Mining in the Philippines - Concerns and Conflicts
Mining in the Philippines - Concerns and Conflicts
Mining in the Philippines - Concerns and Conflicts
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Endnotes<br />
1<br />
Asia <strong>and</strong> <strong>the</strong> Pacific Philipp<strong>in</strong>es Progress Towards Environmental Susta<strong>in</strong>ability MDG 7 UNDP p198 see<br />
http://www.undp.org/energy<strong>and</strong>environment/susta<strong>in</strong>abledifference/PDFs/Asia/Philipp<strong>in</strong>es.com.pdf<br />
2 Tail<strong>in</strong>gs are <strong>the</strong> residue of <strong>the</strong> mill<strong>in</strong>g process that is used to extract metals of <strong>in</strong>terest from m<strong>in</strong>ed ores. Most of <strong>the</strong> mill<br />
tail<strong>in</strong>gs mass produced worldwide is dumped <strong>in</strong> large surface impoundments which are know as "tail<strong>in</strong>gs dams". Due to a<br />
comb<strong>in</strong>ation of <strong>the</strong> geo-hazards <strong>in</strong> <strong>the</strong> Philipp<strong>in</strong>es <strong>and</strong> a lack of adequate assessment <strong>and</strong> cont<strong>in</strong>uous monitor<strong>in</strong>g <strong>and</strong> control<br />
of <strong>the</strong> dams, dur<strong>in</strong>g <strong>the</strong> construction or operations phases, <strong>the</strong>re have been a number of complete or partial failures which<br />
have had disastrous consequences for local people <strong>and</strong> <strong>the</strong> environment. See Chronology of Tail<strong>in</strong>gs Dam Failures <strong>in</strong> <strong>the</strong><br />
Philipp<strong>in</strong>es (1982-2002), compiled by Philipp<strong>in</strong>e Indigenous Peoples L<strong>in</strong>ks http://www.pipl<strong>in</strong>ks.org 29 October 2003. On<br />
file with fact f<strong>in</strong>d<strong>in</strong>g team. The <strong>in</strong>formation is based on <strong>the</strong> records of <strong>the</strong> United Nations Environment Programme<br />
(UNEP), (www.unep.org) <strong>and</strong> o<strong>the</strong>r sources.<br />
3 M<strong>in</strong>es <strong>and</strong> GeoSciences Bureau, An Overview of M<strong>in</strong>erals Potential <strong>and</strong> Opportunity <strong>in</strong> <strong>the</strong> Philipp<strong>in</strong>es, Slide 5, available<br />
at http://clients.westm<strong>in</strong>ster-digital.co.uk/m<strong>in</strong>esite/microsite/events/philipp<strong>in</strong>es/<strong>in</strong>dex.aspx.<br />
4 As of October 2005 <strong>the</strong> Chamber of M<strong>in</strong>es <strong>and</strong> <strong>the</strong> government had held <strong>in</strong>vestment promotion road shows <strong>in</strong> 12<br />
countries. BizNews Asia 5-12 October 2005, p12.<br />
5 Department of Environment <strong>and</strong> Natural Resources (DENR), Summary of <strong>the</strong> Status of Implementation of <strong>the</strong> Philipp<strong>in</strong>es<br />
<strong>M<strong>in</strong><strong>in</strong>g</strong> Act of 1995 (Republic Act No 7942), p2. As of June 2006 <strong>the</strong>re were 1,953 applications. Until June 2006 <strong>the</strong> total<br />
number of major m<strong>in</strong><strong>in</strong>g tenements under <strong>the</strong> <strong>M<strong>in</strong><strong>in</strong>g</strong> Act was 250.<br />
6 Proposed constitutional changes <strong>in</strong>clude a transition from <strong>the</strong> present presidential bi-cameral system to a parliamentary<br />
form of government <strong>and</strong> additional measures, <strong>in</strong>clud<strong>in</strong>g some <strong>in</strong>tended to facilitate <strong>in</strong>creased foreign <strong>in</strong>vestment.<br />
7 DENR, Philipp<strong>in</strong>e Biodiversity Conservation Priorities: National Biodiversity Strategy <strong>and</strong> Action Plan, Executive<br />
Summary, Quezon City, Philipp<strong>in</strong>es, 2002.<br />
8 Haribon Foundation presentation, ‘Status of Philipp<strong>in</strong>e Biodiversity’ Slides 86 <strong>and</strong> 92.<br />
9 Legal Rights <strong>and</strong> Natural Resources Center – Kasama Sa Kalikasan/Friends of <strong>the</strong> Earth Philipp<strong>in</strong>es (LRC-KsK/FoE-Phil)<br />
presentation, ‘<strong>M<strong>in</strong><strong>in</strong>g</strong> Situation’, Slide 22, presented to <strong>the</strong> fact-f<strong>in</strong>d<strong>in</strong>g team on 27 July, at a meet<strong>in</strong>g with NGOs <strong>and</strong><br />
Indigenous Peoples’ Organizations, Malate Parish Hall, Manila. The <strong>in</strong>formation quoted from Natural Disaster Hotspots –<br />
A Global Risk Analysis 2005, World Bank <strong>and</strong> Columbia University see<br />
http://www.earth.columbia.edu/news/2005/story03-29-05.html See also The Manila Observatory, Mapp<strong>in</strong>g Philipp<strong>in</strong>e<br />
Vulnerability to Environmental Disasters at www.observatory.ph/vm/hazard.html.<br />
