Monthly Progress Report of MPLAD for Lok Sabha ... - Jodhpur District
Monthly Progress Report of MPLAD for Lok Sabha ... - Jodhpur District
Monthly Progress Report of MPLAD for Lok Sabha ... - Jodhpur District
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> <strong>Lok</strong> <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE CONSTITUENCY :<br />
NAME OF THE MP :<br />
10th LS :<br />
11th LS :<br />
12tH LS :<br />
13tH LS :<br />
NAME OF THE NODAL DISTRICT :<br />
PHONE No. WITH S.T.D. CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the constituency:<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
<strong>Jodhpur</strong><br />
Sh. Ashok Gehlot, Sh. Jaswant Singh<br />
Sh. Ashok Gehlot<br />
Sh. Ashok Gehlot<br />
Sh. Ashok Gehlot<br />
Sh. Jaswant Singh<br />
<strong>Jodhpur</strong><br />
0291-650322<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
2002-2003<br />
TOTAL<br />
No.<strong>of</strong> work<br />
(a) By the 10th LS MP 137<br />
(b) By the 11th LS MP 158<br />
(c) By the 12th LS MP 75<br />
(d) By the 13th LS MP 681<br />
(e) TOTAL (a+b+c+d) 1051<br />
3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong>: No.<strong>of</strong> work<br />
(a) The 10th LS MP 134<br />
(b) The 11th LS MP 145<br />
(c) The 12th LS MP 60<br />
(d) The 13th LS MP 495<br />
(e) TOTAL (a+b+c+d) 834<br />
4. Total unsanctioned balance available with the constituency 1(c )-3(e)<br />
5. Total No. <strong>of</strong> works completed in the constituency<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
5.000<br />
100.000<br />
100.000<br />
100.000<br />
0.000<br />
150.000<br />
150.000<br />
350.000<br />
250.000<br />
200.000<br />
1405.000<br />
-<br />
1405.000<br />
Estimated cost<br />
197.280<br />
248.286<br />
112.060<br />
1011.037<br />
1568.663<br />
Amount sanctioned<br />
191.280<br />
224.036<br />
94.360<br />
778.120<br />
1287.796<br />
117.204<br />
743<br />
91<br />
1087.860<br />
60.815<br />
1148.675<br />
256.325<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-Jaipur 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE RS MP :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH S.T.D. CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the RS MP :<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
**Note : Amt. Recd. In the year 2001-2002 from other distt. Rs. 18.48<br />
Lacs due to retirement <strong>of</strong> other district's MP (Rajya <strong>Sabha</strong>)<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Sh. M.G.K. Menon, Dr. L.M. Singhvi<br />
<strong>Jodhpur</strong><br />
<strong>District</strong> Collector, <strong>Jodhpur</strong><br />
0291-650322<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
2002-2003<br />
TOTAL<br />
No.<strong>of</strong> work<br />
1993-94<br />
1994-95 15<br />
1995-96 74<br />
1996-97 5<br />
1997-98 3<br />
1998-99 1<br />
1999-00 20<br />
2000-01 48<br />
2001-02 82<br />
2002-03 36<br />
Total 284<br />
3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />
1993-94<br />
1994-95 14<br />
1995-96 74<br />
1996-97 5<br />
1997-98 3<br />
1998-99 1<br />
1999-00 20<br />
2000-01 45<br />
2001-02 72<br />
2002-03 31<br />
Total 265<br />
4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
0.000<br />
0.000<br />
200.000<br />
0.000<br />
0.000<br />
50.000<br />
0.000<br />
200.000<br />
268.480<br />
100.000<br />
818.480<br />
-<br />
818.480<br />
Estimated cost<br />
75.750<br />
126.130<br />
3.000<br />
3.920<br />
10.000<br />
87.250<br />
186.195<br />
259.350<br />
151.834<br />
903.429<br />
Amount sanctioned<br />
74.290<br />
126.130<br />
3.000<br />
3.920<br />
10.000<br />
86.966<br />
172.080<br />
219.684<br />
106.750<br />
802.820<br />
15.660<br />
168<br />
97<br />
488.924<br />
93.215<br />
582.139<br />
236.341<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-Jaipur 10/2/02
Appendix-4<br />
FORMAT FOR THE PURPOSE OF RELEASE OF FUNDS UNDER<br />
MEMBER OF PARLIAMENT LOCAL AREA DEVELOPMENT SCHEME (<strong>MPLAD</strong>S)<br />
FOR RAJYA SABHA MPs<br />
Month : Aug'2002<br />
STATEMENT OF EXPENDITURE UNDER <strong>MPLAD</strong>S<br />
NAME OF THE STATE : RAJASTHAN<br />
NAME OF THE CONSTITUENCY : JODHPUR<br />
NAME OF THE RS MP : LM Singhvi<br />
ADDRESS : DISTT. COLLECTOR, JODHPUR<br />
PHONE No. WITH S.T.D. CODE : 0291 - 650322<br />
FAX :<br />
NAME OF THE DISTRICT IN<br />
:<br />
e-mail :<br />
JODHPUR<br />
WHICH THE MP HAS<br />
1.Total Funds received <strong>for</strong> the constituency:<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
##, ** 2001-2002<br />
2002-2003<br />
TOTAL<br />
No.<strong>of</strong> work<br />
186<br />
3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong> No.<strong>of</strong> work<br />
168<br />
4. Total unsanctioned balance available with the constituency 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in the constituency 94<br />
6. Total No. <strong>of</strong> works started but not completed 74<br />
7. Total actual expenditure -<br />
## Amt. Rs. 100 Lacs transferred by GOI to Gujrat Govt. <strong>for</strong> earthquake relief is added up.<br />
** Amt. Recd. In the year 2000-2001 from other distt. Rs. 18.48 Lacs due to retirement <strong>of</strong><br />
other district's MP (Rajya <strong>Sabha</strong>)<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
--<br />
0.000<br />
0.000<br />
--<br />
--<br />
50.000<br />
0.000<br />
200.000<br />
368.480<br />
100.000<br />
718.480<br />
-<br />
718.480<br />
Estimated cost<br />
784.629<br />
Amount sanctioned<br />
692.423<br />
26.057<br />
479.283<br />
Date :<br />
<strong>District</strong> Collector<br />
<strong>Jodhpur</strong><br />
Note:(1)The next due installment <strong>of</strong> Rs.50 lacs is released only when the amount in respect <strong>of</strong> column No.4 is reported as less than<br />
Rs.50 lacs.<br />
(2)The Nodal <strong>District</strong> collector is required to furnish a consolidated report including the in<strong>for</strong>mation pertaining to other <strong>District</strong> falling<br />
in the constituency where funds were transferred on recommendation <strong>of</strong> the MP.<br />
(3) Sanctioned amount is the cost <strong>of</strong> such schemes only <strong>for</strong> which financial sanctions have already been issued. Cost <strong>of</strong> schemes<br />
which have got only administrative approval (and not financial sanction) should not be reported as sanctioned in column No.3.<br />
2002-2003 10/2/02
FORMAT FOR THE PURPOSE OF RELEASE OF FUNDS UNDER<br />
MEMBER OF PARLIAMENT LOCAL AREA DEVELOPMENT SCHEME (<strong>MPLAD</strong>S)<br />
FOR LOK SABHA MPs<br />
STATEMENT OF EXPENDITURE UNDER <strong>MPLAD</strong>S<br />
NAME OF THE STATE :<br />
NAME OF THE CONSTITUENCY :<br />
NAME OF THE MP :<br />
10th LS :<br />
11th LS :<br />
12tH LS :<br />
13tH LS :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH S.T.D. CODE :<br />
FAX :<br />
1.Total Funds received <strong>for</strong> the constituency:<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
RAJASTHAN<br />
JODHPUR<br />
SH. ASHOK GEHLOT<br />
SH. ASHOK GEHLOT<br />
SH. ASHOK GEHLOT<br />
SH. JASWANT SINGH VISHNOI<br />
JODHPUR<br />
DISTT. COLLECTOR, JODHPUR<br />
0291 - 650322<br />
e-mail :<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
2002-2003<br />
TOTAL<br />
No.<strong>of</strong> work<br />
(a) By the 10th LS MP 137<br />
(b) By the 11th LS MP 158<br />
(c) By the 12th LS MP 75<br />
(d) By the 13th LS MP 681<br />
(e) TOTAL (a+b+c+d) 1051<br />
3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong> No.<strong>of</strong> work<br />
(a) The 10th LS MP 134<br />
(b) The 11th LS MP 145<br />
(c) The 12th LS MP 60<br />
(d) The 13th LS MP 495<br />
(e) TOTAL (a+b+c+d) 834<br />
4. Total unsanctioned balance available with the constituency 1(c )-3(e)<br />
5. Total No. <strong>of</strong> works completed in the constituency 743<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell 91<br />
7. Total actual expenditure -<br />
APPENDIX - 3<br />
Month : Aug'2002<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
5.000<br />
100.000<br />
100.000<br />
100.000<br />
0.000<br />
150.000<br />
150.000<br />
350.000<br />
250.000<br />
200.000<br />
1405.000<br />
-<br />
1405.000<br />
Estimated cost<br />
197.280<br />
248.286<br />
112.060<br />
1011.037<br />
1568.663<br />
Amount sanctioned<br />
191.280<br />
224.036<br />
94.360<br />
778.120<br />
1287.796<br />
117.204<br />
-<br />
-<br />
1148.675<br />
Date :<br />
<strong>District</strong> Collector,<br />
<strong>Jodhpur</strong><br />
Note:(1)The next due installment <strong>of</strong> Rs.50 lacs is released only when the amount in respect <strong>of</strong> column No.4 is reported as less than<br />
Rs.50 lacs.<br />
(2)The Nodal <strong>District</strong> collector is required to furnish a consolidated report including the in<strong>for</strong>mation pertaining to other <strong>District</strong> falling<br />
in the constituency where funds were transferred on recommendation <strong>of</strong> the MP.<br />
(3) Sanctioned amount is the cost <strong>of</strong> such schemes only <strong>for</strong> which financial sanctions have already been issued. Cost <strong>of</strong> schemes<br />
which have got only administrative approval (and not financial sanction) should not be reported as sanctioned in column No.3.<br />
2002-2003 10/2/02
STATEMENT OF EXPENDITURE UNDER <strong>MPLAD</strong>S<br />
NAME OF THE STATE :<br />
NAME OF THE CONSTITUENCY :<br />
NAME OF THE RS MP :<br />
ADDRESS :<br />
PHONE No. WITH S.T.D. CODE :<br />
FAX :<br />
NAME OF THE DISTRICT IN<br />
:<br />
WHICH THE MP HAS<br />
RECOMMENDED WORKS<br />
1.Total Funds received <strong>for</strong> the constituency:<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
TOTAL<br />
No.<strong>of</strong> work<br />
98<br />
3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong> No.<strong>of</strong> work<br />
97<br />
4. Total unsanctioned balance available with the constituency 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in the constituency 88<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell 9<br />
7. Total actual expenditure -<br />
Appendix - 4<br />
FORMAT FOR THE PURPOSE OF RELEASE OF FUNDS UNDER<br />
MEMBER OF PARLIAMENT LOCAL AREA DEVELOPMENT SCHEME (<strong>MPLAD</strong>S)<br />
FOR RAJYA SABHA MPs<br />
RAJASTHAN<br />
JODHPUR<br />
Sh. MGK Menon<br />
DISTT. COLLECTOR, JODHPUR<br />
0291 - 650322<br />
e-mail :<br />
JODHPUR<br />
Month : Aug'2002<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
--<br />
--<br />
200.000<br />
--<br />
--<br />
--<br />
--<br />
--<br />
200.000<br />
0.000<br />
200.000<br />
Estimated cost<br />
218.80<br />
Amount sanctioned<br />
210.397<br />
-10.397<br />
-<br />
-<br />
202.856<br />
Date :<br />
<strong>District</strong> Collector,<br />
<strong>Jodhpur</strong><br />
