Section 1 Executive Summary - Town of Yucca Valley
Section 1 Executive Summary - Town of Yucca Valley
Section 1 Executive Summary - Town of Yucca Valley
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1. <strong>Executive</strong> <strong>Summary</strong><br />
Environmental Impact<br />
5.15 UTILITIES AND SERVICE SYSTEMS<br />
Table ES-3<br />
<strong>Summary</strong> <strong>of</strong> Environmental Impacts, Mitigation Measures and Levels <strong>of</strong> Significance After Mitigation<br />
Level <strong>of</strong> Significance<br />
Before Mitigation<br />
Mitigation Measures<br />
Level <strong>of</strong> Significance<br />
After Mitigation<br />
5.15-1: Projected water supplies are Less than significant No mitigation is required. Less than significant<br />
adequate to accommodate water<br />
demand for the town <strong>of</strong> yucca valley at<br />
general plan buildout.<br />
5.15-2: The High Desert Water District Less than significant No mitigation is required. Less than significant<br />
would need to expand existing<br />
wastewater treatment and water<br />
reclamation systems to serve the <strong>Town</strong> <strong>of</strong><br />
<strong>Yucca</strong> <strong>Valley</strong> at general plan buildout.<br />
5.15-3: Development pursuant to the Less than significant No mitigation is required. Less than significant<br />
proposed general plan update would<br />
increase surface water flows into<br />
drainage systems within the affected<br />
watersheds as a result <strong>of</strong> an increase in<br />
impervious surfaces in the town.<br />
However, the <strong>Town</strong>’s Master Plan <strong>of</strong><br />
Drainage would accommodate<br />
anticipated stormwater flows within the<br />
<strong>Town</strong> <strong>of</strong> <strong>Yucca</strong> <strong>Valley</strong>.<br />
5.15-4: Existing and/or proposed Less than significant No mitigation is required. Less than significant<br />
facilities would be able to accommodate<br />
project-generated solid waste and<br />
comply with related solid waste<br />
regulations.<br />
5.15-5: Existing and/or proposed<br />
facilities would be able to accommodate<br />
project-generated utility demands.<br />
Less than significant No mitigation is required. Less than significant<br />
<strong>Yucca</strong> <strong>Valley</strong> General Plan Update Draft EIR <strong>Town</strong> <strong>of</strong> <strong>Yucca</strong> <strong>Valley</strong> • Page 1-47