kstuk 3.80 13 1.44 4 2.95 11<br />

l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />

;ksx 0.00 0 3.80 13 0 0.00 1.44 4 2.95 11<br />

2 f'k{kk<br />

v- Hkou 23.47 19 11.05 9 23.47 19<br />

c- Hkou foLrkj 26.60 21 10.95 9 24.60 19<br />

l- dEI;wVj 5.90 2 5.90 2<br />

n- vU; lkexzh<br />

;ksx 0.00 0 55.97 42 0 0.00 22.00 18 53.97 40<br />

3 ifjogu<br />

v- lM+d<br />

1- xzsoy<br />

2- MCyw ch ,e 10.00 2 5.00 1 5.00 1 5.5 KM<br />

3- ch-Vh-<br />

4- vU; izdkj<br />

;ksx ¼1&4½ 0.00 0 10.00 2 0 0.00 5.00 1 5.00 1<br />

c- iqfy;k@jiV 1.25 1 1.25 1<br />

dqy ;ksx ¼v$c½ 0.00 0 11.25 3 0 0.00 5.00 1 6.25 2<br />

4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />

v- Hkou 1.40 1 1.40 1 1.40 1<br />

c- Hkou foLrkj 1.82 3 1.82 3<br />

l- fpfdRlk midj.k<br />

n- vkaxuokM+h Hkou<br />

;ksx 0.00 0 3.22 4 0 0.00 1.40 1 3.22 4<br />

5 flapkbZ<br />

v- ykq flapkbZ dk;Z 1.89 1 1.89 1<br />

c- rkykcksa dh lQkbZ@MhflfYVax 1.50 1 1.50 1<br />

l- lkeq-tyks-flapkbZ ;kstuk<br />

;ksx 0.00 0 3.39 2 0 0.00 0.00 0 3.39 2<br />

6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />

fo'ks"k<br />

fooj.k<br />

2002-2003 QPR-mlalad


v- vkcknh {ks= esa lM+d@[kjatk@ukyh 0.40 1<br />

c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />

Hkou<br />

18.97 12 4.00 3 16.47 11<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 1.40 1 14.66 10 2.50 2 12.26 8<br />

n- cl LVs.M<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 7.25 9 1.50 1 6.55 8<br />

;ksx 1.40 1 41.28 32 0 0.00 8.00 6 35.28 27<br />

7 fo|qfrdj.k ds dk;Z<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou 0.71 1 0.71 1<br />

c- iapk;rh jkt laLFkkvksa ds Hkou 1.25 1 1.25 1<br />

;ksx 0.00 0 1.96 2 0 0.00 0.00 0 1.96 2<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou 2.00 1<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 2.00 1 0 0.00 0.00 0 0.00 0<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

1.40 1 122.87 99 0 0.00 37.84 30 107.02 88<br />

2002-2003 QPR-mlalad


ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % ljnkjiqjk ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />

Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />

;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />

;kstuk izkjEHk ls<br />

lanfHkZr =Sekl esa<br />

Ø-la- lsDVj @ dk;Z<br />

lanfHkZr =Sekl rd fujLr<br />

lanfHkZr =Sekl esa<br />

lanfHkZr =Sekl rd<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

la[;k<br />

jkf'k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 is;ty<br />

v- gs.MiEi<br />

c- is;ty ;kstuk 0.50 1 0.50 1<br />

l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />

;ksx 0.00 0 0.50 1 0 0.00 0.00 0 0.50 1<br />

2 f'k{kk<br />

v- Hkou 31.55 18 7.80 5 19.80 11<br />

c- Hkou foLrkj 4.50 2 1.50 1 1.50 1<br />

l- dEI;wVj 5.00 1 5.00 1<br />

n- vU; lkexzh<br />

;ksx 0.00 0 41.05 21 0 0.00 9.30 6 26.30 13<br />

3 ifjogu<br />

v- lM+d<br />

1- xzsoy<br />

2- MCyw ch ,e<br />

3- ch-Vh-<br />

4- vU; izdkj<br />

;ksx ¼1&4½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

c- iqfy;k@jiV<br />

dqy ;ksx ¼v$c½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />

v- Hkou 3.00 2 3.00 2<br />

c- Hkou foLrkj<br />

l- fpfdRlk midj.k 7.16 2 7.16 2<br />

n- vkaxuokM+h Hkou<br />

;ksx 0.00 0 10.16 4 0 0.00 0.00 0 10.16 4<br />

5 flapkbZ<br />

v- ykq flapkbZ dk;Z<br />

c- rkykcksa dh lQkbZ@MhflfYVax<br />

l- lkeq-tyks-flapkbZ ;kstuk<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />

fo'ks"k<br />

fooj.k<br />

2002-2003 QPR-mlalad


v- vkcknh {ks= esa lM+d@[kjatk@ukyh<br />

c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />

Hkou<br />

9.75 6 1.25 1 7.31 5<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 8.00 4 0.50 1 2.50 2<br />

n- cl LVs.M<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 8.42 6 0.60 1 3.32 4<br />

;ksx 0.00 0 26.17 16 0 0.00 2.35 3 13.13 11<br />

7 fo|qfrdj.k ds dk;Z<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou<br />

c- iapk;rh jkt laLFkkvksa ds Hkou<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

0.00 0 77.88 42 0 0.00 11.65 9 50.09 29<br />

2002-2003 QPR-mlalad


Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

la[;k<br />

jkf'k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 is;ty<br />

v- gs.MiEi<br />

c- is;ty ;kstuk<br />

l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

2 f'k{kk<br />

v- Hkou 18.94 6 3.00 1 6.49 2<br />

c- Hkou foLrkj<br />

l- dEI;wVj 5.00 1 5.00 1<br />

n- vU; lkexzh<br />

;ksx 0.00 0 23.94 7 0 0.00 3.00 1 11.49 3<br />

3 ifjogu<br />

v- lM+d<br />

1- xzsoy<br />

2- MCyw ch ,e<br />

3- ch-Vh-<br />

4- vU; izdkj<br />

;ksx ¼1&4½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

c- iqfy;k@jiV<br />

dqy ;ksx ¼v$c½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />

v- Hkou<br />

c- Hkou foLrkj 6.00 2 3.00 1<br />

l- fpfdRlk midj.k 2.00 1<br />

n- vkaxuokM+h Hkou<br />

;ksx 0.00 0 8.00 3 0 0.00 0.00 0 3.00 1<br />

5 flapkbZ<br />

v- ykq flapkbZ dk;Z<br />

c- rkykcksa dh lQkbZ@MhflfYVax<br />

l- lkeq-tyks-flapkbZ ;kstuk<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />

v- vkcknh {ks= esa lM+d@[kjatk@ukyh<br />

ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % tks/kiqj 'kgj ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />

Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />

;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />

;kstuk izkjEHk ls<br />

lanfHkZr =Sekl esa<br />

lanfHkZr =Sekl esa<br />

Ø-la- lsDVj @ dk;Z<br />

lanfHkZr =Sekl rd fujLr<br />

lanfHkZr =Sekl rd<br />

2002-2003 QPR-mlalad<br />

fo'ks"k<br />

fooj.k


c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />

Hkou<br />

20.94 9 3.00 1 8.94 3<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk<br />

n- cl LVs.M<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 2.51 3 2.51 3<br />

;ksx 0.00 0 23.45 12 0 0.00 3.00 1 11.45 6<br />

7 fo|qfrdj.k ds dk;Z<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou<br />

c- iapk;rh jkt laLFkkvksa ds Hkou<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

0.00 0 55.39 22 0 0.00 6.00 2 25.94 10<br />

2002-2003 QPR-mlalad


ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % fcykM+k ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />

Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />

;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />

;kstuk izkjEHk ls<br />

lanfHkZr =Sekl esa<br />

Ø-la- lsDVj @ dk;Z<br />

lanfHkZr =Sekl rd fujLr<br />

lanfHkZr =Sekl esa<br />

lanfHkZr =Sekl rd<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

la[;k<br />

jkf'k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 is;ty<br />

v- gs.MiEi 0.25 1 2.42 6 0.44 1 1.17 3<br />

c- is;ty ;kstuk 14.79 21 3.05 4 10.82 13<br />

l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />

;ksx 0.25 1 17.21 27 0 0.00 3.49 5 11.99 16<br />

2 f'k{kk<br />

v- Hkou 3.00 2 18.94 13 1.50 1 9.07 6<br />

c- Hkou foLrkj 3.46 2 10.04 9 1.20 1 6.08 6<br />

l- dEI;wVj 1.35 1 1.35 1<br />

n- vU; lkexzh<br />

;ksx 6.46 4 30.33 23 0 0.00 2.70 2 16.50 13<br />

3 ifjogu<br />

v- lM+d<br />

1- xzsoy 1.00 1 1 KM<br />

2- MCyw ch ,e<br />

3- ch-Vh-<br />

4- vU; izdkj<br />

;ksx ¼1&4½ 0.00 0 1.00 1 0 0.00 0.00 0 0.00 0<br />

c- iqfy;k@jiV 0.50 1 0.50 1<br />

dqy ;ksx ¼v$c½ 0.00 0 1.50 2 0 0.00 0.00 0 0.50 1<br />

4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />

v- Hkou<br />

c- Hkou foLrkj<br />

l- fpfdRlk midj.k 0.99 2 0.99 2<br />

n- vkaxuokM+h Hkou<br />

;ksx 0.00 0 0.99 2 0 0.00 0.00 0 0.99 2<br />

5 flapkbZ<br />

v- ykq flapkbZ dk;Z<br />

c- rkykcksa dh lQkbZ@MhflfYVax<br />

l- lkeq-tyks-flapkbZ ;kstuk<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />

fo'ks"k<br />

fooj.k<br />

2002-2003 QPR-mlalad


v- vkcknh {ks= esa lM+d@[kjatk@ukyh 1.00 1 5.50 7 1.00 2 2.00 3<br />

c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh 1.50 1 18.05 13 0.74 1 12.55 9<br />