Note:(1)The next due installment <strong>of</strong> Rs.50 lacs is released only when the amount in respect <strong>of</strong> column No.4 is reported as less than<br />
Rs.50 lacs.<br />
(2)The Nodal <strong>District</strong> collector is required to furnish a consolidated report including the in<strong>for</strong>mation pertaining to other <strong>District</strong> falling<br />
in the constituency where funds were transferred on recommendation <strong>of</strong> the MP.<br />
(3) Sanctioned amount is the cost <strong>of</strong> such schemes only <strong>for</strong> which financial sanctions have already been issued. Cost <strong>of</strong> schemes<br />
which have got only administrative approval (and not financial sanction) should not be reported as sanctioned in column No.3.<br />
2002-2003 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE RS MP :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH STD CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the RS MP :<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Consolidate<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
TOTAL<br />
No.<strong>of</strong> work<br />
1993-94 0<br />
1994-95 0<br />
1995-96 0<br />
1996-97 0<br />
1997-98 0<br />
1998-99 8<br />
1999-00 3<br />
2000-01 5<br />
2001-02 10<br />
Total 26<br />
3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />
1993-94 0<br />
1994-95 0<br />
1995-96 0<br />
1996-97 0<br />
1997-98 0<br />
1998-99 8<br />
1999-00 3<br />
2000-01 6<br />
2001-02 7<br />
Total 24<br />
4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2001<br />
8. Expenditure during the year 2001-2002<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
0.000<br />
0.000<br />
0.000<br />
0.000<br />
0.000<br />
5.000<br />
6.000<br />
31.000<br />
44.000<br />
86.000<br />
0.000<br />
98.500<br />
Estimated cost<br />
0.000<br />
0.000<br />
0.000<br />
0.000<br />
0.000<br />
5.000<br />
21.000<br />
14.000<br />
47.760<br />
87.760<br />
Amount sanctioned<br />
0.000<br />
0.000<br />
0.000<br />
0.000<br />
0.000<br />
5.000<br />
21.000<br />
16.000<br />
18.845<br />
18<br />
6<br />
49.295<br />
14.622<br />
63.917<br />
34.583<br />
37.655<br />
79.655<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-other-distt 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE RS MP :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH STD CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the RS MP :<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Sh. Mahesh Chandra Sharma<br />
Churu<br />
<strong>District</strong> Collector, Churu<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
TOTAL<br />
No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99 8<br />
1999-00 1<br />
2000-01<br />
2001-02 1<br />
Total 10<br />
3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99 8<br />
1999-00 1<br />
2000-01<br />
2001-02 1<br />
Total 10<br />
4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
5.000<br />
6.000<br />
5.000<br />
16.000<br />
16.000<br />
Estimated cost<br />
5.000<br />
6.000<br />
5.000<br />
16.000<br />
Amount sanctioned<br />
0.040<br />
10<br />
0<br />
14.370<br />
0.970<br />
15.340<br />
0.660<br />
5.000<br />
6.000<br />
4.960<br />
15.960<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-other-distt 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE RS MP :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH STD CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the RS MP :<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Sh. Ramdas Agarwal<br />
<strong>District</strong> Collector, Jaipur<br />
<strong>District</strong> Collector, Jaipur<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
TOTAL<br />
No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00<br />
2000-01 1<br />
2001-02 4<br />
Total 5<br />
3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00<br />
2000-01 1<br />
2001-02 3<br />
Total 4<br />
4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
2.000<br />
18.500<br />
20.500<br />
20.500<br />
Estimated cost<br />
2.000<br />
18.500<br />
20.500<br />
Amount sanctioned<br />
3.236<br />
2<br />
2<br />
4.500<br />
10.077<br />
14.577<br />
5.923<br />
2.000<br />
15.264<br />
17.264<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-other-distt 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE RS MP :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH STD CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the RS MP :<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Sh. Onkar Singh<br />
Ajmer<br />
<strong>District</strong> Collector, Ajmer<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
TOTAL<br />
No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00 2<br />
2000-01 1<br />
2001-02<br />
Total 3<br />
3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00 2<br />
2000-01 1<br />
2001-02<br />
Total 3<br />
4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
17.000<br />
Amount sanctioned<br />
0.000<br />
2<br />
1<br />
15.550<br />
0.000<br />
15.550<br />
1.450<br />
17.000<br />
17.000<br />
17.000<br />
Estimated cost<br />
15.000<br />
2.000<br />
15.000<br />
2.000<br />
17.000<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-other-distt 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE RS MP :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH STD CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the RS MP :<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Smt. Jamuna Barupal<br />
Bikaner<br />
<strong>District</strong> Collector, Bikaner<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
TOTAL<br />
No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00<br />
2000-01<br />
2001-02 1<br />
Total 1<br />
3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00<br />
2000-01 1<br />
2001-02<br />
Total 1<br />
4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
2.000<br />
2.000<br />
2.000<br />
Estimated cost<br />
2.000<br />
2.000<br />
Amount sanctioned<br />
0.000<br />
1<br />
0<br />
1.500<br />
1.500<br />
0.500<br />
2.000<br />
2.000<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-other-distt 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE RS MP :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH STD CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the RS MP :<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Sh. Santosh Bagoria<br />
Bhilwara<br />
<strong>District</strong> Collector, Bhilwara<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
TOTAL<br />
No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00<br />
2000-01<br />
2001-02 1<br />
Total 1<br />
3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00<br />
2000-01<br />
2001-02 1<br />
Total 1<br />
4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
10.000<br />
10.000<br />
10.000<br />
Estimated cost<br />
10.000<br />
10.000<br />
Amount sanctioned<br />
0.000<br />
1<br />
0.000<br />
10.000<br />
10.000<br />
10.000<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-other-distt 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> <strong>Lok</strong> <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE CONSTITUENCY :<br />
NAME OF THE MP :<br />
10th LS :<br />
11th LS :<br />
12tH LS :<br />
13tH LS :<br />
NAME OF THE NODAL DISTRICT :<br />
PHONE No. WITH S.T.D. CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the constituency:<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Barmer<br />
Sh. Ram Niwas Mirdha/Col. Sona Ram<br />
Sh. Ram Niwas Mirdha<br />
Col. Sona Ram Choudhary<br />
Col. Sona Ram Choudhary<br />
Barmer<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
2002-2003<br />
TOTAL<br />
No.<strong>of</strong> work<br />
(a) By the 10th LS MP 0<br />
(b) By the 11th LS MP 16<br />
(c) By the 12th LS MP 0<br />
(d) By the 13th LS MP 98<br />
(e) TOTAL (a+b+c+d) 114<br />
3. No. and cost <strong>of</strong> the works sanctioned on recommendations <strong>of</strong>: No.<strong>of</strong> work<br />
(a) The 10th LS MP 0<br />
(b) The 11th LS MP 16<br />
(c) The 12th LS MP 0<br />
(d) The 13th LS MP 85<br />
(e) TOTAL (a+b+c+d) 101<br />
4. Total unsanctioned balance available with the constituency 1(c )-3(e)<br />
5. Total No. <strong>of</strong> works completed in the constituency<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
0.620<br />
12.500<br />
12.500<br />
10.000<br />
5.000<br />
11.000<br />
5.000<br />
40.000<br />
20.000<br />
6.000<br />
122.620<br />
-<br />
122.620<br />
Estimated cost<br />
0.000<br />
25.520<br />
0.000<br />
110.457<br />
135.977<br />
Amount sanctioned<br />
0.000<br />
25.520<br />
0.000<br />
100.165<br />
125.685<br />
-3.065<br />
78<br />
23<br />
86.859<br />
28.510<br />
115.369<br />
7.251<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-other-distt 10/2/02
<strong>Monthly</strong> <strong>Progress</strong> <strong>Report</strong> <strong>of</strong> <strong>MPLAD</strong> <strong>for</strong> Rajya <strong>Sabha</strong> MPs<br />
<strong>District</strong> : <strong>Jodhpur</strong><br />
NAME OF THE STATE :<br />
NAME OF THE RS MP :<br />
NAME OF THE NODAL DISTRICT :<br />
ADDRESS :<br />
PHONE No. WITH STD CODE :<br />
FAX : email :<br />
1.Total Funds received <strong>for</strong> the RS MP :<br />
(a) Fund received from the Govt. <strong>of</strong> India<br />
(b) Total amount <strong>of</strong> interest accrued on the funds<br />
(c) TOTAL (a+b)<br />
2.Total No. and cost <strong>of</strong> works recommended:<br />
Month : Aug'2002<br />
Rajasthan<br />
Sh. Jaswant Singh Jasol<br />
Barmer<br />
<strong>District</strong> Collector, Barmer<br />
YEAR<br />
1993-1994<br />
1994-1995<br />
1995-1996<br />
1996-1997<br />
1997-1998<br />
1998-1999<br />
1999-2000<br />
2000-2001<br />
2001-2002<br />
2002-2003<br />
TOTAL<br />
No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00<br />
2000-01 3<br />
2001-02 3<br />
2002-03 4<br />
Total 10<br />
3. Total No. and cost <strong>of</strong> works sanctioned No.<strong>of</strong> work<br />
1993-94<br />
1994-95<br />
1995-96<br />
1996-97<br />
1997-98<br />
1998-99<br />
1999-00<br />
2000-01 3<br />
2001-02 2<br />
Total 5<br />
4. Total unsanctioned balance available in respect <strong>of</strong> the MP 1(c )-3<br />
5. Total No. <strong>of</strong> works completed in respect <strong>of</strong> the MP<br />
6. Total No. <strong>of</strong> works started but not completed/not started/cancell<br />
7. Expenditure upto March'2002<br />
8. Expenditure during the year 2002-2003<br />
9. Total Expenditure upto the Month (7+8)<br />
10. Balance amount as on 01.__________[1(c)-9]<br />
FUNDS RECEIVED<br />
(Rs. In Lacs)<br />
10.000<br />
10.500<br />
12.500<br />
33.000<br />
33.000<br />
Estimated cost<br />
10.000<br />
12.260<br />
10.500<br />
32.760<br />
Amount sanctioned<br />
15.569<br />
3<br />
2<br />
13.375<br />
3.575<br />
16.950<br />
16.050<br />
10.000<br />
7.431<br />
17.431<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003 mp-other-distt 10/2/02
