01.02.2015 Views

front cover page to tender documents - tamil nadu - Priasoft Login ...

front cover page to tender documents - tamil nadu - Priasoft Login ...

front cover page to tender documents - tamil nadu - Priasoft Login ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a) Cement - Rs. ................per MT.<br />

b). Steel - Rs. ………………. Per MT.<br />

c). Emulsion - Rs. …………………per MT<br />

d). Bitumen - Rs. …………………per MT<br />

e). RCC Hume pipe - Rs. per each<br />

For the quantity of Cement, Steel, Packed Bitumen and Bitumen emulsion issued <strong>to</strong><br />

the contrac<strong>to</strong>r in excess of permissible limits (i.e.) more than 2½ % not yet returned<br />

by the contrac<strong>to</strong>r. Re<strong>cover</strong>y cost will be double the rate plus s<strong>to</strong>rage charges or<br />

market rate whichever is higher which the supply of bitumen is agreed <strong>to</strong> for bonfide<br />

use in the work.<br />

If the quantity of Cement, Steel, Packed bitumen and Bitumen emulsion issued is<br />

less by 2½ % of permissible quantity, the re<strong>cover</strong>y will be made for the quantity of<br />

Packed bitumen and Bitumen emulsion calculated as per the original requirement<br />

despite the quantity noted in the unstamped receipt. The contrac<strong>to</strong>rs’ rates shall be<br />

inclusive of all sales tax if any which he has <strong>to</strong> pay <strong>to</strong> Government.<br />

2. The quoted rate shall be inclusive of cost of steel, cement, Bitumen, Bitumen<br />

emulsion, RCC Hume pipes, conveyance handling and s<strong>to</strong>rage charges, watering,<br />

barricading, lighting, watching safety arrangements in the intensity of traffic etc.,<br />

and other requisites as contained in clause 103-04 of P.S. <strong>to</strong> S.S.R.B.<br />

3. The Department will not undertake supply of water if it for plain pre-stressed and<br />

RCC Works. It is the responsibilities of the contrac<strong>to</strong>r <strong>to</strong> get from approved source.<br />

Water shall confirm the specifications 108-12-212 and 1007.02 of SSRS. The rates<br />

quoted shall be inclusive of charges for procuring and transport of water <strong>to</strong> site<br />

whatsoever be the distance<br />

4. All the Provisions contained in clause 106 & 107 of P.S. <strong>to</strong> SSRB in regard <strong>to</strong><br />

quality of materials and control of work shall be applicable and enforced.<br />

5.1 The contrac<strong>to</strong>r shall be responsible <strong>to</strong> make good and remedy at his own cost<br />

any defect which may develop or may be noticed and intimation of which has been<br />

sent <strong>to</strong> the contrac<strong>to</strong>r by a letter sent by hand delivery or by registered post before<br />

the expiry of a period of 60 (Sixty) months (herein after referred <strong>to</strong> as defects<br />

liability period) from the completion of whole of the work, for major works like<br />

formation of road including metalling and black <strong>to</strong>pping.<br />

Bidder Signature with Seal 19

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!