Hkou<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 6.00 6 1.00 1 4.00 4<br />

n- cl LVs.M<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 8.42 4 1.50 1 5.29 3<br />

;ksx 2.50 2 37.97 30 0 0.00 4.24 5 23.84 19<br />

7 fo|qfrdj.k ds dk;Z 1.00 1 1.00 1<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou 1.78 1 1.78 1<br />

c- iapk;rh jkt laLFkkvksa ds Hkou<br />

;ksx 0.00 0 1.78 1 0 0.00 0.00 0 1.78 1<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

9.21 7 90.78 86 0 0.00 10.43 12 56.60 53<br />

2002-2003 QPR-mlalad


ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />

fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />

fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % ywuh ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />

Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />

;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />

;kstuk izkjEHk ls<br />

lanfHkZr =Sekl esa<br />

lanfHkZr =Sekl esa<br />

Ø-la- lsDVj @ dk;Z<br />

lanfHkZr =Sekl rd fujLr<br />

lanfHkZr =Sekl rd<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

Lohd`r<br />

jkf'k<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

la[;k<br />

jkf'k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

dk;ksZa dh<br />

ykxr<br />

dk;ksZa dh<br />

la[;k<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 is;ty<br />

v- gs.MiEi<br />

c- is;ty ;kstuk 0.88 4 4.31 20 0.75 5 3.00 14<br />

l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />

;ksx 0.88 4 4.31 20 0 0.00 0.75 5 3.00 14<br />

2 f'k{kk<br />

v- Hkou 10.80 8 20.80 17 2.00 2 10.82 9<br />

c- Hkou foLrkj 3.60 5 27.79 31 1 0.50 1.00 1 24.14 24<br />

l- dEI;wVj<br />

n- vU; lkexzh<br />

;ksx 14.40 13 48.59 48 1 0.50 3.00 3 34.96 33<br />

3 ifjogu<br />

v- lM+d<br />

1- xzsoy<br />

2- MCyw ch ,e<br />

3- ch-Vh-<br />

4- vU; izdkj<br />

;ksx ¼1&4½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

c- iqfy;k@jiV 0.25 1<br />

dqy ;ksx ¼v$c½ 0.00 0 0.25 1 0 0.00 0.00 0 0.00 0<br />

4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />

v- Hkou<br />

c- Hkou foLrkj<br />

l- fpfdRlk midj.k<br />

n- vkaxuokM+h Hkou<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

5 flapkbZ<br />

v- ykq flapkbZ dk;Z<br />

c- rkykcksa dh lQkbZ@MhflfYVax<br />

l- lkeq-tyks-flapkbZ ;kstuk<br />

;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />

6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />

fo'ks"k<br />

fooj.k<br />

2002-2003 QPR-mlalad


v- vkcknh {ks= esa lM+d@[kjatk@ukyh 2.00 2 3.20 3<br />

c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />

Hkou<br />

6.75 5 41.58 33 8.05 6 24.59 18<br />

l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 2.60 2 3.50 4 1.20 2<br />

n- cl LVs.M<br />

;- iqLrdky; Hkou<br />

j- LiksVªl dkEIysDl 2.00 1<br />

y- Le`fr Hkou<br />

o- vU; tuksi;ksxh dk;Z 1.10 1 7.47 10 5.47 8<br />

;ksx 12.45 10 57.75 51 0 0.00 8.05 6 31.26 28<br />

7 fo|qfrdj.k ds dk;Z<br />

8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />

iapk;r jkt laLFkk ds Hkou<br />

v- jkT; ljdkj ds Hkou 0.90 1<br />

c- iapk;rh jkt laLFkkvksa ds Hkou<br />

;ksx 0.00 0 0.90 1 0 0.00 0.00 0 0.00 0<br />

9 i'kqikyu<br />

v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou 0.90 1 0.90 1<br />

c- i'kq is;ty ds dk;Z<br />

;ksx 0.00 0 0.90 1 0 0.00 0.00 0 0.90 1<br />

10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />

egk;ksx<br />

27.73 27 112.70 122 1 0.50 11.80 14 70.12 76<br />

2002-2003 QPR-mlalad


Month : Aug '2002<br />

DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

MONTHLY PROGRESS REPORT OF M.L.A. LOCAL AREA DEVELOPMENT SCHEME<br />

Closing Balance <strong>of</strong> previous year --<br />

1 Cash 487.10<br />

2 Advances 120.88<br />

3 Total (1+2) 607.98<br />

4 Adjustment made out <strong>of</strong> the advances given upto the previous year 160.47<br />

5 Net total balance <strong>of</strong> previous year (3-4) 447.51<br />

6 Releases <strong>of</strong> current year 0.00<br />

7 Total available amount upto month (5+6) 447.51<br />

CONSTITUENCYWISE INFORMATION<br />

Name <strong>of</strong> Constituency<br />

Soorsagar Shergarh Osian Bilara Luni Phalodi Bhopalgarh Sardarpura <strong>Jodhpur</strong> Total<br />

1 No. <strong>of</strong> incomplete works <strong>of</strong> Previous years 7 29 4 11 27 13 35 2 4 132<br />

Proposed Works <strong>of</strong> Current Year<br />

2 No. <strong>of</strong> proposed works 31 31 1 33 0 2 0 2 4 104<br />

3 Estimated cost <strong>of</strong> proposed works 64.38 23.27 7.80 31.32 0.00 7.50 0.00 9.50 15.00 158.77<br />

Position <strong>of</strong> Sanctioned (Financial) works <strong>of</strong> Current Year<br />

4 No. <strong>of</strong> sanctioned works 29 24 27 25 9 3 6 22 8 153<br />

5 Cost <strong>of</strong> sanctioned works 59.52 24.40 46.25 27.59 11.70 7.48 11.24 44.80 24.33 257.31<br />

Expenditure<br />

6 On Incomplete works <strong>of</strong> previous years 7.78 16.20 2.10 7.94 12.18 11.58 7.13 6.30 2.60 73.81<br />

7 On works sanctioned in the current year 17.76 10.12 11.27 10.95 2.85 1.79 2.80 21.96 6.70 86.20<br />

8 Total Expenditure 25.54 26.32 13.37 18.89 15.03 13.37 9.93 28.26 9.30 160.01<br />

No. <strong>of</strong> Complete Works<br />

9 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years 6 18 2 6 16 10 10 0 1 69<br />

10 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year 2 0 0 1 1 0 0 1 0 5<br />

No. <strong>of</strong> Cancelled Works<br />

11 Out <strong>of</strong> works <strong>of</strong> previous years -- -- -- -- 1 -- -- -- -- 1<br />

12 Out <strong>of</strong> new sanctions 14 -- -- -- -- -- -- -- -- 14<br />

No. <strong>of</strong> Ongoing Works<br />

13 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years 1 11 2 5 10 3 25 2 3 62<br />

14 Out <strong>of</strong> sanctioned works <strong>of</strong> current year 13 24 27 24 8 3 6 21 8 134<br />

No. <strong>of</strong> Works not started<br />

15 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years -- -- -- -- -- -- -- -- -- 0<br />

16 Out <strong>of</strong> sanctioned <strong>of</strong> current year -- -- -- -- -- -- -- -- -- 0<br />

17 No. <strong>of</strong> Incomplete & closed works -- -- -- -- -- -- -- -- -- 0<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

MONTHLY PROGRESS REPORT - BATTIS ZILA BATTIS KAAM YOJNA<br />

<strong>District</strong> : <strong>Jodhpur</strong> Month : Aug '2002<br />

INCOMPLETE WORKS OF PREVIOUS YEARS :<br />

1 No. <strong>of</strong> incomplete works as on 01.04.2002 : 186<br />

2 Amount required to complete the incomplete works <strong>of</strong> previous : 81.782<br />

years as on 01.04.2002<br />

SANCTION WORKS OF CURRENT YEAR :<br />

In MLA Quota<br />

3 No. <strong>of</strong> sanctioned works : 0<br />

4 Cost <strong>of</strong> sanctioned works : 0.00<br />

Others<br />

5 No. <strong>of</strong> sanctioned works : 0<br />

6 Cost <strong>of</strong> sanctioned works : 0.00<br />

EXPENDITURE (Rs. in Lacs) :<br />

7 On Incomplete works <strong>of</strong> previous years : 0.000<br />

8 On works sanctioned in the current year : 0.000<br />

9 Total Expenditure : 0.000<br />

NO. OF COMPLETE WORKS :<br />

10 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 62<br />

11 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : 0<br />

NO. OF CANCELLED WORKS :<br />

12 Out <strong>of</strong> works <strong>of</strong> previous year : 0<br />

13 Out <strong>of</strong> new Sanctions : 0<br />

NO. OF ONGOING WORKS :<br />

Out <strong>of</strong> Incomplete works <strong>of</strong> previous years<br />

