16.02.2015 Views

Gemini 9 Press Kit - heroicrelics Mirror

Gemini 9 Press Kit - heroicrelics Mirror

Gemini 9 Press Kit - heroicrelics Mirror

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CTCMTNT 3A CRTM TRA’TNTNG<br />

(For oricinal trainin[: ccc Comirii. 3 press kit)<br />

After the pxtponement of the <strong>Gemini</strong> 3 mission thc crcw rctwncd<br />

to the Manned Spacecraft Center. on thc followin[; day. ‘l’hcy rcmuincd<br />

in Houston until May 23, participating in f‘light plnnniny; meetings<br />

and other briefings in prepsration €or the sccorid attempt to launch<br />

<strong>Gemini</strong> 9. During this period thcy received a three hour briel’iriL;<br />

on the ATDA from McDonncll Aircraft Co. and <strong>Gemini</strong> Program Ol’l’ice Personnel.<br />

They also performed another walk-through of the EVA procedures<br />

using the Crew Procedurcs Trainer in Duilding //5.<br />

Upon returning ‘to Cape Kennedy, the crcw exmined thc RTDR on l’ad<br />

14 and received two more brie€ings or1 its systems and functions. Thoy<br />

began simulations in the <strong>Gemini</strong> Mission Simulator at the Cape to specifically<br />

practice the new type of second re-rendezvous (lunar abort) which<br />

was required when the passive ATDA was substituted for thc Agena.<br />

They also performed another walk through of the EVA procedures and<br />

attended flight readiness review and. other briefings lcading up to Llic<br />

flight.<br />

The back-up crew participated in the launch simulation conciuctccl<br />

on May 26 and assisted the prime crew in training during the turn around<br />

period .<br />

At T-2 days, the crew received another physical as a prelude to the<br />

beginning of countdown activities.<br />

-17-

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!