A ABOITIZ POWER CORPORATION Glossary of Terms ...
A ABOITIZ POWER CORPORATION Glossary of Terms ...
A ABOITIZ POWER CORPORATION Glossary of Terms ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
K<br />
KA<br />
A<br />
Kiloampere<br />
<strong>ABOITIZ</strong> <strong>POWER</strong> <strong>CORPORATION</strong><br />
<strong>Glossary</strong> <strong>of</strong> <strong>Terms</strong>, Abbreviations and Acronyms<br />
kV<br />
kVARh<br />
kW<br />
kWh<br />
Kilovolt, or one thousand volts<br />
Kilovolt-Ampere Reactive-hour<br />
Kilowatt, or one thousand watts<br />
Kilowatt-hour<br />
L<br />
LHC<br />
LRMC<br />
Load<br />
Load Factor<br />
Loss <strong>of</strong> Load Probability<br />
or LOLP<br />
Low Voltage or LV<br />
LTI<br />
LWAP<br />
Luzon Hydro Corporation<br />
Long Run Marginal Cost<br />
An entity or an electrical equipment that consumes electrical energy<br />
The ratio <strong>of</strong> the total energy delivered during a given period to the product <strong>of</strong> the maximum demand and the number <strong>of</strong> hours<br />
during the same period<br />
The expected number <strong>of</strong> days in a specified period in which the daily peak demand will exceed the available generating capacity<br />
A voltage level not exceeding 1000 volts<br />
Lost Time Incident<br />
Load Weighted Average Price<br />
M<br />
Magat Plant<br />
Manual<br />
Manual Load Dropping<br />
or MLD<br />
MAP<br />
MCM<br />
MEPZ I<br />
MEPZ II<br />
Metering Equipment<br />
MEZ<br />
Momentary Average<br />
Interruption Frequency<br />
Index or MAIFI<br />
MOPS<br />
Multiple Outage<br />
Contingency<br />
MV<br />
MVA<br />
MVAR<br />
MVARh<br />
MW<br />
MWh<br />
The 360 MW Magat Hydroelectric Power Plant <strong>of</strong> SNAP - Magat located at the border <strong>of</strong> Isabela and Ifugao provinces<br />
Manual <strong>of</strong> Corporate Governance<br />
The process <strong>of</strong> manually and deliberately removing pre-selected loads from a power system, in response to an abnormal condition,<br />
and in order to maintain the integrity <strong>of</strong> the system<br />
Maximum Average Price<br />
Under PBR, refers to million cubic meters<br />
Mactan Export Processing Zone I<br />
Mactan Export Processing Zone II<br />
The apparatus necessary for measuring electrical, real and reactive power and energy, inclusive <strong>of</strong> a multi-function meter and the<br />
necessary instrument, potential, current and phase shifting transformers and all wiring and communication devices as provided<br />
Mactan Enerzone Corporation<br />
The total number <strong>of</strong> momentary customer power interruptions within a given period divided by the total number <strong>of</strong> customers<br />
served within the same period<br />
Mean <strong>of</strong> Platts Singapore<br />
An event caused by the failure <strong>of</strong> two or more components <strong>of</strong> the grid including generating units, transmission lines, and<br />
transformers<br />
Medium Voltage<br />
Megavolt-Ampere<br />
Megavolt-Ampere Reactive<br />
Megavolt-Ampere Reactive-hour<br />
Megawatt, or one million watts<br />
Megawatt-hour