front cover page to tender documents - tamil nadu - Priasoft Login ...
front cover page to tender documents - tamil nadu - Priasoft Login ...
front cover page to tender documents - tamil nadu - Priasoft Login ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
a. The contrac<strong>to</strong>r shall set up his own labora<strong>to</strong>ry at location (s) approved<br />
by the Engineer. The labora<strong>to</strong>ry with sufficient stand byes suitable <strong>to</strong><br />
carry out the tests prescribed for different materials and work according<br />
<strong>to</strong> the specifications. The Engineer shall be approved the list of<br />
equipment <strong>to</strong> be provided. The equipment should be maintained in a<br />
workable condition <strong>to</strong> the satisfaction of the Engineer.<br />
b. Sampling and testing procedure shall be in accordance with the<br />
relevant standards of BIS (Previously called (ISI) of IRC. Frequency of<br />
testing shall be as laid down in the Ministry’s specifications for Roads<br />
and Bridge work III rd Revision). In the absence of relevant Indian<br />
Standard, sampling and testing procedures shall be as approved by the<br />
Engineer.<br />
c. The labora<strong>to</strong>ry should be manned by a qualified materials Engineer and<br />
assisted by materials Inspec<strong>to</strong>rs/Technicians, and the Engineer should<br />
be approved the set-up.<br />
d. The contrac<strong>to</strong>r should prepare printed proforma for recording readings<br />
and results of each type of test, after getting the formats of the<br />
performance approved from the Engineer. He should keep a daily<br />
record of all the tests conducted by him. Two copies of the tests results<br />
should be submitted <strong>to</strong> the Engineer for his examinations and approval<br />
of which one copy will be returned <strong>to</strong> the contrac<strong>to</strong>r for being kept at<br />
site of work.<br />
e. The materials Engineer of the contrac<strong>to</strong>r should keep close liaison with<br />
the quality control unit of the Engineer and kept the latter informed of<br />
the sampling and testing Programme so that the Engineer’s<br />
representative could be present during this activity, if considered<br />
necessary.<br />
22.2 The Engineer shall check the Contrac<strong>to</strong>r's work and notify the Contrac<strong>to</strong>r of any<br />
Defects that are found. Such checking shall not affect the Contrac<strong>to</strong>r's<br />
responsibilities. The Engineer may instruct the Contrac<strong>to</strong>r <strong>to</strong> search for a Defect and<br />
<strong>to</strong> un<strong>cover</strong> and test any work that the Engineer considers may have a Defect.<br />
Tests<br />
The contrac<strong>to</strong>r shall be solely responsible for:<br />
a. Carrying out the manda<strong>to</strong>ry tests prescribed in the Rural Roads<br />
Manual, and<br />
b. For the correctness of the test results, whether preformed in his<br />
labora<strong>to</strong>ry or elsewhere.<br />
22.3 If the Engineer instructs the Contrac<strong>to</strong>r <strong>to</strong> carry out a test not specified in the<br />
Specification / Rural Roads Manual <strong>to</strong> check whether any work has a Defect<br />
and the test shows that it does, the Contrac<strong>to</strong>r shall pay for the test and any<br />
samples.<br />
Bidder Signature with Seal 27