Smartmatic - Elections How to Manage A Complex Project
Smartmatic - Elections How to Manage A Complex Project
Smartmatic - Elections How to Manage A Complex Project
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Audits<br />
Source<br />
Code<br />
Pre-Roll<br />
Out<br />
Post-<br />
Elec<strong>to</strong>ral<br />
Consists in checking,<br />
<strong>to</strong>gether with the<br />
cus<strong>to</strong>mer and the<br />
political entities<br />
involved the source<br />
codes of: The voting<br />
machine, the tally<br />
application and the<br />
Infrastructure of the<br />
tally national center.<br />
Consist on taking a<br />
sample of the<br />
equipment<br />
produced in the<br />
warehouse <strong>to</strong> certify<br />
that the equipment<br />
and platform has the<br />
required<br />
configuration<br />
Consist on taking a<br />
sample of the<br />
equipment after the<br />
Final event <strong>to</strong><br />
confirm the integrity<br />
of the system that<br />
was used during the<br />
elections