14 Out <strong>of</strong> sanctioned works in 95-96 & be<strong>for</strong>e : 49<br />

15 Out <strong>of</strong> sanctioned works in 96-97 : 17<br />

16 Out <strong>of</strong> sanctioned works in 97-98 : 20<br />

17 Out <strong>of</strong> sanctioned works in 98-99 : 38<br />

18 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : 0<br />

NO. OF WORKS NOT STARTED<br />

19 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 0<br />

20 Out <strong>of</strong> sanctioned <strong>of</strong> Previous year : 0<br />

21 No. <strong>of</strong> Incomplete & closed works : --<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


DISTRICT : JODHPUR<br />

INCOMPLETE WORKS OF PREVIOUS YEARS :<br />

Month : Aug'2002<br />

1 No. <strong>of</strong> incomplete works as on 01.04.2002 : 120<br />

2 Amount required to complete the incomplete works <strong>of</strong><br />

previous years as on 01.04.2002<br />

SANCTION WORKS OF CURRENT YEAR :<br />

In MLA Quota<br />

: 87.974<br />

3 No. <strong>of</strong> sanctioned works : 0<br />

4 Cost <strong>of</strong> sanctioned works : 0.00<br />

Others<br />

DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

5 No. <strong>of</strong> sanctioned works : 0<br />

6 Cost <strong>of</strong> sanctioned works : 0<br />

EXPENDITURE (Rs. in Lacs) :<br />

7 On Incomplete works <strong>of</strong> previous years : 0.000<br />

8 On works sanctioned in the current year : 0.000<br />

9 Total Expenditure : 0.000<br />

NO. OF COMPLETE WORKS :<br />

10 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 44<br />

11 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : 0<br />

NO. OF CANCELLED WORKS :<br />

12 Out <strong>of</strong> works <strong>of</strong> previous year : 0<br />

13 Out <strong>of</strong> new Sanctions : 0<br />

NO. OF ONGOING WORKS :<br />

MONTHLY PROGRESS REPORT - UNTIED FUND YOJANA<br />

Out <strong>of</strong> Incomplete works <strong>of</strong> previous years<br />

14 Out <strong>of</strong> sanctioned works in 95-96 & be<strong>for</strong>e : 30<br />

15 Out <strong>of</strong> sanctioned works in 96-97 :<br />

16 Out <strong>of</strong> sanctioned works in 97-98 : 16<br />

17 Out <strong>of</strong> sanctioned works in 98-99 : 30<br />

18 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : 0<br />

NO. OF WORKS NOT STARTED :<br />

19 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 0<br />

2002-2003


20 Out <strong>of</strong> sanctioned <strong>of</strong> Previous year : 0<br />

21 No. <strong>of</strong> Incomplete & closed works : 0<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


Month : Aug'2002<br />

A. PHYSICAL<br />

1 Target <strong>of</strong> New Plants : --<br />

Revival <strong>of</strong> old plants 25<br />

2 Plants Completed New : Nil<br />

Revival<br />

Nil<br />

3 Plants under construction : 0<br />

4 Details <strong>of</strong> Plants Commissioned : Nil<br />

Size KVIC Drum type Deenbandhu Other<br />

Category <strong>of</strong> Beneficiaries<br />

Others<br />

2 Cum<br />

3 Cum<br />

4 Cum<br />

SC ST SM/SF<br />

B. FINANCIAL (Rs. In Lacs)<br />

1 Balance as on 01.04.2002 : 0.94<br />

2 Allocation during the year<br />

(a) State : --<br />

(b) Central : --<br />

3 Receipt during the year<br />

(a) State : -<br />

(b) Central : -<br />

(c) Others Zila Parishad, Pali : --<br />

4 Total Available Fund : 0.94<br />

5 Expenditure upto the Month/Amount Transfer : 0.80<br />

6 Balance : 0.94<br />

B-I DETAILS OF UC's/ SUBSIDY CLAIM<br />

1 Plants Constructed (No.) : Nil<br />

2 Subsidy Paid<br />

State : --<br />

Central : --<br />

3 Turnkey Charges : --<br />

4 Claims Submitted<br />

No. <strong>of</strong> Plants : --<br />

Amount : --<br />

C. IBP / NBP<br />

DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

BIOGAS MONTHLY PROGRESS REPORT<br />

C.A. Audit <strong>Report</strong> : --<br />

Pending Audit Para's : --<br />

1 Plants Sanctioned : --<br />

2 Completed : 5<br />

3 Under <strong>Progress</strong> : --<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


1. Name <strong>of</strong> State : Rajasthan<br />

2. Name <strong>of</strong> Nodal Deptt./Agency : D.R.D.A., <strong>Jodhpur</strong><br />

3. Annual Target :<br />

4. Physical <strong>Progress</strong> : --<br />

Month :<br />

Category<br />

<strong>of</strong> plants<br />

Aug'2002<br />

No. <strong>of</strong><br />

cooking<br />

conn./<br />

family<br />

covered<br />

(KG)<br />

Details <strong>of</strong><br />

duel fuel<br />

eng. /<br />

generator<br />

etc. (cap.)<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

Oswal Gau Seva<br />

Pinjara Pole,<br />

I IBP<br />

Sadan, Pinjara Pole, 45 KVIC Complete 249000 -- -- -- -- --<br />

Phalodi<br />

Phalodi<br />

--<br />

--<br />

--<br />

--<br />

Location<br />

Rawan Ka<br />

Chabutra,<br />

<strong>Jodhpur</strong><br />

Haddimeal<br />

Ind. Area,<br />

<strong>Jodhpur</strong><br />

Sansi Basti<br />

Near Nala,<br />

<strong>Jodhpur</strong><br />

Waed No.45<br />

Bhagat ki<br />

Kothi, Near<br />

Peli tanki,<br />

<strong>Jodhpur</strong><br />

DISTRICT RURAL DEVELOPMENT AGENCY, JOHDPUR<br />

COMMUNITY, INSTITUTIONAL AND NIGHT-SOIL BASED BIOGAS PROGRAMME<br />

Name & Address <strong>of</strong><br />

society organisation<br />

owing/managing the<br />

plants<br />

No. <strong>of</strong><br />

gas<br />

lights,<br />

if any<br />

Aryan Assosiate,<br />

Jaipur 35 Night Soil Complete 975000 -- -- -- -- --<br />

Aryan Assosiate,<br />

Jaipur 35 Night Soil Complete 975000 -- -- -- -- --<br />

Aryan Assosiate,<br />

Jaipur 35 Night Soil Complete 975000 -- -- -- -- --<br />

Aryan Assosiate,<br />

Jaipur<br />

<strong>Progress</strong> <strong>Report</strong> in respect <strong>of</strong> Completed/ Under complition Plants<br />

Capacity<br />

(cum)<br />

Model<br />

(KVIC/<br />

NEDA/<br />

SULABH)<br />

Date <strong>of</strong> comp.<br />

Commissioning <strong>for</strong><br />

fully completed<br />

plants or details <strong>of</strong><br />

stage up to which<br />

work is completed<br />

Total<br />

Estimated<br />

Cost<br />

Quantity <strong>of</strong><br />

cattle<br />

dung (Kg)<br />

/ No. <strong>of</strong><br />

user<br />

available<br />

<strong>for</strong> the<br />

plant<br />

Details <strong>of</strong> gas utilisation<br />

No. <strong>of</strong> latrine<br />

attached with<br />

the plant<br />

35 Night Soil Complete 975000 -- -- -- -- --<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

<strong>District</strong> Level Summary <strong>Report</strong><br />

<strong>Monthly</strong> Per<strong>for</strong>mance <strong>Report</strong> on the SGRY (Ist Stream EAS)<br />

Year : 2001-2002 Disrtict : JODHPUR<br />

Month : Aug.'2002<br />

I. Summary Data (Upto the month)<br />

Total No. <strong>of</strong> works under taken : 408 (Nos.)<br />

Total No. <strong>of</strong> works completed (upto the month) : 20 (Nos.)<br />

Works under <strong>Progress</strong> (upto the month) : 213 (Nos.)<br />

Cumulative Expenditure (upto the month) : 59.04 (Lac Rs.)<br />

Employment Generation (Cum.upto the month) : 0.597 (Lac Mandays)<br />

II. Physical Per<strong>for</strong>mance<br />

Employment Generation Categorywise<br />

CATEGORIES<br />

(i) S.C. :<br />

(ii) S.T. :<br />

(iii) Other :<br />

(iv) Total :<br />

(v) Women :<br />

(vi) Landless :<br />

(vii) F.B.L. (Free Bonded Labourers) :<br />

Employment Generation<br />

During the<br />

Month<br />

0.168<br />

0.020<br />

0.088<br />

0.276<br />

0.147<br />

0.000<br />

--<br />

Cum. Upto<br />

the month<br />

0.297<br />

0.055<br />

0.245<br />

0.597<br />

0.248<br />

0.026<br />

--<br />

III. Financial Per<strong>for</strong>mance (Cumulative including the month under report)<br />

O.B. at<br />

the<br />

beginnin<br />

g <strong>of</strong> the**<br />

Releases as on date<br />

Centre State Total<br />

Other<br />

Receipt<br />

Total<br />

(1+4+5)<br />

On pending<br />

works <strong>of</strong> last<br />

Wage<br />

Non<br />

wage Wage<br />

On new works<br />

Cumulative Expenditure<br />

Non<br />

wage<br />

On<br />

maintenance<br />

Wag<br />

e<br />

Non<br />

wage<br />

Wage<br />

Total<br />

Non<br />

wage<br />

Total<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

0.00 104.79 34.93 139.72 0.00 139.72 13.980 10.20 25.49 9.37 0.00 0.00 39.47 19.57 59.040<br />

** Included Advance Ammount<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

MONTHLY PERFORMANCE REPORT OF SGRY (IInd Stream JGSY)<br />

Pr<strong>of</strong>orma - 1<br />

<strong>District</strong> : <strong>Jodhpur</strong> Year : 2002-2003 Month : Aug. '2002<br />

DISTRICT LEVEL SUMMARY REPORT<br />

Summary Data<br />

Total No. <strong>of</strong> works undertaken<br />

Total No. <strong>of</strong> works completed (upto the month)<br />

Works under progress (upto the month)<br />

No. <strong>of</strong> works undertaken exclusively <strong>for</strong> SC/ST<br />