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % QykSnh ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />
Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />
;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />
;kstuk izkjEHk ls<br />
lanfHkZr =Sekl esa<br />
Ø-la- lsDVj @ dk;Z<br />
lanfHkZr =Sekl rd fujLr lanfHkZr =Sekl esa<br />
fo'ks"k<br />
lanfHkZr =Sekl rd<br />
fooj.k<br />
Lohd`r dk;ksZa dh Lohd`r dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh<br />
jkf'k<br />
jkf'k la[;k jkf'k la[;k la[;k ykxr la[;k ykxr la[;k<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 is;ty<br />
v- gs.MiEi<br />
c- is;ty ;kstuk 4.25 2 3.00 1 3.00 1<br />
l- ikjEifjd tyL=ksr ds fodkl dk;Z 0.15 1 0.15 1 0.15 1<br />
;ksx 0.00 0 4.40 3 0 0.00 3.15 2 3.15 2<br />
2 f'k{kk<br />
v- Hkou 1.50 1 59.42 44 5.66 4 39.22 30<br />
c- Hkou foLrkj 3.96 5 2.36 2 3.56 4<br />
l- dEI;wVj<br />
n- vU; lkexzh<br />
;ksx 1.50 1 63.38 49 0 0.00 8.02 6 42.78 34<br />
3 ifjogu<br />
v- lM+d<br />
1- xzsoy 2.49 2 5.49 4 3.00 2<br />
2- MCyw ch ,e<br />
3- ch-Vh-<br />
4- vU; izdkj<br />
;ksx ¼1&4½ 2.49 2 5.49 4 0 0.00 0.00 0 3.00 2<br />
c- iqfy;k@jiV 2.00 1 2.00 1<br />
dqy ;ksx ¼v$c½ 4.49 3 7.49 5 0 0.00 0.00 0 3.00 2<br />
4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />
v- Hkou<br />
c- Hkou foLrkj<br />
l- fpfdRlk midj.k<br />
n- vkaxuokM+h Hkou<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
5 flapkbZ<br />
v- ykq flapkbZ dk;Z<br />
c- rkykcksa dh lQkbZ@MhflfYVax 2.00 1 2.00 1<br />
l- lkeq-tyks-flapkbZ ;kstuk<br />
;ksx 0.00 0 2.00 1 0 0.00 0.00 0 2.00 1<br />
6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />
2002-2003 QPR-mlalad
v- vkcknh {ks= esa lM+d@[kjatk@ukyh 1.00 1 1.00 1<br />
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh 4.00 2 30.75 17 2.25 2 23.75 13<br />
Hkou<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 1.50 2<br />
n- cl LVs.M<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 2.00 2 2.00 2<br />
;ksx 4.00 2 35.25 22 0 0.00 2.25 2 26.75 16<br />
7 fo|qfrdj.k ds dk;Z<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou 1.50 1 1.50 1<br />
c- iapk;rh jkt laLFkkvksa ds Hkou<br />
;ksx 0.00 0 1.50 1 0 0.00 0.00 0 1.50 1<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
9.99 6 114.02 81 0 0.00 13.42 10 79.18 56<br />
2002-2003 QPR-mlalad
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % 'ksjx
v- vkcknh {ks= esa lM+d@[kjatk@ukyh 2.90 2 0.90 1 2.90 2<br />
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh 2.00 1 23.95 15 9.57 5 15.20 10<br />
Hkou<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk<br />
n- cl LVs.M 3.00 2 3.00 2<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 9.00 6 7.00 3<br />
;ksx 2.00 1 38.85 25 0 0.00 10.47 6 28.10 17<br />
7 fo|qfrdj.k ds dk;Z<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou 0.50 1 0.50 1<br />
c- iapk;rh jkt laLFkkvksa ds Hkou<br />
;ksx 0.00 0 0.50 1 0 0.00 0.00 0 0.50 1<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou 2.00 1<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 2.00 1 0 0.00 0.00 0 0.00 0<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
10.27 12 93.37 75 2 6.21 21.87 15 57.80 43<br />
2002-2003 QPR-mlalad
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % Hkksikyx
v- vkcknh {ks= esa lM+d@[kjatk@ukyh 4.50 4 3.62 3<br />
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />
1.47 1 1.47 1<br />
Hkou<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 0.70 2 0.70 2<br />
n- cl LVs.M<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 2.05 4 2.05 4<br />
;ksx 0.00 0 8.72 11 0 0.00 0.00 0 7.84 10<br />
7 fo|qfrdj.k ds dk;Z<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou<br />
c- iapk;rh jkt laLFkkvksa ds Hkou<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
0.00 0 46.38 43 0 0.00 13.06 9 39.79 35<br />
2002-2003 QPR-mlalad
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % vkSfl;ka ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />
Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />
;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />
;kstuk izkjEHk ls<br />
Ø-la- lsDVj @ dk;Z<br />
lanfHkZr =Sekl esa<br />
fujLr<br />
lanfHkZr =Sekl esa<br />
fo'ks"k<br />
lanfHkZr =Sekl rd<br />
lanfHkZr =Sekl rd<br />
fooj.k<br />
Lohd`r dk;ksZa dh Lohd`r dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh dk;ksZa dh<br />
jkf'k<br />
jkf'k la[;k jkf'k la[;k la[;k ykxr la[;k ykxr la[;k<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 is;ty<br />
v- gs.MiEi<br />
c- is;ty ;kstuk<br />
l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
2 f'k{kk<br />
v- Hkou 28.14 19 5.85 4 22.14 16<br />
c- Hkou foLrkj<br />
l- dEI;wVj<br />
n- vU; lkexzh<br />
;ksx 0.00 0 28.14 19 0 0.00 5.85 4 22.14 16<br />
3 ifjogu<br />
v- lM+d<br />
1- xzsoy<br />
2- MCyw ch ,e<br />
3- ch-Vh-<br />
4- vU; izdkj<br />
;ksx ¼1&4½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
c- iqfy;k@jiV<br />
dqy ;ksx ¼v$c½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />
v- Hkou 1.40 1 1.40 1 1.40 1<br />
c- Hkou foLrkj<br />
l- fpfdRlk midj.k<br />
n- vkaxuokM+h Hkou<br />
;ksx 0.00 0 1.40 1 0 0.00 1.40 1 1.40 1<br />
5 flapkbZ<br />
v- ykq flapkbZ dk;Z<br />
c- rkykcksa dh lQkbZ@MhflfYVax<br />
l- lkeq-tyks-flapkbZ ;kstuk<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />
v- vkcknh {ks= esa lM+d@[kjatk@ukyh 2.00 1<br />
2002-2003 QPR-mlalad
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />
Hkou<br />
13.38 9 1.50 1 10.38 7<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk<br />
n- cl LVs.M<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 1.50 2 1.50 2<br />
;ksx 0.00 0 16.88 12 0 0.00 1.50 1 11.88 9<br />
7 fo|qfrdj.k ds dk;Z<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou<br />
c- iapk;rh jkt laLFkkvksa ds Hkou 1.00 1 1.00 1<br />
;ksx 0.00 0 1.00 1 0 0.00 0.00 0 1.00 1<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
0.00 0 47.42 33 0 0.00 8.75 6 36.42 27<br />
2002-2003 QPR-mlalad
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % lwjlkxj ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />
Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />
;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />
;kstuk izkjEHk ls<br />
lanfHkZr =Sekl esa<br />
lanfHkZr =Sekl esa<br />
Ø-la- lsDVj @ dk;Z<br />
lanfHkZr =Sekl rd fujLr<br />
lanfHkZr =Sekl rd<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
la[;k<br />
jkf'k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 is;ty<br />
v- gs.MiEi<br />
c- is;ty ;kstuk 3.80 13 1.44 4 2.95 11<br />
l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />
;ksx 0.00 0 3.80 13 0 0.00 1.44 4 2.95 11<br />
2 f'k{kk<br />
v- Hkou 23.47 19 11.05 9 23.47 19<br />
c- Hkou foLrkj 26.60 21 10.95 9 24.60 19<br />
l- dEI;wVj 5.90 2 5.90 2<br />
n- vU; lkexzh<br />
;ksx 0.00 0 55.97 42 0 0.00 22.00 18 53.97 40<br />
3 ifjogu<br />
v- lM+d<br />
1- xzsoy<br />
2- MCyw ch ,e 10.00 2 5.00 1 5.00 1 5.5 KM<br />
3- ch-Vh-<br />
4- vU; izdkj<br />
;ksx ¼1&4½ 0.00 0 10.00 2 0 0.00 5.00 1 5.00 1<br />
c- iqfy;k@jiV 1.25 1 1.25 1<br />
dqy ;ksx ¼v$c½ 0.00 0 11.25 3 0 0.00 5.00 1 6.25 2<br />
4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />
v- Hkou 1.40 1 1.40 1 1.40 1<br />
c- Hkou foLrkj 1.82 3 1.82 3<br />
l- fpfdRlk midj.k<br />
n- vkaxuokM+h Hkou<br />
;ksx 0.00 0 3.22 4 0 0.00 1.40 1 3.22 4<br />
5 flapkbZ<br />
v- ykq flapkbZ dk;Z 1.89 1 1.89 1<br />
c- rkykcksa dh lQkbZ@MhflfYVax 1.50 1 1.50 1<br />
l- lkeq-tyks-flapkbZ ;kstuk<br />
;ksx 0.00 0 3.39 2 0 0.00 0.00 0 3.39 2<br />
6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />
fo'ks"k<br />
fooj.k<br />
2002-2003 QPR-mlalad
v- vkcknh {ks= esa lM+d@[kjatk@ukyh 0.40 1<br />
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />
Hkou<br />
18.97 12 4.00 3 16.47 11<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 1.40 1 14.66 10 2.50 2 12.26 8<br />
n- cl LVs.M<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 7.25 9 1.50 1 6.55 8<br />
;ksx 1.40 1 41.28 32 0 0.00 8.00 6 35.28 27<br />
7 fo|qfrdj.k ds dk;Z<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou 0.71 1 0.71 1<br />
c- iapk;rh jkt laLFkkvksa ds Hkou 1.25 1 1.25 1<br />
;ksx 0.00 0 1.96 2 0 0.00 0.00 0 1.96 2<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou 2.00 1<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 2.00 1 0 0.00 0.00 0 0.00 0<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
1.40 1 122.87 99 0 0.00 37.84 30 107.02 88<br />
2002-2003 QPR-mlalad
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % ljnkjiqjk ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />
Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />
;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />
;kstuk izkjEHk ls<br />
lanfHkZr =Sekl esa<br />
Ø-la- lsDVj @ dk;Z<br />
lanfHkZr =Sekl rd fujLr<br />
lanfHkZr =Sekl esa<br />
lanfHkZr =Sekl rd<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
la[;k<br />
jkf'k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 is;ty<br />
v- gs.MiEi<br />
c- is;ty ;kstuk 0.50 1 0.50 1<br />
l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />
;ksx 0.00 0 0.50 1 0 0.00 0.00 0 0.50 1<br />
2 f'k{kk<br />
v- Hkou 31.55 18 7.80 5 19.80 11<br />
c- Hkou foLrkj 4.50 2 1.50 1 1.50 1<br />
l- dEI;wVj 5.00 1 5.00 1<br />
n- vU; lkexzh<br />
;ksx 0.00 0 41.05 21 0 0.00 9.30 6 26.30 13<br />
3 ifjogu<br />
v- lM+d<br />
1- xzsoy<br />
2- MCyw ch ,e<br />
3- ch-Vh-<br />
4- vU; izdkj<br />
;ksx ¼1&4½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
c- iqfy;k@jiV<br />
dqy ;ksx ¼v$c½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />
v- Hkou 3.00 2 3.00 2<br />
c- Hkou foLrkj<br />
l- fpfdRlk midj.k 7.16 2 7.16 2<br />
n- vkaxuokM+h Hkou<br />
;ksx 0.00 0 10.16 4 0 0.00 0.00 0 10.16 4<br />
5 flapkbZ<br />
v- ykq flapkbZ dk;Z<br />
c- rkykcksa dh lQkbZ@MhflfYVax<br />
l- lkeq-tyks-flapkbZ ;kstuk<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />
fo'ks"k<br />
fooj.k<br />
2002-2003 QPR-mlalad
v- vkcknh {ks= esa lM+d@[kjatk@ukyh<br />
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />
Hkou<br />
9.75 6 1.25 1 7.31 5<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 8.00 4 0.50 1 2.50 2<br />
n- cl LVs.M<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 8.42 6 0.60 1 3.32 4<br />
;ksx 0.00 0 26.17 16 0 0.00 2.35 3 13.13 11<br />
7 fo|qfrdj.k ds dk;Z<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou<br />
c- iapk;rh jkt laLFkkvksa ds Hkou<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
0.00 0 77.88 42 0 0.00 11.65 9 50.09 29<br />
2002-2003 QPR-mlalad
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
la[;k<br />
jkf'k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 is;ty<br />
v- gs.MiEi<br />
c- is;ty ;kstuk<br />
l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
2 f'k{kk<br />
v- Hkou 18.94 6 3.00 1 6.49 2<br />
c- Hkou foLrkj<br />
l- dEI;wVj 5.00 1 5.00 1<br />
n- vU; lkexzh<br />
;ksx 0.00 0 23.94 7 0 0.00 3.00 1 11.49 3<br />
3 ifjogu<br />
