06.02.2015 Views

How to Smoothly and Successfully Complete the Process for IRB ...

How to Smoothly and Successfully Complete the Process for IRB ...

How to Smoothly and Successfully Complete the Process for IRB ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>IRB</strong> Presentation<br />

What if my Study Changes<br />

• Alterations, even minor, must be sent <strong>to</strong> <strong>IRB</strong>, called<br />

“Amendment” (a modification <strong>to</strong> an approved project)<br />

• Sometimes shows up with Continuing Reviews; take care of<br />

this be<strong>for</strong>eh<strong>and</strong> so your study is not interrupted<br />

• Remember that <strong>the</strong> application is a signed document<br />

specifying very specific procedures <strong>and</strong> details<br />

• Examples:<br />

– Number of subjects<br />

– Criteria <strong>for</strong> participant recruitment (even labels)<br />

– Adding new data collection sites<br />

– Altering an instrument (e.g., add items <strong>to</strong> a survey)<br />

– Staff person leaves project or new person is hired<br />

Dept. of Communication<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!