No. <strong>of</strong> works completed (upto the month) <strong>for</strong> SC/ST<br />

Works under progress (upto the month) SC/ST<br />

No. <strong>of</strong> works undertaken exclusively <strong>for</strong> Disabled persons<br />

No. <strong>of</strong> works completed (upto the month) <strong>for</strong> Disabled persons<br />

475<br />

77<br />

340<br />

44<br />

12<br />

32<br />

0<br />

0<br />

(Nos.)<br />

(Nos.)<br />

(Nos.)<br />

(Nos.)<br />

(Nos.)<br />

(Nos.)<br />

(Nos.)<br />

(Nos.)<br />

Cumulative expenditure upto the month<br />

Expenditure on the works undertaken <strong>for</strong> disabled persons<br />

Expenditure on individual beneficiary schemes <strong>for</strong> SCs/STs<br />

Employment Generated (Cumulative upto the month)<br />

108.520<br />

0.000<br />

10.740<br />

1.890<br />

(Rs. In Lac)<br />

(Rs. In Lac)<br />

(Rs. In Lac)<br />

(Lac Mandays)<br />

PHYSICAL PERFORMANCE<br />

EMPLOYMENT GENERATED CATEGORY-WISE<br />

Categories<br />

SC<br />

ST<br />

Disabled Persons<br />

Others<br />

Total<br />

Women<br />

Landless<br />

Others<br />

(Lac Mandays)<br />

Employment Generated<br />

During the month Cum. upto the month<br />

0.602 0.757<br />

0.674<br />

0.320<br />

0.031 0.000<br />

0.569 0.813<br />

1.876 1.890<br />

0.100 0.129<br />

0.026 0.028<br />

0.000 0.000<br />

FINANCIAL PERFORMANCE (CUMULATIVE INCLUDING THE MONTH UNDER REPORT)<br />

(Rs. In Lacs)<br />

O.B. at the beginning<br />

Releases as on date<br />

Total<br />

Cumulative Expenditure<br />

<strong>of</strong> the year ** As<br />

Centre State Total Other receipts availability<br />

per C.A.<br />

Gen.working SC/ST Disabled Maint. Other Total<br />

1 2 3 4 5 6 7 8 9 10 11 12<br />

0.97 97.30 0.00 97.30 0.00 98.27 97.78 10.74 0.00 0.00 0.00 108.52<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


INDIRA AWAAS YOJANA<br />

Conversion <strong>of</strong> unserviceable kutcha houses into pucca/ semi pucca houses<br />

MONTHLY PERFORMANCE<br />

State : Rajasthan Month : Aug. '2002<br />

Year : 2002-2003<br />

Physical Per<strong>for</strong>mance<br />

1. Annual Target (Houses) 629 (in Nos.)<br />

2. Houses upgraded (Cumulative <strong>for</strong> the year including current month)<br />

Category<br />

During the month<br />

(a) SC 24<br />

(b) ST 6<br />

(c) Free bonded labourers<br />

(d) Ex-servicemen etc.<br />

(e) Disabled<br />

(f) Others 14<br />

Total 44<br />

Cumulative including current month<br />

26<br />

6<br />

-<br />

-<br />

-<br />

18<br />

50<br />

3. Percentage <strong>of</strong> houses upgraded to Annual Target 7.95 (%)<br />

4. Houses under upgradation 286 (in Nos.)<br />

Financial Per<strong>for</strong>mance<br />

1. Opening Balance as on 01.04.2002 2.43 (Rs. In lac)<br />

2. Central Releases 65.37 (Rs. In lac)<br />

3. State Releases 22.72 (Rs. In lac)<br />

4. Total availability <strong>of</strong> funds (1+2+3) 90.52 (Rs. In lac)<br />

5. Cumulative Expenditure upto end <strong>of</strong> month (Rs. In lac)<br />

Category<br />

During the month Cumulative including current month<br />

(i) SC 0.00<br />

17.300<br />

(ii) ST 0.00<br />

1.000<br />

(iii) Others 0.00<br />

7.680<br />

(iv) Total 0.00<br />

25.980<br />

6. Percentage <strong>of</strong> expen. to total availability <strong>of</strong> funds 28.70 %<br />

(Total Expenditure/Total availablity <strong>of</strong> funds)*100<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


INDIRA AWAAS YOJANA (UPGRADATION)<br />

Conversion <strong>of</strong> unserviceable kutcha houses into pucca/ semi pucca houses<br />

State : Rajasthan Month : Aug. '2002<br />

Physical Per<strong>for</strong>mance<br />

MONTHLY PERFORMANCE<br />

Year : 2002-2003<br />

1. Annual Target (Houses) 286 (in Nos.)<br />

2. Houses upgraded (Cumulative <strong>for</strong> the year including current month)<br />

Category<br />

During the month<br />

(a) SC 5<br />

(b) ST -<br />

(c) Free bonded labourers -<br />

(d) Ex-servicemen etc. -<br />

(e) Disabled<br />

(f) Others 5<br />

Total 10<br />

Cumulative including current month<br />

14<br />

2<br />

-<br />

-<br />

5<br />

21<br />

3. Percentage <strong>of</strong> houses upgraded to Annual Target (%)<br />

4. Houses under upgradation 154 (in Nos.)<br />

Financial Per<strong>for</strong>mance<br />

1. Opening Balance as on 01.04.2002 1.23 (Rs. In lac)<br />

2. Central Releases 16.34 (Rs. In lac)<br />

3. State Releases 5.68 (Rs. In lac)<br />

4. Total availability <strong>of</strong> funds (1+2+3) 23.25 (Rs. In lac)<br />

5. Cumulative Expenditure upto end <strong>of</strong> month (Rs. In lac)<br />

Category<br />

During the month Cumulative including current month<br />

(i) SC 0.000<br />

3.300<br />

(ii) ST 0.000<br />

0.800<br />

(iii) Others 0.000<br />

2.500<br />

(iv) Total 0.000<br />

6.600<br />

6. Percentage <strong>of</strong> expenditure to total availability <strong>of</strong> funds 28.39 %<br />

(Total Expenditure/Total availablity <strong>of</strong> funds)*100<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


PRADHAN MANTRI GRAMODAYA AWAAS YOJANA (UPGRADATION)<br />

Conversion <strong>of</strong> unserviceable kutcha houses into pucca/ semi pucca houses<br />

MONTHLY PERFORMANCE<br />

State : Rajasthan Month : Aug. '2002<br />

Physical Per<strong>for</strong>mance<br />

Year : 2002-2003<br />

1. Annual Target (Houses) 76 (in Nos.)<br />

2. Houses upgraded (Cumulative <strong>for</strong> the year including current month)<br />

Category<br />

During the month<br />

(a) SC 1<br />

(b) ST<br />

(c) Free bonded labourers -<br />

(d) Ex-servicemen etc. -<br />

(e) Disabled -<br />

(f) Others 3<br />

Total 4<br />

Cumulative including current month<br />

30<br />

1<br />

-<br />

-<br />

-<br />

17<br />

48<br />

3. Percentage <strong>of</strong> houses upgraded to Annual Target (%)<br />

4. Houses under upgradation 52 (in Nos.)<br />

Financial Per<strong>for</strong>mance<br />

1. Opening Balance as on 01.04.2002 1.37 (Rs. In lac)<br />

2. Central Releases 5.20 (Rs. In lac)<br />

3. State Releases 0.00 (Rs. In lac)<br />

4. Total availability <strong>of</strong> funds (1+2+3) 6.57 (Rs. In lac)<br />

5. Cumulative Expenditure upto end <strong>of</strong> month (Rs. In lac)<br />

Category<br />

During the month<br />

(i) SC 0.55<br />

(ii) ST 0.05<br />

(iii) Others 0.00<br />

(iv) Total 0.60<br />

Cumulative including current month<br />

2.05<br />

0.15<br />

0.82<br />

3.02<br />

6. Percentage <strong>of</strong> expenditure to total availability <strong>of</strong> funds 45.97%<br />

(Total Expenditure/Total availablity <strong>of</strong> funds)*100<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


PRADHAN MANTRI GRAMODAYA AWAAS YOJANA<br />

Conversion <strong>of</strong> unserviceable kutcha houses into pucca/ semi pucca houses<br />

MONTHLY PERFORMANCE<br />

State : Rajasthan Month : Aug. '2002<br />

Physical Per<strong>for</strong>mance<br />

Year : 2002-2003<br />

1. Annual Target (Houses) 133 (in Nos.)<br />

2. Houses upgraded (Cumulative <strong>for</strong> the year including current month)<br />

Category<br />

During the month<br />

(a) SC 6<br />

(b) ST 1<br />

(c) Free bonded labourers -<br />

(d) Ex-servicemen etc. -<br />

(e) Disabled -<br />

(f) Others 5<br />

Total 12<br />

Cumulative including current month<br />

63<br />

5<br />

-<br />

-<br />

-<br />

42<br />

110<br />

3. Percentage <strong>of</strong> houses upgraded to Annual Target (%)<br />

4. Houses under upgradation 98 (in Nos.)<br />

Financial Per<strong>for</strong>mance<br />

1. Opening Balance as on 01.04.2002 0.50 (Rs. In lac)<br />

2. Central Releases 18.20 (Rs. In lac)<br />

3. State Releases 0.00 (Rs. In lac)<br />

4. Total availability <strong>of</strong> funds (1+2+3) 18.70 (Rs. In lac)<br />

5. Cumulative Expenditure upto end <strong>of</strong> month (Rs. In lac)<br />

Category<br />

During the month Cumulative including current month<br />

(i) SC 1.450<br />

5.300<br />

(ii) ST 0.140<br />

0.240<br />

(iii) Others 1.200<br />

5.420<br />

(iv) Total 2.790<br />

10.960<br />

6. Percentage <strong>of</strong> expenditure to total availability <strong>of</strong> funds 58.61%<br />

(Total Expenditure/Total availablity <strong>of</strong> funds)*100<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