v- lM+d<br />
1- xzsoy<br />
2- MCyw ch ,e<br />
3- ch-Vh-<br />
4- vU; izdkj<br />
;ksx ¼1&4½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
c- iqfy;k@jiV<br />
dqy ;ksx ¼v$c½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />
v- Hkou<br />
c- Hkou foLrkj 6.00 2 3.00 1<br />
l- fpfdRlk midj.k 2.00 1<br />
n- vkaxuokM+h Hkou<br />
;ksx 0.00 0 8.00 3 0 0.00 0.00 0 3.00 1<br />
5 flapkbZ<br />
v- ykq flapkbZ dk;Z<br />
c- rkykcksa dh lQkbZ@MhflfYVax<br />
l- lkeq-tyks-flapkbZ ;kstuk<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />
v- vkcknh {ks= esa lM+d@[kjatk@ukyh<br />
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % tks/kiqj 'kgj ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />
Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />
;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />
;kstuk izkjEHk ls<br />
lanfHkZr =Sekl esa<br />
lanfHkZr =Sekl esa<br />
Ø-la- lsDVj @ dk;Z<br />
lanfHkZr =Sekl rd fujLr<br />
lanfHkZr =Sekl rd<br />
2002-2003 QPR-mlalad<br />
fo'ks"k<br />
fooj.k
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />
Hkou<br />
20.94 9 3.00 1 8.94 3<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk<br />
n- cl LVs.M<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 2.51 3 2.51 3<br />
;ksx 0.00 0 23.45 12 0 0.00 3.00 1 11.45 6<br />
7 fo|qfrdj.k ds dk;Z<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou<br />
c- iapk;rh jkt laLFkkvksa ds Hkou<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
0.00 0 55.39 22 0 0.00 6.00 2 25.94 10<br />
2002-2003 QPR-mlalad
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % fcykM+k ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />
Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />
;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />
;kstuk izkjEHk ls<br />
lanfHkZr =Sekl esa<br />
Ø-la- lsDVj @ dk;Z<br />
lanfHkZr =Sekl rd fujLr<br />
lanfHkZr =Sekl esa<br />
lanfHkZr =Sekl rd<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
la[;k<br />
jkf'k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 is;ty<br />
v- gs.MiEi 0.25 1 2.42 6 0.44 1 1.17 3<br />
c- is;ty ;kstuk 14.79 21 3.05 4 10.82 13<br />
l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />
;ksx 0.25 1 17.21 27 0 0.00 3.49 5 11.99 16<br />
2 f'k{kk<br />
v- Hkou 3.00 2 18.94 13 1.50 1 9.07 6<br />
c- Hkou foLrkj 3.46 2 10.04 9 1.20 1 6.08 6<br />
l- dEI;wVj 1.35 1 1.35 1<br />
n- vU; lkexzh<br />
;ksx 6.46 4 30.33 23 0 0.00 2.70 2 16.50 13<br />
3 ifjogu<br />
v- lM+d<br />
1- xzsoy 1.00 1 1 KM<br />
2- MCyw ch ,e<br />
3- ch-Vh-<br />
4- vU; izdkj<br />
;ksx ¼1&4½ 0.00 0 1.00 1 0 0.00 0.00 0 0.00 0<br />
c- iqfy;k@jiV 0.50 1 0.50 1<br />
dqy ;ksx ¼v$c½ 0.00 0 1.50 2 0 0.00 0.00 0 0.50 1<br />
4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />
v- Hkou<br />
c- Hkou foLrkj<br />
l- fpfdRlk midj.k 0.99 2 0.99 2<br />
n- vkaxuokM+h Hkou<br />
;ksx 0.00 0 0.99 2 0 0.00 0.00 0 0.99 2<br />
5 flapkbZ<br />
v- ykq flapkbZ dk;Z<br />
c- rkykcksa dh lQkbZ@MhflfYVax<br />
l- lkeq-tyks-flapkbZ ;kstuk<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />
fo'ks"k<br />
fooj.k<br />
2002-2003 QPR-mlalad
v- vkcknh {ks= esa lM+d@[kjatk@ukyh 1.00 1 5.50 7 1.00 2 2.00 3<br />
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh 1.50 1 18.05 13 0.74 1 12.55 9<br />
Hkou<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 6.00 6 1.00 1 4.00 4<br />
n- cl LVs.M<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 8.42 4 1.50 1 5.29 3<br />
;ksx 2.50 2 37.97 30 0 0.00 4.24 5 23.84 19<br />
7 fo|qfrdj.k ds dk;Z 1.00 1 1.00 1<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou 1.78 1 1.78 1<br />
c- iapk;rh jkt laLFkkvksa ds Hkou<br />
;ksx 0.00 0 1.78 1 0 0.00 0.00 0 1.78 1<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
9.21 7 90.78 86 0 0.00 10.43 12 56.60 53<br />
2002-2003 QPR-mlalad
ftyk xzkeh.k fodkl vfHkdj.k] tks/kiqj<br />
fo/kk;d LFkkuh; {ks= fodkl ;kstuk ds rgr fo/kkulHkk {ks=okj Lohd`r@fujLr@fufeZr ifjlEifÙk;ksa dk =Sekfld izxfr izfrosnu<br />
fo/kkulHkk {ks= dk uke ¼ftyk tks/kiqj½ % ywuh ¼r`rh; =Sekl o"kZ 2001-2002½ ¼jkf'k yk[kksa esa½<br />
Lohd`r ifjlEifÙk;ksa dk fooj.k ;kstuk izkjEHk ls iw.kZ ifjlEifÙk;ksa dk fooj.k<br />
;kstuk izkjEHk ls lanfHkZr =Sekl rd<br />
;kstuk izkjEHk ls<br />
lanfHkZr =Sekl esa<br />
lanfHkZr =Sekl esa<br />
Ø-la- lsDVj @ dk;Z<br />
lanfHkZr =Sekl rd fujLr<br />
lanfHkZr =Sekl rd<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
Lohd`r<br />
jkf'k<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
la[;k<br />
jkf'k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
dk;ksZa dh<br />
ykxr<br />
dk;ksZa dh<br />
la[;k<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 is;ty<br />
v- gs.MiEi<br />
c- is;ty ;kstuk 0.88 4 4.31 20 0.75 5 3.00 14<br />
l- ikjEifjd tyL=ksr ds fodkl dk;Z<br />
;ksx 0.88 4 4.31 20 0 0.00 0.75 5 3.00 14<br />
2 f'k{kk<br />
v- Hkou 10.80 8 20.80 17 2.00 2 10.82 9<br />
c- Hkou foLrkj 3.60 5 27.79 31 1 0.50 1.00 1 24.14 24<br />
l- dEI;wVj<br />
n- vU; lkexzh<br />
;ksx 14.40 13 48.59 48 1 0.50 3.00 3 34.96 33<br />
3 ifjogu<br />
v- lM+d<br />
1- xzsoy<br />
2- MCyw ch ,e<br />
3- ch-Vh-<br />
4- vU; izdkj<br />
;ksx ¼1&4½ 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
c- iqfy;k@jiV 0.25 1<br />
dqy ;ksx ¼v$c½ 0.00 0 0.25 1 0 0.00 0.00 0 0.00 0<br />
4 fpfdRlk ,oa <strong>Lok</strong>LF;<br />
v- Hkou<br />
c- Hkou foLrkj<br />
l- fpfdRlk midj.k<br />
n- vkaxuokM+h Hkou<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
5 flapkbZ<br />
v- ykq flapkbZ dk;Z<br />
c- rkykcksa dh lQkbZ@MhflfYVax<br />
l- lkeq-tyks-flapkbZ ;kstuk<br />
;ksx 0.00 0 0.00 0 0 0.00 0.00 0 0.00 0<br />
6 xzkeksa esa vk/kkjHkwr lajpuk@tuksi;ksxh dk;Z<br />
fo'ks"k<br />
fooj.k<br />
2002-2003 QPR-mlalad
v- vkcknh {ks= esa lM+d@[kjatk@ukyh 2.00 2 3.20 3<br />
c- lkeq-Hkou@/keZ'kkyk@ foJkex`g@ okfYedh<br />
Hkou<br />
6.75 5 41.58 33 8.05 6 24.59 18<br />
l- 'e'kku@dfczLrku dh pkjnhokjh@lqfo/kk 2.60 2 3.50 4 1.20 2<br />
n- cl LVs.M<br />
;- iqLrdky; Hkou<br />
j- LiksVªl dkEIysDl 2.00 1<br />
y- Le`fr Hkou<br />
o- vU; tuksi;ksxh dk;Z 1.10 1 7.47 10 5.47 8<br />
;ksx 12.45 10 57.75 51 0 0.00 8.05 6 31.26 28<br />
7 fo|qfrdj.k ds dk;Z<br />
8 jkT; ljdkj ds Lohd`r dk;kZy; Hkou@<br />
iapk;r jkt laLFkk ds Hkou<br />
v- jkT; ljdkj ds Hkou 0.90 1<br />
c- iapk;rh jkt laLFkkvksa ds Hkou<br />
;ksx 0.00 0 0.90 1 0 0.00 0.00 0 0.00 0<br />
9 i'kqikyu<br />
v- i'kq fpfdRlk@<strong>Lok</strong>LF; Hkou 0.90 1 0.90 1<br />
c- i'kq is;ty ds dk;Z<br />
;ksx 0.00 0 0.90 1 0 0.00 0.00 0 0.90 1<br />
10 vU; dk;Z tks mijksDr esa lfEefyr ugha<br />
egk;ksx<br />
27.73 27 112.70 122 1 0.50 11.80 14 70.12 76<br />
2002-2003 QPR-mlalad
Month : Aug '2002<br />
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
MONTHLY PROGRESS REPORT OF M.L.A. LOCAL AREA DEVELOPMENT SCHEME<br />
Closing Balance <strong>of</strong> previous year --<br />
1 Cash 487.10<br />
2 Advances 120.88<br />
3 Total (1+2) 607.98<br />
4 Adjustment made out <strong>of</strong> the advances given upto the previous year 160.47<br />
5 Net total balance <strong>of</strong> previous year (3-4) 447.51<br />
6 Releases <strong>of</strong> current year 0.00<br />
7 Total available amount upto month (5+6) 447.51<br />
CONSTITUENCYWISE INFORMATION<br />
Name <strong>of</strong> Constituency<br />
Soorsagar Shergarh Osian Bilara Luni Phalodi Bhopalgarh Sardarpura <strong>Jodhpur</strong> Total<br />
1 No. <strong>of</strong> incomplete works <strong>of</strong> Previous years 7 29 4 11 27 13 35 2 4 132<br />
Proposed Works <strong>of</strong> Current Year<br />
2 No. <strong>of</strong> proposed works 31 31 1 33 0 2 0 2 4 104<br />
3 Estimated cost <strong>of</strong> proposed works 64.38 23.27 7.80 31.32 0.00 7.50 0.00 9.50 15.00 158.77<br />
Position <strong>of</strong> Sanctioned (Financial) works <strong>of</strong> Current Year<br />
4 No. <strong>of</strong> sanctioned works 29 24 27 25 9 3 6 22 8 153<br />
5 Cost <strong>of</strong> sanctioned works 59.52 24.40 46.25 27.59 11.70 7.48 11.24 44.80 24.33 257.31<br />
Expenditure<br />
6 On Incomplete works <strong>of</strong> previous years 7.78 16.20 2.10 7.94 12.18 11.58 7.13 6.30 2.60 73.81<br />
7 On works sanctioned in the current year 17.76 10.12 11.27 10.95 2.85 1.79 2.80 21.96 6.70 86.20<br />
8 Total Expenditure 25.54 26.32 13.37 18.89 15.03 13.37 9.93 28.26 9.30 160.01<br />
No. <strong>of</strong> Complete Works<br />
9 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years 6 18 2 6 16 10 10 0 1 69<br />
10 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year 2 0 0 1 1 0 0 1 0 5<br />
No. <strong>of</strong> Cancelled Works<br />
11 Out <strong>of</strong> works <strong>of</strong> previous years -- -- -- -- 1 -- -- -- -- 1<br />
12 Out <strong>of</strong> new sanctions 14 -- -- -- -- -- -- -- -- 14<br />
No. <strong>of</strong> Ongoing Works<br />
13 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years 1 11 2 5 10 3 25 2 3 62<br />
14 Out <strong>of</strong> sanctioned works <strong>of</strong> current year 13 24 27 24 8 3 6 21 8 134<br />
No. <strong>of</strong> Works not started<br />
15 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years -- -- -- -- -- -- -- -- -- 0<br />
16 Out <strong>of</strong> sanctioned <strong>of</strong> current year -- -- -- -- -- -- -- -- -- 0<br />
17 No. <strong>of</strong> Incomplete & closed works -- -- -- -- -- -- -- -- -- 0<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
MONTHLY PROGRESS REPORT - BATTIS ZILA BATTIS KAAM YOJNA<br />
<strong>District</strong> : <strong>Jodhpur</strong> Month : Aug '2002<br />
INCOMPLETE WORKS OF PREVIOUS YEARS :<br />
1 No. <strong>of</strong> incomplete works as on 01.04.2002 : 186<br />
2 Amount required to complete the incomplete works <strong>of</strong> previous : 81.782<br />
years as on 01.04.2002<br />
SANCTION WORKS OF CURRENT YEAR :<br />
In MLA Quota<br />
3 No. <strong>of</strong> sanctioned works : 0<br />
4 Cost <strong>of</strong> sanctioned works : 0.00<br />
Others<br />
5 No. <strong>of</strong> sanctioned works : 0<br />
6 Cost <strong>of</strong> sanctioned works : 0.00<br />
EXPENDITURE (Rs. in Lacs) :<br />
7 On Incomplete works <strong>of</strong> previous years : 0.000<br />
8 On works sanctioned in the current year : 0.000<br />
9 Total Expenditure : 0.000<br />
NO. OF COMPLETE WORKS :<br />
10 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 62<br />
11 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : 0<br />
NO. OF CANCELLED WORKS :<br />
12 Out <strong>of</strong> works <strong>of</strong> previous year : 0<br />
13 Out <strong>of</strong> new Sanctions : 0<br />
NO. OF ONGOING WORKS :<br />
Out <strong>of</strong> Incomplete works <strong>of</strong> previous years<br />
14 Out <strong>of</strong> sanctioned works in 95-96 & be<strong>for</strong>e : 49<br />
15 Out <strong>of</strong> sanctioned works in 96-97 : 17<br />
16 Out <strong>of</strong> sanctioned works in 97-98 : 20<br />
17 Out <strong>of</strong> sanctioned works in 98-99 : 38<br />
