Gemini 9 Press Kit - heroicrelics Mirror
Gemini 9 Press Kit - heroicrelics Mirror
Gemini 9 Press Kit - heroicrelics Mirror
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CTCMTNT 3A CRTM TRA’TNTNG<br />
(For oricinal trainin[: ccc Comirii. 3 press kit)<br />
After the pxtponement of the <strong>Gemini</strong> 3 mission thc crcw rctwncd<br />
to the Manned Spacecraft Center. on thc followin[; day. ‘l’hcy rcmuincd<br />
in Houston until May 23, participating in f‘light plnnniny; meetings<br />
and other briefings in prepsration €or the sccorid attempt to launch<br />
<strong>Gemini</strong> 9. During this period thcy received a three hour briel’iriL;<br />
on the ATDA from McDonncll Aircraft Co. and <strong>Gemini</strong> Program Ol’l’ice Personnel.<br />
They also performed another walk-through of the EVA procedures<br />
using the Crew Procedurcs Trainer in Duilding //5.<br />
Upon returning ‘to Cape Kennedy, the crcw exmined thc RTDR on l’ad<br />
14 and received two more brie€ings or1 its systems and functions. Thoy<br />
began simulations in the <strong>Gemini</strong> Mission Simulator at the Cape to specifically<br />
practice the new type of second re-rendezvous (lunar abort) which<br />
was required when the passive ATDA was substituted for thc Agena.<br />
They also performed another walk through of the EVA procedures and<br />
attended flight readiness review and. other briefings lcading up to Llic<br />
flight.<br />
The back-up crew participated in the launch simulation conciuctccl<br />
on May 26 and assisted the prime crew in training during the turn around<br />
period .<br />
At T-2 days, the crew received another physical as a prelude to the<br />
beginning of countdown activities.<br />
-17-