INDIRA AWAAS YOJANA<br />

PHYSICAL PERFORMANCE<br />

State : Rajasthan Month : Aug'2002 Year : 2002-2003<br />

(In Nos.)<br />

S.No.<br />

Houses Completed<br />

No. <strong>of</strong> Houses<br />

No. <strong>of</strong> Houses constructed<br />

No. <strong>of</strong><br />

Houses<br />

Annual<br />

allotted to<br />

Smokeless Sanitary<br />

under<br />

In the Name <strong>of</strong> In the Name <strong>of</strong> In the Name <strong>of</strong><br />

Target SC ST Others Total<br />

Physically<br />

Chulhas latrines<br />

Construction<br />

Female Male Husband & Wife<br />

Handicapped<br />

Installed Constructed<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 629 26 6 18 50 286 0 44 4 12 22 22<br />

S.No<br />

O.B. as on<br />

01.04.<br />

FINANCIAL PERFORMANCE<br />

Releases<br />

Total<br />

Expenditure<br />

Central State Total<br />

Availability<br />

(2+5)<br />

SC ST Others<br />

Total (7 to 9)<br />

%age <strong>of</strong><br />

Expenditure to total<br />

availability<br />

(10/6)*100<br />

1 2 3 4 5 6 7 8 9 10 11<br />

1 2.43 65.37 22.72 88.092 90.522 17.30 1.00 7.68 25.98 28.70<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


State : Rajasthan Month : Aug'2002 Year : 2002-2003<br />

(In Nos.)<br />

S.No.<br />

Annual<br />

Target<br />

Houses Completed<br />

SC ST Others Total<br />

INDIRA AWAAS YOJANA (UPGRADATION)<br />

PHYSICAL PERFORMANCE<br />

Houses<br />

under<br />

Construction<br />

No. <strong>of</strong> Houses<br />

allotted to<br />

Physically<br />

Handicapped<br />

In the Name <strong>of</strong><br />

Female<br />

No. <strong>of</strong> Houses constructed<br />

In the Name <strong>of</strong><br />

Male<br />

In the Name <strong>of</strong><br />

Husband & Wife<br />

Smokeless<br />

Chulhas<br />

Installed<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 286 14 2 5 21 154 0 15 5 5 0 0<br />

No. <strong>of</strong><br />

Sanitary<br />

latrines<br />

Constructed<br />

S.No<br />

O.B. as on<br />

01.04.<br />

FINANCIAL PERFORMANCE<br />

Releases<br />

Total<br />

Expenditure<br />

Availability<br />

Central State Total (2+5) SC ST Others<br />

Total (7 to 9)<br />

%age <strong>of</strong><br />

Expenditure to total<br />

availability<br />

(10/6)*100<br />

1 2 3 4 5 6 7 8 9 10 11<br />

1 1.23 16.34 5.68 22.02 23.25 3.30 0.80 2.50 6.6 28.39<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


PRADHAN MANTRI GRAMODAYA YOJANA (UPGRADATION)<br />

PHYSICAL PERFORMANCE<br />

State : Rajasthan Month : Aug'2002 Year : 2002-2003<br />

(In Nos.)<br />

S.No.<br />

Houses Completed<br />

No. <strong>of</strong> Houses<br />

No. <strong>of</strong> Houses constructed<br />

No. <strong>of</strong><br />

Houses<br />

Annual<br />

allotted to<br />

under<br />

Smokeless<br />

Target<br />

In the Name <strong>of</strong> In the Name <strong>of</strong> In the Name <strong>of</strong><br />

SC ST Others Total<br />

Physically<br />

Construction<br />

Chulhas<br />

Handicapped Female Male Husband & Wife<br />

Installed<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 76 30 1 17 48 52 0 43 0 2 0 0<br />

Sanitary<br />

latrines<br />

Constructed<br />

S.No<br />

O.B. as on<br />

01.04.<br />

FINANCIAL PERFORMANCE<br />

Releases<br />

Total<br />

Expenditure<br />

Availability<br />

Central State Total (2+5) SC ST Others<br />

Total (7 to 9)<br />

%age <strong>of</strong><br />

Expenditure to total<br />

availability<br />

(10/6)*100<br />

1 2 3 4 5 6 7 8 9 10 11<br />

1 1.37 5.20 0.00 5.20 6.57 2.05 0.15 0.82 3.02 45.97<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


State : Rajasthan Month : Aug'2002 Year : 2002-2003<br />

(In Nos.)<br />

S.No.<br />

Annual<br />

Target<br />

Houses Completed<br />

SC ST Others Total<br />

PRADHAN MANTRI GRAMODAYA YOJANA<br />

PHYSICAL PERFORMANCE<br />

Houses<br />

under<br />

Construction<br />

No. <strong>of</strong> Houses<br />

allotted to<br />

Physically<br />

Handicapped<br />

In the Name <strong>of</strong><br />

Female<br />

No. <strong>of</strong> Houses constructed<br />

In the Name <strong>of</strong><br />

Male<br />

In the Name <strong>of</strong><br />

Husband & Wife<br />

Smokeless<br />

Chulhas<br />

Installed<br />

1 2 3 4 5 6 7 8 9 10 11 12 13<br />

1 133 63 5 42 110 98 0 86 0 15 10 10<br />

No. <strong>of</strong><br />

Sanitary<br />

latrines<br />

Constructed<br />

S.No<br />

O.B. as on<br />

01.04.<br />

FINANCIAL PERFORMANCE<br />

Releases<br />

Total<br />

Expenditure<br />

Availability<br />

Central State Total (2+5) SC ST Others<br />

Total (7 to 9)<br />

%age <strong>of</strong><br />

Expenditure to total<br />

availability<br />

(10/6)*100<br />

1 2 3 4 5 6 7 8 9 10 11<br />

1 0.50 18.20 0.00 18.20 18.7 5.30 0.24 5.42 10.96 58.61<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


dzekad<br />

ftyk xzkeh.k fodkl vfHkdj.k<br />

dk;kZy; vfrfjDr dyDVj ¼fodkl½] tks/kiqj<br />

fnukad<br />

ifj;kstuk funs'kd ¼,l-,-ih-½<br />

,oa insu 'kklu mi lfpo<br />

xzkeh.k fodkl foHkkx<br />

t;iqj<br />

fo"k; %& vkaxuokMh Hkou ifj;kstuk kkk dh izxfr fjiksVZ ekg 08@2002<br />

egksn;]<br />

mijksDr fo"k;kUrxZr fuosnu gs fd fu/kkZfjr izi= esa vkxuokMh Hkou ifj;kstuk kkk vUrxZr ekfld izxfr<br />

fjiksVZ fuEukuqlkj gS%&<br />

1 Lohd`r vkaxuokMh dsUnz 80<br />

2 r`rh; izkstsDV gsrq fuekZ.k gsrq vkoafVr Hkouksa dh la[;k 84<br />

3 r`rh; izkstsDV gsrq vkoafVr Hkouksa gsrq jkT; Lrj ls nh xbZ jkf'k ¼yk[k½ 90.93<br />

4 ftyk xzkeh.k fodkl vfHkdj.k Lrj ls Lohd`r vkaxuokMh dsUnz Hkouksa dh la[;k 80<br />

5 Lohd`r vkaxuokMh dsUnzksa ij O;; jkf'k 76.15<br />

6 iw.kZ djk;s x;s vkaxuokMh Hkouksa dh la[;k 72<br />

7 izxfrjr vkaxuokMh Hkouksa dh la[;k 8<br />

8 izkjEHk ugha gq, vkaxuokMh dsUnz Hkouksa dh la[;k 0<br />

9 dkWye 8 esa vafdr Hkouksa ds izkjEHk ugha gksus ds dkj.k &<br />

10 izkjEHk gksdj can gks x;s vkaxuokMh dsUnz Hkouksa dh la[;k &<br />

11 dkWye 10 esa vafdr Hkouksa dk fuekZ.k can gksus ds dkj.k &<br />

tks/kiqj<br />

vfrfjDr dyDVj ¼fodkl½<br />

2002-2003


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

CREDIT CUM SUBSIDY SCHEME<br />

Month :Aug'2002<br />

I. Physical Per<strong>for</strong>mance (Cummulative including the current month)<br />

S.No.<br />

<strong>District</strong><br />

Annual<br />

Target<br />

<strong>District</strong> Level <strong>Report</strong><br />

Total<br />

(4+5+6)<br />

Freed<br />

Bonded<br />

Labourers<br />

Ex-<br />

Service<br />

Men<br />

CCSS - <strong>District</strong><br />

Form II (a)<br />

<strong>Monthly</strong><br />

<strong>District</strong> Level<br />

Units : Numbers<br />

No. <strong>of</strong> Houses Completed<br />

House<br />

No. <strong>of</strong> Houses Completed <strong>for</strong> Number <strong>of</strong><br />

Under<br />

SC ST Others<br />

<strong>Progress</strong><br />

Disabled Women<br />

Smokeless<br />

Chullah<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />

1 <strong>Jodhpur</strong> 250 -- -- -- -- 27 -- -- -- -- -- --<br />

Sanitary<br />

Latrines<br />

Note : Application <strong>of</strong> BPL families has been <strong>for</strong>warded to Banks <strong>for</strong> sanction <strong>of</strong> Loan<br />