18 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : 0<br />
NO. OF WORKS NOT STARTED<br />
19 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 0<br />
20 Out <strong>of</strong> sanctioned <strong>of</strong> Previous year : 0<br />
21 No. <strong>of</strong> Incomplete & closed works : --<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
DISTRICT : JODHPUR<br />
INCOMPLETE WORKS OF PREVIOUS YEARS :<br />
Month : Aug'2002<br />
1 No. <strong>of</strong> incomplete works as on 01.04.2002 : 120<br />
2 Amount required to complete the incomplete works <strong>of</strong><br />
previous years as on 01.04.2002<br />
SANCTION WORKS OF CURRENT YEAR :<br />
In MLA Quota<br />
: 87.974<br />
3 No. <strong>of</strong> sanctioned works : 0<br />
4 Cost <strong>of</strong> sanctioned works : 0.00<br />
Others<br />
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
5 No. <strong>of</strong> sanctioned works : 0<br />
6 Cost <strong>of</strong> sanctioned works : 0<br />
EXPENDITURE (Rs. in Lacs) :<br />
7 On Incomplete works <strong>of</strong> previous years : 0.000<br />
8 On works sanctioned in the current year : 0.000<br />
9 Total Expenditure : 0.000<br />
NO. OF COMPLETE WORKS :<br />
10 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 44<br />
11 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : 0<br />
NO. OF CANCELLED WORKS :<br />
12 Out <strong>of</strong> works <strong>of</strong> previous year : 0<br />
13 Out <strong>of</strong> new Sanctions : 0<br />
NO. OF ONGOING WORKS :<br />
MONTHLY PROGRESS REPORT - UNTIED FUND YOJANA<br />
Out <strong>of</strong> Incomplete works <strong>of</strong> previous years<br />
14 Out <strong>of</strong> sanctioned works in 95-96 & be<strong>for</strong>e : 30<br />
15 Out <strong>of</strong> sanctioned works in 96-97 :<br />
16 Out <strong>of</strong> sanctioned works in 97-98 : 16<br />
17 Out <strong>of</strong> sanctioned works in 98-99 : 30<br />
18 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : 0<br />
NO. OF WORKS NOT STARTED :<br />
19 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 0<br />
2002-2003
20 Out <strong>of</strong> sanctioned <strong>of</strong> Previous year : 0<br />
21 No. <strong>of</strong> Incomplete & closed works : 0<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
Month : Aug'2002<br />
A. PHYSICAL<br />
1 Target <strong>of</strong> New Plants : --<br />
Revival <strong>of</strong> old plants 25<br />
2 Plants Completed New : Nil<br />
Revival<br />
Nil<br />
3 Plants under construction : 0<br />
4 Details <strong>of</strong> Plants Commissioned : Nil<br />
Size KVIC Drum type Deenbandhu Other<br />
Category <strong>of</strong> Beneficiaries<br />
Others<br />
2 Cum<br />
3 Cum<br />
4 Cum<br />
SC ST SM/SF<br />
B. FINANCIAL (Rs. In Lacs)<br />
1 Balance as on 01.04.2002 : 0.94<br />
2 Allocation during the year<br />
(a) State : --<br />
(b) Central : --<br />
3 Receipt during the year<br />
(a) State : -<br />
(b) Central : -<br />
(c) Others Zila Parishad, Pali : --<br />
4 Total Available Fund : 0.94<br />
5 Expenditure upto the Month/Amount Transfer : 0.80<br />
6 Balance : 0.94<br />
B-I DETAILS OF UC's/ SUBSIDY CLAIM<br />
1 Plants Constructed (No.) : Nil<br />
2 Subsidy Paid<br />
State : --<br />
Central : --<br />
3 Turnkey Charges : --<br />
4 Claims Submitted<br />
No. <strong>of</strong> Plants : --<br />
Amount : --<br />
C. IBP / NBP<br />
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
BIOGAS MONTHLY PROGRESS REPORT<br />
C.A. Audit <strong>Report</strong> : --<br />
Pending Audit Para's : --<br />
1 Plants Sanctioned : --<br />
2 Completed : 5<br />
3 Under <strong>Progress</strong> : --<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
1. Name <strong>of</strong> State : Rajasthan<br />
2. Name <strong>of</strong> Nodal Deptt./Agency : D.R.D.A., <strong>Jodhpur</strong><br />
3. Annual Target :<br />
4. Physical <strong>Progress</strong> : --<br />
Month :<br />
Category<br />
<strong>of</strong> plants<br />
Aug'2002<br />
No. <strong>of</strong><br />
cooking<br />
conn./<br />
family<br />
covered<br />
(KG)<br />
Details <strong>of</strong><br />
duel fuel<br />
eng. /<br />
generator<br />
etc. (cap.)<br />
1 2 3 4 5 6 7 8 9 10 11 12<br />
Oswal Gau Seva<br />
Pinjara Pole,<br />
I IBP<br />
Sadan, Pinjara Pole, 45 KVIC Complete 249000 -- -- -- -- --<br />
Phalodi<br />
Phalodi<br />
--<br />
--<br />
--<br />
--<br />
Location<br />
Rawan Ka<br />
Chabutra,<br />
<strong>Jodhpur</strong><br />
Haddimeal<br />
Ind. Area,<br />
<strong>Jodhpur</strong><br />
Sansi Basti<br />
Near Nala,<br />
<strong>Jodhpur</strong><br />
Waed No.45<br />
Bhagat ki<br />
Kothi, Near<br />
Peli tanki,<br />
<strong>Jodhpur</strong><br />
DISTRICT RURAL DEVELOPMENT AGENCY, JOHDPUR<br />
COMMUNITY, INSTITUTIONAL AND NIGHT-SOIL BASED BIOGAS PROGRAMME<br />
Name & Address <strong>of</strong><br />
society organisation<br />
owing/managing the<br />
plants<br />
No. <strong>of</strong><br />
gas<br />
lights,<br />
if any<br />
Aryan Assosiate,<br />
Jaipur 35 Night Soil Complete 975000 -- -- -- -- --<br />
Aryan Assosiate,<br />
Jaipur 35 Night Soil Complete 975000 -- -- -- -- --<br />
Aryan Assosiate,<br />
Jaipur 35 Night Soil Complete 975000 -- -- -- -- --<br />
Aryan Assosiate,<br />
Jaipur<br />
<strong>Progress</strong> <strong>Report</strong> in respect <strong>of</strong> Completed/ Under complition Plants<br />
Capacity<br />
(cum)<br />
Model<br />
(KVIC/<br />
NEDA/<br />
SULABH)<br />
Date <strong>of</strong> comp.<br />
Commissioning <strong>for</strong><br />
fully completed<br />
plants or details <strong>of</strong><br />
stage up to which<br />
work is completed<br />
Total<br />
Estimated<br />
Cost<br />
Quantity <strong>of</strong><br />
cattle<br />
dung (Kg)<br />
/ No. <strong>of</strong><br />
user<br />
available<br />
<strong>for</strong> the<br />
plant<br />
Details <strong>of</strong> gas utilisation<br />
No. <strong>of</strong> latrine<br />
attached with<br />
the plant<br />
35 Night Soil Complete 975000 -- -- -- -- --<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
<strong>District</strong> Level Summary <strong>Report</strong><br />
<strong>Monthly</strong> Per<strong>for</strong>mance <strong>Report</strong> on the SGRY (Ist Stream EAS)<br />
Year : 2001-2002 Disrtict : JODHPUR<br />
Month : Aug.'2002<br />
I. Summary Data (Upto the month)<br />
Total No. <strong>of</strong> works under taken : 408 (Nos.)<br />
Total No. <strong>of</strong> works completed (upto the month) : 20 (Nos.)<br />
Works under <strong>Progress</strong> (upto the month) : 213 (Nos.)<br />
Cumulative Expenditure (upto the month) : 59.04 (Lac Rs.)<br />
Employment Generation (Cum.upto the month) : 0.597 (Lac Mandays)<br />
II. Physical Per<strong>for</strong>mance<br />
Employment Generation Categorywise<br />
CATEGORIES<br />
(i) S.C. :<br />
(ii) S.T. :<br />
(iii) Other :<br />
(iv) Total :<br />
(v) Women :<br />
(vi) Landless :<br />
(vii) F.B.L. (Free Bonded Labourers) :<br />
Employment Generation<br />
During the<br />
Month<br />
0.168<br />
0.020<br />
0.088<br />
0.276<br />
0.147<br />
0.000<br />
--<br />
Cum. Upto<br />
the month<br />
0.297<br />
0.055<br />
0.245<br />
0.597<br />
0.248<br />
0.026<br />
--<br />
III. Financial Per<strong>for</strong>mance (Cumulative including the month under report)<br />
O.B. at<br />
the<br />
beginnin<br />
g <strong>of</strong> the**<br />
Releases as on date<br />
Centre State Total<br />
Other<br />
Receipt<br />
Total<br />
(1+4+5)<br />
On pending<br />
works <strong>of</strong> last<br />
Wage<br />
Non<br />
wage Wage<br />
On new works<br />
Cumulative Expenditure<br />
Non<br />
wage<br />
On<br />
maintenance<br />
Wag<br />
e<br />
Non<br />
wage<br />
Wage<br />
Total<br />
Non<br />
wage<br />
Total<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
0.00 104.79 34.93 139.72 0.00 139.72 13.980 10.20 25.49 9.37 0.00 0.00 39.47 19.57 59.040<br />
** Included Advance Ammount<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
MONTHLY PERFORMANCE REPORT OF SGRY (IInd Stream JGSY)<br />
Pr<strong>of</strong>orma - 1<br />
<strong>District</strong> : <strong>Jodhpur</strong> Year : 2002-2003 Month : Aug. '2002<br />
DISTRICT LEVEL SUMMARY REPORT<br />
Summary Data<br />
Total No. <strong>of</strong> works undertaken<br />
Total No. <strong>of</strong> works completed (upto the month)<br />
Works under progress (upto the month)<br />
No. <strong>of</strong> works undertaken exclusively <strong>for</strong> SC/ST<br />
No. <strong>of</strong> works completed (upto the month) <strong>for</strong> SC/ST<br />
Works under progress (upto the month) SC/ST<br />
No. <strong>of</strong> works undertaken exclusively <strong>for</strong> Disabled persons<br />
No. <strong>of</strong> works completed (upto the month) <strong>for</strong> Disabled persons<br />
475<br />
77<br />
340<br />
44<br />
12<br />
32<br />
0<br />
0<br />
(Nos.)<br />
(Nos.)<br />
(Nos.)<br />
(Nos.)<br />
(Nos.)<br />
(Nos.)<br />
(Nos.)<br />
(Nos.)<br />
Cumulative expenditure upto the month<br />
Expenditure on the works undertaken <strong>for</strong> disabled persons<br />
Expenditure on individual beneficiary schemes <strong>for</strong> SCs/STs<br />
Employment Generated (Cumulative upto the month)<br />
108.520<br />
0.000<br />
10.740<br />
1.890<br />
(Rs. In Lac)<br />
(Rs. In Lac)<br />
(Rs. In Lac)<br />
(Lac Mandays)<br />
PHYSICAL PERFORMANCE<br />
EMPLOYMENT GENERATED CATEGORY-WISE<br />
Categories<br />
SC<br />
ST<br />
Disabled Persons<br />
Others<br />
Total<br />
Women<br />
Landless<br />
Others<br />
(Lac Mandays)<br />
Employment Generated<br />
During the month Cum. upto the month<br />
0.602 0.757<br />
0.674<br />
0.320<br />
0.031 0.000<br />
0.569 0.813<br />
1.876 1.890<br />
0.100 0.129<br />
0.026 0.028<br />
0.000 0.000<br />
FINANCIAL PERFORMANCE (CUMULATIVE INCLUDING THE MONTH UNDER REPORT)<br />
(Rs. In Lacs)<br />
O.B. at the beginning<br />
Releases as on date<br />
Total<br />
Cumulative Expenditure<br />
<strong>of</strong> the year ** As<br />
Centre State Total Other receipts availability<br />
per C.A.<br />
Gen.working SC/ST Disabled Maint. Other Total<br />
1 2 3 4 5 6 7 8 9 10 11 12<br />
0.97 97.30 0.00 97.30 0.00 98.27 97.78 10.74 0.00 0.00 0.00 108.52<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
INDIRA AWAAS YOJANA<br />
Conversion <strong>of</strong> unserviceable kutcha houses into pucca/ semi pucca houses<br />
MONTHLY PERFORMANCE<br />
State : Rajasthan Month : Aug. '2002<br />
Year : 2002-2003<br />
Physical Per<strong>for</strong>mance<br />
1. Annual Target (Houses) 629 (in Nos.)<br />
2. Houses upgraded (Cumulative <strong>for</strong> the year including current month)<br />
Category<br />
During the month<br />
(a) SC 24<br />
(b) ST 6<br />
(c) Free bonded labourers<br />
(d) Ex-servicemen etc.<br />
(e) Disabled<br />
(f) Others 14<br />
Total 44<br />
Cumulative including current month<br />
