13.02.2015 Views

Conservation Plan Hughes Creek Landscape Zone - Strathbogie ...

Conservation Plan Hughes Creek Landscape Zone - Strathbogie ...

Conservation Plan Hughes Creek Landscape Zone - Strathbogie ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

All Key<br />

Biodiversity sites<br />

Trends in vegetation condition (resurvey the 100 sites using VQA assessments)<br />

(this includes threats data)<br />

Trends in bird survey data (resurvey the 100 sites using bird survey method)<br />

Vegetation Quality Assessments, bird surveys and photographic point surveys at<br />

the remaining unsurveyed BAP sites<br />

Inclusion and surveying of up to date data and information (if any changes), or<br />

addition of sites (eg. if not already an identified site)<br />

Trends in Focal Species reporting/sightings (eg. population size, age distribution,<br />

frequency of records, number of birds/pairs recorded, habitat (eg number of<br />

sites/EVC), breeding success, recruitment)<br />

Monitoring of threatened species, against current records<br />

Undertake surveys for all of listed (threatened) species to establish baseline data<br />

on abundance and distribution in accordance with VROTPop procedures<br />

Subsequent assessments of selected populations (as per above threatened<br />

populations) to determine population trends<br />

Trends in connectivity and characteristics of sites within landscape (eg. size of<br />

remnants)<br />

Overlay of on-ground works areas against this plans mapping data to determine<br />

the number of incentives processed and implemented for priority sites for all Key<br />

Biodiversity Assets (private land only)<br />

Trends in plants of special concern (eg. undertake monitoring of River Swamp<br />

Wallaby-grass in the zone to further determine management requirements)<br />

Every 5 years - 30 sites<br />

Every 5 years 30 sites<br />

Within next 5 years, to allow monitoring of<br />

these sites (as outlined above)<br />

Once yearly, all new information;; all sites<br />

Initial survey throughout zone to establish<br />

baseline data on population size and structure,<br />

subsequent two-yearly as part of bioregional<br />

program: across the zone<br />

Every 2 years: across the zone<br />

Within next 5 years: across the zone<br />

Within next 5 years (subsequent to above<br />

action): across the zone<br />

Every 5 years;; aerial photography<br />

Once yearly, in accordance with incentive<br />

mapping and overlaying of on-ground works<br />

areas (as per above action)<br />

Once;; then as required<br />

51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!