SC/ST 102<br />

Others 215<br />

Total 317<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

Month :Aug'2002<br />

II. Financial Per<strong>for</strong>mance<br />

RAJASTHAN CREDIT CUM SUBSIDY SCHEME<br />

CCSS - <strong>District</strong><br />

<strong>Monthly</strong><br />

<strong>District</strong> Level<br />

S.No.<br />

<strong>District</strong><br />

Opening<br />

Balance<br />

as on<br />

01.04.02<br />

Allocation 2002-2003<br />

Centre<br />

State<br />

Total<br />

(4+5)<br />

Centre<br />

Release<br />

State<br />

Total<br />

(7+8)<br />

Total<br />

Availability<br />

(3+9)<br />

Expenditure<br />

SC ST Others<br />

Exp. Upto<br />

March'02<br />

(11+12+13)<br />

% Exp.<br />

To Total<br />

Available<br />

Freed<br />

Bonded<br />

Labourers<br />

Expenditure on<br />

Ex-<br />

Service<br />

men<br />

Disabled<br />

Women<br />

Total Loan<br />

Disbursed<br />

Total Loan<br />

Recovered<br />

Average<br />

Loan<br />

Disbursed<br />

Average<br />

Loan<br />

Recovered<br />

Credit<br />

Subsidy<br />

Ratio<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24<br />

1 <strong>Jodhpur</strong> 1.81 0 0 0 0 0 0 1.81 - -- - 2.70 -- -- -- -- -- -- -- -- -- --<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

STATE PLAN (Sub Health Centre) PROGRESS REPORT OF CIVIL WORKS<br />

PART-I WORK IN PROGRESS<br />

S.No. Sub Health's work & place Block / PHC / PS Sanctioned<br />

Cost<br />

Month :Aug, 2002 (Rs. in Lacs)<br />

Previous<br />

month<br />

Current<br />

month<br />

1 2 3 4 5 6 7 8 9<br />

1 BASANI MAMNA BALESAR 2.50 0.00 0.00 2.25 O<br />

2 GHODERLAI BALESAR 2.50 0.00 0.00 2.25 O<br />

3 HINGOLI BHOPALGARH 2.50 0.00 0.00 2.50 O<br />

4 JHAK BILARA 2.50 0.00 0.00 2.03 O<br />

5 SINDLO KI DHANI LUNI 2.50 0.00 0.00 2.50 O<br />

6 MOGARA KALLAN LUNI 3.00 0.00 0.00 2.70 O<br />

7 KAKELAV LUNI 2.50 0.00 0.00 2.50 O<br />

8 HANIA OSIAN 2.50 0.00 0.00 2.00 O<br />

9 KHINDAKOR OSIAN 2.50 0.00 0.00 2.25 O<br />

10 KHAWANIA OSIAN 3.42 0.00 0.00 3.00 O<br />

11 JATABAS PHALODI 2.50 0.00 0.00 2.50 O<br />

12 MORIYA PHALODI 2.50 0.00 0.00 2.28 O<br />

13 RAYDA PHALODI 2.50 0.00 0.00 2.50 O<br />

14 SUVAP PHALODI 2.50 0.00 0.00 2.50 O<br />

15 PALINA PHALODI 2.50 0.00 0.00 2.50 O<br />

16 LAXMAN NAGAR PHALODI 2.50 0.00 0.00 2.26 O<br />

17 JHRDE KI BHAKARI PHALODI 2.50 0.00 0.00 2.00 O<br />

18 BHOJAKOR PHALODI 2.50 0.00 0.00 2.00 O<br />

19 FATEH SAGAR PHALODI 2.50 0.00 0.00 2.25 O<br />

20 BENGTI KHURD PHALODI 2.50 0.00 0.00 2.50 O<br />

21 MANDLA KHURD PHALODI 3.31 0.00 0.00 2.41 O<br />

22 KRISHAN NAGAR PHALODI 3.00 0.00 0.00 2.29 O<br />

23 CHANDAR NAGAR PHALODI 2.96 0.00 0.00 2.46 O<br />

24 BHIYASAR(BARJASAR) PHALODI 3.38 0.00 0.00 2.50 O<br />

25 GUMANSINGHPURA SHERGARH 2.50 0.00 0.00 2.13 O<br />

26 GANTYALA MANDOR 3.47 1.50 0.00 1.50 O<br />

27 DANGIYAWAS MANDOR 3.47 1.50 1.00 2.50 O<br />

28 JAJIWAL BHATAN MANDOR 3.47 1.50 1.00 2.50 N<br />

29 BUDHNAGAR MANDOR 3.47 0.00 2.50 2.50 O<br />

30 BAVERLA MANDOR 3.47 0.00 2.00 2.00 O<br />

31 SURPURA MANDOR 3.47 0.00 2.25 2.25 O<br />

32 JALELYAICHA MANDOR 3.47 0.00 1.50 1.50 N<br />

33 ROHILANADI PHALODI 3.47 0.00 3.47 3.47 0<br />

34 CHANDRAKH OSIAN 3.47 2.00 1.00 3.00 M<br />

35 LAVERA KHURED OSIAN 3.47 0.70 2.40 3.10 M<br />

36 PALDIRANAVATA BHOPALGARH 3.47 0.00 1.50 1.50 M<br />

37 ANWANA OSIAN 3.47 1.50 1.40 2.90 M<br />

38 AMRUTNAGAR BALESAR 3.47 0.00 1.50 2.50 M<br />

39 DEVELYA MANDOR 3.47 0.00 2.00 2.00 O<br />

40 PABUSAR SHERGARH 3.47 0.00 1.50 1.50 E<br />

41 KOLUPABUJI PHALODI 3.47 0.00 1.16 1.16 E<br />

TOTAL 122.09 8.70 26.18 94.94<br />

S.No. Physical <strong>Progress</strong> Code No. S.No. Bottleneckness<br />

Code No.<br />

1 Taking Over Land A 1 Non Availability <strong>of</strong> Land<br />

01<br />

2 Preparation <strong>of</strong> Drawing B 2 Non Availability <strong>of</strong> Plans<br />

02<br />

3 Technical Sanction C 3 Estimate not Sanctioned<br />

03<br />

4 Award <strong>of</strong> Work D 4 Tender not Approved<br />

04<br />

5 Completed upto Plinth E 5 Non Availability <strong>of</strong> Fund<br />

05<br />

6 Completed upto Ro<strong>of</strong> Level F 6 Land equate Admn. Sanctoin<br />

06<br />

7 Ro<strong>of</strong> Laid G 7 Court Stay<br />

07<br />

8 Plaster / Floor Completed H 8 Slow progress <strong>of</strong> Contractor<br />

08<br />

9 Jotnery Work Completed I 9 Any other Reason<br />

09<br />

10 Internal Sanatery Fitting J<br />

11 Internal Electric Fitting K<br />

12 External Services L<br />

13 Development Work Comp. M<br />

14 Work Completed N<br />

15 Building Handed over O<br />

Expenditure during<br />

ABSTRACT<br />

Exp. Upto<br />

the month<br />

Physical<br />

status <strong>of</strong> work<br />

(Code No.)<br />

Observations,<br />

if any<br />

Work<br />

Deptt.<br />

YEAR<br />

Sanctioned<br />

Ongoing Exp.<br />

Cancelled Dispute<br />

Completed<br />

Trans.<br />

STATE PLAN 41 34 7 94.94 32 -- --<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

MONTHLY PROGRESS REPORT - APNA GAON APNA KAAM<br />

<strong>District</strong> : <strong>Jodhpur</strong> Month : Aug' 2002<br />

As per C.A. Audit <strong>Report</strong> Balance as on 01.04.02 : 46.65<br />

Given to Executive Agencies be<strong>for</strong>e 01.04.00 : 0<br />

Adjusted against advances given be<strong>for</strong>e 01.04.02 : 0<br />

INCOMPLETE WORKS OF PREVIOUS YEARS :<br />

1 No. <strong>of</strong> incomplete works as on 01.04.2000 : 7<br />

2 Amount required to complete the incomplete works <strong>of</strong><br />

previous years as on 01.04.2000<br />

: 10.65<br />

SANCTION WORKS OF CURRENT YEAR :<br />

3 No. <strong>of</strong> sanctioned works : 0<br />

AMONTH OF SANCTIONED WORKS<br />

4 AGAK (State Plan) Head : 0.000<br />

5 Other Schemes : 0.000<br />

6 Public Contribution : 0.000<br />

7 Total (4+5+6) : 0.000<br />

8 Amount released in Current Year : 0.00<br />

EXPENDITURE (Rs. in Lacs) :<br />

ON INCOMPLETE WORKS OF PREVIOUS YEARS<br />

9 AGAK (State Plan) Head : 1.773<br />

10 Other Schemes : 0.000<br />

11 Public Contribution : 0.000<br />

12 Total (9+10+11) : 1.773<br />

ON WORKS SANCTIONED IN CURRENTS YEAR<br />

13 AGAK (State Plan) Head : 0.000<br />

14 Other Schemes : 0.000<br />

15 Public Contribution : 0.000<br />

16 Total (13+14+15) : 0.000<br />

NO. OF COMPLETE WORKS :<br />

17 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 2<br />

18 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : 0<br />

NO. OF CANCELLED WORKS :<br />

19 Out <strong>of</strong> works <strong>of</strong> previous year : 2<br />

20 Out <strong>of</strong> Current Year : --<br />

NO. OF ONGOING WORKS :<br />

Out <strong>of</strong> Incomplete works <strong>of</strong> previous years<br />