26<br />
6<br />
-<br />
-<br />
-<br />
18<br />
50<br />
3. Percentage <strong>of</strong> houses upgraded to Annual Target 7.95 (%)<br />
4. Houses under upgradation 286 (in Nos.)<br />
Financial Per<strong>for</strong>mance<br />
1. Opening Balance as on 01.04.2002 2.43 (Rs. In lac)<br />
2. Central Releases 65.37 (Rs. In lac)<br />
3. State Releases 22.72 (Rs. In lac)<br />
4. Total availability <strong>of</strong> funds (1+2+3) 90.52 (Rs. In lac)<br />
5. Cumulative Expenditure upto end <strong>of</strong> month (Rs. In lac)<br />
Category<br />
During the month Cumulative including current month<br />
(i) SC 0.00<br />
17.300<br />
(ii) ST 0.00<br />
1.000<br />
(iii) Others 0.00<br />
7.680<br />
(iv) Total 0.00<br />
25.980<br />
6. Percentage <strong>of</strong> expen. to total availability <strong>of</strong> funds 28.70 %<br />
(Total Expenditure/Total availablity <strong>of</strong> funds)*100<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
INDIRA AWAAS YOJANA (UPGRADATION)<br />
Conversion <strong>of</strong> unserviceable kutcha houses into pucca/ semi pucca houses<br />
State : Rajasthan Month : Aug. '2002<br />
Physical Per<strong>for</strong>mance<br />
MONTHLY PERFORMANCE<br />
Year : 2002-2003<br />
1. Annual Target (Houses) 286 (in Nos.)<br />
2. Houses upgraded (Cumulative <strong>for</strong> the year including current month)<br />
Category<br />
During the month<br />
(a) SC 5<br />
(b) ST -<br />
(c) Free bonded labourers -<br />
(d) Ex-servicemen etc. -<br />
(e) Disabled<br />
(f) Others 5<br />
Total 10<br />
Cumulative including current month<br />
14<br />
2<br />
-<br />
-<br />
5<br />
21<br />
3. Percentage <strong>of</strong> houses upgraded to Annual Target (%)<br />
4. Houses under upgradation 154 (in Nos.)<br />
Financial Per<strong>for</strong>mance<br />
1. Opening Balance as on 01.04.2002 1.23 (Rs. In lac)<br />
2. Central Releases 16.34 (Rs. In lac)<br />
3. State Releases 5.68 (Rs. In lac)<br />
4. Total availability <strong>of</strong> funds (1+2+3) 23.25 (Rs. In lac)<br />
5. Cumulative Expenditure upto end <strong>of</strong> month (Rs. In lac)<br />
Category<br />
During the month Cumulative including current month<br />
(i) SC 0.000<br />
3.300<br />
(ii) ST 0.000<br />
0.800<br />
(iii) Others 0.000<br />
2.500<br />
(iv) Total 0.000<br />
6.600<br />
6. Percentage <strong>of</strong> expenditure to total availability <strong>of</strong> funds 28.39 %<br />
(Total Expenditure/Total availablity <strong>of</strong> funds)*100<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
PRADHAN MANTRI GRAMODAYA AWAAS YOJANA (UPGRADATION)<br />
Conversion <strong>of</strong> unserviceable kutcha houses into pucca/ semi pucca houses<br />
MONTHLY PERFORMANCE<br />
State : Rajasthan Month : Aug. '2002<br />
Physical Per<strong>for</strong>mance<br />
Year : 2002-2003<br />
1. Annual Target (Houses) 76 (in Nos.)<br />
2. Houses upgraded (Cumulative <strong>for</strong> the year including current month)<br />
Category<br />
During the month<br />
(a) SC 1<br />
(b) ST<br />
(c) Free bonded labourers -<br />
(d) Ex-servicemen etc. -<br />
(e) Disabled -<br />
(f) Others 3<br />
Total 4<br />
Cumulative including current month<br />
30<br />
1<br />
-<br />
-<br />
-<br />
17<br />
48<br />
3. Percentage <strong>of</strong> houses upgraded to Annual Target (%)<br />
4. Houses under upgradation 52 (in Nos.)<br />
Financial Per<strong>for</strong>mance<br />
1. Opening Balance as on 01.04.2002 1.37 (Rs. In lac)<br />
2. Central Releases 5.20 (Rs. In lac)<br />
3. State Releases 0.00 (Rs. In lac)<br />
4. Total availability <strong>of</strong> funds (1+2+3) 6.57 (Rs. In lac)<br />
5. Cumulative Expenditure upto end <strong>of</strong> month (Rs. In lac)<br />
Category<br />
During the month<br />
(i) SC 0.55<br />
(ii) ST 0.05<br />
(iii) Others 0.00<br />
(iv) Total 0.60<br />
Cumulative including current month<br />
2.05<br />
0.15<br />
0.82<br />
3.02<br />
6. Percentage <strong>of</strong> expenditure to total availability <strong>of</strong> funds 45.97%<br />
(Total Expenditure/Total availablity <strong>of</strong> funds)*100<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
PRADHAN MANTRI GRAMODAYA AWAAS YOJANA<br />
Conversion <strong>of</strong> unserviceable kutcha houses into pucca/ semi pucca houses<br />
MONTHLY PERFORMANCE<br />
State : Rajasthan Month : Aug. '2002<br />
Physical Per<strong>for</strong>mance<br />
Year : 2002-2003<br />
1. Annual Target (Houses) 133 (in Nos.)<br />
2. Houses upgraded (Cumulative <strong>for</strong> the year including current month)<br />
Category<br />
During the month<br />
(a) SC 6<br />
(b) ST 1<br />
(c) Free bonded labourers -<br />
(d) Ex-servicemen etc. -<br />
(e) Disabled -<br />
(f) Others 5<br />
Total 12<br />
Cumulative including current month<br />
63<br />
5<br />
-<br />
-<br />
-<br />
42<br />
110<br />
3. Percentage <strong>of</strong> houses upgraded to Annual Target (%)<br />
4. Houses under upgradation 98 (in Nos.)<br />
Financial Per<strong>for</strong>mance<br />
1. Opening Balance as on 01.04.2002 0.50 (Rs. In lac)<br />
2. Central Releases 18.20 (Rs. In lac)<br />
3. State Releases 0.00 (Rs. In lac)<br />
4. Total availability <strong>of</strong> funds (1+2+3) 18.70 (Rs. In lac)<br />
5. Cumulative Expenditure upto end <strong>of</strong> month (Rs. In lac)<br />
Category<br />
During the month Cumulative including current month<br />
(i) SC 1.450<br />
5.300<br />
(ii) ST 0.140<br />
0.240<br />
(iii) Others 1.200<br />
5.420<br />
(iv) Total 2.790<br />
10.960<br />
6. Percentage <strong>of</strong> expenditure to total availability <strong>of</strong> funds 58.61%<br />
(Total Expenditure/Total availablity <strong>of</strong> funds)*100<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
INDIRA AWAAS YOJANA<br />
PHYSICAL PERFORMANCE<br />
State : Rajasthan Month : Aug'2002 Year : 2002-2003<br />
(In Nos.)<br />
S.No.<br />
Houses Completed<br />
No. <strong>of</strong> Houses<br />
No. <strong>of</strong> Houses constructed<br />
No. <strong>of</strong><br />
Houses<br />
Annual<br />
allotted to<br />
Smokeless Sanitary<br />
under<br />
In the Name <strong>of</strong> In the Name <strong>of</strong> In the Name <strong>of</strong><br />
Target SC ST Others Total<br />
Physically<br />
Chulhas latrines<br />
Construction<br />
Female Male Husband & Wife<br />
Handicapped<br />
Installed Constructed<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 629 26 6 18 50 286 0 44 4 12 22 22<br />
S.No<br />
O.B. as on<br />
01.04.<br />
FINANCIAL PERFORMANCE<br />
Releases<br />
Total<br />
Expenditure<br />
Central State Total<br />
Availability<br />
(2+5)<br />
SC ST Others<br />
Total (7 to 9)<br />
%age <strong>of</strong><br />
Expenditure to total<br />
availability<br />
(10/6)*100<br />
1 2 3 4 5 6 7 8 9 10 11<br />
1 2.43 65.37 22.72 88.092 90.522 17.30 1.00 7.68 25.98 28.70<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
State : Rajasthan Month : Aug'2002 Year : 2002-2003<br />
(In Nos.)<br />
S.No.<br />
Annual<br />
Target<br />
Houses Completed<br />
SC ST Others Total<br />
INDIRA AWAAS YOJANA (UPGRADATION)<br />
PHYSICAL PERFORMANCE<br />
Houses<br />
under<br />
Construction<br />
No. <strong>of</strong> Houses<br />
allotted to<br />
Physically<br />
Handicapped<br />
In the Name <strong>of</strong><br />
Female<br />
No. <strong>of</strong> Houses constructed<br />
In the Name <strong>of</strong><br />
Male<br />
In the Name <strong>of</strong><br />
Husband & Wife<br />
Smokeless<br />
Chulhas<br />
Installed<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 286 14 2 5 21 154 0 15 5 5 0 0<br />
No. <strong>of</strong><br />
Sanitary<br />
latrines<br />
Constructed<br />
S.No<br />
O.B. as on<br />
01.04.<br />
FINANCIAL PERFORMANCE<br />
Releases<br />
Total<br />
Expenditure<br />
Availability<br />
Central State Total (2+5) SC ST Others<br />
Total (7 to 9)<br />
%age <strong>of</strong><br />
Expenditure to total<br />
availability<br />
(10/6)*100<br />
1 2 3 4 5 6 7 8 9 10 11<br />
1 1.23 16.34 5.68 22.02 23.25 3.30 0.80 2.50 6.6 28.39<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
PRADHAN MANTRI GRAMODAYA YOJANA (UPGRADATION)<br />
PHYSICAL PERFORMANCE<br />
State : Rajasthan Month : Aug'2002 Year : 2002-2003<br />
(In Nos.)<br />
S.No.<br />
Houses Completed<br />
No. <strong>of</strong> Houses<br />
No. <strong>of</strong> Houses constructed<br />
No. <strong>of</strong><br />
Houses<br />
Annual<br />
allotted to<br />
under<br />
Smokeless<br />
Target<br />
In the Name <strong>of</strong> In the Name <strong>of</strong> In the Name <strong>of</strong><br />
SC ST Others Total<br />
Physically<br />
Construction<br />
Chulhas<br />
Handicapped Female Male Husband & Wife<br />
Installed<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 76 30 1 17 48 52 0 43 0 2 0 0<br />
Sanitary<br />
latrines<br />
Constructed<br />
S.No<br />
O.B. as on<br />
01.04.<br />
FINANCIAL PERFORMANCE<br />
Releases<br />
Total<br />
Expenditure<br />
Availability<br />
Central State Total (2+5) SC ST Others<br />
Total (7 to 9)<br />
%age <strong>of</strong><br />
Expenditure to total<br />
availability<br />
(10/6)*100<br />
1 2 3 4 5 6 7 8 9 10 11<br />
1 1.37 5.20 0.00 5.20 6.57 2.05 0.15 0.82 3.02 45.97<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
State : Rajasthan Month : Aug'2002 Year : 2002-2003<br />
(In Nos.)<br />
S.No.<br />
Annual<br />
Target<br />
Houses Completed<br />
SC ST Others Total<br />
PRADHAN MANTRI GRAMODAYA YOJANA<br />
PHYSICAL PERFORMANCE<br />
Houses<br />
under<br />
Construction<br />
No. <strong>of</strong> Houses<br />
allotted to<br />
Physically<br />
Handicapped<br />
In the Name <strong>of</strong><br />
Female<br />
No. <strong>of</strong> Houses constructed<br />
In the Name <strong>of</strong><br />
Male<br />
In the Name <strong>of</strong><br />
Husband & Wife<br />
Smokeless<br />
Chulhas<br />
Installed<br />
1 2 3 4 5 6 7 8 9 10 11 12 13<br />
1 133 63 5 42 110 98 0 86 0 15 10 10<br />
No. <strong>of</strong><br />
Sanitary<br />
latrines<br />
Constructed<br />
S.No<br />
O.B. as on<br />
01.04.<br />
FINANCIAL PERFORMANCE<br />
Releases<br />
Total<br />
Expenditure<br />
Availability<br />
Central State Total (2+5) SC ST Others<br />
Total (7 to 9)<br />
%age <strong>of</strong><br />
Expenditure to total<br />
availability<br />
(10/6)*100<br />
1 2 3 4 5 6 7 8 9 10 11<br />
1 0.50 18.20 0.00 18.20 18.7 5.30 0.24 5.42 10.96 58.61<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
dzekad<br />
ftyk xzkeh.k fodkl vfHkdj.k<br />
dk;kZy; vfrfjDr dyDVj ¼fodkl½] tks/kiqj<br />
fnukad<br />
ifj;kstuk funs'kd ¼,l-,-ih-½<br />
,oa insu 'kklu mi lfpo<br />
xzkeh.k fodkl foHkkx<br />
t;iqj<br />
fo"k; %& vkaxuokMh Hkou ifj;kstuk kkk dh izxfr fjiksVZ ekg 08@2002<br />
egksn;]<br />
mijksDr fo"k;kUrxZr fuosnu gs fd fu/kkZfjr izi= esa vkxuokMh Hkou ifj;kstuk kkk vUrxZr ekfld izxfr<br />
fjiksVZ fuEukuqlkj gS%&<br />