10 The practice is effectively illegal <strong>in</strong> Canada <strong>and</strong> <strong>the</strong> United States. See Submar<strong>in</strong>e Tail<strong>in</strong>gs Disposal Toolkit<br />
‘Introduction: <strong>M<strong>in</strong><strong>in</strong>g</strong>’s Problem with Waste’, p1, available at www.m<strong>in</strong><strong>in</strong>gwatch.ca/<strong>in</strong>dex.php?/Crew/STD_toolkit.<br />
Published jo<strong>in</strong>tly by <strong>M<strong>in</strong><strong>in</strong>g</strong>Watch Canada <strong>and</strong> Project Underground, June 2002.<br />
The European Parliament, <strong>in</strong> response to <strong>the</strong> Extractive Industry Review, called on its member states ‘to br<strong>in</strong>g <strong>the</strong>ir<br />
<strong>in</strong>fluence to bear to m<strong>in</strong>imize its support for <strong>the</strong> use of toxic materials such as cyanide <strong>and</strong> mercury <strong>and</strong> to support a<br />
moratorium on submar<strong>in</strong>e tail<strong>in</strong>g disposal.’ European Parliament Resolution on World Bank-commissioned Extractive<br />
Industry Review (EIR)2004, available at<br />
http://www.environmentaldefense.org/documents/3637_EPF<strong>in</strong>alResOnEIR.pdf#search=%22european%20parliament%20re<br />
solution%20extractive%20<strong>in</strong>dustry%20review%22.<br />
11 The EIR noted that ‘The large economic rents generated by extractive <strong>in</strong>dustries may help provoke or prolong civil<br />
conflict. Indigenous peoples are particularly vulnerable’ (p6). The review recommended that one of <strong>the</strong> ‘core macrogovernance’<br />
criteria <strong>in</strong> relation to m<strong>in</strong><strong>in</strong>g should be ‘<strong>the</strong> absence of conflict or of a high risk of conflict’ <strong>and</strong> that <strong>in</strong> no<br />
circumstance should <strong>the</strong> Bank support m<strong>in</strong><strong>in</strong>g projects <strong>in</strong> areas <strong>in</strong>volved <strong>in</strong> armed conflict (p46).<br />
12 Placer Dome, <strong>the</strong> Canadian company, were holders of a 40 per cent stake <strong>in</strong> <strong>the</strong> Marcopper operations, <strong>and</strong> were <strong>the</strong> only<br />
m<strong>in</strong><strong>in</strong>g company <strong>in</strong>volved <strong>in</strong> <strong>the</strong> m<strong>in</strong>e. After <strong>the</strong> spill, Marcopper closed <strong>and</strong> Placer Dome subsequently withdrew. The<br />
prov<strong>in</strong>cial authorities <strong>in</strong> Mar<strong>in</strong>duque are currently pursu<strong>in</strong>g a case aga<strong>in</strong>st Placer Dome <strong>in</strong> <strong>the</strong> US courts to try to ga<strong>in</strong> some<br />
redress. The result was <strong>the</strong> loss of livelihoods for <strong>the</strong> local Mar<strong>in</strong>duque population <strong>and</strong> huge economic loss for <strong>the</strong><br />
Philipp<strong>in</strong>es. See http://www.umich.edu/~snre492/Jones/marcopper.htm University of Michigan Environmental Justice,<br />
Case Study Marcopper <strong>in</strong> <strong>the</strong> Philipp<strong>in</strong>es. See also <strong>the</strong> UNEP report F<strong>in</strong>al Report of <strong>the</strong> United Nations Expert Assessment<br />
Mission Mar<strong>in</strong>duque Isl<strong>and</strong>, Philipp<strong>in</strong>es 30 September, 1996 pp65, 69, which declared <strong>the</strong> river biologically dead.<br />
13 “President Gloria Macapagal Arroyo’s Adm<strong>in</strong>istrative Order No. 145, created <strong>the</strong> Rapu-Rapu fact-f<strong>in</strong>d<strong>in</strong>g commission.<br />
See F<strong>in</strong>d<strong>in</strong>gs <strong>and</strong> Recommendations of <strong>the</strong> Fact-F<strong>in</strong>d<strong>in</strong>g Commission on <strong>the</strong> <strong>M<strong>in</strong><strong>in</strong>g</strong> Operations <strong>in</strong> Rapu-Rapu Isl<strong>and</strong> May<br />
19 th 2006 Executive Summary p12, p24. The company Lafayette Philipp<strong>in</strong>es Inc is 100% owned by Lafayette <strong>M<strong>in</strong><strong>in</strong>g</strong><br />
Limited of Australia”<br />
The commission received submissions from Lafayette see http://www.greenpeace.org/seasia/en/targets/lafayette for more<br />
details. The full report is available at<br />
http://www.agham.org/<strong>in</strong>dex.php?option=com_docman&task=cat_view&gid=40&Itemid=33<br />
The Department of Environment <strong>and</strong> Natural Resources own report also accused <strong>the</strong> company of negligence ‘The ma<strong>in</strong><br />
cause of <strong>the</strong> two <strong>in</strong>cidents can largely be attributed to <strong>the</strong> negligence <strong>and</strong> un-preparedness of <strong>the</strong> company to<br />
address such emergencies.’ DENR Assessment of <strong>the</strong> Rapu-Rapu Polymetallic Project P35 available at<br />
http://www.greenpeace.org/raw/content/seasia/en/press/reports/denr-assessment-of-<strong>the</strong>-rapu-ra.pdf.<br />
55