21 Out <strong>of</strong> sanctioned works in 96-97 & be<strong>for</strong>e : 1<br />

22 Out <strong>of</strong> sanctioned works in 97-98 : 0<br />

23 Out <strong>of</strong> sanctioned works in 98-99 : 2<br />

24 Out <strong>of</strong> sanctioned works in 99-2000 : 0<br />

25 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : 0<br />

NO. OF WORKS NOT STARTED :<br />

26 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 0<br />

27 Out <strong>of</strong> sanctioned <strong>of</strong> current year : 0<br />

28 No. <strong>of</strong> Incomplete & closed works : 0<br />

PENDING FOR SANCTIONS :<br />

29 No. <strong>of</strong> works : 0<br />

30 Required Amount <strong>of</strong> AGAK (State Plan) Head : 0<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

MONTHLY PROGRESS REPORT - RURAL GROWTH CENTRE<br />

DISTRICT : JODHPUR Month : Aug'2002<br />

As per C.A. Audit <strong>Report</strong> Balance as on 01.04.2002 : 20.44<br />

Advance given to Exe. Agencies be<strong>for</strong>e 01.04.2002 : 0<br />

Adjusted against advances given be<strong>for</strong>e 01.04.2002 : 0<br />

Annual Allocation : 0.00 Lacs<br />

INCOMPLETE WORKS OF PREVIOUS YEARS :<br />

1 No. <strong>of</strong> incomplete works as on 01.04.2002 : 32<br />

2 Amount required to complete the incomplete works <strong>of</strong> previous years : 12.386<br />

as on 01.04.2002<br />

SANCTION WORKS OF CURRENT YEAR :<br />

FOR RGC<br />

3 No. <strong>of</strong> sanctioned works : 0<br />

4 Amonth <strong>of</strong> sanctioned works : 0.000<br />

FOR MRGC<br />

5 No. <strong>of</strong> sanctioned works : 0<br />

6 Amonth <strong>of</strong> sanctioned works : 0.00<br />

EXPENDITURE (Rs. in Lacs) :<br />

ON RGC<br />

7 On Incomplete works <strong>of</strong> previous years : 1.325<br />

8 On works sanctioned in Current Year : 0.000<br />

9 Total Expenditure : 1.325<br />

ON MRGC<br />

10 On Incomplete works <strong>of</strong> previous years : 0.000<br />

11 On works sanctioned in Current Year : 0.000<br />

12 Total Expenditure : 0.000<br />

NO. OF COMPLETE WORKS :<br />

RGC<br />

13 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 11<br />

14 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : --<br />

MRGC<br />

15 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 3<br />

16 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : --<br />

NO. OF CANCELLED WORKS :<br />

RGC<br />

17 Out <strong>of</strong> works <strong>of</strong> previous year : 2<br />

18 Out <strong>of</strong> New Sanctions : --<br />

MRGC<br />

19 Out <strong>of</strong> works <strong>of</strong> previous year : 0<br />

20 Out <strong>of</strong> New Sanctions : --<br />

NO. OF ONGOING WORKS :<br />

RGC<br />

21 Out <strong>of</strong> sanctioned works in 97-98 & be<strong>for</strong>e : 9<br />

22 Out <strong>of</strong> sanctioned works in 98-99 : 1<br />

23 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : --<br />

MRGC<br />

24 Out <strong>of</strong> sanctioned works in 97-98 & be<strong>for</strong>e : 0<br />

25 Out <strong>of</strong> sanctioned works in 98-99 : 6<br />

26 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : --<br />

NO. OF WORKS NOT STARTED :<br />

RGC<br />

27 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : --<br />

28 Out <strong>of</strong> sanctioned <strong>of</strong> current year : --<br />

29 No. <strong>of</strong> Incomplete & closed works : --<br />

MRGC<br />

30 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : --<br />

31 Out <strong>of</strong> sanctioned <strong>of</strong> current year : --<br />

32 No. <strong>of</strong> Incomplete & closed works : --<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003


izi= & d<br />

dk;kZy; ftyk dyDVj@eq[; dk;Zdkjh vf/kdkjh] ftyk ifj"kn] tks/kiqj<br />

ek-loksZPp U;k;ky; fjV fiVh'ku ¼flfoy½ u- 196 o"kZ 2001 esa fnukad 08-05-02 dks fn;s<br />

x;s vkns'kksa dh vogsyuk ckcr izkIr f'kdk;rksa dk ekfld izfrosnu<br />

ftyk % tks/kiqj ekg % vxLr 2002<br />

xr ekg rd izkIr dqy f'kdk;rksa dh la[;k 0<br />

izfrosnu ekg esa izkIr f'kdk;rksa dh la[;k 0<br />

dqy 0<br />

xr ekg rd fuLrkfjr f'kdk;rksa dh la[;k 0<br />

izfrosnu ekg esa fuLrkfjr f'kdk;rksa dh la[;k 0<br />

dqy 0<br />

'ks"k yfEcr f'kdk;rksa dh la[;k 0<br />

vfrfjDr dyDVj ¼fodkl½<br />

tks/kiqj<br />

2002-2003


DESERT DEVELOPMENT PROGRAMME (WATERSHED) PROGRESS AT A GLANCE<br />

DISTRICT : JODHPUR<br />

Format-2(1)<br />

Month : Aug.'2002<br />

S.N<br />

o.<br />

<strong>District</strong><br />

Total<br />

Cost<br />

Total<br />

Amount<br />

Recd.<br />

Balance<br />

as on<br />

01.04.02<br />

Amount<br />

Recd. duing<br />

02-03<br />

Total<br />

Exp. upto<br />

the month<br />

Percentage<br />

Exp.<br />

Scheme<br />

Allot.<br />

Forest S & C PRI Other Total<br />

(Rs. in Lacs/ Works in Nos.)<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21<br />

Scheme<br />

Sanction<br />

No. <strong>of</strong> PIA<br />

DPR<br />

Approved<br />

1 DDP-I Phase 2425 2425 54.39 0 54.39 2.98 5.48 97 122 55 54 0 11 120 120 0 120 0<br />

DPR<br />

under<br />

Prog.<br />

Scheme<br />

Comp.<br />

Scheme<br />

under<br />

Prog.<br />

Remarks<br />

2 DDP-II Phase 625 281.23 80.16 31.25 111.41 58.99 52.95 25 25 0 19 5 1 25 22 3 0 25<br />

3 DDP-III Phase 780 116.99 64.5 0 64.5 10.32 16.00 26 26 0 10 16 0 26 15 11 0 26<br />

4 DDP-IV Phase 690 103.51 103.51 0 103.51 0 0.00 23 23 0 0 23 0 23 0 0 0 23<br />

Total<br />

4520 2926.7 302.56 31.25 333.81 72.29 21.66 171 196 55 83 44 12 194 157 14 120 74<br />

2002-2003 com1


DESERT DEVELOPMENT PROGRAMME (COMBATIFICATION) PROGRESS<br />

DISTRICT : JODHPUR<br />

Month : Aug.'2002<br />

S.N<br />

o.<br />

<strong>District</strong><br />

Total<br />

Cost<br />

Amount<br />

Recd.<br />

Balance<br />

as on<br />

01.04.02<br />

Amount<br />

Recd. duing<br />

02-03<br />

Total<br />

Exp. upto<br />

the month<br />

Percentage<br />

Exp.<br />

Scheme<br />

allotment<br />

Forest GP Other<br />

Format-2(2)<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17<br />

1 DDP-I Phase 1838 832.49 91.5 0 91.5 69.98 76.48 1 1 1 0 0 0 1<br />

Sanctioned<br />

Agency<br />

(Rs. in Lacs/ Works in Nos.)<br />

Schem Schem<br />

e e under Remarks<br />

Comp. Prog.<br />

2 DDP-II Phase 720 108 50.3 0 50.3 56.47 112.27 1 1 1 0 0 0 1<br />

3 DDP-III Phase 960 144 144 0 144 0 0.00 0 0 0 0 0 0 0<br />

Total<br />

3518 1084.5 285.8 0 285.8 126.45 44.24 2 2 2 0 0 0 2<br />

2002-2003 com1


ftyk % tks/kiqj<br />

ekg % vxLr'2002<br />

dz-l- ;kstuk dk uke<br />

f<strong>of</strong>HkUu jkstxkj mUeq[kh ,oa vU; fodkl ;kstukvksa dh izxfr<br />

1-4-02 dks<br />

'ks"k jkf'k<br />

02&03 esa<br />

izkIr jkf'k<br />

;ksx<br />

O;;<br />

izfr'kr<br />

O;;<br />

1-4-02 dks<br />

'ks"k dk;Z<br />

02&03 esa u;s<br />

Loh- dk;Z<br />

dqy dk;Z iw.kZ dk;Z<br />

izi=&1<br />

¼:Ik;s yk[kksa esa@dk;Z la[;k esa½<br />

izxfr ij<br />

dk;Z<br />

dk;Z izkjEHk<br />

ugha<br />

fujLr<br />

fo-fo-<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />

1 ,l-th-vkj-okbZ- 0.97 269.45 270.42 170.12 62.91 45 838 883 97 553 227 6<br />

2 ,e-ih-,y-,-Mh- 117.9 300 417.9 158.19 37.85 144 54 198 27 171 0 0<br />

3 ,e-,y-,-,y-,-Mh 487.1 0 487.1 160.01 32.85 132 153 285 74 196 0 15<br />

4 bZ-,-,l ¼okVj'kSM½ 6.77 0 6.77 1.5 22.16 20 0 20 0 20 0 0<br />

5 vkbz-,-okbZ- 2.43 87.86 90.29 25.98 28.77 49 502 551 50 286 215 0<br />

6 vkbZ-,-okbZ- ¼vi½ 1.23 23.2 24.43 6.6 27.02 21 237 258 21 154 83 0<br />

7 ih-th-,e-okbZ ¼vkokl½ 1.37 18.2 19.57 10.96 56.00 149 89 238 110 98 27 3<br />

8 ih-th-,e-okbZ ¼vixzs½ 0.5 5.2 5.7 3.02 52.98 77 41 118 48 52 16 2<br />

9 ih-,e-th-okbZ ¼bUQzk½ 2.4 2.6 5 0 0.00 5 0 5 2 3 0 0<br />

10 ch-,-Mh-ih- 0 0 0 0 #DIV/0! 0 0 0 0 0 0 0<br />

2556 429 1533 568 26<br />

2002-2003 com2


ftyk % tks/kiqj<br />

ekg % vxLr '2002<br />

dz-l-<br />

;kstuk dk uke<br />

1-4-02 dks<br />

'ks"k<br />

02&03 esa<br />

izkIr jkf'k<br />

O;fDrxr ykHkkfUor ;kstuk<br />

;ksx<br />

O;;<br />

izfr'kr<br />

O;;<br />

izi=&3<br />

¼:Ik;s yk[kksa esa@dk;Z la[;k esa½<br />

<strong>for</strong>j.k ¼:Ik;s yk[kksa esa½<br />

ykHkkfUor<br />

vuqnku _.k ;ksx<br />

1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />

1 ,l-th-,l-okbZ- -111.90 71.40 -40.50 14.06 -34.72 232 Lacs 544 0 75 12.440 5.940 18.380<br />