1 Lohd`r vkaxuokMh dsUnz 80<br />
2 r`rh; izkstsDV gsrq fuekZ.k gsrq vkoafVr Hkouksa dh la[;k 84<br />
3 r`rh; izkstsDV gsrq vkoafVr Hkouksa gsrq jkT; Lrj ls nh xbZ jkf'k ¼yk[k½ 90.93<br />
4 ftyk xzkeh.k fodkl vfHkdj.k Lrj ls Lohd`r vkaxuokMh dsUnz Hkouksa dh la[;k 80<br />
5 Lohd`r vkaxuokMh dsUnzksa ij O;; jkf'k 76.15<br />
6 iw.kZ djk;s x;s vkaxuokMh Hkouksa dh la[;k 72<br />
7 izxfrjr vkaxuokMh Hkouksa dh la[;k 8<br />
8 izkjEHk ugha gq, vkaxuokMh dsUnz Hkouksa dh la[;k 0<br />
9 dkWye 8 esa vafdr Hkouksa ds izkjEHk ugha gksus ds dkj.k &<br />
10 izkjEHk gksdj can gks x;s vkaxuokMh dsUnz Hkouksa dh la[;k &<br />
11 dkWye 10 esa vafdr Hkouksa dk fuekZ.k can gksus ds dkj.k &<br />
tks/kiqj<br />
vfrfjDr dyDVj ¼fodkl½<br />
2002-2003
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
CREDIT CUM SUBSIDY SCHEME<br />
Month :Aug'2002<br />
I. Physical Per<strong>for</strong>mance (Cummulative including the current month)<br />
S.No.<br />
<strong>District</strong><br />
Annual<br />
Target<br />
<strong>District</strong> Level <strong>Report</strong><br />
Total<br />
(4+5+6)<br />
Freed<br />
Bonded<br />
Labourers<br />
Ex-<br />
Service<br />
Men<br />
CCSS - <strong>District</strong><br />
Form II (a)<br />
<strong>Monthly</strong><br />
<strong>District</strong> Level<br />
Units : Numbers<br />
No. <strong>of</strong> Houses Completed<br />
House<br />
No. <strong>of</strong> Houses Completed <strong>for</strong> Number <strong>of</strong><br />
Under<br />
SC ST Others<br />
<strong>Progress</strong><br />
Disabled Women<br />
Smokeless<br />
Chullah<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />
1 <strong>Jodhpur</strong> 250 -- -- -- -- 27 -- -- -- -- -- --<br />
Sanitary<br />
Latrines<br />
Note : Application <strong>of</strong> BPL families has been <strong>for</strong>warded to Banks <strong>for</strong> sanction <strong>of</strong> Loan<br />
SC/ST 102<br />
Others 215<br />
Total 317<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
Month :Aug'2002<br />
II. Financial Per<strong>for</strong>mance<br />
RAJASTHAN CREDIT CUM SUBSIDY SCHEME<br />
CCSS - <strong>District</strong><br />
<strong>Monthly</strong><br />
<strong>District</strong> Level<br />
S.No.<br />
<strong>District</strong><br />
Opening<br />
Balance<br />
as on<br />
01.04.02<br />
Allocation 2002-2003<br />
Centre<br />
State<br />
Total<br />
(4+5)<br />
Centre<br />
Release<br />
State<br />
Total<br />
(7+8)<br />
Total<br />
Availability<br />
(3+9)<br />
Expenditure<br />
SC ST Others<br />
Exp. Upto<br />
March'02<br />
(11+12+13)<br />
% Exp.<br />
To Total<br />
Available<br />
Freed<br />
Bonded<br />
Labourers<br />
Expenditure on<br />
Ex-<br />
Service<br />
men<br />
Disabled<br />
Women<br />
Total Loan<br />
Disbursed<br />
Total Loan<br />
Recovered<br />
Average<br />
Loan<br />
Disbursed<br />
Average<br />
Loan<br />
Recovered<br />
Credit<br />
Subsidy<br />
Ratio<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24<br />
1 <strong>Jodhpur</strong> 1.81 0 0 0 0 0 0 1.81 - -- - 2.70 -- -- -- -- -- -- -- -- -- --<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
STATE PLAN (Sub Health Centre) PROGRESS REPORT OF CIVIL WORKS<br />
PART-I WORK IN PROGRESS<br />
S.No. Sub Health's work & place Block / PHC / PS Sanctioned<br />
Cost<br />
Month :Aug, 2002 (Rs. in Lacs)<br />
Previous<br />
month<br />
Current<br />
month<br />
1 2 3 4 5 6 7 8 9<br />
1 BASANI MAMNA BALESAR 2.50 0.00 0.00 2.25 O<br />
2 GHODERLAI BALESAR 2.50 0.00 0.00 2.25 O<br />
3 HINGOLI BHOPALGARH 2.50 0.00 0.00 2.50 O<br />
4 JHAK BILARA 2.50 0.00 0.00 2.03 O<br />
5 SINDLO KI DHANI LUNI 2.50 0.00 0.00 2.50 O<br />
6 MOGARA KALLAN LUNI 3.00 0.00 0.00 2.70 O<br />
7 KAKELAV LUNI 2.50 0.00 0.00 2.50 O<br />
8 HANIA OSIAN 2.50 0.00 0.00 2.00 O<br />
9 KHINDAKOR OSIAN 2.50 0.00 0.00 2.25 O<br />
10 KHAWANIA OSIAN 3.42 0.00 0.00 3.00 O<br />
11 JATABAS PHALODI 2.50 0.00 0.00 2.50 O<br />
12 MORIYA PHALODI 2.50 0.00 0.00 2.28 O<br />
13 RAYDA PHALODI 2.50 0.00 0.00 2.50 O<br />
14 SUVAP PHALODI 2.50 0.00 0.00 2.50 O<br />
15 PALINA PHALODI 2.50 0.00 0.00 2.50 O<br />
16 LAXMAN NAGAR PHALODI 2.50 0.00 0.00 2.26 O<br />
17 JHRDE KI BHAKARI PHALODI 2.50 0.00 0.00 2.00 O<br />
18 BHOJAKOR PHALODI 2.50 0.00 0.00 2.00 O<br />
19 FATEH SAGAR PHALODI 2.50 0.00 0.00 2.25 O<br />
20 BENGTI KHURD PHALODI 2.50 0.00 0.00 2.50 O<br />
21 MANDLA KHURD PHALODI 3.31 0.00 0.00 2.41 O<br />
22 KRISHAN NAGAR PHALODI 3.00 0.00 0.00 2.29 O<br />
23 CHANDAR NAGAR PHALODI 2.96 0.00 0.00 2.46 O<br />
24 BHIYASAR(BARJASAR) PHALODI 3.38 0.00 0.00 2.50 O<br />
25 GUMANSINGHPURA SHERGARH 2.50 0.00 0.00 2.13 O<br />
26 GANTYALA MANDOR 3.47 1.50 0.00 1.50 O<br />
27 DANGIYAWAS MANDOR 3.47 1.50 1.00 2.50 O<br />
28 JAJIWAL BHATAN MANDOR 3.47 1.50 1.00 2.50 N<br />
29 BUDHNAGAR MANDOR 3.47 0.00 2.50 2.50 O<br />
30 BAVERLA MANDOR 3.47 0.00 2.00 2.00 O<br />
31 SURPURA MANDOR 3.47 0.00 2.25 2.25 O<br />
32 JALELYAICHA MANDOR 3.47 0.00 1.50 1.50 N<br />
33 ROHILANADI PHALODI 3.47 0.00 3.47 3.47 0<br />
34 CHANDRAKH OSIAN 3.47 2.00 1.00 3.00 M<br />
35 LAVERA KHURED OSIAN 3.47 0.70 2.40 3.10 M<br />
36 PALDIRANAVATA BHOPALGARH 3.47 0.00 1.50 1.50 M<br />
37 ANWANA OSIAN 3.47 1.50 1.40 2.90 M<br />
38 AMRUTNAGAR BALESAR 3.47 0.00 1.50 2.50 M<br />
39 DEVELYA MANDOR 3.47 0.00 2.00 2.00 O<br />
40 PABUSAR SHERGARH 3.47 0.00 1.50 1.50 E<br />
41 KOLUPABUJI PHALODI 3.47 0.00 1.16 1.16 E<br />
TOTAL 122.09 8.70 26.18 94.94<br />
S.No. Physical <strong>Progress</strong> Code No. S.No. Bottleneckness<br />
Code No.<br />
1 Taking Over Land A 1 Non Availability <strong>of</strong> Land<br />
01<br />
2 Preparation <strong>of</strong> Drawing B 2 Non Availability <strong>of</strong> Plans<br />
02<br />
3 Technical Sanction C 3 Estimate not Sanctioned<br />
03<br />
4 Award <strong>of</strong> Work D 4 Tender not Approved<br />
04<br />
5 Completed upto Plinth E 5 Non Availability <strong>of</strong> Fund<br />
05<br />
6 Completed upto Ro<strong>of</strong> Level F 6 Land equate Admn. Sanctoin<br />
06<br />
7 Ro<strong>of</strong> Laid G 7 Court Stay<br />
07<br />
8 Plaster / Floor Completed H 8 Slow progress <strong>of</strong> Contractor<br />
08<br />
9 Jotnery Work Completed I 9 Any other Reason<br />
09<br />
10 Internal Sanatery Fitting J<br />
11 Internal Electric Fitting K<br />
12 External Services L<br />
13 Development Work Comp. M<br />
14 Work Completed N<br />
15 Building Handed over O<br />
Expenditure during<br />
ABSTRACT<br />
Exp. Upto<br />
the month<br />
Physical<br />
status <strong>of</strong> work<br />
(Code No.)<br />
Observations,<br />
if any<br />
Work<br />
Deptt.<br />
YEAR<br />
Sanctioned<br />
Ongoing Exp.<br />
Cancelled Dispute<br />
Completed<br />
Trans.<br />
STATE PLAN 41 34 7 94.94 32 -- --<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
MONTHLY PROGRESS REPORT - APNA GAON APNA KAAM<br />
<strong>District</strong> : <strong>Jodhpur</strong> Month : Aug' 2002<br />
As per C.A. Audit <strong>Report</strong> Balance as on 01.04.02 : 46.65<br />
Given to Executive Agencies be<strong>for</strong>e 01.04.00 : 0<br />
Adjusted against advances given be<strong>for</strong>e 01.04.02 : 0<br />
INCOMPLETE WORKS OF PREVIOUS YEARS :<br />
1 No. <strong>of</strong> incomplete works as on 01.04.2000 : 7<br />
2 Amount required to complete the incomplete works <strong>of</strong><br />
previous years as on 01.04.2000<br />
: 10.65<br />
SANCTION WORKS OF CURRENT YEAR :<br />
3 No. <strong>of</strong> sanctioned works : 0<br />
AMONTH OF SANCTIONED WORKS<br />
4 AGAK (State Plan) Head : 0.000<br />
5 Other Schemes : 0.000<br />
6 Public Contribution : 0.000<br />
7 Total (4+5+6) : 0.000<br />
8 Amount released in Current Year : 0.00<br />
EXPENDITURE (Rs. in Lacs) :<br />
ON INCOMPLETE WORKS OF PREVIOUS YEARS<br />
9 AGAK (State Plan) Head : 1.773<br />
10 Other Schemes : 0.000<br />
11 Public Contribution : 0.000<br />
12 Total (9+10+11) : 1.773<br />
ON WORKS SANCTIONED IN CURRENTS YEAR<br />
13 AGAK (State Plan) Head : 0.000<br />
14 Other Schemes : 0.000<br />
15 Public Contribution : 0.000<br />
16 Total (13+14+15) : 0.000<br />
NO. OF COMPLETE WORKS :<br />
17 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 2<br />
18 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : 0<br />
NO. OF CANCELLED WORKS :<br />
19 Out <strong>of</strong> works <strong>of</strong> previous year : 2<br />
20 Out <strong>of</strong> Current Year : --<br />
NO. OF ONGOING WORKS :<br />
Out <strong>of</strong> Incomplete works <strong>of</strong> previous years<br />
21 Out <strong>of</strong> sanctioned works in 96-97 & be<strong>for</strong>e : 1<br />
22 Out <strong>of</strong> sanctioned works in 97-98 : 0<br />
23 Out <strong>of</strong> sanctioned works in 98-99 : 2<br />
24 Out <strong>of</strong> sanctioned works in 99-2000 : 0<br />
25 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : 0<br />
NO. OF WORKS NOT STARTED :<br />
26 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 0<br />
27 Out <strong>of</strong> sanctioned <strong>of</strong> current year : 0<br />
28 No. <strong>of</strong> Incomplete & closed works : 0<br />
PENDING FOR SANCTIONS :<br />
29 No. <strong>of</strong> works : 0<br />
30 Required Amount <strong>of</strong> AGAK (State Plan) Head : 0<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
MONTHLY PROGRESS REPORT - RURAL GROWTH CENTRE<br />
DISTRICT : JODHPUR Month : Aug'2002<br />
As per C.A. Audit <strong>Report</strong> Balance as on 01.04.2002 : 20.44<br />
Advance given to Exe. Agencies be<strong>for</strong>e 01.04.2002 : 0<br />
Adjusted against advances given be<strong>for</strong>e 01.04.2002 : 0<br />
Annual Allocation : 0.00 Lacs<br />
INCOMPLETE WORKS OF PREVIOUS YEARS :<br />
1 No. <strong>of</strong> incomplete works as on 01.04.2002 : 32<br />
2 Amount required to complete the incomplete works <strong>of</strong> previous years : 12.386<br />
as on 01.04.2002<br />
SANCTION WORKS OF CURRENT YEAR :<br />
FOR RGC<br />
3 No. <strong>of</strong> sanctioned works : 0<br />
4 Amonth <strong>of</strong> sanctioned works : 0.000<br />
FOR MRGC<br />
5 No. <strong>of</strong> sanctioned works : 0<br />
6 Amonth <strong>of</strong> sanctioned works : 0.00<br />
EXPENDITURE (Rs. in Lacs) :<br />
ON RGC<br />
7 On Incomplete works <strong>of</strong> previous years : 1.325<br />
8 On works sanctioned in Current Year : 0.000<br />
9 Total Expenditure : 1.325<br />
ON MRGC<br />
10 On Incomplete works <strong>of</strong> previous years : 0.000<br />
11 On works sanctioned in Current Year : 0.000<br />
12 Total Expenditure : 0.000<br />
NO. OF COMPLETE WORKS :<br />
RGC<br />
13 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 11<br />
14 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : --<br />
MRGC<br />
15 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : 3<br />
16 Out <strong>of</strong> new sanctioned works <strong>of</strong> current year : --<br />
NO. OF CANCELLED WORKS :<br />
RGC<br />
