01.02.2015 Views

front cover page to tender documents - tamil nadu - Priasoft Login ...

front cover page to tender documents - tamil nadu - Priasoft Login ...

front cover page to tender documents - tamil nadu - Priasoft Login ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

a. The contrac<strong>to</strong>r shall set up his own labora<strong>to</strong>ry at location (s) approved<br />

by the Engineer. The labora<strong>to</strong>ry with sufficient stand byes suitable <strong>to</strong><br />

carry out the tests prescribed for different materials and work according<br />

<strong>to</strong> the specifications. The Engineer shall be approved the list of<br />

equipment <strong>to</strong> be provided. The equipment should be maintained in a<br />

workable condition <strong>to</strong> the satisfaction of the Engineer.<br />

b. Sampling and testing procedure shall be in accordance with the<br />

relevant standards of BIS (Previously called (ISI) of IRC. Frequency of<br />

testing shall be as laid down in the Ministry’s specifications for Roads<br />

and Bridge work III rd Revision). In the absence of relevant Indian<br />

Standard, sampling and testing procedures shall be as approved by the<br />

Engineer.<br />

c. The labora<strong>to</strong>ry should be manned by a qualified materials Engineer and<br />

assisted by materials Inspec<strong>to</strong>rs/Technicians, and the Engineer should<br />

be approved the set-up.<br />

d. The contrac<strong>to</strong>r should prepare printed proforma for recording readings<br />

and results of each type of test, after getting the formats of the<br />

performance approved from the Engineer. He should keep a daily<br />

record of all the tests conducted by him. Two copies of the tests results<br />

should be submitted <strong>to</strong> the Engineer for his examinations and approval<br />

of which one copy will be returned <strong>to</strong> the contrac<strong>to</strong>r for being kept at<br />

site of work.<br />

e. The materials Engineer of the contrac<strong>to</strong>r should keep close liaison with<br />

the quality control unit of the Engineer and kept the latter informed of<br />

the sampling and testing Programme so that the Engineer’s<br />

representative could be present during this activity, if considered<br />

necessary.<br />

22.2 The Engineer shall check the Contrac<strong>to</strong>r's work and notify the Contrac<strong>to</strong>r of any<br />

Defects that are found. Such checking shall not affect the Contrac<strong>to</strong>r's<br />

responsibilities. The Engineer may instruct the Contrac<strong>to</strong>r <strong>to</strong> search for a Defect and<br />

<strong>to</strong> un<strong>cover</strong> and test any work that the Engineer considers may have a Defect.<br />

Tests<br />

The contrac<strong>to</strong>r shall be solely responsible for:<br />

a. Carrying out the manda<strong>to</strong>ry tests prescribed in the Rural Roads<br />

Manual, and<br />

b. For the correctness of the test results, whether preformed in his<br />

labora<strong>to</strong>ry or elsewhere.<br />

22.3 If the Engineer instructs the Contrac<strong>to</strong>r <strong>to</strong> carry out a test not specified in the<br />

Specification / Rural Roads Manual <strong>to</strong> check whether any work has a Defect<br />

and the test shows that it does, the Contrac<strong>to</strong>r shall pay for the test and any<br />

samples.<br />

Bidder Signature with Seal 27

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!