y{;<br />

vkosnu Ik=<br />

Hksts<br />

Lohd`r@<br />

izf'k{k.kkFk<br />

hZ<br />

2 Vh-,-Mh-,- ¼VkMk½ 0.00 0.00 0.00 0.00 #DIV/0! 0 0 0 0 0.000 0.000 0.000<br />

3 ,e-,-Mh-, ¼ekMk½ 21.37 0.00 21.37 0.100 0.47 196 0 0 4 0.100 0.000 0.100<br />

4 ck;ksxSl ¼fjok;oy½ 0.94 4.20 5.14 0.80 15.56 25 0 0 0 0.000 0.000 0.000<br />

5 vkj-,l-lh-Mh-lh-<br />

¼jk-vuq-tkfr fodkl<br />

;kstuk,a½<br />

13.40 44.71 58.11 33.20 57.13 3268 2445 366 366 33.200 62.690 95.890<br />

2002-2003 com2


ftyk % tks/kiqj<br />

ekg % Aug.'2002<br />

izi=&6<br />

tks/kiqj lEHkkx esa f<strong>of</strong>HkUu ;kstukUrxZr xsgwa vkoaVu mBko dh lwpuk<br />

¼eSfVªd Vu esa½ ykHkkfUor ifjokj ¼la[;k½<br />

dz-l- ftyk fo'ks"k fooj.k<br />

vkoaVu mBko <strong>for</strong>j.k y{; izkfIr;ka<br />

1 2 3 4 5 6 7 8<br />

1 dke ds cnys vukt ;kstuk 2478 2478 2478 0 0<br />

2 vRU;ksn; vUu ;kstuk 242 254 254 6902 6902<br />

3 vUuiw.kkZ ;kstuk 152.01 152.01 152.01 5067 5067<br />

4 ch-ih-,y- ifjokj 1202 1395 1395 42722 42722<br />

7@02 ls 12<br />

,e-Vh- cdk;k<br />

mBko 'kkfey gS<br />

kk fd'r 7@02<br />

ls 9@02 rd<br />

7@02 dk<br />

cdk;k 193 ,e-<br />

Vh- 'kkfey gS<br />

5 ,-ih-,y-ifjokj 11097 313 313 0 0<br />

6 jk"Vªh; iks"kkgkj ;kstuk 8665.44 8665.44 8665.44 8665.44 0<br />

;ksx<br />

23836.45 13257.45 13257.45 63356.44 54691<br />

2002-2003 com3


vYi cpr ,oa lkekftd lqj{kk ;kstuk;sa<br />

tks/kiqj lEHkkx<br />

ftyk % tks/kiqj<br />

ekg % Aug.'2002<br />

izi=&4<br />

dz-l- ;kstuk bdkbZ y{; izkfIr;ka izfr'kr<br />

1 2 3 4 5 6<br />

1 vYi cpr dk;Zdze yk[k :Ik;s 23100 5051.91 21.87<br />

2 Hkw[k.M vkoaVu la[;k 1000 301 30.1<br />

3 mUur pwYgk la[;k 0 0 0<br />

4<br />

1-jk"Vªh; o`)koLFkk isa'ku la[;k 0 12362 0<br />

2-jkT; o`)koLFkk isa'ku la[;k 0 1575 0<br />

3-fo/kok isa'ku la[;k 0 5923 0<br />

4-fodykax isa'ku la[;k 0 2406 0<br />

5 jk"Vªh; izlwfr ykHk la[;k 0 110 0<br />

6 jk"Vªh; ikfjokfjd lgk;rk la[;k 0 86 0<br />

7 ckfydk le`f) ;kstuk la[;k 0 83 0<br />

8 jk"Vªh; iks"kkgkj dk;Zdze ¼Nk=½ la[;k 0 0 0<br />

2002-2003 com3


ftyk% tks/kiqj<br />

ekg % Aug.'2002<br />

izi=&5<br />

lw=-la- ;kstuk bdkbZ okf"kZd y{; ekfld y{; miyfC/k;ka izfr'kr<br />

1 2 3 4 5 6 7<br />

01 ch ,l-th-vkj-okbZ yk[k<br />

01 lh ,l-,l-vkbZ-;wfuV la[;k<br />

05 , ljIyl Hkwfe vkoaVu ,dM<br />

07 , lqjf{kr is;ty O;oLFkk xzke la[;k<br />

08 Mh cPpksa dk Vhdkdj.k gtkjksa esa<br />

09 , ulcUnh gtkjksa esa<br />

09 ch vkbZ-;w-Mh- la[;k<br />

09 lh vkbZ-lh-Mh-,l- [k.M la[;k<br />

09 Mh vkaxuokMh la[;k<br />

11 , ,l-lh-ykHkkfUor ifjokj la[;k<br />

1 ch ,l-Vh-ykHkkfUor ifhjokj la[;k<br />

14 , vkokl Hkwfe vkoaVu la[;k<br />

14 ch fuekZ.k lgk;rk la[;k<br />

14 lh vkbZ-,-okbZ- la[;k<br />

14 ,Q vkb-,-okbZ- dzeksUur la[;k<br />

14 Mh bZ-MCY;w-,l-vkokl bdkbZ la[;k<br />

14 bZ ,y-vkbZ-th- vkokl la[;k<br />

15 dPph cLrh lq/kkj la[;k<br />

16 o`{kkjksi.k gSDVj<br />

16 , o`{kkjksi.k yk[kksa esa<br />

20 lw=h dk;Zdze<br />

tks/kiqj lEHkkx izxfr izfrosnu<br />

2002-2003 com3


18 mfpr ewY; dh nqdku la[;k<br />

19 , xkao dk fo/kqfrdj.k la[;k<br />

19 ch iEi lSV fo/kqfrdj.k la[;k<br />

19 lh bEizwOM pwYgk la[;k<br />

19 Mh ck;ksxSl IykaV la[;k<br />

2002-2003 com3


DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />

<strong>District</strong> Level Summary <strong>Report</strong><br />

<strong>Monthly</strong> Per<strong>for</strong>mance <strong>Report</strong> on the SGRY (Ist Stream EAS)<br />

Year : 2001-2002 Disrtict : JODHPUR<br />

Month : Upto 20.09.02<br />

I. Summary Data (Upto the month)<br />

Total No. <strong>of</strong> works under taken : 414 (Nos.)<br />

Total No. <strong>of</strong> works completed (upto the month) : 25 (Nos.)<br />

Works under <strong>Progress</strong> (upto the month) : 346 (Nos.)<br />

Cumulative Expenditure (upto the month) : 117.31 (Lac Rs.)<br />

Employment Generation (Cum.upto the month) : 2.11 (Lac Mandays)<br />

II. Physical Per<strong>for</strong>mance<br />

Employment Generation Categorywise<br />

CATEGORIES<br />

(i) S.C. :<br />

(ii) S.T. :<br />

(iii) Other :<br />

(iv) Total :<br />

(v) Women :<br />

(vi) Landless :<br />

(vii) F.B.L. (Free Bonded Labourers) :<br />

Employment Generation<br />

During the<br />

Month<br />

0.263<br />

0.035<br />

1.215<br />

1.513<br />

0.248<br />

0.029<br />

--<br />

Cum. Upto<br />

the month<br />

0.560<br />

0.090<br />

1.460<br />

2.110<br />

0.496<br />

0.055<br />

--<br />

III. Financial Per<strong>for</strong>mance (Cumulative including the month under report)<br />

O.B. at<br />

the<br />

beginnin<br />

g <strong>of</strong> the**<br />

Releases as on date<br />

Centre State Total<br />

Other<br />

Receipt<br />

Total<br />

(1+4+5)<br />

On pending<br />

works <strong>of</strong> last<br />

Wage<br />

Non<br />

wage Wage<br />

On new works<br />

Cumulative Expenditure<br />

Non<br />

wage<br />

On<br />

maintenance<br />

Wag<br />

e<br />

Non<br />

wage<br />

Wage<br />

Total<br />

Non<br />

wage<br />

Total<br />

1<br />

2<br />

3<br />

4<br />

5<br />

6<br />

7<br />

8<br />

9<br />

10<br />

11<br />

12<br />

13<br />

14<br />

15<br />

0.00 104.79 34.93 139.72 0.00 139.72 13.980 10.20 72.01 21.12 0.00 0.00 85.99 31.32 117.310<br />

** Included Advance Ammount<br />

Addl. Collector (Dev.)<br />

DRDA, <strong>Jodhpur</strong><br />

2002-2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!