17 Out <strong>of</strong> works <strong>of</strong> previous year : 2<br />
18 Out <strong>of</strong> New Sanctions : --<br />
MRGC<br />
19 Out <strong>of</strong> works <strong>of</strong> previous year : 0<br />
20 Out <strong>of</strong> New Sanctions : --<br />
NO. OF ONGOING WORKS :<br />
RGC<br />
21 Out <strong>of</strong> sanctioned works in 97-98 & be<strong>for</strong>e : 9<br />
22 Out <strong>of</strong> sanctioned works in 98-99 : 1<br />
23 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : --<br />
MRGC<br />
24 Out <strong>of</strong> sanctioned works in 97-98 & be<strong>for</strong>e : 0<br />
25 Out <strong>of</strong> sanctioned works in 98-99 : 6<br />
26 Out <strong>of</strong> sanctioned works <strong>of</strong> current year : --<br />
NO. OF WORKS NOT STARTED :<br />
RGC<br />
27 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : --<br />
28 Out <strong>of</strong> sanctioned <strong>of</strong> current year : --<br />
29 No. <strong>of</strong> Incomplete & closed works : --<br />
MRGC<br />
30 Out <strong>of</strong> Incomplete works <strong>of</strong> previous years : --<br />
31 Out <strong>of</strong> sanctioned <strong>of</strong> current year : --<br />
32 No. <strong>of</strong> Incomplete & closed works : --<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003
izi= & d<br />
dk;kZy; ftyk dyDVj@eq[; dk;Zdkjh vf/kdkjh] ftyk ifj"kn] tks/kiqj<br />
ek-loksZPp U;k;ky; fjV fiVh'ku ¼flfoy½ u- 196 o"kZ 2001 esa fnukad 08-05-02 dks fn;s<br />
x;s vkns'kksa dh vogsyuk ckcr izkIr f'kdk;rksa dk ekfld izfrosnu<br />
ftyk % tks/kiqj ekg % vxLr 2002<br />
xr ekg rd izkIr dqy f'kdk;rksa dh la[;k 0<br />
izfrosnu ekg esa izkIr f'kdk;rksa dh la[;k 0<br />
dqy 0<br />
xr ekg rd fuLrkfjr f'kdk;rksa dh la[;k 0<br />
izfrosnu ekg esa fuLrkfjr f'kdk;rksa dh la[;k 0<br />
dqy 0<br />
'ks"k yfEcr f'kdk;rksa dh la[;k 0<br />
vfrfjDr dyDVj ¼fodkl½<br />
tks/kiqj<br />
2002-2003
DESERT DEVELOPMENT PROGRAMME (WATERSHED) PROGRESS AT A GLANCE<br />
DISTRICT : JODHPUR<br />
Format-2(1)<br />
Month : Aug.'2002<br />
S.N<br />
o.<br />
<strong>District</strong><br />
Total<br />
Cost<br />
Total<br />
Amount<br />
Recd.<br />
Balance<br />
as on<br />
01.04.02<br />
Amount<br />
Recd. duing<br />
02-03<br />
Total<br />
Exp. upto<br />
the month<br />
Percentage<br />
Exp.<br />
Scheme<br />
Allot.<br />
Forest S & C PRI Other Total<br />
(Rs. in Lacs/ Works in Nos.)<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21<br />
Scheme<br />
Sanction<br />
No. <strong>of</strong> PIA<br />
DPR<br />
Approved<br />
1 DDP-I Phase 2425 2425 54.39 0 54.39 2.98 5.48 97 122 55 54 0 11 120 120 0 120 0<br />
DPR<br />
under<br />
Prog.<br />
Scheme<br />
Comp.<br />
Scheme<br />
under<br />
Prog.<br />
Remarks<br />
2 DDP-II Phase 625 281.23 80.16 31.25 111.41 58.99 52.95 25 25 0 19 5 1 25 22 3 0 25<br />
3 DDP-III Phase 780 116.99 64.5 0 64.5 10.32 16.00 26 26 0 10 16 0 26 15 11 0 26<br />
4 DDP-IV Phase 690 103.51 103.51 0 103.51 0 0.00 23 23 0 0 23 0 23 0 0 0 23<br />
Total<br />
4520 2926.7 302.56 31.25 333.81 72.29 21.66 171 196 55 83 44 12 194 157 14 120 74<br />
2002-2003 com1
DESERT DEVELOPMENT PROGRAMME (COMBATIFICATION) PROGRESS<br />
DISTRICT : JODHPUR<br />
Month : Aug.'2002<br />
S.N<br />
o.<br />
<strong>District</strong><br />
Total<br />
Cost<br />
Amount<br />
Recd.<br />
Balance<br />
as on<br />
01.04.02<br />
Amount<br />
Recd. duing<br />
02-03<br />
Total<br />
Exp. upto<br />
the month<br />
Percentage<br />
Exp.<br />
Scheme<br />
allotment<br />
Forest GP Other<br />
Format-2(2)<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17<br />
1 DDP-I Phase 1838 832.49 91.5 0 91.5 69.98 76.48 1 1 1 0 0 0 1<br />
Sanctioned<br />
Agency<br />
(Rs. in Lacs/ Works in Nos.)<br />
Schem Schem<br />
e e under Remarks<br />
Comp. Prog.<br />
2 DDP-II Phase 720 108 50.3 0 50.3 56.47 112.27 1 1 1 0 0 0 1<br />
3 DDP-III Phase 960 144 144 0 144 0 0.00 0 0 0 0 0 0 0<br />
Total<br />
3518 1084.5 285.8 0 285.8 126.45 44.24 2 2 2 0 0 0 2<br />
2002-2003 com1
ftyk % tks/kiqj<br />
ekg % vxLr'2002<br />
dz-l- ;kstuk dk uke<br />
f<strong>of</strong>HkUu jkstxkj mUeq[kh ,oa vU; fodkl ;kstukvksa dh izxfr<br />
1-4-02 dks<br />
'ks"k jkf'k<br />
02&03 esa<br />
izkIr jkf'k<br />
;ksx<br />
O;;<br />
izfr'kr<br />
O;;<br />
1-4-02 dks<br />
'ks"k dk;Z<br />
02&03 esa u;s<br />
Loh- dk;Z<br />
dqy dk;Z iw.kZ dk;Z<br />
izi=&1<br />
¼:Ik;s yk[kksa esa@dk;Z la[;k esa½<br />
izxfr ij<br />
dk;Z<br />
dk;Z izkjEHk<br />
ugha<br />
fujLr<br />
fo-fo-<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15<br />
1 ,l-th-vkj-okbZ- 0.97 269.45 270.42 170.12 62.91 45 838 883 97 553 227 6<br />
2 ,e-ih-,y-,-Mh- 117.9 300 417.9 158.19 37.85 144 54 198 27 171 0 0<br />
3 ,e-,y-,-,y-,-Mh 487.1 0 487.1 160.01 32.85 132 153 285 74 196 0 15<br />
4 bZ-,-,l ¼okVj'kSM½ 6.77 0 6.77 1.5 22.16 20 0 20 0 20 0 0<br />
5 vkbz-,-okbZ- 2.43 87.86 90.29 25.98 28.77 49 502 551 50 286 215 0<br />
6 vkbZ-,-okbZ- ¼vi½ 1.23 23.2 24.43 6.6 27.02 21 237 258 21 154 83 0<br />
7 ih-th-,e-okbZ ¼vkokl½ 1.37 18.2 19.57 10.96 56.00 149 89 238 110 98 27 3<br />
8 ih-th-,e-okbZ ¼vixzs½ 0.5 5.2 5.7 3.02 52.98 77 41 118 48 52 16 2<br />
9 ih-,e-th-okbZ ¼bUQzk½ 2.4 2.6 5 0 0.00 5 0 5 2 3 0 0<br />
10 ch-,-Mh-ih- 0 0 0 0 #DIV/0! 0 0 0 0 0 0 0<br />
2556 429 1533 568 26<br />
2002-2003 com2
ftyk % tks/kiqj<br />
ekg % vxLr '2002<br />
dz-l-<br />
;kstuk dk uke<br />
1-4-02 dks<br />
'ks"k<br />
02&03 esa<br />
izkIr jkf'k<br />
O;fDrxr ykHkkfUor ;kstuk<br />
;ksx<br />
O;;<br />
izfr'kr<br />
O;;<br />
izi=&3<br />
¼:Ik;s yk[kksa esa@dk;Z la[;k esa½<br />
<strong>for</strong>j.k ¼:Ik;s yk[kksa esa½<br />
ykHkkfUor<br />
vuqnku _.k ;ksx<br />
1 2 3 4 5 6 7 8 9 10 11 12 13 14<br />
1 ,l-th-,l-okbZ- -111.90 71.40 -40.50 14.06 -34.72 232 Lacs 544 0 75 12.440 5.940 18.380<br />
y{;<br />
vkosnu Ik=<br />
Hksts<br />
Lohd`r@<br />
izf'k{k.kkFk<br />
hZ<br />
2 Vh-,-Mh-,- ¼VkMk½ 0.00 0.00 0.00 0.00 #DIV/0! 0 0 0 0 0.000 0.000 0.000<br />
3 ,e-,-Mh-, ¼ekMk½ 21.37 0.00 21.37 0.100 0.47 196 0 0 4 0.100 0.000 0.100<br />
4 ck;ksxSl ¼fjok;oy½ 0.94 4.20 5.14 0.80 15.56 25 0 0 0 0.000 0.000 0.000<br />
5 vkj-,l-lh-Mh-lh-<br />
¼jk-vuq-tkfr fodkl<br />
;kstuk,a½<br />
13.40 44.71 58.11 33.20 57.13 3268 2445 366 366 33.200 62.690 95.890<br />
2002-2003 com2
ftyk % tks/kiqj<br />
ekg % Aug.'2002<br />
izi=&6<br />
tks/kiqj lEHkkx esa f<strong>of</strong>HkUu ;kstukUrxZr xsgwa vkoaVu mBko dh lwpuk<br />
¼eSfVªd Vu esa½ ykHkkfUor ifjokj ¼la[;k½<br />
dz-l- ftyk fo'ks"k fooj.k<br />
vkoaVu mBko <strong>for</strong>j.k y{; izkfIr;ka<br />
1 2 3 4 5 6 7 8<br />
1 dke ds cnys vukt ;kstuk 2478 2478 2478 0 0<br />
2 vRU;ksn; vUu ;kstuk 242 254 254 6902 6902<br />
3 vUuiw.kkZ ;kstuk 152.01 152.01 152.01 5067 5067<br />
4 ch-ih-,y- ifjokj 1202 1395 1395 42722 42722<br />
7@02 ls 12<br />
,e-Vh- cdk;k<br />
mBko 'kkfey gS<br />
kk fd'r 7@02<br />
ls 9@02 rd<br />
7@02 dk<br />
cdk;k 193 ,e-<br />
Vh- 'kkfey gS<br />
5 ,-ih-,y-ifjokj 11097 313 313 0 0<br />
6 jk"Vªh; iks"kkgkj ;kstuk 8665.44 8665.44 8665.44 8665.44 0<br />
;ksx<br />
23836.45 13257.45 13257.45 63356.44 54691<br />
2002-2003 com3
vYi cpr ,oa lkekftd lqj{kk ;kstuk;sa<br />
tks/kiqj lEHkkx<br />
ftyk % tks/kiqj<br />
ekg % Aug.'2002<br />
izi=&4<br />
dz-l- ;kstuk bdkbZ y{; izkfIr;ka izfr'kr<br />
1 2 3 4 5 6<br />
1 vYi cpr dk;Zdze yk[k :Ik;s 23100 5051.91 21.87<br />
2 Hkw[k.M vkoaVu la[;k 1000 301 30.1<br />
3 mUur pwYgk la[;k 0 0 0<br />
4<br />
1-jk"Vªh; o`)koLFkk isa'ku la[;k 0 12362 0<br />
2-jkT; o`)koLFkk isa'ku la[;k 0 1575 0<br />
3-fo/kok isa'ku la[;k 0 5923 0<br />
4-fodykax isa'ku la[;k 0 2406 0<br />
5 jk"Vªh; izlwfr ykHk la[;k 0 110 0<br />
6 jk"Vªh; ikfjokfjd lgk;rk la[;k 0 86 0<br />
7 ckfydk le`f) ;kstuk la[;k 0 83 0<br />
8 jk"Vªh; iks"kkgkj dk;Zdze ¼Nk=½ la[;k 0 0 0<br />
2002-2003 com3
ftyk% tks/kiqj<br />
ekg % Aug.'2002<br />
izi=&5<br />
lw=-la- ;kstuk bdkbZ okf"kZd y{; ekfld y{; miyfC/k;ka izfr'kr<br />
1 2 3 4 5 6 7<br />
01 ch ,l-th-vkj-okbZ yk[k<br />
01 lh ,l-,l-vkbZ-;wfuV la[;k<br />
05 , ljIyl Hkwfe vkoaVu ,dM<br />
07 , lqjf{kr is;ty O;oLFkk xzke la[;k<br />
08 Mh cPpksa dk Vhdkdj.k gtkjksa esa<br />
09 , ulcUnh gtkjksa esa<br />
09 ch vkbZ-;w-Mh- la[;k<br />
09 lh vkbZ-lh-Mh-,l- [k.M la[;k<br />
09 Mh vkaxuokMh la[;k<br />
11 , ,l-lh-ykHkkfUor ifjokj la[;k<br />
1 ch ,l-Vh-ykHkkfUor ifhjokj la[;k<br />
14 , vkokl Hkwfe vkoaVu la[;k<br />
14 ch fuekZ.k lgk;rk la[;k<br />
14 lh vkbZ-,-okbZ- la[;k<br />
14 ,Q vkb-,-okbZ- dzeksUur la[;k<br />
14 Mh bZ-MCY;w-,l-vkokl bdkbZ la[;k<br />
14 bZ ,y-vkbZ-th- vkokl la[;k<br />
15 dPph cLrh lq/kkj la[;k<br />
16 o`{kkjksi.k gSDVj<br />
16 , o`{kkjksi.k yk[kksa esa<br />
20 lw=h dk;Zdze<br />
tks/kiqj lEHkkx izxfr izfrosnu<br />
2002-2003 com3
18 mfpr ewY; dh nqdku la[;k<br />
19 , xkao dk fo/kqfrdj.k la[;k<br />
19 ch iEi lSV fo/kqfrdj.k la[;k<br />
19 lh bEizwOM pwYgk la[;k<br />
19 Mh ck;ksxSl IykaV la[;k<br />
2002-2003 com3
DISTRICT RURAL DEVELOPMENT AGENCY, JODHPUR<br />
<strong>District</strong> Level Summary <strong>Report</strong><br />
<strong>Monthly</strong> Per<strong>for</strong>mance <strong>Report</strong> on the SGRY (Ist Stream EAS)<br />
Year : 2001-2002 Disrtict : JODHPUR<br />
Month : Upto 20.09.02<br />
I. Summary Data (Upto the month)<br />
Total No. <strong>of</strong> works under taken : 414 (Nos.)<br />
Total No. <strong>of</strong> works completed (upto the month) : 25 (Nos.)<br />
Works under <strong>Progress</strong> (upto the month) : 346 (Nos.)<br />
Cumulative Expenditure (upto the month) : 117.31 (Lac Rs.)<br />
Employment Generation (Cum.upto the month) : 2.11 (Lac Mandays)<br />
II. Physical Per<strong>for</strong>mance<br />
Employment Generation Categorywise<br />
CATEGORIES<br />
(i) S.C. :<br />
(ii) S.T. :<br />
(iii) Other :<br />
(iv) Total :<br />
(v) Women :<br />
(vi) Landless :<br />
(vii) F.B.L. (Free Bonded Labourers) :<br />
Employment Generation<br />
During the<br />
Month<br />
0.263<br />
0.035<br />
1.215<br />
1.513<br />
0.248<br />
0.029<br />
--<br />
Cum. Upto<br />
the month<br />
0.560<br />
0.090<br />
1.460<br />
2.110<br />
0.496<br />
0.055<br />
--<br />
III. Financial Per<strong>for</strong>mance (Cumulative including the month under report)<br />
O.B. at<br />
the<br />
beginnin<br />
g <strong>of</strong> the**<br />
Releases as on date<br />
Centre State Total<br />
Other<br />
Receipt<br />
Total<br />
(1+4+5)<br />
On pending<br />
works <strong>of</strong> last<br />
Wage<br />
Non<br />
wage Wage<br />
On new works<br />
Cumulative Expenditure<br />
Non<br />
wage<br />
On<br />
maintenance<br />
Wag<br />
e<br />
Non<br />
wage<br />
Wage<br />
Total<br />
Non<br />
wage<br />
Total<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
8<br />
9<br />
10<br />
11<br />
12<br />
13<br />
14<br />
15<br />
0.00 104.79 34.93 139.72 0.00 139.72 13.980 10.20 72.01 21.12 0.00 0.00 85.99 31.32 117.310<br />
** Included Advance Ammount<br />
Addl. Collector (Dev.)<br />
DRDA, <strong>Jodhpur</strong><br />
2002-2003